SECOND SPECIAL LEGISLATIVE SESSION

___________________________________________________________________________________________

 

SIXTEENTH DAY

___________________________________________________________________________________________

 

House Chamber, Olympia, Tuesday, June 19, 2001

 

             The House was called to order at 10:00 a.m. by Speaker Chopp. The Clerk called the roll and a quorum was present.

 

             The flag was escorted to the rostrum by a Sergeant at Arms Color Guard, Pages Steve Elam and Tim Sekerak. Prayer was offered by Speaker Clyde Ballard. The House held a moment of silence in tribute to Jeremy Chandler, son of Representative Gary Chandler, who unexpectedly died the day before.

 

             Reading of the Journal of the previous day was dispensed with and it was ordered to stand approved.

 

INTRODUCTIONS AND FIRST READING

 

ESSB 5237       by Senate Committee on Ways & Means (originally sponsored by Senators Rasmussen, Swecker, Sheahan, Honeyford, West, Fraser, Kastama, Regala, Hewitt, Hale, Parlette, Morton, Hochstatter and Franklin)

 

              AN ACT Relating to the fair fund; and amending RCW 15.76.115.

 

2ESB 5686       by Senators Eide, Rasmussen, Kohl-Welles, McAuliffe and Carlson; by request of Governor Locke

 

              AN ACT Relating to changing academic assessments timelines; and amending RCW 28A.655.060.

 

ESSB 5937       by Senate Committee on Ways & Means (originally sponsored by Senators Shin, Rasmussen, Jacobsen, Winsley, Kohl-Welles and McAuliffe; by request of Governor Locke and Superintendent of Public Instruction)

 

              AN ACT Relating to postretirement employment for teachers' retirement system, public employees' retirement system, and school employees' retirement system retirees; amending RCW 28A.405.900, 41.32.570, 41.40.037, 41.32.802, 41.32.860, 41.32.862, 41.35.060, 41.40.037, and 41.40.750; adding a new section to chapter 41.40 RCW; creating new sections; providing effective dates; providing expiration dates; and declaring an emergency.

 

ESB 5990         by Senators Fairley, Spanel, B. Sheldon and Zarelli; by request of Office of Financial Management

 

              AN ACT Relating to state general obligation bonds and related accounts; amending RCW 39.42.060; adding a new chapter to Title 43 RCW; and declaring an emergency.

 

SSB 6155          by Senate Committee on Ways & Means (originally sponsored by Senator Brown)

 

              AN ACT Relating to the capital budget; making appropriations and authorizing expenditures for capital improvements; creating new sections; and declaring an emergency.

 

             There being no objection, Engrossed Substitute Senate Bill No. 5237 was read the first time in full, the rules were suspended and the bill were placed on the Second Reading calendar.

 

             There being no objection, Second Engrossed Senate Bill No. 5686 the rules were suspended and the bill were placed on the Second Reading calendar.

 

             There being no objection, Engrossed Substitute Senate Bill No. 5937 was read the first time in full, the rules were suspended and the bill were placed on the Second Reading calendar.

 

             There being no objection, Engrossed Senate Bill No. 5990 was read the first time in full, the rules were suspended and the bill were placed on the Second Reading calendar.

 

             There being no objection, Substitute Senate Bill No. 6155 was read the first time in full, the rules were suspended and the bill were placed on the Second Reading calendar.

 

             Speaker Chopp called upon Representative Ogden to preside.

 

SECOND READING

 

             SECOND ENGROSSED SENATE BILL NO. 5686, By Senators Eide, Rasmussen, Kohl-Welles, McAuliffe and Carlson; by request of Governor Locke

 

             Changing academic assessments timelines.

 

             The bill was read the second time.

 

             There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.

 

             Representatives Schual-Berke, Talcott and Santos spoke in favor of passage of the bill.

 

             Representative Benson spoke against passage of the bill.

 

             The Speaker (Representative Ogden presiding) stated the question before the House to be the final passage of Second Engrossed Senate Bill No. 5686.

 

MOTIONS

 

             On motion of Representative Santos, Representatives Kessler and Quall were excused. On motion of Representative Schoesler, Representatives Ahern, Boldt, B. Chandler, G. Chandler, Haigh, Mielke, Mitchell, Pennington, Schindler and Schmidt were excused.

 

ROLL CALL

 

             The Clerk called the roll on the final passage of Second Engrossed Senate Bill No. 5686 and the bill passed the House by the following vote: Yeas - 79, Nays - 7, Absent - 0, Excused - 12.

             Voting yea: Representatives Anderson, Armstrong, Ballasiotes, Barlean, Berkey, Buck, Bush, Cairnes, Campbell, Carrell, Casada, Cody, Conway, Cooper, Cox, Darneille, Delvin, Dickerson, Doumit, Dunshee, Edmonds, Edwards, Eickmeyer, Ericksen, Esser, Fisher, Fromhold, Gombosky, Grant, Hankins, Hatfield, Hunt, Hurst, Jackley, Jarrett, Kagi, Keiser, Kenney, Kirby, Lambert, Lantz, Linville, Lisk, Lovick, Marine, Mastin, McDermott, McIntire, McMorris, Miloscia, Morell, Morris, Murray, O'Brien, Ogden, Pearson, Pflug, Poulsen, Reardon, Roach, Rockefeller, Romero, Ruderman, Santos, Schoesler, Schual-Berke, Sehlin, Simpson, Skinner, Sommers, Sump, Talcott, Tokuda, Van Luven, Veloria, Wood, Woods, Speaker Ballard, and Speaker Chopp - 79.

             Voting nay: Representatives Alexander, Benson, Clements, Crouse, DeBolt, Dunn, and Mulliken - 7.

             Excused: Representatives Ahern, Boldt, B. Chandler, G. Chandler, Haigh, Kessler, Mielke, Mitchell, Pennington, Quall, Schindler and Schmidt - 12.

 

             Second Engrossed Senate Bill No. 5686, having received the necessary constitutional majority, was declared passed.

 

             ENGROSSED SUBSTITUTE SENATE BILL NO. 5937, By Senate Committee on Ways & Means (originally sponsored by Senators Shin, Rasmussen, Jacobsen, Winsley, Kohl-Welles and McAuliffe; by request of Governor Locke and Superintendent of Public Instruction)

 

             Changing the limits on postretirement employment for teachers' retirement system plan 1 and public employees' retirement system plan 1 retirees. (REVISED FOR ENGROSSED: Changing postretirement employment restrictions for teachers' retirement system, public employees' retirement system, and school employees' retirement system retirees.)

 

             The bill was read the second time.

 

             Representative Alexander moved the adoption of the following amendment 382 :

 

             Strike everything after the enacting clause and insert the following:

 

             "NEW SECTION. Sec. 1. (1) The department of retirement systems, the office of the superintendent of public instruction, the department of personnel, and the health care authority shall jointly develop publications for use during the 2001-03 biennium to explain options for, and implications of, postretirement employment for members and retirees of the teachers' retirement system plan 1 and the public employees' retirement system plan 1.

             (2) The publications shall address such issues as: (a) Health insurance coverage upon reemployment; (b) health benefit options upon termination of postretirement employment; (c) sick leave, annual leave, and other compensation practices; (d) options for, and implications of, reentry into active retirement system membership; (e) hiring procedures for retirees; and (f) collective bargaining rights and responsibilities.

 

             Sec. 2. RCW 28A.405.900 and 1990 c 33 s 404 are each amended to read as follows:

             Certificated employees subject to the provisions of RCW 28A.310.250, 28A.405.010 through 28A.405.240, 28A.405.400 through 28A.405.410, 28A.415.250, and 28A.405.900 shall not include those certificated employees hired to replace certificated employees who have been granted sabbatical, regular, or other leave by school districts, and shall not include retirees hired for postretirement employment under the provisions of this act.

             It is not the intention of the legislature that this section apply to any regularly hired certificated employee or that the legal or constitutional rights of such employee be limited, abridged, or abrogated.

 

             Sec. 3. RCW 41.32.570 and 1999 c 387 s 1 are each amended to read as follows:

             (1)(a) If a retiree enters employment with an employer sooner than one calendar month after his or her accrual date, the retiree's monthly retirement allowance will be reduced by five and one-half percent for every seven hours worked during that month. This reduction will be applied each month until the retiree remains absent from employment with an employer for one full calendar month.

             (b) The benefit reduction provided in (a) of this subsection will accrue for a maximum of one hundred forty hours per month. Any monthly benefit reduction over one hundred percent will be applied to the benefit the retiree is eligible to receive in subsequent months.

             (2) Any retired teacher or retired administrator who enters service in any public educational institution in Washington state and who has satisfied the break in employment requirement of subsection (1) of this section shall cease to receive pension payments while engaged in such service((: PROVIDED, That service may be rendered up to five hundred twenty-five hours per school year without reduction of pension.

             (3) In addition to the five hundred twenty-five hours of service permitted under subsection (2) of this section, a retired teacher or retired administrator may also serve only as a substitute teacher for up to an additional three hundred fifteen hours per school year without reduction of pension if:

             (a) A school district, which is not a member of a multidistrict substitute cooperative, determines that it has exhausted or can reasonably anticipate that it will exhaust its list of qualified and available substitutes and the school board of the district adopts a resolution to make its substitute teachers who are retired teachers or retired administrators eligible for the extended service once the list of qualified and available substitutes has been exhausted. The resolution by the school district shall state that the services of retired teachers and retired administrators are necessary to address the shortage of qualified and available substitutes. The resolution shall be valid only for the school year in which it is adopted. The district shall forward a copy of the resolution with a list of retired teachers and retired administrators who have been employed as substitute teachers to the department and may notify the retired teachers and retired administrators included on the list of their right to take advantage of the provisions of this subsection; or

             (b) A multidistrict substitute cooperative determines that the school districts have exhausted or can reasonably anticipate that they will exhaust their list of qualified and available substitutes and each of the school boards adopts a resolution to make their substitute teachers who are retired teachers or retired administrators eligible for the extended service once the list of qualified and available substitutes has been exhausted. The resolutions by each of the school districts shall state that the services of retired teachers and retired administrators are necessary to address the shortage of qualified and available substitutes. The resolutions shall be valid only for the school year in which they are adopted. The cooperative shall forward a copy of the resolutions with a list of retired teachers and retired administrators who have been employed as substitute teachers to the department and may notify the retired teachers and retired administrators included on the list of their right to take advantage of the provisions of this subsection.

             (4) In addition to the five hundred twenty-five hours of service permitted under subsection (2) of this section, a retired administrator or retired teacher may also serve as a substitute administrator up to an additional one hundred five hours per school year without reduction of pension if a school district board of directors adopts a resolution declaring that the services of a retired administrator or retired teacher are necessary because it cannot find a replacement administrator to fill a vacancy. The resolution shall be valid only for the school year in which it is adopted. The district shall forward a copy of the resolution with the name of the retired administrator or retired teacher who has been employed as a substitute administrator to the department.

             (5) In addition to the five hundred twenty-five hours of service permitted under subsection (2) of this section and the one hundred five hours permitted under subsection (4) of this section, a retired principal may also serve as a substitute principal up to an additional two hundred ten hours per school year without a reduction of pension if a school district board of directors adopts a resolution declaring that the services of a retired principal are necessary because it cannot find a replacement principal to fill a vacancy. The resolution shall be valid only for the school year in which it is adopted. The district shall forward a copy of the resolution with the name of the retired principal who has been employed as a substitute principal to the department.

             (6) Subsection (2) of this section shall apply to all persons governed by the provisions of plan 1, regardless of the date of their retirement, but shall apply only to benefits payable after June 11, 1986.

             (7) Subsection (3) of this section shall apply to all persons governed by the provisions of plan 1, regardless of the date of their retirement, but shall only apply to benefits payable after September 1, 1994)), after the retiree has rendered service for more than one thousand five hundred hours in a school year. When a retired teacher or administrator renders service beyond eight hundred sixty-seven hours, the department shall collect from the employer the applicable employer retirement contributions for the entire duration of the member's employment during that fiscal year.

             (3) The department shall collect and provide the state actuary with information relevant to the use of this section for the joint committee on pension policy.

             (4) The legislature reserves the right to amend or repeal this section in the future and no member or beneficiary has a contractual right to be employed for more than five hundred twenty-five hours per year without a reduction of his or her pension.

 

             Sec. 4. RCW 41.40.037 and 1997 c 254 s 14 are each amended to read as follows:

             (1)(a) If a retiree enters employment with an employer sooner than one calendar month after his or her accrual date, the retiree's monthly retirement allowance will be reduced by five and one-half percent for every eight hours worked during that month. This reduction will be applied each month until the retiree remains absent from employment with an employer for one full calendar month.

