SIXTY SECOND LEGISLATURE - FIRST SPECIAL SESSION

 

 

THIRTIETH  DAY

 

 

House Chamber, Olympia, Wednesday, May 25, 2011

 


The House was called to order at 10:00 a.m. by the Speaker (Representative Orwall presiding).  The Clerk called the roll and a quorum was present.

 

The flags were escorted to the rostrum by a Sergeant at Arms Color Guard, Pages Paula Rehwaldt and Scott Obert.  The Speaker (Representative Orwall presiding) led the Chamber in the Pledge of Allegiance.  The prayer was offered by Representative Kirk Pearson, 39th District,Washington.

 

Reading of the Journal of the previous day was dispensed with and it was ordered to stand approved.

 

MESSAGES FROM THE SENATE

 

May 24, 2011

MR. SPEAKER:

 

The Senate has passed:

HOUSE BILL 1131

SECOND SUBSTITUTE HOUSE BILL 1132

SUBSTITUTE HOUSE BILL 2119

and the same are herewith transmitted.

Brad Hendrickson, Deputy Secretary

 

May 24, 2011

MR. SPEAKER:

 

The Senate has passed:

SUBSTITUTE SENATE BILL 5181

ENGROSSED SUBSTITUTE SENATE BILL 5834

and the same are herewith transmitted.

Brad Hendrickson, Deputy Secretary

 

May 24, 2011

MR. SPEAKER:

 

The President has signed:

SECOND ENGROSSED SUBSTITUTE HOUSE BILL 1224

ENGROSSED SECOND SUBSTITUTE HOUSE BILL 1371

ENGROSSED SUBSTITUTE HOUSE BILL 1449

ENGROSSED SECOND SUBSTITUTE HOUSE BILL 1795

ENGROSSED SECOND SUBSTITUTE HOUSE BILL 1965

ENGROSSED HOUSE BILL 2123

and the same are herewith transmitted.

Thomas Hoemann, Secretary

 

May 24, 2011

MR. SPEAKER:

 

The President has signed:

SECOND ENGROSSED SUBSTITUTE SENATE BILL 5742

SECOND ENGROSSED SENATE BILL 5764

and the same are herewith transmitted.

Thomas Hoemann, Secretary

 

May 24, 2011

MR. SPEAKER:

 

The President has signed ENGROSSED SUBSTITUTE SENATE BILL 5749 and the same is herewith transmitted.

Thomas Hoemann, Secretary

 

INTRODUCTIONS AND FIRST READING

 

HB 2124 by Representatives Nealey, Takko, Haler, Blake, Armstrong, Short, Crouse, Kristiansen, Walsh, Klippert, Hinkle, Orcutt, Harris, Chandler, Johnson, Rodne, Overstreet, Bailey and McCune

 

AN ACT Relating to narrowing the requirement that utilities purchase electricity, renewable energy credits, or electric generating facilities that are not needed to serve their customers' loads; amending RCW 19.285.040; and creating a new section.

 

Referred to Committee on Environment.

 

HB 2125 by Representatives Parker, Schmick and Fagan

 

AN ACT Relating to the health care compact; adding a new chapter to Title 74 RCW; and creating a new section.

 

Referred to Committee on Health Care & Wellness.

 

SSB 5181        by Senate Committee on Ways & Means (originally sponsored by Senators Parlette, Kilmer, Zarelli, Murray, Litzow, Rockefeller, Stevens, Becker, Baumgartner and Hill)

 

AN ACT Relating to limitations on state debt; adding a new section to chapter 39.42 RCW; creating new sections; and making an appropriation.

 

ESSB 5834      by Senate Committee on Ways & Means (originally sponsored by Senators Murray, Litzow, McAuliffe, Nelson, Hill, White, Kohl-Welles, Fain and Eide)

 

AN ACT Relating to permitting counties to direct an existing portion of local lodging taxes to programs for arts, culture, heritage, tourism, and housing; and amending RCW 67.28.180, 36.38.010, and 36.100.220.

 

There being no objection, SUBSTITUTE SENATE BILL NO. 5181 was read the first time, and under suspension of the rules was placed on the second reading calendar.

 

There being no objection, the bills listed on the day’s introduction sheet under the fourth order of business were referred to the committees so designated, with the exception of ENGROSSED SUBSTITUTE SENATE BILL NO. 5834, which was held on first reading.

 

The Speaker (Representative Orwall presiding) called upon Representative Moeller to preside.

 

There being no objection, the House advanced to the sixth order of business.

 

SECOND READING

 

      SUBSTITUTE SENATE BILL NO. 5181, by Senate Committee on Ways & Means (originally sponsored by Senators Parlette, Kilmer, Zarelli, Murray, Litzow, Rockefeller, Stevens, Becker, Baumgartner and Hill)

 

      Creating a statutory limitation on state debts. Revised for 1st Substitute: Concerning limitations on state debt.

 

      The bill was read the second time.

 

There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.

 

      Representatives Dunshee, Warnick and Smith spoke in favor of the passage of the bill.

 

      Representative Ormsby spoke against the passage of the bill.

 

MOTION

 

On motion of Representative Hinkle, Representatives Anderson, Crouse, Hargrove, McCune and Overstreet were excused.

 

The Speaker (Representative Moeller presiding) stated the question before the House to be the final passage of Substitute Senate Bill No. 5181.

 

ROLL CALL

 

      The Clerk called the roll on the final passage of Substitute Senate Bill No. 5181, and the bill passed the House by the following vote: Yeas, 79; Nays, 14; Absent, 0; Excused, 5.

      Voting yea: Representatives Ahern, Alexander, Angel, Appleton, Armstrong, Asay, Bailey, Billig, Blake, Buys, Carlyle, Chandler, Clibborn, Cody, Condotta, Dahlquist, Dammeier, Darneille, DeBolt, Dickerson, Dunshee, Eddy, Fagan, Finn, Frockt, Green, Haigh, Haler, Harris, Hinkle, Hope, Hudgins, Hunt, Hunter, Hurst, Johnson, Kagi, Kelley, Kenney, Klippert, Kretz, Kristiansen, Ladenburg, Lytton, Maxwell, Miloscia, Moeller, Morris, Nealey, Orcutt, Orwall, Parker, Pearson, Pettigrew, Probst, Rivers, Roberts, Rodne, Rolfes, Ross, Santos, Schmick, Seaquist, Shea, Short, Smith, Springer, Stanford, Sullivan, Takko, Taylor, Upthegrove, Van De Wege, Walsh, Warnick, Wilcox, Wylie, Zeiger and Mr. Speaker.

      Voting nay: Representatives Fitzgibbon, Goodman, Hasegawa, Jinkins, Kirby, Liias, McCoy, Moscoso, Ormsby, Pedersen, Reykdal, Ryu, Sells and Tharinger.

      Excused: Representatives Anderson, Crouse, Hargrove, McCune and Overstreet.

 

SUBSTITUTE SENATE BILL NO. 5181, having received the necessary constitutional majority, was declared passed.

 

      HOUSE BILL NO. 2020, by Representative Dunshee

 

      Relating to funding capital projects. Revised for 1st Substitute: Funding capital projects.

 

      The bill was read the second time.

 

There being no objection, Substitute House Bill No. 2020 was substituted for House Bill No. 2020 and the substitute bill was placed on the second reading calendar.

 

SUBSTITUTE HOUSE BILL NO. 2020 was read the second time.

 

Representative Dunshee moved the adoption of amendment (856).

0) 

                Strike everything after the enacting clause and insert the following:

"NEW SECTION.  Sec. 1.  (1) The legislature finds that:

      (a) The capital budget includes appropriations for the construction and repair of public schools, colleges and universities, prisons and juvenile rehabilitation facilities, state office buildings, housing for low-income and disabled persons, farm workers and others, parks, public infrastructure, and for other capital facilities and programs;

      (b) The size of the capital budget is determined by the available bond capacity under the constitutional debt limit and by moneys available from dedicated accounts, trust revenue, and other funding sources; 

      (c) Approximately half of the capital budget is financed with state-issued general obligation bonds, which pledge the full faith, credit and taxing power of the state toward payment of debt service; and

      (d) The capital budget has limited purpose if there is no bond authorization bill to finance appropriations.

      (2) The legislature therefore intends to increase the transparency and clarity of the uses and sources of the capital budget for the 2011 supplemental and 2011-2013 fiscal biennium by combining in one bill the authorization of state general obligation bonds with the appropriations that they support.

NEW SECTION.  Sec. 2.  (1) A capital budget is hereby adopted and, subject to the provisions set forth in this act, the several dollar amounts hereinafter specified, or so much thereof as shall be sufficient to accomplish the purposes designated, are hereby appropriated and authorized to be incurred for capital projects during the period beginning with the effective date of this act and ending June 30, 2013, out of the several funds specified in this act.

      (2) The appropriations in this act are appropriations for capital purposes from proceeds of general obligation and other bonds.  Appropriations in this act may not necessarily represent all expenditures authorized for a particular project for the 2011-2013 fiscal biennium.  For some projects receiving appropriations in this act, additional appropriations from other sources for those projects may also be contained in chapter . . . ., Laws of 2011 (House Bill No. 1497).

      (3) The definitions in this subsection apply throughout this act unless the context clearly requires otherwise.

      (a) "Fiscal year 2012" or "FY 2012" means the period beginning July 1, 2011, and ending June 30, 2012.

      (b) "Fiscal year 2013" or "FY 2013" means the period beginning July 1, 2012, and ending June 30, 2013.

      (c) "Lapse" or "revert" means the amount shall return to an unappropriated status.

      (d) "Provided solely" means the specified amount may be spent only for the specified purpose.

      (4) Unless otherwise specifically authorized in this act, any portion of an amount provided solely for a specified purpose that is not expended subject to the specified conditions and limitations to fulfill the specified purpose shall lapse.

      (5) The amounts shown under the headings "Prior Biennia," "Future Biennia," and "Total" in this act are for informational purposes only and do not constitute legislative approval of these amounts.  "Prior biennia" typically refers to the immediate prior biennium for reappropriations, but may refer to multiple biennia in the case of specific projects.  A "future biennia" amount is an estimate of what may be appropriated for the project or program in the 2011-2013 biennium and the following three biennia; an amount of zero does not necessarily constitute legislative intent to not provide funding for the project or program in the future.

      (6) "Reappropriations" in this act are appropriations and, unless the context clearly provides otherwise, are subject to the relevant conditions and limitations applicable to appropriations.  Reappropriations shall be limited to the unexpended balances remaining on June 30, 2011, from the 2009-2011 biennial appropriations for each project.

PART 1
GENERAL GOVERNMENT

NEW SECTION.  Sec. 1001.  FOR THE DEPARTMENT OF COMMERCE

      Local and Community Projects (20064008)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1001, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $5,052,000

 

      Prior Biennia (Expenditures)               $40,850,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $45,902,000

NEW SECTION.  Sec. 1002.  FOR THE DEPARTMENT OF COMMERCE

      Job and Economic Development Grants (20064950)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation in this section is subject to the provisions of section 1002, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $4,418,000

 

      Prior Biennia (Expenditures)               $42,523,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $46,941,000

NEW SECTION.  Sec. 1003.  FOR THE DEPARTMENT OF COMMERCE

      Jobs in Communities (20064951)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 140, chapter 488, Laws of 2005.

 

Reappropriation:

      State Building Construction Account--State       $1,949,000

 

      Prior Biennia (Expenditures)               $10,301,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $12,250,000

NEW SECTION.  Sec. 1004.  FOR THE DEPARTMENT OF COMMERCE

      Public Works Trust Fund (20074005)

 

Reappropriation:

      State Taxable Building Construction Account--State          $26,742,000

 

      Prior Biennia (Expenditures)               $168,258,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $195,000,000

NEW SECTION.  Sec. 1005.  FOR THE DEPARTMENT OF COMMERCE

      Water System Acquisition and Rehabilitation Program (20074006)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1040, chapter 520, Laws of 2007.

 

Reappropriation:

      State Building Construction Account--State       $106,000

 

      Prior Biennia (Expenditures)               $3,550,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,656,000

NEW SECTION.  Sec. 1006.  FOR THE DEPARTMENT OF COMMERCE

      Housing Assistance, Weatherization, and Affordable Housing (20074009)

 

Reappropriation:

      State Building Construction Account--State       $2,000

      State Taxable Building Construction

             Account--State              $10,688,000

             Subtotal Reappropriation              $10,690,000

 

      Prior Biennia (Expenditures)               $176,010,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $186,700,000

NEW SECTION.  Sec. 1007.  FOR THE DEPARTMENT OF COMMERCE

      Job Development Fund Grants (20074010)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1032, chapter 520, Laws of 2007 and section 1005, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $7,999,000

 

      Prior Biennia (Expenditures)               $40,931,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $48,930,000

NEW SECTION.  Sec. 1008.  FOR THE DEPARTMENT OF COMMERCE

      Longview Regional Water Treatment Plant Dredging (20081001)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1016, chapter 328, Laws of 2008.

 

Reappropriation:

      State Building Construction Account--State       $41,000

 

      Prior Biennia (Expenditures)               $109,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $150,000

NEW SECTION.  Sec. 1009.  FOR THE DEPARTMENT OF COMMERCE

      Quincy Water Treatment System (20081002)

 

Reappropriation:

      State Building Construction Account--State       $172,000

 

      Prior Biennia (Expenditures)               $4,328,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,500,000

NEW SECTION.  Sec. 1010.  FOR THE DEPARTMENT OF COMMERCE

      Innovation Partnership Zones (20082003)

 

Reappropriation:

      State Building Construction Account--State       $1,437,000

 

      Prior Biennia (Expenditures)               $3,563,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $5,000,000

NEW SECTION.  Sec. 1011.  FOR THE DEPARTMENT OF COMMERCE

      Local and Community Projects (20084001)

 

      The reappropriation in this section is subject to the following conditions and limitations: 

      (1) The projects must comply with RCW 43.63A.125 and other requirements for community projects administered by the department.

      (2) The reappropriation is subject to the provisions of section 1008, chapter 328, Laws of 2008 and section 1003, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $18,387,000

 

      Prior Biennia (Expenditures)               $106,757,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $125,144,000

NEW SECTION.  Sec. 1012.  FOR THE DEPARTMENT OF COMMERCE

      Community Development Fund (20084850)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1006, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $2,507,000

 

      Prior Biennia (Expenditures)               $18,409,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $20,916,000

NEW SECTION.  Sec. 1013.  FOR THE DEPARTMENT OF COMMERCE

      Belfair Sewer Improvements (20084852)

 

Reappropriation:

      State Building Construction Account--State       $10,294,000

 

      Prior Biennia (Expenditures)               $6,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $10,300,000

NEW SECTION.  Sec. 1014.  FOR THE DEPARTMENT OF COMMERCE

      Community Schools Program (20084856)

 

Reappropriation:

      State Building Construction Account--State       $1,116,000

 

      Prior Biennia (Expenditures)               $3,469,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,585,000

NEW SECTION.  Sec. 1015.  FOR THE DEPARTMENT OF COMMERCE

      2008 Local and Community Projects (20084861)

 

Reappropriation:

      State Building Construction Account--State       $4,418,000

 

      Prior Biennia (Expenditures)               $13,326,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $17,744,000

NEW SECTION.  Sec. 1016.  FOR THE DEPARTMENT OF COMMERCE

      Building for the Arts Grants (30000006)

 

      The reappropriation in this section is subject to the provisions of section 1011, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $6,028,000

 

      Prior Biennia (Expenditures)               $4,047,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $10,075,000

NEW SECTION.  Sec. 1017.  FOR THE DEPARTMENT OF COMMERCE

      Youth Recreational Facilities Grants (30000007)

 

Reappropriation:

      State Building Construction Account--State       $2,774,000

 

      Prior Biennia (Expenditures)               $3,776,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $6,550,000

NEW SECTION.  Sec. 1018.  FOR THE DEPARTMENT OF COMMERCE

      Building Communities Fund Grants (30000008)

 

Reappropriation:

      State Building Construction Account--State       $5,203,000

 

      Prior Biennia (Expenditures)               $21,917,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $27,120,000

NEW SECTION.  Sec. 1019.  FOR THE DEPARTMENT OF COMMERCE

      Innovation Partnership Zones (30000012)

 

Reappropriation:

      State Building Construction Account--State       $1,250,000

 

      Prior Biennia (Expenditures)               $250,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,500,000

NEW SECTION.  Sec. 1020.  FOR THE DEPARTMENT OF COMMERCE

      Housing Assistance, Weatherization, and Affordable Housing (30000013)

 

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations are subject to the provisions of section 1012, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $12,851,000

      State Taxable Building Construction

            Account--State              $40,700,000

             Subtotal Reappropriation              $53,551,000

 

      Prior Biennia (Expenditures)               $66,449,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $120,000,000

NEW SECTION.  Sec. 1021.  FOR THE DEPARTMENT OF COMMERCE

      Local and Community Projects (30000019)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to section 1014, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $7,825,000

 

      Prior Biennia (Expenditures)               $12,320,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $20,145,000

NEW SECTION.  Sec. 1022.  FOR THE DEPARTMENT OF COMMERCE

      2010 Local and Community Projects (30000082)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1015, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $12,108,000

 

      Prior Biennia (Expenditures)               $2,022,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $14,130,000

NEW SECTION.  Sec. 1023.  FOR THE DEPARTMENT OF COMMERCE

      Community Schools (91000002)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1013, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $3,280,000

 

      Prior Biennia (Expenditures)               $3,220,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $6,500,000

NEW SECTION.  Sec. 1024.  FOR THE DEPARTMENT OF COMMERCE

      Temporary Public Works Grant Program (92000021)

 

      The reappropriation in this section is subject to the provisions of section 1050, chapter 497, Laws of 2009.

 

Reappropriation:

      State Building Construction Account--State       $17,106,000

      State Taxable Building Construction Account--State          $1,298,000

             Subtotal Reappropriation              $18,404,000

 

      Prior Biennia (Expenditures)               $23,936,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $42,340,000

NEW SECTION.  Sec. 1025.  FOR THE DEPARTMENT OF COMMERCE

      Jobs Act for K-12 Public Schools & Higher Education Institutions (91000085)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1016, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $44,630,000

 

      Prior Biennia (Expenditures)               $179,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $44,809,000

NEW SECTION.  Sec. 1026.  FOR THE DEPARTMENT OF COMMERCE

      Housing Assistance, Weatherization, Affordable Housing Trust Fund (30000098)

 

      The appropriations in this section are subject to the following conditions and limitations:

      (1) $3,000,000 of the appropriation is provided solely to construct or rehabilitate facilities to house homeless veterans.  The department must consult with the department of veterans affairs and must use these funds as matching resources for funds available from the federal veterans administration and the department of housing and urban development.

      (2) $3,000,000 of the appropriation is provided solely to promote development of safe and affordable housing units for persons eligible for services from the division of developmental disabilities within the department of social and health services.

      (3) $6,000,000 of the appropriation is provided solely for weatherization administered through the energy matchmakers program.

      (4) $3,000,000 of the appropriation is provided solely for facilities to house low-income migrant, seasonal, or temporary farmworkers.  The department shall work with the farmworker housing advisory committee to prioritize funding of projects to the areas of highest need.

      (5) $3,000,000 of the appropriation is provided solely to build low-income housing units in underserved communities and to concurrently develop capacity in these same communities.  Underserved communities of concern are those that have high levels of poverty, specifically, thirty percent of the local median income; experience chronic homelessness; and lack affordable housing.  Underserved communities include veterans, immigrants, refugees, and those communities of color disproportionately impacted by chronic homelessness and lack of affordable housing.  The department must collaborate with representatives of underserved communities and organizations committed to assistance in these efforts to prioritize and plan distribution of funding.

      (6) For counties with populations exceeding one million five hundred thousand during the 2011-2013 fiscal biennium, allocation of funds provided in this section shall account for local policies related to affordable housing as required by chapter 36.70A RCW.

 

Appropriation:

      State Taxable Building Construction Account--

             State               $50,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $163,200,000

             TOTAL         $213,200,000

NEW SECTION.  Sec. 1027.  FOR THE DEPARTMENT OF COMMERCE

      Building Communities Fund Grants (30000102)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) Except as directed otherwise prior to the effective date of this section, the department shall not expend the appropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the projects or a distinct phase of the project that is useable to the public for this purpose intended by the legislature.

      (2) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease.  This requirement does not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.

      (3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.

      (4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.

      (5) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(6).

      (6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay state prevailing wages.

      (7) The appropriation is provided solely for the following list of projects:

 

Project

Authorized

Amount

Serenity House of Clallam County

$52,000

Boys & Girls Clubs of King County

$316,000

YMCA of Pierce and Kitsap

Counties

$1,250,000

Jewish Family Service

$2,313,000

Low Income Housing Institute

$313,000

The Salvation Army

$56,000

Share

$581,000

Navos

$2,500,000

Kitsap Community Resources

$600,000

Transitions

$109,000

Boys & Girls Clubs of the Columbia

Basin

$648,000

Village Green Foundation

$1,029,000

Community Action Council of LMT

$95,000

United Way of Kitsap County

$605,000

ARC of Spokane

$862,000

Dynamic Family Services

$575,000

University District Food Bank

$573,000

Total

$12,327,000

 

 

Appropriation:

      State Building Construction Account--

             State               $12,327,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $56,000,000

             TOTAL         $68,327,000

NEW SECTION.  Sec. 1028.  FOR THE DEPARTMENT OF COMMERCE

      Local and Community Projects (30000166)

 

      The appropriations in this section are subject to the following conditions and limitations:

      (1) Except as directed otherwise prior to the effective date of this section, the department shall not expend the appropriations in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.

      (2) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease.  This requirement does not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.

      (3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.

      (4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.

      (5) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(6).

      (6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay state prevailing wages.

      (7) The appropriation in this section for the Roslyn Renaissance project is subject to the following conditions and limitations:  It is the intent of this appropriation to undertake a feasibility study of structural and program integrity of historic buildings including (a) the northwest improvement company store, (b) the Sylvia's house, and (c) vacant commercial lots within the city of Roslyn.  The study will analyze the adaptability of relocating the city offices to the renovated city hall building.  The Roslyn downtown association shall submit the completed study to the department by July 1, 2012, including a detailed cost estimate for the property acquisition and redevelopment, and a capital fundraising plan to support the acquisitions through multiple funding sources.

      (8) The appropriation is provided solely for the following list of projects:

 

 

Project

Authorized Amount

Adna Athletic and Fitness Facility

$80,000

American Lake Veterans' Golf

Course

$250,000

Anacortes Depot

$380,000

Bothell North Creek Forest Land

Acquisition

$200,000

Boys and Girls Federal Way

$50,000

Bucoda Odd Fellows Community

Center

$150,000

Central WA State Fair

Association

$35,000

City of Kirkland Athletic Fields

$150,000

Colville Tribal Museum

$250,000

Daybreak Youth Services Pre-Construction Activities

$100,000

Dekalb Pier Project

$700,000

Gig Harbor Maritime Pier

$390,000

Grays Harbor Historical Seaport

Lady Washington Rehabilitation

$169,000

Legion Park Visitors Center and

Trailhead Project

$110,000

Match FEMA funds for Sprague

Response Center

$300,000

North Mason Senior Center

$1,360,000

Port of Bremerton

$1,100,000

Puyallup Transit Oriented

Development

$1,500,000

Redmond Central Connector

$850,000

Roslyn Renaissance

$300,000

Seattle Children's Hospital

Emergency Department

$1,000,000

Skagit Valley Hospital

$750,000

South Tacoma Community Center

Playground

$380,000

Spokane Food Bank Distribution

Center Capacity and Renovation

$1,250,000

Spokane Valley Partners Boiler

Replacement

$100,000

Sultan Boys and Girls Club

$500,000

Tacoma Hilltop Health Center

$1,500,000

The Arc of Tri-Cities Facility

$350,000

Traumatic Brain Injury Center

$900,000

Vancouver Waterfront Park Pre-Construction Activities

$500,000

Veteran's Memorial

$210,000

West Hill Skyway

Redevelopment

$750,000

YWCA Yakima

$203,000

Total

$16,817,000

 

 

Appropriation:

      State Building Construction Account--State       $16,817,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $16,817,000

NEW SECTION.  Sec. 1029.  FOR THE DEPARTMENT OF COMMERCE

      Youth Recreational Facilities Grants (30000100)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation is subject to the provisions of RCW 43.63A.135.

      (2) The appropriation is provided solely for the following list of projects:

 

 

Project

Authorized

Amount

Little Bit Therapeutic Riding Center

$560,000

Boys & Girls Clubs of King County -

      Mercer Island PEAK

 

$800,000

Boys & Girls Clubs of Thurston County

$163,000

YMCA of Pierce and Kitsap Counties

$800,000

YMCA of Greater Seattle

$800,000

Boys & Girls Clubs of King County -

      Ballard Boys & Girls Club Addition

 

$475,000

Boys & Girls Clubs of the Columbia Basin

$629,000

Boys & Girls Clubs of Whatcom County

$26,000

Total

$4,253,000

 

 

Appropriation:

      State Building Construction Account--State       $4,253,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $24,000,000

             TOTAL         $28,253,000

NEW SECTION.  Sec. 1030.  FOR THE DEPARTMENT OF COMMERCE

      Building for the Arts Grants (30000101)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) Except as directed otherwise prior to the effective date of this section, the department shall not expend the appropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the projects or a distinct phase of the project that is useable to the public for this purpose intended by the legislature.

      (2) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease.  This requirement does not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.

      (3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.

      (4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.

      (5) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(6).

      (6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay state prevailing wages.

      (7) The appropriation is provided solely for the following list of projects:

 

 

Project

Authorized

Amount

Bainbridge Art Museum

$518,000

Community Theatre, Inc.

$91,000

Coyote Central

$243,000

Harrington Opera House

$66,000

Olympia Little Theatre

$44,000

Seattle Musical Theatre

$163,000

SIFF

$491,000

Studio East Training for the Performing

      Arts/Studio

 

$100,000

Taproot Theatre Company

$570,000

Town Hall Association dba Town Hall

      Seattle

 

$70,000

Velocity Dance Center

$106,000

Total

$2,462,000

 

 

Appropriation:

      State Building Construction Account--State       $2,462,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $29,506,000

             TOTAL         $31,968,000

NEW SECTION.  Sec. 1031.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Oversight of State Facilities (91000002)

 

Appropriation:

      State Building Construction Account--State       $1,400,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $6,600,000

             TOTAL         $8,000,000

NEW SECTION.  Sec. 1032.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Cowlitz River Dredging (20082856)

 

Reappropriation:

      State Building Construction Account--State       $856,000

 

      Prior Biennia (Expenditures)               $644,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,500,000

NEW SECTION.  Sec. 1033.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Catastrophic Flood Relief (20084850)

 

      (1) The appropriations in this section are subject to the following conditions and limitations:

      (a) $1,320,000 of the appropriations are provided solely for the Chehalis basin flood control authority or other local flood districts (i) to study, develop, construct, maintain, operate, and fund flood control measures throughout the basin, (ii) to complete by December 2011 the ongoing study of the effect of possible retention structures on fish in the basin, and (iii) to complete the hydraulic model for the Chehalis river to calculate flood levels, flood damages, and benefits of proposed flood mitigation projects for the lower portions of the river; and

      (b) $1,200,000 of the appropriations are provided solely for nonfederal matching funds and state agency costs associated with the United States army corps of engineers flood hazard mitigation projects for the Chehalis river basin.

      (2) By July 2012, the office of financial management, in collaboration with the department of transportation and the department of ecology, and affected and interested federal agencies, tribal governments and local governments, must provide a report to the governor and legislature that identifies recommended priority flood hazard mitigation projects in the Chehalis river basin for continued feasibility and design work.  The report must:

      (a) Address the potential for flood mitigation through upstream water retention facilities, including benefits and impacts to fish and potential mitigation of impacts;

      (b) Describe the current alignment and design of the federal flood levees proposed at Centralia and Chehalis, including extent of protection provided to these communities, and any upstream or downstream effects of the levees;

      (c) Evaluate alternative projects that could protect the interstate highway and the municipal airport at Centralia and Chehalis, and ensure access to medical and other critical community facilities during flood events;

      (d) Discuss other alternatives that could provide flood relief and protection in the basin, such as replacement of highway bridges that constrain flood waters, flood easements on agricultural lands, livestock evacuation facilities and routes, small-scale water diversion and retention, use of riparian habitat and environmental restoration projects to mitigate damages from flood waters, and other projects or programs;

      (e) Summarize the benefits and costs of recommended projects, using available information and accepted benefit/cost methods; and

      (f) Identify the responsible parties and procedures for making final decisions on funding, construction and governance of recommended flood projects, any related and necessary government agreements, and a schedule for these decisions.

      (3) It is the intent of the legislature to fulfill the commitment of section 101, chapter 179, Laws of 2008 and chapter 180, Laws of 2008, by appropriating funds when the federal match requirement is needed.

 

Reappropriation:

      State Building Construction Account--State       $2,980,000

 

Appropriation:

      State Building Construction Account--State       $895,000

 

      Prior Biennia (Expenditures)               $5,610,000

      Future Biennia (Projected Costs)        $40,515,000

             TOTAL         $50,000,000

NEW SECTION.  Sec. 1034.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Graving Dock Settlement (20084001)

 

Appropriation:

      State Building Construction Account--State       $140,000

 

      Prior Biennia (Expenditures)               $15,760,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $15,900,000

NEW SECTION.  Sec. 1035.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Emergency Repairs (30000027)

 

      The appropriations in this section are subject to the following conditions and limitations:  Emergency funds shall not be allotted until an emergency declaration signed by the affected agency director, a scope of work, and cost estimate are approved by the office of financial management.  Emergency funds may only be used for unexpected building or grounds failures that will impact public health and safety, or the day-to-day operations of the facility.  The office of financial management shall report to the house capital budget committee and senate ways and means committee annually on the approved emergency projects.

 

Appropriation:

      State Building Construction Account--State       $8,183,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $8,183,000

NEW SECTION.  Sec. 1036.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Bid Savings Contingency Pool (92000002)

 

Appropriation:

      State Building Construction Account--State       $6,500,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $6,500,000

NEW SECTION.  Sec. 1037.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      O'Brien Building Improvements (20081007)

 

      The reappropriation in this section is subject to the following conditions and limitations:  Upon completion of the project, temporary modular buildings shall be removed, and the parking lot shall be restored and landscaped within budget.

