EIGHTEENTH DAY

 


AFTERNOON SESSION

 

Senate Chamber, Olympia, Saturday, June 29, 2013

 

The Senate was called to order at 1:00 p.m. by President Owen. The Secretary called the roll and announced to the President that all Senators were present with the exception of Senators Kline, Mullet and Murray.

The Sergeant at Arms Color Guard consisting of Senate Staff Elise Greef and Steve Jones, presented the Colors. Senator Pearson offered the prayer.

 

MOTION

 

On motion of Senator Fain the reading of the Journal of the previous day was dispensed with and it was approved.

 

MOTION

 

On motion of Senator Fain, the Senate advanced to the fifth order of business.

 

INTRODUCTION AND FIRST READING

 

SB 5951             by Senator Roach

 

AN ACT Relating to costs of incarceration for impaired driving offenders; and amending RCW 9.94A.760 and 10.01.160.

 

Referred to Committee on Law & Justice.

 

MOTION

 

      On motion of Senator Fain, the measure listed on the Introduction and First Reading report was referred to the committee as designated.

 

MOTION

 

At 1:10 p.m., on motion of Senator Fain, the Senate was declared to be at ease subject to the call of the President.

 

The Senate was called to order at 1:36 p.m. by President Owen.

 

MOTION

 

On motion of Senator Fain, the Senate advanced to the sixth order of business.

 

SECOND READING

 

SENATE BILL NO. 5644, by Senators Schoesler and Murray

 

Concerning sales for resale by retail licensees of liquor.

 

MOTION

 

On motion of Senator Holmquist Newbry, Substitute Senate Bill No. 5644 was substituted for Senate Bill No. 5644 and the substitute bill was placed on the second reading and read the second time.

 

PARLIAMENTARY INQUIRY

 

Senator Darneille:  “I would like to inquire Mr. President as to how many votes are required to pass this bill as it is quite clearly amending Initiative 1183? Thank you.”

 

REPLY BY THE PRESIDENT

 

President Owen:  “Senator Darneille, we are on second reading and we have an amendment to deal with and, until we complete the amending process, I will get to your ruling when we get to third reading.”

 

MOTION

 

Senator Holmquist Newbry moved that the following striking amendment by Senator Holmquist Newbry and Harper be adopted:

0.Strike everything after the enacting clause and insert the following:

"Sec. 1.  RCW 66.24.055 and 2012 c 2 s 105 (Initiative Measure No. 1183) are each amended to read as follows:

      (1) There is a license for spirits distributors to (a) sell spirits purchased from manufacturers, distillers, or suppliers including, without limitation, licensed Washington distilleries, licensed spirits importers, other Washington spirits distributors, or suppliers of foreign spirits located outside of the United States, to spirits retailers including, without limitation, spirits retail licensees, special occasion license holders, interstate common carrier license holders, restaurant spirits retailer license holders, spirits, beer, and wine private club license holders, hotel license holders, sports entertainment facility license holders, and spirits, beer, and wine nightclub license holders, and to other spirits distributors; and (b) export the same from the state.

      (2) By January 1, 2012, the board must issue spirits distributor licenses to all applicants who, upon December 8, 2011, have the right to purchase spirits from a spirits manufacturer, spirits distiller, or other spirits supplier for resale in the state, or are agents of such supplier authorized to sell to licensees in the state, unless the board determines that issuance of a license to such applicant is not in the public interest.

      (3)(a) As limited by (b) of this subsection and subject to (c) of this subsection, each spirits distributor licensee must pay to the board, for deposit into the liquor revolving fund, a license issuance fee calculated as follows:

      (i) In each of the first ((two years)) twenty-seven months of licensure, ten percent of the total revenue from all the licensee's sales of spirits made during the ((year)) month for which the fee is due, respectively; and

      (ii) In the ((third year)) twenty-eighth month of licensure and each ((year)) month thereafter, five percent of the total revenue from all the licensee's sales of spirits made during the ((year)) month for which the fee is due, respectively.

      (b) The fee required under this subsection (3) is calculated only on sales of items which the licensee was the first spirits distributor in the state to have received:

      (i) In the case of spirits manufactured in the state, from the distiller; or

      (ii) In the case of spirits manufactured outside the state, from an authorized out‑of‑state supplier.

      (c) By March 31, 2013, all persons holding spirits distributor licenses on or before March 31, 2013, must have paid collectively one hundred fifty million dollars or more in spirits distributor license fees.  If the collective payment through March 31, 2013, totals less than one hundred fifty million dollars, the board must, according to rules adopted by the board for the purpose, collect by May 31, 2013, as additional spirits distributor license fees the difference between one hundred fifty million dollars and the actual receipts, allocated among persons holding spirits distributor licenses at any time on or before March 31, 2013, ratably according to their spirits sales made during calendar year 2012.  Any amount by which such payments exceed one hundred fifty million dollars by March 31, 2013, must be credited to future license issuance fee obligations of spirits distributor licensees according to rules adopted by the board.

      (d) A retail licensee selling for resale must pay a distributor license fee under the terms and conditions in this section on resales of spirits the licensee has purchased on which no other distributor license fee has been paid.  The board must establish rules setting forth the frequency and timing of such payments and reporting of sales dollar volume by the licensee, with payments due quarterly in arrears.

      (e) No spirits inventory may be subject to calculation of more than a single spirits distributor license issuance fee.

      (4) In addition to the payment set forth in subsection (3) of this section, each spirits distributor licensee renewing its annual license must pay an annual license renewal fee of one thousand three hundred twenty dollars for each licensed location.

      (5) There is no minimum facility size or capacity for spirits distributor licenses, and no limit on the number of such licenses issued to qualified applicants.  License applicants must provide physical security of the product that is substantially as effective as the physical security of the distribution facilities currently operated by the board with respect to preventing pilferage.  License issuances and renewals are subject to RCW 66.24.010 and the regulations promulgated thereunder, including without limitation rights of cities, towns, county legislative authorities, the public, churches, schools, and public institutions to object to or prevent issuance of local liquor licenses.  However, existing distributor premises licensed to sell beer and/or wine are deemed to be premises "now licensed" under RCW 66.24.010(9)(a) for the purpose of processing applications for spirits distributor licenses.

NEW SECTION.  Sec. 2.  The changes made in section 1 of this act apply to spirits distributors licensed on or after January 1, 2012.

NEW SECTION.  Sec. 3.  A new section is added to chapter 66.24 RCW to read as follows:

      (1) Beginning on the effective date of this section, the license issuance fee under RCW 66.24.630(4) does not apply to a spirits retail licensee that was a contract liquor store manager with respect to sales of spirits in original containers from the location of its spirits retail licensed premises to retailers licensed to sell spirits for consumption on the premises for resale at their licensed premises.

      (2) Beginning on the effective date of this section, the license issuance fee under RCW 66.24.630(4) does not apply to a spirits retail licensee that was a former state store auction buyer, with respect to sales of spirits in original containers from the location of its spirits retail licensed premises to retailers licensed to sell spirits for consumption on the premises for resale at their licensed premises.

      (3) The exemptions created in this section attach to any successor, by purchase or otherwise, to the spirits retail license, except that an exemption does not attach to any such successor that owns, directly or indirectly, any interest in a spirits retail license that is not derived directly from a former contract liquor store manager or a former state store auction buyer.

NEW SECTION.  Sec. 4.  This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately."

 

MOTION

 

On motion of Senator Billig, Senators Kline, Mullet and Murray were excused.

 

 

The President declared the question before the Senate to be the adoption of the striking amendment by Senator Holmquist Newbry and Harper to Substitute Senate Bill No. 5644.

The motion by Senator Holmquist Newbry carried and the striking amendment was adopted by voice vote.

 

MOTION

 

There being no objection, the following title amendment was adopted:

      On page 1, line 1 of the title, after "Relating to" strike the remainder of the title and insert "license issuance fees of former contract liquor stores, former state store auction buyers, and spirits distributors; amending RCW 66.24.055; adding a new section to chapter 66.24 RCW; creating a new section; and declaring an emergency."

 

MOTION

 

 

On motion of Senator Holmquist Newbry, the rules were suspended, Engrossed Substitute Senate Bill No. 5644 was advanced to third reading, the second reading considered the third and the bill was placed on final passage.

      Senators Holmquist Newbry and Conway spoke in favor of passage of the bill.

 

RULING BY THE PRESIDENT

 

President Owen: “Senator Darneille had raised the point of order as to the number of votes necessary to pass Substitute Senate Bill No. 5644. The President believes that the bill clearly amends Initiative 1183 and it would take thirty-three votes or two-thirds of the members.”

 

Senators Ericksen, Sheldon and Bailey spoke in favor of passage of the bill.

 

      The President declared the question before the Senate to be the final passage of Engrossed Substitute Senate Bill No. 5644.

 

ROLL CALL

 

      The Secretary called the roll on the final passage of Engrossed Substitute Senate Bill No. 5644 and the bill passed the Senate by the following vote:  Yeas, 41; Nays, 5; Absent, 0; Excused, 3.

      Voting yea: Senators Bailey, Baumgartner, Becker, Benton, Billig, Brown, Chase, Cleveland, Conway, Dammeier, Darneille, Eide, Ericksen, Fain, Fraser, Frockt, Harper, Hasegawa, Hatfield, Hewitt, Hobbs, Holmquist Newbry, Honeyford, Keiser, King, Kohl-Welles, Litzow, McAuliffe, Nelson, O'Ban, Parlette, Ranker, Rivers, Roach, Rolfes, Schlicher, Schoesler, Sheldon, Shin, Smith and Tom

      Voting nay: Senators Braun, Hargrove, Hill, Padden and Pearson

      Excused: Senators Kline, Mullet and Murray

ENGROSSED SUBSTITUTE SENATE BILL NO. 5644, having received the constitutional majority, was declared passed. There being no objection, the title of the bill was ordered to stand as the title of the act.

 

MOTION

 

On motion of Senator Fain, Engrossed Substitute Senate Bill No. 5644 was immediately transmitted to the House of Representatives.

 

The President announced the following appointment to the Joint Legislative Audit and Review Committee:

 

Senators Becker, Rivers, Braun Holmquist Newbry, Cleveland, Kohl-Welles, Mullet and Nelson.

 

MOTION

 

On motion of Senator Fain the appointments were confirmed by voice vote.

 

MOTION

 

On motion of Senator Fain, the Senate reverted to the fifth order of business.

POINT OF ORDER

 

Senator Padden:  “Mr. President, could you please help? A little decorum, there’s a lot of noise in the wings and it’s hard to follow what’s going on here on the floor. Thank you.”

 

REPLY BY THE PRESIDENT

 

President Owen:  “Thank you Senator Padden. I think that message has been sent and I will keep a better eye on it – or gavel on it.”

 

SUPPLEMENTAL INTRODUCTION AND FIRST READING OF HOUSE BILLS

 

ESHB 1632        by House Committee on Transportation (originally sponsored by Representatives Shea, Blake, Kristiansen, Sells, Warnick, Upthegrove, Wilcox, Scott, Moscoso, Fagan and Condotta)

 

AN ACT Relating to regulating the use of off-road vehicles in certain areas; amending RCW 46.09.310, 46.09.310, 46.09.360, 46.09.400, 46.09.410, 46.09.420, 46.09.450, 46.09.460, 46.09.530, 46.17.350, 46.30.020, 46.63.020, 79A.80.010, 46.63.030, 43.84.092, and 43.84.092; reenacting and amending RCW 46.09.470; adding new sections to chapter 46.09 RCW; creating a new section; prescribing penalties; providing effective dates; providing a contingent effective date; providing an expiration date; providing a contingent expiration date; and declaring an emergency.

 

MOTION

 

Senator Fain moved that the rules be suspended and Engrossed Substitute House Bill No. 1632 be placed on the second reading calendar.

 

Senator Eide spoke against the motion to suspend the rules and advance the bill.

 

Senator Fain spoke in favor of the motion to suspend the rules and advance the bill.

 

PARLIAMENTARY INQUIRY

 

Senator Frockt:  “Thank you Mr. President. The motion before us is on the motion to boost. Is that correct?”

 

REPLY BY THE PRESIDENT

 

President Owen:  “That is correct.”

 

The motion by Senator Fain failed and Engrossed Substitute House Bill No. 1632 advanced on a rising vote.

 

MOTION

 

At 1:59 p.m., on motion of Senator Fain, the Senate was declared to be at ease subject to the call of the President.

 

The Senate was called to order at 3:27 p.m. by President Owen.

 

SIGNED BY THE PRESIDENT

 

Pursuant to Article 2, Section 32 of the State Constitution and Senate Rule 1(5), the President announced the signing of and thereupon did sign in open session:

ENGROSSED SUBSTITUTE SENATE BILL NO. 5882,

ENGROSSED SUBSTITUTE SENATE BILL NO. 5946.

 

Motion

Senator Schlicher, having voted on the prevailing side, moved that the vote by which the motion by Senator Fain to suspend the rules and place Engrossed Substitute House Bill No. 1632 on the second reading calendar failed earlier in the day be immediately reconsidered.

The President declared the question before the Senate to be the motion to immediately reconsider the vote by which the motion by Senator Fain to suspend the rules and place Engrossed Substitute House Bill No. 1632 on the second reading calendar failed.

The motion by Senator Schlicher carried and the Senate immediately reconsidered the vote by which the motion by Senator Fain to suspend the rules and place Engrossed Substitute House Bill No. 1632 on the second reading calendar failed by voice vote.

The President declared the question before the Senate to be the motion by Senator Fain to suspend the rules and place Engrossed Substitute House Bill No. 1632 on the second reading calendar of the day on immediate reconsideration.

The motion by Senator Fain carried on immediate reconsideration, the rules were suspended, and Engrossed Substitute House Bill No. 1632 was placed on the second reading calendar by voice vote.

MOTION

 

On motion of Senator Fain, the Senate advanced to the sixth order of business.

 

SECOND READING

 

ENGROSSED SUBSTITUTE HOUSE BILL NO. 1632, by House Committee on Transportation (originally sponsored by Representatives Shea, Blake, Kristiansen, Sells, Warnick, Upthegrove, Wilcox, Scott, Moscoso, Fagan and Condotta)

 

Regulating the use of off-road vehicles in certain areas.

 

The measure was read the second time.

 

MOTION

 

On motion of Senator Smith, the rules were suspended, Engrossed Substitute House Bill No. 1632 was advanced to third reading, the second reading considered the third and the bill was placed on final passage.

      Senators Smith, Rolfes, Pearson, Becker, Ranker and Parlette spoke in favor of passage of the bill.

 

MOTION

 

On motion of Senator Hobbs, Senator Nelson was excused.

 

POINT OF INQUIRY

 

Senator Ericksen:  “Would Senator Smith yield to a question? It’s my understanding the fifty dollar fee included in this bill is a one-time fee paid for inspection of the vehicle to be used for this purpose and will not be charged on a yearly basis. Is that also your understanding of the bill.?”

 

Senator Smith:  “Yes sir, that is my understanding of the bill.”

 

      Senator Fraser and Hill spoke in favor of passage of the bill.

 

MOTION

 

On motion of Senator Billig, Senators Eide, Hargrove, Murray and Shin were excused.

 

The President declared the question before the Senate to be the final passage of Engrossed Substitute House Bill No. 1632.

 

ROLL CALL

 

The Secretary called the roll on the final passage of Engrossed Substitute House Bill No. 1632 and the bill passed the Senate by the following vote:  Yeas, 39; Nays, 5; Absent, 0; Excused, 5.

      Voting yea: Senators Bailey, Baumgartner, Becker, Benton, Billig, Braun, Brown, Chase, Cleveland, Conway, Dammeier, Ericksen, Fain, Frockt, Harper, Hasegawa, Hatfield, Hewitt, Hill, Hobbs, Holmquist Newbry, Honeyford, Keiser, King, Litzow, McAuliffe, O'Ban, Padden, Parlette, Pearson, Ranker, Rivers, Roach, Rolfes, Schlicher, Schoesler, Sheldon, Smith and Tom

      Voting nay: Senators Darneille, Eide, Fraser, Kohl-Welles and Murray

      Excused: Senators Hargrove, Kline, Mullet, Nelson and Shin

ENGROSSED SUBSTITUTE HOUSE BILL NO. 1632, having received the constitutional majority, was declared passed. There being no objection, the title of the bill was ordered to stand as the title of the act.

 

MOTION

 

At 3:42 p.m., on motion of Senator Fain, the Senate was declared to be at ease subject to the call of the President.

 

The Senate was called to order at 4:43 p.m. by President Owen.

 

MOTION

 

Senator Eide moved that the Senate advance to the ninth order of business.

 

POINT OF ORDER

 

Senator Schoesler:  “Thank you Mr. President. I believe we were preparing the sixth order of business with the gentleman here to my right?”