             (b) The benefit reduction provided in (a) of this subsection will accrue for a maximum of one hundred sixty hours per month. Any benefit reduction over one hundred percent will be applied to the benefit the retiree is eligible to receive in subsequent months.

             (2)(a) A retiree from plan 1 who has satisfied the break in employment requirement of subsection (1) of this section and who enters employment with an employer may continue to receive pension payments while engaged in such service for up to one thousand five hundred hours of service in a calendar year without a reduction of pension. When a plan 1 member renders service beyond eight hundred sixty-seven hours, the department shall collect from the employer the applicable employer retirement contributions for the entire duration of the member's employment during that fiscal year.

             (b) A retiree from plan 2 or plan 3 who has satisfied the break in employment requirement of subsection (1) of this section((,)) may work up to ((five months per)) eight hundred sixty-seven hours in a calendar year in an eligible position, as defined in RCW 41.32.010, 41.35.010, or 41.40.010, or as a fire fighter or law enforcement officer, as defined in RCW 41.26.030, without suspension of his or her benefit.

             (3) If the retiree opts to reestablish membership under RCW 41.40.023(12), he or she terminates his or her retirement status and becomes a member. Retirement benefits shall not accrue during the period of membership and the individual shall make contributions and receive membership credit. Such a member shall have the right to again retire if eligible in accordance with RCW 41.40.180. However, if the right to retire is exercised to become effective before the member has rendered two uninterrupted years of service, the retirement formula and survivor options the member had at the time of the member's previous retirement shall be reinstated.

             (4) The department shall collect and provide the state actuary with information relevant to the use of this section for the joint committee on pension policy.

             (5) The legislature reserves the right to amend or repeal this section in the future and no member or beneficiary has a contractual right to be employed for more than five months in a calendar year without a reduction of his or her pension.

 

             NEW SECTION. Sec. 5. Sections 2 and 3 of this act expire June 30, 2004.

 

             NEW SECTION. Sec. 6. Section 4 of this act expires December 31, 2004.

 

             NEW SECTION. Sec. 7. The office of the state actuary shall review the actuarial impact of the temporary expansion of the postretirement employment limitations provided by sections 3 and 4 of this act. No later than July 1, 2003, the state actuary shall prepare a report for the joint committee on pension policy regarding the fiscal and policy impacts of this act. The joint committee shall solicit information from the superintendent of public instruction, the department of personnel, the office of financial management, the department of retirement systems, and the health care authority regarding the program impacts of this act and shall report to the legislative fiscal committees no later than October 1, 2003, on any proposed changes or improvements to this act. If the state actuary determines the expansion of postretirement options under sections 3 and 4 of this act has resulted in increased costs for the state retirement funds, the joint committee report shall include a proposal for a process to charge those employers who employ retirees pursuant to an extension of sections 3 and 4 of this act for the costs incurred by the retirement funds under the extension.

 

             Sec. 8. RCW 41.32.802 and 1997 c 254 s 8 are each amended to read as follows:

             (1)(a) If a retiree enters employment with an employer sooner than one calendar month after his or her accrual date, the retiree's monthly retirement allowance will be reduced by five and one-half percent for every seven hours worked during that month. This reduction will be applied each month until the retiree remains absent from employment with an employer for one full calendar month.

             (b) The benefit reduction provided in (a) of this subsection will accrue for a maximum of one hundred forty hours per month. Any benefit reduction over one hundred percent will be applied to the benefit the retiree is eligible to receive in subsequent months.

             (2) A retiree who has satisfied the break in employment requirement of subsection (1) of this section, may work up to ((five months)) eight hundred sixty-seven hours per calendar year in an eligible position, as defined in RCW 41.32.010, 41.35.010, or 41.40.010, or as a fire fighter or law enforcement officer, as defined in RCW 41.26.030, without suspension of his or her benefit.

             (3) If the retiree opts to reestablish membership under RCW 41.32.044, he or she terminates his or her retirement status and immediately becomes a member. Retirement benefits shall not accrue during the period of membership and the individual shall make contributions and receive membership credit. Such a member shall have the right to again retire if eligible.

 

             Sec. 9. RCW 41.32.860 and 1997 c 254 s 7 are each amended to read as follows:

             (1) Except under RCW 41.32.862, no retiree shall be eligible to receive such retiree's monthly retirement allowance if he or she is employed in an eligible position as defined in RCW 41.40.010 ((or)), 41.32.010, or 41.35.010, or as a law enforcement officer or fire fighter as defined in RCW 41.26.030.

             (2) If a retiree's benefits have been suspended under this section, his or her benefits shall be reinstated when the retiree terminates the employment that caused the suspension of benefits. Upon reinstatement, the retiree's benefits shall be actuarially recomputed pursuant to the rules adopted by the department.

 

             Sec. 10. RCW 41.32.862 and 1997 c 254 s 9 are each amended to read as follows:

             (1)(a) If a retiree enters employment with an employer sooner than one calendar month after his or her accrual date, the retiree's monthly retirement allowance will be reduced by five and one-half percent for every seven hours worked during that month. This reduction will be applied each month until the retiree remains absent from employment with an employer for one full calendar month.

             (b) The benefit reduction provided in (a) of this subsection will accrue for a maximum of one hundred forty hours per month. Any benefit reduction over one hundred percent will be applied to the benefit the retiree is eligible to receive in subsequent months.

             (2) A retiree who has satisfied the break in employment requirement of subsection (1) of this section, may work up to ((five months)) eight hundred sixty-seven hours per calendar year in an eligible position, as defined in RCW 41.32.010, 41.35.010, or 41.40.010, or as a fire fighter or law enforcement officer, as defined in RCW 41.26.030, without suspension of his or her benefit.

             (3) If the retiree opts to reestablish membership under RCW 41.32.044, he or she terminates his or her retirement status and immediately becomes a member. Retirement benefits shall not accrue during the period of membership and the individual shall make contributions and receive membership credit. Such a member shall have the right to again retire if eligible.

 

             Sec. 11. RCW 41.35.060 and 1998 c 341 s 7 are each amended to read as follows:

             (1)(a) If a retiree enters employment with an employer sooner than one calendar month after his or her accrual date, the retiree's monthly retirement allowance will be reduced by five and one-half percent for every eight hours worked during that month. This reduction will be applied each month until the retiree remains absent from employment with an employer for one full calendar month.

             (b) The benefit reduction provided in (a) of this subsection will accrue for a maximum of one hundred sixty hours per month. Any benefit reduction over one hundred percent will be applied to the benefit the retiree is eligible to receive in subsequent months.

             (2) A retiree who has satisfied the break in employment requirement of subsection (1) of this section may work up to ((five months)) eight hundred sixty-seven hours per calendar year in an eligible position, as defined in RCW 41.32.010, 41.35.010, or 41.40.010, or as a fire fighter or law enforcement officer, as defined in RCW 41.26.030, without suspension of his or her benefit.

             (3) If the retiree opts to reestablish membership under RCW 41.35.030, he or she terminates his or her retirement status and becomes a member. Retirement benefits shall not accrue during the period of membership and the individual shall make contributions and receive membership credit. Such a member shall have the right to again retire if eligible in accordance with RCW 41.35.420 or 41.35.680. However, if the right to retire is exercised to become effective before the member has rendered two uninterrupted years of service, the retirement formula and survivor options the member had at the time of the member's previous retirement shall be reinstated.

 

             Sec. 12. RCW 41.40.037 and 1997 c 254 s 14 are each amended to read as follows:

             (1)(a) If a retiree enters employment with an employer sooner than one calendar month after his or her accrual date, the retiree's monthly retirement allowance will be reduced by five and one-half percent for every eight hours worked during that month. This reduction will be applied each month until the retiree remains absent from employment with an employer for one full calendar month.

             (b) The benefit reduction provided in (a) of this subsection will accrue for a maximum of one hundred sixty hours per month. Any benefit reduction over one hundred percent will be applied to the benefit the retiree is eligible to receive in subsequent months.

             (2) A retiree who has satisfied the break in employment requirement of subsection (1) of this section, may work up to ((five months)) eight hundred sixty-seven hours per calendar year in an eligible position, as defined in RCW 41.32.010, 41.35.010, or 41.40.010, or as a fire fighter or law enforcement officer, as defined in RCW 41.26.030, without suspension of his or her benefit.

             (3) If the retiree opts to reestablish membership under RCW 41.40.023(12), he or she terminates his or her retirement status and becomes a member. Retirement benefits shall not accrue during the period of membership and the individual shall make contributions and receive membership credit. Such a member shall have the right to again retire if eligible in accordance with RCW 41.40.180. However, if the right to retire is exercised to become effective before the member has rendered two uninterrupted years of service, the retirement formula and survivor options the member had at the time of the member's previous retirement shall be reinstated.

 

             Sec. 13. RCW 41.40.750 and 1998 c 341 s 113 are each amended to read as follows:

             (1) Effective September 1, 2000, the membership of all plan 2 members currently employed in eligible positions in a school district or educational service district and all plan 2 service credit for such members, is transferred to the Washington school employees' retirement system plan 2. Plan 2 members who have withdrawn their member contributions for prior plan 2 service may restore contributions and service credit to the Washington school employees' retirement system plan 2 as provided under RCW 41.40.740.

             (2)(a) The membership and previous service credit of a plan 2 member not employed in an eligible position on September 1, 2000, will be transferred to the Washington school employees' retirement system plan 2 when he or she becomes employed in an eligible position. Plan 2 members not employed in an eligible position on September 1, 2000, who have withdrawn their member contributions for prior plan 2 service may restore contributions and service credit to the Washington school employees' retirement system plan 2 as provided under RCW 41.40.740.

             (b) The membership and previous service credit of a plan 2 member last employed by a school district or educational service district and retired prior to September 1, 2000, will be transferred to the Washington school employees' retirement system plan 2 if the member opts to reestablish membership.

             (3) Members who restore contributions and service credit under subsection (1) or (2) of this section shall have their contributions and service credit transferred to the Washington school employees' retirement system.

 

             NEW SECTION. Sec. 14. Except for section 12 of this act which takes effect December 31, 2004, this act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect July 1, 2001."

 

             Correct the title.

 

             Representative Fromhold moved the adoption of the following amendment (386) to amendment (382):

 

             On page 5, line 5, after "employment during that" strike "fiscal" and insert "calendar"

 

             Representative Fromhold spoke in favor of the adoption of the amendment to the amendment.

 

             The amendment to the amendment was adopted.

 

             The question before the House was the adoption of amendment (382) as amended.

 

             Representatives Alexander, Fromhold and Talcott spoke in favor of adoption of the amendment as amended.

             The amendment as amended was adopted.

 

             There being no objection, the rules were suspended, the second reading considered the third and the bill as amended by the House was placed on final passage.

 

             Representatives Fromhold and Cox spoke in favor of passage of the bill.

 

             The Speaker (Representative Ogden presiding) stated the question before the House to be the final passage of Engrossed Substitute Senate Bill No. 5937 as amended by the House.

 

MOTION

 

             On motion of Representative Santos, Representative Hurst was excused.

 

ROLL CALL

 

             The Clerk called the roll on the final passage of Engrossed Substitute Senate Bill No. 5937 as amended by the House and the bill passed the House by the following vote: Yeas - 84, Nays - 1, Absent - 0, Excused - 13.

             Voting yea: Representatives Alexander, Anderson, Armstrong, Ballasiotes, Barlean, Benson, Berkey, Buck, Bush, Cairnes, Campbell, Carrell, Casada, Clements, Cody, Conway, Cooper, Cox, Crouse, Darneille, DeBolt, Delvin, Dickerson, Doumit, Dunshee, Edmonds, Edwards, Eickmeyer, Ericksen, Esser, Fisher, Fromhold, Gombosky, Grant, Hankins, Hatfield, Hunt, Jackley, Jarrett, Kagi, Keiser, Kenney, Kirby, Lambert, Lantz, Linville, Lisk, Lovick, Marine, Mastin, McDermott, McIntire, McMorris, Miloscia, Morell, Morris, Mulliken, Murray, O'Brien, Ogden, Pearson, Pflug, Poulsen, Reardon, Roach, Rockefeller, Romero, Ruderman, Santos, Schoesler, Schual-Berke, Sehlin, Simpson, Skinner, Sommers, Sump, Talcott, Tokuda, Van Luven, Veloria, Wood, Woods, Speaker Ballard, and Speaker Chopp - 84.

             Voting nay: Representative Dunn - 1.

             Excused: Representatives Ahern, Boldt, B. Chandler, G. Chandler, Haigh, Hurst, Kessler, Mielke, Mitchell, Pennington, Quall, Schindler and Schmidt - 13.

 

             Engrossed Substitute Senate Bill No. 5937 as amended by the House, having received the necessary constitutional majority, was declared passed.