 

Reappropriation:

      State Building Construction Account--State       $8,257,000

 

      Prior Biennia (Expenditures)               $2,944,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $11,201,000

NEW SECTION.  Sec. 1038.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Capitol Campus High Voltage System Improvements (20081010)

 

Reappropriation:

      State Building Construction Account--State       $111,000

 

      Prior Biennia (Expenditures)               $2,093,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,204,000

NEW SECTION.  Sec. 1039.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Legislative Building Improvements (20081011)

 

Reappropriation:

      State Building Construction Account--State       $92,000

 

      Prior Biennia (Expenditures)               $1,659,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,751,000

NEW SECTION.  Sec. 1040.  FOR THE DEPARTMENT OF GENERAL  ADMINISTRATION

      Minor Works Preservation (30000012)

 

Reappropriation:

      State Building Construction Account--State       $868,000

 

      Prior Biennia (Expenditures)               $2,532,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,400,000

NEW SECTION.  Sec. 1041.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Emergency Repairs (30000033)

 

Reappropriation:

      State Building Construction Account--State       $400,000

 

      Prior Biennia (Expenditures)               $2,100,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,500,000

NEW SECTION.  Sec. 1042.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Powerhouse:  Improvements and Preservation (30000056)

 

Reappropriation:

      State Building Construction Account--State       $815,000

 

      Prior Biennia (Expenditures)               $425,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,240,000

NEW SECTION.  Sec. 1043.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Facility Oversight Program:  Staffing (91000003)

 

Appropriation:

      State Building Construction Account--State       $520,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $520,000

NEW SECTION.  Sec. 1044.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Transportation Building Preservation (20021008)

 

Reappropriation:

      State Building Construction Account--State       $924,000

 

      Prior Biennia (Expenditures)               $8,692,000

      Future Biennia (Projected Costs)        $12,000,000

             TOTAL         $21,616,000

NEW SECTION.  Sec. 1045.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Minor Works Preservation (30000550)

 

Appropriation:

      State Building Construction Account--State       $2,334,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $14,420,000

             TOTAL         $16,754,000

NEW SECTION.  Sec. 1046.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Engineering and Architectural Services:  Staffing (91000005)

 

Appropriation:

      State Building Construction Account--State       $5,282,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $34,250,000

             TOTAL         $39,532,000

NEW SECTION.  Sec. 1047.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Natural Resource Building Roof Replacement and Exterior Foam Insulation System Repairs (30000546)

 

Appropriation:

      State Building Construction Account--State       $4,482,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,482,000

NEW SECTION.  Sec. 1048.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Legislative Building Critical Exterior Repairs (30000577)

 

Appropriation:

      State Building Construction Account--State       $956,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $3,270,000

             TOTAL         $4,226,000

NEW SECTION.  Sec. 1049.  FOR THE MILITARY DEPARTMENT

      Minor Works Preservation (30000002)

 

Reappropriation:

      State Building Construction Account--State       $346,000

 

      Prior Biennia (Expenditures)               $1,363,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,709,000

NEW SECTION.  Sec. 1050.  FOR THE MILITARY DEPARTMENT

      Minor Works Preservation (30000560)

 

Appropriation:

      State Building Construction Account--State       $1,198,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $7,384,000

             TOTAL         $8,582,000

NEW SECTION.  Sec. 1051.  FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION

      Historic Barn Preservation (20084851)

 

Reappropriation:

      State Building Construction Account--State       $297,000

 

      Prior Biennia (Expenditures)               $503,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $800,000

NEW SECTION.  Sec. 1052.  FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION

      Courthouse Preservation (30000004)

 

Reappropriation:

      State Building Construction Account--State       $1,963,000

 

      Prior Biennia (Expenditures)               $37,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,000,000

NEW SECTION.  Sec. 1053.  FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION

      Heritage Barn Preservation Program (30000005)

 

Appropriation:

      State Building Construction Account--State       $200,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $200,000

NEW SECTION.  Sec. 1054.  FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION

      Courthouse Preservation (30000006)

 

Appropriation:

      State Building Construction Account--State       $750,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $750,000

(End of part)

PART 2
HUMAN SERVICES

NEW SECTION.  Sec. 2001.  FOR THE CRIMINAL JUSTICE TRAINING COMMISSION

      Fire Alarm Replacement (30000004)

 

Appropriation:

      State Building Construction Account--State       $200,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $200,000

NEW SECTION.  Sec. 2002.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Special Commitment Center:  Utility Replacements (20081504)

 

Reappropriation:

      State Building Construction Account--State       $4,193,000

 

      Prior Biennia (Expenditures)               $1,813,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $6,006,000

NEW SECTION.  Sec. 2003.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Minor Works Preservation:  Health, Safety, and Code Requirements (30000366)

 

Reappropriation:

      State Building Construction Account--State       $2,201,000

 

      Prior Biennia (Expenditures)               $449,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,650,000

NEW SECTION.  Sec. 2004.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Minor Works Preservation:  Infrastructure Preservation (30000367)

 

Reappropriation:

      State Building Construction Account--State       $1,195,000

 

      Prior Biennia (Expenditures)               $1,125,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,320,000

NEW SECTION.  Sec. 2005.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Minor Works Preservation:  Facilities Preservation (30000368)

 

Reappropriation:

      State Building Construction Account--State       $3,951,000

 

      Prior Biennia (Expenditures)               $1,639,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $5,590,000

NEW SECTION.  Sec. 2006.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Echo Glen Children's Center:  Portable Classroom Replacement (30000844)

 

Reappropriation:

      State Building Construction Account--State       $751,000

 

      Prior Biennia (Expenditures)               $99,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $850,000

NEW SECTION.  Sec. 2007.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Eastern State Hospital:  Westlake Building Renovation (30000852)

 

Appropriation:

      State Building Construction Account--State       $1,035,000

 

      Prior Biennia (Expenditures)               $840,000

      Future Biennia (Projected Costs)        $1,100,000

             TOTAL         $2,975,000

NEW SECTION.  Sec. 2008.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Capacity to Replace Maple Lane School (92000005)

 

Reappropriation:

      State Building Construction Account--State       $1,635,000

 

      Prior Biennia (Expenditures)               $462,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,097,000

NEW SECTION.  Sec. 2009.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Minor Works Preservation:  Health, Safety, and Code Requirements (30001264)

 

Appropriation:

      State Building Construction Account--State       $3,500,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $14,000,000

             TOTAL         $17,500,000

NEW SECTION.  Sec. 2010.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Minor Works Preservation:  Infrastructure Preservation (30001290)

 

Appropriation:

      State Building Construction Account--State       $4,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $20,000,000

             TOTAL         $24,000,000

NEW SECTION.  Sec. 2011.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Minor Works Preservation:  Facilities Preservation (30001291)

 

Appropriation:

      State Building Construction Account--State       $4,861,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $40,000,000

             TOTAL         $44,861,000

NEW SECTION.  Sec. 2012.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Hazards Abatement and Demolition (30002221)

 

Appropriation:

      State Building Construction Account--State       $1,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $2,000,000

             TOTAL         $3,000,000

NEW SECTION.  Sec. 2013.  FOR THE DEPARTMENT OF HEALTH

      Public Health Laboratory:  Addition (20082003)

 

Reappropriation:

      State Building Construction Account--State       $5,561,000

 

      Prior Biennia (Expenditures)               $4,616,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $10,177,000

NEW SECTION.  Sec. 2014.  FOR THE DEPARTMENT OF HEALTH

      Public Health Laboratory:  HVAC Systems Upgrades (20081002)

 

Reappropriation:

      State Building Construction Account--State       $4,439,000

 

      Prior Biennia (Expenditures)               $473,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,912,000

NEW SECTION.  Sec. 2015.  FOR THE DEPARTMENT OF HEALTH

      Minor Works Preservation:  Facility Preservation (30000027)

 

Appropriation:

      State Building Construction Account--State       $380,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $1,200,000

             TOTAL         $1,580,000

NEW SECTION.  Sec. 2016.  FOR THE DEPARTMENT OF HEALTH

      Drinking Water Grants:  Tulalip Water Supply and Hanson Harbor (92000001)

 

      The appropriation in this section is subject to the following conditions and limitations:  $699,000 of the appropriation is provided solely for the Hanson Harbor water supply project.  $2,500,000 of the appropriation is provided solely for the Tulalip water supply pipeline.

 

Appropriation:

      State Building Construction Account--State       $3,199,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,199,000

NEW SECTION.  Sec. 2017.  FOR THE DEPARTMENT OF VETERANS AFFAIRS

      Walla Walla Nursing Facility (20082008)

 

Appropriation:

      State Building Construction Account--State       $2,400,000

 

      Prior Biennia (Expenditures)               $125,000

      Future Biennia (Projected Costs)        $29,141,000

             TOTAL         $31,666,000

NEW SECTION.  Sec. 2018.  FOR THE DEPARTMENT OF CORRECTIONS

      Clallam Bay Corrections Center:  Install Close Custody Slider Doors (20062070)

 

Reappropriation:

      State Building Construction Account--State       $881,000

 

      Prior Biennia (Expenditures)               $2,029,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,910,000

NEW SECTION.  Sec. 2019.  FOR THE DEPARTMENT OF CORRECTIONS

      Monroe Correctional Complex:  Close Sewer Lagoon (20082022)

 

Reappropriation:

      State Building Construction Account--State       $798,000

 

      Prior Biennia (Expenditures)               $593,000

      Future Biennia (Projected Costs)        $8,024,000

             TOTAL         $9,415,000

NEW SECTION.  Sec. 2020.  FOR THE DEPARTMENT OF CORRECTIONS

      Statewide Minor Works:  Infrastructure Preservation (30000016)

 

Reappropriation:

      State Building Construction Account--State       $456,000

 

      Prior Biennia (Expenditures)               $990,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,446,000

NEW SECTION.  Sec. 2021.  FOR THE DEPARTMENT OF CORRECTIONS

      Statewide Minor Works:  Health, Safety, and Code Requirements (30000047)

 

Reappropriation:

      State Building Construction Account--State       $1,721,000

 

      Prior Biennia (Expenditures)               $888,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,609,000

NEW SECTION.  Sec. 2022.  FOR THE DEPARTMENT OF CORRECTIONS

      Statewide Minor Works:  Facility Preservation (30000086)

 

Reappropriation:

      State Building Construction Account--State       $1,902,000

 

      Prior Biennia (Expenditures)               $955,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,857,000

NEW SECTION.  Sec. 2023.  FOR THE DEPARTMENT OF CORRECTIONS

      Clallam Bay Corrections Center:  Replace 5 Towers and Housing Roofs (30000108)

 

      The appropriations in this section are subject to the following conditions and limitations:  The funding is provided solely for the replacement of roofs on offender housing units.

 

Reappropriation:

      State Building Construction Account--State       $1,102,000

 

      Prior Biennia (Expenditures)               $1,448,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,550,000

NEW SECTION.  Sec. 2024.  FOR THE DEPARTMENT OF CORRECTIONS

      Washington Corrections Center:  Replace Fire Detection/Suppression (30000123)

 

Reappropriation:

      State Building Construction Account--State       $500,000

 

      Prior Biennia (Expenditures)               $398,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $898,000

NEW SECTION.  Sec. 2025.  FOR THE DEPARTMENT OF CORRECTIONS

      Monroe Correctional Complex:  Water Line Replacements (30000137)

 

Reappropriation:

      State Building Construction Account--State       $1,338,000

 

      Prior Biennia (Expenditures)               $200,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,538,000

NEW SECTION.  Sec. 2026.  FOR THE DEPARTMENT OF CORRECTIONS

      Statewide Minor Works:  Programmatic Projects (30000173)

 

Reappropriation:

      State Building Construction Account--State       $2,559,000

 

      Prior Biennia (Expenditures)               $1,175,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,734,000

NEW SECTION.  Sec. 2027.  FOR THE DEPARTMENT OF CORRECTIONS

      Washington State Penitentiary:  Housing Units, Kitchen and Site Work (30000482)

 

Reappropriation:

      State Building Construction Account--State       $5,810,000

      Public Safety Reimbursable Bond Account--State              $546,000

             Subtotal Reappropriation              $6,356,000

Appropriation:

      State Building Construction Account--State       $42,453,000

 

      Prior Biennia (Expenditures)               $463,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $49,272,000

NEW SECTION.  Sec. 2028.  FOR THE DEPARTMENT OF CORRECTIONS

      Westside Corrections Complex:  Siting and Predesign (92000032)

 

Reappropriation:

      State Building Construction Account--State       $2,327,000

 

      Prior Biennia (Expenditures)               $273,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,600,000

NEW SECTION.  Sec. 2029.  FOR THE DEPARTMENT OF CORRECTIONS

      Washington Corrections Center:  Regional Infrastructure (20042008)

 

Reappropriation:

      State Building Construction Account--State       $655,000

 

      Prior Biennia (Expenditures)               $14,974,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $15,629,000

NEW SECTION.  Sec. 2030.  FOR THE DEPARTMENT OF CORRECTIONS

      Monroe Correctional Complex:  Special Offender Unit Core Building and Wings Roofing (30000528)

 

Appropriation:

      State Building Construction Account--State       $2,822,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,822,000

NEW SECTION.  Sec. 2031.  FOR THE DEPARTMENT OF CORRECTIONS

      Statewide:  Minor Works Preservation:  Infrastructure Preservation (30000539)

 

Appropriation:

      State Building Construction Account--State       $2,500,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $9,827,000

             TOTAL         $12,327,000

NEW SECTION.  Sec. 2032.  FOR THE DEPARTMENT OF CORRECTIONS

      Statewide:  Minor Works Preservation:  Facility Preservation (30000540)

 

Appropriation:

      State Building Construction Account--State       $2,500,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $72,978,000

             TOTAL         $75,478,000

NEW SECTION.  Sec. 2033.  FOR THE DEPARTMENT OF CORRECTIONS

      Statewide:  Minor Works Preservation:  Health, Safety, and Code Requirements (30000541)

 

Appropriation:

      State Building Construction Account--State       $2,600,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $10,490,000

             TOTAL         $13,090,000

NEW SECTION.  Sec. 2034.  FOR THE DEPARTMENT OF CORRECTIONS

      New Prison Reception Center (30000570)

 

Appropriation:

      State Building Construction Account--State       $6,200,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $246,181,000

             TOTAL         $252,381,000

(End of part)

PART 3
NATURAL RESOURCES

NEW SECTION.  Sec. 3001.  FOR THE DEPARTMENT OF ECOLOGY

      Water Supply Facilities (19742006)

 

Reappropriation:

      State and Local Improvements Revolving Account

             (Water Supply Facilities)--State   $1,792,000

 

      Prior Biennia (Expenditures)               $18,406,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $20,198,000

NEW SECTION.  Sec. 3002.  FOR THE DEPARTMENT OF ECOLOGY

      Twin Lake Aquifer Recharge Project (20042951)

 

Reappropriation:

      State Building Construction Account--State       $343,000

 

      Prior Biennia (Expenditures)               $407,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $750,000

NEW SECTION.  Sec. 3003.  FOR THE DEPARTMENT OF ECOLOGY

      Water Supply Facilities (20044006)

 

Reappropriation:

      State Building Construction Account--State       $329,000

      State and Local Improvements Revolving Account

             (Water Supply Facilities)--State   $87,000

             Subtotal Reappropriation              $416,000

 

      Prior Biennia (Expenditures)               $13,102,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $13,518,000

NEW SECTION.  Sec. 3004.  FOR THE DEPARTMENT OF ECOLOGY

      Water Conveyance Infrastructure Projects (20052850)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 322, chapter 488, Laws of 2005.

 

Reappropriation:

      State Building Construction Account--State       $1,569,000

 

      Prior Biennia (Expenditures)               $4,212,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $5,781,000

NEW SECTION.  Sec. 3005.  FOR THE DEPARTMENT OF ECOLOGY

      Sunnyside Valley Irrigation District Water Conservation (20052851)

 

Reappropriation:

      State Building Construction Account--State       $1,968,000

 

      Prior Biennia (Expenditures)               $12,229,000

      Future Biennia (Projected Costs)        $4,900,000

             TOTAL         $19,097,000

NEW SECTION.  Sec. 3006.  FOR THE DEPARTMENT OF ECOLOGY

      Quad Cities Water Right Mitigation (20052852)

 

Reappropriation:

      State Building Construction Account--State       $1,325,000

 

      Prior Biennia (Expenditures)               $275,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,600,000

NEW SECTION.  Sec. 3007.  FOR THE DEPARTMENT OF ECOLOGY

      Watershed Plan Implementation and Flow Achievement (20062003)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 136, chapter 371, Laws of 2006.

 

Reappropriation:

      State Building Construction Account--State       $1,196,000

 

      Prior Biennia (Expenditures)               $11,604,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $12,800,000

NEW SECTION.  Sec. 3008.  FOR THE DEPARTMENT OF ECOLOGY

      Columbia River Basin Water Supply Development Program (20062950)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) $1,000,000 of the appropriation is provided solely to the Columbia basin ground water management area for the following projects:

      (a) $600,000 of the appropriation is provided solely to construct localized hydrologic models for municipal supply sources and aquifer storage and recovery potential; and

      (b) $400,000 of the appropriation is provided solely to develop and implement methods to identify sustainable wells near the East Low Canal.

      (2) $6,000,000 of the appropriation is provided solely for the Sunnyside Valley Irrigation District Water Conservation program.

      (3) The department must reexamine its method of accounting for in- stream and out-of-stream benefits and develop a means of accounting for the indirect but substantial and tangible out-of-stream benefits that accrue from conservation, pump exchanges, and other projects.  The department must report the results of this reexamination to the legislature by September 15, 2011.

 

Reappropriation:

      Columbia River Basin Water Supply Development

             Account--State              $23,987,000

Appropriation:

      Columbia River Basin Water Supply Development

             Account--State              $47,000,000

 

      Prior Biennia (Expenditures)               $20,513,000

      Future Biennia (Projected Costs)        $128,700,000

             TOTAL         $220,200,000

NEW SECTION.  Sec. 3009.  FOR THE DEPARTMENT OF ECOLOGY

      Centennial Clean Water Program (20064007)

 

Reappropriation:

      State Building Construction Account--State       $2,263,000

 

      Prior Biennia (Expenditures)               $22,287,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $24,550,000

NEW SECTION.  Sec. 3010.  FOR THE DEPARTMENT OF ECOLOGY

      Local Toxics Grants for Cleanup and Prevention (20064008)

 

Reappropriation:

      State Building Construction Account--State       $15,029,000

 

      Prior Biennia (Expenditures)               $83,871,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $98,900,000

NEW SECTION.  Sec. 3011.  FOR THE DEPARTMENT OF ECOLOGY

      Transfer of Water Rights for Cabin Owners (20081951)

 

Reappropriation:

      State Building Construction Account--State       $350,000

 

      Prior Biennia (Expenditures)               $100,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $450,000

NEW SECTION.  Sec. 3012.  FOR THE DEPARTMENT OF ECOLOGY

      Puget Sound Storm water Projects (20082002)

 

Reappropriation:

      State Building Construction Account--State       $8,949,000

 

      Prior Biennia (Expenditures)               $8,971,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $17,920,000

NEW SECTION.  Sec. 3013.  FOR THE DEPARTMENT OF ECOLOGY

      Storm water Projects (20082003)

 

Reappropriation:

      State Building Construction Account--State       $467,000

 

      Prior Biennia (Expenditures)               $2,533,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,000,000

NEW SECTION.  Sec. 3014.  FOR THE DEPARTMENT OF ECOLOGY

      Reclaimed Water (20084002)

 

Reappropriation:

      State Building Construction Account--State       $2,960,000

 

      Prior Biennia (Expenditures)               $2,495,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $5,455,000

NEW SECTION.  Sec. 3015.  FOR THE DEPARTMENT OF ECOLOGY

      Remedial Action Grants (20084008)

 

Reappropriation:

      State Building Construction Account--State       $20,251,000

 

      Prior Biennia (Expenditures)               $72,624,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $92,875,000

NEW SECTION.  Sec. 3016.  FOR THE DEPARTMENT OF ECOLOGY

      Centennial Clean Water Program (20084010)

 

Reappropriation:

      State Building Construction Account--State       $6,468,000

 

      Prior Biennia (Expenditures)               $51,559,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $58,027,000

NEW SECTION.  Sec. 3017.  FOR THE DEPARTMENT OF ECOLOGY

      Yakima River Basin Water Storage Feasibility Study (20084026)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is provided solely for completion of the United States bureau of reclamation's Yakima basin storage feasibility study, including the associated joint national environmental policy act, the state environmental policy act, and environmental impact statement.  The reappropriated funds are to be used by the bureau of reclamation and the department of ecology to evaluate potential in basin storage facilities such as the proposed Bumping Lake and Wymer reservoirs and other reasonable alternatives that will enhance water supplies and streamflows in the Yakima basin.

 

Reappropriation:

      State Building Construction Account--State       $100,000

 

      Prior Biennia (Expenditures)               $5,150,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $5,250,000

NEW SECTION.  Sec. 3018.  FOR THE DEPARTMENT OF ECOLOGY

      Watershed Plan Implementation and Flow Achievement (20084029)

 

Reappropriation:

      State Building Construction Account--State       $5,789,000

 

      Prior Biennia (Expenditures)               $8,211,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $14,000,000

NEW SECTION.  Sec. 3019.  FOR THE DEPARTMENT OF ECOLOGY

      Centennial Clean Water Program (30000008)

 

Reappropriation:

      State Building Construction Account--State       $16,545,000

 

      Prior Biennia (Expenditures)               $13,455,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $30,000,000

NEW SECTION.  Sec. 3020.  FOR THE DEPARTMENT OF ECOLOGY

      Upper Columbia River Black Sand Beach Cleanup (30000016)

 

Reappropriation:

      State Building Construction Account--State       $365,000

 

      Prior Biennia (Expenditures)               $135,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $500,000

NEW SECTION.  Sec. 3021.  FOR THE DEPARTMENT OF ECOLOGY

      Skykomish Cleanup and Restoration (30000020)

 

Reappropriation:

      State Building Construction Account--State       $1,416,000

 

      Prior Biennia (Expenditures)               $884,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,300,000

NEW SECTION.  Sec. 3022.  FOR THE DEPARTMENT OF ECOLOGY

      Watershed Plan Implementation and Flow Achievement (30000028)

 

Reappropriation:

      State Building Construction Account--State       $4,973,000

 

      Prior Biennia (Expenditures)               $1,027,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $6,000,000

NEW SECTION.  Sec. 3023.  FOR THE DEPARTMENT OF ECOLOGY

      Kittitas Groundwater Study (30000029)

 

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) Funds may be provided to develop and implement water banking and transfer methods and agreements that are fully protective of senior water rights and that protect domestic groundwater users and improve the profitability of farming operations.  The legislature finds such activities to be in the public interest because they can help sustain the viability of the agricultural economy and enhance the certainty of water supplies for domestic groundwater users.

      (2) Funds may be provided to lease or purchase water rights to create a reserve water supply for domestic groundwater users that have a groundwater right with a priority date later than May 10, 1905, as well as for all out-of-priority groundwater users.  In securing water for such domestic groundwater users, strong preference shall be given to the use of water banking and transfer methods that provide alternatives to permanent purchase and dry-up of agricultural water rights in the basin, including dry-year options, water banking, long- term water supply lease agreements, long-term agricultural land fallowing agreements, and reduced consumptive use through efficiency or alternative cropping arrangements while maintaining historic return flows.

      (3) A portion of the reappropriation may be used for administrative costs, not to exceed four percent, and other costs associated with leasing or acquiring and transferring the water rights.  All costs shall be fully recovered from participating domestic water users for their prorated portion of the cost, including but not limited to the costs of securing a water right or rights for this purpose, costs associated with the development and implementation of alternative agricultural water transfer methods, associated annual operational costs, and federal water service contract costs owed to the United States bureau of reclamation.  Funds recovered in this manner shall be deposited in the state and local improvement revolving fund and may be used for any purpose provided in this section.

 

Reappropriation:

      State and Local Improvements Revolving Account

             (Water Supply Facilities)--State   $700,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $700,000

NEW SECTION.  Sec. 3024.  FOR THE DEPARTMENT OF ECOLOGY

      Remedial Action Grant Program (30000039)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 3006, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $10,823,000

 

      Prior Biennia (Expenditures)               $26,877,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $37,700,000

NEW SECTION.  Sec. 3025.  FOR THE DEPARTMENT OF ECOLOGY

      Storm Water Retrofit and Low-Impact Development Grant Program (30000097)

 

      The reappropriations in this section are subject to the following terms and conditions:  The reappropriation is subject to the provisions of section 3005, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $29,879,000

 

      Prior Biennia (Expenditures)               $455,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $30,334,000

NEW SECTION.  Sec. 3026.  FOR THE DEPARTMENT OF ECOLOGY

      Clean Up Toxic Sites - Puget Sound (30000144)

 

      The reappropriation in this section is subject to the following conditions and limitations:  Up to $17,500,000 of the cleanup settlement account--state appropriation may be used for cleanup activities associated with the Asarco contamination in Everett.

 

Reappropriation:

      State Building Construction Account--State       $511,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $511,000

NEW SECTION.  Sec. 3027.  FOR THE DEPARTMENT OF ECOLOGY

      Habitat Mitigation (91000007)

 

Reappropriation:

      State Building Construction Account--State       $2,900,000

 

      Prior Biennia (Expenditures)               $1,500,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,400,000

NEW SECTION.  Sec. 3028.  FOR THE DEPARTMENT OF ECOLOGY

      Protect Communities from Flood and Drought (92000002)

 

Reappropriation:

      State Building Construction Account--State       $6,475,000

 

      Prior Biennia (Expenditures)               $8,500,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $14,975,000

NEW SECTION.  Sec. 3029.  FOR THE DEPARTMENT OF ECOLOGY

      Wastewater Treatment and Water Reclamation (92000041)

 

      The reappropriation is subject to the provisions of section 3016, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $2,980,000

 

      Prior Biennia (Expenditures)               $450,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,430,000

NEW SECTION.  Sec. 3030.  FOR THE DEPARTMENT OF ECOLOGY

      Watershed Plan Implementation and Flow Achievement (30000213)

 

      The appropriation in this section is provided solely for grants for projects that improve water supplies and help achieve instream flows by implementing watershed plans, as follows:

      (1) Surface or groundwater storage feasibility projects, where such projects are consistent with the recommendations of the water storage task force report to the legislature, February 2001 (Ecology Publication # 01 11 2002).  The department shall consult the department of fish and wildlife before issuing water storage grants.

      (2) Infrastructure or water management projects that resolve conflicts among water needs for municipal, agricultural, rural, and fish restoration purposes.  The stream flow improvements and other public benefits secured from these projects must be commensurate with the investment of state funds.

      (3) Purchase and installation of water measuring devices in salmon critical basins and areas participating in the department of fish and wildlife fish screening and cooperative compliance program, and basins where watershed plans call for additional water use or stream flow measurement.

      (4) Acquisition of water to achieve instream flows or to establish water banks, water exchanges or similar tools.  The department of ecology shall give priority to water acquisitions in salmon critical basins and in basins with adopted watershed plans (chapter 90.82 RCW).  The department shall place acquired water into the state's trust water rights program (chapters 90.38 and 90.42 RCW).  $2,000,000 of the appropriation is provided solely for acquisition of water rights that will be placed into the state's trust water rights program specifically and only for instream flow purposes and not for water banks, water exchanges and similar tools that are for mitigation of existing or future water supply needs and other beneficial uses other than instream flows.

 

Appropriation:

      State Building Construction Account--State       $8,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $8,000,000

NEW SECTION.  Sec. 3031.  FOR THE DEPARTMENT OF ECOLOGY

      Hood Canal Regional Septic Repair Loan Program (30000215)

 

Appropriation:

      State Building Construction Account--State       $750,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $750,000

NEW SECTION.  Sec. 3032.  FOR THE DEPARTMENT OF ECOLOGY

      Swift Creek Natural Asbestos Cleanup (30000015)

 

Reappropriation:

      State Building Construction Account--State       $500,000

 

      Prior Biennia (Expenditures)               $500,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,000,000

NEW SECTION.  Sec. 3033.  FOR THE DEPARTMENT OF ECOLOGY

      Yakima Basin Integrated Water Management Plan Implementation (30000278)

 

Appropriation:

      State Building Construction Account--State       $2,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,000,000

NEW SECTION.  Sec. 3034.  FOR THE DEPARTMENT OF ECOLOGY

      Water Irrigation Efficiencies (30000285)

 

Appropriation:

      State Building Construction Account--State       $1,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,000,000

NEW SECTION.  Sec. 3035.  FOR THE DEPARTMENT OF ECOLOGY

      Green River Flood Levee Improvements (30000295)

 

Appropriation:

      State Building Construction Account--State       $4,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

            TOTAL         $4,000,000

NEW SECTION.  Sec. 3036.  FOR THE DEPARTMENT OF ECOLOGY

      Mount Vernon Flood Protection (30000297)

 

Appropriation:

      State Building Construction Account--State       $700,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $700,000

NEW SECTION.  Sec. 3037.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Hood Canal Wastewater (20061850)

 

Reappropriation:

      Hood Canal Aquatic Rehabilitation Bond

             Account--State              $3,130,000

 

      Prior Biennia (Expenditures)               $2,790,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $5,920,000

NEW SECTION.  Sec. 3038.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Minor Works:  Preservation (30000001)

 

Reappropriation:

      State Building Construction Account--State       $2,870,000

 

      Prior Biennia (Expenditures)               $3,930,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $6,800,000

NEW SECTION.  Sec. 3039.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Trail Development (30000003)

 

Reappropriation:

      State Building Construction Account--State       $592,000

 

      Prior Biennia (Expenditures)               $208,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $800,000

NEW SECTION.  Sec. 3040.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Puget Sound Initiative (30000050)

 

Reappropriation:

      State Building Construction Account--State       $600,000

 

      Prior Biennia (Expenditures)               $1,400,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,000,000

NEW SECTION.  Sec. 3041.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Twanoh State Park:  Storm Water Improvements (30000054)

 

Reappropriation:

      State Building Construction Account--State       $226,000

 

      Prior Biennia (Expenditures)               $24,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $250,000

NEW SECTION.  Sec. 3042.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Dash Point State Park:  Sanitary Sewer Collection System (30000269)

 

Reappropriation:

      State Building Construction Account--State       $2,327,000

 

      Prior Biennia (Expenditures)               $920,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,247,000

NEW SECTION.  Sec. 3043.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Fort Worden State Park:  Housing Areas Exterior Improvements (30000433)

 

Reappropriation:

      State Building Construction Account--State       $339,000

 

      Prior Biennia (Expenditures)               $407,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $746,000

NEW SECTION.  Sec. 3044.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Illahee State Park:  Wastewater Treatment Upgrade (30000447)

 

Reappropriation:

      State Building Construction Account--State       $704,000

 

      Prior Biennia (Expenditures)               $868,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,572,000

NEW SECTION.  Sec. 3045.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Deception Pass State Park:  Wastewater System (30000483)

 

Reappropriation:

      State Building Construction Account--State       $262,000

 

      Prior Biennia (Expenditures)               $38,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $300,000

NEW SECTION.  Sec. 3046.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Fish Barrier Removal (30000540)

 

Appropriation:

      State Building Construction Account--State       $1,238,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $8,940,000

             TOTAL         $10,178,000

NEW SECTION.  Sec. 3047.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Iron Horse Tunnel Hazard Repair (30000552)

 

Appropriation:

      State Building Construction Account--State       $1,896,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,896,000

NEW SECTION.  Sec. 3048.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Minor Works:  Health and Safety (30000667)

 

Appropriation:

      State Building Construction Account--State       $5,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $1,866,000

             TOTAL         $6,866,000

NEW SECTION.  Sec. 3049.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Bay View Park Wide Wastewater Treatment System (20082041)

 

Appropriation:

      State Building Construction Account--State       $1,250,000

 

      Prior Biennia (Expenditures)               $937,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,187,000

NEW SECTION.  Sec. 3050.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Minor Works:  Facilities and Infrastructure Preservation (30000766)

 

Appropriation:

      State Building Construction Account--State       $3,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $8,421,000

             TOTAL         $11,421,000

NEW SECTION.  Sec. 3051.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Facility and Infrastructure Backlog Reduction (30000770)

 

Appropriation:

      State Building Construction Account--State       $1,300,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $6,000,000

             TOTAL         $7,300,000

NEW SECTION.  Sec. 3052.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Fort Worden State Park:  Building 202 Rehabilitation (30000027)

 

Appropriation:

      State Building Construction Account--State       $2,377,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,377,000

NEW SECTION.  Sec. 3053.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Washington Wildlife and Recreation Program (19982003)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 158, chapter 371, Laws of 2006.

 

Reappropriation:

      Outdoor Recreation Account--State    $396,000

      Habitat Conservation Account--State $487,000

             Subtotal Reappropriation              $883,000

 

      Prior Biennia (Expenditures)               $76,718,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $77,601,000

NEW SECTION.  Sec. 3054.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Salmon Recovery Funding Board Programs (20044001)

 

Reappropriation:

      State Building Construction Account--State       $920,000

 

      Prior Biennia (Expenditures)               $11,080,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $12,000,000

NEW SECTION.  Sec. 3055.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Washington Wildlife and Recreation Program (20044002)

 

      The reappropriations in this section are subject to the following conditions and limitations:  Any amount of the reappropriation that is not obligated to a specific project may be used to fund alternate projects approved by the legislature from the same account in biennia succeeding that in which the moneys were originally appropriated.

 

Reappropriation:

      Outdoor Recreation Account--State    $889,000

      Habitat Conservation Account--State $1,062,000

             Subtotal Reappropriation              $1,951,000

 

      Prior Biennia (Expenditures)               $42,579,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $44,530,000

NEW SECTION.  Sec. 3056.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Youth Athletic Fields (20062952)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 172, chapter 371, Laws of 2006.