 

REPLY BY THE PRESIDENT

 

President Owen:  “Senator Schoesler, Senator Eide has the floor. She’s made a motion. She has the right to do that. Senator Eide.”

 

REMARKS BY THE PRESIDENT

 

President Owen: “Senator Eide, let the President make a clarification. Your motion is to advance to the ninth order of business but it is not appropriate to, in the motion, to have the bills you’re going to deal with. You can explain, the President allows an explanation for and against, as you know, as a practice, brief explanation and you can state that, those bills, at that time. The motion is only to go to the ninth order of business.”

 

REMARKS BY SENATOR EIDE

 

Senator Eide:  “That’s correct. Can I explain the bills that I’ve requested?”

 

REPLY BY THE PRESIDENT

 

President Owen:  “Senator Eide, the President does not believe that it would be appropriate to spend time on explaining the bills other than to state what they are. Not saying just the number but basically, what they are but not in detail or to debate the merits of the bills. Then we will allow the majority to respond.”

 

The President declared the question before the Senate to be the motion by Senator Eide that the Senate advance to the ninth order of business.

Senator Eide spoke in favor of the motion.

 

REMARKS BY THE PRESIDENT

 

President Owen: “Senator Eide, you are now slipping off of the explanation of what you would like to deal with in the motion.”

 

REMARKS BY THE PRESIDENT

 

President Owen: “Senator Eide, you are off the issue at this point. I believe I got a feeling that’s what the point of order was going to be.”

 

Senator Eide demanded a roll call.

The President declared that one-sixth of the members supported the demand and the demand was sustained.

 

Senator Schoesler spoke against the motion.

 

POINT OF ORDER

 

Senator Murray:  “Procedural not political, I think is...”

 

RULING BY THE PRESIDENT

 

President Owen:  “Senator Murray, it’s not appropriate to be arguing the thing at this point.”

 

ROLL CALL

 

      The Secretary called the roll on the motion by Senator Eide to advance to the ninth order of business and the motion failed by the following vote:  Yeas, 21; Nays, 26; Absent, 0; Excused, 2.

      Voting yea: Senators Billig, Chase, Cleveland, Conway, Darneille, Eide, Fraser, Frockt, Hargrove, Harper, Hasegawa, Hatfield, Hobbs, Keiser, Kohl-Welles, McAuliffe, Murray, Nelson, Ranker, Rolfes and Shin

      Voting nay: Senators Bailey, Baumgartner, Becker, Benton, Braun, Brown, Dammeier, Ericksen, Fain, Hewitt, Hill, Holmquist Newbry, Honeyford, King, Litzow, O'Ban, Padden, Parlette, Pearson, Rivers, Roach, Schlicher, Schoesler, Sheldon, Smith and Tom

      Excused: Senators Kline and Mullet

 

MOTION

 

On motion of Senator Fain, the Senate reverted to the fourth order of business.

 

MESSAGE FROM THE HOUSE

 

June 29, 2013

 

MR. PRESIDENT:

The House has passed: 

SECOND SUBSTITUTE SENATE BILL NO. 5367,

ENGROSSED SUBSTITUTE SENATE BILL NO. 5644,

and the same are herewith transmitted.

 

BARBARA BAKER, Chief Clerk

 

MESSAGE FROM THE HOUSE

 

June 29, 2013

 

MR. PRESIDENT:

The Speaker has signed:

ENGROSSED HOUSE BILL NO. 1450,

ENGROSSED SECOND SUBSTITUTE HOUSE BILL NO. 1872,

ENGROSSED SUBSTITUTE HOUSE BILL NO. 1947,

SECOND ENGROSSED SECOND SUBSTITUTE HOUSE BILL NO. 1971,

HOUSE BILL NO. 2043,

HOUSE BILL NO. 2044,

ENGROSSED SUBSTITUTE HOUSE BILL NO. 2051,

SUBSTITUTE HOUSE BILL NO. 2069,

HOUSE BILL NO. 2079,

and the same are herewith transmitted.

 

BARBARA BAKER, Chief Clerk

 

MOTION

 

On motion of Senator Fain, the Senate advanced to the sixth order of business.

 

SECOND READING

 

SENATE BILL NO. 5036, by Senators Honeyford, Nelson and Shin

 

Concerning state general obligation bonds and related accounts.

 

MOTION

 

On motion of Senator Honeyford, Substitute Senate Bill No. 5036 was substituted for Senate Bill No. 5036 and the substitute bill was placed on the second reading and read the second time.

 

MOTION

 

Senator Honeyford moved that the following striking amendment by Senators Honeyford and Nelson be adopted:

0.Strike everything after the enacting clause and insert the following:

"NEW SECTION.  Sec. 1.  For the purpose of providing funds to finance the projects described and authorized by the legislature in the capital and operating appropriations acts for the 2011-2013 and 2013- 2015 fiscal biennia, and all costs incidental thereto, the state finance committee is authorized to issue general obligation bonds of the state of Washington in the sum of two billion thirty-six million dollars, or as much thereof as may be required, to finance these projects and all costs incidental thereto.  Bonds authorized in this section may be sold at such price as the state finance committee shall determine.  No bonds authorized in this section may be offered for sale without prior legislative appropriation of the net proceeds of the sale of the bonds.

NEW SECTION.  Sec. 2.  (1) The proceeds from the sale of bonds authorized in section 1 of this act shall be deposited in the state building construction account created by RCW 43.83.020.  The proceeds shall be transferred as follows:

      (a) One billion six hundred seventy million six hundred eighty-five thousand dollars to remain in the state building construction account created by RCW 43.83.020;

      (b) Twenty-five million five hundred thousand dollars to the outdoor recreation account created by RCW 79A.25.060;

      (c) Twenty-five million five hundred thousand dollars to the habitat conservation account created by RCW 79A.15.020;

      (d) Eight million five hundred thousand dollars to the riparian protection account created by RCW 79A.15.120;

      (e) Five million five hundred thousand dollars to the farmlands preservation account created by RCW 79A.15.130;

      (f) Two hundred seventy-nine million five hundred thousand dollars to the state taxable building construction account.  All receipts from taxable bond issues are to be deposited into the account.  If the state finance committee deems it necessary or advantageous to issue more than the amount specified in this subsection (1)(f) as taxable bonds in order to comply with federal internal revenue service rules and regulations pertaining to the use of nontaxable bond proceeds or in order to reduce the total financing costs for bonds issued, the proceeds of such additional taxable bonds shall be transferred to the state taxable building construction account in lieu of any transfer otherwise provided by this section.  If the state finance committee determines that a portion of the amount specified in this subsection (1)(f) as taxable bonds may be issued as nontaxable bonds in compliance with federal internal revenue service rules and regulations pertaining to the use of nontaxable bond proceeds, then such bond proceeds shall be transferred to the state building construction account in lieu of the transfer to the state taxable building construction account otherwise provided by this subsection (1)(f).  The state treasurer shall submit written notice to the director of financial management if it is determined that any such additional transfer to the state taxable building construction account is necessary.  Moneys in the account may be spent only after appropriation.

      (2) These proceeds shall be used exclusively for the purposes specified in this section and for the payment of expenses incurred in the issuance and sale of the bonds issued for the purposes of this section, and shall be administered by the office of financial management subject to legislative appropriation.

NEW SECTION.  Sec. 3.  (1) The debt-limit general fund bond retirement account shall be used for the payment of the principal of and interest on the bonds authorized in section 2(1) (a) through (f) of this act.

      (2) The state finance committee shall, on or before June 30th of each year, certify to the state treasurer the amount needed in the ensuing twelve months to meet the bond retirement and interest requirements on the bonds authorized in section 2(1) (a) through (f) of this act.

      (3) On each date on which any interest or principal and interest payment is due on bonds issued for the purposes of section 2(1) (a) through (f) of this act the state treasurer shall withdraw from any general state revenues received in the state treasury and deposit in the debt-limit general fund bond retirement account an amount equal to the amount certified by the state finance committee to be due on the payment date.

NEW SECTION.  Sec. 4.  (1) Bonds issued under sections 1 through 3 of this act shall state that they are a general obligation of the state of Washington, shall pledge the full faith and credit of the state to the payment of the principal thereof and the interest thereon, and shall contain an unconditional promise to pay the principal and interest as the same shall become due.

      (2) The owner and holder of each of the bonds or the trustee for the owner and holder of any of the bonds may by mandamus or other appropriate proceeding require the transfer and payment of funds as directed in this section.

NEW SECTION.  Sec. 5.  The legislature may provide additional means for raising moneys for the payment of the principal of and interest on the bonds authorized in section 1 of this act, and sections 2 and 3 of this act shall not be deemed to provide an exclusive method for the payment.

Sec. 6.  RCW 43.99G.162 and 2006 c 167 s 203 are each amended to read as follows:

      The proceeds from the sale of the bonds authorized in RCW 43.99G.160 shall be deposited in the Columbia river basin water supply development account created in chapter 6, Laws of 2006.  If the state finance committee deems it necessary to issue the bonds authorized in RCW 43.99G.160 as taxable bonds in order to comply with federal internal revenue service rules and regulations pertaining to the use of nontaxable bond proceeds, the proceeds of such taxable bonds shall be transferred to the ((state taxable building construction)) Columbia river basin taxable bond water supply development account in lieu of any deposit otherwise provided by this section.  The state treasurer shall submit written notice to the director of financial management if it is determined that any such transfer to the ((state taxable building construction)) Columbia river basin taxable bond water supply development account is necessary.  Moneys in the account may be spent only after appropriation.  The proceeds shall be used exclusively for the purposes specified in RCW 43.99G.160 and for the payment of expenses incurred in the issuance and sale of the bonds.  These proceeds shall be administered by the office of financial management, subject to legislative appropriation.

NEW SECTION.  Sec. 7.  Sections 1 through 5 of this act constitute a new chapter in Title 43 RCW.

NEW SECTION.  Sec. 8.  If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected.

NEW SECTION.  Sec. 9.  This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately."

      Senators Honeyford and Nelson spoke in favor of adoption of the striking amendment.

 

The President declared the question before the Senate to be the adoption of the striking amendment by Senator Honeyford and others to Substitute Senate Bill No. 5036.

The motion by Senator Honeyford carried and the striking amendment was adopted by voice vote.

 

MOTION

 

There being no objection, the following title amendment was adopted:

      On page 1, line 2 of the title, after "accounts;" strike the remainder of the title and insert "amending RCW 43.99G.162; adding a new chapter to Title 43 RCW; and declaring an emergency."

 

MOTION

 

On motion of Senator Honeyford, the rules were suspended, Engrossed Substitute Senate Bill No. 5036 was advanced to third reading, the second reading considered the third and the bill was placed on final passage.

      Senator Honeyford spoke in favor of passage of the bill.

 

      The President declared the question before the Senate to be the final passage of Engrossed Substitute Senate Bill No. 5036.

 

ROLL CALL

 

      The Secretary called the roll on the final passage of Engrossed Substitute Senate Bill No. 5036 and the bill passed the Senate by the following vote: Yeas, 46; Nays, 1; Absent, 0; Excused, 2.

      Voting yea: Senators Bailey, Baumgartner, Becker, Benton, Billig, Braun, Brown, Chase, Cleveland, Conway, Dammeier, Darneille, Eide, Ericksen, Fain, Fraser, Frockt, Hargrove, Harper, Hasegawa, Hatfield, Hewitt, Hill, Hobbs, Holmquist Newbry, Honeyford, Keiser, King, Litzow, McAuliffe, Murray, Nelson, O'Ban, Padden, Parlette, Pearson, Ranker, Rivers, Roach, Rolfes, Schlicher, Schoesler, Sheldon, Shin, Smith and Tom

      Voting nay: Senator Kohl-Welles

      Excused: Senators Kline and Mullet

ENGROSSED SUBSTITUTE SENATE BILL NO. 5036, having received the constitutional majority, was declared passed. There being no objection, the title of the bill was ordered to stand as the title of the act.

 

SIGNED BY THE PRESIDENT

 

Pursuant to Article 2, Section 32 of the State Constitution and Senate Rule 1(5), the President announced the signing of and thereupon did sign in open session:

SECOND SUBSTITUTE SENATE BILL NO. 5367,

ENGROSSED SUBSTITUTE SENATE BILL NO. 5644.

 

SIGNED BY THE PRESIDENT

 

Pursuant to Article 2, Section 32 of the State Constitution and Senate Rule 1(5), the President announced the signing of and thereupon did sign in open session:

ENGROSSED HOUSE BILL NO. 1450,

ENGROSSED SECOND SUBSTITUTE HOUSE BILL NO. 1872,

ENGROSSED SUBSTITUTE HOUSE BILL NO. 1947,

SECOND ENGROSSED SECOND SUBSTITUTE HOUSE BILL NO. 1971,

HOUSE BILL NO. 2043,

HOUSE BILL NO. 2044,

ENGROSSED SUBSTITUTE HOUSE BILL NO. 2051,

SUBSTITUTE HOUSE BILL NO. 2069,

HOUSE BILL NO. 2079.

 

MOTION

 

On motion of Senator Fain, Engrossed Substitute Senate Bill No. 5036 was immediately transmitted to the House of Representatives.

 

SECOND READING

 

SENATE BILL NO. 5035, by Senators Honeyford, Nelson and Shin

 

Adopting the 2013-2015 capital budget.

 

MOTION

 

On motion of Senator Honeyford, Substitute Senate Bill No. 5035 was substituted for Senate Bill No. 5035 and the substitute bill was placed on the second reading and read the second time.

 

MOTION

 

Senator Honeyford moved that the following striking amendment by Senator Honeyford and others be adopted:

0.Strike everything after the enacting clause and insert the following:

"NEW SECTION.  Sec. 1.  (1) A capital budget is hereby adopted and, subject to the provisions set forth in this act, the several dollar amounts hereinafter specified, or so much thereof as shall be sufficient to accomplish the purposes designated, are hereby appropriated and authorized to be incurred for capital projects during the period beginning with the effective date of this act and ending June 30, 2015, out of the several funds specified in this act.

      (2) The definitions in this subsection apply throughout this act unless the context clearly requires otherwise.

      (a) "Fiscal year 2014" or "FY 2014" means the period beginning July 1, 2013, and ending June 30, 2014.

      (b) "Fiscal year 2015" or "FY 2015" means the period beginning July 1, 2014, and ending June 30, 2015.

      (c) "Lapse" or "revert" means the amount shall return to an unappropriated status.

      (d) "Provided solely" means the specified amount may be spent only for the specified purpose.

      (3) Unless otherwise specifically authorized in this act, any portion of an amount provided solely for a specified purpose that is not expended subject to the specified conditions and limitations to fulfill the specified purpose shall lapse.

      (4) The amounts shown under the headings "Prior Biennia," "Future Biennia," and "Total" in this act are for informational purposes only and do not constitute legislative approval of these amounts.  "Prior biennia" typically refers to the immediate prior biennium for reappropriations, but may refer to multiple biennia in the case of specific projects.  A "future biennia" amount is an estimate of what may be appropriated for the project or program in the 2015-2017 biennium and the following three biennia; an amount of zero does not necessarily constitute legislative intent to not provide funding for the project or program in the future.

      (5) "Reappropriations" in this act are appropriations and, unless the context clearly provides otherwise, are subject to the relevant conditions and limitations applicable to appropriations.  Reappropriations shall be limited to the unexpended balances remaining on June 30, 2013, from the 2011-2013 biennial appropriations for each project.

 

PART 1
GENERAL GOVERNMENT

 

NEW SECTION.  Sec. 1001.  FOR THE JOINT LEGISLATIVE AUDIT AND REVIEW COMMITTEE

      Review of Public Lands (92000002)

      The appropriation in this section is subject to the following conditions and limitation:  The appropriation is provided solely for a three part study of public recreation and habitat lands.  Parts two and three of the study must be conducted under contract with a qualified economist at one of Washington's public universities.

      (1) Part one of the study is a review of the operating budget impacts of recreation and habitat land acquisitions by the departments of fish and wildlife, natural resources, and by the state parks and recreation commission over the past ten years.  The review must describe the separate acquisitions by each agency, including the location, number of acres, the acquisition price, a general description of the land, the intended use of the land at the time of acquisition, and the source or sources of funding for the acquisition.  The report must also identify the current use of the land and whether the current use matches the intended use at the time of acquisition.  The review must estimate the current biennial operating budget costs to manage the land acquired and what the estimated capital and operating budget costs are to put the land to its intended use if that has not yet occurred.

      (2) Part two of the study is a review of estimated economic benefits and costs from acquisitions of recreation and habitat lands.  The study must review and summarize the available literature describing and quantifying the economic benefits and costs of public recreation and habitat lands.  The study must evaluate the reliability and validity of measures used by federal and state agencies to estimate the economic benefits of recreation and habitat lands.