 

             SUBSTITUTE SENATE BILL NO. 6155, By Senate Committee on Ways & Means (originally sponsored by Senator Brown)

 

             Making appropriations and authorizing expenditures for capital improvements.

 

             The bill was read the second time.

 

             Representative Alexander moved the adoption of the following amendment (384):

 

             Strike everything after the enacting clause and insert the following:

 

             "NEW SECTION. Sec. 1. A capital budget is hereby adopted and, subject to the provisions set forth in this act, the several dollar amounts hereinafter specified, or so much thereof as shall be sufficient to accomplish the purposes designated, are hereby appropriated and authorized to be incurred for capital projects during the period ending June 30, 2003, out of the several funds specified in this act.

 

PART 1

GENERAL GOVERNMENT

 

             NEW SECTION. Sec. 101. FOR THE OFFICE OF THE SECRETARY OF STATE

             Deferred Maintenance Reduction Backlog Projects: Regional Archive (02-1-002)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$415,000

                          TOTAL             . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $515,000

 

             NEW SECTION. Sec. 102. FOR THE OFFICE OF THE SECRETARY OF STATE

             Eastern Branch Archives–Design (98-2-001)

             The appropriation in this section is provided solely for the design of the eastern regional archives facility to be sited on the Eastern Washington University campus in Cheney. Construction of the facility will be financed through alternative financing authority provided in section 907 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $295,482

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$530,972

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL             . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $826,454

 

             NEW SECTION. Sec. 103. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Rural Washington Loan Fund (RWLF)(88-2-002)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $558,554

             Rural Washington Loan Account--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $441,000

                          Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $999,554

Appropriation:

             Rural Washington Loan Account--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,650,367

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,309,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$25,958,921

 

             NEW SECTION. Sec. 104. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Grays Harbor Dredging (88-2-006)

             The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $982,500

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  17,500

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000

 

             NEW SECTION. Sec. 105. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Snohomish County Drainage (92-2-011)

             The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $128,584

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  79,584

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$208,168

 

             NEW SECTION. Sec. 106. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Seventh Street Theatre (90-2-008)

             The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $  51,110

                          Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $  78,890

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$130,000

 

             NEW SECTION. Sec. 107. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Mirabeau Point Community Complex (98-2-010)

             The appropriations in this section are subject to the following conditions and limitations:

             (1) The amount is provided solely for a grant to Spokane county for design and development costs for Mirabeau Point community complex.

             (2) The amount represents the entire state contribution to the project and shall be matched by $8,500,000 in contributions toward the project from nonstate sources.

             (3) The reappropriation is subject to the conditions and limitations of section 906(2)(b) of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $351,255

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,148,745

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,500,000

 

             NEW SECTION. Sec. 108. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Sand Point Shoreline Restoration (00-1-002)

             The reappropriation in this section is provided to the city of Seattle for shoreline improvements and wetland restoration at Sand Point. The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$500,000

 

             NEW SECTION. Sec. 109. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Building for the Arts (00-2-005)

             The appropriations in this section are subject to the following conditions and limitations:

             (1) $750,000 of the reappropriation in this section shall support the projects as listed in section 113, chapter 379, Laws of 1999.

             (2) $250,000 of the reappropriation in this section and the new appropriation from the state building construction account is subject to the provisions of RCW 43.63A.750.

             (3) The following projects are eligible for funding:

Projects                                                                                                                                 Recommendation

Orcas Theatre, Eastsound                                                                                                                  $400,000

Empty Space Theatre, Fremont                                                                                                           $29,000

Music Works Northwest, Bellevue                                                                                                   $475,000

Hands on Children's Museum, Olympia                                                                                            $130,000

Spokane Symphony, Spokane                                                                                                           $230,000

Mt. Baker Theatre, Bellingham                                                                                                         $128,000

IKEA Performing Arts Center, Renton                                                                                             $135,000

Seattle Art Museum, Seattle                                                                                                           $1,000,000

Town Hall, Seattle                                                                                                                             $175,000

Gladish Center, Pullman                                                                                                                      $29,000

Broadway Center, Tacoma                                                                                                                  $50,000

CREATE, Newport                                                                                                                             $21,000

Spectrum Dance Theatre, Seattle                                                                                                        $78,000

Gallery One, Ellensburg                                                                                                                    $225,000

Lake Chelan Bachfest, Chelan                                                                                                            $38,000

Historic Seattle Preservation, Seattle                                                                                                 $390,000

Historic Everett Theatre, Everett                                                                                                       $350,000

Holy Names Music Center, Spokane                                                                                                  $50,000

Youth Theatre Northwest, Mercer Island                                                                                            $67,000

Arts West, Seattle                                                                                                                                $87,000

Harrington Opera House, Harrington                                                                                                  $13,000

             Subtotal                                                                                                                             $4,100,000

Alternate Projects

Youth Theatre Northwest, Mercer Island                                                                                          $158,000

             Subtotal                                                                                                                                $158,000

                          Total                                                                                                                     $4,258,000

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,850,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$30,848,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$51,698,000

 

             NEW SECTION. Sec. 110. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Community Services Facilities Program (00-02-006)

             The reappropriation in this section shall support the projects as listed in section 1007, chapter 1, Laws of 2000 2nd sp. sess.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,400,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,253,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,653,000

 

             NEW SECTION. Sec. 111. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Community Services Facilities Program (02-4-007)

             The appropriation in this section is subject to the following conditions and limitations:

             (1) The appropriation in this section is subject to the provisions of RCW 43.63A.125. The following projects are eligible for funding:

Projects                                                                                                                                 Recommendation

YMCA of Grays Harbor, Aberdeen                                                                                                  $300,000

Community Youth Services, Olympia                                                                                              $300,000

Skagit County Community Action, Concrete                                                                                    $300,000

Kindering Center, Bellevue                                                                                                               $300,000

Bellevue Family YMCA, Bellevue                                                                                                   $300,000

Refugee Women's Alliance, Seattle                                                                                                  $300,000

YWCA of Walla Walla, Walla Walla                                                                                               $300,000

Pierce County Alliance (facility), Tacoma                                                                                          $61,000

Compass Health, Everett                                                                                                                   $300,000

Mid-City Concerns, Spokane                                                                                                              $28,000

Children's Home Society, Vaughn                                                                                                      $70,000

Children's Home society, Spokane                                                                                                    $238,000

Catholic Family/Child Services, Yakima                                                                                          $152,000

Korean Women's Association, Tacoma                                                                                             $218,000

Factory Small Biz Incubator, Tacoma                                                                                               $300,000

Lao Highland Association of King County, Seattle                                                                          $119,000

First Place, Seattle                                                                                                                             $300,000

NE Washington Rural Resources, Colville                                                                                       $300,000

Filipino Community Center, Seattle                                                                                                  $200,000

Filipino Community Center, Wapato                                                                                                  $25,000

             Subtotal                                                                                                                             $4,411,000

Alternate Projects

Nooksack Community Aid Society, Deming                                                                                    $165,000

Childhaven, Seattle                                                                                                                            $149,000

             Subtotal                                                                                                                                $314,000

                          Total                                                                                                                     $4,725,000

             (2) $200,000 of the appropriation in this section for the Filipino Community Center in Seattle shall be matched by $200,000 in additional contributions toward the project from local government.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,411,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,411,000

 

             NEW SECTION. Sec. 112. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Housing for Homeless Families With Children Program (00-2-009)

             The reappropriation in this section is provided solely for the development of emergency shelters and transitional housing opportunities for homeless families with children. The department shall minimize the amount of funds that are utilized for staff and administrative purposes.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,500,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,000,000

 

             NEW SECTION. Sec. 113. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Housing for Homeless Families with Children Program (02-4-012)

             The appropriation in this section is provided solely for the development of emergency shelters and transitional housing opportunities for homeless families with children. The department shall minimize the amount of funds that are utilized for staff and administrative purposes.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$25,000,000

 

             NEW SECTION. Sec. 114. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Farmworker Housing Assistance (00-2-011)

             The reappropriation in this section is subject to the following conditions and limitations:

             (1) The reappropriation is provided solely for facilities housing low-income migrant, seasonal, and temporary farmworkers.

             (2) It is the intent of the legislature that operation of the facilities built under this section be in compliance with 8 U.S.C. Sec. 1342.

             (3) The department shall minimize the amount of these funds that are utilized for staff and administrative purposes or for other administrative purposes.

             (4) By December 15, 2001, the department shall submit a report to the governor and the appropriate committees of the legislature on the progress of the development of housing for farmworkers, including a list of projects funded under this section.

             (5) The department shall work with the farmworker housing advisory committee to prioritize funding of projects to the areas of highest need.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,500,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,000,000

 

             NEW SECTION. Sec. 115. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Farmworker Housing Assistance (02-4-011)

             The appropriation in this section is subject to the following conditions and limitations:

             (1) The appropriation is provided solely for facilities housing low-income migrant, seasonal, or temporary farmworkers.

             (2) It is the intent of the legislature that operation of the facilities built under this section be in compliance with 8 U.S.C. Sec. 1342.

             (3) The department shall minimize the amount of these funds that are utilized for staff and administrative purposes or other operational expenses.

             (4) By September 1, 2002, the department shall submit a report to the governor and the appropriate committees of the legislature on the progress of the development of housing for farmworkers, including a list of projects funded under this section.

             (5) The department shall work with the farmworker housing advisory committee to prioritize funding of projects to the areas of highest need.

             (6) Funding may also be provided, to the extent qualified projects are submitted, for health and safety projects.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$32,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$40,000,000

 

             NEW SECTION. Sec. 116. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Housing Assistance, Weatherization, and Affordable Housing (00-2-003)

             The reappropriation in this section is subject to the conditions and limitations set forth in section 111, chapter 379, Laws of 1999.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $26,800,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$35,000,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$61,800,000

 

             NEW SECTION. Sec. 117. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Housing Assistance, Weatherization, and Affordable Housing (02-4-010)

             The appropriations in this section are subject to the following conditions and limitations:

             (1) At least $9,000,000 of the new appropriation from the state building construction account is provided solely for weatherization administered through the energy matchmakers program.

             (2) $5,000,000 of the new appropriation from the state building construction account is provided solely to promote development of safe and affordable housing units for persons eligible for services from the division of developmental disabilities within the department of social and health services.

             (3) $2,000,000 of the appropriation from the state building construction account is provided solely for grants to nonprofit organizations and public housing authorities for revolving loan, self-help housing programs for low and moderate income families.

             (4) $1,000,000 of the new appropriation from the state building construction account is provided solely for shelters, transitional housing, or other housing facilities for victims of domestic violence.

             (5) Reappropriations in this section shall not be included in the annual funds available for determining the administrative costs authorized under RCW 43.185.050.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $60,000,000

             Washington Housing Trust Account. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,000,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$65,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$200,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$265,000,000

 

             NEW SECTION. Sec. 118. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Burke Museum Governance and Siting Study (00-2-012)

             The reappropriation in this section is subject to the following conditions and limitations:

             (1) Funds are provided for a study of the governance of the Burke museum and for an examination of the potential expansion of the museum facility including siting issues. The study shall be facilitated by the University of Washington, the department of community, trade, and economic development's tourism and economic development units, the executive director of the Washington state historical society, the city of Seattle, King county, and members of the community and businesses from various geographic regions of the state. The department shall provide a report to the legislature by June 30, 2002, outlining funding strategies for an expanded state natural history museum that recognizes the limited state resources for capital facilities programmatic enhancements, and outlines alternative funding resources and partners.

             (2) The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

Reappropriation:

             University of Washington Building Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$350,000

 

             NEW SECTION. Sec. 119. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Clark County Skills Center (00-4-100)

             The reappropriation in this section is subject to the following conditions and limitations:

             (1) The reappropriation in this section must be matched by at least $1,300,000 from other sources.

             (2) The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$350,000

 

             NEW SECTION. Sec. 120. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Holly Park Education Center (00-4-101)

             The reappropriation in this section is subject to the following conditions and limitations:

             (1) The reappropriation in this section is provided solely for education space in the Holly Park housing development for South Seattle Community College.

             (2) The reappropriation in this section must be matched by an equal amount from other sources.