 

Reappropriation:

      State Building Construction Account--State       $621,000

 

      Prior Biennia (Expenditures)               $1,879,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,500,000

NEW SECTION.  Sec. 3057.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Salmon Recovery Funding Board Programs (20064001)

 

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations are subject to the provisions of section 403, chapter 488, Laws of 2005.

 

Reappropriation:

      State Building Construction Account--State       $2,585,000

 

      Prior Biennia (Expenditures)               $15,415,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $18,000,000

NEW SECTION.  Sec. 3058.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Washington Wildlife and Recreation Program (20064002)

 

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations are subject to the provisions of section 404, chapter 488, Laws of 2005.

 

Reappropriation:

      Outdoor Recreation Account--State    $1,884,000

      Habitat Conservation Account--State $4,225,000

             Subtotal Reappropriation              $6,109,000

 

      Prior Biennia (Expenditures)               $43,891,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $50,000,000

NEW SECTION.  Sec. 3059.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Family Forest and Fish Passage Program (20082001)

 

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) This reappropriation is provided solely for the salmon recovery funding board in consultation with the small forest landowner office of the department of natural resources and the department of fish and wildlife to provide grants to correct fish passage blockages on nonindustrial forest lands.  Selection of projects must be coordinated with the other salmon recovery grant programs.

      (2) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the committee shall file quarterly project progress reports with the office of financial management.

 

Reappropriation:

      State Building Construction Account--State       $841,000

 

      Prior Biennia (Expenditures)               $5,159,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $6,000,000

NEW SECTION.  Sec. 3060.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Puget Sound Restoration and Acquisition (20084004)

 

Reappropriation:

      State Building Construction Account--State       $10,443,000

 

      Prior Biennia (Expenditures)               $30,307,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $40,750,000

NEW SECTION.  Sec. 3061.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Aquatic Lands Enhancement Account (20084005)

 

Reappropriation:

      State Building Construction Account--State       $2,416,000

 

      Prior Biennia (Expenditures)               $2,609,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $5,025,000

NEW SECTION.  Sec. 3062.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Washington Wildlife Recreation Grants (20084011)

 

      The reappropriations in this section are subject to the following conditions and limitations:

      (1) The reappropriations are provided solely for the approved list of projects in LEAP capital document No. 2007-3 as developed on March 17, 2007, and LEAP capital document No. 2008-1 as developed on February 13, 2008.

      (2) If additional funds are available after funding the farmlands preservation account projects approved in subsection (1) of this section, the board may:  Provide one-time grants of up to $25,000 each to counties requesting assistance in developing farmlands preservation strategies for the purpose of seeking grants from the farmlands preservation account in future grant cycles.

      (3) Funds reappropriated for distribution according to the provisions of RCW 79A.15.040(1)(c) must be allocated forty percent to local government projects and sixty percent to state agency projects.  If the cumulative total of local government projects is less than forty percent of the total distribution to this category, the difference may be allocated to state agency projects.

      (4) Up to $627,299 of the reappropriation from the riparian protection account is for the Chehalis river surge plain natural area preserve.  This amount may not be expended for the project until the department of natural resources has completed a management plan for the preserve that maintains recreational access and that management plan is presented to the house of representatives capital budget and senate ways and means committees.

 

Reappropriation:

      Outdoor Recreation Account--State    $10,665,000

      Farmlands Preservation Account--State              $2,367,000

      Riparian Protection Account--State    $4,262,000

      Habitat Conservation Account--State $13,821,000

             Subtotal Reappropriation              $31,115,000

 

      Prior Biennia (Expenditures)               $67,377,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $98,492,000

NEW SECTION.  Sec. 3063.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Salmon Recovery Funding Board Programs (20084851)

 

Reappropriation:

      State Building Construction Account--State       $3,813,000

 

      Prior Biennia (Expenditures)               $14,187,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $18,000,000

NEW SECTION.  Sec. 3064.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Washington Wildlife Recreation Grants (30000002)

 

Reappropriation:

      Outdoor Recreation Account--State    $13,785,000

      Farmlands Preservation Account--State              $4,357,000

      Riparian Protection Account--State    $7,060,000

      Habitat Conservation Account--State $19,542,000

             Subtotal Reappropriation              $44,744,000

 

      Prior Biennia (Expenditures)               $24,701,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $69,445,000

NEW SECTION.  Sec. 3065.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Salmon Recovery Funding Board Programs (30000003)

 

Reappropriation:

      State Building Construction Account--State       $5,760,000

 

      Prior Biennia (Expenditures)               $4,240,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $10,000,000

NEW SECTION.  Sec. 3066.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Aquatic Lands Enhancement Account (30000007)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is provided solely for the list of projects in LEAP capital document No. 2009-3, developed March 9, 2009.

 

Reappropriation:

      State Building Construction Account--State       $1,138,000

 

      Prior Biennia (Expenditures)               $2,887,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,025,000

NEW SECTION.  Sec. 3067.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Puget Sound Acquisition and Restoration (30000080)

 

Reappropriation:

      State Building Construction Account--State       $23,421,000

 

      Prior Biennia (Expenditures)               $9,579,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $33,000,000

NEW SECTION.  Sec. 3068.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Puget Sound Estuary and Salmon Restoration Program (30000081)

 

Reappropriation:

      State Building Construction Account--State       $5,095,000

 

      Prior Biennia (Expenditures)               $1,905,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $7,000,000

NEW SECTION.  Sec. 3069.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Salmon Recovery Funding Board Programs (30000140)

 

Appropriation:

      State Building Construction Account--State       $10,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $40,000,000

             TOTAL         $50,000,000

NEW SECTION.  Sec. 3070.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Puget Sound Estuary and Salmon Restoration Program (30000148)

 

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation shall not be expended on the acquisition of lands by state agencies.

 

Appropriation:

      State Building Construction Account--State       $5,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $20,000,000

             TOTAL         $25,000,000

NEW SECTION.  Sec. 3071.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Family Forest Fish Passage Program (91000001)

 

Reappropriation:

      State Building Construction Account--State       $3,145,000

 

      Prior Biennia (Expenditures)               $1,855,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $5,000,000

NEW SECTION.  Sec. 3072.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Puget Sound Restoration (30000147)

 

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation shall not be expended on the acquisition of lands by state agencies.

 

Appropriation:

      State Building Construction Account--State       $15,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $60,000,000

             TOTAL         $75,000,000

NEW SECTION.  Sec. 3073.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Family Forest Fish Passage Program (30000203)

 

Appropriation:

      State Building Construction Account--State       $2,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $4,000,000

             TOTAL         $6,000,000

NEW SECTION.  Sec. 3074.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Washington Wildlife Recreation Grants (30000139)

 

      The appropriations in this section are subject to the following conditions and limitations:  The appropriations are provided solely for the list of projects in LEAP capital document No. 2011-3A, developed May 24, 2011.

 

Appropriation:

      Riparian Protection Account--State    $800,000

      Habitat Conservation Account--State $20,200,000

      Outdoor Recreation Account--State    $20,200,000

      Farmlands Preservation Account--State              $800,000

             Subtotal Appropriation $42,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $42,000,000

NEW SECTION.  Sec. 3075.  FOR THE STATE CONSERVATION COMMISSION

      Flood Assistance for Farm Communities (20084850)

 

Reappropriation:

      State Building Construction Account--State       $385,000

 

      Prior Biennia (Expenditures)               $1,115,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,500,000

NEW SECTION.  Sec. 3076.  FOR THE STATE CONSERVATION COMMISSION

      Livestock Nutrient Program (30000001)

 

Reappropriation:

      State Taxable Building Construction Account--State          $780,000

 

      Prior Biennia (Expenditures)               $1,220,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,000,000

NEW SECTION.  Sec. 3077.  FOR THE STATE CONSERVATION COMMISSION

      Conservation Reserve Enhancement Program (30000003)

 

Reappropriation:

      State Building Construction Account--State       $897,000

 

      Prior Biennia (Expenditures)               $103,000

      Future Biennia (Projected Costs)        $1,600,000

             TOTAL         $2,600,000

NEW SECTION.  Sec. 3078.  FOR THE STATE CONSERVATION COMMISSION

      Livestock Nutrient Program (91000002)

 

Appropriation:

      State Taxable Building Construction Account--State          $1,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,000,000

NEW SECTION.  Sec. 3079.  FOR THE STATE CONSERVATION COMMISSION

      Conservation Reserve Enhancement Program (91000003)

 

Appropriation:

      State Building Construction Account--State       $2,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,000,000

NEW SECTION.  Sec. 3080.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Wiley Slough Restoration (20081028)

 

Reappropriation:

      State Building Construction Account--State       $150,000

 

      Prior Biennia (Expenditures)               $2,645,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,795,000

NEW SECTION.  Sec. 3081.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Puget Sound Initiative - Nearshore Salmon Restoration (20062001)

 

      The reappropriation in this section is subject to the following conditions and limitations:  $495,000 of the state building construction account--state reappropriation is provided solely to complete project design, permitting, bid plans and specifications, and preconstruction monitoring for removal or modification of the Seahurst Park North Seawall.

 

Reappropriation:

      State Building Construction Account--State       $2,132,000

 

      Prior Biennia (Expenditures)               $11,731,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $13,863,000

NEW SECTION.  Sec. 3082.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Voights Creek Hatchery (20081003)

 

      The appropriation in this section is subject to the following conditions and limitations:  The appropriations in this section are provided solely for property acquisition, design, and permitting.  If the department does not acquire property, the amounts provided in this section shall lapse.

 

Reappropriation:

      State Building Construction Account--State       $115,000

Appropriation:

      State Building Construction Account--State       $1,000,000

 

      Prior Biennia (Expenditures)               $1,182,000

      Future Biennia (Projected Costs)        $13,000,000

             TOTAL         $15,297,000

NEW SECTION.  Sec. 3083.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Issaquah Hatchery Gravity Intake (20081850)

 

Reappropriation:

      State Building Construction Account--State       $539,000

 

      Prior Biennia (Expenditures)               $23,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $562,000

NEW SECTION.  Sec. 3084.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Stemilt Basin Acquisition (20082029)

 

Reappropriation:

      State Building Construction Account--State       $200,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $200,000

NEW SECTION.  Sec. 3085.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works:  Facility Preservation (30000149)

 

Reappropriation:

      State Building Construction Account--State       $276,000

 

      Prior Biennia (Expenditures)               $144,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $420,000

NEW SECTION.  Sec. 3086.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works:  Facility Preservation (30000300)

 

Appropriation:

      State Building Construction Account--State       $2,557,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $2,500,000

             TOTAL         $5,057,000

NEW SECTION.  Sec. 3087.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works:  Road Maintenance and Abandonment Plan (30000022)

 

Reappropriation:

      State Building Construction Account--State       $234,000

 

      Prior Biennia (Expenditures)               $716,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $950,000

NEW SECTION.  Sec. 3088.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works:  Access Areas Preservation (30000086)

 

Reappropriation:

      State Building Construction Account--State       $388,000

 

      Prior Biennia (Expenditures)               $20,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $408,000

NEW SECTION.  Sec. 3089.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Skamania Hatchery Intake Replacement (30000088)

 

Reappropriation:

      State Building Construction Account--State       $500,000

Appropriation:

      State Building Construction Account--State       $3,446,000

 

      Prior Biennia (Expenditures)               $324,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,270,000

NEW SECTION.  Sec. 3090.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Carpenter Creek Estuary Restoration (92000023)

 

Reappropriation:

      State Building Construction Account--State       $2,784,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,784,000

NEW SECTION.  Sec. 3091.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works:  Health, Safety, and Code Requirements (30000135)

 

Reappropriation:

      State Building Construction Account--State       $384,000

 

      Prior Biennia (Expenditures)               $616,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,000,000

NEW SECTION.  Sec. 3092.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Leque Island Highway 532 Road Protection (92000019)

 

Reappropriation:

      State Building Construction Account--State       $600,000

 

      Prior Biennia (Expenditures)               $80,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $680,000

NEW SECTION.  Sec. 3093.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works:  Dam and Dike (30000145)

 

Reappropriation:

      State Building Construction Account--State       $179,000

 

      Prior Biennia (Expenditures)               $718,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $897,000

NEW SECTION.  Sec. 3094.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works:  Fish Passage Barrier Corrections (30000173)

 

Reappropriation:

      State Building Construction Account--State       $577,000

 

      Prior Biennia (Expenditures)               $423,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,000,000

NEW SECTION.  Sec. 3095.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Beebe Springs Phase 3 (92000006)

 

Reappropriation:

      State Building Construction Account--State       $651,000

 

      Prior Biennia (Expenditures)               $392,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,043,000

NEW SECTION.  Sec. 3096.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Beebe Springs Development (92000026)

 

Appropriation:

      State Building Construction Account--State       $1,891,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,891,000

NEW SECTION.  Sec. 3097.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works:  Road Maintenance and Abandonment Plan (30000295)

 

Appropriation:

      State Building Construction Account--State       $1,826,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $6,727,000

             TOTAL         $8,553,000

NEW SECTION.  Sec. 3098.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works:  Access Areas Preservation (30000296)

 

Appropriation:

      State Building Construction Account--State       $1,027,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $5,300,000

             TOTAL         $6,327,000

NEW SECTION.  Sec. 3099.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works:  Dam and Dike (30000297)

 

Appropriation:

      State Building Construction Account--State       $1,043,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $2,000,000

             TOTAL         $3,043,000

NEW SECTION.  Sec. 3100.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Cherry Valley Fish Passage and Stream Restoration (30000105)

 

Appropriation:

      State Building Construction Account--State       $1,451,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,451,000

NEW SECTION.  Sec. 3101.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works:  Health, Safety, and Code Requirements (30000284)

 

Appropriation:

      State Building Construction Account--State       $1,241,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $4,500,000

             TOTAL         $5,741,000

NEW SECTION.  Sec. 3102.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works:  Infrastructure Preservation (30000298)

 

Appropriation:

      State Building Construction Account--State       $2,530,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $4,600,000

             TOTAL         $7,130,000

NEW SECTION.  Sec. 3103.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works:  Fish Passage Barrier Corrections (30000372)

 

Appropriation:

      State Building Construction Account--State       $1,280,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,280,000

NEW SECTION.  Sec. 3104.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works:  Programmatic (30000301)

 

Appropriation:

      State Building Construction Account--State       $150,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $150,000

NEW SECTION.  Sec. 3105.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Skookumchuck Hatchery Renovation (20082015)

 

Reappropriation:

      State Building Construction Account--State       $200,000

 

      Prior Biennia (Expenditures)               $3,456,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,656,000

NEW SECTION.  Sec. 3106.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Marine Station (20081015)

 

Reappropriation:

      State Building Construction Account--State       $537,000

 

      Prior Biennia (Expenditures)               $213,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $750,000

NEW SECTION.  Sec. 3107.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Forest Riparian Easement Program (30000198)

 

Appropriation:

      State Building Construction Account--State       $1,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,000,000

NEW SECTION.  Sec. 3108.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Fire Hazard Reductions (30000201)

 

      The appropriation in this section is subject to the following conditions and limitations:  The appropriations in this section are provided solely for forest improvement treatments on state trust lands in eastern Washington.

 

Appropriation:

      State Building Construction Account--State       $2,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,000,000

NEW SECTION.  Sec. 3109.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Sustainable Recreation (30000207)

 

Appropriation:

      State Building Construction Account--State       $1,500,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,500,000

NEW SECTION.  Sec. 3110.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Natural Areas Facilities Preservation and Access (30000208)

 

Appropriation:

      State Building Construction Account--State       $1,500,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,500,000

NEW SECTION.  Sec. 3111.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Trust Land Transfer (30000200)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The total appropriation is provided solely to the department to transfer from trust status, or enter into fifty year leases for, certain trust lands of statewide significance deemed appropriate for state park, fish and wildlife habitat, natural area preserve, natural resources conservation area, open space, or recreation purposes.  The approved list of properties for lease or transfer is identified in the LEAP capital document No. 2011-4B, developed April 11, 2011.

      (2) Property transferred under this section must be appraised and transferred at fair market value.  No later than September 30, 2011, the department must deposit in the common school construction account the portion of the appropriation in this section that represents the estimated value of the timber on the transferred properties.  This transfer must be made in the same manner as timber revenues from other common school trust lands.  No deduction may be made for the resource management cost account under RCW 79.64.040.  The portion of the appropriation in this section that represents the value of the land transferred must be deposited in the natural resources real property replacement account.

      (3) Property subject to lease agreements under this section must be appraised at fair market value.  Lease terms must be fifty years with options to renew for an additional fifty years.  Lease payments must be lump sum payments for the entire term of the lease at the beginning of the lease.  The department shall calculate such lump sum payments using professional appraisal standards.  These lease payments may not exceed the fee simple purchase price based on current fair market value and must be deposited by the department to the common school construction account in the same manner as lease revenues from other common school trust lands.  No deduction may be made for the resource management cost account under RCW 79.64.040.  No later than September 30, 2011, the department must transfer to the common school construction account the portion of the appropriation in this section that is attributable to receipts from lease payments.

      (4) All reasonable costs incurred by the department to implement this section are authorized to be paid out of the appropriations.  Authorized costs include the actual cost of appraisals, staff time, environmental reviews, surveys, and other similar costs and shall not exceed one and nine-tenths percent of the appropriation.

      (5) Intergrant exchanges between common school and other trust lands of equal value may occur if the exchange is in the interest of each trust, as determined by the board of natural resources.

      (6) Prior to or concurrent with conveyance of these properties, the department, with full cooperation of the receiving agencies, shall execute and record a real property instrument that dedicates the transferred properties to the purposes identified in subsection (1) of this section.  Transfer and lease agreements for properties identified in subsection (1) of this section must include terms that restrict the use of the property to the intended purpose.  Transfer and lease agreements may include provisions for receiving agencies to request alternative uses of the property, provided the alternative uses are compatible with the original intended public purpose and the department and legislature approves such uses.

      (7) The department and receiving agencies shall work in good faith to carry out the intent of this section.  However, the department or receiving agencies may remove a property from the transfer list based on new, substantive information, if it is determined that transfer of the property is not in the statewide interest of either the common school trust or the receiving agency.

      (8) $53,231,000 of the appropriation must be deposited in the common school construction account by September 30, 2011.  The department shall execute trust land transfers so that after the deduction of reasonable costs as provided in subsection (4) of this section on an aggregate basis eighty percent of the total value of transferred property is timber value or lease payments and is deposited in the common school construction account.  To achieve the eighty percent requirement, the department may choose to lease properties originally intended as transfers or transfer properties originally intended as leases.

      (9) By June 30, 2013, the state treasurer shall transfer to the common school construction account any unexpended balance of the appropriation in this section.

      (10) $500,000 of the appropriation is provided solely for the department to process the fee transfer of properties leased to the department of fish and wildlife through the trust land transfer program during the current or previous biennium.

 

Appropriation:

      State Building Construction Account--State       $60,490,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $60,490,000

NEW SECTION.  Sec. 3112.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Replacing State Forest Lands with Productive Forests (91000029)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The total appropriation is provided solely to the department to transfer from state forest land status to natural resources conservation area status certain state forest lands in counties with a population of 25,000 or less which are subject to timber harvest deferrals greater than thirty years due to the presence of wildlife species listed as endangered or threatened under the federal endangered species act.  The approved list of properties for transfer is identified in the LEAP capital document No. 2011-5A, developed March 24, 2011.

      (2) Property transferred under this section must be appraised and transferred at fair market value, without consideration of management or regulatory encumbrances associated with wildlife species listed under the federal endangered species act.  The value of the timber and other valuable materials transferred must be distributed as provided in RCW 79.64.110, in the same manner as valuable material revenues from other state forest lands in the applicable counties.  The value of the land transferred must be deposited in the park land trust revolving account and be solely used to buy replacement state forest land within the same county as the property transferred, consistent with RCW 79.22.060.

      (3) Prior to or concurrent with conveyance of these properties, the department shall execute and record a real property instrument that dedicates the transferred properties to the purposes identified in subsection (1) of this section.  Transfer agreements for properties identified in subsection (1) of this section must include terms that restrict the use of the property to the intended purpose.

      (4) The department and applicable counties shall work in good faith to carry out the intent of this section.  However, the department or applicable counties may remove a property from the transfer list based on new, substantive information, if it is determined that transfer of the property is not in the statewide interest of either the state forest trust or the natural resources conservation area program.

 

Appropriation:

      State Building Construction Account--State       $2,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,000,000

NEW SECTION.  Sec. 3113.  FOR THE DEPARTMENT OF AGRICULTURE

      Health and Safety Projects at County Fairs (92000001)

 

Appropriation:

      State Building Construction Account--State       $1,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,000,000

(End of part)

PART 4
TRANSPORTATION

NEW SECTION.  Sec. 4001.  FOR THE WASHINGTON STATE PATROL

      Minor Works:  Preservation (30000050)

 

Appropriation:

      State Building Construction Account--State       $315,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $2,100,000

             TOTAL         $2,415,000

(End of part)

PART 5
EDUCATION

NEW SECTION.  Sec. 5001.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Northeast King County Skills Center (20084855)

 

Reappropriation:

      School Construction and Skill Centers Building

             Account--State              $3,343,000

 

      Prior Biennia (Expenditures)               $5,259,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $8,602,000

NEW SECTION.  Sec. 5002.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Vocational Skills Centers (20084300)

 

Reappropriation:

      State Building Construction Account--State       $3,187,000

      School Construction and Skills Centers Building

             Account--State              $119,000

             Subtotal Reappropriation              $3,306,000

 

      Prior Biennia (Expenditures)               $67,401,000

      Future Biennia (Projected Costs)        $0

            TOTAL         $70,707,000

NEW SECTION.  Sec. 5003.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Pierce County Skills Center (20084856)

 

Reappropriation:

      School Construction and Skill Centers Building

             Account--State              $2,087,000

Appropriation:

      State Building Construction Account--State       $7,100,000

 

      Prior Biennia (Expenditures)               $9,949,000

      Future Biennia (Projected Costs)        $10,772,000

             TOTAL         $29,908,000

NEW SECTION.  Sec. 5004.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      2009-11 School Construction Assistance Grant Program (30000031)

 

      The reappropriations in this section are subject to the following conditions and limitations:  Up to $14,000,000 of the state building construction account--state reappropriation in this section is for the Grand Coulee Dam school district school project, contingent on the availability of sufficient contributions from federal, local, or private sources to make up the remainder of the total cost of the project.  The Grand Coulee Dam school district is faced with a unique set of local funding barriers and federal funds may substitute as the usual requirement for school district participation.  In the event sufficient matching contributions are not secured by the Grand Coulee Dam school district, these funds shall lapse.

 

Reappropriation:

      State Building Construction Account--State       $129,681,000

      School Construction and Skill Centers Building

             Account--Bond--State   $40,885,000

             Subtotal Reappropriation              $170,566,000

 

      Prior Biennia (Expenditures)               $144,862,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $315,428,000

NEW SECTION.  Sec. 5005.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Energy Efficiency and Small Repair Grants (91000007)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 5007, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $52,844,000

 

      Prior Biennia (Expenditures)               $17,045,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $69,889,000

NEW SECTION.  Sec. 5006.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      2011-13 School Construction Assistance Program (30000071)

 

      The appropriations in this section are subject to the following conditions and limitations:

      (1) In calculating square foot eligibility for state assistance grants, kindergarten student headcount shall not be reduced by fifty percent.

      (2) The office of the superintendent of public instruction shall review the impact of students enrolled in alternative learning experiences on the calculation of student enrollment projections for determining school district eligibility for school construction assistance, and shall work with interested stakeholders to analyze whether the calculation should be changed.  The results of the analysis, including possible recommendations for an adjustment factor, shall be submitted to the senate ways and means committee and the house capital budget committee no later than December 31, 2011.

 

Appropriation:

      State Building Construction Account--State       $345,754,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $1,581,765,000

             TOTAL         $1,927,519,000

NEW SECTION.  Sec. 5007.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Urgent Repair Grant Program (91000014)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation is provided solely for nonrecurring costs associated with school facility repairs and renovations necessary for unforeseen health and safety needs.

      (2) The office of the superintendent of public instruction, after consulting with maintenance and operations administrators of school districts, shall develop criteria for providing funding for specific projects to stay within the appropriation level provided in this section.  The criteria must include, but are not limited to, the following:  (a) Limiting district applications to one hundred thousand dollars; (b) limiting districts eligible to receive the grant to only once every other biennium; and (c) requiring any district receiving funding provided in this section to demonstrate a consistent commitment to addressing school facilities needs.

 

Appropriation:

      State Building Construction Account--State       $5,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $5,000,000

NEW SECTION.  Sec. 5008.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Skills Centers Minor Works - Facility Preservation (30000111)

 

Appropriation:

      State Building Construction Account--State       $3,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $12,000,000

             TOTAL         $15,000,000

NEW SECTION.  Sec. 5009.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Yakima Valley Technical Skills Center (30000076)

 

Appropriation:

      State Building Construction Account--State       $28,461,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $28,461,000

NEW SECTION.  Sec. 5010.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Aviation High School (20081002)

 

Appropriation:

      State Building Construction Account--State       $1,000,000

 

      Prior Biennia (Expenditures)               $1,175,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,175,000

NEW SECTION.  Sec. 5011.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Energy Operational Savings Project Grants (30000097)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation is provided solely for energy operational cost savings improvements to school facilities.

      (2) Grants shall be awarded for projects using the energy savings performance contracting method under chapter 39.35C RCW or an equivalent method of evaluating and delivering energy operational costs savings improvements.  Projects that do not use energy savings performance contracting must:  (a) Verify energy and operational cost savings for ten years or until the energy and operational costs savings pay for the project, whichever is shorter; (b) follow the department of general administration's energy savings performance contracting method guidelines; and (c) employ a licensed engineer for the energy audit, design, and construction.  The office of the superintendent of public instruction may require third-party verification of savings if a project is not implemented by an energy savings performance contracting method as outlined in chapter 39.35C RCW.  If required, third-party verification must be conducted either by an energy savings performance contractor qualified by the department of general administration, or a licensed engineer that is a certified energy manager.

      (3) Projects must be weighted and prioritized based on the following criteria and in the following order:

      (a) Prior grant award:  Priority consideration shall be given to applicants that did not receive grant awards from appropriations provided in sections 1016 and 5007, chapter 36, Laws of 2010 1st sp.  sess.;

      (b) Leverage ratio:  The higher the leverage ratio of guaranteed energy savings and utility or other incentives to state grant, the higher the project ranking;

      (c) Energy savings:  The higher the simple payback for energy savings, not to exceed the useful life of the energy conservation measure, the higher the project ranking; and

      (d) Persistence:  The more extensively a project ensures the persistence of energy operational cost savings through ongoing measurement, verification, and reporting over the life of a project, the higher the project ranking.

      (4) In order to be eligible for energy cost savings grants under this section, school districts must complete an investment grade audit prior to application, or have completed an audit in the 2009-2011 biennium.

      (5)(a) The superintendent of public instruction must use bond proceeds to pay one-half of the preliminary audit, up to five cents per square foot, if the project does not meet the school district's predetermined cost-effectiveness criteria.  Public school districts must pay the other one-half of the cost of the preliminary audit if the project does not meet their predetermined cost-effectiveness criteria.

      (b) The energy savings performance contractor shall not charge for an investment grade audit if the project does not meet the school district's predetermined cost-effectiveness criteria.  Public school districts must pay the full price of an investment grade audit if they do not proceed with a project that meets the school district's predetermined cost-effectiveness criteria.

      (6) Applicants must submit documentation that demonstrates energy and operational cost savings resulting from the installation of the energy equipment and improvements.  The energy savings analysis shall be performed by a licensed engineer, and the documentation must include, but is not limited to, the following:

      (i) A description of the energy equipment and improvements; and

      (ii) A description of the energy and operational cost savings.

      (7) Each school district is limited to one grant award and no more than $1,000,000.

      (8) The office of the superintendent of public instruction may charge projects administrative fees.

      (9) The superintendent of public instruction must report to the appropriate committees of the legislature and the office of financial management on the timing and use of the funds by the end of each fiscal year, until the funds are fully expended.