      (3) Part three of the study is an analysis of differences in public land ownership among Washington's thirty-nine counties.  The analysis must report the number of acres and percentage of total acres in each county owned by federal, state, tribal and local governmental agencies by the following categories:

      (a) Developed recreation land,

      (b) Habitat and passive recreation land,

      (c) Timber lands,

      (d) Agricultural lands, and

      (e) Other public lands.

      The analysis must evaluate the hypothesis that higher amounts or percentages of acres of public lands in the categories above are detrimental to measures of economic vitality in the county.  Measures of economic vitality should include taxable sales per capita, median household income, median per capita income, annual employment growth, and unemployment rate.  The study should control for other relevant location related factors including elevation, population size and density, urban or rural status, and proximity to major transportation hubs such as commercial airports and seaports.  The study should include a review and compilation of literature and studies on this topic.

      (4) The report must be submitted to the appropriate policy and fiscal committees of the legislature by December 1, 2014.

Appropriation:

      State Building Construction Account—State ........... $320,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $320,000

NEW SECTION.  Sec. 1002.  FOR THE OFFICE OF THE SECRETARY OF STATE

      Archives Facilities Mechanical Systems Chiller Replacement (30000003)

Appropriation:

      State Building Construction Account--State............... $128,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $128,000

NEW SECTION.  Sec. 1003.  FOR THE OFFICE OF THE SECRETARY OF STATE

      Office of Financial Management Emergency Funds (30000027)

Reappropriation:

      State Building Construction Account--State................. $28,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL................................................................ $28,000

NEW SECTION.  Sec. 1004.  FOR THE DEPARTMENT OF COMMERCE

      Rural Washington Loan Fund (19882002)

Reappropriation:

      Rural Washington Loan Account--State.................... $105,000

      Prior Biennia (Expenditures)................................. $13,260,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $13,365,000

NEW SECTION.  Sec. 1005.  FOR THE DEPARTMENT OF COMMERCE

      Local and Community Projects (20064008)

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The reappropriation is subject to the provisions in section 131, chapter 488, Laws of 2005.

      (2) Except as directed otherwise prior to the effective date of this section, the department shall not expend the reappropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.  This requirement does not apply to projects where a share of the reappropriation is released for design costs only.

Reappropriation:

      State Building Construction Account--State............... $692,000

      Prior Biennia (Expenditures)................................. $45,210,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $45,902,000

NEW SECTION.  Sec. 1006.  FOR THE DEPARTMENT OF COMMERCE

      Rural Washington Loan Fund (20064010)

Reappropriation:

      Rural Washington Loan Account--State.................. $2,656,000

      Prior Biennia (Expenditures)................................... $1,471,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,127,000

NEW SECTION.  Sec. 1007.  FOR THE DEPARTMENT OF COMMERCE

      Job and Economic Development Grants (20064950)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 107, chapter 371, Laws of 2006.

Reappropriation:

      State Building Construction Account--State............ $1,406,000

      Prior Biennia (Expenditures)................................. $45,051,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $46,457,000

NEW SECTION.  Sec. 1008.  FOR THE DEPARTMENT OF COMMERCE

      Jobs in Communities (20064951)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 140, chapter 488, Laws of 2005.

Reappropriation:

      State Building Construction Account--State............ $1,428,000

      Prior Biennia (Expenditures)................................. $10,822,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $12,250,000

NEW SECTION.  Sec. 1009.  FOR THE DEPARTMENT OF COMMERCE

      Drinking Water Assistance Program (20074004)

Reappropriation:

      Drinking Water Assistance Repayment Account--State............

             ...................................................................... $15,693,000

      Prior Biennia (Expenditures)................................. $18,347,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $34,040,000

NEW SECTION.  Sec. 1010.  FOR THE DEPARTMENT OF COMMERCE

      Public Works Trust Fund (20074005)

Reappropriation:

      Public Works Assistance Account--State.............. $32,000,000

      Prior Biennia (Expenditures)............................... $295,000,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL........................................................ $327,000,000

NEW SECTION.  Sec. 1011.  FOR THE DEPARTMENT OF COMMERCE

      Rural Washington Loan Fund (20074008)

Reappropriation:

      Rural Washington Loan Account--State.................. $1,751,000

      Prior Biennia (Expenditures)..................................... $276,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,027,000

NEW SECTION.  Sec. 1012.  FOR THE DEPARTMENT OF COMMERCE

      Housing Assistance, Weatherization, and Affordable Housing (20074009)

Reappropriation:

      State Taxable Building Construction Account--State $4,434,000

      Prior Biennia (Expenditures)............................... $195,566,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL........................................................ $200,000,000

NEW SECTION.  Sec. 1013.  FOR THE DEPARTMENT OF COMMERCE

      Job Development Fund Grants (20074010)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1032, chapter 520, Laws of 2007 and section 1005, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:

      State Building Construction Account--State............ $4,061,000

      Prior Biennia (Expenditures)................................. $44,869,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $48,930,000

NEW SECTION.  Sec. 1014.  FOR THE DEPARTMENT OF COMMERCE

      Longview Regional Water Treatment Plant Dredging (20081001)

Reappropriation:

      State Building Construction Account--State................. $24,000

      Prior Biennia (Expenditures)..................................... $126,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $150,000

NEW SECTION.  Sec. 1015.  FOR THE DEPARTMENT OF COMMERCE

      Local and Community Projects (20084001)

      The reappropriation in this section is subject to the following conditions and limitations:  Except as directed otherwise prior to the effective date of this section, the department shall not expend the reappropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.  This requirement does not apply to projects where a share of the reappropriation is released for design costs only. 

Reappropriation:

      State Building Construction Account--State............... $750,000

      Prior Biennia (Expenditures)............................... $124,394,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL........................................................ $125,144,000

NEW SECTION.  Sec. 1016.  FOR THE DEPARTMENT OF COMMERCE

      Innovation Partnership Zones (20082003)

Reappropriation:

      State Building Construction Account--State................. $42,000

      Prior Biennia (Expenditures)................................... $4,958,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,000,000

NEW SECTION.  Sec. 1017.  FOR THE DEPARTMENT OF COMMERCE

      Community Development Fund (20084850)

Reappropriation:

      State Building Construction Account--State............ $1,410,000

      Prior Biennia (Expenditures)................................. $19,506,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $20,916,000

NEW SECTION.  Sec. 1018.  FOR THE DEPARTMENT OF COMMERCE

      Belfair Sewer Improvements (20084852)

Reappropriation:

      State Building Construction Account--State............... $506,000

      Prior Biennia (Expenditures)................................... $9,794,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $10,300,000

NEW SECTION.  Sec. 1019.  FOR THE DEPARTMENT OF COMMERCE

      2008 Local and Community Projects (20084861)

      The reappropriation in this section is subject to the following conditions and limitations:  Except as directed otherwise prior to the effective date of this section, the department shall not expend the reappropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.  This requirement does not apply to projects where a share of the reappropriation is released for design costs only.

Reappropriation:

      State Building Construction Account--State............ $1,535,000

      Prior Biennia (Expenditures)................................. $16,209,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $17,744,000

NEW SECTION.  Sec. 1020.  FOR THE DEPARTMENT OF COMMERCE

      Drinking Water State Revolving Fund Loan Program (30000005)

Reappropriation:

      Drinking Water Assistance Account--State........... $10,233,000

      Drinking Water Assistance Repayment Account--State............

             ...................................................................... $31,201,000

             Subtotal Reappropriation................................ $41,434,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $41,434,000

NEW SECTION.  Sec. 1021.  FOR THE DEPARTMENT OF COMMERCE

      Community Economic Revitalization Board (30000010)

Reappropriation:

      Public Facility Construction Loan Revolving

             Account--State................................................. $5,076,000

      Prior Biennia (Expenditures)................................... $1,177,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $6,253,000

NEW SECTION.  Sec. 1022.  FOR THE DEPARTMENT OF COMMERCE

      Innovation Partnership Zones (30000012)

Reappropriation:

      State Building Construction Account--State............... $750,000

      Prior Biennia (Expenditures)..................................... $750,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,500,000

NEW SECTION.  Sec. 1023.  FOR THE DEPARTMENT OF COMMERCE

      Housing Assistance, Weatherization, and Affordable Housing (30000013)

Reappropriation:

      State Building Construction Account--State............ $1,964,000

      Washington Housing Trust Account--State................ $751,000

             Subtotal Reappropriation.................................. $2,715,000

      Prior Biennia (Expenditures)............................... $127,285,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL........................................................ $130,000,000

NEW SECTION.  Sec. 1024.  FOR THE DEPARTMENT OF COMMERCE

      Local and Community Projects (30000019)

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The projects must comply with RCW 43.63A.125 and other requirements for community projects administered by the department.

      (2) Except as directed otherwise prior to the effective date of this section, the department shall not expend the reappropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.  This requirement does not apply to projects where a share of the reappropriation is released for design costs only.

Reappropriation:

      State Building Construction Account--State............... $556,000

      Prior Biennia (Expenditures)................................. $19,589,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $20,145,000

NEW SECTION.  Sec. 1025.  FOR THE DEPARTMENT OF COMMERCE

      2010 Local and Community Projects (30000082)

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The projects must comply with RCW 43.63A.125 and other requirements for community projects administered by the department.

      (2) Except as directed otherwise prior to the effective date of this section, the department shall not expend the reappropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.  This requirement does not apply to projects where a share of the reappropriation is released for design costs only.

Reappropriation:

      State Building Construction Account--State............ $3,961,000

      Prior Biennia (Expenditures)................................. $10,169,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $14,130,000

NEW SECTION.  Sec. 1026.  FOR THE DEPARTMENT OF COMMERCE

      Community Schools (91000002)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1013, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:

      State Building Construction Account--State............... $150,000

      Prior Biennia (Expenditures)................................... $6,350,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $6,500,000

NEW SECTION.  Sec. 1027.  FOR THE DEPARTMENT OF COMMERCE

      Temporary Public Works Grant Program (92000021)

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations in this section are subject to the provisions of section 6001, chapter 49, Laws of 2011 1st sp. sess.

Reappropriation:

      State Building Construction Account--State............ $1,049,000

      State Taxable Building Construction Account--State... $69,000

             Subtotal Reappropriation.................................. $1,118,000

      Prior Biennia (Expenditures)................................. $40,252,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $41,370,000

NEW SECTION.  Sec. 1028.  FOR THE DEPARTMENT OF COMMERCE

      Jobs Act for K-12 Public Schools and Higher Education Institutions (91000085)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1016, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:

      State Building Construction Account--State............ $3,643,000

      Prior Biennia (Expenditures)................................. $41,166,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $44,809,000

NEW SECTION.  Sec. 1029.  FOR THE DEPARTMENT OF COMMERCE

      Community Economic Revitalization Board - Export Assistance Grants and Loans (92000069)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1018, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:

      Public Facility Construction Loan Revolving

             Account--State.................................................... $601,000

      Prior Biennia (Expenditures)................................... $2,399,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,000,000

NEW SECTION.  Sec. 1030.  FOR THE DEPARTMENT OF COMMERCE

      Drinking Water State Revolving Fund Loan Program (30000095)

      The reappropriations in this section are subject to the following conditions and limitations:  For projects involving repair, replacement, or improvement of a clean water infrastructure facility or other public works facility for which an investment grade efficiency audit is obtainable, the public works board must require as a contract condition that the project sponsor undertake an investment grade efficiency audit.  The project sponsor may finance the costs of the audit as part of its drinking water state revolving fund program loan.

Reappropriation:

      Drinking Water Assistance Repayment Account--State............

             ...................................................................... $92,000,000

      Drinking Water Assistance Account--State........... $16,000,000

             Subtotal Reappropriation.............................. $108,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL........................................................ $108,000,000

NEW SECTION.  Sec. 1031.  FOR THE DEPARTMENT OF COMMERCE

      Community Economic Revitalization Board (30000097)

Reappropriation:

      Public Facility Construction Loan Revolving

             Account--State................................................. $5,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,000,000

NEW SECTION.  Sec. 1032.  FOR THE DEPARTMENT OF COMMERCE

      Housing Assistance, Weatherization, Affordable Housing Trust Fund (30000098)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1026, chapter 49, Laws of 2011 1st sp. sess.

Reappropriation:

      State Taxable Building Construction Account--State................

             ...................................................................... $28,332,000

      Prior Biennia (Expenditures)................................. $21,668,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $50,000,000

NEW SECTION.  Sec. 1033.  FOR THE DEPARTMENT OF COMMERCE

      Youth Recreational Facilities Grants (30000100)

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The reappropriation is subject to the provisions of section 1029, chapter 49, Laws of 2011 1st sp. sess.

      (2) Except as directed otherwise prior to the effective date of this section, the department shall not expend the reappropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.  This requirement does not apply to projects where a share of the reappropriation is released for design costs only.

Reappropriation:

      State Building Construction Account--State............ $1,554,000

      Prior Biennia (Expenditures)................................... $2,699,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,253,000

NEW SECTION.  Sec. 1034.  FOR THE DEPARTMENT OF COMMERCE

      Building for the Arts Grants (30000101)

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The reappropriation is subject to the provisions of section 1030, chapter 49, Laws of 2011 1st sp. sess.

      (2) Except as directed otherwise prior to the effective date of this section, the department shall not expend the reappropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.  This requirement does not apply to projects where a share of the reappropriation is released for design costs only.

Reappropriation:

      State Building Construction Account--State............ $1,137,000

      Prior Biennia (Expenditures)................................... $1,325,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,462,000

NEW SECTION.  Sec. 1035.  FOR THE DEPARTMENT OF COMMERCE

      Building Communities Fund Grants (30000102)

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The reappropriation is subject to the provisions of section 1027, chapter 49, Laws of 2011 1st sp. sess.

      (2) Except as directed otherwise prior to the effective date of this section, the department shall not expend the reappropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.  This requirement does not apply to projects where a share of the reappropriation is released for design costs only.

Reappropriation:

      State Building Construction Account--State............ $3,727,000

      Prior Biennia (Expenditures)................................... $9,676,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $13,403,000

NEW SECTION.  Sec. 1036.  FOR THE DEPARTMENT OF COMMERCE

      Public Works Assistance Account Program (30000103)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1021, chapter 48, Laws of 2011 1st sp. sess.

Reappropriation:

      Public Works Assistance Account--State............ $213,483,000

      Prior Biennia (Expenditures)................................... $8,329,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL........................................................ $221,812,000

NEW SECTION.  Sec. 1037.  FOR THE DEPARTMENT OF COMMERCE

      Local and Community Projects (30000166)

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The reappropriation is subject to the provisions of section 1002, chapter 2, Laws of 2012 2nd sp. sess.

      (2) Except as directed otherwise prior to the effective date of this section, the department shall not expend the reappropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.  This requirement does not apply to projects where a share of the reappropriation is released for design costs only.

Reappropriation:

      State Building Construction Account--State............ $8,541,000

      Prior Biennia (Expenditures)................................... $8,276,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $16,817,000

NEW SECTION.  Sec. 1038.  FOR THE DEPARTMENT OF COMMERCE

      Clean Energy Partnership (30000175)

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The reappropriation is provided solely for implementation of the recommendations of the clean energy leadership council by providing state matching funds for projects that:

      (a) Integrate energy efficiency and renewable energy in buildings;

      (b) Integrate renewable energy into the regional electrical grid;

      (c) Advance bioenergy in the state.

      (2) State funding must not exceed fifty percent of the total program or project funds.

      (3) Eligible projects must:

      (a) Involve a majority of companies that are located in Washington state;

      (b) Represent a substantially new solution that is not widely available today; and

      (c) Be designed to generate solutions that are applicable both inside and outside of the state.

Reappropriation:

      Public Facility Construction Loan Revolving

             Account--State................................................. $5,499,000

      Prior Biennia (Expenditures)......................................... $1,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,500,000

NEW SECTION.  Sec. 1039.  FOR THE DEPARTMENT OF COMMERCE

      Financing Energy/Water Efficiency (30000180)

Reappropriation:

      Public Works Assistance Account--State................ $4,927,000

      Prior Biennia (Expenditures)....................................... $73,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,000,000

NEW SECTION.  Sec. 1040.  FOR THE DEPARTMENT OF COMMERCE

      Public Works Assistance Account Program 2013 Loan List (30000184)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is provided solely for the list of projects in LEAP capital document No. 2012-1B, developed February 18, 2012.