             (3) The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$500,000

 

             NEW SECTION. Sec. 121. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             County Public Facility Construction (00-2-010)

             The reappropriations in this section shall be used solely for financial assistance to distressed counties that have experienced extraordinary costs due to the location of a major new business facility or the substantial expansion of an existing business facility in the county. The entire reappropriation from the state building construction account shall be provided as a grant to support the Grays Harbor water system project and is subject to the conditions and limitations of section 906(2)(b) of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,500,000

             Distressed County Facilities Construction Loan Account--State. . . . . . . . . . . . . . . . . . . . $2,619,000

                          Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,119,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,119,000

 

             NEW SECTION. Sec. 122. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Community Economic Revitalization (CERB) (86-1-001)

Reappropriation:

             Public Works Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $655,517

             Public Facility Construction Loan Revolving Account--State. . . . . . . . . . . . . . . . . . . . . . $4,868,347

                          Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,523,864

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,433,892

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,957,756

 

             NEW SECTION. Sec. 123. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Community Economic Revitalization (CERB)(00-2-001)

             The reappropriation in this section from the public facilities construction loan revolving account is subject to the following conditions and limitations:

             (1) The department shall ensure that all funds transferred from the public works assistance account into the public facility construction loan revolving account during the 1999-2001 biennium are used only for loans to local governments.

             (2) The department shall ensure that all principal and interest payments from these loans are paid into the public works assistance account.

Reappropriation:

             Public Facility Construction Loan Revolving Account--State. . . . . . . . . . . . . . . . . . . . . . $5,519,054

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,121,946

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,641,000

 

             NEW SECTION. Sec. 124. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Community Economic Revitalization (CERB) (02-4-003)

             The appropriation in this section is subject to the following conditions and limitations:

             (1) Appropriations from the public facility construction loan revolving account shall be used solely to provide loans to eligible local governments and grants to the extent permissible by law. The department shall ensure that all principal and interest payments from loans made on moneys from this account are paid into this account.

             (2) By December 15, 2002, the office of financial management shall make recommendations to the appropriate fiscal committees of the legislature on a permanent funding source for the CERB program.

Appropriation:

             Public Facility Construction Loan Revolving Account--State. . . . . . . . . . . . . . . . . . . . . . $2,275,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,275,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,275,000

 

             NEW SECTION. Sec. 125. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Drinking Water Assistance Program (98-2-008)

             The reappropriation in this section is subject to the following conditions and limitations:

             (1) Funding from the state public works trust fund program shall be matched with federal sources to improve the quality of drinking water in the state, and shall be used solely for projects that achieve the goals of the federal safe drinking water act.

             (2) The department shall report to the appropriate committees of the legislature by January 1, 2002, on the progress of the program, including administrative and technical assistance procedures, the application process and funding priorities.

Reappropriation:

             Drinking Water Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,926,937

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,722,063

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,649,000

 

             NEW SECTION. Sec. 126. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Drinking Water Assistance Program (00-2-007)

             The reappropriation in this section is subject to the following conditions and limitations:

             (1) Funding from the state public works trust fund program shall be matched with new federal sources to improve the quality of drinking water in the state, and shall be used solely for projects that achieve the goals of the federal safe drinking water act.

             (2) The department shall report to the appropriate committees of the legislature by January 1, 2002, on the progress of the program, including administrative and technical assistance procedures, the application process, and funding priorities.

Reappropriation:

             Drinking Water Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,700,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,700,000

 

             NEW SECTION. Sec. 127. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Drinking Water Assistance Program (02-4-008)

             The appropriation in this section is subject to the following conditions and limitations:

             (1) Funding from the state public works trust fund program shall be matched with new federal sources to improve the quality of drinking water in the state, and shall be used solely for projects that achieve the goals of the federal safe drinking water act.

             (2) The department shall report to the appropriate committees of the legislature by January 1, 2002, on the progress of the program, including administrative and technical assistance procedures, the application process, and funding priorities.

Appropriation:

             Drinking Water Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,700,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$30,800,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$38,500,000

 

             NEW SECTION. Sec. 128. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Public Works Trust Fund (94-2-001)

Reappropriation:

             Public Works Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $75,159,028

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$68,460,146

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$143,619,174

 

             NEW SECTION. Sec. 129. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Public Works Trust Fund (00-2-002)

Reappropriation:

             Public Works Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $143,971,288

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$59,178,712

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$203,150,000

 

             NEW SECTION. Sec. 130. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Public Works Trust Fund (01-H-001)

Reappropriation:

             Public Works Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $93,593,068

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$93,593,068

 

             NEW SECTION. Sec. 131. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Public Works Trust Fund (02-4-013)

             The appropriation in this section is subject to the following conditions and limitations:

$20,000,000 of the general fund federal appropriation is provided solely for infrastructure projects that will improve water quality and benefit salmon. Projects should be designed to have immediate benefits to water quality and salmon as alternatives to habitat acquisition and improvements. The public works board is authorized and directed to seek funding through the Northwest power planning council, the conservation and reinvestment act, and other federal funding sources to supplement existing loan programs with grants or loans for water quality projects. The public works board shall utilize existing programs within chapter 43.155 RCW to distribute these additional grants or loans, with an emphasis on projects providing immediate benefits to water quality and salmon habitat. For the purposes of this section, the public works board may utilize federal funds as grants in conjunction with loans from chapter 43.155 RCW.

             Appropriation:

             Public Works Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $230,300,000

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,000,000

Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$250,300,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,215,700,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,466,000,000

 

             NEW SECTION. Sec. 132. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Seattle Center Redevelopment (01-S-001)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000

 

             NEW SECTION. Sec. 133. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Fort Vancouver National Historic Reserve (01-S-002)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000

 

             NEW SECTION. Sec. 134. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Chewelah Peak Environmental Learning Center (01-S-003)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000

 

             NEW SECTION. Sec. 135. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Cancer Research Facility Grant (01-S-005)

             The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided as a grant for equipment and facilities improvements for a prostate cancer research project at the University of Washington medical center. The appropriation shall be matched by an equal amount from nonstate sources.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000

 

             NEW SECTION. Sec. 136. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Fox Theater Project (01-S-006)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000

 

             NEW SECTION. Sec. 137. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Des Moines Beach Park - Structure Relocation (01-S-010)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$250,000

 

             NEW SECTION. Sec. 138. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Upper Kittitas County, Emergency Management Service Facility (01-S-16)

             The appropriation in this section is subject to the following conditions and limitations: Funds are provided as a matching grant for enhanced emergency services related to highway travel and incidental local needs. The funds shall be retained in allotment reserve until the office of financial management approves a plan submitted by the recipient organization for the generation of matching funds and the provision for emergency services needs on Interstate 90. The office of financial management shall identify the recipient entity or organization that is best suited to provide enhanced emergency services for the Cle Elum, I-90 region.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $920,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$920,000

 

             NEW SECTION. Sec. 139. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Republic Baseball and Softball Fields (01-H-002)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $  30,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  30,000

 

             NEW SECTION. Sec. 140. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Nevitt Pool Renovation (01-H-003)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $  70,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  70,000

 

             NEW SECTION. Sec. 141. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Lake Forest Park Elementary School - Americans with Disabilities Act Equipment (01-S-015)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $  25,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  25,000

 

             NEW SECTION. Sec. 142. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             West Central Community Center (01-S-016)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$100,000

 

             NEW SECTION. Sec. 143. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Milton Skate Park (01-H-016)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $117,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$117,000

 

             NEW SECTION. Sec. 144. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Pierce County Fairgrounds (01-H-017)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $150,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$150,000

 

             NEW SECTION. Sec. 145. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Clark Lake Park (01-S-013)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$250,000

 

             NEW SECTION. Sec. 146. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

             Coastal Erosion Grants (01-S-019)

             The appropriation in this section is subject to the following conditions and limitations: Funds are provided for coastal erosion grants in southwest Washington in partnership with other state and federal funds. Grays Harbor county is the lead agency in the administration of the grants.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,250,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,250,000

 

             NEW SECTION. Sec. 147. FOR THE OFFICE OF FINANCIAL MANAGEMENT

             Budget System Improvements (02-1-004)

             The appropriation in this section is subject to the following conditions and limitations:

             Funds are provided solely for the following studies and activities:

             (1) Budget evaluation study team reviews of project proposals;

             (2) The compilation of benchmarking data and the development of standards for construction costs;

             (3) Contracts associated with a higher education facility financial responsibility study to be conducted in conjunction with the higher education coordinating board and the state board for community and technical colleges that shall provide guidelines for project cost sharing between state and federal funds, institutional funds, student fees and charges, and private donations; and

             (4) Other studies and system improvements planned in consultation with the house capital budget committee and the senate committee on ways and means.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,200,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,400,000

 

             NEW SECTION. Sec. 148. FOR THE OFFICE OF FINANCIAL MANAGEMENT

             Residential Habilitation Study (01-S-002)

             The appropriation in this section is subject to the following conditions and limitations: The office of financial management shall enter into a contract with the joint legislative audit and review committee to conduct a study of the possible alternative uses of the land and facilities currently used by state operated residential habilitation centers and nursing facilities for persons with developmental disabilities.

Appropriation:

             Charitable, Educational, Penal and Reformatory Institutions

                          Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$100,000

 

             NEW SECTION. Sec. 149. FOR THE OFFICE OF FINANCIAL MANAGEMENT

             Higher Education Condition Assessment (01-H-019)

             The appropriations in this section are subject to the following conditions and limitations:

             (1) The office of financial management shall contract with the joint legislative audit and review committee to conduct a study of higher education facility conditions, maintenance, repair, and renovation. The study shall assess the relationship between facility management and health and safety requirements, educational program delivery priorities, operating costs, and long-term capital costs. The study shall evaluate, and make recommendations on, the following topics:

             (a) The capability and reliability of current management systems and controls, including facility condition assessment processes and their results;

             (b) Current maintenance, repair, and renovation planning and budgeting processes;

             (c) Comparable methods across institutions for developing maintenance, repair, and renovation backlog lists and setting priorities for associated budget requests;

             (d) Appropriate operating and capital budgeting processes to provide both means and incentives for effective facility stewardship; and

             (e) Options for statewide, long-term facility maintenance, repair, and renovation investment strategies that are linked to anticipated future demands for public higher education enrollments and associated educational program delivery priorities.

             (2) In conducting the study under this section, the joint legislative audit and review committee shall work closely with the appropriate legislative policy and fiscal committees and shall consult with the office of financial management, the higher education coordinating board, the state board for community and technical colleges, and, as necessary, with individual public institutions of higher education. The committee may contract for consulting services in conducting this study. The committee shall provide a preliminary report to the appropriate legislative committees by December 15, 2001, and a final report by September 15, 2002.

Appropriation:

             Eastern Washington Capital Projects Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  35,000

             The Evergreen State College Capital Projects Account--State. . . . . . . . . . . . . . . . . . . . . .$  35,000

             The Western Washington University Capital Projects Account--State. . . . . . . . . . . . . . . .$  35,000

             The Central Washington University Capital Projects Account--State. . . . . . . . . . . . . . . . $  35,000

             Washington State University Building Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . .$  55,000

             University of Washington Building Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $  55,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$500,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$500,000

 

             NEW SECTION. Sec. 150. FOR THE OFFICE OF FINANCIAL MANAGEMENT

             Merrill Hall Fire Repairs - Horticulture Building (01-H-020)

             The appropriation in this section is subject to the following conditions and limitations: In addition to the funds provided in this section, the University of Washington may utilize appropriated funds for minor works allotted under section 905 of this act to address emergent needs for Merrill Hall.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000

 

             NEW SECTION. Sec. 151. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             East Plaza Repairs (96-1-002)

             The appropriations in this section are subject to the following conditions and limitations: $16,000,000 of the appropriation from the state vehicle parking account--state is subject to the approval of a reimbursable bond for this project in a bond bill; if the bond bill is not enacted by June 30, 2001, authorizing bonds for this project, the appropriation from the state vehicle parking account--state in this section shall lapse.

Reappropriation:

             Capitol Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $900,000

Appropriation:

             State Vehicle Parking Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$21,667,150

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,200,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$55,767,150

 

             NEW SECTION. Sec. 152. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Transportation Building Preservation (98-1-008)

Reappropriation:

             Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,884,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,234,000

 

             NEW SECTION. Sec. 153. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Transportation Building Preservation - Elevator (02-1-008)

             The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Appropriation:

             Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,001,250

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,098,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,099,250

 

             NEW SECTION. Sec. 154. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Heritage Park/Capitol Lake (00-1-007)

             The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:

             Capitol Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $700,000

                          Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $950,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,650,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,600,000

 

             NEW SECTION. Sec. 155. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Heritage Park Development (01-H-004)

Appropriation:

             Capitol Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,100,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,765,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,358,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,223,000

 

             NEW SECTION. Sec. 156. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Legislative Building: Safety and Infrastructure (98-1-005)

Reappropriation:

             Capitol Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $660,000

             Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $440,000

                          Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,100,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,210,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,310,000

 

             NEW SECTION. Sec. 157. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Legislative Building: Rehabilitation (01-1-008)

             The appropriations in this section are subject to the following conditions and limitations:

             (1) The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.