 

Appropriation:

      State Building Construction Account--State       $20,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $20,000,000

NEW SECTION.  Sec. 5012.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Clark County Skills Center (30000093)

 

Appropriation:

      State Building Construction Account--State       $100,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $14,750,000

             TOTAL         $14,850,000

NEW SECTION.  Sec. 5013.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      SEA-Tech Branch Campus of Tri-Tech Skills Center (30000078)

 

Appropriation:

      State Building Construction Account--State       $1,169,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $11,739,000

             TOTAL         $12,908,000

NEW SECTION.  Sec. 5014.  FOR THE STATE SCHOOL FOR THE BLIND

      Minor Works - Preservation (30000002)

 

Reappropriation:

      State Building Construction Account--State       $188,000

 

      Prior Biennia (Expenditures)               $432,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $620,000

NEW SECTION.  Sec. 5015.  FOR THE WASHINGTON STATE CENTER FOR CHILDHOOD DEAFNESS AND HEARING LOSS

      Well Replacement (91000003)

 

Reappropriation:

      State Building Construction Account--State       $264,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $264,000

NEW SECTION.  Sec. 5016.  FOR THE UNIVERSITY OF WASHINGTON

      Odegaard Undergraduate Learning Center (30000370)

 

Appropriation:

      State Building Construction Account--State       $16,575,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $16,575,000

NEW SECTION.  Sec. 5017.  FOR THE UNIVERSITY OF WASHINGTON

      University of Washington Bothell (20082006)

 

Reappropriation:

      State Building Construction Account--State       $2,934,000

 

      Prior Biennia (Expenditures)               $2,216,000

      Future Biennia (Projected Costs)        $77,435,000

             TOTAL         $82,585,000

NEW SECTION.  Sec. 5018.  FOR THE UNIVERSITY OF WASHINGTON

      House of Knowledge Longhouse (30000021)

 

Reappropriation:

      State Building Construction Account--State       $53,000

Appropriation:

      State Building Construction Account--State       $2,700,000

 

      Prior Biennia (Expenditures)               $247,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,000,000

NEW SECTION.  Sec. 5019.  FOR THE UNIVERSITY OF WASHINGTON

      Minor Works:  Facility Preservation (30000027)

 

Reappropriation:

      State Building Construction Account--State       $10,366,000

 

      Prior Biennia (Expenditures)               $8,769,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $19,135,000

NEW SECTION.  Sec. 5020.  FOR THE UNIVERSITY OF WASHINGTON

      High Voltage Infrastructure Improvement Project (30000371)

 

Appropriation:

      State Building Construction Account--State       $4,365,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,365,000

NEW SECTION.  Sec. 5021.  FOR THE UNIVERSITY OF WASHINGTON

      University of Washington - Minor Capital Repairs (30000372)

 

Appropriation:

      State Building Construction Account--State       $11,186,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $30,000,000

             TOTAL         $41,186,000

NEW SECTION.  Sec. 5022.  FOR THE UNIVERSITY OF WASHINGTON

      Anderson Hall Renovation (20091002)

 

Appropriation:

      State Building Construction Account--State       $1,553,000

 

      Prior Biennia (Expenditures)               $200,000

      Future Biennia (Projected Costs)        $19,997,000

             TOTAL         $21,750,000

NEW SECTION.  Sec. 5023.  FOR THE WASHINGTON STATE UNIVERSITY

      Washington State University Vancouver - Applied Technology and Classroom Building (20062950)

 

Reappropriation:

      State Building Construction Account--State       $22,685,000

 

      Prior Biennia (Expenditures)               $5,828,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $28,513,000

NEW SECTION.  Sec. 5024.  FOR THE WASHINGTON STATE UNIVERSITY

      Washington State University Spokane - Riverpoint Biomedical and Health Sciences (20162953)

 

Reappropriation:

      State Building Construction Account--State       $4,200,000

Appropriation:

      State Building Construction Account--State       $31,230,000

 

      Prior Biennia (Expenditures)               $3,640,000

      Future Biennia (Projected Costs)        $35,000,000

             TOTAL         $74,070,000

NEW SECTION.  Sec. 5025.  FOR THE WASHINGTON STATE UNIVERSITY

      Minor Works:  Preservation (30000065)

 

Reappropriation:

      State Building Construction Account--State       $10,100,000

 

      Prior Biennia (Expenditures)               $13,803,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $23,903,000

NEW SECTION.  Sec. 5026.  FOR THE WASHINGTON STATE UNIVERSITY

      Minor Works:  Program (30000066)

 

Reappropriation:

      State Building Construction Account--State       $6,192,000

 

      Prior Biennia (Expenditures)               $11,335,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $17,527,000

NEW SECTION.  Sec. 5027.  FOR THE EASTERN WASHINGTON UNIVERSITY

      Patterson Hall Remodel (20062002)

 

Reappropriation:

      State Building Construction Account--State       $18,978,000

Appropriation:

      State Building Construction Account--State       $30,500,000

 

      Prior Biennia (Expenditures)               $7,365,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $56,843,000

NEW SECTION.  Sec. 5028.  FOR THE EASTERN WASHINGTON UNIVERSITY

      Minor Works:  Health, Safety, Code Compliance (30000053)

 

Reappropriation:

      State Building Construction Account--State       $1,217,000

 

      Prior Biennia (Expenditures)               $1,283,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,500,000

NEW SECTION.  Sec. 5029.  FOR THE EASTERN WASHINGTON UNIVERSITY

      Minor Works:  Preservation (30000427)

 

Appropriation:

      State Building Construction Account--State       $4,895,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $8,000,000

             TOTAL         $12,895,000

NEW SECTION.  Sec. 5030.  FOR THE EASTERN WASHINGTON UNIVERSITY

      Minor Works:  Health, Safety, and Code Compliance (20081002)

 

Reappropriation:

      State Building Construction Account--State       $286,000

 

      Prior Biennia (Expenditures)               $3,871,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,157,000

NEW SECTION.  Sec. 5031.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Hogue Hall Renovation and Addition (20082003)

 

Reappropriation:

      State Building Construction Account--State       $15,098,000

 

      Prior Biennia (Expenditures)               $15,144,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $30,242,000

NEW SECTION.  Sec. 5032.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Minor Works:  Health, Safety, and Code Requirements (30000002)

 

Reappropriation:

      State Building Construction Account--State       $380,000

 

      Prior Biennia (Expenditures)               $570,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $950,000

NEW SECTION.  Sec. 5033.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Minor Works:  Infrastructure Preservation (30000009)

 

Reappropriation:

      State Building Construction Account--State       $253,000

 

      Prior Biennia (Expenditures)               $348,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $601,000

NEW SECTION.  Sec. 5034.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Minor Works:  Program (30000025)

 

Reappropriation:

      State Building Construction Account--State       $477,000

 

      Prior Biennia (Expenditures)               $1,523,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,000,000

NEW SECTION.  Sec. 5035.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Science Building (30000045)

 

Reappropriation:

      State Building Construction Account--State       $202,000

Appropriation:

      State Building Construction Account--State       $2,000,000

 

      Prior Biennia (Expenditures)               $376,000

      Future Biennia (Projected Costs)        $53,290,000

             TOTAL         $55,868,000

NEW SECTION.  Sec. 5036.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Samuelson Communication and Technology Center (30000451)

 

Appropriation:

      State Building Construction Account--State       $5,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $60,000,000

             TOTAL         $65,000,000

NEW SECTION.  Sec. 5037.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Combined Utilities (30000448)

 

Appropriation:

      State Building Construction Account--State       $3,727,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $19,600,000

             TOTAL         $23,327,000

NEW SECTION.  Sec. 5038.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Nutrition Science:  Predesign (30000456)

 

Appropriation:

      State Building Construction Account--State       $300,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $39,750,000

             TOTAL         $40,050,000

NEW SECTION.  Sec. 5039.  FOR THE EVERGREEN STATE COLLEGE

      Communications Laboratory Building Preservation and Renovation (30000002)

 

Reappropriation:

      State Building Construction Account--State       $1,291,000

Appropriation:

      State Building Construction Account--State       $8,130,000

 

      Prior Biennia (Expenditures)               $530,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $9,951,000

NEW SECTION.  Sec. 5040.  FOR THE EVERGREEN STATE COLLEGE

      Minor Works Preservation (30000003)

 

Reappropriation:

      State Building Construction Account--State       $1,567,000

 

      Prior Biennia (Expenditures)               $2,440,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,007,000

NEW SECTION.  Sec. 5041.  FOR THE EVERGREEN STATE COLLEGE

      Minor Works:  Health, Safety, Code Compliance (30000016)

 

Reappropriation:

      State Building Construction Account--State       $1,288,000

 

      Prior Biennia (Expenditures)               $665,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,953,000

NEW SECTION.  Sec. 5042.  FOR THE EVERGREEN STATE COLLEGE

      Minor Works:  Program (30000031)

 

Reappropriation:

      State Building Construction Account--State       $1,043,000

 

      Prior Biennia (Expenditures)               $507,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,550,000

NEW SECTION.  Sec. 5043.  FOR THE EVERGREEN STATE COLLEGE

      Minor Works:  Infrastructure (30000046)

 

Reappropriation:

      State Building Construction Account--State       $398,000

 

      Prior Biennia (Expenditures)               $982,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,380,000

NEW SECTION.  Sec. 5044.  FOR THE EVERGREEN STATE COLLEGE

      Science Center - Lab I, 2nd Floor Renovation (30000116)

 

Appropriation:

      State Building Construction Account--State       $4,950,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,950,000

NEW SECTION.  Sec. 5045.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Miller Hall Renovation (20041953)

 

Reappropriation:

      State Building Construction Account--State       $19,075,000

 

      Prior Biennia (Expenditures)               $32,442,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $51,517,000

NEW SECTION.  Sec. 5046.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Minor Works - Program (20082093)

 

Reappropriation:

      State Building Construction Account--State       $191,000

 

      Prior Biennia (Expenditures)               $10,364,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $10,555,000

NEW SECTION.  Sec. 5047.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Minor Works:  Health, Safety, and Code Requirements (30000004)

 

Reappropriation:

      State Building Construction Account--State       $710,000

 

      Prior Biennia (Expenditures)               $1,862,000

      Future Biennia (Projected Costs)        $0

            TOTAL         $2,572,000

NEW SECTION.  Sec. 5048.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Minor Works:  Facilities Preservation (30000005)

 

Reappropriation:

      State Building Construction Account--State       $1,030,000

 

      Prior Biennia (Expenditures)               $2,881,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,911,000

NEW SECTION.  Sec. 5049.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Minor Works:  Infrastructure (30000006)

 

Reappropriation:

      State Building Construction Account--State       $401,000

 

      Prior Biennia (Expenditures)               $1,380,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,781,000

NEW SECTION.  Sec. 5050.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Minor Works:  Program (30000007)

 

Reappropriation:

      State Building Construction Account--State       $2,023,000

 

      Prior Biennia (Expenditures)               $3,225,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $5,248,000

NEW SECTION.  Sec. 5051.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Classroom and Lab Upgrades (30000425)

 

Appropriation:

      State Building Construction Account--State       $2,486,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,486,000

NEW SECTION.  Sec. 5052.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Fraser Hall Renovation (30000427)

 

Appropriation:

      State Building Construction Account--State       $4,480,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,480,000

NEW SECTION.  Sec. 5053.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Carver Academic Renovation (20081060)

 

Appropriation:

      State Building Construction Account--State       $6,784,000

 

      Prior Biennia (Expenditures)               $391,000

      Future Biennia (Projected Costs)        $61,175,000

             TOTAL         $68,350,000

NEW SECTION.  Sec. 5054.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

      Pacific-Lewis and Clark Station Camp Park Project (2002S001)

 

Reappropriation:

      State Building Construction Account--State       $2,368,000

 

      Prior Biennia (Expenditures)               $2,119,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,487,000

NEW SECTION.  Sec. 5055.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

      Lewis and Clark Trail Interpretive Infrastructure Grant (20024001)

 

Reappropriation:

      State Building Construction Account--State       $319,000

 

      Prior Biennia (Expenditures)               $1,681,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,000,000

NEW SECTION.  Sec. 5056.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

      Statewide - Washington Heritage Project Grants (20064004)

 

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The reappropriation is subject to the provisions of section 212, chapter 371, Laws of 2006.

      (2) The reappropriation in this section is subject to the provisions of section 5043, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $964,000

 

      Prior Biennia (Expenditures)               $3,635,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,599,000

NEW SECTION.  Sec. 5057.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

      Washington Heritage Grants (20074004)

 

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The reappropriation is subject to the project list in section 5137, chapter 520, Laws of 2007.

      (2) The reappropriation in this section is subject to the provisions of section 5044, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $3,146,000

 

      Prior Biennia (Expenditures)               $6,759,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $9,905,000

NEW SECTION.  Sec. 5058.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

      Washington Heritage Project Capital Grants (30000011)

 

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The reappropriation in this section is subject to the provisions of section 5120, chapter 497, Laws of 2009.

      (2) The reappropriation in this section is subject to the provisions of section 5045, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $5,637,000

 

      Prior Biennia (Expenditures)               $3,788,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $9,425,000

NEW SECTION.  Sec. 5059.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

      Minor Works:  Preservation (30000093)

 

Reappropriation:

      State Building Construction Account--State       $572,000

 

      Prior Biennia (Expenditures)               $830,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,402,000

NEW SECTION.  Sec. 5060.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

      Vancouver National Historic Reserve West Barracks (91000002)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation in this section is subject to the provisions of section 5040, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State Building Construction Account--State       $1,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,000,000

NEW SECTION.  Sec. 5061.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

      Building Preservation (30000111)

 

Appropriation:

      State Building Construction Account--State       $800,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $3,200,000

             TOTAL         $4,000,000

NEW SECTION.  Sec. 5062.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

      Washington Heritage Grants (30000117)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation is subject to the provisions of RCW 27.34.330.

      (2) The appropriation is provided solely for the following list of projects:

 

Project

Authorized Amount

Schooner Martha Foundation

$118,000

Cascade Land Conservancy

$155,000

Port of Chinook

$45,000

City of Bellingham

$100,000

La Conner Quilt and Textile

Museum

$25,000

City of Vancouver

$610,000

Blue Mountain Heritage

Society

$30,000

Metro Parks Tacoma

$60,000

Si View Metro Park District

$25,000

Total

$1,168,000

 

 

Appropriation:

      State Building Construction Account--State       $1,168,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,168,000

NEW SECTION.  Sec. 5063.  FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY

      Museum System Repair and Upgrades/Preservation (20081013)

 

Reappropriation:

      State Building Construction Account--State       $1,264,000

 

      Prior Biennia (Expenditures)               $593,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,857,000

NEW SECTION.  Sec. 5064.  FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY

      Minor Works:  Facility Preservation (30000014)

 

Appropriation:

      State Building Construction Account--State       $100,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $400,000

             TOTAL         $500,000

NEW SECTION.  Sec. 5065.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Tacoma Community College - Science Building (20012687)

 

Reappropriation:

      State Building Construction Account--State       $143,000

 

      Prior Biennia (Expenditures)               $30,835,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $30,978,000

NEW SECTION.  Sec. 5066.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Spokane Falls Community College - Music Building 15 Renovation (20081320)

 

Reappropriation:

      State Building Construction Account--State       $634,000

 

      Prior Biennia (Expenditures)               $10,967,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $11,601,000

NEW SECTION.  Sec. 5067.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Spokane Falls - Business and Social Science Building (20051853)

 

Reappropriation:

      Gardner-Evans Higher Education Construction

             Account--State              $400,000

 

      Prior Biennia (Expenditures)               $19,913,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $20,313,000

NEW SECTION.  Sec. 5068.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Pierce College, Fort Steilacoom - Science and Technology (20042694)

 

Reappropriation:

      State Building Construction Account--State       $834,000

 

      Prior Biennia (Expenditures)               $31,559,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $32,393,000

NEW SECTION.  Sec. 5069.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Pierce College Fort Steilacoom - Cascade Core (20061326)

 

Reappropriation:

      State Building Construction Account--State       $503,000

 

      Prior Biennia (Expenditures)               $26,450,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $26,953,000

NEW SECTION.  Sec. 5070.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Clover Park Technical College - Allied Health Care Facility (20062699)

 

Reappropriation:

      State Building Construction Account--State       $317,000

Appropriation:

      State Building Construction Account--State       $20,706,000

 

      Prior Biennia (Expenditures)               $1,748,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $22,771,000

NEW SECTION.  Sec. 5071.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Spokane Community College - Building 7 Renovation (20081319)

 

Reappropriation:

      State Building Construction Account--State       $732,000

 

      Prior Biennia (Expenditures)               $8,620,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $9,352,000

NEW SECTION.  Sec. 5072.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Olympic College - Humanities and Student Services (20061204)

 

Reappropriation:

      State Building Construction Account--State       $500,000

 

      Prior Biennia (Expenditures)               $40,888,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $41,388,000

NEW SECTION.  Sec. 5073.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Pierce College Puyallup - Communication Arts and Health Building (20042691)

 

Reappropriation:

      Gardner-Evans Higher Education Construction

             Account--State              $559,000

 

      Prior Biennia (Expenditures)               $26,691,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $27,250,000

NEW SECTION.  Sec. 5074.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Green River Community College:  Water System Replacement (20061501)

 

Reappropriation:

      Gardner-Evans Higher Education Construction

             Account--State              $1,000,000

 

      Prior Biennia (Expenditures)               $951,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,951,000

NEW SECTION.  Sec. 5075.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      North Seattle Community College:  Technology Building Renewal (30000129)

 

Reappropriation:

      State Building Construction Account--State       $1,478,000

 

      Prior Biennia (Expenditures)               $606,000

      Future Biennia (Projected Costs)        $20,950,000

             TOTAL         $23,034,000

NEW SECTION.  Sec. 5076.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Lake Washington Technical College:  Allied Health Building (20062697)

 

Reappropriation:

      State Building Construction Account--State       $3,462,000

 

      Prior Biennia (Expenditures)               $22,343,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $25,805,000

NEW SECTION.  Sec. 5077.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      South Puget Sound Community College:  Learning Resource Center (20062698)

 

Reappropriation:

      State Building Construction Account--State       $2,130,000

Appropriation:

      State Building Construction Account--State       $30,196,000

 

      Prior Biennia (Expenditures)               $1,976,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $34,302,000

NEW SECTION.  Sec. 5078.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Seattle Central Community College:  Wood Construction Center (20081216)

 

Reappropriation:

      State Building Construction Account--State       $15,922,000

 

      Prior Biennia (Expenditures)               $6,387,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $22,309,000

NEW SECTION.  Sec. 5079.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Peninsula College:  Business and Humanities Center (20081218)

 

Reappropriation:

      State Building Construction Account--State       $8,957,000

 

      Prior Biennia (Expenditures)               $22,987,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $31,944,000

NEW SECTION.  Sec. 5080.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Spokane Falls Community College:  Chemistry and Life Science Building (20081219)

 

Reappropriation:

      State Building Construction Account--State       $4,696,000

 

      Prior Biennia (Expenditures)               $18,831,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $23,527,000

NEW SECTION.  Sec. 5081.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Spokane Community College:  Technical Education Building (20081220)

 

Reappropriation:

      State Building Construction Account--State       $14,095,000

 

      Prior Biennia (Expenditures)               $12,335,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $26,430,000

NEW SECTION.  Sec. 5082.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Everett Community College:  Index Hall Replacement (20081221)

 

Reappropriation:

      State Building Construction Account--State       $1,468,000

Appropriation:

      State Building Construction Account--State       $31,988,000

 

      Prior Biennia (Expenditures)               $3,489,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $36,945,000

NEW SECTION.  Sec. 5083.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Green River Community College:  Trades and Industry Building (20081222)

 

Reappropriation:

      State Building Construction Account--State       $1,127,000

 

      Prior Biennia (Expenditures)               $718,000

      Future Biennia (Projected Costs)        $35,810,000

             TOTAL         $37,655,000

NEW SECTION.  Sec. 5084.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Skagit Valley College:  Academic and Student Services Building (20081224)

 

Reappropriation:

      State Building Construction Account--State       $890,000

 

      Prior Biennia (Expenditures)               $976,000

      Future Biennia (Projected Costs)        $26,545,000

             TOTAL         $28,411,000

NEW SECTION.  Sec. 5085.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Lower Columbia College:  Health and Science Building (20081225)

 

Reappropriation:

      State Building Construction Account--State       $760,000

 

      Prior Biennia (Expenditures)               $3,927,000

      Future Biennia (Projected Costs)        $33,931,000

             TOTAL         $38,618,000

NEW SECTION.  Sec. 5086.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Grays Harbor College:  Science and Math Building (20081226)

 

Reappropriation:

      State Building Construction Account--State       $1,863,000

 

      Prior Biennia (Expenditures)               $705,000

      Future Biennia (Projected Costs)        $46,270,000

             TOTAL         $48,838,000

NEW SECTION.  Sec. 5087.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Pierce College Fort Steilacoom:  Cascade Core (20081321)

 

Reappropriation:

      State Building Construction Account--State       $4,590,000

 

      Prior Biennia (Expenditures)               $10,751,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $15,341,000

NEW SECTION.  Sec. 5088.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Tacoma Community College:  Health Careers Center (20082701)

 

Reappropriation:

      State Building Construction Account--State       $906,000

 

      Prior Biennia (Expenditures)               $1,160,000

      Future Biennia (Projected Costs)        $38,819,000

             TOTAL         $40,885,000

NEW SECTION.  Sec. 5089.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Bellevue Community College:  Health Science Building (20082702)

 

Reappropriation:

      State Building Construction Account--State       $500,000

 

      Prior Biennia (Expenditures)               $2,554,000

      Future Biennia (Projected Costs)        $42,712,000

             TOTAL         $45,766,000

NEW SECTION.  Sec. 5090.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Bates Technical College:  Mohler Communications Technology Center (20082703)

 

Reappropriation:

      State Building Construction Account--State       $1,123,000

 

      Prior Biennia (Expenditures)               $805,000

      Future Biennia (Projected Costs)        $26,657,000

             TOTAL         $28,585,000

NEW SECTION.  Sec. 5091.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Clark College:  Health and Advanced Technologies Building (20082705)

 

Reappropriation:

      State Building Construction Account--State       $1,941,000

 

      Prior Biennia (Expenditures)               $633,000

      Future Biennia (Projected Costs)        $49,186,000

             TOTAL         $51,760,000

NEW SECTION.  Sec. 5092.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Roof Repairs "A" (30000010)

 

Reappropriation:

      State Building Construction Account--State       $578,000

 

      Prior Biennia (Expenditures)               $2,049,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,627,000

NEW SECTION.  Sec. 5093.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Facility Repairs "A" (30000048)

 

Reappropriation:

      State Building Construction Account--State       $12,058,000

 

      Prior Biennia (Expenditures)               $4,670,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $16,728,000

NEW SECTION.  Sec. 5094.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Minor Works:  Program (30000078)

 

Reappropriation:

      State Building Construction Account--State       $2,599,000

 

      Prior Biennia (Expenditures)               $1,259,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,858,000

NEW SECTION.  Sec. 5095.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Yakima Valley Community College:  College/City Library (30000113)

 

Reappropriation:

      State Building Construction Account--State       $1,752,000

 

      Prior Biennia (Expenditures)               $248,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,000,000

NEW SECTION.  Sec. 5096.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Bellingham Technical College:  Fisheries Program (30000117)

 

Appropriation:

      State Building Construction Account--State       $2,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,000,000

NEW SECTION.  Sec. 5097.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Lower Columbia College:  Myklebust Gymnasium (30000118)

 

Appropriation:

      State Building Construction Account--State       $2,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,000,000

NEW SECTION.  Sec. 5098.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Wenatchee Valley College:  Music and Arts Center (30000119)

 

Appropriation:

      State Building Construction Account--State       $1,689,000

 

      Prior Biennia (Expenditures)               $311,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,000,000

NEW SECTION.  Sec. 5099.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Seattle Central Community College:  Seattle Maritime Academy (30000120)

 

Reappropriation:

      State Building Construction Account--State       $1,160,000

 

      Prior Biennia (Expenditures)               $177,000

      Future Biennia (Projected Costs)        $17,954,000

             TOTAL         $19,291,000

NEW SECTION.  Sec. 5100.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Yakima Valley Community College:  Palmer Martin Building (30000121)

 

Reappropriation:

      State Building Construction Account--State       $736,000

 

      Prior Biennia (Expenditures)               $261,000

      Future Biennia (Projected Costs)        $24,584,000

             TOTAL         $25,581,000

NEW SECTION.  Sec. 5101.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Peninsula College:  Fort Worden Building 202 (30000114)

 

Appropriation:

      State Building Construction Account--State       $2,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,000,000

NEW SECTION.  Sec. 5102.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Spokane Falls Community College:  Stadium & Athletic Fields (30000116)

 

Appropriation:

      State Building Construction Account--State       $758,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $758,000

NEW SECTION.  Sec. 5103.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Green River Community College:  Science Math Technology Building (30000130)

 

Reappropriation:

      State Building Construction Account--State       $942,000

Appropriation:

      State Building Construction Account--State       $18,562,000

 

      Prior Biennia (Expenditures)               $373,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $19,877,000

NEW SECTION.  Sec. 5104.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Site Repairs "A" (30000504)

 

Appropriation:

      State Building Construction Account--State       $1,983,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,983,000

NEW SECTION.  Sec. 5105.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Minor Works Program (30000674)

 

Appropriation:

      State Building Construction Account--State       $20,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $20,000,000

NEW SECTION.  Sec. 5106.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Spokane Falls Community College:  Campus Classrooms (20062696)

 

Appropriation:

      State Building Construction Account--State       $17,647,000

 

      Prior Biennia (Expenditures)               $1,317,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $18,964,000

NEW SECTION.  Sec. 5107.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Construction Contingency Pool (92000007)

 

      The reappropriation in this section is provided solely for allocation by the state board for community and technical colleges for major construction and renovation projects that confront emergent and unavoidable costs in excess of the construction contingency and management reserves included in the project appropriation.  The board shall report at least quarterly to the office of financial management and the legislative capital budget committees on requests for and allocations from the pool.

 

Reappropriation:

      State Building Construction Account--State       $900,000

 

      Prior Biennia (Expenditures)               $2,439,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,339,000

(End of part)

PART 6
2011 SUPPLEMENTAL CAPITAL BUDGET

Sec. 6001.  2009 c 497 s 1050 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) COMMERCE

      Temporary Public Works Grant Program (92000021)

 

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation is provided solely for grants for the specified public works projects and competitive public works grant programs specified below.  The public works board (board) shall administer the following competitive public works grant programs within the amounts specified, provided that up to ten percent of the amounts provided for competitive grant programs may be transferred to other competitive grant categories if acceptable applications for any category do not total the amount available.

      (1) $9,531,000 is provided solely for a competitive public works grant program for local governments serving communities in rural counties as defined in RCW 43.160.020.  The board shall prioritize applications for funding for this small community jobs program based on the following criteria:

      (a) The unemployment rate of the community;

      (b) The ability of the applicant to complete the project promptly; and

      (c) The value the project presents to the community in lasting improvements to public safety, environmental quality, recreation and community life, or economic development.

      (2) $9,531,000 is provided solely for a competitive public works grant program for local governments serving high density urban communities.  The board shall prioritize applications for funding from this urban vitality program based on the following criteria:

      (a) The proposed project's ability to decrease the per capita vehicle miles driven in the community by increasing access to mass transit, supporting residential density in proximity to employment opportunities, and improving the safety and appeal of walking and biking in a community;

      (b) The ability of the applicant to complete the project promptly; and

      (c) The local support for the project as indicated by the level of local matching funds devoted to the project.  Local matching funds do not include funds from other state sources.

      (3) The state taxable building construction account--state appropriation is provided solely for emergency loans under RCW 43.155.065.

      (4) (($23,535,000)) $21,528,000 is provided solely for the following list of projects.  The appropriation for Airway Heights wastewater treatment plant is contingent upon a capacity agreement with the Kalispel Tribe that precludes the need to build multiple wastewater treatment facilities on the West Plains.  If any project on the following list is unable to show reasonable progress towards accomplishing the intended project by December 31, 2010, the board may transfer the amount allocated for the project to the competitive grant categories in subsections (1) and (2) of this section.

 

 

Airway Heights Water Treatment Plant

$1,000,000

Small Community Jobs - Assistance for Grand Coulee School

$500,000

Small Community Jobs - Camano Island County Park Development

$300,000

Small Community Jobs - Connell Infrastructure

$1,100,000

Small Community Jobs - Dayton School Biomass Heating System

$100,000

Small Community Jobs - Grandview Downtown Revitalization

$500,000

Small Community Jobs - Green Acres Neighborhood Park

$200,000

Small Community Jobs - Hoh Tribe Fire Station

$623,000

Small Community Jobs - Longview Elementary Safety Underpass

$250,000

Small Community Jobs - Mesa Playground

$35,000

Small Community Jobs - Pasco Commercial Avenue Construction

$800,000

Small Community Jobs - Union Gap School Crossing Improvement

$227,000

Small Community Jobs - Yakima Downtown Futures

$1,000,000

Small Community Jobs - Yelm Longmire Park

$400,000

Urban Vitality - Federal Way Urban Infrastructure

$5,000,000

((Urban Vitality - Infrastructure for Puyallup (Parametrix)

$2,000,000))

Urban Vitality - Percival Landing

$3,000,000

Urban Vitality - Redmond Square Development

$2,000,000

Urban Vitality - Renton Hawks Landing

$1,700,000

Water - Gig Harbor Waste Water Treatment

$2,500,000

Water - Pine Terrace Water Association Project

(($300,000))

$293,000

Total

$21,528,000

 

 

Appropriation:

      State Building Construction Account--State       (($42,597,000))

      $40,340,000

      State Taxable Building Construction Account--State          $2,000,000

             Subtotal Appropriation (($44,597,000))

      $42,340,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($44,597,000))

      $42,340,000

Sec. 6002.  2010 1st sp.s. c 36 s 1001 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF COMMERCE

      Local and Community Projects (20064008)

 

      The reappropriation in this section is subject to the following conditions and limitations:  (1) $64,319 of the remaining reappropriation for El Centro de la raza may be used for building infrastructure.  (2) $10,000 of the remaining reappropriation for miracle league handicapped baseball may be used for pre-grading and resurfacing construction.  (3) $1,394,107 of the remaining reappropriation for MOBIUS/inland northwest science and technology center may be used for building design, construction, and renovation.  (4) $500,000 of the remaining reappropriation for the Soundway property preservation project may be used by the city of Seattle, in cooperation with the nature consortium for habitat, recreation improvements, or stewardship of the property, if the city of Seattle enacts pending city legislation to preserve the property and place it under the jurisdiction of city of Seattle parks and recreation.  (5) The reappropriation is adjusted for the transfer of the Vancouver national historical reserve west barracks project to the Washington state historical society and the termination of the following projects that are no longer viable:  (a) Snohomish senior center ((and)), (b) central area motivation program (CAMP), (c) undeveloped woodlands linked to interurban trail, (d) Hamilton improvement project, (e) Chambers Creek footbridge, and (f) Tukwila kayak and canoe launching facility.

 

Reappropriation:

      State Building Construction Account--State       (($9,258,000))

      $8,761,000

 

      Prior Biennia (Expenditures)               $37,141,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($46,399,000))

      $45,902,000

Sec. 6003.  2010 1st sp.s. c 36 s 1002 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF COMMERCE

      Job and Economic Development Grants (20064950)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation is subject to the provisions of section 107, chapter 371, Laws of 2006.

      (2) The appropriation is subject to the project list in section 107, chapter 371, Laws of 2006.

      (3) Up to $1,000,000 of the appropriation for the Pacific Northwest national labs campus infrastructure project is provided solely for giga-pop infrastructure.

      (4) Up to $2,200,000 of the appropriation is provided solely for military communities infrastructure projects.  Military communities infrastructure projects shall include:

      (a) Grants to counties and cities for the purchase of development easements and the purchase of real property in fee simple to restrict the use of accident potential zones and clear zones.  The office of financial management shall establish a competitive process for selecting projects to receive the grants.  Final allocation of these grants shall be at the discretion and with the approval of the director of the office of financial management.

      The grants are subject to the following conditions:

      (i) The county or city must be subject to and in compliance with RCW 36.70A.530;

      (ii) The grants may not be used to remove encroachments into these zones allowed by county or city zoning or permitting actions;

      (iii) The county or city must have an encroachment prevention plan preventing future encroachment into these zones; and

      (iv) The grant provided by the state must not exceed one-third of the project cost with funds from local and federal sources providing the balance of the funds.

      (b) Up to $481,000 of the ((re))appropriation is provided solely for improvements to a military department site on Fairchild air force base.

 

Reappropriation:

      Public Works Assistance Account--State            (($1,733,000))

      $1,253,000

Appropriation:

      State Building Construction Account--State       (($12,439,000))

      $9,860,000

 

      Prior Biennia (Expenditures)               $35,828,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($50,000,000))

      $46,941,000

Sec. 6004.  2009 c 497 s 1016 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) COMMERCE

      Community Services Facilities Grants (20074002)

 

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The reappropriation is subject to the provisions of RCW 43.63A.125.

      (2) The reappropriation is subject to the provisions of section 1029, chapter 520, Laws of 2007.

(3) The reappropriation is adjusted for the termination of the YMCA of Snohomish county project.

 

Reappropriation:

      State Building Construction Account--State       (($1,495,000))

      $1,220,000

 

      Prior Biennia (Expenditures)               $8,652,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($10,147,000))

      $9,872,000

Sec. 6005.  2009 c 497 s 1017 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) COMMERCE

      Youth Recreational Facilities Grants (20074003)

 

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The reappropriation is subject to the provisions of RCW 43.63A.135.

      (2) The reappropriation is subject to the provisions of section 1007, chapter 328, Laws of 2008.

(3) The reappropriation is adjusted for the termination of the Bellevue clubhouse project and the Mukilteo boys and girls club project.

 

Reappropriation:

      State Building Construction Account--State       (($4,000,000))

      $2,950,000

 

      Prior Biennia (Expenditures)               $5,050,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($9,050,000))

      $8,000,000

Sec. 6006.  2009 c 497 s 1020 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) COMMERCE

      Water System Acquisition Rehabilitation Program (20074006)

 

      The reappropriation in this section is subject to the following conditions and limitations:  Up to $1,000,000 of the reappropriation is provided solely for the city of Republic to acquire the Pine Grove water system.

 

Reappropriation:

      State Building Construction Account--State       (($2,191,000))

      $2,097,000

 

      Prior Biennia (Expenditures)               $1,559,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($3,750,000))

      $3,656,000

Sec. 6007.  2010 1st sp.s. c 36 s 1005 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF COMMERCE

      Job Development Fund Grants (20074010)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation is subject to the provisions of section 1032, chapter 520, Laws of 2007.

      (2) $3,000,000 of the appropriation is provided solely for a grant to the port of Grays Harbor for the bulk liquid facility project.

(3) The reappropriation is adjusted for (a) the termination of the city of Soap Lake project.

 

Reappropriation:

      Job Development Account--State       $4,298,000

 

Appropriation:

      State Building Construction Account--State       (($20,930,000))

      $19,930,000

 

      Prior Biennia (Expenditures)               $24,702,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($49,930,000))

      $48,930,000

Sec. 6008.  2010 1st sp.s. c 36 s 1003 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF COMMERCE

      Local and Community Projects (20084001)

 

      The reappropriation in this section is subject to the following conditions and limitations: 

      (1) The projects must comply with RCW 43.63A.125 and other requirements for community projects administered by the department.

      (2) The reappropriation is subject to the provisions of section 1008, chapter 328, Laws of 2008.

      (3) $1,000,000 of the remaining reappropriation for the Evergreen school district health and biosciences academy may be used for land acquisition.  If the facility is not constructed by June 30, 2015, the school district shall reimburse the state an amount equal to $1,000,000 increased by the average percentage appreciation in property values for undeveloped land in the surrounding area between the date the school district acquired the property and June 30, 2015 or the date the school district disposes of the property.

