SENATE BILL REPORT

SB 6482

This analysis was prepared by non-partisan legislative staff for the use of legislative members in their deliberations. This analysis is not a part of the legislation nor does it constitute a statement of legislative intent.

As Reported by Senate Committee On:

Commerce & Labor, February 3, 2016

Title: An act relating to construction bonds and liens.

Brief Description: Concerning contractor bonds and mechanics' and materialmen's liens.

Sponsors: Senators Hewitt, Keiser, Fraser, Conway, Angel, Hasegawa, King, Bailey, Brown, Dansel, Schoesler, Warnick, Honeyford and Sheldon.

Brief History:

Committee Activity: Commerce & Labor: 1/27/16, 2/03/16 [DPS].

SENATE COMMITTEE ON COMMERCE & LABOR

Majority Report: That Substitute Senate Bill No. 6482 be substituted therefor, and the substitute bill do pass.

Signed by Senators Baumgartner, Chair; Braun, Vice Chair; Hasegawa, Ranking Minority Member; Conway, Keiser, King and Warnick.

Staff: Susan Jones (786-7404)

Background: Mechanics' and Materialmen's Liens. Any person furnishing labor, professional services, materials, or equipment for the improvement of real property generally has a lien upon the improvement for the contract price of labor, professional services, materials, or equipment furnished at the instance of the owner, or the agent or construction agent of the owner. There are exceptions.

Notice of Right to Claim a Lien for Mechanics' and Materialmen's Liens. The person furnishing the services, materials, or equipment must give the owner notice in writing of the right to claim a lien. The notice may be given at any time but only protects the right to claim a lien after the date which is 60 days before:

In the case of new construction of a single-family residence, the notice of a right to claim a lien may be given at any time but only protects the right to claim a lien after a date which is 10 days before the notice is given.

Notices of a right to claim a lien are not be required of:

Persons who furnish professional services, materials, or equipment in connection with the repair, alteration, or remodel of an existing owner-occupied single-family residence or appurtenant garage who:

The notice of right to claim a lien must include the information provided in statute.

Summary of Bill (Recommended Substitute): Lien Limited to Actual Costs. The amount of the lien for persons furnishing labor, professional services, materials, or equipment for the improvement of real property is limited to the actual costs to the person furnishing labor, professional services, materials, or equipment.

Notice Prior to Filing a Claim of Lien. Before filing a claim of lien, any person furnishing labor, professional services, materials, or equipment, who is required to give notice of the right to claim a lien, must give written notice to the owner and to the contractor when such payment is 30 days late.

EFFECT OF CHANGES MADE BY COMMERCE & LABOR COMMITTEE (Recommended Substitute): Does not increase the contractor bonds; changes the notification of late payment to require that, before filing a claim of lien, the person claiming a lien must give written notice to the owner and to the contactor when the payment is 30 days late; and changes the title.

Appropriation: None.

Fiscal Note: Not requested.

Committee/Commission/Task Force Created: No.

Effective Date: Ninety days after adjournment of session in which bill is passed.

Staff Summary of Public Testimony on Original Bill: PRO: This comes from an actual situation in Walla Walla. Under current law, if you hire a contractor to remodel your home, you end up with a secondary lien with the building supply company. If the consumer pays the contractor but the contractor does not pay the building supply company, the building supply company has the right to come back and sue the consumer. The consumer can end up paying twice for a remodel of a home or a home-build. This bill is trying to weed out the bad guys and make sure the consumer is protected. This is a good consumer protection bill. The best part of the bill is the last part where the building supply company has to notify the consumer that the contractor has not paid the bill. This is a complicated area to try to make sure everyone is paid. There may be an issue with raising the bond limit too high and creating an underground economy.

CON: There is understanding of the problem but the solution needs additional work. This can be as a result of a bad builder or a bad consumer as a result of nonpayment. If the consumer is late in paying, that can cause late payment by the contractor to the vendor. Increasing the bonds does not solve the problem and drives more people to the underground economy.

OTHER: Page 5, line 23 needs some changes. You don’t want to change the lien from the contract price. Also, the "actual costs" needs clarification and also the lien should be on the "contract price". With respect to providing information to the property owner, most systems do not track five years so that would be very difficult. Most of the time when a consumer calls, the supplier provides references verbally with respect to the contractors' credit. The bill asks the supplier to lose their profit. The suppliers do send out the preliminary notices.

Persons Testifying on Original Bill: PRO: Senator Mike Hewitt, prime sponsor.

CON: Bill Stauffacher, Building Industry Association of Washington.

OTHER: Larry Stevens, Mechanical Contractors, and Electrical Contractors MCA/NECA; Jon Flora, National Association of Credit Managers; Paulyne VanderSloot, Mutual Materials; Shoni Tiede, Stoneway Concrete.