             (2) The department of general administration, in consultation with the legislature, the governor, and the state capitol committee, shall immediately begin planning and initiate an accelerated design/construction schedule for the renovation of the state legislative building as follows:

             (a) No new permanent buildings shall be constructed, and the department shall follow standards for historic preservation;

             (b) The goal shall be to reoccupy the building in time for the 2005 legislative session;

             (c) The department shall make temporary accommodations for the displacement of legislators and legislative staff in the John L. O'Brien building, the Pritchard building, the Cherberg building, and the Newhouse building, and may use modular space. Decisions on the use of space for the Pritchard building will be made by legislative leadership by July 1, 2001, to make it available for use by the legislature by April 1, 2002;

             (d) The department shall temporarily move the state library from the Pritchard building by October 1, 2001, and, if needed, the department shall lease storage facilities in Thurston county for books and other library assets;

             (e) The department shall make temporary accommodations for other tenants of the state legislative building as follows:

             (i) The office of the insurance commissioner shall be temporarily moved to leased space in Thurston county;

             (ii) The office of the governor shall be moved to the Insurance building;

             (iii) The primary office of the code reviser and the lieutenant governor shall be moved to a location on the west capitol campus; and

             (iv) The other tenants, including the office of the state treasurer, the office of the state auditor, and the office of the secretary of state shall be moved to leased space in Thurston county;

             (f) The state legislative building shall be completely vacated by the office of the governor, the office of the secretary of state, the office of treasurer, and the office of the state auditor by November 1, 2001, and by the legislature fourteen days after the end of the 2002 legislative session to make it available for renovation by the contractor; and

             (g) State contracts for the legislative building renovation, Nisqually earthquake repair, and future earthquake mitigation shall conform to all rules, regulations, and requirements of the federal emergency management agency.

             (3) The state capitol committee, in conjunction with a legislative building renovation oversight committee consisting of two members from both the house of representatives and senate, each appointed by legislative leadership, shall periodically advise the department regarding the rehabilitation, the receipt and use of private funds, and other issues that may arise.

             (4) The department shall report on the progress of accelerated planning, design, and relocations related to the renovation of the state legislative building to the legislature and the governor by July 15, 2001, and November 15, 2001, and shall consult with the legislature and governor on major decisions including placement of the cafeteria and exiting stairs in the legislative building by August 31, 2001.

             (5) In the event of any conflicts between the conditions and limitations in this section and section 3, chapter 123, Laws of 2001, the conditions and limitations of this section shall apply.

Reappropriation:

             Capitol Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000

             Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,500,000

                          Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,500,000

Appropriation:

             Capitol Historic District Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . $81,681,000

             Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,300,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$82,981,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,300,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$90,781,000

 

             NEW SECTION. Sec. 158. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Legislative Buildings - O'Brien and Newhouse Building Improvements (01-H-021)

Appropriation:

             Capitol Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000

             Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000

 

             NEW SECTION. Sec. 159. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Emergency/Small Repairs and Improvements (02-1-001)

             The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Appropriation:

             Capitol Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $400,000

             Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $900,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,400,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,500,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,900,000

 

             NEW SECTION. Sec. 160. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Thurston County Facilities: Preservation (00-1-009)

Reappropriation:

             Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,450,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,700,000

 

             NEW SECTION. Sec. 161. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Thurston County Facilities: Preservation (02-1-002)

             The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Appropriation:

             Capitol Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,110,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,860,000

             Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,861,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,831,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$35,636,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$42,467,000

 

             NEW SECTION. Sec. 162. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Capitol Campus Facilities: Preservation (00-1-003)

             The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:

             Capitol Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $900,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $  75,000

             Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,025,000

                          Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,140,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,140,000

 

             NEW SECTION. Sec. 163. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Capitol Campus Infrastructure Preservation (02-1-003)

             The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Appropriation:

             Capitol Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $  75,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,750,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,825,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$24,050,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$25,875,000

 

             NEW SECTION. Sec. 164. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             North Cascades Gateway Center: Preservation (00-1-010)

Reappropriation:

             General Fund--Private/Local. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$210,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$397,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$607,000

 

             NEW SECTION. Sec. 165. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             North Cascades Gateway Center Minor Works (02-1-004)

             The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Appropriation:

             General Fund/Private/Local. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$500,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $850,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,350,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,685,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,035,000

 

             NEW SECTION. Sec. 166. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Cherberg Building: Rehabilitation (02-1-005)

Appropriation:

             Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $695,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,695,000

 

             NEW SECTION. Sec. 167. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Pritchard Library: Rehabilitation (02-1-006)

Appropriation:

             Thurston County Capital Facilities

                          Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $300,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,300,000

 

             NEW SECTION. Sec. 168. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Infrastructure Project: Savings (02-1-999)

             Projects that are completed in accordance with section 915 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $           1

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           1

 

             NEW SECTION. Sec. 169. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Capitol Campus Chiller Plant and Loop (02-2-006)

Appropriation:

             Capitol Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $  50,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $550,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$600,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$21,220,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$21,820,000

 

             NEW SECTION. Sec. 170. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Engineering and Architectural Services (02-2-012)

             The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section shall be used to provide those services to state agencies required by RCW 43.19.450 that are essential and mandated activities defined as core services and are included in the engineering and architectural services responsibilities and task list for general public works projects of normal complexity. The department may negotiate agreements with agencies for additional fees to manage exceptional projects including projects financed with alternative financing or for services above core services as described as optional and extra services in the task list.

Appropriation:

             Capitol Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $220,700

             Charitable, Educational, Penal, and Reformatory

                          Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$772,700

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,057,800

             Thurston County Capital Facilities

                          Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $386,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,437,200

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$43,049,325

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$52,486,525

 

             NEW SECTION. Sec. 171. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Isabella Bush Records Center: Expansion (02-3-001)

Appropriation:

             Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $344,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$344,000

 

             NEW SECTION. Sec. 172. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Tumwater Office Building 1 (01-S-003)

             The appropriation in this section is subject to the following conditions and limitations: Planning funds are provided to lease/develop a state office building of 150,000 to 200,000 square feet on state-owned property in Tumwater according to the terms of the agreement with the Port of Olympia when the property was acquired or within the preferred development/leasing areas in Thurston county. The building shall be constructed and financed so that agency occupancy costs will not exceed comparable private market rental rates. The comparable general office space rate shall be calculated based on the three latest Thurston county leases of new space of at least 100,000 rentable square feet adjusted for inflation as determined by the department of general administration. The department of general administration shall coordinate with potential state agency tenants whose current lease expire near the time of occupancy so that buyout of current leases do not add to state expense.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$200,000

 

             NEW SECTION. Sec. 173. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Office Building Two Rehabilitation (98-1-007)

Reappropriation:

             Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000

Appropriation:

             Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,850,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,250,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,310,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$22,410,000

 

             NEW SECTION. Sec. 174. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             General Administration Building Renovation or Redevelopment (00-1-004)

             The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:

             State Building Construction Account--

                          State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $150,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$850,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,635,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,635,000

 

             NEW SECTION. Sec. 175. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

             Americans with Disabilities Act: Pool (00-1-011)

             The reappropriation in this section is subject to the following conditions and limitations:

             (1) The moneys provided in this section shall be solely allocated to agencies and institutions, except for the state community and technical colleges, for improvements to state-owned facilities for program access enhancements.

             (2) No money appropriated in this section or in any section specifically referencing this section shall be expended unless the department of general administration has reviewed and approved the cost estimates for the project. The department of general administration shall implement an agency request and evaluation procedure similar to the one adopted in the 1999-2001 biennium for distribution of funds.

             (3) No moneys appropriated in this section shall be available to institutions of higher education to modify dormitories.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $150,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,850,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000

 

             NEW SECTION. Sec. 176. FOR THE MILITARY DEPARTMENT

             Minor Works to Support Federal Construction Projects (98-1-001)

             The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$280,913

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $305,193

                          Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $586,106

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,766,394

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,352,500

 

             NEW SECTION. Sec. 177. FOR THE MILITARY DEPARTMENT

             Minor Works to Support Federal Construction Projects (02-1-001)

             The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Appropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,248,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,277,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,525,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$62,340,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$74,865,000

 

             NEW SECTION. Sec. 178. FOR THE MILITARY DEPARTMENT

             Yakima Readiness Center: Construction (98-2-001)

             The appropriations in this section are subject to the following conditions and limitations:

             (1) Funds expended on this project for off-site utility infrastructure that may include the provision of electricity, natural gas service, water service, or sewer service shall be for the benefit of the state. Entities that subsequently connect or use this off-site utility infrastructure shall reimburse the state at a rate proportional to their use. The department shall develop policies and procedures to ensure that this reimbursement occurs.

             (2) The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.

             (3) No money shall be committed or expended from the state building construction account until the general fund--federal construction funds are received and allotted in accordance with section 903 of this act.

             (4) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department will file quarterly project progress reports with the office of financial management. These reports will contain local, state, and federal funding reconciliations and balance sheets for this project and will detail any federal intentions on future readiness center projects.

Reappropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,523,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,520,966

                          Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,043,966

Appropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,522,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $653,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,175,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,737,876

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$21,956,842

 

             NEW SECTION. Sec. 179. FOR THE MILITARY DEPARTMENT

             Centralia Readiness Center: Preservation (00-1-030)

             The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$700,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,050,000

 

             NEW SECTION. Sec. 180. FOR THE MILITARY DEPARTMENT

             Preservation Projects-Statewide (02-1-006)

             The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,478,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,116,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,594,000

 

             NEW SECTION. Sec. 181. FOR THE MILITARY DEPARTMENT

             Infrastructure Projects-Savings (02-1-009)

             Projects that are completed in accordance with section 915 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $           1

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           1

 

             NEW SECTION. Sec. 182. FOR THE MILITARY DEPARTMENT

             Spokane Combined Public Safety Training Center (02-2-003)

             The appropriation in this section is subject to the following conditions and limitations:

             (1) The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

             (2) No money shall be committed or expended from the state building construction account until the general fund--federal construction funds are received and allotted in accordance with section 903 of this act.

             (3) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department will file quarterly project progress reports with the office of financial management. These reports will contain local, state, and federal funding reconciliations and balance sheets for this project and will detail any federal intentions on future readiness center projects.

Appropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,996,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,267,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,263,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,899,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$23,162,000

 

             NEW SECTION. Sec. 183. FOR THE MILITARY DEPARTMENT

             Bremerton Readiness Center (02-2-004)

             The appropriation in this section is subject to the following conditions and limitations:

             (1) The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

             (2) No money shall be committed or expended from the state building construction account until the general fund--federal construction funds are received and allotted in accordance with section 903 of this act.

             (3) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department will file quarterly project progress reports with the office of financial management. These reports will contain local, state, and federal funding reconciliations and balance sheets for this project and will detail any federal intentions on future readiness center projects.

Appropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,446,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,728,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,174,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,174,000

 

             NEW SECTION. Sec. 184. FOR THE MILITARY DEPARTMENT

             Fort Lewis Readiness Center (02-2-010)

             The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

Appropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,941,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,941,000

 

             NEW SECTION. Sec. 185. FOR THE MILITARY DEPARTMENT

             Combined Support Maintenance Shop (02-2-011)

             The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

Appropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,032,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,032,000

 

             NEW SECTION. Sec. 186. FOR THE MILITARY DEPARTMENT

             Combined Regional Training Institute (02-2-012)

             The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

Appropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,712,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,712,000

 

             NEW SECTION. Sec. 187. FOR THE MILITARY DEPARTMENT

             Phase 2 Yakima Maneuver and Training Equipment Site (02-2-013)

             The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

Appropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,304,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,304,000

 

             NEW SECTION. Sec. 188. FOR THE STATE CONVENTION AND TRADE CENTER

             Seattle Convention Center: Replacement Housing (00-2-002)

Reappropriation:

             State Convention and Trade Center Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,745,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,255,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,000,000

 

             NEW SECTION. Sec. 189. FOR THE STATE CONVENTION AND TRADE CENTER

             Repairs and Improvements (01-S-001)

             The appropriation in this section is subject to the following conditions and limitations:

             (1) $545,000 is provided for payment to the department of transportation for fire control and other improvements to the I-90 tunnel.

             (2) $2,650,000 is provided for chiller and window replacement and roof repairs.