Reappropriation:

      Public Works Assistance Account--State............ $152,781,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL........................................................ $152,781,000

NEW SECTION.  Sec. 1041.  FOR THE DEPARTMENT OF COMMERCE

      Energy Efficiency Grants for Local Governments (91000241)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 301, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

      State Building Construction Account--State.......... $17,797,000

      Prior Biennia (Expenditures)..................................... $203,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $18,000,000

NEW SECTION.  Sec. 1042.  FOR THE DEPARTMENT OF COMMERCE

      Energy Efficiency Grants for Higher Education (91000242)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 307, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

      State Building Construction Account--State.......... $19,910,000

      Prior Biennia (Expenditures)....................................... $90,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $20,000,000

NEW SECTION.  Sec. 1043.  FOR THE DEPARTMENT OF COMMERCE

      Weatherization (91000247)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1015, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:

      State Taxable Building Construction Account--State................

             ...................................................................... $20,534,000

      Prior Biennia (Expenditures)................................... $4,466,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $25,000,000

NEW SECTION.  Sec. 1044.  FOR THE DEPARTMENT OF COMMERCE

      Connell Klindworth Water Line Distribution (91000318)

Reappropriation:

      State Building Construction Account--State................. $28,000

      Prior Biennia (Expenditures)..................................... $512,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $540,000

NEW SECTION.  Sec. 1045.  FOR THE DEPARTMENT OF COMMERCE

      Public Works Preconstruction Loan Program (91000319)

Reappropriation:

      Public Works Assistance Account--State................ $3,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,000,000

NEW SECTION.  Sec. 1046.  FOR THE DEPARTMENT OF COMMERCE

      Housing for Families with Children (91000409)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 310, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

      State Taxable Building Construction Account--State $8,250,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $8,250,000

NEW SECTION.  Sec. 1047.  FOR THE DEPARTMENT OF COMMERCE

      Housing for People with Developmental Disabilities (91000410)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1009, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:

      State Taxable Building Construction Account--State $2,900,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,900,000

NEW SECTION.  Sec. 1048.  FOR THE DEPARTMENT OF COMMERCE

      Housing for Seniors and People with Physical Disabilities (91000411)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 311, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

      State Taxable Building Construction Account--State $9,666,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $9,666,000

NEW SECTION.  Sec. 1049.  FOR THE DEPARTMENT OF COMMERCE

      Housing for People with Chronic Mental Illness (91000412)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1010, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:

      State Taxable Building Construction Account--State $1,125,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,125,000

NEW SECTION.  Sec. 1050.  FOR THE DEPARTMENT OF COMMERCE

      Housing for the Homeless (91000413)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1011, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:

      State Taxable Building Construction Account--State................

             ...................................................................... $28,944,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $28,944,000

NEW SECTION.  Sec. 1051.  FOR THE DEPARTMENT OF COMMERCE

      Housing for Farmworkers (91000414)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1012, chapter 2, Laws of 2012 2nd sp. sess.

 

Reappropriation:

      State Taxable Building Construction Account--State $6,215,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $6,215,000

NEW SECTION.  Sec. 1052.  FOR THE DEPARTMENT OF COMMERCE

      Housing for People At Risk of Homelessness (91000415)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 312, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

      State Taxable Building Construction Account--State $2,500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,500,000

NEW SECTION.  Sec. 1053.  FOR THE DEPARTMENT OF COMMERCE

      Housing for Low-Income Households (91000416)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1013, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:

      State Taxable Building Construction Account—State

             ........................................................................ $2,982,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,982,000

NEW SECTION.  Sec. 1054.  FOR THE DEPARTMENT OF COMMERCE

      2012 Local and Community Projects (91000417)

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The reappropriation is subject to the provisions of section 302, chapter 1, Laws of 2012 2nd sp. sess.

      (2) Except as directed otherwise prior to the effective date of this section, the department shall not expend the reappropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.  This requirement does not apply to projects where a share of the reappropriation is released for design costs only.

Reappropriation:

      State Building Construction Account--State............ $9,097,000

      Prior Biennia (Expenditures)..................................... $526,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $9,623,000

NEW SECTION.  Sec. 1055.  FOR THE DEPARTMENT OF COMMERCE

      Housing Competitive Pool (91000432)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 1014, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:

      State Taxable Building Construction Account--State................

             ........................................................................ $4,530,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,530,000

NEW SECTION.  Sec. 1056.  FOR THE DEPARTMENT OF COMMERCE

      Local and Community Projects 2012 (91000437)

      The reappropriations in this section are subject to the following conditions and limitations:

      (1) The reappropriations are subject to the provisions of section 1003, chapter 2, Laws of 2012 2nd sp. sess.

      (2) Except as directed otherwise prior to the effective date of this section, the department shall not expend the reappropriations in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.  This requirement does not apply to projects where a share of the reappropriation is released for design costs only.

Reappropriation:

      State Building Construction Account--State................. $31,000

      State Taxable Building Construction Account--State................

             ........................................................................ $1,800,000

             Subtotal Reappropriation.................................. $1,831,000

      Prior Biennia (Expenditures)................................... $1,004,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,835,000

NEW SECTION.  Sec. 1057.  FOR THE DEPARTMENT OF COMMERCE

      Innovation Partnership Zones - Facilities and Infrastructure (92000089)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 309, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

      State Building Construction Account--State.......... $13,177,000

      Prior Biennia (Expenditures)..................................... $343,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $13,520,000

NEW SECTION.  Sec. 1058.  FOR THE DEPARTMENT OF COMMERCE

      Community Economic Revitalization Board Administered Economic Development, Innovation, and Export Grants (92000096)

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations are subject to the provisions of section 304, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

      State Building Construction Account--State.......... $14,891,000

      Public Works Assistance Account--State.............. $15,836,000

             Subtotal Reappropriation................................ $30,727,000

      Prior Biennia (Expenditures)................................... $1,871,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $32,598,000

NEW SECTION.  Sec. 1059.  FOR THE DEPARTMENT OF COMMERCE

      Main Street Improvement Grants (92000098)

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations are subject to the provisions of section 305, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

      State Building Construction Account--State.......... $13,771,000

      Public Works Assistance Account--State................... $793,000

             Subtotal Reappropriation................................ $14,564,000

      Prior Biennia (Expenditures)..................................... $286,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $14,850,000

NEW SECTION.  Sec. 1060.  FOR THE DEPARTMENT OF COMMERCE

      Brownfield Redevelopment Grants (92000100)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation in this section is provided solely for redevelopment of the Bellingham waterfront.

Reappropriation:

      Local Toxics Control Account--State...................... $1,492,000

      Prior Biennia (Expenditures)......................................... $8,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,500,000

NEW SECTION.  Sec. 1061.  FOR THE DEPARTMENT OF COMMERCE

      Port and Export Related Infrastructure (92000102)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 306, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

      State Building Construction Account--State.......... $30,222,000

      Prior Biennia (Expenditures)................................... $2,928,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $33,150,000

NEW SECTION.  Sec. 1062.  FOR THE DEPARTMENT OF COMMERCE

      Youth Recreational Facilities Grants (30000185)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation is subject to the provisions of RCW 43.63A.135.

      (2) Except as directed otherwise prior to the effective date of this section, the department shall not expend the appropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.  This requirement does not apply to projects where a share of the appropriation is released for design costs only.

      (3) The appropriation is provided solely for the following list of projects:

Camp Korey.................................................................... $303,000

Boys and Girls Clubs of Bellevue.................................... $388,000       

Boys and Girls Clubs of King county............................... $140,000

Boys and Girls Clubs of Skagit county............................. $100,000

YMCA of Greater Seattle................................................ $800,000

Boys and Girls Clubs of Southwest Washington.............. $800,000

Boys and Girls Clubs of South Puget Sound.................... $800,000

New Life Community Development Agency................... $800,000

      TOTAL.................................................................. $4,131,000

Appropriation:

      State Building Construction Account--State............ $4,131,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $32,000,000

             TOTAL.......................................................... $36,131,000

NEW SECTION.  Sec. 1063.  FOR THE DEPARTMENT OF COMMERCE

      Building for the Arts Grants (30000186)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation is subject to the provisions of RCW 43.63A.750.

      (2) Except as directed otherwise prior to the effective date of this section, the department shall not expend the appropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.  This requirement does not apply to projects where a share of the appropriation is released for design costs only.

      (3) The appropriation is provided solely for the following list of projects:

Washington Center for the Performing Arts..................... $816,000

Tacoma Art Museum.................................................... $2,000,000

Coyote Central................................................................. $115,000

Icicle Creek Center for the Arts..................................... $1,052,000

Capitol Hill Housing Foundation..................................... $565,000

Bellevue Youth Theatre Foundation................................. $199,000

Broadway Center for the Performing Arts..................... $1,300,000

Capitol Theatre Committee.............................................. $833,000

Bainbridge Island Museum of Art................................. $1,750,000

Tacoma Musical Playhouse............................................. $240,000

Spokane Public Radio................................................... $1,000,000

Stageworks Northwest..................................................... $334,000

      TOTAL................................................................ $10,204,000

Appropriation:

      State Building Construction Account--State.......... $10,204,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $48,000,000

             TOTAL.......................................................... $58,204,000

NEW SECTION.  Sec. 1064.  FOR THE DEPARTMENT OF COMMERCE

      Housing for Homeless Veterans (91000455)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation in this section is provided for the ranked list of projects in the category "Housing for Homeless Veterans" in LEAP capital document No. 2013-1A, developed April 10, 2013.  The department shall evaluate projects on the LEAP list and allocate the funding based on the requirements of RCW 43.185.050 and 43.185.070.  Upon review of a completed application, if the department determines that a project is not eligible or is not ready to proceed, the department may reallocate the funding to the highest ranking project on the alternate list in LEAP capital document No. 2013-1A, developed April 10, 2013.  The department shall, at its discretion, determine the actual amount of funding to be allocated to each project, provided that the total allocation does not exceed the appropriation provided in this section.

Appropriation:

      State Taxable Building Construction

             Account--State................................................. $9,367,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $9,367,000

NEW SECTION.  Sec. 1065.  FOR THE DEPARTMENT OF COMMERCE

      Housing for Farmworkers (91000457)

      The appropriation in this section is subject to the following conditions and limitations:

      The appropriation in this section is provided for the ranked list of projects in the category "Housing for Farmworkers" in LEAP capital document No. 2013-1A, developed April 10, 2013.  The department shall evaluate projects on the LEAP list and allocate the funding based on the requirements of RCW 43.185.050 and 43.185.070.  Upon review of a completed application, if the department determines that a project is not eligible or is not ready to proceed, the department may reallocate the funding to the highest ranking project on the alternate list in LEAP capital document No. 2013-1A, developed April 10, 2013.  The department shall, at its discretion, determine the actual amount of funding to be allocated to each project, provided that the total allocation does not exceed the appropriation provided in this section.

Appropriation:

      State Taxable Building Construction

             Account--State............................................... $27,050,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $27,050,000

NEW SECTION.  Sec. 1066.  FOR THE DEPARTMENT OF COMMERCE

      Housing for People with Developmental Disabilities (91000458)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation in this section is provided for the ranked list of projects in the category "Housing for People with Developmental Disabilities" in LEAP capital document No. 2013-1A, developed April 10, 2013.  The department shall evaluate projects on the LEAP list and allocate the funding based on the requirements of RCW 43.185.050 and 43.185.070.  Upon review of a completed application, if the department determines that a project is not eligible or is not ready to proceed, the department may reallocate the funding to the highest ranking project on the alternate list in LEAP capital document No. 2013-1A, developed April 10, 2013.  The department shall, at its discretion, determine the actual amount of funding to be allocated to each project, provided that the total allocation does not exceed the appropriation provided in this section.

Appropriation:

      State Taxable Building Construction

             Account--State................................................. $9,019,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $9,019,000

NEW SECTION.  Sec. 1067.  FOR THE DEPARTMENT OF COMMERCE

      Housing for People with Chronic Mental Illness (91000459)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation in this section is provided for the ranked list of projects in the category "Housing for People with Chronic Mental Illness" in LEAP capital document No. 2013- 1A, developed April 10, 2013.  The department shall evaluate projects on the LEAP list and allocate the funding based on the requirements of RCW 43.185.050 and 43.185.070.  Upon review of a completed application, if the department determines that a project is not eligible or is not ready to proceed, the department may reallocate the funding to the highest ranking project on the alternate list in LEAP capital document No. 2013-1A, developed April 10, 2013.  The department shall, at its discretion, determine the actual amount of funding to be allocated to each project, provided that the total allocation does not exceed the appropriation provided in this section.

Appropriation:

      State Taxable Building Construction

             Account--State................................................. $6,064,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $6,064,000

NEW SECTION.  Sec. 1068.  FOR THE DEPARTMENT OF COMMERCE

      Sand Point Building 9 (91000446)

      The appropriation in this section is subject to the following conditions and limitations: ....................................................................................

      (1) $10,000,000 of the appropriation in this section is provided solely for the renovation of Sand Point Building 9 into affordable housing units for low-income tenants.

      (2) Up to $4,000,000 of the appropriation in this section is for reimbursement to the University of Washington for its expenditures associated with Sand Point Building 9 for infrastructure, major repairs, operations and maintenance, staffing and development preparation.

      (3) The department may not expend the appropriation provided in this section unless and until the United States department of education and the United States department of the Navy provide the University of Washington with title to Sand Point Building 9 that is either free and clear or that, at a minimum, does not prohibit use of that property for affordable housing.  If the federal government does not provide such title by January 1, 2015, the appropriation provided in this section shall lapse.

Appropriation:

      State Taxable Building Construction

             Account--State............................................... $14,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $14,000,000

NEW SECTION.  Sec. 1069.  FOR THE DEPARTMENT OF COMMERCE

      Housing Preservation (91000448)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation in this section is provided solely for grants to local housing authorities for the purchase of the housing projects designated in this section.  The purpose of providing the grants is to assure the retention of subsidized housing for low-income tenants.

      (2) The appropriation is provided solely for the following list of projects:

 Charter House................................................................ $777,000       

Emerson Manor............................................................... $829,000

Naches House............................................................... $1,065,000

Wenatchee House......................................................... $1,173,000

Harbor Manor.................................................................. $656,000

      TOTAL.................................................................. $4,500,000

Appropriation:

      State Building Construction

             Account--State................................................. $2,000,000

      Washington Housing Trust Account--State............. $2,500,000

             Subtotal Appropriation..................................... $4,500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,500,000

NEW SECTION.  Sec. 1070.  FOR THE DEPARTMENT OF COMMERCE

      Community Economic Revitalization Board (30000190)

      The appropriation in this section is subject to the following conditions and limitations:  During the 2013-2015 fiscal biennium, the community economic revitalization board may make loans to municipalities to finance public facilities projects that will improve opportunities for revitalizing existing retail, industrial, or commercial properties located within incorporated areas.  These properties must have either been abandoned, or have more than seventy- five percent of their square footage vacant.

      (1) Municipalities include:  Cities, towns, counties, port districts, and housing authorities of this state.

      (2) Public facilities projects include:  Planning, acquisition, construction, repair, reconstruction, replacement, rehabilitation, or improvement of:  Bridges; roads; research, testing, training, and incubation facilities in areas designated as innovation partnership zones under RCW 43.330.270; buildings or structures; domestic and industrial water; earth stabilization; sanitary sewer; storm sewer; railroad; electricity; telecommunications; transportation; natural gas; and port facilities.

      (3) The board may make a revitalization loan only for a public facilities project approved by a municipality that demonstrates convincing evidence that a specific private development or expansion is ready to occur and will occur only if the public facility improvement is made.

      (4) The board may allow de minimis general system improvements to be funded if they are critically linked to the viability of the project.

      (5) An application for a revitalization loan must be made in the form and manner prescribed by the board.  When evaluating and prioritizing projects, the board must give consideration, at a minimum, to the following factors:

      (a) The project's value to the community, including evidence of support from affected local businesses and government;

      (b) The project's feasibility, using standard economic principles;

      (c) Commitment of local matching resources and local participation;

      (d) The project's inclusion in a capital facilities plan, comprehensive plan, or local economic development plan consistent with applicable state planning requirements;

      (e) Whether the proposed project offers a health insurance plan for employees that includes an option for dependents of employees; and

      (f) The project's readiness to proceed.

      (6) In making revitalization loans, the board must conform to the following requirements:

      (a) The board must provide reasonable terms and conditions for repayment for loans;

      (b) The board must not make loans that exceed twenty years in duration;

      (c) A municipality must begin repayment of a loan five years after receiving it; and

      (d) One or a combination of loans made to a municipality for a specific project must not exceed two million dollars.

      (7) The board must not provide financing for any public facilities project that:

      (a) Has the primary purpose of facilitating or promoting a retail shopping development with a floor exceeding ten thousand square feet;

      (b) Will result in a development or expansion that would displace existing jobs in any other community in the state;

      (c) Has the primary purpose of facilitating or promoting gambling;

      (d) Is located outside the jurisdiction of the applicant; or

      (e) Will result in a development or expansion of a professional sports arena.

