Washington Clean Energy Transformation Act.
Under the Washington Clean Energy Transformation Act (CETA), electric utilities must:
By January 1, 2024, and at least every four years thereafter, the Department of Commerce must submit a report to the Legislature that includes the following:
If the report indicates adverse system reliability impacts from implementation of the Greenhouse Gas Neutral Standard or Clean Energy Standard, then the Governor may suspend or delay implementation of the Greenhouse Gas Neutral Standard or Clean Energy Standard until system reliability impacts can be addressed.
Energy Resource Plans.
Each electric utility is required to develop a resource plan that includes at least 10-year estimates of electricity loads and resources to meet those loads, among numerous other requirements that are specific to the type of utility. Investor-owned utilities and consumer-owned utilities with 25,000 or more customers that are not fully served by the Bonneville Power Administration (BPA) must develop Integrated Resource Plans. Utilities with fewer than 25,000 customers, or that are fully served BPA customers, must either file an Integrated Resource Plan or complete a less-detailed resource plan. All resource plans must be updated at least every two years.
Resource Adequacy Stakeholder Meetings.
The Department of Commerce and the Utilities and Transportation Commission are required to jointly convene a stakeholder meeting, at least annually through 2024, to discuss the adequacy of the state's energy resources for meeting electric needs and to address steps utilities can take to coordinate planning in light of changes to the northwest power system. The meeting must include representatives of the investor-owned utilities, consumer-owned utilities, regional planning organizations, transmission operators, and other stakeholders. The first resource adequacy meeting was held on May 11, 2021.
Widespread Power Outage Events.
When demand for electricity exceeds available supply, a widespread electrical power outage event may occur, which is often referred to as a blackout. During an event of this nature, utilities may temporarily shut off power to parts of the electric grid on a rolling basis, which is often referred to as a rolling blackout.
Resource Adequacy Stakeholder Meetings.
In 2022, the resource adequacy stakeholder meeting must specifically:
The requirement that the Department of Commerce and the Utilities and Transportation Commission jointly convene annual resource adequacy stakeholder meetings is extended through 2029, instead of through 2024.