Appropriation:

             State Convention and Trade Center Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,195,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,195,000

 

PART 2

HUMAN SERVICES

 

             NEW SECTION. Sec. 201. FOR THE CRIMINAL JUSTICE TRAINING COMMISSION

             Site Improvements - Minor Works (02-1-005)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$600,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$800,000

 

             NEW SECTION. Sec. 202. FOR THE CRIMINAL JUSTICE TRAINING COMMISSION

             Building Omnibus Minor Works (02-1-007)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $150,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$600,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$750,000

 

             NEW SECTION. Sec. 203. FOR THE DEPARTMENT OF LABOR AND INDUSTRIES

             Facilities Preservation and Improvement (02-1-001)

Appropriation:

             Accident Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $325,000

             Medical Aid Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $325,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$650,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,700,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,350,000

 

             NEW SECTION. Sec. 204. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Maple Lane School: Wastewater Treatment Plant (94-1-201)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $339,945

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,767,109

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,107,054

 

             NEW SECTION. Sec. 205. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Crisis Residential Centers (96-1-900)

             The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,450,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,800,000

 

             NEW SECTION. Sec. 206. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Echo Glen Children's Center - Site: Infrastructure Improvements (96-2-229)

             The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,215,229

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,312,523

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,527,752

 

             NEW SECTION. Sec. 207. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Green Hill School Redevelopment: 416 Bed Institution (96-2-230)

             The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,853,668

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,995,479

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,849,147

 

             NEW SECTION. Sec. 208. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Medical Lake Wastewater Treatment Facility (96-1-301)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $921,597

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,459,550

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,381,147

 

             NEW SECTION. Sec. 209. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Eastern State Hospital: Legal Offender Unit (98-2-002)

             The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,365,463

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,330,537

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,696,000

 

             NEW SECTION. Sec. 210. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Echo Glen Children's Center - Vocational Education: Construction (98-2-211)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $298,838

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,916,667

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$156,162

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,371,667

 

             NEW SECTION. Sec. 211. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Western State Hospital: Legal Offender Unit (98-2-052)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $25,829,040

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,059,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$22,406,301

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$50,294,341

 

             NEW SECTION. Sec. 212. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Maple Lane: 124 Bed Housing (98-2-216)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $126,545

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,620,021

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,746,566

 

             NEW SECTION. Sec. 213. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Western State Hospital: Security Improvements (99-1-001)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $487,963

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$166,037

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$654,000

 

             NEW SECTION. Sec. 214. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Americans with Disabilities Act (00-9-036)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $103,348

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  14,852

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$118,200

 

             NEW SECTION. Sec. 215. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Child Study and Treatment Center - Cottages: Modifications (00-1-015)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,376,682

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,500,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  23,318

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,678,262

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,578,262

 

             NEW SECTION. Sec. 216. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Eastern State Hospital: Campus Renovation, Phase 5 (00-2-002)

             The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $677,100

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,154,750

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$268,150

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,100,000

 

             NEW SECTION. Sec. 217. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Echo Glen Children's Center - Eleven Cottages: Renovation (00-1-041)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $700,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  75,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,131,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,906,000

 

             NEW SECTION. Sec. 218. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Emergency and Small Repairs (00-1-006)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $400,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$475,165

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$875,165

 

             NEW SECTION. Sec. 219. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Statewide: Emergency and Small Repair Projects (02-1-042)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $750,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,609,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,359,000

 

             NEW SECTION. Sec. 220. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Lakeland Village: Cottage Renovation (00-1-002)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $425,057

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  24,943

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$450,000

 

             NEW SECTION. Sec. 221. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Maple Lane School - Multi-Services Building: Renovation (00-1-003)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $640,000

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $300,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  60,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,550,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,550,000

 

             NEW SECTION. Sec. 222. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Minor Works: Preservation (00-1-018)

             The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:

             Charitable, Educational, Penal, and Reformatory

                          Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,200,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,700,000

                          Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,900,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,459,966

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,359,966

 

             NEW SECTION. Sec. 223. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Statewide: Omnibus Preservation Projects (02-1-069)

             The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Appropriation:

             Charitable, Educational, Penal, and Reformatory Institutions Account--State. . . . . . . . . .$2,700,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,800,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,500,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$42,253,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$47,753,000

 

             NEW SECTION. Sec. 224. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Minor Works: Program (00-2-019)

             The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$148,725

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,148,725

 

             NEW SECTION. Sec. 225. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Statewide: Omnibus Programmatic Projects (02-2-070)

             The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Appropriation:

             Charitable, Educational, Penal, and Reformatory Institutions Account--State. . . . . . . . . .$500,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,812,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,812,000

 

             NEW SECTION. Sec. 226. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Mission Creek Youth Camp - Main Building: Renovation Phase 2 (00-1-010)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,642,973

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$357,027

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000

 

             NEW SECTION. Sec. 227. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Special Commitment Center - Secure Facility: Construction (00-2-001)

             The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act. To the extent that the department projects savings and efficiencies through design or scope changes, funds appropriated in this section may be transferred to the statewide omnibus preservation project (02-1-069) for expenditure for minor works projects in accordance with the provisions of section 905 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $13,100,000

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $47,665,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,400,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,970,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$70,135,000

 

             NEW SECTION. Sec. 228. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Special Commitment Center - Less Restrictive Alternative (02-2-075)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,207,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,207,000

 

             NEW SECTION. Sec. 229. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Eastern State Hospital - Activity Therapy Building: Renovation (02-1-060)

             The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $150,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,765,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,915,000

 

             NEW SECTION. Sec. 230. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Green Hill School - Entry/Security/Visitation: Addition (02-2-064)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $400,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,400,000

 

             NEW SECTION. Sec. 231. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Green Hill School - Health Center Building: Renovation (02-1-061)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $400,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,400,000

 

             NEW SECTION. Sec. 232. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Green Hill School - Intensive Management Unit: Renovation (02-1-054)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,200,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,200,000

 

             NEW SECTION. Sec. 233. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Infrastructure Project: Savings (00-1-053)

             The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $563,057

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$436,944

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,001

 

             NEW SECTION. Sec. 234. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Infrastructure Project: Savings (02-1-053)

             Projects that are completed in accordance with section 915 of this act, may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $           1

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           1

 

             NEW SECTION. Sec. 235. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Capital Project Management (02-1-041)

Appropriation:

             Charitable, Penal, Educational, and

                          Reformatory Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,625,800

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,625,800

 

             NEW SECTION. Sec. 236. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Rainier School - Laundry: Equipment (00-1-001)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $435,602

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  14,398

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$450,000

 

             NEW SECTION. Sec. 237. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Statewide: Facilities Condition Assessment and Preservation Plan (02-1-047)

Appropriation:

             Charitable, Educational, Penal, and Reformatory

                          Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$185,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$800,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$985,000

 

             NEW SECTION. Sec. 238. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Statewide: Hazardous Materials Abatement (02-1-043)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $300,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,430,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,730,000

 

             NEW SECTION. Sec. 239. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

             Child Care Facilities for Students and State Employees (01-S-003)

             Funds are provided to recapitalize child care facilities grant programs. These funds may be used by state agencies and higher education institutions to provide child care facilities for employees and students. Grants to state agencies will be provided and administered per chapter 41.04 RCW. The department shall develop guidelines for grant application for student child care facilities at institutions of higher education in conjunction with the office of financial management, the higher education coordinating board, and the state board for community and technical colleges. Grants for higher education child care facilities will be transferred into accounts administered through chapter 28B.135 RCW.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,000,000

 

             NEW SECTION. Sec. 240. FOR THE DEPARTMENT OF HEALTH

             Referendum 38 (86-2-099)

Reappropriation:

             State and Local Improvements Revolving Account

                          (Water Supply Facilities)--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .             $                                                                                                                                              158,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$541,483

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$699,483

 

             NEW SECTION. Sec. 241. FOR THE DEPARTMENT OF HEALTH

             Public Health Laboratory: Repairs and Improvements (96-1-001)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,292,693

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,203,406

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,496,099

 

             NEW SECTION. Sec. 242. FOR THE DEPARTMENT OF HEALTH

             Public Health Laboratories: Consolidation of Facilities (96-2-001)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,228,332

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,444,719

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,673,051

 

             NEW SECTION. Sec. 243. FOR THE DEPARTMENT OF HEALTH

             Public Health Laboratory: Wastewater Treatment Systems (00-1-008)

             The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $208,802

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$208,802

 

             NEW SECTION. Sec. 244. FOR THE DEPARTMENT OF HEALTH

             Public Health Laboratory: Chiller Plant Upgrade (02-1-004)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,355,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,355,000

 

             NEW SECTION. Sec. 245. FOR THE DEPARTMENT OF HEALTH

             Public Health Laboratory: Repairs and Improvements (02-1-005)

             The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $172,400

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,944,200

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,116,600

 

             NEW SECTION. Sec. 246. FOR THE DEPARTMENT OF HEALTH

             Public Health Laboratory: Biosafety Level 3 Facility (02-2-001)

             The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,231,485

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,231,485

 

             NEW SECTION. Sec. 247. FOR THE DEPARTMENT OF HEALTH

             Public Health Laboratory: C-Wing Remodel (02-2-002)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $295,900

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$295,900

 

             NEW SECTION. Sec. 248. FOR THE DEPARTMENT OF HEALTH

             Public Health Laboratory: E-Wing Remodel (02-2-003)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $295,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$295,000

 

             NEW SECTION. Sec. 249. FOR THE DEPARTMENT OF HEALTH

             Drinking Water Assistance Program (97-2-001)

             The reappropriation in this section is provided solely for an interagency agreement with the department of community, trade, and economic development to make, in cooperation with the public works board, loans to local governments and public water systems for projects and activities to protect and improve the state's drinking water facilities and resources.

Reappropriation:

             Drinking Water Assistance Account--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$30,086,024

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$35,086,024

 

             NEW SECTION. Sec. 250. FOR THE DEPARTMENT OF HEALTH

             Drinking Water Assistance Program (02-4-004)

             The appropriation in this section is provided solely for an interagency agreement with the department of community, trade, and economic development to make, in cooperation with the public works board, loans to local governments and public water systems for projects and activities to protect and improve the state's drinking water facilities and resources.

Appropriation:

             Drinking Water Assistance Account--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$24,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$77,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$101,000,000

 

             NEW SECTION. Sec. 251. FOR THE DEPARTMENT OF VETERANS' AFFAIRS

             Retsil Veterans' Home: Minor Works Mechanical/Electrical/HVAC (02-1-001)

Appropriation:

             Charitable, Educational, Penal, and Reformatory

                           Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,070,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$777,750

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,847,750

 

             NEW SECTION. Sec. 252. FOR THE DEPARTMENT OF VETERANS' AFFAIRS

             Orting Soldiers' Home: Minor Works Mechanical/Electrical/HVAC (02-1-002)

Appropriation:

             Charitable, Educational, Penal, and Reformatory

                           Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $127,736

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,060,835

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,188,571

 

             NEW SECTION. Sec. 253. FOR THE DEPARTMENT OF VETERANS' AFFAIRS

             Orting Soldiers' Home: Minor Works Buildings (02-1-004)

Appropriation:

             Charitable, Educational, Penal, and Reformatory

                           Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $140,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,813,590

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,953,590

 

             NEW SECTION. Sec. 254. FOR THE DEPARTMENT OF VETERANS' AFFAIRS

             Emergency Funds (02-1-007)

Appropriation:

             Charitable, Educational, Penal, and Reformatory

                           Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$500,000

 

             NEW SECTION. Sec. 255. FOR THE DEPARTMENT OF VETERANS' AFFAIRS

             Retsil Veterans' Home: Steam Plant Seismic Upgrade (02-1-010)

Appropriation:

             Charitable, Educational, Penal, and Reformatory

                           Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,391,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,391,000

 

             NEW SECTION. Sec. 256. FOR THE DEPARTMENT OF VETERANS' AFFAIRS

             240 Bed Nursing Facility (02-2-008)

             The appropriation in this section is subject to the following conditions and limitations:

             (1) The appropriation in this section, combined with the authorities granted in section 907(5) of this act, for a total of $16.5 million, are authorized to apply for a matching grant from the federal department of veterans' affairs.

             (2) The department shall not commit or expend funds from these authorities until the federal construction grant has been certified and is available to Washington state for the purpose of constructing replacement nursing care beds.

             (3) By September 1, 2002, the department shall submit recommendations to the appropriate committees of the legislature on a transition plan and program for the Orting soldiers' home, including costs and funding assumptions.