Appropriation:

      Public Facility Construction Loan Revolving

             Account--State................................................. $9,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $36,000,000

             TOTAL.......................................................... $45,000,000

NEW SECTION.  Sec. 1071.  FOR THE DEPARTMENT OF COMMERCE

      Mental Health Beds (91000447)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation in this section is provided solely for the department of commerce, in collaboration with the department of social and health services, to issue grants to hospitals or other entities to establish new community hospital inpatient psychiatric beds, free-standing evaluation and treatment facilities, enhanced services facilities, triage facilities, or crisis stabilization facilities with sixteen or fewer beds for the purpose of providing short term detention services through the publicly funded mental health system.  Funds may be used for construction and equipment costs associated with establishment of the community hospital inpatient psychiatric beds, free-standing evaluation and treatment facilities, enhanced services facilities, triage facilities, or crisis stabilization facilities.  These funds shall not be used for operating costs associated with the treatment of patients using these services.  The department shall establish criteria for the issuance of grants and priority shall be given to those proposals to establish new community hospital inpatient psychiatric beds or free-standing evaluation and treatment facilities.  The criteria shall include:

      (1) Evidence that the application was developed in collaboration with one or more regional support networks, as defined in RCW 71.24.025;

      (2) Evidence that the applicant has assessed and would meet gaps in geographical access to short term detention services under chapter 71.05 RCW in their region;

      (3) A commitment by applicants to serve persons who are publicly funded and persons detained under the involuntary treatment act at chapter 71.05 RCW;

      (4) Evidence of capacity of the applicant to serve individuals with medical and psychiatric comorbidities;

      (5) A commitment by the applicant to maintain the beds or facility for at least a ten year period;

      (6) The date upon which structural modifications or construction would begin and the anticipated date of completion of the project;

      (7) A detailed estimate of the costs associated with opening the beds; and

      (8) The applicant's commitment to work with local courts and prosecutors to ensure that prosecutors and courts in the area served by the hospital or facility will be available to conduct involuntary commitment hearings and proceedings under chapter 71.05 RCW.

      To accommodate the emergent need for inpatient psychiatric services, the department of health and the department of commerce, in collaboration with the department of social and health services shall establish a concurrent and expedited process for the purpose of grant applicants meeting any applicable regulatory requirements necessary to operate inpatient psychiatric beds, free-standing evaluation and treatment facilities, enhanced services facilities, triage facilities, or crisis stabilization facilities.

Appropriation:

      State Building Construction

             Account--State................................................. $5,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,000,000

NEW SECTION.  Sec. 1072.  FOR THE DEPARTMENT OF COMMERCE

      Building Communities Fund Grants (30000188)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation is subject to the provisions of RCW 43.63A.125.

      (2) Except as directed otherwise prior to the effective date of this section, the department shall not expend the appropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.  This requirement does not apply to projects where a share of the appropriation is released for design costs only.

      (3) The appropriation is provided solely for the following list of projects:

Interfaith community health center................................... $559,000

LaCrosse community pride............................................... $ 20,000

Gay city health project...................................................... $ 64,000

YWCA Pierce county...................................................... $305,000

University Heights center for the community................... $367,000

Brigit Collins family support center................................... $ 62,000

Safeplace......................................................................... $241,000

Spokane neighborhood action partners............................. $638,000

Associated ministries of Tacoma-Pierce county............... $105,000

Friends of youth............................................................... $476,000

Behavioral health resources........................................... $1,000,000

Ryther  ........................................................................... $240,000

PROVAIL....................................................................... $268,000

Vadis    $73,000

New Life CDA................................................................ $800,000

MLK FAME community center......................................... $61,000

      TOTAL.................................................................. $5,279,000

Appropriation:

      State Building Construction Account--State............ $5,279,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $40,000,000

             TOTAL.......................................................... $45,279,000

NEW SECTION.  Sec. 1073.  FOR THE DEPARTMENT OF COMMERCE

      Drinking Water State Revolving Fund Loan Program (30000189)

      The appropriations in this section are subject to the following conditions and limitations:

      (1) $4,400,000 for fiscal year 2014 and $4,400,000 for fiscal year 2015 is provided solely as state match for federal safe drinking water funds.

      (2) For projects involving repair, replacement, or improvement of a clean water infrastructure facility or other public works facility for which an investment grade efficiency audit is obtainable, the public works board must require as a contract condition that the project sponsor undertake an investment grade efficiency audit.  The project sponsor may finance the costs of the audit as part of its drinking water state revolving fund program loan.

Appropriation:

      State Building Construction Account--State............ $8,800,000

      Drinking Water Assistance Repayment Account--State............

             ..................................................................... $200,000,000

             Subtotal Appropriation................................. $208,800,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)......................... $680,000,000

             TOTAL........................................................ $888,800,000

NEW SECTION.  Sec. 1074.   FOR THE DEPARTMENT OF COMMERCE

Clean Energy and Energy Freedom Program (910000582)

      The appropriations in this section are subject to the following conditions and limitations:

      (1) All expenditures from the state taxable building construction account--state appropriation in this section must be used for projects that provide a benefit to the public through development, demonstration, and deployment of clean energy technologies that save energy and reduce energy costs, reduce harmful air emissions or otherwise increase energy independence for the state.  All expenditures must be used for projects that develop and acquire assets that have a useful life of at least thirteen years.  These requirements must be specified in funding agreements issued by the department.

      (2) For any project funded from the state taxable building construction account--state appropriation in this section, state funds must not exceed fifty percent of the estimated cost of a project, and funding preference must be provided to projects that offer a higher percentage of nonstate match funds.

      (3)(a) $15,000,000 of the state taxable building construction account--state appropriation in this section is provided solely to create a revolving loan fund to support the widespread use of proven building energy efficiency and renewable energy technologies now inhibited by lack of access to capital.

      (b) To create the loan fund, the department shall provide grant funds to a competitively selected nonprofit lender that will provide matching private capital and will administer the loan fund.  The department must select the loan fund administrator through a competitive process, with scoring conducted by a group of qualified experts, applying criteria specified by the department.

      (c) The department must establish guidelines for the lender related to applicant eligibility, the screening process, and evaluation and selection criteria.  The criteria must include requiring evidence of support for the proposed project from the impacted community and consistency with economic growth strategies and plans of the affected local governments.  Applications for loans from the revolving fund must disclose all sources of public funding to be provided for a project.  The nonprofit lender must use the revolving loan fund to make affordable loans for projects including, but not limited to:  Residential and commercial energy retrofits, residential and community- scale solar installations, anaerobic digesters to treat dairy and organic waste, and combined heat and power projects using woody biomass as a fuel source.

      (d) The department must conduct due diligence activities associated with the use of public funds, including oversight of the project selection process and project monitoring.

      (e) Projects seeking financing of solar installations under this section must agree in contract to not participate in the cost-recovery program under RCW 82.16.120.

      (4) $15,000,000 of the state taxable building construction account--state appropriation in this section is provided solely for grants to advance renewable energy technologies by public and private electrical utilities that serve retail customers in the state.  The department shall work with utilities to offer matching grants for projects that demonstrate new smart grid technologies.  The department shall develop a grant application process to competitively select projects for grant awards, to include scoring conducted by a group of qualified experts with application of criteria specified by the department.  Applications for grants must disclose all sources of public funding to be provided for a project.  The grant funds must be used to fund projects that demonstrate how to:  Integrate intermittent renewables through energy storage and information technology, dispatch energy storage resources from utility control rooms, use the thermal properties and electric load of commercial buildings and district energy systems to store energy, or otherwise improve the reliability and reduce the costs of intermittent or distributed renewable energy.

      (5) $6,000,000 of the state taxable building construction account-- state appropriation in this section is provided solely for grants to match federal funds used to develop and demonstrate clean energy technologies.  The department shall work with the University of Washington, Washington State University, and the Pacific Northwest National Laboratory to offer matching funds for projects including, but not limited to:  Advancing energy storage and solar technologies, and federal manufacturing innovation centers related to use of light-weight carbon fiber components to advance energy efficiency in the aeronautical, automotive, and marine sectors.

      (6) The department must report on number and results of projects funded through the clean energy fund, including the number of job hours created and the number of jobs maintained and created, to the governor and the legislature, by November 1, 2014.

      (7) The energy recovery act account--federal appropriation in this section is provided solely for loans, loan guarantees, and grants that encourage the establishment of innovative and sustainable industries for renewable energy and energy efficiency technology, consistent with provisions of RCW 43.325.040 (energy freedom account).

Appropriation:

      State Taxable Building Construction Account--State................

             ...................................................................... $36,000,000

      Energy Recovery Act Account--Federal................. $4,000,000

             Subtotal Appropriation................................... $40,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $40,000,000

NEW SECTION.  Sec. 1075.  FOR THE DEPARTMENT OF COMMERCE

      2013-2015 Energy Efficiency Grants (30000193)

      The appropriation in this section is subject to the following conditions and limitations:  $18,000,000 for fiscal year 2014 and $7,000,000 for fiscal year 2015 is provided solely for grants to be awarded in competitive rounds to local agencies, public higher education institutions, and state agencies for operational cost savings improvements to facilities and related projects that result in energy and operational cost savings.

      (1) At least ten percent of each competitive grant round must be awarded to small cities or towns with a population of five thousand or fewer residents.

      (2) In each competitive round, the higher the leverage ratio of non-state funding sources to state grant and the higher the energy savings, the higher the project ranking.

      (3) The department must develop rating criteria and a scoring system that provide access to at least five million dollars in energy efficiency grants for projects that involve the purchase and installation of Washington-manufactured solar energy systems, including solar modules and inverters.

Appropriation:

      State Building Construction Account--State.......... $25,000,000

 

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)......................... $240,000,000

             TOTAL........................................................ $265,000,000

NEW SECTION.  Sec. 1076.  FOR THE DEPARTMENT OF COMMERCE

      Weatherization (30000192)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) $10,000,000 of the appropriation in this section is provided solely for low-income weatherization through the energy matchmakers program.

      (2)  $10,000,000 of the appropriation in this section is provided solely for continuation of the community energy efficiency program administered by the Washington State University energy extension.

Appropriation:

      State Taxable Building Construction Account--State................

             ...................................................................... $20,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $20,000,000

             TOTAL.......................................................... $40,000,000

NEW SECTION.  Sec. 1077.  FOR THE DEPARTMENT OF COMMERCE

      Projects for Jobs and Economic Development (92000151)

      The appropriations in this section are subject to the following conditions and limitations:

      (1) Except as directed otherwise prior to the effective date of this section, the department shall not expend the appropriations in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.  This requirement does not apply to projects where a share of the appropriations are released for design costs only.

      (2) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease.  This requirement does not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.

      (3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.

      (4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.

      (5) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(6).

      (6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay state prevailing wages.

      (7) The appropriations are provided solely for the following list of projects:

Projects for Jobs & Economic Development

 

City of Bremerton Puget Sound Naval Safety Project

$1,300,000

Fairchild Airforce Base

$2,700,000

City of Lynnwood Main Street Improvements

$250,000

Port of Everett:  Roll-On/Roll-Off Cargo Berth

$1,500,000

Kittitas County Infrastructure and Facilities

$5,000,000

City of Kennewick Industrial Land

$1,000,000

Perry Tech Institute Building

$1,000,000

City of Buckley Drinking Water Improvements

$350,000

Coronado Reservoir Replacement

$525,000

Hopelink Cleveland Street Project

$1,000,000

Redmond Connector

$1,300,000

Washougal Storm Water Decant Facility

$1,000,000

Roslyn Renaissance Northwest Improvement Company Building

$500,000

Everett/Tulalip Water Pipeline Construction

$1,000,000

Renton Aerospace Training Center Construction

$5,000,000

Renton Riverview Bridge Replacement

$1,100,000

Omak City Sewer, Collection System, and Treatment Plant

$2,000,000

Harper Pier Replacement

$800,000

University Place Main Street Redevelopment

$975,000

Sultan Alder Avenue Water/Sewer Line Replacement

$185,000

Quincy Industrial Water Reclamation & Reuse

$700,000

NW Medical School

$136,000

Ione - 8th St Lift Station Replacement

$165,000

Stevens PUD Projects

$532,000

Port Orchard Bay St.  Pedestrian Path - Phase 2

$336,000

Dekalb Pier - Phase 2

$255,000

Kenmore Village

$300,000

South Kirkland TOD/Cross Kirkland Corridor

$1,300,000

Washington Agriculture Discovery Center

$100,000

Mountlake Terrace Mainstreet Grant

$2,000,000

Issaquah - North Roadway Network Improvement

$5,000,000

TRIDEC Development of Small Modular Reactor Proposal

$500,000

City of Shelton Wastewater

$1,500,000

Port of Moses Lake Firefighting System

$300,000

Seattle Chinatown/ID Development

$500,000

 

 

TOTAL

$42,109,000

Appropriation:

      State Building Construction Account--State.......... $35,009,000

      Public Facility Construction Loan Revolving

      Account--State........................................................ $7,100,000

             Subtotal Appropriation................................... $42,109,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $42,109,000

NEW SECTION.  Sec. 1078.  FOR THE DEPARTMENT OF COMMERCE

      Projects That Strengthen Communities and Quality of Life (92000230)

      The appropriations in this section are subject to the following conditions and limitations:

      (1) Except as directed otherwise prior to the effective date of this section, the department shall not expend the appropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.  This requirement does not apply to projects where a share of the appropriation is released for design costs only.

      (2) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease.  This requirement does not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.

      (3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.

      (4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.

      (5) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(6).

      (6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay state prevailing wages.

      (7) $1,500,000 of the appropriation in this section from the state building construction account--state is provided solely for design development to align ongoing planning for the replacement of the Seattle multimodal terminal at Colman dock with the creation of a public park.  The scope of work must provide a design plan that includes an elevated park and corresponding amenities above the terminal.  Design development shall be delivered through the city of Seattle.  The scope of this project does not preclude any current plans for Colman dock to replace or seismically upgrade the facility, nor does it reduce the amount of general and commercial traffic, high occupancy vehicles, transit, bicyclist and pedestrian movement.

      (8) $500,000 of the appropriation from the environmental legacy stewardship account--state is provided solely for an investigation of possible contaminated soils around the Colman dock.

      (9) The appropriation is provided solely for the following list of projects:

 

Projects that Strengthen Communities & Quality of Life

 

Ft. Vancouver - Mother Joseph Academy & Infantry Barracks

$1,000,000

LaConner Boardwalk

$1,600,000

Kent Interurban Trail Connector

$750,000

Town of Concrete Public Safety Building

$785,000

Complete Development of Ashford Park Facilities

$1,000,000

Jackson Park Renovation

$1,000,000

South Whatcom Library Construction

$90,000

Guemes Channel Trail Project

$700,000

Seabrook Trail

$437,000

Vashon Island Allied Arts

$2,000,000

Federal Way Performing Arts

$2,000,000

Japanese Gulch Land Acquisition

$1,000,000

Milton - Triangle Park ADA Upgrades

$225,000

Langston Hughes Performing Arts Center - Storage

$150,000

Wood Pellet Heat in Schools Pilot

$500,000

Snohomish County Sheriff's Office South Precinct

$1,000,000

Ravensdale Park

$650,000

Worthington Park

$210,000

Eastside Tacoma Community Center

$400,000

228th Street Trail

$500,000

Institute for Community Leadership

$275,000

FISH of Vancouver/Nonprofit Community Service Center

$1,000,000

Yelm Community Center

$1,000,000

Ellensburg Depot

$500,000

Roslyn City Hall

$400,000

Northwest Carriage Museum

$375,000

People's Community Center and Pool

$500,000

Town of Concrete Fire and Life Safety Facility

$500,000

Chehalis Pool

$250,000

Mount Rainier Park Ranger Memorial

$60,000

McAllister Air Museum

$500,000

Repairs to Stevenson Grange

$50,000

Meydenbauer Park Improvements

$3,000,000

Sixty Acres Park Enhancements

$750,000

Covington Community Park Phase 2

$2,100,000

Johnson Farm Museum - Anderson Island

$250,000

Nikolai Project

$40,000

Ft. Steilacoom Building Preservation

$250,000

Plaza Roberto Maestas - Building the Beloved Community

$1,000,000

Seattle Multimodal Terminal at Colman Dock/Public Park

$2,000,000

Confluence Project

$747,000

Castle Rock Citywide Residential Street Project

$504,000

UWAVE

$30,000

Transit-Community Center

$800,000

Mt. Spokane Lodge

$250,000

 

 

TOTAL

$33,128,000

Appropriation:

      State Building Construction Account--State.......... $32,628,000

      Environmental Legacy Stewardship Account--State.. $500,000

             Subtotal Appropriation................................... $33,128,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $33,128,000

NEW SECTION.  Sec. 1079.  FOR THE DEPARTMENT OF COMMERCE

      Projects That Strengthen Youth and Families (92000227)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) Except as directed otherwise prior to the effective date of this section, the department shall not expend the appropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.  This requirement does not apply to projects where a share of the appropriation is released for design costs only.