      (4) $600,000 of the remaining reappropriation for the institute for community leadership may be used for land acquisition.

      (5) $250,000 of the remaining reappropriation for the Pacific Northwest ilocandia association may be used for acquisition and renovation.

      (6) $200,000 of the remaining reappropriation for the library connection at Greenbridge may be used for construction and equipment.

      (7) $1,000,000 of the remaining reappropriation for the Evergreen school district health and biosciences academy may be used for land acquisition.

      (8) The remaining reappropriation for the Mobius/inland northwest science and technology center may be used for building design, construction, and renovation.

      (9) The reappropriation is adjusted for the transfer of the Vancouver national historical reserve project to the Washington state historical society; the reduction of $1,400,000 from the Tacoma narrows bridge lights project and $110,000 from the Seatac world war I memorial plaza; and the termination of the following projects that are no longer viable:  (a) Camp kilworth land acquisition - Federal Way, (b) Kitsap SEED, ((and (c) Seatac world war I memorial plaza)) (c) dining car historic preservation, (d) Lake Stevens civic center, (e) Mill Creek senior center, (f) mountains to sound - state route no. 18/Interstate 90 interchange project, (g) Simon youth foundation resource center, (h) Shoreline YMCA, and (i) town square grid - Drexler drive project.

(10) The remaining reappropriation for the Ashford cultural and mountaineering museum may be used for amenities in support of the amphitheater and the park.

 

Reappropriation:

      State Building Construction Account--State       (($56,650,000))

      $53,450,000

 

      Prior Biennia (Expenditures)               $71,694,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($128,344,000))

      $125,144,000

Sec. 6009.  2010 1st sp.s. c 36 s 1008 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF COMMERCE

      Quillayute Valley Wood-Fire Boiler (20084858)

 

Reappropriation:

      Energy Freedom Account--State         $20,000

Appropriation:

      State Building Construction Account--State       (($980,000))

      $960,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($1,000,000))

      $980,000

Sec. 6010.  2010 1st sp.s. c 36 s 1009 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF COMMERCE

      Snohomish County Biodiesel (20084859)

 

Reappropriation:

      Energy Freedom Account--State         $419,000

Appropriation:

      State Building Construction Account--State       (($81,000))

      $0

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($500,000))

      $419,000

Sec. 6011.  2009 c 497 s 1036 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) COMMERCE

      2008 Local and Community Projects (20084861)

 

      The reappropriation in this section is subject to the following conditions and limitations:

(1) The reappropriation is subject to the provisions of section 1019, chapter 328, Laws of 2008.

(2) The reappropriation is adjusted for the termination of the (a) armed forces and aerospace museum project, (b) Cispus environmental learning center project, and (c) the hope center project.

 

Reappropriation:

      State Building Construction Account--State       (($12,751,000))

      $12,366,000

 

      Prior Biennia (Expenditures)               $5,378,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($18,129,000))

      $17,744,000

Sec. 6012.  2010 1st sp.s. c 36 s 1011 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF COMMERCE

      Building for the Arts Grants (30000006)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) Projects must be selected based on their readiness to proceed.

      (2) The grant for the Federal Way performing arts center must be to the city of Federal Way.
      (3) The appropriation is provided solely for the following list of projects:

 

 

Admiral Theatre-No Theatre Left

Behind

$140,000

Building a Foundation for Discovery

$250,000

((Campus Consolidation (Cornish)

$375,000))

Convert Key Bank to Everett's Plaza

      Theatre

$500,000

Cottage Renovation (Hedgebrook)

$20,000

Downstairs at the 5th

$800,000

Federal Way Performing Arts Center

$325,000

Gateway Center (Lummi)

$150,000

((James Center for the Performing Arts
      (Sequim)

$150,000))

Langston Hughes Performing Arts

Center

$475,000

Legacy Project (Imagine)

$200,000

Modular Classrooms for Dance

(Gladish)

$30,000

Mt.  Baker Theatre

$1,000,000

Museum Expansion (Maryhill)

$1,500,000

New Hands On Children's Museum

$1,000,000

Reconstruction of First Stage

(Issaquah)

$400,000

Seattle Opera Center

$650,000

Stage Two (Whidbey)

$450,000

Vashon Arts Center

$1,115,000

Visual Arts Education Center

      (Snohomish  County)

$1,000,000

Viva Vera Capital Campaign

$70,000

 

 

Total

(($10,600,000))

$10,075,000

 

 

Appropriation:

      State Building Construction Account--State       (($10,600,000))

      $10,075,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        (($48,000,000))

      $0

             TOTAL         (($58,600,000))

      $10,075,000

Sec. 6013.  2009 c 497 s 1041 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) COMMERCE

      Youth Recreational Facilities Grants (30000007)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) Projects must be selected based on their readiness to proceed.

      (2) The appropriation is provided solely for the following list of projects:

 

 

Allen Place

$800,000

Auburn Boys & Girls Club

$800,000

Central Kitsap Community Campus

      YMCA

$800,000

Coal Creek Family YMCA

$800,000

((East Pierce County HOPE Center

$800,000))

Highline YMCA

$800,000

((Hough Pool Renovation

$150,000))

Jim Parsley Community Center

$800,000

Kitsap Girl Scout Center

$205,000

Naval Avenue Boys & Girls Club

$80,000

Toutle River Ranch

$360,000

West Sound Teen Center

$305,000

YMCA Spokane Central

$800,000

 

 

Total

(($7,500,000))

$6,550,000

 

 

Appropriation:

      State Building Construction Account--State       (($7,500,000))

      $6,550,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $30,000,000

             TOTAL         (($37,500,000))

      $36,550,000

Sec. 6014.  2009 c 497 s 1042 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) COMMERCE

      Building Communities Fund Grants (30000008)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) Except as otherwise directed before the effective date of this section, the department shall not expend the appropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.

      (2) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease.  This requirement does not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.

      (3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.

      (4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.

      (5) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(2)(c).

      (6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay state prevailing wages.

      (7) The appropriation is provided solely for the following list of projects:

 

 

A Home for Opportunity - CASA Latina

$325,000

Building the new Eastside Clinic - Community Health Care

$1,900,000

Community Center for Sand Point Housing

$350,000

Donald G. Topping HOPE Center - Boys & Girls Clubs of Puget Sound

$1,934,250

Dove House (Domestic Violence/Sexual Assault Program of Jefferson County)

$240,000

Duvall Multi-Service Center - Hopelink

$617,985

((Education and Training Center Mt. Baker Planned Parenthood

$881,847))

Emmanuel Family Life Center - Richard Allen Enterprises

$400,594

Eritrean Community Center Expansion

$300,000

Ferndale Boys & Girls Club

$752,847

Giant Step - RRA

$520,761

Greenbridge Early Learning Center

$1,419,281

High Point Neighborhood Center

$2,000,000

Highline YMCA

$1,163,000

Milgard Work Opportunity Center - Tacoma Goodwill

$1,850,000

Northeast Community Center Expansion

$1,300,000

Pierce County Therapy Center

$128,000

Rainier Vista & Rainier Valley Teen Center

$2,400,000

Repurposing Daybreak Star

$87,500

Riverwalk Point Community Building - Spokane Neighborhood Action Program

$79,253

Rotary Support Center for Families

$3,500,000

Safety & Systems Improvements at El Centro de la raza

$250,031

TAF Community Learning Space (CLS)

$1,500,000

The Keller House Services Center

$600,000

YMCA/YWCA Central Spokane Facility

$3,500,000

 

 

Total

(($28,000,349))

$27,120,000

 

 

Appropriation:

      State Building Construction Account--State       (($28,001,000))

      $27,120,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($28,001,000))

      $27,120,000

Sec. 6015.  2010 1st sp.s. c 36 s 1014 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF COMMERCE

      Local and Community Projects (30000019)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease.  This requirement does not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.

      (3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.

      (4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.

      (5) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(2)(c).

      (6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay

state prevailing wages.

      (7) Except as directed otherwise prior to the effective date of this section, the department shall not expend the appropriations in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.

      (8) The appropriation is provided solely for the following list of projects:

 

Local Community Projects

 

 

7th St. Theater

$330,000

Arc of Tri-Cities

$900,000

Bellevue Clinic--Seattle Children's Hospital

$2,000,000

Blessed Sacrament Food and Emergency Facilities Renovation

$200,000

Children's Village Expansion Project

$500,000

Clark County Food Distribution Facility

$1,500,000

Coal Creek YMCA (Newcastle)

$800,000

Dawson Place Child Advocacy Center

$1,000,000

Federal Way National Little League Field Lighting Project and Monument Entry Sign

$177,000

Harlequin Theater

$235,000

Home Dialysis Center and Professional Workforce Training

$250,000

Kirkland Park Place Redevelopment

$2,000,000

Livingston Baker Fire and Life Safety

$750,000

Marshland Diking District

$500,000

Marysville Boys & Girls Club

$500,000

McClure Middle School Energy Saving Performance Contract Demonstration Project

$1,000,000

((Mountains to Sound Greenway

$100,000))

Mukilteo Boys & Girls Club

$150,000

Neighborcare Health Clinic and Rainier Beach Medical Clinic

$1,000,000

Parkland at Japanese Gulch

$1,000,000

Petrovitsky Park Upgrade

$750,000

Phoenix House

$200,000

Poulsbo Marine Center

$500,000

Public Broadcasting Frequency Expansion

$223,000

((Ready by Five Early Learning Center

$1,000,000))

Renovations to Mill Creek City Annex Building

$30,000

Snohomish County Emergency Center

$1,000,000

South Tacoma Community Center

$1,000,000

Whatcom Hospice House

$700,000

Zina Linnik

$950,000

Total

$20,145,000

 

 

Appropriation:

      State Building Construction Account--State       (($20,245,000))

      $20,145,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($20,245,000))

      $20,145,000

Sec. 6016.  2010 1st sp.s. c 36 s 1015 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF COMMERCE

      2010 Local and Community Projects (30000082)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease.  This requirement does not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.

      (2) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.

      (3) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.

      (4) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(6).

      (5) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay

state prevailing wages.

      (6) Except as directed otherwise prior to the effective date of this section, the department shall not expend the appropriations in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.

      (7) The appropriation is provided solely for the following list of projects:

 

Local Community Projects

Aviation High School

$2,000,000

Bainbridge Island Metropolitan Park & Recreation District

$130,000

Children's Village Expansion

$250,000

East King County Performing Arts Center (PACE)

$2,000,000

Hanford Reach Interpretive Center

$500,000

Junior Achievement (Statewide JA World Initiative)

      $1,500,000

Lake Boren Park - Replace Unsafe Playground

$325,000

Museum of Flight Space Gallery

$3,000,000

Pike Market Workforce Childcare Facility

$1,000,000

Rainier Beach Medical & Dental Clinic (Neighborcare Health)

$500,000

Relocation of NAVES Mental Health Center in Brien

$1,000,000

Restoration of Historic Piciform Theater

$250,000

San Juan Island Farmers Market - Purchase Historic Building

$375,000

South King County Multi service Center

$300,000

Spokane Aerospace Technology Center Design

$400,000

Sultan Lake 16 Dam Repair

$250,000

Urban League Village at Colman School/NW African American Museum

$100,000

West Hill/Skyway Area Infrastructure

$250,000

Total

$14,130,000

 

 

Appropriation:

      State Building Construction Account--State       (($13,750,000))

      $14,130,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($13,750,000))

      $14,130,000

Sec. 6017.  2010 1st. sp.s. c 36 s 1016 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF COMMERCE

      Jobs Act for K-12 Public Schools and Higher Education Institutions (91000085)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation is provided solely for grants to public school districts and public higher education institutions for operational cost savings improvements to public school district and higher education facilities and related projects that result in energy and operational cost savings.  Related projects are those projects that must be completed in order for the energy efficiency improvements to be effective.  Grants may also be used for loan interest payments over the term of a loan.

      (2) The department of commerce, in consultation with the department of general administration, the office of the superintendent of public instruction, and the Washington State University energy program shall establish a competitive process to solicit and evaluate applications from public school districts and public higher education institutions.  Final grant awards shall be determined by the department of commerce.

      (3) The definitions in this section apply throughout this section.

      (a) "Cost-effectiveness" means that the present value to public school districts and public higher education institutions of the energy reasonably expected to be saved or produced by a facility, activity, measure, or piece of equipment over its useful life, including any compensation received from a utility or the Bonneville power administration, is greater than the net present value of the costs of implementing, maintaining, and operating such facility, activity, measure, or piece of equipment over its useful life, when discounted at the cost of public borrowing.

      (b) "Energy equipment" means energy management systems and any equipment, materials, or supplies that are expected, upon installation, to reduce the energy use or energy cost of an existing building or facility, and the services associated with the equipment, materials, or supplies, including but not limited to design, engineering, financing, installation, project management, guarantees, operations, and maintenance.  Reduction in energy use or energy cost may also include reductions in the use or cost of water, wastewater, or solid waste.

      (c) "Energy cost savings" means savings realized in expenses for energy use and expenses associated with water, wastewater, or solid waste systems.

      (d) "Energy savings performance contracting" means the process authorized by chapter 39.35C RCW by which a company contracts with a public agency to conduct energy audits and guarantee energy savings from energy efficiency.

      (e) "Operational cost savings" means savings realized from parts, service fees, capital renewal costs, and other measurable annual expenses to maintain and repair systems.  This definition does not mean labor savings related to existing facility staff.

      (f) "Public facilities" means buildings, building components, and major equipment or systems owned by public school districts and public higher education institutions.

      (g) "Innovative measures" means advanced or emerging technologies, systems or approaches that may not yet be in common practice but improve energy efficiency, accelerate deployment, or reduce energy usage, and become widely commercially available in the future if proven successful in demonstration programs without compromising the guaranteed performance or measurable energy and operational cost savings anticipated.  Examples of innovative measures include, but are not limited to, advanced energy and systems operations monitoring, diagnostics and controls systems for buildings; novel heating, cooling, ventilation and water heating systems; advanced windows and insulation technologies, highly efficient lighting technologies, designs, and controls; and integration of renewable energy sources into buildings, and energy savings verification technologies and solutions.

      (4) Grants must be awarded in competitive rounds, based on demand and capacity, with at least five percent of each grant round awarded to small public school districts with fewer than 1,000 full-time equivalent students, based on demand and capacity.

      (5) Within each competitive round, projects must be weighted and prioritized based on the following criteria and in the following order:

      (a) Leverage ratio:  In each round, the higher the leverage ratio of nonstate funding sources to state jobs act grant, the higher the project ranking.

      (b) Energy savings:  In each round, the higher the energy savings, the higher the project ranking.  Applicants must submit documentation that demonstrates energy and operational cost savings resulting from the installation of the energy equipment and improvements.  The energy savings analysis shall be performed by a licensed engineer, and the documentation must include but is not limited to the following:

      (i) A description of the energy equipment and improvements;

      (ii) A description of the energy and operational cost savings; and

      (iii) A description of the extent to which the project employs collaborative and innovative measures and encourages demonstration of new and emerging technologies with high energy-savings or energy cost- reductions.

      (c) Expediency of expenditure:  Project readiness to spend funds must be prioritized so that the legislative intent to expend funds quickly is met.

      (6) Projects that do not use energy savings performance contracting must:  (a) Verify energy and operational cost savings for ten years or until the energy and operational costs savings pay for the project, whichever is shorter; (b) follow the department of general administration's energy savings performance contracting project guidelines; and (c) employ a licensed engineer for the energy audit and construction.  The department of commerce may require third-party verification of savings if a project is not implemented by an energy savings performance contractor selected by the department of general administration through the request of qualifications process.  Third- party verification must be conducted either by an energy savings performance contractor selected by the department of general administration through a request for qualifications, a licensed engineer that is a certified energy manager, a project resource conservation manager, or educational service district resource conservation manager.

      (7) To intensify competition, the department of commerce may only award funds to the top eighty-five percent of projects applying in a round until the department of commerce determines a final round is appropriate.  Projects that do not receive a grant award in one round may reapply in subsequent rounds.

      (8) To match federal grants and programs that require state matching funds and produce significantly higher efficiencies in operations and utilities, the level of innovation criteria may be increased for the purposes of weighted scoring to capture those federal dollars for selected projects that require a higher level of innovation and regional collaboration.

      (9) Grant amounts awarded to each project must allow for the maximum number of projects funded with the greatest energy and cost benefit.

      (10)(a) The department of commerce must use bond proceeds to pay one-half of the preliminary audit, up to five cents per square foot, if the project does not meet the school district's and higher education institution's predetermined cost-effectiveness criteria.  Public school districts and public higher education institutions must pay the other one-half of the cost of the preliminary audit if the project does not meet their predetermined cost-effectiveness criteria.

      (b) The energy savings performance contractor shall not charge for an investment grade audit if the project does not meet the school district's and higher education institution's predetermined cost- effectiveness criteria.  Public school districts and public higher education institutions must pay the full price of an investment grade audit if they do not proceed with a project that meets the school district's and higher education institution's predetermined cost- effectiveness criteria.

      (11) The department of commerce may charge projects administrative fees and may pay the department of general administration, the Washington State University energy program, and the office of the superintendent of public instruction administration fees in an amount determined through a memorandum of understanding.

      (12) The department of commerce and the department of general administration must submit a joint report to the appropriate committees of the legislature and the office of financial management on the timing and use of the grant funds, program administrative function, compliance with apprenticeship utilization requirements in RCW 39.04.320, compliance with prevailing wage requirements, and administration fees by the end of each fiscal year, until the funds are fully expended and all savings verification requirements are fulfilled.

 

Appropriation:

      State Building Construction Account--State       (($50,000,000))

      $44,809,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($50,000,000))

      $44,809,000

Sec. 6018.  2010 1st sp.s. c 36 s 1021 (uncodified) is amended to read as follows:

FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Risk Pool (91000001)

 

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation is provided solely for a risk pool to complete projects within the scope described in budget documents submitted as part of the governor's capital budget request and consistent with legislative history.  This section only applies to projects included in this 2010 supplemental capital budget with reduced appropriations.  The office of financial management may allot portions of this appropriation ten days after notifying the senate ways and means committee and the house of representatives capital budget committee.  The notification must include an explanation of the need and the amount for the allotment to complete the scope of an approved project.

 

Appropriation:

      State Building Construction Account--State       (($4,000,000))

      $0

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($4,000,000))

      $0

Sec. 6019.  2010 1st sp.s. c 36 s 1034 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Pro Arts Building (91000002)

 

Appropriation:

      State Building Construction Account--State       (($225,000))

      $201,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($225,000))

      $201,000

Sec. 6020.  2009 c 497 s 1069 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Infrastructure Relocation (20082028)

 

Reappropriation:

      State Building Construction Account--State       (($1,500,000))

      $281,000

 

      Prior Biennia (Expenditures)               $500,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($2,000,000))

      $781,000

Sec. 6021.  2009 c 497 s 1076 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Facility Oversight Program:  Staffing (30000063)

 

      ((The appropriation in this section is subject to the following conditions and limitations:  The appropriation in this section is provided solely for the department of general administration to assist the office of financial management with the development and implementation of RCW 43.82.035 and 43.82.055.))

 

Appropriation:

      State Building Construction Account--State       (($740,000))

      $705,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $5,597,000

             TOTAL         (($6,337,000))

      $6,302,000

Sec. 6022.  2009 c 497 s 1078 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Engineering and Architectural Services:  Staffing (30000086)

 

Appropriation:

      State Building Construction Account--State       (($9,300,000))

      $9,169,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $43,033,000

             TOTAL         (($52,333,000))

      $52,202,000

Sec. 6023.  2010 1st sp.s. c 36 s 2006 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Capacity to Replace Maple Lane School (92000005)

 

Appropriation:

      State Building Construction Account--State       (($760,000))

      $2,097,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        (($1,025,000))

      $0

             TOTAL         (($1,785,000))

      $2,097,000

Sec. 6024.  2009 c 497 s 2016 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Special Commitment Center Medium Management Housing Addition (20082505)

 

      ((The reappropriation in this section is subject to the following conditions and limitations:
      The reappropriation is to add residential space to existing facilities by remodeling existing residential space and converting existing program space to residential space for additional beds.))

 

Reappropriation:

      State Building Construction Account--State       (($700,000))

      $554,000

      Prior Biennia (Expenditures)               $575,000

      Future Biennia (Projected Costs)        $53,664,000

             TOTAL         (($54,939,000))

      $54,793,000

Sec. 6025.  2009 c 497 s 2025 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Western State Hospital: Traffic Study Implementation (30000843)

 

Appropriation:

      State Building Construction Account--State       (($355,000))

      $39,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $996,000

             TOTAL         (($1,351,000))

      $1,035,000

Sec. 6026.  2009 c 497 s 2012 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Western State Hospital New Kitchen and Commissary Building (20081319)

 

Reappropriation:

      State Building Construction Account--State       $400,000

Appropriation:

      State Building Construction Account--State       (($650,000))

      $540,000

 

      Prior Biennia (Expenditures)               $250,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($1,300,000))

      $1,190,000

Sec. 6027.  2009 c 497 s 2017 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Fircrest Campus Master Plan (20082850)

 

      ((The reappropriation in this section is subject to the following conditions and limitations:
      (1) The department shall resume and complete a master plan of the portion of the Fircrest campus that is not utilized by the Fircrest school or the department of health.
      (2) In drafting the master plan, the department shall consult with the following:
      (a) The city of Shoreline;
      (b) The department of natural resources;
      (c) The department of health regarding their master planning effort;
      (d) Representatives of institutions of higher education with whom the department has a partnership; and
      (e) Representatives of the Shoreline community and neighboring communities.))

 

Reappropriation:

      State Building Construction Account--State       (($50,000))

      $47,000

 

      Prior Biennia (Expenditures)               $395,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($445,000))

      $442,000

Sec. 6028.  2009 c 497 s 2041 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Coyote Ridge Corrections Center:  Design and Construct Medium Security Beds (19982011)

 

Reappropriation:

      State Building Construction Account--State       (($4,772,000))

      $4,630,000

 

      Prior Biennia (Expenditures)               $228,170,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($232,942,000))

      $232,800,000

Sec. 6029.  2009 c 497 s 2045 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Monroe Corrections Center:  Health Care Facility (20062043)

 

Reappropriation:

      State Building Construction Account--State       (($283,000))

      $1,000

 

      Prior Biennia (Expenditures)               $417,000

      Future Biennia (Projected Costs)        (($89,446,000))

      $17,604,000

             TOTAL         (($90,146,000))

      $18,022,000

Sec. 6030.  2009 c 497 s 2048 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Larch Corrections Center:  80-Bed Expansion (20062852)

 

Reappropriation:

      State Building Construction Account--State       (($560,000))

      $425,000

 

      Prior Biennia (Expenditures)               $2,512,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($3,072,000))

      $2,937,000

Sec. 6031.  2009 c 497 s 2043 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      McNeil Island Corrections:  Replace and Stabilize Housing Unit Siding (20061005)

 

Reappropriation:

      State Building Construction Account--State       (($400,000))

      $211,000

 

      Prior Biennia (Expenditures)               $3,394,000

      Future Biennia (Projected Costs)        $4,087,000

             TOTAL         (($7,881,000))

      $7,692,000

Sec. 6032.  2009 c 497 s 2044 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Washington State Penitentiary: South Close Security Complex (20062021)

 

Reappropriation:

      State Building Construction Account--State       (($35,950,000))

      $34,287,000

 

      Prior Biennia (Expenditures)               $29,344,000

      Future Biennia (Projected Costs)        (($14,276,000))

      $0

             TOTAL         (($79,570,000))

      $63,631,000

Sec. 6033.  2009 c 497 s 2046 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Washington Corrections Center for Women: Healthcare Center (20062066)

 

Reappropriation:

      State Building Construction Account--State       (($7,700,000))

      $6,935,000

 

      Prior Biennia (Expenditures)               $11,358,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($19,058,000))

      $18,293,000

Sec. 6034.  2009 c 497 s 2049 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Airway Heights Heating and Cooling Loop Replacement (20081001)

 

Reappropriation:

      State Building Construction Account--State       (($180,000))

      $104,000

 

      Prior Biennia (Expenditures)               $2,745,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($2,925,000))

      $2,849,000

Sec. 6035.  2009 c 497 s 2050 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      McNeil Island Corrections Center:  Replace Barge Slip Pilings (20081002)

 

Reappropriation:

      State Building Construction Account--State       (($3,612,000))

      $3,146,000

 

      Prior Biennia (Expenditures)               $288,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($3,900,000))

      $3,434,000

Sec. 6036.  2009 c 497 s 2051 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Replace Kitchen Roofs at Monroe Correctional Complex (20081003)

 

Reappropriation:

      State Building Construction Account--State       (($250,000))

      $157,000

 

      Prior Biennia (Expenditures)               $1,812,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($2,062,000))

      $1,969,000

Sec. 6037.  2009 c 497 s 2052 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Washington Corrections Center:  Replace G Building Roof (20081004)

 

Reappropriation:

      State Building Construction Account--State       (($412,000))

      $205,000

 

      Prior Biennia (Expenditures)               $4,019,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($4,431,000))

      $4,224,000

Sec. 6038.  2009 c 497 s 2053 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Washington Corrections Center:  Replace Roofs (20081005)

 

Reappropriation:

      State Building Construction Account--State       (($900,000))

      $890,000

 

      Prior Biennia (Expenditures)               $5,766,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($6,666,000))

      $6,656,000

Sec. 6039.  2010 1st sp.s. c 36 s 2016 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Washington State Penitentiary:  Replace Roofs (20081007)

 

Reappropriation:

      State Building Construction Account--State       (($180,000))

      $160,000

 

      Prior Biennia (Expenditures)               $589,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($769,000))

      $749,000

Sec. 6040.  2009 c 497 s 2055 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Washington Corrections Center:  Replace Fire Alarm System (20081008)

 

Reappropriation:

      State Building Construction Account--State       (($600,000))

      $487,000

 

      Prior Biennia (Expenditures)               $924,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($1,524,000))

      $1,411,000

Sec. 6041.  2009 c 497 s 2056 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Replace Electrical Distribution Building at Special Offenders Unit (20081009)

 

Reappropriation:

      State Building Construction Account--State       (($539,000))

      $536,000

 

      Prior Biennia (Expenditures)               $683,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($1,222,000))

      $1,219,000

Sec. 6042.  2009 c 497 s 2057 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Washington State Reformatory:  Replace Cell Door and Electronics (20081010)

 

Reappropriation:

      State Building Construction Account--State       (($230,000))

      $133,000

 

      Prior Biennia (Expenditures)               $1,315,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($1,545,000))

      $1,448,000

Sec. 6043.  2009 c 497 s 2058 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Clallam Bay Corrections Center:  Replace Telecommunications Infrastructure (20081013)

 

Reappropriation:

      State Building Construction Account--State       (($1,329,000))

      $1,110,000

 

      Prior Biennia (Expenditures)               $521,000

      Future Biennia (Projected Costs)        (($19,045,000))

      $19,105,000

             TOTAL         (($20,895,000))

      $20,736,000

Sec. 6044.  2009 c 497 s 2062 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Washington State Penitentiary:  Laundry Improvements (20081033)

 

Reappropriation:

      State Building Construction Account--State       (($3,701,000))

      $3,686,000

 

      Prior Biennia (Expenditures)               $350,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($4,051,000))

      $4,036,000

Sec. 6045.  2009 c 497 s 2063 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Washington Corrections Center:  Expand Reception Center (20082016)

 

Reappropriation:

      State Building Construction Account--State       (($73,000))

      $2,000

 

      Prior Biennia (Expenditures)               $397,000

      Future Biennia (Projected Costs)        (($64,100,000))

      $55,900,000

             TOTAL         (($64,570,000))

      $56,299,000

Sec. 6046.  2009 c 497 s 2066 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Airway Heights Corrections Center:  Sex Offender Treatment Program Building (20082028)

 

Reappropriation:

      State Building Construction Account--State       (($550,000))

      $545,000

 

      Prior Biennia (Expenditures)               $4,397,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($4,947,000))

      $4,942,000

Sec. 6047.  2010 1st sp.s. c 36 s 2010 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Washington Corrections Center for Women:  Roof Replacement (30000178)

 

Appropriation:

      State Building Construction Account--State       (($1,557,000))

      $860,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($1,557,000))

      $860,000

Sec. 6048.  2009 c 497 s 2074 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Washington Corrections Center: Replace Fire Detection/Suppression (30000123)

 

Appropriation:

      State Building Construction Account--State       (($1,098,000))

      $898,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($1,098,000))

      $898,000

Sec. 6049.  2009 c 497 s 2073 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

      Washington Corrections Center for Women: Replace Fire Alarm (30000121)

 

Appropriation:

      State Building Construction Account--State       (($1,625,000))

      $661,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($1,625,000))

      $661,000

Sec. 6050.  2009 c 497 s 3026 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ECOLOGY

      Centennial Clean Water Program (20084010)

 

Reappropriation:

      State Building Construction Account--State       (($34,870,000))

      $34,470,000

      Water Quality Capital Account--State                $4,698,000

             Subtotal Reappropriation              $39,168,000

 

      Prior Biennia (Expenditures)               $27,315,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($66,883,000))

      $66,483,000

Sec. 6051.  2009 c 497 s 3011 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ECOLOGY

      Columbia River Program (20062010)

 

Reappropriation:

      State Building Construction Account--State       (($1,423,000))

      $1,183,000

 

      Prior Biennia (Expenditures)               $14,577,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($16,000,000))

      $15,760,000

Sec. 6052.  2009 c 497 s 3006 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ECOLOGY

      Water Conveyance Infrastructure Projects (20052850)

 

Reappropriation:

      Water Quality Capital Account--State                $81,000

      State Building Construction Account--State       (($1,708,000))

      $1,689,000

      State and Local Improvements Revolving Account

             (Water Supply Facilities)--State   $438,000

             Subtotal Reappropriation              (($2,227,000))

      $2,208,000

 

      Prior Biennia (Expenditures)               $3,573,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($5,800,000))

      $5,781,000

Sec. 6053.  2009 c 497 s 3004 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ECOLOGY

      Water Supply Facilities (20044006)

 

Reappropriation:

      State Building Construction Account--State       (($1,600,000))

      $1,468,000

      State and Local Improvements Revolving Account

             (Water Supply Facilities)--State   $392,000

             Subtotal Reappropriation              (($1,992,000))

      $1,860,000

 

      Prior Biennia (Expenditures)               $11,658,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($13,650,000))

      $13,518,000

Sec. 6054.  2009 c 497 s 3008 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ECOLOGY

      Quad Cities Water Right Mitigation (20052852)

 

Reappropriation:

      State Building Construction Account--State       (($1,925,000))

      $1,325,000

 

      Prior Biennia (Expenditures)               $275,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($2,200,000))

      $1,600,000

Sec. 6055.  2009 c 497 s 3005 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ECOLOGY

      Centennial Clean Water Fund (20044007)

 

Reappropriation:

      State Building Construction Account--State       (($1,481,000))

      $1,366,000

      Water Quality Capital Account--State                $31,000

             Subtotal Reappropriation              (($1,512,000))

      $1,397,000

 

      Prior Biennia (Expenditures)               $43,538,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($45,050,000))

      $44,935,000

Sec. 6056.  2009 c 497 s 3039 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ECOLOGY

      Flood Protection Study (20082855)

 

      ((The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation in this section is provided solely for the department to conduct a study to determine the number of decertified levees in the state and to identify strategies for recertifying the levees so that they provide optimum protection for the communities protected by the levees.  The department must prioritize areas to include in the study based on population and the economic impact of potential flood damage.
      The study must include the following components:
      (1) A working group of levee managers to advise and inform the study;
      (2) A technical review of the structural integrity of levee systems;
      (3) An inventory, map, and rate the effectiveness of existing levee systems; and
      (4) The development of strategies and actions needed to improve the existing levee system and to ensure certification by the United States army corps of engineers for one-hundred year flood protection.
      The study must be completed and a report provided to the appropriate legislative committees by July 1, 2010.))