Appropriation:

             Charitable, Educational, Penal, and Reformatory

                          Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,500,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,500,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$30,477,200

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$34,977,200

 

             NEW SECTION. Sec. 257. FOR THE DEPARTMENT OF CORRECTIONS

             Expand Coyote Ridge Corrections Center (98-2-011)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $447,348

 

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,150,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$802,069

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$227,763,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$230,162,417

 

             NEW SECTION. Sec. 258. FOR THE DEPARTMENT OF CORRECTIONS

             Clallam Bay Corrections Center - Youthful Offender Facility Improvements (97-2-005)

             The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,170,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,330,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,500,000

 

             NEW SECTION. Sec. 259. FOR THE DEPARTMENT OF CORRECTIONS

             Stafford Creek Corrections Center Construction (98-2-001)

             The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

Reappropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,648,233

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $16,389,590

                          Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $24,037,823

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$172,988,377

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$197,026,200

 

             NEW SECTION. Sec. 260. FOR THE DEPARTMENT OF CORRECTIONS

             Monroe Corrections Center - Expand Special Offender Unit (98-2-010)

             The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,436,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$37,499,280

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$42,935,280

 

             NEW SECTION. Sec. 261. FOR THE DEPARTMENT OF CORRECTIONS

             Washington Corrections Center for Women - Special Needs and Reception Unit (96-2-006)

             The reappropriation in this section is subject to the following conditions and limitations: To the extent that funds appropriated in this section are not needed to complete the project, up to $3,000,000 may be transferred to the statewide omnibus preservation project (02-1-015) for minor work projects in accordance with the provisions of section 905 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $18,336,885

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,463,115

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$24,800,000

 

             NEW SECTION. Sec. 262. FOR THE DEPARTMENT OF CORRECTIONS

             Washington Corrections Center: Infrastructure Evaluation (99-2-005)

             The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $310,438

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  39,562

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$350,000

 

             NEW SECTION. Sec. 263. FOR THE DEPARTMENT OF CORRECTIONS

             Violent Offender/Truth in Sentencing Grant Administration (99-2-004)

Reappropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$359,000

             Charitable, Educational, Penal, and Reformatory

                          Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  55,000

                          Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $414,000

Appropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$386,536

             Charitable, Educational, Penal, and Reformatory

                          Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  42,592

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$429,128

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$194,514

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$214,743

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,252,385

 

             NEW SECTION. Sec. 264. FOR THE DEPARTMENT OF CORRECTIONS

             Americans with Disabilities Act (00-1-011)

             The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $  66,500

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  20,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  86,500

 

             NEW SECTION. Sec. 265. FOR THE DEPARTMENT OF CORRECTIONS

             Local Criminal Justice Facilities (99-2-003)

             The appropriations in this section are subject to the following conditions and limitations: $3,000,000 of the state building construction account--state appropriation is provided solely for grants to local jurisdictions for jail capacity expansion projects. Grants provided in this section shall be limited to up to $500,000 per jurisdiction.

Reappropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,952,091

Appropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,335,619

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,335,619

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,193,270

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$966,338

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,447,318

 

             NEW SECTION. Sec. 266. FOR THE DEPARTMENT OF CORRECTIONS

             McNeil Island - Special Commitment Center (00-2-005)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $259,665

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,240,335

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,500,000

 

             NEW SECTION. Sec. 267. FOR THE DEPARTMENT OF CORRECTIONS

             McNeil Island Underground Storage Tank (00-1-001)

             The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $377,896

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$414,415

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$792,311

 

             NEW SECTION. Sec. 268. FOR THE DEPARTMENT OF CORRECTIONS

             Monroe Corrections Center: Kitchen Consolidations/Modifications (00-2-011)

             The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $952,109

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$147,891

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,100,000

 

             NEW SECTION. Sec. 269. FOR THE DEPARTMENT OF CORRECTIONS

             Monroe Corrections Center - Hazardous Materials (00-1-002)

             The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $  52,950

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  52,950

 

             NEW SECTION. Sec. 270. FOR THE DEPARTMENT OF CORRECTIONS

             Monroe Corrections Center - 100 Bed Intensive Management and Segregation Units (00-2-008)

             The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $  40,665

Appropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$18,162,205

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,521,795

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,684,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$149,335

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,727,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$38,601,000

 

             NEW SECTION. Sec. 271. FOR THE DEPARTMENT OF CORRECTIONS

             Washington State Penitentiary - Intensive Management Unit Improvements (00-1-025)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,199,502

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $852,462

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$300,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,351,964

 

             NEW SECTION. Sec. 272. FOR THE DEPARTMENT OF CORRECTIONS

             Correctional Industries Space Statewide (98-2-005)

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $327,206

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,500,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,972,794

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,652,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,452,000

 

             NEW SECTION. Sec. 273. FOR THE DEPARTMENT OF CORRECTIONS

             Minor Works: Preservation (00-1-020)

             The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $15,530,719

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,479,281

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,010,000

 

             NEW SECTION. Sec. 274. FOR THE DEPARTMENT OF CORRECTIONS

             Minor Works: Omnibus Preservation (02-1-015)

             The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $619,247

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,619,247

 

             NEW SECTION. Sec. 275. FOR THE DEPARTMENT OF CORRECTIONS

             Minor Works: Program (00-2-010)

             The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,933,797

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,066,203

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,000,000

 

             NEW SECTION. Sec. 276. FOR THE DEPARTMENT OF CORRECTIONS

             Minor Works: Omnibus Program (02-2-030)

             The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,525,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,525,000

 

             NEW SECTION. Sec. 277. FOR THE DEPARTMENT OF CORRECTIONS

             Monroe Corrections Center: Regional Training Center (02-2-016)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,955,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,955,000

 

             NEW SECTION. Sec. 278. FOR THE DEPARTMENT OF CORRECTIONS

             Statewide: Department of Corrections Emergency Funds (02-1-028)

Appropriation:

             Charitable, Educational, Penal, and Reformatory

                           Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,700,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$901,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,800,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,401,000

 

             NEW SECTION. Sec. 279. FOR THE DEPARTMENT OF CORRECTIONS

             Statewide: Intensive Management Unit Repairs (02-1-040)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,612,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,612,000

 

             NEW SECTION. Sec. 280. FOR THE DEPARTMENT OF CORRECTIONS

             Washington Corrections Center - Building Water Pipe Replacement Phase 2 (02-1-008)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,694,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,694,000

 

             NEW SECTION. Sec. 281. FOR THE DEPARTMENT OF CORRECTIONS

             Washington Corrections Center - Domestic Water Systems Improvements (02-1-007)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,531,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,531,000

 

             NEW SECTION. Sec. 282. FOR THE DEPARTMENT OF CORRECTIONS

             Washington Corrections Center - Replace Steam and Condensate Piping (02-1-006)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,170,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,170,000

 

             NEW SECTION. Sec. 283. FOR THE DEPARTMENT OF CORRECTIONS

             Washington State Penitentiary - Replace Old Sanitary and Domestic Water Lines (02-1-026)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,070,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,640,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,710,000

 

             NEW SECTION. Sec. 284. FOR THE DEPARTMENT OF CORRECTIONS

             Washington State Penitentiary - Replace Electrical Supply System (02-1-024)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,061,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,655,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,716,000

 

             NEW SECTION. Sec. 285. FOR THE DEPARTMENT OF CORRECTIONS

             Olympic Corrections Center - Replace Telecommunications Systems (02-1-041)

             The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,406,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,406,000

 

             NEW SECTION. Sec. 286. FOR THE DEPARTMENT OF CORRECTIONS

             Pine Lodge - Replace Telecommunications System (02-1-009)

             The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,139,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,139,000

 

             NEW SECTION. Sec. 287. FOR THE DEPARTMENT OF CORRECTIONS

             Statewide: Emergency Funds (R) (00-1-021)

Reappropriation:

             Charitable, Educational, Penal and Reformatory

                          Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$742,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,723,016

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,465,016

 

             NEW SECTION. Sec. 288. FOR THE DEPARTMENT OF CORRECTIONS

             Tacoma: Design 400 Bed Prerelease Facility (98-2-003)

             The reappropriation in this section is subject to the following conditions and limitations: To the extent that funds reappropriated in this section are not needed to complete the project, funds may be utilized for design of the McNeil Island water storage project.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$250,000

 

PART 3

NATURAL RESOURCES

 

             NEW SECTION. Sec. 301. FOR THE DEPARTMENT OF ECOLOGY

             Referendum 26 Waste Disposal Facilities (74-2-004)

Reappropriation:

             State and Local Improvements Revolving Account (Waste Facilities)--State. . . . . . . . . . $398,083

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,810,539

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,208,622

 

             NEW SECTION. Sec. 302. FOR THE DEPARTMENT OF ECOLOGY

             Referendum 39 Waste Disposal Facilities (82-2-005)

Reappropriation:

             State and Local Improvements Revolving Account - Waste Facilities 1980--State. . . . . . $500,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,928,221

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,428,221

 

             NEW SECTION. Sec. 303. FOR THE DEPARTMENT OF ECOLOGY

             Local Toxics Grants to Locals for Cleanup and Prevention (88-2-008)

             The appropriations in this section are subject to the following conditions and limitations:

             (1) The reappropriation in this section is provided solely for projects under contract on or before June 30, 2001. Reappropriated funds not associated with contracted projects shall lapse on June 30, 2001. The office of financial management may grant waivers from this lapse requirement for specific projects upon findings of exceptional circumstances after notification of the chairs of the house of representatives capital budget committee and senate ways and means committee.

             (2) The department shall submit a report to the office of financial management and house of representatives capital budget committee and senate ways and means committee by December 1, 2001, listing all projects funded from this section.

             (3) The department of ecology shall offer the port of Ridgefield a funding package totaling $8,400,000 to conduct an emergency cleanup action on port-owned property. A portion of the appropriation in this section shall be combined with funds from the appropriation to the department from the state toxics control account in the omnibus operating budget for the 2001-2003 biennium to provide a funding package consisting of sixty-five percent grant and thirty-five percent loan. The terms of the loan shall provide for repayment by the port of Ridgefield commencing ten years from the effective date of this section and is contingent upon an independent financial audit conducted at the direction of the department to determine the port's ability to repay the loan. It is the intent of the legislature to support necessary action by the port of Ridgefield to protect public health and the environment without jeopardizing the port's financial standing.

Reappropriation:

             Local Toxics Control Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $20,749,772

Appropriation:

             Local Toxics Control Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $50,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$84,103,008

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$154,852,780

 

             NEW SECTION. Sec. 304. FOR THE DEPARTMENT OF ECOLOGY

             Methow Basin Water Conservation (92-2-009)

             The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely for projects under contract on or before June 30, 2001. Reappropriated funds not associated with contracted projects shall lapse on June 30, 2001.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $  87,689

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  87,689

 

             NEW SECTION. Sec. 305. FOR THE DEPARTMENT OF ECOLOGY

             Low-Level Nuclear Waste Disposal Trench Closure (97-2-012)

Reappropriation:

             Site Closure Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,292,009

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,045,451

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,337,460

 

             NEW SECTION. Sec. 306. FOR THE DEPARTMENT OF ECOLOGY

             Water Rights Purchase/Lease (99-1-005)

             The appropriation in this section is provided for the purchase or lease of water rights under the trust water rights program under chapters 90.42 and 90.38 RCW, for the purpose of improving stream and river flows in fish critical basins.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,000,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,000,000

 

             NEW SECTION. Sec. 307. FOR THE DEPARTMENT OF ECOLOGY

             Minor Works (02-1-003)

             The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act and is limited to projects that protect the health and safety of the public and agency employees.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $865,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,291,745

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,156,745

 

             NEW SECTION. Sec. 308. FOR THE DEPARTMENT OF ECOLOGY

             Padilla Bay (02-2-006)

Appropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,885,800

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $808,200

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,694,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,694,000

 

             NEW SECTION. Sec. 309. FOR THE DEPARTMENT OF ECOLOGY

             Local Hazardous Waste Liability (02-4-001)

             The appropriation in this section is subject to the following conditions and limitations:

             (1) The appropriation in this section is provided solely for grants to local governmental agencies named as potentially liable persons or potentially responsible parties when those agencies have conducted a moderate risk waste or similar program, and have become financially liable for clean-up and corrective action due to circumstances at a facility they used for hazardous waste treatment, storage, recycling, or disposal services.

             (2) The department shall adopt rules for this financial assistance program. For the purposes of this grant program, the department may offer grants up to one hundred percent of total eligible costs. Eligible costs may include retroactive costs and legal fees associated with facility cleanup or corrective action.

Appropriation:

             Local Toxics Control Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000

 

             NEW SECTION. Sec. 310. FOR THE DEPARTMENT OF ECOLOGY

             Water Pollution Control Revolving Account (90-2-002)

Reappropriation:

             Water Pollution Control Revolving Account--

                          State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .             $                                                                                                                                         38,403,302

             Water Pollution Control Revolving Account--

                          Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $44,795,830

                          Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $83,199,132

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$169,901,509

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$253,100,641

 

             NEW SECTION. Sec. 311. FOR THE DEPARTMENT OF ECOLOGY

             Water Pollution Control Revolving Account (02-4-002)

Appropriation:

             Water Pollution Control Revolving Account--

                          State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $113,835,792

             Water Pollution Control Revolving Account--

                          Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $45,277,010

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$159,112,802

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$467,108,040

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$626,220,842

 

             NEW SECTION. Sec. 312. FOR THE DEPARTMENT OF ECOLOGY

             Referendum 38 Water Supply Facilities (74-2-006)

             The reappropriation in this section is subject to the following conditions and limitations:

             (1) The reappropriation is provided solely for projects under contracts on or before June 30, 2001. Reappropriated funds not associated with contracted projects shall lapse on June 30, 2001.