      (2) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease.  This requirement does not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.

      (3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.

      (4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.

      (5) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(6).

      (6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay state prevailing wages.

      (7) The appropriation is provided solely for the following list of projects:

 

Projects that Strengthen Youth & Families

 

Emmanuel Family Life Center

$250,000

Lower Falls Community Center

$230,000

Jerry Taylor Memorial Plaza for Veterans

$65,000

Spokane Valley Foodbank Remodel

$225,000

Rainier Beach Urban Farm Youth Program

$300,000

Algona Community Center

$125,000

Community Center at the Village Green

$500,000

Milton - Activities Center

$250,000

S Everett Community Resource Center

$53,000

Dynamic Aquatic and Autism Center

$250,000

Disabled Veterans' Recreation Improvements

$500,000

B. F. Day School Playground

$157,000

YWCA Facility Improvements

$231,000

King County Boys and Girls Club

$1,000,000

The Children's Center - Vancouver

$1,200,000

Food Lifeline Relocation

$3,100,000

Camp Primetime Repairs and Improvements

$100,000

Boys & Girls Club Community Center/Clubhouse

$300,000

Safe Routes to School - 68th Avenue NW

$471,000

Drug Abuse Prevention Center

$114,000

SERA Campus Multi-Sports Facility

$1,000,000

Adna School District Track

$160,000

Safe Harbor

$100,000

HUB Center for Seniors

$500,000

Small Faces Child Development Center

$500,000

Meals on Wheels Services Center

$496,000

Cottages at Forest Park

$500,000

Pasco Second Harvest Distribution Center Construction Phase 2

$3,000,000

Thurston County Food Bank

$1,000,000

Auburn Community Center at Les Grove Park Campus

$3,000,000

 

 

TOTAL

$19,677,000

Appropriation:

      State Building Construction Account--State.......... $19,677,000

 

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $19,677,000

NEW SECTION.  Sec. 1080.  FOR THE DEPARTMENT OF COMMERCE

      Pacific Medical Center (91000445)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation in this section is provided solely for predesign, design, renovation, and other development or transition costs necessary for Pacific Tower to be used for community college health career training programs, offices for the department of commerce or other appropriate state agencies, and other nonprofit community uses, including community meeting and training facilities.  Funds may be allotted only after a memorandum of understanding containing the lease provisions and a plan for construction management has been executed between the state of Washington and the Pacific hospital preservation and development authority.

Appropriation:

      State Building Construction Account--State.......... $20,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $20,000,000

NEW SECTION.  Sec. 1081.  FOR THE DEPARTMENT OF COMMERCE

      Public Works Assistance Account Project Backfill (91000581)

      The appropriation in this section is subject to the following conditions and limitations:  $104,000,000 for fiscal year 2014 and $54,000,000 for fiscal year 2015 is provided solely for the anticipated drawdown of funds associated with previously authorized projects under sections 1010, 1036, 1039, 1040, 1058, and 1059 of this act.

Appropriation:

      State Taxable Building Construction Account--

             State............................................................. $158,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL........................................................ $158,000,000

NEW SECTION.  Sec. 1082.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Cowlitz River Dredging (20082856)

Reappropriation:

      State Building Construction Account--State............... $250,000

      Prior Biennia (Expenditures)................................... $1,250,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,500,000

NEW SECTION.  Sec. 1083.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Chehalis River Basin Flood Relief Projects (91000398)

Reappropriation:

      State Building Construction Account--State............ $4,689,000

      Prior Biennia (Expenditures)..................................... $311,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,000,000

NEW SECTION.  Sec. 1084.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Catastrophic Flood Relief (20084850)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) Up to $9,200,000 of the appropriation is for design alternatives for large capital flood damage reduction projects, including basin-level water retention and Interstate 5 protection projects.

      (2) Up to $15,092,000 of the appropriation is for construction of priority local flood protection projects, including multipurpose projects that reduce flood damage and benefit fish habitat.

      (3) Up to $1,750,000 of the appropriation is for projects to reduce damage to residential and other structures in the floodplain, through flood proofing and buyouts.

      (4) Up to $2,160,000 of the appropriation is for state agency technical assistance, stakeholder project management, project support, and coordination.

 Reappropriation:

      State Building Construction Account--State............... $752,000

Appropriation:

      State Building Construction Account--State.......... $28,202,000

      Prior Biennia (Expenditures)................................... $8,733,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $37,687,000

NEW SECTION.  Sec. 1085.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Oversight of State Facilities (30000035)

      The appropriation in this section is subject to the following conditions and limitations:  The office of financial management in consultation with the department of enterprise services, shall work with all appropriate public and private stakeholders that lease and/or build commercial office space and/or warehouse facilities to the state of Washington to review and recommend policies relating to lease renewals, request for proposals, cancellation clauses, backfill policy of private sector real estate, and other related issues.  Members of the appropriate fiscal committees of the legislature must be invited to participate in stakeholder meetings.  The office of financial management must recommend improvements to these policies to ensure cancellation clauses are used in a financially advantageous way, and renewal practices minimize unnecessary relocation costs.

Appropriation:

      State Building Construction Account--State............ $2,080,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,080,000

NEW SECTION.  Sec. 1086.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Aerospace and Manufacturing Training Equipment Pool (91000003)

Reappropriation:

      State Building Construction Account--State............ $2,265,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,265,000

NEW SECTION.  Sec. 1087.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Emergency Repairs (90000008)

      The appropriation in this section is subject to the following conditions and limitations:  Emergency repair funding is provided solely to address unexpected building or grounds failures that will impact public health and safety and the day-to-day operations of the facility.  To be eligible for funds from the emergency repair pool, an emergency declaration signed by the affected agency director must be submitted to the office of financial management and the appropriate legislative fiscal committees.  The emergency declaration must include a description of the health and safety hazard, the possible cause, the proposed scope of emergency repair work and related cost estimate, and identification of other funding that may be applied to the project.  For emergencies occurring during a legislative session, an agency must notify the legislative fiscal committees before requesting emergency funds from the office of financial management.  The office of financial management must notify the legislative evaluation and accountability program committee, the house capital budget committee, and senate ways and means committee as emergency projects are approved for funding.

Appropriation:

      State Building Construction Account--State............ $5,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,000,000

NEW SECTION.  Sec. 1088.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Office of Financial Management Capital Staff (30000034)

      The appropriation in this section is subject to the following conditions and limitation:

      (1) Up to $100,000 of the appropriation in this section is for the office of financial management to review and update the existing cost estimating process and electronic forms to more accurately reflect project costs and alternative public works.  The scope of the review must include, at a minimum, construction inflation, project management fees, the architectural and engineering fee schedule, consultant extra services, project contingencies, and project cost ranges.  The office of financial management shall confer with legislative staff and other agencies with public works authority. Inflation must be adjusted biennially while the governor's budget is being developed using the construction cost index from global insight.

      (2) The department of enterprise services, in consultation with the office of financial management, shall provide the capital project cost estimates source data, business logic, and electronic copies to the legislative evaluation and accountability program.  The source data and electronic copies of the cost estimates shall be provided with the agency request and governor budget submittals to the legislature.  The business logic used for creation of the cost estimates developed for the 2013 legislative session must be provided to the legislative evaluation and accountability program by July 31, 2013.  Any changes to the cost estimate business logic must be shared with the legislative evaluation and accountability program on an ongoing basis.  Projects may also be adjusted by the legislature with new inflation forecasts using the cost estimate tool developed by the legislative evaluation and accountability program.

      (3) The office of financial management shall report to the senate ways and means committee and the house capital budget committee by November 30, 2013, on these efforts.

Appropriation:

      State Building Construction Account--State............... $900,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $900,000

NEW SECTION.  Sec. 1089.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Emergency Repair Pool for K-12 Public Schools (91000399)

      The appropriation in this section is subject to the following conditions and limitations:  Emergency repair funding is provided solely to address unexpected and imminent health and safety hazards at K-12 public schools, including skill centers, that will impact the day- to-day operations of the school facility.  To be eligible for funds from the emergency repair pool, an emergency declaration must be signed by the school district board of directors and the superintendent of public instruction, and submitted to the office of financial management for consideration.  The emergency declaration must include a description of the imminent health and safety hazard, the possible cause, the proposed scope of emergency repair work and related cost estimate, and identification of local funding to be applied to the project.  Grants of emergency repair moneys must be conditioned upon the written commitment and plan of the school district board of directors to repay the grant with any insurance payments or other judgments that may be awarded, if applicable.  The office of financial management must notify the legislative evaluation and accountability program committee, the house capital budget committee, and the senate ways and means committee as emergency projects are approved for funding.

Appropriation:

      State Building Construction Account--State............ $5,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,000,000

NEW SECTION.  Sec. 1090.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Higher Education Preservation Information (91000427)

      The appropriations in this section are subject to the following conditions and limitations:  The appropriations are provided solely to refresh preservation information that resides in the state's comparable framework for higher education buildings including any necessary revisions or adjustments that will enable more direct translation of information, updates for last renewal or replacement of major systems, and quality assurance field sampling.  In executing this continued capital study, the office of financial management shall consult the legislative fiscal committees about its workplan to ensure field sampling of facilities prioritized for renovation or replacement, and timely delivery of assembled facilities information and related capital models in an easy to understand format.  As a general condition, upon appropriations provided to higher education agencies in this act, the state board for community and technical colleges and each state baccalaureate institution shall provide requested facilities information in a timely manner to enable the office of financial management to complete the tasks and oversight assigned in this section.

Appropriation:

      University of Washington Building Account--State... $130,000

      Washington State University Building Account--State. $94,000

      Eastern Washington University Capital Projects

             Account--State...................................................... $23,000

      Central Washington University Capital Projects

             Account--State...................................................... $19,000

      The Evergreen State College Capital Projects

             Account--State...................................................... $13,000

      Western Washington University Capital Projects

             Account--State...................................................... $21,000

             Subtotal Appropriation........................................ $300,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $300,000

NEW SECTION.  Sec. 1091.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Construction Contingency Pool (91000428)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation in this section is provided solely for construction projects that confront emergent and unavoidable costs in excess of the construction contingency and management reserves included in the project appropriation.  For requests occurring during a legislative session, an agency must notify the legislative fiscal committees before requesting contingency funds from the office of financial management.  Eligible agencies that may apply to the pool include higher education institutions, the state parks and recreation commission, the department of corrections, the department of enterprise services, and the department of health.  Eligible construction projects  are only projects that had project cost reductions.  The office of financial management must notify the legislative evaluation and accountability program committee, the house capital budget committee, and senate ways and means committee as projects are approved for funding.

 

Appropriation:

      State Building Construction Account--State............ $4,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,000,000

NEW SECTION.  Sec. 1092.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

      Culverts in Three State Agencies (92000004)

Appropriation:

      State Building Construction Account--State............ $7,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $7,000,000

NEW SECTION.  Sec. 1093.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Natural Resource Building Roof Replacement/Exterior Foam Insulation Repairs (30000546)

Reappropriation:

      State Building Construction Account--State............... $510,000

      Prior Biennia (Expenditures)................................... $3,972,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,482,000

NEW SECTION.  Sec. 1094.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      East Plaza - Water Infiltration and Elevator Repairs (30000548)

Appropriation:

      State Vehicle Parking Account--State........................ $793,000

      State Building Construction Account--State............ $2,310,000

             Subtotal Appropriation..................................... $3,103,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $7,444,000

             TOTAL.......................................................... $10,547,000

NEW SECTION.  Sec. 1095.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Minor Works Preservation (30000550)

Reappropriation:

      State Building Construction Account--State............ $1,698,000

      Prior Biennia (Expenditures)..................................... $636,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,334,000

NEW SECTION.  Sec. 1096.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Capitol Lake Dredging (30000571)

      The reappropriation in this section is subject to the following conditions and limitations:  Within the reappropriation, the department must prepare a long term financing plan for maintenance dredging activities that may be required to either maintain Capitol Lake or support estuary restoration efforts.  In consultation with the involved local governments, the department must recommend an equitable cost sharing formula for the cost of maintenance dredging based on the relative benefits received by the state and the various local governments.

Reappropriation:

      State Toxics Control Account--State.......................... $181,000

      Prior Biennia (Expenditures)....................................... $19,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $200,000

NEW SECTION.  Sec. 1097.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Legislative Building Critical Exterior Repairs (30000577)

Reappropriation:

      State Building Construction Account--State................. $64,000

      Prior Biennia (Expenditures)..................................... $892,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $956,000

NEW SECTION.  Sec. 1098.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Engineering and Architectural Services: Staffing (30000580)

      The appropriations in this section are subject to the following conditions and limitations:  Within the appropriations the department must determine the rough feasibility and economic benefits of recovering heat energy from wastewater at one of the state's large facilities.  If likely to be feasible and economically beneficial, the department must recommend an institution for a pilot project.

Appropriation:

      Charitable, Educational, Penal and Reformatory

      Institutions Account--State..................................... $1,000,000

      State Vehicle Parking Account--State........................ $500,000

      Thurston County Capital Facilities

             Account--State................................................. $1,850,000

      State Building Construction Account--State............ $9,550,000

             Subtotal Appropriation................................... $12,900,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $56,600,000

             TOTAL.......................................................... $69,500,000

NEW SECTION.  Sec. 1099.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Legislative Building Critical Hydronic Loop Repairs (30000584)

Reappropriation:

      State Building Construction Account--State............ $1,075,000

Appropriation:

      State Building Construction Account--State............... $851,000

      Prior Biennia (Expenditures)..................................... $104,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,030,000

NEW SECTION.  Sec. 1100.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Reuse General Administration Building for Heritage Center, State Library, and State Patrol (92000003)

Reappropriation:

      Washington State Heritage Center Account--State....... $75,000

      Prior Biennia (Expenditures)....................................... $75,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $150,000

NEW SECTION.  Sec. 1101.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Legislative Building Critical Exterior Repairs (92000004)

Reappropriation:

      State Building Construction Account--State............... $557,000

      Prior Biennia (Expenditures)..................................... $843,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,400,000

NEW SECTION.  Sec. 1102.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Natural Resources Building Garage Fire Suppression System Repairs (30000578)

Appropriation:

      State Vehicle Parking Account--State........................ $738,000

      State Building Construction Account--State............ $1,500,000

             Subtotal Appropriation..................................... $2,238,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,238,000

NEW SECTION.  Sec. 1103.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Minor Works Preservation (30000635)

Appropriation:

      State Building Construction Account--State............ $3,218,000

      Thurston County Capital Facilities Account--State.... $810,000

             Subtotal Appropriation..................................... $4,028,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $12,000,000

             TOTAL.......................................................... $16,028,000

NEW SECTION.  Sec. 1104.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Capitol Campus Underground Utility Repairs (30000687)

Appropriation:

      State Building Construction Account--State............ $1,983,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $8,827,000

             TOTAL.......................................................... $10,810,000

NEW SECTION.  Sec. 1105.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Natural Resource Building Repairs Phase 1 (91000009)

      The appropriations in this section are subject to the following conditions and limitations:  The natural resource building repairs phase 1 project must include at a minimum the multipurpose room water infiltration project and the roof project.  After this work is completed, the department may include work that was in the department's 2013-2015 capital budget request for other repairs to the building.

Appropriation:

      State Building Construction Account--State............ $4,161,000

      Thurston County Capital Facilities Construction

             Account--State.................................................... $940,000

             Subtotal Appropriation..................................... $5,101,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,101,000

NEW SECTION.  Sec. 1106.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Campus Steam System and Chiller Upgrades (91000014)

      The appropriations in this section are subject to the following conditions and limitations:  The campus steam system repairs and powerhouse chiller projects must be done as one project, with energy savings from heat recovery paying for as much of the project as practical.  Energy savings must also be used to upgrade the HVAC system in the governor's residence, and provide hot water boilers in as many buildings as needed to shut down the powerhouse in the summer months.

Appropriation:

      State Building Construction Account--State............ $2,497,000

      Thurston County Capital Facilities Construction

             Account--State................................................. $1,500,000

             Subtotal Appropriation..................................... $3,997,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,997,000

NEW SECTION.  Sec. 1107.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Archives Building and Capitol Court HVAC Upgrades (91000015)

      The appropriation in this section is subject to the following conditions and limitations:  The archives building HVAC upgrade and capitol court HVAC upgrade projects must be done as one project, with energy savings from heat recovery paying for as much of the project as practical.