 

Reappropriation:

      State Building Construction Account--State       (($280,000))

      $205,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($280,000))

      $205,000

Sec.  6057.  2010 1st sp.s. c 36 s 3015 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ECOLOGY

      Safe Soils Remediation Program (30000019)

 

Appropriation:

      State Building Construction Account--State       (($2,380,000))

      $669,000

      Cleanup Settlement Account--State    $1,620,000

             Subtotal Appropriation (($4,000,000))

      $2,289,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($4,000,000))

      $2,289,000

Sec. 6058.  2009 c 497 s 3055 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ECOLOGY

      Protect Communities from Flood and Drought (92000002)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) $2,500,000 of the appropriation is provided solely for the Columbia basin ground water management area ground water hydrologic modeling project.  The project shall submit a report to the appropriate committees of the legislature that does the following:

      (a) Describes the physical properties of the aquifer system and the variation of those properties throughout the area of concern,

      (b) Quantifies the rate and location of aquifer recharge and discharge within the subarea,

      (c) Quantifies the water balance for the by land use type,

      (d) Demonstrates with empirical data a viable solution to the observed problems in the area of concern,

      (e) Estimates the quantity of water needed for the solution, and

      (f) Evaluates the physical and legal availability of such water from the Columbia River.  The final report must be submitted by June 30, 2011.

      (2) $10,000,000 of the appropriation is provided solely for a grant to repair the Horseshoe Bend levy that protects communities in the Kent valley.

      (3) $150,000 of the appropriation is provided solely for a grant for the King County fire protection district no. 16 to prevent flood damage to the fire station.

      (4) $2,350,000 of the appropriation is provided solely for a competitive grant program for projects that protect communities from flood damage and prepare communities for drought and water shortages.  The department shall prioritize applications from communities most at risk to flood damage and drought and who are least able to fund mitigation projects from local resources.  The department shall also seek to balance the needs of different regions of the state, and choose projects most ready to proceed.

 

Appropriation:

      State Building Construction Account--State       (($15,000,000))

      $14,975,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($15,000,000))

      $14,975,000

Sec.  6059.  2010 1st sp.s. c 36 s 3020 (uncodified) is amended to read as follows:

FOR THE STATE PARKS AND RECREATION COMMISSION

      Cama Beach State Park (30000101)

 

Appropriation:

      State Building Construction Account--State       (($2,775,000))

      $1,625,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($2,775,000))

      $1,625,000

Sec. 6060.  2010 1st sp.s. c 36 s 3017 (uncodified) is amended to read as follows:

FOR THE STATE PARKS AND RECREATION COMMISSION

      Flaming Geyser State Park Park-wide Infrastructure Redevelopment (30000173)

 

Appropriation:

      State Building Construction Account--State       (($3,003,000))

      $603,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($3,003,000))

      $603,000

Sec. 6061.  2009 c 497 s 3077 (uncodified) is amended to read as follows:

FOR THE STATE PARKS AND RECREATION COMMISSION

      Bay View Park Wide Wastewater Treatment System (20082041)

 

Reappropriation:

      State Building Construction Account--State       (($1,760,000))

      $510,000

 

      Prior Biennia (Expenditures)               $427,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($2,187,000))

      $937,000

Sec. 6062.  2009 c 497 s 3082 (uncodified) is amended to read as follows:

FOR THE STATE PARKS AND RECREATION COMMISSION

      Minor Works Preservation (30000001)

 

Appropriation:

      State Building Construction Account--State       (($6,930,000))

      $6,800,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $40,641,000

             TOTAL         (($47,571,000))

      $47,441,000

Sec. 6063.  2010 1st sp.s. c 36 s 3024 (uncodified) is amended to read as follows:

FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Washington Wildlife Recreation Grants (20084011)

 

      The reappropriations in this section are subject to the following conditions and limitations:

      (1) The reappropriations are provided solely for the approved list of projects in LEAP capital document No. 2007-3 as developed on March 17, 2007, and LEAP capital document No. 2008-1 as developed on February 13, 2008.

      (2) If additional funds are available after funding the farmlands preservation account projects approved in subsection (1) of this section, the committee may:  Provide one-time grants of up to $25,000 each to counties requesting assistance in developing farmlands preservation strategies for the purpose of seeking grants from the farmlands preservation account in future grant cycles.

      (3) Funds reappropriated for distribution according to the provisions of RCW 79A.15.040(1)(c) must be allocated forty percent to local government projects and sixty percent to state agency projects.  If the cumulative total of local government projects is less than forty percent of the total distribution to this category, the difference may be allocated to state agency projects.

      (4) Up to $627,299 of the reappropriation from the riparian protection account is provided solely for the Chehalis river surge plain natural area preserve.  This amount may not be expended for the project until the department of natural resources has completed a management plan for the preserve that maintains recreational access and that management plan is presented to the house of representatives capital budget and senate ways and means committees.

 

Reappropriation:

      Farmlands Preservation Account--State              (($4,319,000))

      $3,792,000

      Riparian Protection Account--State    $12,500,000

      Habitat Conservation Account--State $23,956,000

      Outdoor Recreation Account--State    $22,994,000

             Subtotal Reappropriation              (($63,769,000))

      $63,242,000

 

      Prior Biennia (Expenditures)               $35,250,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($99,019,000))

      $98,492,000

Sec. 6064.  2009 c 497 s 3135 (uncodified) is amended to read as follows:

FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Washington Wildlife Recreation Grants (30000002)

 

      ((The appropriations in this section are subject to the following conditions and limitations:
      The appropriations are provided solely for the list of projects in LEAP capital document No. 2009-1a, developed April 23, 2009.))

 

Appropriation:

      Riparian Protection Account--State    $10,000,000

      Habitat Conservation Account--State $27,000,000

      Outdoor Recreation Account--State    $27,000,000

      Farmlands Preservation Account--State              (($6,000,000))

      $5,445,000

             Subtotal Appropriation (($70,000,000))

      $69,445,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $200,000,000

             TOTAL         (($270,000,000))

      $269,445,000

Sec. 6065.  2009 c 497 s 3157 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Voights Creek Hatchery (20081003)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) $200,000 of the amount appropriated is provided solely for the repair necessary to restore the facility for limited operations;

      (2) $550,000 of the amount appropriated is provided solely for property acquisition.  If the department does not acquire property, the amount provided in this subsection shall lapse; and

      (3) $50,000 of the amount appropriated is provided solely for the department to participate in a work group with the Puyallup Tribe of Indians that will make recommendations no later than December 1, 2009, regarding the options for improving production from hatcheries along the Puyallup river system while reducing cost.  Options to be considered include shifting production among the hatcheries, consolidation of hatcheries, and shifting responsibilities for construction, maintenance and operations of hatcheries.

 

Reappropriation:

      State Building Construction Account--State       $150,000

 

Appropriation:

      State Building Construction Account--State       (($800,000))

      $792,000

 

      Prior Biennia (Expenditures)               $355,000

      Future Biennia (Projected Costs)        $1,800,000

             TOTAL         (($3,105,000))

      $3,097,000

Sec. 6066.  2009 c 497 s 3186 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF FISH AND WILDLIFE

      ((Bebee)) Beebe Springs Phase 3 (92000006)

 

Appropriation:

      State Building Construction Account--State       (($2,643,000))

      $1,043,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($2,643,000))

      $1,043,000

Sec. 6067.  2009 c 497 s 3174 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Washougal Hatchery Pond Renovation (30000094)

 

Appropriation:

      State Building Construction Account--State       (($1,236,000))

      $1,086,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($1,236,000))

      $1,086,000

Sec. 6068.  2009 c 497 s 3184 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Chambers Creek Adult Trap (20081004)

 

Reappropriation:

      State Building Construction Account--State       (($240,000))

      $0

 

      Prior Biennia (Expenditures)               $12,000

      Future Biennia (Projected Costs)        (($450,000))

      $0

             TOTAL         (($702,000))

      $12,000

Sec. 6069.  2009 c 497 s 3166 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Skookumchuck Hatchery Renovation (20082015)

 

Reappropriation:

      State Building Construction Account--State       $200,000

 

 Appropriation:

      State Building Construction Account--State       (($3,728,000))

      $3,128,000

 

      Prior Biennia (Expenditures)               $328,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($4,256,000))

      $3,656,000

Sec. 6070.  2009 c 497 s 3175 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Grays River Hatchery Intake Replacement (30000089)

 

Appropriation:

      State Building Construction Account--State       (($549,000))

      $81,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        (($3,499,000))

      $4,000,000

             TOTAL         (($4,048,000))

      $4,081,000

Sec. 6071.  2009 c 497 s 3193 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF NATURAL RESOURCES

      Road Maintenance and Abandonment Projects (30000071)

 

Appropriation:

      State Building Construction Account--State       (($500,000))

      $450,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $1,800,000

             TOTAL         (($2,300,000))

      $2,250,000

Sec. 6072.  2009 c 497 s 3194 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF NATURAL RESOURCES

      Natural Areas Facilities Preservation and Access (30000079)

 

Appropriation:

      State Building Construction Account--State       (($700,000))

      $665,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $13,923,000

             TOTAL         (($14,623,000))

      $14,588,000

Sec. 6073.  2009 c 497 s 3195 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF NATURAL RESOURCES

      Recreation Capital Renovations (30000109)

 

Appropriation:

      State Building Construction Account--State       (($816,000))

      $591,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $32,682,000

             TOTAL         (($33,498,000))

      $33,273,000

Sec. 6074.  2009 c 497 s 3189 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF NATURAL RESOURCES

      Colville Armory (20082851)

 

Reappropriation:

      Forest Development Account--State   $306,000

      Resource Management Cost Account--State       $323,000

      State Building Construction Account--State       (($292,000))

      $162,000

             Subtotal Reappropriation              (($921,000))

      $791,000

 

      Prior Biennia (Expenditures)               $21,000

      Future Biennia (Projected Costs)        $3,000,000

             TOTAL         (($3,942,000))

      $3,812,000

Sec. 6075.  2009 c 497 s 3192 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF NATURAL RESOURCES

      Blanchard Mountain (20081951)

 

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation is provided solely as a continuing compensation for preservation of the core of Blanchard mountain in Skagit County and the subsequent acquisition of replacement working forest lands as Skagit county state forest lands.  The department shall consult with the University of Washington college of forest resources' northwest environmental forum and with other interest groups prior to the purchase.

 

Reappropriation:

      State Building Construction Account--State       $3,975,000

 

Appropriation:

      State Building Construction Account--State       (($1,500,000))

      $527,000

 

      Prior Biennia (Expenditures)               $25,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($5,500,000))

      $4,527,000

Sec. 6076.  2009 c 497 s 5015 (uncodified) is amended to read as follows:

FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Apple Awards (91000001)

 

      ((The appropriation in this section is subject to the following conditions and limitations:  Grants of $25,000 may be awarded to public elementary schools whose students propose capital projects on school property or on other public property in the community, city, or county in which the school is located.  The program must be administered by the office of the superintendent of public instruction which shall determine competitive criteria for awarding the grants.  $125,000 of the appropriation is available for five awards of $25,000 each in the 2009-2010 school year and $125,000 of the appropriation for five awards of $25,000 each in the 2010-2011 school year.  The funds must be used exclusively for capital projects as proposed by the students in the schools and approved by the district's school board.))

 

Appropriation:

      State Building Construction Account--State       (($250,000))

      $247,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($250,000))

      $247,000

Sec. 6077.  2010 1st sp.s. c 36 s 5007 (uncodified) is amended to read as follows:

FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Energy Efficiency and Small Repair Grants (91000007)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) Up to $3,000,000 of the appropriation is provided solely for nonrecurring costs associated with school facility repairs and renovations necessary for health and safety.  The office of the superintendent of public instruction, after consulting with maintenance and operations administrators of school districts, shall develop criteria for providing funding for specific projects to stay within the appropriation level provided in this section.  The criteria must include, but are not limited to, the following:  (a) Limiting recipient district applications to one hundred thousand dollars per three-year period; (b) limiting districts eligible to receive the grant only once in any three-year period; and (c) requiring any district receiving funding provided in this section to demonstrate a consistent commitment to addressing school facilities needs.

      (2) $50,000,000 of the new appropriation is provided solely for energy operational cost savings improvements to school facilities.  The appropriation must be distributed using the performance-based contracting method of delivering energy operational cost savings improvements to public facilities.

      (3) The superintendent of public instruction must report to the appropriate committees of the legislature and the office of financial management on the timing and use of the funds by the end of each fiscal year, until the funds are fully expended.

      (4) $100,000 of the appropriation is provided solely to the Monroe public schools for retrofitting the Frank Wagner Elementary chimney.

 

Appropriation:

      State Building Construction Account--State       (($70,000,000))

      $69,889,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($70,000,000))

      $69,889,000

NEW SECTION.  Sec. 6078.  A new section is added to 2009 c 497 (uncodified) to read as follows:

FOR THE WASHINGTON STATE CENTER FOR CHILDHOOD DEAFNESS AND HEARING LOSS

      Well Replacement (91000003)

 

Appropriation:

      State Building Construction Account--State       $264,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $264,000

Sec. 6079.  2010 1st sp.s. c 36 s 5012 (uncodified) is amended to read as follows:

FOR THE UNIVERSITY OF WASHINGTON

      Savery Hall Renovation (20061005)

 

Reappropriation:

      Gardner-Evans Higher Education Construction

             Account--State              (($10,822,000))

      $10,757,000

 

      Prior Biennia (Expenditures)               $50,510,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($61,332,000))

      $61,267,000

Sec. 6080.  2009 c 497 s 5077 (uncodified) is amended to read as follows:

FOR THE CENTRAL WASHINGTON UNIVERSITY

      Hogue Hall Renovation and Addition (20082003)

 

Reappropriation:

      Gardner-Evans Higher Education Construction

             Account--State              (($1,500,000))

      $1,473,000

Appropriation:

      State Building Construction Account--State       $27,265,000

 

      Prior Biennia (Expenditures)               $1,500,000

      Future Biennia (Projected Costs)        (($18,837,000))

      $0

             TOTAL         (($49,102,000))

      $30,238,000

Sec. 6081.  2009 c 497 s 5082 (uncodified) is amended to read as follows:

FOR THE CENTRAL WASHINGTON UNIVERSITY

      Science Building (30000045)

 

Appropriation:

      State Building Construction Account--State       (($600,000))

      $578,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $55,870,000

             TOTAL         (($56,470,000))

      $56,448,000

Sec. 6082.  2010 1st sp.s. c 36 s 5041 (uncodified) is amended to read as follows:

FOR THE WASHINGTON STATE HISTORICAL SOCIETY

      Vancouver National Historic Reserve Visitors Center (91000001)

 

Appropriation:

      State Building Construction Account  (($750,000))

      $0

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($750,000))

      $0

Sec. 6083.  2010 1st sp.s. c 36 s 5078 (uncodified) is amended to read as follows:

FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Construction Contingency Pool (92000007)

 

      ((The appropriation in this section is provided solely for allocation by the state board for community and technical colleges for major construction and renovation projects that confront emergent and unavoidable costs in excess of the construction contingency and management reserves included in the project appropriation.  The board shall report at least quarterly to the office of financial management and the legislative capital budget committees on requests for and allocations from the pool.))

 

Appropriation:

      State Building Construction Account--State       (($3,076,000))

      $2,835,000

      Gardner-Evans Higher Education Construction

             Account--State              $263,000

             Subtotal Appropriation (($3,339,000))

      $3,098,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($3,339,000))

      $3,098,000

Sec. 6084.  2010 1st sp.s. c 36 s 5080 (uncodified) is amended to read as follows:

FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Centralia Community College - Science Building (20042850)

 

Reappropriation:

      State Building Construction Account--State       $194,000

      Gardner-Evans Higher Education Construction

             Account--State              (($2,737,000))

      $2,445,000

             Subtotal Reappropriation              (($2,931,000))

      $2,639,000

 

      Prior Biennia (Expenditures)               $28,919,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($31,850,000))

      $31,558,000

Sec. 6085.  2009 c 497 s 5144 (uncodified) is amended to read as follows:

FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Spokane Falls - Business and Social Science Building (20051853)

 

Reappropriation:

      Gardner-Evans Higher Education Construction

             Account--State              (($1,000,000))

      $416,000

 

      Prior Biennia (Expenditures)               $19,313,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($20,313,000))

      $19,729,000

Sec. 6086.  2009 c 497 s 5161 (uncodified) is amended to read as follows:

FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Infrastructure Savings (20061751)

 

Reappropriation:

      Gardner-Evans Higher Education Construction

             Account--State              (($519,000))

      $402,000

 

      Prior Biennia (Expenditures)               $2,197,000

      Future Biennia (Projected Costs)        $0

             TOTAL         (($2,716,000))

      $2,599,000

Sec. 6087.  2009 c 497 s 5228 (uncodified) is amended to read as follows:

FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Bellingham Technical College - Fisheries Program (30000117)

 

Appropriation:

      State Building Construction Account--State       (($2,000,000))

      $0

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($2,000,000))

      $0

Sec. 6088.  2009 c 497 s 5216 (uncodified) is amended to read as follows:

FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Wenatchee Valley College - Music and Arts Center (30000119)

 

Appropriation:

      State Building Construction Account--State       (($2,000,000))

      $311,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         (($2,000,000))

      $311,000

(End of part)

PART 7
BOND AUTHORIZATION

NEW SECTION.  Sec. 7001.  For the purpose of providing funds to finance the projects described and authorized by the legislature in the capital and operating appropriations acts for the 2009-2011 and 2011- 2013 fiscal bienniums, and all costs incidental thereto, the state finance committee is authorized to issue general obligation bonds of the state of Washington in the sum of one billion one hundred twenty- two million dollars, or as much thereof as may be required, to finance these projects and all costs incidental thereto.  Bonds authorized in this section may be sold at such price as the state finance committee shall determine.  No bonds authorized in this section may be offered for sale without prior legislative appropriation of the net proceeds of the sale of the bonds.

NEW SECTION.  Sec. 7002.  (1) The proceeds from the sale of the bonds authorized in section 7001 of this act shall be deposited in the state building construction account created by RCW 43.83.020.  The proceeds shall be transferred as follows:

      (a) One billion seven million dollars to remain in the state building construction account created by RCW 43.83.020;

      (b) Twenty million two hundred thousand dollars to the outdoor recreation account created by RCW 79A.25.060;

      (c) Twenty million two hundred thousand dollars to the habitat conservation account created by RCW 79A.15.020;

      (d) Eight hundred thousand dollars to the riparian protection account created by RCW 79A.15.120;

      (e) Eight hundred thousand dollars to the farmlands preservation account created by RCW 79A.15.130;

      (f) Fifty-one million dollars to the state taxable building construction account.  All receipts from taxable bond issues are to be deposited into the account.  If the state finance committee deems it necessary or advantageous to issue more than the amount specified in this subsection (1)(f) as taxable bonds in order to comply with federal internal revenue service rules and regulations pertaining to the use of nontaxable bond proceeds or in order to reduce the total financing costs for bonds issued, the proceeds of such additional taxable bonds shall be transferred to the state taxable building construction account in lieu of any transfer otherwise provided by this section.  If the state finance committee determines that a portion of the amount specified in this subsection (1)(f) as taxable bonds may be issued as nontaxable bonds in compliance with federal internal revenue service rules and regulations pertaining to the use of nontaxable bond proceeds, then such bond proceeds shall be transferred to the state building construction account in lieu of the transfer to the state taxable building construction account otherwise provided by this subsection (1)(f).  The state treasurer shall submit written notice to the director of financial management if it is determined that any such additional transfer to the state taxable building construction account is necessary or that a transfer from the state taxable building construction account to the state building construction account may be made.  Moneys in the account may be spent only after appropriation.

      (2) These proceeds shall be used exclusively for the purposes specified in this section and for the payment of expenses incurred in the issuance and sale of the bonds issued for the purposes of this section, and shall be administered by the office of financial management subject to legislative appropriation.

NEW SECTION.  Sec. 7003.  (1) The debt-limit general fund bond retirement account shall be used for the payment of the principal of and interest on the bonds authorized in section 7002(1) (a) through (f) of this act.

      (2) The state finance committee shall, on or before June 30th of each year, certify to the state treasurer the amount needed in the ensuing twelve months to meet the bond retirement and interest requirements on the bonds authorized in section 7002(1) (a) through (f) of this act.

      (3) On each date on which any interest or principal and interest payment is due on bonds issued for the purposes of section 7002(1) (a) through (f) of this act, the state treasurer shall withdraw from any general state revenues received in the state treasury and deposit in the debt-limit general fund bond retirement account an amount equal to the amount certified by the state finance committee to be due on the payment date.

NEW SECTION.  Sec. 7004.  (1) Bonds issued under sections 7001 through 7003 of this act shall state that they are a general obligation of the state of Washington, shall pledge the full faith and credit of the state to the payment of the principal thereof and the interest thereon, and shall contain an unconditional promise to pay the principal and interest as the same shall become due.

      (2) The owner and holder of each of the bonds or the trustee for the owner and holder of any of the bonds may by mandamus or other appropriate proceeding require the transfer and payment of funds as directed in this section.

NEW SECTION.  Sec. 7005.  The legislature may provide additional means for raising moneys for the payment of the principal of and interest on the bonds authorized in section 7001 of this act, and sections 7002 and 7003 of this act shall not be deemed to provide an exclusive method for the payment.

NEW SECTION.  Sec. 7006.  A new section is added to chapter 43.99I RCW to read as follows:

      If any bonds authorized in this chapter have not been issued by June 30, 2013, the authority of the state finance committee to issue such remaining unissued bonds shall expire June 30, 2013.

NEW SECTION.  Sec. 7007.  A new section is added to chapter 43.99N RCW to read as follows:

      If any bonds authorized in this chapter have not been issued by June 30, 2013, the authority of the state finance committee to issue such remaining unissued bonds shall expire June 30, 2013.

NEW SECTION.  Sec. 7008.  A new section is added to chapter 43.99P RCW to read as follows:

      If any bonds authorized in this chapter have not been issued by June 30, 2013, the authority of the state finance committee to issue such remaining unissued bonds shall expire June 30, 2013.

Sec. 7009.  RCW 43.99Q.130 and 2009 c 500 s 10 are each amended to read as follows:

(1) For the purpose of providing funds for the planning, design, construction, and other necessary costs for the rehabilitation of the state legislative building, the state finance committee is authorized to issue general obligation bonds of the state of Washington in the sum of eighty‑two million five hundred ten thousand dollars or as much thereof as may be required to finance the rehabilitation and improvements to the legislative building and all costs incidental thereto.  The approved rehabilitation plan includes costs associated with earthquake repairs and future earthquake mitigation and allows for associated relocation costs and the acquisition of appropriate relocation space.  Bonds authorized in this section may be sold at a price the state finance committee determines.  No bonds authorized in this section may be offered for sale without prior legislative appropriation of the net proceeds of the sale of the bonds.  The proceeds of the sale of the bonds issued for the purposes of this section shall be deposited in the capitol historic district construction account hereby created in the state treasury.  These proceeds shall be used exclusively for the purposes specified in this section and for the payment of expenses incurred in the issuance and sale of the bonds issued for the purposes of this section, and shall be administered by the office of financial management subject to legislative appropriation.

(2) If any bonds authorized in this chapter have not been issued by June 30, 2013, the authority of the state finance committee to issue such remaining unissued bonds shall expire June 30, 2013.

NEW SECTION.  Sec. 7010.  A new section is added to chapter 43.99Q RCW to read as follows:

      If any bonds authorized pursuant to RCW 43.99Q.020(5) have not been issued by June 30, 2013, the authority of the state finance committee to issue such remaining unissued bonds shall expire June 30, 2013.

NEW SECTION.  Sec. 7011.  Sections 7001 through 7005 of this act constitute a new chapter in Title 43 RCW.

PART 8
MISCELLANEOUS PROVISIONS

NEW SECTION.  Sec. 8001.  (1) Allotments for appropriations in this act shall be provided in accordance with the capital project review requirements adopted by the office of financial management and in compliance with RCW 43.88.110.  Projects that will be employing alternative public works construction procedures under chapter 39.10 RCW are subject to the allotment procedures defined in this section and RCW 43.88.110.

      (2) Each project is defined as proposed in the legislative budget notes or in the governor's budget document.

NEW SECTION.  Sec. 8002.  To ensure that major construction projects are carried out in accordance with legislative and executive intent, appropriations in this act in excess of $5,000,000 shall not be expended or encumbered until the office of financial management has reviewed and approved the agency's predesign.  The predesign document shall include but not be limited to program, site, and cost analysis in accordance with the predesign manual adopted by the office of financial management.  To improve monitoring of major construction projects, progress reports shall be submitted by the agency administering the project to the office of financial management and to the fiscal committees of the house of representatives and senate.  Reports will be submitted on July 1st and December 31st each year in a format to be developed by the office of financial management.

NEW SECTION.  Sec. 8003.  (1) To ensure minor works appropriations are carried out in accordance with legislative intent, funds appropriated in this act shall not be allotted until project lists are on file at the office of financial management, the house of representatives capital budget committee, and the senate ways and means committee.  All projects must meet the criteria included in subsection (2)(a) of this section.  Revisions to the lists must be filed with the office of financial management, the house of representatives capital budget committee, and the senate ways and means committee and include an explanation of variances from the prior lists before funds may be expended on the revisions.

      (2)(a) Minor works projects are single line appropriations that include multiple projects of a similar nature and that are valued between $25,000 and $1,000,000 each, with the exception of higher education minor works projects that may be valued up to $2,000,000.  These projects can generally be completed within two years of the appropriation with the funding provided.  Agencies are prohibited from including projects on their minor works lists that are a phase of a larger project, and that if combined over a continuous period of time, would exceed $1,000,000, or $2,000,000 for higher education minor works projects.  Improvements for accessibility in compliance with the Americans with disabilities act may be included in any of the above minor works categories.

      (b) Minor works appropriations shall not be used for, among other things:  Studies, except for technical or engineering reviews or designs that lead directly to and support a project on the same minor works list; planning; design outside the scope of work on a minor works list; moveable, temporary, and traditionally funded operating equipment not in compliance with the equipment criteria established by the office of financial management; software not dedicated to control of a specialized system; moving expenses; land or facility acquisition; or to supplement funding for projects with funding shortfalls unless expressly authorized elsewhere in this act.  The office of financial management may make an exception to the limitations described in this subsection (2)(b) for exigent circumstances after notifying the legislative fiscal committees and waiting ten days for comments by the legislature regarding the proposed exception.

      (c) Minor works preservation projects may include program improvements of no more than twenty-five percent of the individual minor works preservation project cost.

      (3) It is generally not the intent of the legislature to make future appropriations for capital expenditures or for maintenance and operating expenses for an acquisition project or a significant expansion project that is initiated through the minor works process and therefore does not receive a policy and fiscal analysis by the legislature.  Minor works projects are intended to be one-time expenditures that do not require future state resources to complete.

NEW SECTION.  Sec. 8004.  (1) The office of financial management may authorize a transfer of appropriation authority provided for a capital project that is in excess of the amount required for the completion of such project to another capital project for which the appropriation is insufficient.  No such transfer may be used to expand the capacity of any facility beyond that intended in making the appropriation.  Such transfers may be effected only between capital appropriations to a specific department, commission, agency, or institution of higher education and only between capital projects that are funded from the same fund or account.  No transfers may occur between projects to local government agencies except where the grants are provided within a single omnibus appropriation and where such transfers are specifically authorized by the implementing statutes that govern the grants.

      (2) The office of financial management may find that an amount is in excess of the amount required for the completion of a project only if:  (a) The project as defined in the notes to the budget document is substantially complete and there are funds remaining; or (b) bids have been let on a project and it appears to a substantial certainty that the project as defined in the notes to the budget document can be completed within the biennium for less than the amount appropriated in this act.

      (3) For the purposes of this section, the intent is that each project be defined as proposed to the legislature in the governor's budget document, unless it clearly appears from the legislative history that the legislature intended to define the scope of a project in a different way.

      (4) The office of financial management shall report any transfer effected under this section to the house of representatives capital budget committee, the senate ways and means committee, and the legislative evaluation and accountability program committee, at least thirty days before the date the transfer is effected.  The office of financial management shall report all emergency or smaller transfers within thirty days from the date of transfer.  The governor's capital budget request following any transfer shall reflect that transfer in the affected agency.

NEW SECTION.  Sec. 8005.  (1) It is expected that projects be ready to proceed in a timely manner depending on the type or phase of the project or program that is the subject of the appropriation in this act.  Except for major projects that customarily may take more than two biennia to complete from predesign to the end of construction, or large infrastructure grant or loan programs supporting projects that often take more than two biennia to complete, the legislature generally does not intend to reappropriate funds more than once, particularly for smaller grant programs, local/community projects, and minor works.

      (2) Agencies shall expedite the expenditure of reappropriations and appropriations in this act in order to:  (a) Rehabilitate infrastructure resources; (b) accelerate environmental rehabilitation and restoration projects for the improvement of the state's natural environment; (c) reduce additional costs associated with acquisition and construction inflationary pressures; and (d) provide additional employment opportunities associated with capital expenditures.

      (3) To the extent feasible, agencies are directed to accelerate expenditure rates at their current level of permanent employees and shall use contracted design and construction services wherever necessary to meet the goals of this section.

NEW SECTION.  Sec. 8006.  State agencies, including institutions of higher education, shall allot and report full-time equivalent staff for capital projects in a manner comparable to staff reporting for operating expenditures.

NEW SECTION.  Sec. 8007.  Executive Order No. 05-05, archaeological and cultural resources, was issued effective November 10, 2005.  Agencies and higher education institutions shall comply with the requirements set forth in this executive order.

NEW SECTION.  Sec. 8008.  PUGET SOUND PROTECTION AND RESTORATION

      Consistent with RCW 90.71.340, when expending appropriations under this act that contribute to Puget Sound protection and recovery, agencies shall consult with the Puget Sound partnership to ensure that projects and expenditures are either in, or consistent with the 2020 action agenda.  These consultations shall include the exchange of information on specific actions, projects, associated funding, performance measures, and other information necessary to track project implementation and ensure alignment with the action agenda.  In situations where the Puget Sound partnership finds that a project is not in, or is not consistent with the action agenda Puget Sound partnership shall document this finding and report back to the governor and legislative fiscal committees.

NEW SECTION.  Sec. 8009.  FOR THE ARTS COMMISSION--ART WORK ALLOWANCE POOLING

      (1) One-half of one percent of moneys appropriated in this act for original construction of school plant facilities may be expended for the purposes of RCW 28A.335.210.  The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the superintendent of public instruction and representatives of school district boards.

      (2) One-half of one percent of moneys appropriated in this act for original construction or any major renovation or remodel work exceeding two hundred thousand dollars by colleges or universities may be expended for the purposes of RCW 28B.10.027.  The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the board of regents or trustees.

      (3) One-half of one percent of moneys appropriated in this act for original construction of any public building by a state agency as defined in RCW 43.17.020 may be expended for the purposes of RCW 43.17.200.  The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the state agency.

      (4) At least eighty-five percent of the moneys spent by the Washington state arts commission during the 2011-2013 biennium for the purposes of RCW 28A.335.210, 28B.10.027, and 43.17.200 must be expended solely for direct acquisition of works of art.  The commission may use up to $100,000 of this amount to conserve or maintain existing pieces in the state art collection pursuant to chapter 36, Laws of 2005.

NEW SECTION.  Sec. 8010.  To carry out the provisions of this act, the governor may assign responsibility for predesign, design, construction, and other related activities to any appropriate agency.

NEW SECTION.  Sec. 8011.  (1) Unless otherwise stated, for all appropriations under this act that require a match of nonstate money or in-kind contributions, the following requirement, consistent with RCW 43.88.150, shall apply:  Expenditures of state money shall be timed so that the state share of project expenditures never exceeds the intended state share of total project costs.

      (2) Provision of the full amount of required matching funds is not required to permit the expenditure of capital budget appropriations for phased projects if a proportional amount of the required matching funds is provided for each distinct, identifiable phase of the project.