             (2) The office of financial management may grant waivers from this lapse requirement for specific projects upon findings of exceptional circumstances after notification of the chairs of the house of representatives capital budget committee and senate ways and means committee.

             (3) The department shall submit a report to the office of financial management and house of representatives capital budget committee and senate ways and means committee by December 1, 2001, listing all projects funded from this section.

             (4) $2,500,000 of the reappropriation from the state drought preparedness account is provided solely to purchase or lease water pursuant to section 306 of this act.

Reappropriation:

             State Drought Preparedness--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,525,000

             State and Local Improvements Revolving Account

                          (Water Supply Facilities)--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,000,000

                          Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $11,525,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,029,098

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,554,098

 

             NEW SECTION. Sec. 313. FOR THE DEPARTMENT OF ECOLOGY

             Referendum 38 Water Supply Facilities (02-4-006)

             The appropriation in this section is subject to the following conditions and limitations: $250,000 of the appropriation is provided solely to study the development of the Lake Wenatchee water storage project.

Appropriation:

             State and Local Improvements Revolving Account (Water Supply

                          Facilities)--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$18,000,000

 

             NEW SECTION. Sec. 314. FOR THE DEPARTMENT OF ECOLOGY

             Centennial Clean Water Fund (86-2-007)

             The reappropriation in this section is subject to the following conditions and limitations:

             (1) The reappropriation in this section is provided solely for projects under contract on or before June 30, 2001. Reappropriated funds not associated with contracted projects shall lapse on June 30, 2001.

             (2) The office of financial management may grant waivers from this lapse requirement for specific projects upon findings of exceptional circumstances after notification of the chairs of the house of representatives capital budget committee and senate ways and means committee.

             (3) The department shall submit a report to the office of financial management and house of representatives capital budget committee and senate ways and means committee by December 1, 2001, listing all projects funded from this section.

             (4) The entire public works assistance account reappropriation is provided for water quality facility grants for communities with a population of less than 5,000. The department shall give priority consideration to: (a) Communities subject to a regulatory order from the department of ecology for noncompliance with water quality regulations; (b) projects for which design work has been completed; and (c) projects with a local match from reasonable water quality rates and charges.

Reappropriation:

             Public Works Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,013,151

             Water Quality Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$27,318,809

                          Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $34,331,960

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$131,764,921

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$166,096,881

 

             NEW SECTION. Sec. 315. FOR THE DEPARTMENT OF ECOLOGY

             Centennial Clean Water Fund (02-4-007)

             The appropriation in this section is subject to the following conditions and limitations:

             (1) Up to $15,097,000 of the water quality account appropriation is provided for the extended grant payment to Metro/King county.

             (2) Up to $10,000,000 of the water quality account appropriation is provided for the extended grant payment to Spokane for the Spokane-Rathdrum Prairie aquifer.

             (3) $2,000,000 of the water quality account--state appropriation is provided for water quality facility grants for communities with a population of less than 5,000. The department shall give priority consideration to: (a) Communities subject to a regulatory order from the department of ecology for noncompliance with water quality regulations; (b) projects for which design work has been completed; and (c) projects with a local match from reasonable water quality rates and charges.

             (4) $250,000 is provided solely for a water reclamation project for the city of Pullman and Washington State University; the appropriation in this subsection (4) does not imply a commitment of future funding for this project to either the city of Pullman or Washington State University.

             (5) The remaining appropriation in this section is provided for statewide water quality implementation and planning grants and loans. The department shall give priority consideration to projects located in basins with critical or depressed salmonid stocks.

Appropriation:

             Water Quality Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$50,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$208,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$258,000,000

 

             NEW SECTION. Sec. 316. FOR THE DEPARTMENT OF ECOLOGY

             Water Irrigation Efficiencies (01-H-010)

             The appropriation in this section is subject to the following conditions and limitations:

             (1) The appropriation is provided solely to provide grants to conservation districts to assist the agricultural community to implement water conservation measures and irrigation efficiencies in the 16 critical basins. A conservation district receiving funds shall manage each grant to ensure that a portion of the water saved by the water conservation measure or irrigation efficiency will be placed as a purchase or a lease in the trust water rights program to enhance instream flows. The proportion of saved water placed in the trust water rights program must be equal to the percentage of the public investment in the conservation measure or irrigation efficiency. The percentage of the public investment may not exceed 85 percent of the total cost of the conservation measure or irrigation efficiency. In awarding grants, a conservation district shall give first priority to family farms.

             (2) By February 1, 2003, the state conservation commission shall submit a progress report to the appropriate standing committees of the legislature on: (1) The amount of public funds expended from this section; and (2) the location and amount of water placed in the trust water rights program pursuant to this section.

             (3) $1,000,000 of the water quality account appropriation is provided for water leases or projects in the Yakima River basin for acquifer recharge necessary to allow the use of drought wells to meet essential irrigation needs. Essential irrigation needs is defined as eighty percent of the amount of water a farmer would ordinarily receive from the irrigation district, less the water that is actually delivered and regardless of crops grown.

Appropriation:

             State and Local Improvements Revolving Account

                          (Water Supply Facilities)--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,000,000

             Water Quality Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,000,000

                          Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,000,000

 

             NEW SECTION. Sec. 317. FOR THE DEPARTMENT OF ECOLOGY

             Water Measuring Devices and Gauges (01-H-009)

             The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely for water measuring devices and gauges. The department shall prioritize the distribution of water measuring devices and gauges to locations participating in the department of fish and wildlife fish screens and cooperative compliance programs.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,400,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,400,000

 

             NEW SECTION. Sec. 318. FOR THE STATE PARKS AND RECREATION COMMISSION

             Spokane Centennial Trail (89-5-112)

             The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

Reappropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$206,534

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  89,888

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$296,422

 

             NEW SECTION. Sec. 319. FOR THE STATE PARKS AND RECREATION COMMISSION

             Statewide Recreation Development Program (98-2-008)

             The reappropriation in this section is subject to the following conditions and limitations:

             (1) The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

             (2) $33,881 of the general fund--federal reappropriation is provided for the continuation of the United States national park service and the United States department of energy grants as described in section 325, chapter 379, Laws of 1999.

             (3) $647,240 of the general fund--federal reappropriation is provided for the continuation of the United States forest service grant as described in section 325, chapter 379, Laws of 1999.

Reappropriation:

             General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$868,255

             General Fund--Private/Local. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$  29,294

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,502,376

                          Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,399,925

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,154,673

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,554,598

 

             NEW SECTION. Sec. 320. FOR THE STATE PARKS AND RECREATION COMMISSION

             Recreation Development (02-2-007)

             The appropriation in this section is subject to the following conditions and limitations:

             (1) $500,000 is provided solely for Grayland Beach state park development, including expanding campsites, installing yurts, adding comfort stations, and related park infrastructure development.

             (2) $164,000 of this appropriation is provided as state match to federal funds for the Iron Horse depot.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $664,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,664,000

 

             NEW SECTION. Sec. 321. FOR THE STATE PARKS AND RECREATION COMMISSION

             Cama Beach State Park Development (99-2-001)

Reappropriation:

             Parks Renewal and Stewardship Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$310,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$690,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000

 

             NEW SECTION. Sec. 322. FOR THE STATE PARKS AND RECREATION COMMISSION

             Major Park Renovation - Cama Beach (02-1-022)

             The appropriation in this section is provided to complete electrical power, water, and sewer utilities, and for other park development and renovation.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,000,000

 

             NEW SECTION. Sec. 323. FOR THE STATE PARKS AND RECREATION COMMISSION

             Coastal Facility Relocation (00-1-005)

             The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,500,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$500,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000

 

             NEW SECTION. Sec. 324. FOR THE STATE PARKS AND RECREATION COMMISSION

             Coastal Facility Relocation (02-1-017)

             The appropriation in this section is subject to the following conditions and limitations:

             (1) The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

             (2) The commission shall ensure that all funds transferred from the public works assistance account to the parks renewal and stewardship account during the 2001-2003 biennium are used only for this project.

             (3) Funds expended on this project for off-site utility infrastructure that may include the provision of electricity, water service, or sewer service shall be for the benefit of the state. Entities that subsequently connect to or use this off-site utility infrastructure shall reimburse the state at a rate proportional to their use. The commission, in consultation with the public works board, shall develop policies and procedures to ensure this reimbursement occurs.

             (4) The commission shall ensure that all reimbursement recovered as specified in subsection (3) of this section is paid into the public works assistance account.

             (5) Ownership of the off-site sewer and water utility infrastructure constructed in this section shall transfer to the city of Ilwaco.

Appropriation:

             Parks Renewal and Stewardship Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,700,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,700,000

 

             NEW SECTION. Sec. 325. FOR THE STATE PARKS AND RECREATION COMMISSION

             Historic Structure and Land Use Program (00-1-007)

             The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,477,393

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,022,607

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,500,000

 

             NEW SECTION. Sec. 326. FOR THE STATE PARKS AND RECREATION COMMISSION

             Lewis and Clark Trail Bicentennial (00-1-010)

             The appropriation in this section is provided solely to renovate facilities and enhance exhibits at Lewis and Clark trail interpretive centers located at Sacajawea state park and Fort Canby state park.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,250,000

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$250,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,500,000

 

             NEW SECTION. Sec. 327. FOR THE STATE PARKS AND RECREATION COMMISSION

             Park Housing (00-1-014)

             The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$250,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$500,000

 

             NEW SECTION. Sec. 328. FOR THE STATE PARKS AND RECREATION COMMISSION

             Park Housing (02-2-008)

             The appropriation in this section is subject to the following conditions and limitations:

             (1) The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

             (2) The appropriation in this section is provided solely to replace existing substandard housing or construct new housing at park locations that presently do not have a full-time, on-site ranger.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,500,000

 

             NEW SECTION. Sec. 329. FOR THE STATE PARKS AND RECREATION COMMISSION

             Americans with Disabilities Act (00-9-036)

             The reappropriation in this section is subject to the following conditions and limitations:

             (1) The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

             (2) The department shall minimize the expenditure of these funds for staff and administrative purposes or for other operational expenses.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $226,845

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$195,887

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$422,732

 

             NEW SECTION. Sec. 330. FOR THE STATE PARKS AND RECREATION COMMISSION

             Facilities Preservation: Statewide (98-1-003)

             The appropriations in this section are subject to the following conditions and limitations:

             (1) The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

             (2) $399,000 of the reappropriation and $50,000 of the new appropriation from the state building construction account--state are provided solely to transfer Mukilteo state park to the city of Mukilteo.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,700,000

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $  50,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,934,532

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,684,532

 

             NEW SECTION. Sec. 331. FOR THE STATE PARKS AND RECREATION COMMISSION

             Statewide Facility Preservation and Deferred Maintenance (99-1-001)

             The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,300,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,700,000

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,000,000

 

             NEW SECTION. Sec. 332. FOR THE STATE PARKS AND RECREATION COMMISSION

             Statewide Facility Preservation (02-1-001)

             The appropriation in this section is subject to the following conditions and limitations:

             (1) The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

             (2) The appropriation in this section is provided solely to continue minor works projects that reduce the deferred maintenance backlog.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $10,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$40,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$50,000,000

 

             NEW SECTION. Sec. 333. FOR THE STATE PARKS AND RECREATION COMMISSION

             Fort Worden State Park Preservation and Multi-Purpose Facilities (02-1-003)

             The appropriation in this section is subject to the following conditions and limitations:

             (1) The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

             (2) The appropriation in this section is provided solely for park preservation and for development of the multi-purpose dining and meeting facility.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,500,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,500,000

 

             NEW SECTION. Sec. 334. FOR THE STATE PARKS AND RECREATION COMMISSION

             Emergency and Unforseen Needs (02-1-004)

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,200,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,700,000

 

             NEW SECTION. Sec. 335. FOR THE STATE PARKS AND RECREATION COMMISSION

             Natural/Historic Stewardship (02-1-006)

             The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,000,000

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,000,000

 

             NEW SECTION. Sec. 336. FOR THE STATE PARKS AND RECREATION COMMISSION

             Environmental Learning Centers (02-1-010)

             The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for the Seahurst environmental learning center.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000

             Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

             Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$           0

                          TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$250,000

 

             NEW SECTION. Sec. 337. FOR THE STATE PARKS AND RECREATION COMMISSION

             Facilities Assessment Program (02-2-005)

             The appropriation in this section shall lapse on June 30, 2003.

Appropriation:

             State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000