Appropriation:

      State Building Construction Account--State............ $1,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,000,000

NEW SECTION.  Sec. 1108.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Legislative Building Exterior Repairs (30000604)

Appropriation:

      State Building Construction Account--State............ $1,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,000,000

NEW SECTION.  Sec. 1109.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      1063 Block Replacement (91000016)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation in this section is provided solely for predesign and bridging documents, design, competition honoraria, project management, demolition, and other planning activities including permits.  The predesign must specify the tenants of the building as directed by the office of financial management.  The predesign must indicate the estimated annual cost increase for state agency tenants compared to the cost of their existing leases.  The estimated cost increase may take into account estimated cost savings in staff costs and other costs that may result in more efficient building design and layout of office space.  The director of the office of financial management must review these cost estimates and submit a report to the appropriate committees of the legislature indicating the budget increase that would be required sixty days prior to executing any construction contracts for the building.  The lease for any prospective tenant may not be extended beyond the anticipated occupancy date of the building.  The building will be alternatively financed as authorized in section 7014 of this act.

 Appropriation:

      State Building Construction Account--State.......... $13,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $13,000,000

NEW SECTION.  Sec. 1110.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Security Improvements Division 3 Court of Appeals (92000006)

Appropriation:

      State Building Construction Account--State............... $104,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $104,000

NEW SECTION.  Sec. 1111.  FOR THE MILITARY DEPARTMENT

      Minor Works Preservation (30000560)

Reappropriation:

      General Fund--Federal............................................ $1,840,000

      State Building Construction Account--State............... $417,000

             Subtotal Reappropriation.................................. $2,257,000

      Prior Biennia (Expenditures)................................... $2,542,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,799,000

NEW SECTION.  Sec. 1112.  FOR THE MILITARY DEPARTMENT

      Minor Works Program (30000561)

Reappropriation:

      General Fund--Federal............................................ $4,728,000

      Prior Biennia (Expenditures)................................... $5,230,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $9,958,000

NEW SECTION.  Sec. 1113.  FOR THE MILITARY DEPARTMENT

      Information Operations Readiness Center-Joint Base Lewis McChord (30000589)

Appropriation:

      General Fund--Federal.......................................... $35,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $35,000,000

NEW SECTION.  Sec. 1114.  FOR THE MILITARY DEPARTMENT

      Pierce County Readiness Center (30000593)

Appropriation:

      General Fund--Federal.......................................... $26,942,000

      State Building Construction Account--State............ $3,659,000

      Military Department Capital Account--State........... $3,000,000

             Subtotal Appropriation................................... $33,601,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $33,601,000

NEW SECTION.  Sec. 1115.  FOR THE MILITARY DEPARTMENT

      Thurston County Readiness Center (30000594)

Appropriation:

      State Building Construction Account--State............ $2,800,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $44,249,000

             TOTAL.......................................................... $47,049,000

NEW SECTION.  Sec. 1116.  FOR THE MILITARY DEPARTMENT

      Minor Works Preservation - 2013-2015 Biennium (30000602)

Appropriation:

      General Fund--Federal............................................ $3,726,000

      State Building Construction Account--State............ $1,500,000

             Subtotal Appropriation..................................... $5,226,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $13,121,000

             TOTAL.......................................................... $18,347,000

NEW SECTION.  Sec. 1117.  FOR THE MILITARY DEPARTMENT

      Minor Works Program - 2013-2015 Biennium (30000605)

Appropriation:

      General Fund--Federal.......................................... $12,925,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $29,397,000

             TOTAL.......................................................... $42,322,000

NEW SECTION.  Sec. 1118.  FOR THE MILITARY DEPARTMENT

      Yakima Training Center Barracks (30000696)

Appropriation:

      General Fund--Federal.......................................... $18,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $18,000,000

NEW SECTION.  Sec. 1119.  FOR THE MILITARY DEPARTMENT

      Thurston County Readiness Center (91000005)

Reappropriation:

      General Fund--Federal................................................. $75,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL................................................................ $75,000

NEW SECTION.  Sec. 1120.  FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION

      Heritage Barn Preservation Program (30000005)

Reappropriation:

      State Building Construction Account--State............... $105,000

      Prior Biennia (Expenditures)....................................... $95,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $200,000

NEW SECTION.  Sec. 1121.  FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION

      Courthouse Preservation (30000006)

Reappropriation:

      State Building Construction Account--State............... $673,000

      Prior Biennia (Expenditures)....................................... $77,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $750,000

NEW SECTION.  Sec. 1122.  FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION

      Historic Courthouse Preservation Grants (92000001)

Appropriation:

      State Building Construction Account--State............ $2,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,000,000

NEW SECTION.  Sec. 1123.  FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION

      Heritage Barn Preservation Program (92000002)

Appropriation:

      State Building Construction Account--State............... $500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $500,000

 

(End of part)

 

PART 2
HUMAN SERVICES

 

NEW SECTION.  Sec. 2001.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Eastern State Hospital:  Westlake Building Renovation (30000852)

Reappropriation:

      State Building Construction Account--State............... $300,000

      Prior Biennia (Expenditures)................................... $1,575,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,875,000

NEW SECTION.  Sec. 2002.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Minor Works Preservation:  Health, Safety, and Code Requirements (30001264)

Reappropriation:

      State Building Construction Account--State............ $1,500,000

      Prior Biennia (Expenditures)................................... $2,000,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,500,000

NEW SECTION.  Sec. 2003.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Minor Works Preservation:  Infrastructure Preservation (30001290)

Reappropriation:

      State Building Construction Account--State............ $2,000,000

      Prior Biennia (Expenditures)................................... $2,000,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,000,000

NEW SECTION.  Sec. 2004.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Minor Works Preservation:  Facilities Preservation (30001291)

Reappropriation:

      State Building Construction Account--State............ $3,315,000

      Prior Biennia (Expenditures)................................... $2,760,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $6,075,000

NEW SECTION.  Sec. 2005.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Hazards Abatement and Demolition (30002221)

Reappropriation:

      State Building Construction Account--State............... $600,000

      Prior Biennia (Expenditures)..................................... $400,000

      Future Biennia (Projected Costs)............................ $4,244,000

             TOTAL............................................................ $5,244,000

NEW SECTION.  Sec. 2006.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Capacity to Replace Maple Lane School (92000005)

Reappropriation:

      State Building Construction Account--State................. $50,000

 

      Prior Biennia (Expenditures)................................... $2,410,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,460,000

NEW SECTION.  Sec. 2007.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Rainier School:  Cottages Remodel and Renovation (91000017)

Reappropriation:

      State Building Construction Account--State............ $2,800,000

      Prior Biennia (Expenditures)..................................... $200,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,000,000

NEW SECTION.  Sec. 2008.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Naselle Youth Camp-Three Cottages:  Renovation (20081222)

Appropriation:

      State Building Construction Account--State............ $1,900,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,900,000

NEW SECTION.  Sec. 2009.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Eastern State Hospital and Western State Hospital - All Wards:  Patient Safety Improvements (91000019)

Appropriation:

      Charitable, Educational, Penal and Reformatory

      Institutions Account--State..................................... $4,800,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,800,000

NEW SECTION.  Sec. 2010.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Minor Works Preservation Projects:  Statewide (30002235)

Appropriation:

      State Building Construction Account--State.......... $11,755,000

      Charitable, Educational, Penal and Reformatory

             Institutions Account--State............................... $2,400,000

             Subtotal Appropriation................................... $14,155,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $14,155,000

NEW SECTION.  Sec. 2011.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

      Medical Lake Infrastructure Modernization Study (92000007)

Appropriation:

      State Building Construction Account--State............... $500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

            TOTAL.............................................................. $500,000

NEW SECTION.  Sec. 2012.  FOR THE DEPARTMENT OF HEALTH

      Drinking Water Assistance Program (30000013)

Reappropriation:

      Drinking Water Assistance Account--Federal....... $75,670,000

      Prior Biennia (Expenditures)................................. $51,840,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL........................................................ $127,510,000

NEW SECTION.  Sec. 2013.  FOR THE DEPARTMENT OF HEALTH

      Safe Reliable Drinking Water Grants (92000002)

Reappropriation:

      State Building Construction Account--State............ $9,628,000

      Prior Biennia (Expenditures)................................... $2,010,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $11,638,000

NEW SECTION.  Sec. 2014.  FOR THE DEPARTMENT OF HEALTH

      HVAC Systems Upgrade Continuation (30000298)

Appropriation:

      State Building Construction Account--State............ $2,809,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,809,000

NEW SECTION.  Sec. 2015.  FOR THE DEPARTMENT OF HEALTH

      Minor Works - Facility Preservation (30000300)

Appropriation:

      State Building Construction Account--State............... $958,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $1,800,000

             TOTAL............................................................ $2,758,000

NEW SECTION.  Sec. 2016.  FOR THE DEPARTMENT OF HEALTH

      Drinking Water Assistance Program (30000323)

Appropriation:

      Drinking Water Assistance Account--Federal....... $28,800,000

 

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)......................... $115,200,000

             TOTAL........................................................ $144,000,000

NEW SECTION.  Sec. 2017.  FOR THE DEPARTMENT OF VETERANS AFFAIRS

      Minor Works Facilities Preservation (30000094)

Appropriation:

      State Building Construction Account--State............ $1,313,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,313,000

NEW SECTION.  Sec. 2018.  FOR THE DEPARTMENT OF VETERANS AFFAIRS

      Walla Walla Nursing Facility (20082008)

Reappropriation:

      General Fund--Federal.......................................... $31,200,000

      State Building Construction Account--State.......... $15,978,000

             Subtotal Reappropriation................................ $47,178,000

      Prior Biennia (Expenditures)..................................... $947,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $48,125,000

NEW SECTION.  Sec. 2019.  FOR THE DEPARTMENT OF CORRECTIONS

      Washington State Penitentiary:  Housing Units, Kitchen, and Site Work (30000482)

Reappropriation:

      State Building Construction Account--State............ $9,130,000

      Prior Biennia (Expenditures)................................. $38,442,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $47,572,000

NEW SECTION.  Sec. 2020.  FOR THE DEPARTMENT OF CORRECTIONS

      SW: Minor Works - Infrastructure Preservation (30000539)

 Reappropriation:

      State Building Construction Account--State............ $1,026,000

      Prior Biennia (Expenditures)................................... $1,474,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,500,000

NEW SECTION.  Sec. 2021.  FOR THE DEPARTMENT OF CORRECTIONS

      SW: Minor Works - Facility Preservation (30000540)

Reappropriation:

      State Building Construction Account--State............ $1,506,000

 

      Prior Biennia (Expenditures)..................................... $994,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,500,000

NEW SECTION.  Sec. 2022.  FOR THE DEPARTMENT OF CORRECTIONS

      Monroe Corrections Complex:  Close Sewer Lagoon (20082022)

Reappropriation:

      State Building Construction Account--State............... $294,000

      Prior Biennia (Expenditures)................................... $1,097,000

      Future Biennia (Projected Costs)............................ $8,500,000

             TOTAL............................................................ $9,891,000

NEW SECTION.  Sec. 2023.  FOR THE DEPARTMENT OF CORRECTIONS

      SW: Minor Works - Health, Safety, and Code (30000541)

Reappropriation:

      State Building Construction Account--State............ $1,740,000

      Prior Biennia (Expenditures)..................................... $860,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,600,000

NEW SECTION.  Sec. 2024.  FOR THE DEPARTMENT OF CORRECTIONS

      Monroe Corrections Center:  WSR Living Units Roofs (30000542)

Appropriation:

      State Building Construction Account--State............ $1,785,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,785,000

NEW SECTION.  Sec. 2025.  FOR THE DEPARTMENT OF CORRECTIONS

      Washington Corrections Center:  Replace Intensive Management Unit Roof (30000723)

Appropriation:

      State Building Construction Account--State............ $1,071,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,071,000

NEW SECTION.  Sec. 2026.  FOR THE DEPARTMENT OF CORRECTIONS

      Monroe Corrections Center:  WSR Replace Fire Alarm System (30000724)

Appropriation:

      State Building Construction Account--State............ $2,616,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,616,000

NEW SECTION.  Sec. 2027.  FOR THE DEPARTMENT OF CORRECTIONS

      Airway Heights Corrections Center:  Replace Fire Alarm System (30000725)

Appropriation:

      State Building Construction Account--State............ $3,399,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,399,000

NEW SECTION.  Sec. 2028.  FOR THE DEPARTMENT OF CORRECTIONS

      Washington Corrections Center for Women:  Replace Fire Alarm System (30000727)

Appropriation:

      State Building Construction Account--State............ $2,569,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,569,000

NEW SECTION.  Sec. 2029.  FOR THE DEPARTMENT OF CORRECTIONS

      SW: Minor Works - Preservation Projects (30000734)

Appropriation:

      State Building Construction Account--State.......... $10,100,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $51,618,000

             TOTAL.......................................................... $61,718,000

NEW SECTION.  Sec. 2030.  FOR THE DEPARTMENT OF CORRECTIONS

      Airway Heights Corrections Center:  Security Electronics Renovations (30000726)

Appropriation:

      State Building Construction Account--State............ $5,047,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,047,000

NEW SECTION.  Sec. 2031.  FOR THE DEPARTMENT OF CORRECTIONS

      Washington Corrections Center:  Security Video System (30000791)

Appropriation:

      State Building Construction Account--State............ $6,972,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $6,972,000

NEW SECTION.  Sec. 2032.  FOR THE DEPARTMENT OF CORRECTIONS

      Monroe Corrections Center:  TRU Security Video System (30000801)

Appropriation:

      State Building Construction Account--State............ $3,876,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,876,000

NEW SECTION.  Sec. 2033.  FOR THE DEPARTMENT OF CORRECTIONS

      Washington Corrections Center for Women:  Security Video System (30000802)

Appropriation:

      State Building Construction Account--State............ $3,421,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,421,000

NEW SECTION.  Sec. 2034.  FOR THE DEPARTMENT OF CORRECTIONS

      Monroe Corrections Center:  SOU IMU Security Video (30000803)

Appropriation:

      State Building Construction Account--State............ $2,640,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,640,000

NEW SECTION.  Sec. 2035.  FOR THE DEPARTMENT OF CORRECTIONS

      Monroe Corrections Center:  WSR Security Video System (30000795)

Appropriation:

      State Building Construction Account--State............ $5,233,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,233,000

NEW SECTION.  Sec. 2036.  FOR THE DEPARTMENT OF CORRECTIONS

      Monroe Corrections Center:  TRU Support Building Repair Fire Detection System (30000733)

Appropriation:

      State Building Construction Account--State............ $1,058,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,058,000

NEW SECTION.  Sec. 2037.  FOR THE DEPARTMENT OF CORRECTIONS

      Department of Corrections Centralized Pharmacy (92000034)

Appropriation:

      State Building Construction Account--State............... $700,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $700,000

NEW SECTION.  Sec. 2038.  FOR THE DEPARTMENT OF CORRECTIONS

      OFM Emergency Funds (90000027)

Reappropriation:

      State Building Construction Account--State............... $250,000

 

      Prior Biennia (Expenditures)................................... $1,050,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,300,000

 

(End of part)

 

PART 3
NATURAL RESOURCES

 

NEW SECTION.  Sec. 3001.  FOR THE DEPARTMENT OF ECOLOGY

      Water Supply Facilities (19742006)

Reappropriation:

      State and Local Improvements Revolving Account

             (Water Supply Facilities)--State.......................... $552,000

      Prior Biennia (Expenditures)................................. $19,998,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $20,550,000

NEW SECTION.  Sec. 3002.  FOR THE DEPARTMENT OF ECOLOGY

      Low-Level Nuclear Waste Disposal Trench Closure (19972012)

Reappropriation:

      Site Closure Account--State.................................. $11,885,000

      Prior Biennia (Expenditures)................................... $3,548,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $15,433,000

NEW SECTION.  Sec. 3003.  FOR THE DEPARTMENT OF ECOLOGY

      Twin Lake Aquifer Recharge Project (20042951)

Reappropriation:

      State Building Construction Account--State............... $191,000

      Prior Biennia (Expenditures)..................................... $559,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $750,000

NEW SECTION.  Sec. 3004.  FOR THE DEPARTMENT OF ECOLOGY

      Water Supply Facilities (20044006)

Reappropriation:

      State and Local Improvements Revolving Account

             (Water Supply Facilities)--State............................ $51,000

      Prior Biennia (Expenditures)................................. $13,467,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $13,518,000

NEW SECTION.  Sec. 3005.  FOR THE DEPARTMENT OF ECOLOGY

      Water Conveyance Infrastructure Projects (20052850)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions in section 322, chapter 488, Laws of 2005.