NEW SECTION.  Sec. 8012.  SALARY ADJUSTMENT

      The appropriations in this act shall be expended solely for the purposes designated in this act and are subject to the following conditions and limitations:

      (1) Appropriations in this act are provided solely for a 3.0 percent salary reduction effective July 1, 2011, through June 29, 2013, for all employees of the executive, legislative, and judicial branches, including those employees in the Washington management service, and including employees exempt from merit system rules, except for:

      (a) Elected officials whose salaries are set by the commission on salaries for elected officials;

      (b) Student employees at state institutions of higher education;

      (c) Faculty employees at state institutions of higher education:  PROVIDED, HOWEVER, That appropriations to higher education institutions are reduced in an amount reflecting a 3.0 percent reduction in faculty salary expenditures;

      (d) Certificated employees of the state school for the blind and the center for childhood deafness and hearing loss;

      (e) Commissioned officers of the Washington state patrol represented by the state patrol troopers' association and the Washington state patrol lieutenants' association;

      (f) Represented ferry workers of the Washington state department of transportation, provided, however, that other reductions are included in section 504 of the 2011-2013 transportation appropriations act;

      (g) Employees whose salary is less than $2,500 per month; and

      (h) Employees as specified in subsection (2) of this section.

      (2) For employees subject to the 3.0 percent reduction in salary under subsection (1) of this section employees will receive temporary salary reduction leave of up to 5.2 hours per month.  The director of personnel shall adopt rules governing the accrual and use of temporary salary reduction leave.

      (3) The department of retirement systems shall include any forgone salary or lost work hours under subsections (1) and (3) of this section in the final average compensation of employees affected for purposes of calculating retirement benefits, as specified in executive request legislation Z-0211.1/11.

      (4) The appropriation from dedicated funds and accounts shall be made in the amounts specified and from the dedicated funds and accounts specified in office of financial management document 2011-01, which is hereby incorporated by reference.  The office of financial management shall allocate the moneys appropriated in this section in the amounts specified and to the state agencies specified in office of financial management document 2011-01 and adjust appropriation schedules accordingly.

NEW SECTION.  Sec. 8013.  If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected.

NEW SECTION.  Sec. 8014.  This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately.

 

      Representatives Dunshee and Warnick spoke in favor of the adoption of the amendment.

 

Amendment (856) was adopted.

 

The bill was ordered engrossed.

 

There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.

 

      Representatives Dunshee, Warnick, Ross, Lytton and Smith spoke in favor of the passage of the bill.

 

      Representative Shea spoke against the passage of the bill.

 

The Speaker (Representative Moeller presiding) stated the question before the House to be the final passage of Engrossed Substitute House Bill No. 2020.

 

ROLL CALL

 

The Clerk called the roll on the final passage of Engrossed Substitute House Bill No. 2020, and the bill passed the House by the following vote: Yeas, 84; Nays, 10; Absent, 0; Excused, 4.

Voting yea: Representatives Ahern, Alexander, Angel, Appleton, Armstrong, Asay, Bailey, Billig, Blake, Buys, Carlyle, Clibborn, Cody, Dammeier, Darneille, DeBolt, Dickerson, Dunshee, Eddy, Fagan, Finn, Fitzgibbon, Frockt, Goodman, Green, Haigh, Haler, Hargrove, Harris, Hasegawa, Hope, Hudgins, Hunt, Hunter, Hurst, Jinkins, Johnson, Kagi, Kelley, Kenney, Kirby, Klippert, Kretz, Ladenburg, Liias, Lytton, Maxwell, McCoy, Miloscia, Moeller, Morris, Moscoso, Nealey, Orcutt, Ormsby, Orwall, Parker, Pearson, Pedersen, Pettigrew, Probst, Reykdal, Rivers, Roberts, Rolfes, Ross, Ryu, Santos, Schmick, Seaquist, Sells, Smith, Springer, Stanford, Sullivan, Takko, Tharinger, Upthegrove, Van De Wege, Walsh, Warnick, Wylie, Zeiger and Mr. Speaker.

Voting nay: Representatives Chandler, Condotta, Dahlquist, Hinkle, Kristiansen, Rodne, Shea, Short, Taylor and Wilcox.

Excused: Representatives Anderson, Crouse, McCune and Overstreet.

 

ENGROSSED SUBSTITUTE HOUSE BILL NO. 2020, having received the necessary constitutional majority, was declared passed.

 

      HOUSE BILL NO. 1497, by Representatives Dunshee and Warnick

 

      Adopting a 2011-2013 capital budget. Revised for 1st Substitute: Regarding the capital budget.

 

      The bill was read the second time.

 

There being no objection, Substitute House Bill No. 1497 was substituted for House Bill No. 1497 and the substitute bill was placed on the second reading calendar.

 

SUBSTITUTE HOUSE BILL NO. 1497 was read the second time.

 

With the consent of the house, amendments (751), (736), (696), (745), (753) and (738) were withdrawn.

 

Representative Dunshee moved the adoption of amendment (857).

0) 

                Strike everything after the enacting clause and insert the following:

"NEW SECTION.  Sec. 1.  (1) A capital budget is hereby adopted and, subject to the provisions set forth in this act, the several dollar amounts hereinafter specified, or so much thereof as shall be sufficient to accomplish the purposes designated, are hereby appropriated and authorized to be incurred for capital projects during the period beginning with the effective date of this act and ending June 30, 2013, out of the several funds specified in this act.

      (2) The definitions in this subsection apply throughout this act unless the context clearly requires otherwise.

      (a) "Fiscal year 2012" or "FY 2012" means the period beginning July 1, 2011, and ending June 30, 2012.

      (b) "Fiscal year 2013" or "FY 2013" means the period beginning July 1, 2012, and ending June 30, 2013.

      (c) "Lapse" or "revert" means the amount shall return to an unappropriated status.

      (d) "Provided solely" means the specified amount may be spent only for the specified purpose.

      (3) The appropriations in this act are appropriations for capital purposes from sources other than bond proceeds.  Appropriations in this act may not necessarily represent all expenditures authorized for a particular project for the 2011-2013 fiscal biennium.  For some projects receiving appropriations in this act, additional appropriations from other sources for those projects may also be contained in chapter . . . ., Laws of 2011 (House Bill No. 2020).

      (4) Unless otherwise specifically authorized in this act, any portion of an amount provided solely for a specified purpose that is not expended subject to the specified conditions and limitations to fulfill the specified purpose shall lapse.

      (5) The amounts shown under the headings "Prior Biennia," "Future Biennia," and "Total" in this act are for informational purposes only and do not constitute legislative approval of these amounts.  "Prior biennia" typically refers to the immediate prior biennium for reappropriations, but may refer to multiple biennia in the case of specific projects.  A "future biennia" amount is an estimate of what may be appropriated for the project or program in the 2011-2013 biennium and the following three biennia; an amount of zero does not necessarily constitute legislative intent to not provide funding for the project or program in the future.

      (6) "Reappropriations" in this act are appropriations and, unless the context clearly provides otherwise, are subject to the relevant conditions and limitations applicable to appropriations.  Reappropriations shall be limited to the unexpended balances remaining on June 30, 2011, from the 2009-2011 biennial appropriations for each project.

PART 1
GENERAL GOVERNMENT

NEW SECTION.  Sec. 1001.  FOR THE DEPARTMENT OF COMMERCE

      Rural Washington Loan Fund (19882002)

 

Reappropriation:

      Rural Washington Loan Account--State              $209,000

 

      Prior Biennia (Expenditures)               $6,334,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $6,543,000

NEW SECTION.  Sec. 1002.  FOR THE DEPARTMENT OF COMMERCE

      Drinking Water Assistance Account (20044002)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 130, chapter 26, Laws of 2003.

 

Reappropriation:

      Drinking Water Assistance Repayment Account--State     $764,000

 

      Prior Biennia (Expenditures)               $15,936,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $16,700,000

NEW SECTION.  Sec. 1003.  FOR THE DEPARTMENT OF COMMERCE

      Drinking Water Assistance Program (20064003)

 

Reappropriation:

      Drinking Water Assistance Repayment

             Account--State              $13,508,000

 

      Prior Biennia (Expenditures)               $16,372,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $29,880,000

NEW SECTION.  Sec. 1004.  FOR THE DEPARTMENT OF COMMERCE

      Rural Washington Loan Fund (20064010)

 

Reappropriation:

      Rural Washington Loan Account--State              $2,658,000

 

      Prior Biennia (Expenditures)               $1,469,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,127,000

NEW SECTION.  Sec. 1005.  FOR THE DEPARTMENT OF COMMERCE

      Community Economic Revitalization Board (20064011)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 121, chapter 488, Laws of 2005.

 

Reappropriation:

      Public Facility Construction Loan Revolving

             Account--State              $2,165,000

 

      Prior Biennia (Expenditures)               $18,284,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $20,449,000

NEW SECTION.  Sec. 1006.  FOR THE DEPARTMENT OF COMMERCE

      Drinking Water Assistance Program (20074004)

 

Reappropriation:

      Drinking Water Assistance Account--State         $3,902,000

      Drinking Water Assistance Repayment

             Account--State              $21,100,000

             Subtotal Reappropriation              $25,002,000

 

      Prior Biennia (Expenditures)               $6,898,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $31,900,000

NEW SECTION.  Sec. 1007.  FOR THE DEPARTMENT OF COMMERCE

      Public Works Trust Fund (20074005)

 

Reappropriation:

      Public Works Assistance Account--State            $100,000,000

 

      Prior Biennia (Expenditures)               $32,000,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $132,000,000

NEW SECTION.  Sec. 1008.  FOR THE DEPARTMENT OF COMMERCE

      Rural Washington Loan Fund (20074008)

 

Reappropriation:

      Rural Washington Loan Account--State              $1,856,000

 

      Prior Biennia (Expenditures)               $171,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,027,000

NEW SECTION.  Sec. 1009.  FOR THE DEPARTMENT OF COMMERCE

      Housing Assistance, Weatherization, and Affordable Housing (20074009)

 

Reappropriation:

      Washington Housing Trust Account--State        $2,209,000

 

      Prior Biennia (Expenditures)               $11,091,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $13,300,000

NEW SECTION.  Sec. 1010.  FOR THE DEPARTMENT OF COMMERCE

      Community Economic Revitalization Board (20074015)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1028, chapter 520, Laws of 2007.

 

Reappropriation:

      Public Facility Construction Loan Revolving

             Account--State              $7,289,000

 

      Prior Biennia (Expenditures)               $12,711,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $20,000,000

NEW SECTION.  Sec. 1011.  FOR THE DEPARTMENT OF COMMERCE

      Drinking Water State Revolving Fund Loan Program (30000005)

 

Reappropriation:

      Drinking Water Assistance Account--State         $10,930,000

      Drinking Water Assistance Repayment

             Account--State              $31,201,000

             Subtotal Reappropriation              $42,131,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $42,131,000

NEW SECTION.  Sec. 1012.  FOR THE DEPARTMENT OF COMMERCE

      Community Economic Revitalization Board (30000010)

 

Reappropriation:

      Public Facility Construction Loan Revolving

             Account--State              $6,253,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $6,253,000

NEW SECTION.  Sec. 1013.  FOR THE DEPARTMENT OF COMMERCE

      Housing Assistance, Weatherization, and Affordable Housing (30000013)

 

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations are subject to the provisions of section 1012, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      Washington Housing Trust Account--State        $9,199,000

 

      Prior Biennia (Expenditures)               $801,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $10,000,000

NEW SECTION.  Sec. 1014.  FOR THE DEPARTMENT OF COMMERCE

      Energy Freedom Program (30000056)

 

Reappropriation:

      Energy Recovery Act Account--Federal Stimulus              $32,218,000

 

      Prior Biennia (Expenditures)               $6,282,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $38,500,000

NEW SECTION.  Sec. 1015.  FOR THE DEPARTMENT OF COMMERCE

      Community Development Block Grants (91000011)

 

Reappropriation:

      General Fund--Federal Stimulus          $911,000

 

      Prior Biennia (Expenditures)               $3,289,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,200,000

NEW SECTION.  Sec. 1016.  FOR THE DEPARTMENT OF COMMERCE

      Weatherization (91000013)

 

Reappropriation:

      General Fund--Federal Stimulus          $17,469,000

 

      Prior Biennia (Expenditures)               $31,531,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $49,000,000

NEW SECTION.  Sec. 1017.  FOR THE DEPARTMENT OF COMMERCE

      Community Economic Revitalization Board - Export Assistance Grants and Loans (92000069)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1018, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      Public Facility Construction Loan Revolving

             Account--State              $2,965,000

 

      Prior Biennia (Expenditures)               $35,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,000,000

NEW SECTION.  Sec. 1018.  FOR THE DEPARTMENT OF COMMERCE

      Drinking Water State Revolving Fund Loan Program (30000095)

 

      The appropriations in this section are subject to the following conditions and limitations:  For projects involving repair, replacement, or improvement of a clean water infrastructure facility or other public works facility for which an investment grade audit is obtainable, the public works board must require as a contract condition that the project sponsor undertake an investment grade audit.  The project sponsor may finance the costs of the audit as part of its drinking water state revolving fund program loan.

 

Appropriation:

      Drinking Water Assistance Account--State         $16,000,000

      Drinking Water Assistance Repayment

             Account--State              $32,000,000

             Subtotal Appropriation $48,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $192,000,000

             TOTAL         $240,000,000

NEW SECTION.  Sec. 1019.  FOR THE DEPARTMENT OF COMMERCE

      Community Economic Revitalization Board (30000097)

 

Appropriation:

      Public Facility Construction Loan Revolving

             Account--State              $5,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $20,000,000

             TOTAL         $25,000,000

NEW SECTION.  Sec. 1020.  FOR THE DEPARTMENT OF COMMERCE

      Clean Energy Partnership (30000175)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation is provided solely for implementation of the recommendations of the clean energy leadership council by providing state matching funds for projects that:

      (a) Integrate energy efficiency and renewable energy in buildings;

      (b) Integrate renewable energy into the regional electrical grid; or

      (c) Advance bioenergy in the state.

      (2) State funding must not exceed fifty percent of the total program or project funds.

      (3) The majority of companies involved in these projects must be companies that are located in Washington state.

      (4) Eligible projects must:

      (a) Represent a substantially new solution that is not widely available today; and

      (b) Be designed to generate solutions that are applicable both inside and outside of the state.

 

Appropriation:

      Public Facility Construction Loan Revolving

             Account--State              $5,500,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $5,500,000

NEW SECTION.  Sec. 1021.  FOR THE DEPARTMENT OF COMMERCE

      Public Works Assistance Account Program (30000103)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation is provided solely for the list of projects in LEAP capital document No. 2011-1D, developed May 24, 2011.

      (2) For projects involving repair, replacement, or improvement of a wastewater treatment plant or other public works facility for which an investment grade audit is obtainable, the public works board must require as a contract condition that the project sponsor undertake an investment grade audit.  The project sponsor may finance the costs of the audit as part of its public works assistance account loan.

      (3) The public works board is directed to develop a more effective program for the efficient achievement of the goals of RCW 70.235.070. The board shall report to the legislature on this effort by January 1, 2012.

      (4) For application rounds that occur during the 2011-2013 biennium, roads, streets, and bridges will not be eligible for funding from the public works assistance account.

 

Appropriation:

      Public Works Assistance Account--State            $324,585,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $324,585,000

NEW SECTION.  Sec. 1022.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Engineering and Architectural Services:  Staffing (91000005)

 

Appropriation:

      Charitable, Educational, Penal and Reformatory

             Institutions Account--State           $928,000

      Capitol Building Construction Account--State   $790,000

             Subtotal Appropriation $1,718,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,718,000

NEW SECTION.  Sec. 1023.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Legislative Building Critical Hydronic Loop Repairs (30000584)

 

Appropriation:

      Capitol Building Construction Account--State   $1,179,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

            TOTAL         $1,179,000

NEW SECTION.  Sec. 1024.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Capitol Lake Dredging (30000571)

 

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation is provided solely to begin the process of seeking necessary permits to dredge and spot dredge excess sediments as required under all of the proposed long-term management strategies.

 

Appropriation:

      State Toxics Control Account--State   $200,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $200,000

NEW SECTION.  Sec. 1025.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

      Reuse GA Building for Heritage Center, State Library, and State Patrol (92000003)

 

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation is provided solely for the preparation of an updated predesign for renovation of the "GA Building."  Tenants in the renovated facility must include the Washington state heritage center, the Washington state library, the state patrol, and other possible state agency tenants.  The Washington state heritage center shall occupy approximately 50,000 square feet, the Washington state library shall occupy approximately 50,000 square feet, and the state patrol and other state agencies shall occupy the remaining space.  A small cafeteria with public space may be included in a part of the building that provides view of the Olympic Mountains, Budd Bay, and Capital Lake.  The predesign must limit the scope of the project to a price that can be financed with the fund balance and expected annual revenue in the Washington state heritage center account and the current level lease payments of the tenants expected to move into the building at the time of occupancy.  The department shall also review the suitability of the space in "OB2" that will be vacated by the department of information services for expanding archive storage space.  The space in the renovated "GA Building" must be limited to the exhibition of historically significant documents from the state archives and may include online access to state archive records, and must not include permanent storage of state archive documents.

 

Appropriation:

      Washington State Heritage Account--State         $150,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $150,000

NEW SECTION.  Sec. 1026.  FOR THE MILITARY DEPARTMENT

      Minor Works Preservation (30000002)

 

Reappropriation:

      General Fund--Federal         $5,633,000

 

      Prior Biennia (Expenditures)               $3,039,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $8,672,000

NEW SECTION.  Sec. 1027.  FOR THE MILITARY DEPARTMENT

      Minor Works Program (30000003)

 

Reappropriation:

      General Fund--Federal         $2,596,000

 

      Prior Biennia (Expenditures)               $543,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,139,000

NEW SECTION.  Sec. 1028.  FOR THE MILITARY DEPARTMENT

      Camp Murray New Primary Gate Entrance (30000482)

 

Reappropriation:

      General Fund--Federal         $2,994,000

      Military Department Capital Account--State     $1,435,000

             Subtotal Reappropriation              $4,429,000

 

      Prior Biennia (Expenditures)               $498,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,927,000

NEW SECTION.  Sec. 1029.  FOR THE MILITARY DEPARTMENT

      Combined Support Maintenance Shop (20082006)

 

Reappropriation:

      General Fund--Federal         $4,736,000

Appropriation:

      General Fund--Federal         $20,264,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $25,000,000

NEW SECTION.  Sec. 1030.  FOR THE MILITARY DEPARTMENT

      Minor Works Preservation (30000560)

 

Appropriation:

      General Fund--Federal         $3,601,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $18,677,000

             TOTAL         $22,278,000

NEW SECTION.  Sec. 1031.  FOR THE MILITARY DEPARTMENT

      Minor Works Program (30000561)

 

Appropriation:

      General Fund--Federal         $9,958,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $59,273,000

             TOTAL         $69,231,000

(End of part)

PART 2
HUMAN SERVICES

NEW SECTION.  Sec. 2001.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Minor Works Preservation:  Facilities Preservation (30001291)

 

Appropriation:

      Charitable, Educational, Penal and Reformatory

             Institutions Account--State           $1,214,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,214,000

NEW SECTION.  Sec. 2002.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Frances Haddon Morgan Center (91000014)

 

The appropriation in this section is subject to the following conditions and limitations:  The appropriation is provided solely for the department of social and health services to develop a predesign with options for the future use of the Frances Haddon Morgan Center site, including the permanent use of the property to support housing or other services for low-income, disabled, or vulnerable persons.  The predesign shall be delivered to the house of representatives fiscal committees and the senate ways and means committee by December 31, 2011.  This predesign shall not delay any activities associated with ceasing to operate the facility as a residential habilitation center after December 31, 2012.  On and after January 1, 2013, the Frances Haddon Morgan Center property must remain either in public ownership, or may be sold or leased for a nominal amount to a nonprofit organization for the permanent use of the property to support housing or other services for low-income, disabled, or vulnerable persons.

 

Appropriation:

      Charitable, Educational, Penal and Reformatory

             Institutions Account--State           $150,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $150,000

NEW SECTION.  Sec. 2003.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Yakima Valley School (91000016)

 

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation is provided solely for the department of social and health services to develop a predesign with options for the future use of the Yakima Valley School site, including the permanent use of the property to support housing or other services for low-income, disabled, or vulnerable persons.  The predesign shall be delivered to the house of representatives fiscal committees and the senate ways and means committee by December 31, 2011.  This predesign shall not delay any activities associated with ceasing to operate the facility as a residential habilitation center after December 31, 2012.  On and after January 1, 2013, the Yakima Valley School property must remain either in public ownership, or may be sold or leased for a nominal amount to a nonprofit organization for the permanent use of the property to support housing or other services for low-income, disabled, or vulnerable persons.

 

Appropriation:

      Charitable, Educational, Penal and Reformatory

             Institutions Account--State           $150,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $150,000

NEW SECTION.  Sec. 2004.  FOR THE DEPARTMENT OF HEALTH

      Drinking Water Assistance Program (20064001)

 

Reappropriation:

      Drinking Water Assistance Account--Federal     $16,652,000

 

      Prior Biennia (Expenditures)               $77,944,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $94,596,000

NEW SECTION.  Sec. 2005.  FOR THE DEPARTMENT OF HEALTH

      Drinking Water Assistance Program (30000013)

 

Reappropriation:

      Drinking Water Assistance Account--Federal     $38,348,000

      Drinking Water Assistance Account--Federal

             Stimulus         $9,373,000

             Subtotal Reappropriation              $47,721,000

 

Appropriation:

      Drinking Water Assistance Account--Federal     $49,868,000

 

      Prior Biennia (Expenditures)               $29,089,000

      Future Biennia (Projected Costs)        $199,472,000

             TOTAL         $326,150,000

NEW SECTION.  Sec. 2006.  FOR THE DEPARTMENT OF VETERANS AFFAIRS

      Minor Works Preservation:  Facilities Preservation (90000001)

 

Appropriation:

      Charitable, Educational, Penal and Reformatory

             Institutions Account--State           $2,722,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $7,728,000

             TOTAL         $10,450,000

NEW SECTION.  Sec. 2007.  FOR THE DEPARTMENT OF LABOR AND INDUSTRIES

      Labor and Industries Building Repairs and Renewal (30000014)

 

Appropriation:

      Accident Account--State     $284,000

      Medical Aid Account--State                $283,000

             Subtotal Appropriation $567,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $567,000

(End of part)

PART 3
NATURAL RESOURCES

NEW SECTION.  Sec. 3001.  FOR THE DEPARTMENT OF ECOLOGY

      Low-Level Nuclear Waste Disposal Trench Closure (19972012)

 

Reappropriation:

      Site Closure Account--State                $12,052,000

 

      Prior Biennia (Expenditures)               $3,381,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $15,433,000

NEW SECTION.  Sec. 3002.  FOR THE DEPARTMENT OF ECOLOGY

      State Drought Preparedness (20054009)

 

Reappropriation:

      State Drought Preparedness Account--State       $300,000

 

      Prior Biennia (Expenditures)               $15,052,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $15,352,000

NEW SECTION.  Sec. 3003.  FOR THE DEPARTMENT OF ECOLOGY

      Motor Vehicle Mercury Removal Program (20062850)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 137, chapter 371, Laws of 2006.

 

Reappropriation:

      State Toxics Control Account--State   $250,000

 

      Prior Biennia (Expenditures)               $750,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,000,000

NEW SECTION.  Sec. 3004.  FOR THE DEPARTMENT OF ECOLOGY

      Water Pollution Control Revolving Account (20064002)

 

Reappropriation:

      Water Pollution Control Revolving Account--State            $11,025,000

      Water Pollution Control Revolving Account--Federal        $8,825,000

             Subtotal Reappropriation              $19,850,000

 

      Prior Biennia (Expenditures)               $219,766,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $239,616,000

NEW SECTION.  Sec. 3005.  FOR THE DEPARTMENT OF ECOLOGY

      Centennial Clean Water Program (20064007)

 

Reappropriation:

      Water Quality Capital Account--State                $502,000

 

      Prior Biennia (Expenditures)               $22,448,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $22,950,000

NEW SECTION.  Sec. 3006.  FOR THE DEPARTMENT OF ECOLOGY

      Puget Sound Aquatic Cleanup and Restoration (20084004)

 

Reappropriation:

      State Toxics Control Account--State   $1,267,000

 

      Prior Biennia (Expenditures)               $3,733,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $5,000,000

NEW SECTION.  Sec. 3007.  FOR THE DEPARTMENT OF ECOLOGY

      Centennial Clean Water Program (20084010)

 

Reappropriation:

      Water Quality Capital Account--State                $1,024,000

 

      Prior Biennia (Expenditures)               $7,432,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $8,456,000

NEW SECTION.  Sec. 3008.  FOR THE DEPARTMENT OF ECOLOGY

      Water Pollution Control Loan Program (20084011)

 

Reappropriation:

      Water Pollution Control Revolving Account--State            $18,878,000

      Water Pollution Control Revolving Account--Federal        $21,988,000

             Subtotal Reappropriation              $40,866,000

 

      Prior Biennia (Expenditures)               $99,134,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $140,000,000

NEW SECTION.  Sec. 3009.  FOR THE DEPARTMENT OF ECOLOGY

      Mason County Consortium (20084851)

 

Reappropriation:

      State Toxics Control Account--State   $500,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $500,000

NEW SECTION.  Sec. 3010.  FOR THE DEPARTMENT OF ECOLOGY

      Water Pollution Control Revolving Fund Program (30000007)

 

Reappropriation:

      Water Pollution Control Revolving Account--State            $48,342,000

      Water Pollution Control Revolving Account--Federal        $39,475,000

      Water Pollution Control Revolving Account--Federal

             Stimulus         $18,050,000

             Subtotal Reappropriation              $105,867,000

 

      Prior Biennia (Expenditures)               $72,833,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $178,700,000

NEW SECTION.  Sec. 3011.  FOR THE DEPARTMENT OF ECOLOGY

      Cleanup and Prevention of Waste Tire Piles (30000012)

 

Reappropriation:

      Waste Tire Removal Account--State   $100,000

 

      Prior Biennia (Expenditures)               $900,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,000,000

NEW SECTION.  Sec. 3012.  FOR THE DEPARTMENT OF ECOLOGY

      Safe Soils Remediation Program (30000019)

 

Reappropriation:

      Cleanup Settlement Account--State    $1,520,000

 

      Prior Biennia (Expenditures)               $769,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,289,000

NEW SECTION.  Sec. 3013.  FOR THE DEPARTMENT OF ECOLOGY

      Skykomish Cleanup and Restoration (30000020)

 

Reappropriation:

      Cleanup Settlement Account--State    $816,000

 

      Prior Biennia (Expenditures)               $1,234,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,050,000

NEW SECTION.  Sec. 3014.  FOR THE DEPARTMENT OF ECOLOGY

      Remedial Action Grant Program (30000039)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 3006, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      Local Toxics Control Account--State  $34,687,000

 

      Prior Biennia (Expenditures)               $3,524,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $38,211,000

NEW SECTION.  Sec. 3015.  FOR THE DEPARTMENT OF ECOLOGY

      Storm Water Retrofit and Low-Impact Development Grant Program (30000097)

 

      The reappropriations in this section are subject to the following terms and conditions:  The reappropriation is subject to the provisions of section 3005, chapter 36, Laws of 2010 1st sp. sess.

 

Reappropriation:

      State and Local Improvements Revolving Account--

             State               $1,284,000

      State and Local Improvements Revolving Account--

             Waste Facilities 1980--State          $325,000

      State Toxics Control Account--State   $15,343,000

      Local Toxics Control Account--State  $6,080,000

            Subtotal Reappropriation              $23,032,000

 

      Prior Biennia (Expenditures)               $1,243,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $24,275,000

NEW SECTION.  Sec. 3016.  FOR THE DEPARTMENT OF ECOLOGY

      Reducing Diesel Particle Emissions in Tacoma (30000139)

 

Reappropriation:

      Air Pollution Control Account--State $996,000

 

      Prior Biennia (Expenditures)               $4,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,000,000

NEW SECTION.  Sec. 3017.  FOR THE DEPARTMENT OF ECOLOGY

      Diesel Emissions Reduction (91000003)

 

Reappropriation:

      General Fund--Federal ARRA             $380,000

 

      Prior Biennia (Expenditures)               $1,350,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,730,000

NEW SECTION.  Sec. 3018.  FOR THE DEPARTMENT OF ECOLOGY

      Diesel Emissions Reduction (91000024)

 

Reappropriation:

      General Fund--Federal         $347,000

 

      Prior Biennia (Expenditures)               $6,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $353,000

NEW SECTION.  Sec. 3019.  FOR THE DEPARTMENT OF ECOLOGY

      Reducing Wood Smoke Particle Emissions in Tacoma (30000140)

 

Reappropriation:

      Air Pollution Control Account--State $300,000

 

      Prior Biennia (Expenditures)               $300,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $600,000

NEW SECTION.  Sec. 3020.  FOR THE DEPARTMENT OF ECOLOGY

      Water Pollution Control Revolving Fund Program (30000142)

 

Reappropriation:

      Water Pollution Control Revolving Account--State            $23,750,000

      Water Pollution Control Revolving Account--Federal        $11,400,000

             Subtotal Reappropriation              $35,150,000

 

      Prior Biennia (Expenditures)               $1,850,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $37,000,000

NEW SECTION.  Sec. 3021.  FOR THE DEPARTMENT OF ECOLOGY

      Clean Up Toxic Sites - Puget Sound (30000144)

 

      The reappropriation in this section is subject to the following conditions and limitations:  Up to $17,500,000 of the cleanup settlement account--state appropriation may be used for cleanup activities associated with the Asarco contamination in Everett.

 

Reappropriation:

      Cleanup Settlement Account--State    $18,300,000

      State Toxics Control Account--State   $20,495,000

             Subtotal Reappropriation              $38,795,000

 

      Prior Biennia (Expenditures)               $1,892,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $40,687,000

NEW SECTION.  Sec. 3022.  FOR THE DEPARTMENT OF ECOLOGY

      Settlement Funding To Clean Up Toxic Sites (30000145)

 

Reappropriation:

      Cleanup Settlement Account--State    $7,502,000

 

      Prior Biennia (Expenditures)               $998,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $8,500,000

NEW SECTION.  Sec. 3023.  FOR THE DEPARTMENT OF ECOLOGY

      Leaking Underground Tanks (91000002)

 

Reappropriation:

      General Fund--Federal Stimulus          $1,118,000

 

      Prior Biennia (Expenditures)               $2,382,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,500,000

NEW SECTION.  Sec. 3024.  FOR THE DEPARTMENT OF ECOLOGY

      Centennial Clean Water Program (30000208)

 

      The appropriations in this section are subject to the following conditions and limitations:

      (1) $3,500,000 of the appropriation is provided solely to the city of Snohomish to implement the near-term wastewater treatment plant improvement project required under agreed order No. 7973 between the department of ecology and the city.

      (2) $3,500,000 of the appropriation is provided solely for a grant for the Freeland sewer project.

      (3) $540,000 of the appropriation is provided solely for the city of Connell's Klindworth Campbell waterline distribution project.

      (4) $600,000 of the appropriation is provided solely for a grant for the town of Mabton's wastewater treatment project.

      (5) For projects involving repair, replacement, or improvement of a wastewater treatment plant or other public works facility for which an investment grade audit is obtainable, the department of ecology must require as a contract condition that the project sponsor undertake an investment grade audit.  The project sponsor may finance the costs of the audit as part of its centennial clean water program grant.

 

Appropriation:

      State Toxics Control Account--State   $34,100,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $34,100,000

NEW SECTION.  Sec. 3025.  FOR THE DEPARTMENT OF ECOLOGY

      Water Pollution Control Revolving Fund Program (30000209)

 

      The appropriations in this section are subject to the following conditions and limitations:  For projects involving repair, replacement, or improvement of a wastewater treatment plant or other public works facility for which an investment grade audit is obtainable, the department of ecology must require as a contract condition that the project sponsor undertake an investment grade audit.  The project sponsor may finance the costs of the audit as part of its water pollution control revolving fund program loan.

 

Appropriation:

      Water Pollution Control Revolving Account--State            $102,000,000

      Water Pollution Control Revolving Account--Federal        $82,205,000

             Subtotal Appropriation $184,205,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $736,820,000

             TOTAL         $921,025,000

NEW SECTION.  Sec. 3026.  FOR THE DEPARTMENT OF ECOLOGY

      Waste Tire Pile Prevention and Cleanup (30000210)

 

Appropriation:

      Waste Tire Removal Account--State   $1,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,000,000

NEW SECTION.  Sec. 3027.  FOR THE DEPARTMENT OF ECOLOGY

      Wood Stove Pollution Reduction (30000211)

 

Appropriation:

      Local Toxics Control Account--State  $3,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $4,000,000

             TOTAL         $7,000,000

NEW SECTION.  Sec. 3028.  FOR THE DEPARTMENT OF ECOLOGY

      Diesel Emissions Reduction (30000212)

 

Appropriation:

      Local Toxics Control Account--State  $7,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $5,000,000

             TOTAL         $12,000,000

NEW SECTION.  Sec. 3029.  FOR THE DEPARTMENT OF ECOLOGY

      Coordinated Prevention Grants (30000214)

 

      The appropriation in this section is subject to the following conditions and limitations:

      (1) $4,000,000 of the appropriation is provided solely for grants to local governments for local waste and pollution prevention projects.  Grants shall fund new organics composting and conversion, green building, and moderate risk waste initiatives described in the state "beyond waste" plan.

      (2) Up to $2,000,000 of the appropriation may be used for grants to local governments to provide alternatives to backyard burning of organic materials.  Priority for these grants shall be given to:  (a) Urban growth areas of less than 5,000 people affected by the January 1, 2007, ban on outdoor burning; (b) projects that develop infrastructure for an ongoing program; and (c) projects that coordinate regionally.

 

Appropriation:

      Local Toxics Control Account--State  $28,610,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $114,440,000

             TOTAL         $143,050,000

NEW SECTION.  Sec. 3030.  FOR THE DEPARTMENT OF ECOLOGY

      Hood Canal Regional Septic Repair Loan Program (30000215)

 

Appropriation:

      General Fund--Federal         $2,500,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,500,000

NEW SECTION.  Sec. 3031.  FOR THE DEPARTMENT OF ECOLOGY

      Remedial Action Grant Program (30000216)

 

Appropriation:

      Local Toxics Control Account--State  $63,834,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $11,235,000

             TOTAL         $75,069,000

NEW SECTION.  Sec. 3032.  FOR THE DEPARTMENT OF ECOLOGY

      Eastern Washington Clean Sites Initiative (30000217)

 

Appropriation:

      State Toxics Control Account--State   $6,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $6,000,000

NEW SECTION.  Sec. 3033.  FOR THE DEPARTMENT OF ECOLOGY

      Burlington Northern Santa Fe Skykomish Restoration (30000218)

 

Appropriation:

      Cleanup Settlement Account--State    $284,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $284,000

NEW SECTION.  Sec. 3034.  FOR THE DEPARTMENT OF ECOLOGY

      Safe Soils Remediation Program - Central Washington (30000263)

 

Appropriation:

      State Toxics Control Account--State   $3,711,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,711,000

NEW SECTION.  Sec. 3035.  FOR THE DEPARTMENT OF ECOLOGY

      Swift Creek Natural Asbestos Cleanup (30000015)

 

Appropriation:

      General Fund--Federal         $1,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,000,000

NEW SECTION.  Sec. 3036.  FOR THE DEPARTMENT OF ECOLOGY

      Clean Up Toxics Sites - Puget Sound (30000265)

 

Appropriation:

      Local Toxics Control Account--State  $16,400,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $11,248,000

             TOTAL         $27,648,000

NEW SECTION.  Sec. 3037.  FOR THE DEPARTMENT OF ECOLOGY

      ASARCO - Tacoma Smelter Plume and Mines (30000280)

 

Appropriation:

      Cleanup Settlement Account--State    $20,647,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $20,647,000

NEW SECTION.  Sec. 3038.  FOR THE DEPARTMENT OF ECOLOGY

      Padilla Bay Boat Launch (30000281)

 

Appropriation:

      General Fund--Federal         $320,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $320,000

NEW SECTION.  Sec. 3039.  FOR THE DEPARTMENT OF ECOLOGY

      Padilla Bay Federal Capital Projects (30000282)

 

Appropriation:

      General Fund--Federal         $800,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $800,000

NEW SECTION.  Sec. 3040.  FOR THE DEPARTMENT OF ECOLOGY

      Coastal Wetlands Federal Funds Administration (30000283)

 

Appropriation:

      General Fund--Federal         $23,200,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $40,000,000

             TOTAL         $63,200,000

NEW SECTION.  Sec. 3041.  FOR THE DEPARTMENT OF ECOLOGY

      Statewide Storm Water Projects (30000294)

 

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation is provided solely for construction projects or design/construction projects statewide that result in the greatest improvements necessary to meet national pollution discharge elimination system requirements for communities least able to pay for those projects or for jurisdictions who are early adopters of new regulations and effective new technology.  The department must develop specific evaluative criteria to award grants on a competitive basis to projects that meet the policy objectives in this section, demonstrate readiness to proceed and have a minimum cash match of twenty-five percent.

 

Appropriation:

      Local Toxics Control Account--State  $30,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $30,000,000

NEW SECTION.  Sec. 3042.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Rocky Reach - Chelan County Public Utility District (20061023)

 

Reappropriation:

      Parks Renewal and Stewardship Account--Private/

             Local              $500,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $500,000

NEW SECTION.  Sec. 3043.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Ike Kinswa State Park Improvement (20082950)

 

Reappropriation:

      Parks Renewal and Stewardship Account--Private/

             Local              $500,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $500,000

NEW SECTION.  Sec. 3044.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Clean Vessel Boating Pumpout Grants (30000665)

 

Appropriation:

      General Fund--Federal         $3,300,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $12,000,000

             TOTAL         $15,300,000

NEW SECTION.  Sec. 3045.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Parkland Account Authority (91000016)

 

      The appropriation in this section is subject to the following conditions and limitations:  The state parks and recreation commission shall provide lists of potential purchases and sales to the office of financial management and the appropriate policy and fiscal committees of the legislature prior to committing the state parks and recreation commission to any sale or purchase of land or buildings and prior to any allotments made for those purchases.  The list shall include any potential operating or capital cost impacts known to the state parks and recreation commission.

 

Appropriation:

      Parkland Acquisition Account--State  $2,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,000,000

NEW SECTION.  Sec. 3046.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Federal Grant Authority (30000768)

 

Appropriation:

      General Fund--Federal         $750,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $3,000,000

             TOTAL         $3,750,000

NEW SECTION.  Sec. 3047.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Local Grant Authority (30000769)

 

Appropriation:

      Parks Renewal and Stewardship Account--Private/

             Local              $750,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $3,000,000

             TOTAL         $3,750,000

NEW SECTION.  Sec. 3048.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Salmon Recovery Funding Board Programs (20044001)

 

Reappropriation:

      General Fund--Federal         $6,892,000

 

      Prior Biennia (Expenditures)               $27,483,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $34,375,000

NEW SECTION.  Sec. 3049.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Salmon Recovery Funding Board Programs (20064001)

 

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations are subject to the provisions of section 403, chapter 488, Laws of 2005.

 

Reappropriation:

      General Fund--Federal         $11,045,000

 

      Prior Biennia (Expenditures)               $32,955,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $44,000,000

NEW SECTION.  Sec. 3050.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Boating Facilities Program (20064003)

 

Reappropriation:

      Recreation Resources Account--State $377,000

 

      Prior Biennia (Expenditures)               $6,894,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $7,271,000

NEW SECTION.  Sec. 3051.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Nonhighway and Off-Road Vehicle Activities Program (20064004)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 170, chapter 371, Laws of 2006.

 

Reappropriation:

      NOVA Program Account--State          $986,000

 

      Prior Biennia (Expenditures)               $6,593,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $7,579,000

NEW SECTION.  Sec. 3052.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Boating Facilities Program (20084001)

 

Reappropriation:

      Recreation Resources Account--State $2,620,000

 

      Prior Biennia (Expenditures)               $5,401,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $8,021,000

NEW SECTION.  Sec. 3053.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Firearms and Archery Range Recreation (20084003)

 

Reappropriation:

      Firearms Range Account--State           $284,000

 

      Prior Biennia (Expenditures)               $188,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $472,000

NEW SECTION.  Sec. 3054.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Nonhighway and Off-Road Vehicle Activities Program (20084008)

 

Reappropriation:

      NOVA Program Account--State          $3,534,000

 

      Prior Biennia (Expenditures)               $5,502,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $9,036,000

NEW SECTION.  Sec. 3055.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Salmon Recovery Funding Board Programs (20084851)

 

Reappropriation:

      General Fund--Federal         $11,591,000

 

      Prior Biennia (Expenditures)               $30,409,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $42,000,000

NEW SECTION.  Sec. 3056.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Salmon Recovery Funding Board Programs (30000003)

 

Reappropriation:

      General Fund--Federal         $52,015,000

 

      Prior Biennia (Expenditures)               $7,985,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $60,000,000

NEW SECTION.  Sec. 3057.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Land and Water Conservation Fund (30000005)

 

Reappropriation:

      General Fund--Federal         $3,877,000

 

      Prior Biennia (Expenditures)               $123,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,000,000

NEW SECTION.  Sec. 3058.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Aquatic Lands Enhancement Account (30000007)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is provided solely for the list of projects in LEAP capital document No. 2009-3, developed March 9, 2009.

 

Reappropriation:

      Aquatic Lands Enhancement Account--State      $1,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,000,000

NEW SECTION.  Sec. 3059.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Firearms and Archery Range Recreation (30000009)

 

Reappropriation:

      Firearms Range Account--State           $419,000

 

      Prior Biennia (Expenditures)               $76,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $495,000

NEW SECTION.  Sec. 3060.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Boating Improvement Grants (30000010)

 

Reappropriation:

      General Fund--Federal         $948,000

 

      Prior Biennia (Expenditures)               $52,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,000,000

NEW SECTION.  Sec. 3061.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      National Recreational Trails Program (30000012)

 

Reappropriation:

      General Fund--Federal         $3,045,000

 

      Prior Biennia (Expenditures)               $955,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,000,000

NEW SECTION.  Sec. 3062.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Salmon Recovery Funding Board Programs (30000140)

 

Appropriation:

      General Fund--Federal         $60,000,000

      Salmon Recovery Account--State        $62,000

             Subtotal Appropriation $60,062,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $240,248,000

             TOTAL         $300,310,000

NEW SECTION.  Sec. 3063.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Land and Water Conservation Fund (30000142)

 

Appropriation:

      General Fund--Federal         $4,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $16,000,000

             TOTAL         $20,000,000

NEW SECTION.  Sec. 3064.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Firearms and Archery Range Recreation (30000144)

 

Appropriation:

      Firearms Range Account--State           $365,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $1,412,000

             TOTAL         $1,777,000

NEW SECTION.  Sec. 3065.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Boating Improvement Grants (30000145)

 

Appropriation:

      General Fund--Federal         $2,100,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $8,000,000

             TOTAL         $10,100,000

NEW SECTION.  Sec. 3066.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Boating Facilities Program (30000138)

 

Appropriation:

      Recreation Resources Account--State $8,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $32,000,000

             TOTAL         $40,000,000

NEW SECTION.  Sec. 3067.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Nonhighway and Off-Road Vehicle Activities Program (30000141)

 

      The appropriation in this section is subject to the following conditions and limitations:  The board shall work with its existing stakeholder groups to suggest priorities and procedures for the use of any funds diverted during the 2009-2011 biennium which in future years might be restored to the program.  Established allocations among recreation users shall be respected.  Special consideration shall be given to funding of the Reiter Foothills forest recreation motorized trail system, recreation projects of statewide significance, or recreation projects that would enhance destination facilities.

 

Appropriation:

      NOVA Program Account--State          $5,500,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $22,000,000

             TOTAL         $27,500,000

NEW SECTION.  Sec. 3068.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Recreational Trails Program (30000146)

 

Appropriation:

      General Fund--Federal         $5,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $20,000,000

             TOTAL         $25,000,000

NEW SECTION.  Sec. 3069.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Family Forest Fish Passage Program (30000203)

 

Appropriation:

      General Fund--Federal         $15,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $30,000,000

             TOTAL         $45,000,000

NEW SECTION.  Sec. 3070.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Aquatic Lands Enhancement Account (30000143)

 

      The appropriations in this section are subject to the following conditions and limitations:  The appropriations are provided solely for the list of projects in LEAP capital document No. 2011-3B, developed April 6, 2011.

 

Appropriation:

      Aquatic Lands Enhancement Account--State      $6,806,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $6,806,000

NEW SECTION.  Sec. 3071.  FOR THE STATE CONSERVATION COMMISSION

      Conservation Reserve Enhancement Program - Practice Incentive Payment Loan Program (30000005)

 

Reappropriation:

      Conservation Assistance Revolving Account--State           $259,000

Appropriation:

      Conservation Assistance Revolving Account--State           $150,000

 

      Prior Biennia (Expenditures)               $141,000

      Future Biennia (Projected Costs)        $600,000

             TOTAL         $1,150,000

NEW SECTION.  Sec. 3072.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Puget Sound Initiative - Nearshore Salmon Restoration (20062001)

 

Reappropriation:

      General Fund--Federal         $945,000

 

      Prior Biennia (Expenditures)               $855,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,800,000

NEW SECTION.  Sec. 3073.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Migratory Waterfowl Habitat (20082045)

 

Reappropriation:

      State Wildlife Account--State              $745,000

Appropriation:

      State Wildlife Account--State              $600,000

 

      Prior Biennia (Expenditures)               $505,000

      Future Biennia (Projected Costs)        $2,400,000

             TOTAL         $4,250,000

NEW SECTION.  Sec. 3074.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Puget Sound General Investigation for Nearshore Restoration (92000025)

 

Reappropriation:

      State Toxics Control Account--State   $1,023,000

 

      Prior Biennia (Expenditures)               $7,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,030,000

NEW SECTION.  Sec. 3075.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Mitigation Projects and Dedicated Funding (20082048)

 

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations in this section are provided contingent upon the department providing advance notice to the appropriate fiscal committees of the legislature and the office of financial management before applying for federal grants for acquisition of fish and wildlife habitat lands.  The department shall submit this information in the form of a report that explains the funding source, the match and use requirements, a description of the project that will be funded, and a description of future impacts to the operating budget.

 

Reappropriation:

      General Fund--Federal         $25,411,000

      General Fund--Private/Local                $4,802,000

      Special Wildlife Account--Federal       $1,533,000

      Special Wildlife Account--Private/Local              $1,209,000

             Subtotal Reappropriation              $32,955,000

 

Appropriation:

      General Fund--Federal         $30,600,000

      General Fund--Private/Local                $2,500,000

      State Wildlife Account--State              $500,000

      Special Wildlife Account--Federal       $800,000

      Special Wildlife Account--Private/Local              $1,450,000

             Subtotal Appropriation $35,850,000

 

      Prior Biennia (Expenditures)               $30,170,000

      Future Biennia (Projected Costs)        $121,000,000

             TOTAL         $219,975,000

NEW SECTION.  Sec. 3076.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Mitchell Act Federal Grant (91000021)

 

Reappropriation:

      General Fund--Federal         $3,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,000,000

NEW SECTION.  Sec. 3077.  FOR THE PUGET SOUND PARTNERSHIP

      Community Partnership Restoration Grants (30000007)

 

Appropriation:

      General Fund--Federal         $3,950,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,950,000

NEW SECTION.  Sec. 3078.  FOR THE PUGET SOUND PARTNERSHIP

      Community Partnership Restoration Grants (30000008)

 

Reappropriation:

      General Fund--Federal         $500,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $500,000

NEW SECTION.  Sec. 3079.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Land Acquisition Grants (20052021)

 

Reappropriation:

      General Fund--Federal         $47,882,000

Appropriation:

      General Fund--Federal         $8,000,000

 

      Prior Biennia (Expenditures)               $24,636,000

      Future Biennia (Projected Costs)        $32,000,000

             TOTAL         $112,518,000

NEW SECTION.  Sec. 3080.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Marine Station (20081015)

 

Reappropriation:

      Resources Management Cost Account--State     $524,000

 

      Prior Biennia (Expenditures)               $226,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $750,000

NEW SECTION.  Sec. 3081.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Forest Legacy (30000060)

 

Reappropriation:

      General Fund--Federal         $6,524,000

Appropriation:

      General Fund--Federal         $5,000,000

 

      Prior Biennia (Expenditures)               $2,476,000

      Future Biennia (Projected Costs)        $20,000,000

             TOTAL         $34,000,000

NEW SECTION.  Sec. 3082.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Hazardous Fuels Reduction, Forest Health, and Ecosystem Improvement (91000001)

 

Reappropriation:

      General Fund--Federal Stimulus          $18,994,000

 

      Prior Biennia (Expenditures)               $1,006,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $20,000,000

NEW SECTION.  Sec. 3083.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Elk River Estuarine Lands Acquisition (91000007)

 

Reappropriation:

      General Fund--Federal         $1,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,000,000

NEW SECTION.  Sec. 3084.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Minor Works:  Preservation (30000202)

 

Appropriation:

      Forest Development Account--State   $446,000

      Resources Management Cost Account--State     $474,000

             Subtotal Appropriation $920,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $3,680,000

             TOTAL         $4,600,000

NEW SECTION.  Sec. 3085.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Land Bank (30000205)

 

      The appropriation in this section is subject to the following conditions and limitations:  The department shall consult with an agricultural economist with expertise in the fruit growing sector at the Washington State University college of agriculture to review existing policy and recommend changes in the management of trust lands in agricultural production to increase long-term benefits to trust beneficiaries.  A report of the review must be submitted to the appropriate committees of the legislature by December 1, 2011.

 

Appropriation:

      Resources Management Cost Account--State     $25,000,000

      Natural Resources Real Property

             Replacement Account--State         $50,000,000

      Community and Technical College Forest

             Reserve Account--State $500,000

             Subtotal Appropriation $75,500,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $302,000,000

             TOTAL         $377,500,000

(End of part)

PART 4
TRANSPORTATION

NEW SECTION.  Sec. 4001.  FOR THE WASHINGTON STATE PATROL

      Fire Training Academy Burn Building (91000003)

 

Appropriation:

      Fire Service Training Account--State   $100,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $100,000

NEW SECTION.  Sec. 4002.  FOR THE WASHINGTON STATE PATROL

      Fire Training Academy Burn Building Repairs (91000002)

 

Reappropriation:

      Fire Service Training Account--State   $300,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $300,000

(End of part)

PART 5
EDUCATION

NEW SECTION.  Sec. 5001.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      2007-09 School Construction Assistance Grant Program (20084200)

 

      The reappropriation in this section is subject to the following conditions and limitations:  For school construction projects funded through the school construction assistance grant program, the superintendent of public instruction shall require mapping the design of new facilities and remapping the design of facilities to be remodeled.

 

Reappropriation:

      Common School Construction Account--State   $15,260,000

 

      Prior Biennia (Expenditures)               $776,499,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $791,759,000

NEW SECTION.  Sec. 5002.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      2009-11 School Construction Assistance Grant Program (30000031)

 

Reappropriation:

      Common School Construction Account--State   $85,000,000

 

      Prior Biennia (Expenditures)               $117,526,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $202,526,000

NEW SECTION.  Sec. 5003.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      2011-13 School Construction Assistance Program (30000071)

 

      The appropriations in this section are subject to the following conditions and limitations:

      (1) $1,337,000 of the common school construction account--state appropriation is provided solely for study and survey grants and for completing inventory and building condition assessments for all public school districts once every six years.

      (2) In calculating square foot eligibility for state assistance grants, kindergarten student headcount shall not be reduced by fifty percent.

      (3) $952,000 of the common school construction account--state appropriation is provided solely for mapping the design of new facilities and remapping the design of facilities to be remodeled, for school construction projects funded through the school construction assistance program.

 

Appropriation:

      Common School Construction Account--State   $314,960,000

      Common School Construction Account--Federal                $600,000

             Subtotal Appropriation $315,560,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $1,351,581,000

             TOTAL         $1,667,141,000

NEW SECTION.  Sec. 5004.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Capital Program Administration (30000095)

 

Appropriation:

      Common School Construction Account--State   $3,851,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $16,111,000

             TOTAL         $19,962,000

NEW SECTION.  Sec. 5005.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Pre-Disaster Mitigation Planning Grant (91000011)

 

Appropriation:

      General Fund--Federal         $800,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $800,000

NEW SECTION.  Sec. 5006.  FOR THE STATE SCHOOL FOR THE BLIND

      General Campus Preservation (30000018)

 

Appropriation:

      Charitable, Educational, Penal and Reformatory

             Institutions Account--State           $550,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $2,557,000

             TOTAL         $3,107,000

NEW SECTION.  Sec. 5007.  FOR THE WASHINGTON STATE CENTER FOR CHILDHOOD DEAFNESS AND HEARING LOSS

      Minor Public Works (30000013)

 

Appropriation:

      Charitable, Educational, Penal and Reformatory

             Institutions Account--State           $536,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $3,811,000

             TOTAL         $4,347,000

NEW SECTION.  Sec. 5008.  FOR THE UNIVERSITY OF WASHINGTON

      University of Washington Tacoma-Soils Remediation (20082852)

 

Reappropriation:

      State Toxics Control Account--State   $1,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,000,000

NEW SECTION.  Sec. 5009.  FOR THE UNIVERSITY OF WASHINGTON

      University of Washington Tacoma-Land Acquisition (20092003)

 

Reappropriation:

      University of Washington Building Account--State            $425,000

 

      Prior Biennia (Expenditures)               $3,575,000

      Future Biennia (Projected Costs)        $15,000,000

             TOTAL         $19,000,000

NEW SECTION.  Sec. 5010.  FOR THE UNIVERSITY OF WASHINGTON

      Safe Campus (30000022)

 

Reappropriation:

      University of Washington Building Account--State            $500,000

 

      Prior Biennia (Expenditures)               $7,500,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $8,000,000

NEW SECTION.  Sec. 5011.  FOR THE UNIVERSITY OF WASHINGTON

      Minor Works:  Facility Preservation (30000027)

 

Reappropriation:

      University of Washington Building Account--State            $9,596,000

 

      Prior Biennia (Expenditures)               $5,444,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $15,040,000

NEW SECTION.  Sec. 5012.  FOR THE UNIVERSITY OF WASHINGTON

      University of Washington - Minor Capital Repairs (30000372)

 

Appropriation:

      University of Washington Building Account--State            $27,801,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $30,000,000

             TOTAL         $57,801,000

NEW SECTION.  Sec. 5013.  FOR THE UNIVERSITY OF WASHINGTON

      Preventive Facility Maintenance and Building System Repairs (30000480)

 

Appropriation:

      University of Washington Building Account--State            $25,825,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $103,300,000

             TOTAL         $129,125,000

NEW SECTION.  Sec. 5014.  FOR THE WASHINGTON STATE UNIVERSITY

      Washington State University Spokane - Riverpoint Biomedical and Health Sciences (20162953)

 

Appropriation:

      Washington State University Building Account--

             State               $3,770,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,770,000

NEW SECTION.  Sec. 5015.  FOR THE WASHINGTON STATE UNIVERSITY

      Minor Works:  Preservation (30000065)

 

Reappropriation:

      Washington State University Building Account--State       $687,000

 

      Prior Biennia (Expenditures)               $1,538,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,225,000

NEW SECTION.  Sec. 5016.  FOR THE WASHINGTON STATE UNIVERSITY

      Minor Works:  Preservation (30000525)

 

Appropriation:

      Washington State University Building

             Account--State              $24,315,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $89,960,000

             TOTAL         $114,275,000

NEW SECTION.  Sec. 5017.  FOR THE WASHINGTON STATE UNIVERSITY

      Clean Technology Laboratory (30000069)

 

Appropriation:

      Washington State University Building Account--

             State               $2,500,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $61,213,000

             TOTAL         $63,713,000

NEW SECTION.  Sec. 5018.  FOR THE WASHINGTON STATE UNIVERSITY

      Washington State University Pullman - Agricultural Animal Health Research Facility (30000514)

 

Appropriation:

      Washington State University Building Account--

             State               $250,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $23,096,000

             TOTAL         $23,346,000

NEW SECTION.  Sec. 5019.  FOR THE WASHINGTON STATE UNIVERSITY

      Preventive Facility Maintenance and Building System Repairs (30000823)

 

Appropriation:

      Washington State University Building Account--

             State               $10,115,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $40,460,000

             TOTAL         $50,575,000

NEW SECTION.  Sec. 5020.  FOR THE EASTERN WASHINGTON UNIVERSITY

      Minor Works:  Facility Preservation (30000054)

 

Reappropriation:

      Eastern Washington University Capital Projects

             Account--State              $113,000

 

      Prior Biennia (Expenditures)               $2,887,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,000,000

NEW SECTION.  Sec. 5021.  FOR THE EASTERN WASHINGTON UNIVERSITY

      Minor Works:  Program (30000056)

 

Reappropriation:

      Eastern Washington University Capital Projects

             Account--State              $1,153,000

 

      Prior Biennia (Expenditures)               $2,153,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,306,000

NEW SECTION.  Sec. 5022.  FOR THE EASTERN WASHINGTON UNIVERSITY

      Minor Works:  Preservation (30000427)

 

Appropriation:

      Eastern Washington University Capital Projects

             Account--State              $9,205,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $9,205,000

NEW SECTION.  Sec. 5023.  FOR THE EASTERN WASHINGTON UNIVERSITY

      Preventive Facility Maintenance and Building System Repairs (30000431)

 

Appropriation:

      Eastern Washington University Capital Projects

             Account--State              $2,217,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $8,868,000

             TOTAL         $11,085,000

NEW SECTION.  Sec. 5024.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Minor Works:  Health, Safety, and Code Requirements (30000002)

 

Reappropriation:

      Central Washington University Capital Projects

             Account--State              $130,000

 

      Prior Biennia (Expenditures)               $570,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $700,000

NEW SECTION.  Sec. 5025.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Minor Works:  Infrastructure Preservation (30000009)

 

Reappropriation:

      Central Washington University Capital Projects

             Account--State              $1,100,000

 

      Prior Biennia (Expenditures)               $1,039,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,139,000

NEW SECTION.  Sec. 5026.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Minor Works:  Facility Preservation (30000016)

 

Reappropriation:

      Central Washington University Capital Projects

             Account--State              $1,244,000

 

      Prior Biennia (Expenditures)               $1,366,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,610,000

NEW SECTION.  Sec. 5027.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Minor Works Preservation:  Preservation (30000444)

 

Appropriation:

      Central Washington University Capital

             Projects Account--State                $7,000,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $10,000,000

             TOTAL         $17,000,000

NEW SECTION.  Sec. 5028.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Combined Utilities (30000448)

 

Appropriation:

      State Building Construction Account--State       $273,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $273,000

NEW SECTION.  Sec. 5029.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Preventive Facility Maintenance and Building System Repairs (30000463)

 

Appropriation:

      Central Washington University Capital Projects

             Account--State              $2,422,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $9,688,000

             TOTAL         $12,110,000

NEW SECTION.  Sec. 5030.  FOR THE EVERGREEN STATE COLLEGE

      Minor Works Preservation (30000003)

 

Reappropriation:

      The Evergreen State College Capital Projects

             Account--State              $116,000

 

      Prior Biennia (Expenditures)               $402,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $518,000

NEW SECTION.  Sec. 5031.  FOR THE EVERGREEN STATE COLLEGE

      Minor Works:  Health, Safety, Code Compliance (30000016)

 

Reappropriation:

      The Evergreen State College Capital Projects

             Account--State              $63,000

 

      Prior Biennia (Expenditures)               $499,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $562,000

NEW SECTION.  Sec. 5032.  FOR THE EVERGREEN STATE COLLEGE

      Laboratory and Art Annex Building Renovation (30000026)

 

Reappropriation:

      The Evergreen State College Capital Projects

             Account--State              $1,834,000

 

      Prior Biennia (Expenditures)               $3,015,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,849,000

NEW SECTION.  Sec. 5033.  FOR THE EVERGREEN STATE COLLEGE

      Preservation (30000051)

 

Appropriation:

      The Evergreen State College Capital Projects

             Account--State              $6,935,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $21,940,000

             TOTAL         $28,875,000

NEW SECTION.  Sec. 5034.  FOR THE EVERGREEN STATE COLLEGE

      Communications Laboratory Building Preservation and Renovation (30000002)

 

Appropriation:

      The Evergreen State College Capital Projects

             Account--State              $1,030,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,030,000

NEW SECTION.  Sec. 5035.  FOR THE EVERGREEN STATE COLLEGE

      Preventive Facility Maintenance and Building System Repairs (30000502)

 

Appropriation:

      The Evergreen State College Capital Projects

             Account--State              $760,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $3,040,000

             TOTAL         $3,800,000

NEW SECTION.  Sec. 5036.  FOR THE EVERGREEN STATE COLLEGE

      Lecture Hall Remodel Predesign (30000493)

 

Appropriation:

      The Evergreen State College Capital Projects

             Account--State              $300,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $10,540,000

             TOTAL         $10,840,000

NEW SECTION.  Sec. 5037.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Minor Works:  Program (30000007)

 

Reappropriation:

      Western Washington University Capital Projects

             Account--State              $638,000

 

      Prior Biennia (Expenditures)               $2,362,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $3,000,000

NEW SECTION.  Sec. 5038.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Network Infrastructure/Switches (30000011)

 

Reappropriation:

      Western Washington University Capital Projects

             Account--State              $834,000

 

      Prior Biennia (Expenditures)               $3,782,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $4,616,000

NEW SECTION.  Sec. 5039.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Classroom and Lab Upgrades (30000425)

 

Appropriation:

      Western Washington University Capital Projects

             Account--State              $2,313,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,313,000

NEW SECTION.  Sec. 5040.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Minor Works:  Preservation (30000431)

 

Appropriation:

      Western Washington University Capital Projects

             Account--State              $8,264,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $16,600,000

             TOTAL         $24,864,000

NEW SECTION.  Sec. 5041.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Preventive Facility Maintenance and Building System Repairs (30000510)

 

Appropriation:

      Western Washington University Capital Projects

             Account--State              $3,614,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $14,456,000

             TOTAL         $18,070,000

NEW SECTION.  Sec. 5042.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Academic Services & Performing Arts Facility (30000424)

 

Appropriation:

      Western Washington University Capital Projects

             Account--State              $350,000

 

      Prior Biennia (Expenditures)               $0

      Future Biennia (Projected Costs)        $53,552,000

             TOTAL         $53,902,000

NEW SECTION.  Sec. 5043.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Pierce College Fort Steilacoom:  Cascade Core (20081321)

 

Reappropriation:

      Community/Technical College Capital Projects

             Account--State              $8,119,000

 

      Prior Biennia (Expenditures)               $381,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $8,500,000

NEW SECTION.  Sec. 5044.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Roof Repairs "A" (30000010)

 

Reappropriation:

      Community/Technical College Capital Projects

             Account--State              $3,534,000

 

      Prior Biennia (Expenditures)               $3,320,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $6,854,000

NEW SECTION.  Sec. 5045.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Site Repairs "A" (30000036)

 

Reappropriation:

      Community/Technical College Capital Projects

             Account--State              $1,835,000

 

      Prior Biennia (Expenditures)               $875,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $2,710,000

NEW SECTION.  Sec. 5046.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Facility Repairs "A" (30000048)

 

Reappropriation:

      Community/Technical College Capital Projects

             Account--State              $1,359,000

 

      Prior Biennia (Expenditures)               $448,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $1,807,000

NEW SECTION.  Sec. 5047.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Minor Works:  Program (30000078)

 

Reappropriation:

      Community/Technical College Capital Projects

             Account--State              $6,690,000

 

      Prior Biennia (Expenditures)               $5,537,000

      Future Biennia (Projected Costs)        $0

             TOTAL         $12,227,000

NEW SECTION.  Sec. 5048.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Minor Works:  Preservation (30000210)