Reappropriation:

      State Building Construction Account--State............ $1,569,000

      Prior Biennia (Expenditures)................................... $4,143,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,712,000

NEW SECTION.  Sec. 3006.  FOR THE DEPARTMENT OF ECOLOGY

      Quad Cities Water Right Mitigation (20052852)

Reappropriation:

      State Building Construction Account--State............... $421,000

      Prior Biennia (Expenditures)................................... $1,179,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,600,000

NEW SECTION.  Sec. 3007.  FOR THE DEPARTMENT OF ECOLOGY

      Watershed Plan Implementation and Flow Achievement (20062003)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions in section 136, chapter 371, Laws of 2006.

Reappropriation:

      State Building Construction Account--State............... $364,000

      Prior Biennia (Expenditures)................................. $12,436,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $12,800,000

NEW SECTION.  Sec. 3008.  FOR THE DEPARTMENT OF ECOLOGY

      Columbia River Basin Water Supply Development Program (20062950)

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations are subject to the provisions of section 3008, chapter 49, Laws of 2011 1st sp. sess.

Reappropriation:

      Columbia River Basin Water Supply Development

             Account--State............................................... $29,705,000

      Columbia River Basin Taxable Bond Water Supply

             Development Account--State......................... $10,404,000

             Subtotal Reappropriation................................ $40,109,000

      Prior Biennia (Expenditures)................................. $51,391,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $91,500,000

NEW SECTION.  Sec. 3009.  FOR THE DEPARTMENT OF ECOLOGY

      Water Pollution Control Revolving Account (20064002)

Reappropriation:

      Water Pollution Control Revolving Account--State. $5,223,000

      Water Pollution Control Revolving Account--Federal...............

             ........................................................................ $8,453,000

             Subtotal Reappropriation................................ $13,676,000

      Prior Biennia (Expenditures)............................... $225,940,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL........................................................ $239,616,000

NEW SECTION.  Sec. 3010.  FOR THE DEPARTMENT OF ECOLOGY

      Centennial Clean Water Program (20064007)

Reappropriation:

      State Building Construction Account--State............... $317,000

      Water Quality Capital Account--State.......................... $32,000

             Subtotal Reappropriation..................................... $349,000

 

      Prior Biennia (Expenditures)................................. $47,151,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $47,500,000

NEW SECTION.  Sec. 3011.  FOR THE DEPARTMENT OF ECOLOGY

      Local Toxics Grants for Cleanup and Prevention (20064008)

Reappropriation:

      State Building Construction Account--State............ $9,066,000

      Prior Biennia (Expenditures)................................. $89,834,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $98,900,000

NEW SECTION.  Sec. 3012.  FOR THE DEPARTMENT OF ECOLOGY

      Transfer of Water Rights for Cabin Owners (20081951)

Reappropriation:

      State Building Construction Account--State............... $305,000

      Prior Biennia (Expenditures)..................................... $145,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $450,000

NEW SECTION.  Sec. 3013.  FOR THE DEPARTMENT OF ECOLOGY

      Remedial Action Grants (20084008)

Reappropriation:

      State Building Construction Account--State.......... $14,108,000

      Prior Biennia (Expenditures)................................. $78,767,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $92,875,000

NEW SECTION.  Sec. 3014.  FOR THE DEPARTMENT OF ECOLOGY

      Centennial Clean Water Program (20084010)

Reappropriation:

      State Building Construction Account--State............... $771,000

      Water Quality Capital Account--State........................ $401,000

      State Toxics Control Account--State.......................... $997,000

             Subtotal Reappropriation.................................. $2,169,000

      Prior Biennia (Expenditures)................................. $64,314,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $66,483,000

NEW SECTION.  Sec. 3015.  FOR THE DEPARTMENT OF ECOLOGY

      Water Pollution Control Loan Program (20084011)

Reappropriation:

      Water Pollution Control Revolving Account--State $14,581,000

      Water Pollution Control Revolving

             Account--Federal........................................... $19,068,000

             Subtotal Reappropriation................................ $33,649,000

      Prior Biennia (Expenditures)............................... $106,351,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL........................................................ $140,000,000

NEW SECTION.  Sec. 3016.  FOR THE DEPARTMENT OF ECOLOGY

      Yakima River Basin Water Storage Feasibility Study (20084026)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is provided solely for completion of the United States bureau of reclamation's Yakima basin storage feasibility study, including the associated joint national environmental policy act, the state environmental policy act, and the environmental impact statement.  The reappropriated funds are to be used by the bureau of reclamation and the department of ecology to evaluate potential in basin storage facilities such as the proposed Bumping Lake and Wymer reservoirs and other reasonable alternatives that will enhance water supplies and streamflows in the Yakima Basin.

Reappropriation:

      State Building Construction Account--State................. $83,000

      Prior Biennia (Expenditures)................................... $5,167,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,250,000

NEW SECTION.  Sec. 3017.  FOR THE DEPARTMENT OF ECOLOGY

      Watershed Plan Implementation and Flow Achievement (20084029)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions in section 3054, chapter 520, Laws of 2007.

Reappropriation:

      State Building Construction Account--State............ $2,897,000

      Prior Biennia (Expenditures)................................. $11,103,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $14,000,000

NEW SECTION.  Sec. 3018.  FOR THE DEPARTMENT OF ECOLOGY

      Water Pollution Control Revolving Fund Program (30000007)

Reappropriation:

      Water Pollution Control Revolving Account--State $16,325,000

      Water Pollution Control Revolving

             Account--Federal........................................... $16,825,000

      Water Pollution Control Revolving Account--Federal

             Stimulus........................................................... $2,720,000

             Subtotal Reappropriation................................ $35,870,000

      Prior Biennia (Expenditures)............................... $142,830,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL........................................................ $178,700,000

NEW SECTION.  Sec. 3019.  FOR THE DEPARTMENT OF ECOLOGY

      Centennial Clean Water Program (30000008)

Reappropriation:

      State Building Construction Account--State............ $8,925,000

      Prior Biennia (Expenditures)................................. $21,075,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $30,000,000

NEW SECTION.  Sec. 3020.  FOR THE DEPARTMENT OF ECOLOGY

      Upper Columbia River Black Sand Beach Cleanup (30000016)

Reappropriation:

      State Building Construction Account--State............... $117,000

      Prior Biennia (Expenditures)..................................... $383,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $500,000

NEW SECTION.  Sec. 3021.  FOR THE DEPARTMENT OF ECOLOGY

      Watershed Plan Implementation and Flow Achievement (30000028)

Reappropriation:

      State Building Construction Account--State............ $2,612,000

      Prior Biennia (Expenditures)................................... $3,388,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $6,000,000

NEW SECTION.  Sec. 3022.  FOR THE DEPARTMENT OF ECOLOGY

      Kittitas Groundwater Study (30000029)

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) Funds may be provided to develop and implement water banking and transfer methods and agreements that are fully protective of senior water rights and that protect domestic groundwater users and improve the profitability of farming operations.  The legislature finds such activities to be in the public interest because they can help sustain the viability of the agricultural economy and enhance the certainty of water supplies for domestic groundwater users.

      (2) Funds may be provided to lease or purchase water rights to create a reserve water supply for domestic groundwater users that have a groundwater right with a priority date later than May 10, 1905, as well as for all out-of-priority groundwater users.  In securing water for such domestic groundwater users, strong preference must be given to the use of water banking and transfer methods that provide alternatives to permanent purchase and dry-up of agricultural water rights in the basin, including dry-year options, water banking, long-term water supply lease agreements, long-term agricultural land fallowing agreements, and reduced consumptive use through efficiency or alternative cropping arrangements while maintaining historic return flows.

      (3) A portion of the reappropriation may be used for administrative costs, not to exceed four percent, and other costs associated with leasing or acquiring and transferring the water rights.  All costs must be fully recovered from participating domestic water users for their prorated portion of the cost, including, but not limited to, the costs of securing a water right or rights for this purpose, costs associated with the development and implementation of alternative agricultural water transfer methods, associated annual operational costs, and federal water service contract costs owed to the United States bureau of reclamation.  Funds recovered in this manner must be deposited in the state and local improvements revolving account and may be used for any purpose provided in this section.

Reappropriation:

      State and Local Improvements Revolving Account

             (Water Supply Facilities)--State.......................... $263,000

      Prior Biennia (Expenditures)..................................... $437,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $700,000

NEW SECTION.  Sec. 3023.  FOR THE DEPARTMENT OF ECOLOGY

      Remedial Action Grant Program (30000039)

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations are subject to the provisions of section 3006, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:

      Local Toxics Control Account--State.................... $17,019,000

      State Building Construction Account--State............ $3,062,000

             Subtotal Reappropriation................................ $20,081,000

      Prior Biennia (Expenditures)................................. $55,830,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $75,911,000

NEW SECTION.  Sec. 3024.  FOR THE DEPARTMENT OF ECOLOGY

      Storm Water Retrofit and Low-Impact Development Grant Program (30000097)

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations are subject to the provisions of section 3005, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:

      State and Local Improvements Revolving

             Account--State.................................................... $973,000

      Local Toxics Control Account--State...................... $1,151,000

      State and Local Improvements Revolving

             Account--Waste Facilities 1980--State................ $325,000

      State Building Construction Account--State.......... $20,812,000

      State Toxics Control Account--State....................... $5,564,000

             Subtotal Reappropriation................................ $28,825,000

      Prior Biennia (Expenditures)................................. $25,784,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $54,609,000

NEW SECTION.  Sec. 3025.  FOR THE DEPARTMENT OF ECOLOGY

      Reducing Diesel Particle Emissions in Tacoma (30000139)

Reappropriation:

      Air Pollution Control Account--State......................... $350,000

      Prior Biennia (Expenditures)..................................... $650,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,000,000

NEW SECTION.  Sec. 3026.  FOR THE DEPARTMENT OF ECOLOGY

      Water Pollution Control Revolving Fund Program (30000142)

Reappropriation:

      Water Pollution Control Revolving Account--Federal...............

             ........................................................................ $8,793,000

      Water Pollution Control Revolving Account--State $21,742,000

             Subtotal Reappropriation................................ $30,535,000

      Prior Biennia (Expenditures)................................... $6,465,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $37,000,000

NEW SECTION.  Sec. 3027.  FOR THE DEPARTMENT OF ECOLOGY

      Clean Up Toxic Sites - Puget Sound (30000144)

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations are subject to the provisions of section 3021, chapter 48, Laws of 2011 1st sp. sess.

Reappropriation:

      Cleanup Settlement Account--State........................ $7,402,000

      State Toxics Control Account--State....................... $6,670,000

             Subtotal Reappropriation................................ $14,072,000

 

      Prior Biennia (Expenditures)................................. $27,126,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $41,198,000

NEW SECTION.  Sec. 3028.  FOR THE DEPARTMENT OF ECOLOGY

      Settlement Funding To Clean Up Toxic Sites (30000145)

Reappropriation:

      Cleanup Settlement Account--State........................... $299,000

      Prior Biennia (Expenditures)................................... $8,201,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $8,500,000

NEW SECTION.  Sec. 3029.  FOR THE DEPARTMENT OF ECOLOGY

      Habitat Mitigation (91000007)

Reappropriation:

      State Building Construction Account--State............ $3,338,000

      Prior Biennia (Expenditures)................................... $1,062,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,400,000

NEW SECTION.  Sec. 3030.  FOR THE DEPARTMENT OF ECOLOGY

      Protect Communities from Flood and Drought (92000002)

Reappropriation:

      State Building Construction Account--State............ $3,984,000

      Prior Biennia (Expenditures)................................. $10,991,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $14,975,000

NEW SECTION.  Sec. 3031.  FOR THE DEPARTMENT OF ECOLOGY

      Wastewater Treatment and Water Reclamation (92000041)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 3016, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:

      State Building Construction Account--State............ $1,641,000

      Prior Biennia (Expenditures)................................... $1,789,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,430,000

NEW SECTION.  Sec. 3032.  FOR THE DEPARTMENT OF ECOLOGY

      Centennial Clean Water Program (30000208)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 3024, chapter 48, Laws of 2011 1st sp. sess.

Reappropriation:

      State Toxics Control Account--State..................... $20,904,000

      Prior Biennia (Expenditures)................................. $13,196,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $34,100,000

NEW SECTION.  Sec. 3033.  FOR THE DEPARTMENT OF ECOLOGY

      Water Pollution Control Revolving Fund Program (30000209)

      The reappropriations in this section are subject to the following conditions and limitations:  For projects involving repair, replacement, or improvement of a wastewater treatment plant or other public works facility for which an investment grade efficiency audit is obtainable, the department of ecology must require as a contract condition that the project sponsor undertake an investment grade efficiency audit.  The project sponsor may finance the costs of the audit as part of its water pollution control revolving fund program loan.

Reappropriation:

      Water Pollution Control Revolving

             Account--Federal........................................... $58,594,000

      Water Pollution Control Revolving Account--State $97,068,000

             Subtotal Reappropriation.............................. $155,662,000

      Prior Biennia (Expenditures)................................. $36,482,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL........................................................ $192,144,000

NEW SECTION.  Sec. 3034.  FOR THE DEPARTMENT OF ECOLOGY

      Waste Tire Pile Prevention and Cleanup (30000210)

Reappropriation:

      Waste Tire Removal Account--State.......................... $263,000

      Prior Biennia (Expenditures)..................................... $737,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,000,000

NEW SECTION.  Sec. 3035.  FOR THE DEPARTMENT OF ECOLOGY

      Wood Stove Pollution Reduction (30000211)

Reappropriation:

      Local Toxics Control Account--State...................... $2,111,000

      Prior Biennia (Expenditures)..................................... $889,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,000,000

NEW SECTION.  Sec. 3036.  FOR THE DEPARTMENT OF ECOLOGY

      Diesel Emissions Reduction (30000212)

Reappropriation:

      Local Toxics Control Account--State...................... $3,419,000

      Prior Biennia (Expenditures)................................... $3,581,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $7,000,000

NEW SECTION.  Sec. 3037.  FOR THE DEPARTMENT OF ECOLOGY

      Watershed Plan Implementation and Flow Achievement (30000213)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 3030, chapter 49, Laws of 2011 1st sp. sess.

Reappropriation:

      State Building Construction Account--State............ $6,219,000

      Prior Biennia (Expenditures)................................... $1,781,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $8,000,000

NEW SECTION.  Sec. 3038.  FOR THE DEPARTMENT OF ECOLOGY

      Hood Canal Regional Septic Repair Loan Program (30000215)

Reappropriation:

      State Building Construction Account--State............... $395,000

      Prior Biennia (Expenditures)................................... $2,855,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,250,000

NEW SECTION.  Sec. 3039.  FOR THE DEPARTMENT OF ECOLOGY

      Remedial Action Grant Program (30000216)

Reappropriation:

      Local Toxics Control Account--State.................... $51,463,000

      Prior Biennia (Expenditures)................................. $12,371,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $63,834,000

NEW SECTION.  Sec. 3040.  FOR THE DEPARTMENT OF ECOLOGY

      Eastern Washington Clean Sites Initiative (30000217)

Reappropriation:

      State Toxics Control Account--State....................... $4,146,000

      Prior Biennia (Expenditures)................................... $1,854,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $6,000,000

NEW SECTION.  Sec. 3041.  FOR THE DEPARTMENT OF ECOLOGY

      Burlington Northern Santa Fe Skykomish Restoration (30000218)

Reappropriation:

      Cleanup Settlement Account--State........................... $284,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $284,000

NEW SECTION.  Sec. 3042.  FOR THE DEPARTMENT OF ECOLOGY

      Safe Soils Remediation Program - Central Washington (30000263)

Reappropriation:

      State Toxics Control Account--State....................... $2,693,000

      Prior Biennia (Expenditures)................................... $1,018,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,711,000

NEW SECTION.  Sec. 3043.  FOR THE DEPARTMENT OF ECOLOGY

      Clean Up Toxics Sites - Puget Sound (30000265)

Reappropriation:

      State Toxics Control Account--State..................... $15,410,000

      Prior Biennia (Expenditures)..................................... $990,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $16,400,000

NEW SECTION.  Sec. 3044.  FOR THE DEPARTMENT OF ECOLOGY

      Yakima Basin Integrated Water Management Plan Implementation (30000278)

Reappropriation:

      State Building Construction Account--State............... $220,000

      Prior Biennia (Expenditures)................................... $1,780,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,000,000

NEW SECTION.  Sec. 3045.  FOR THE DEPARTMENT OF ECOLOGY

      ASARCO - Tacoma Smelter Plume and Mines (30000280)

Reappropriation:

      Cleanup Settlement Account--State...................... $17,963,000

      Prior Biennia (Expenditures)................................... $2,684,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $20,647,000

NEW SECTION.  Sec. 3046.  FOR THE DEPARTMENT OF ECOLOGY

      Padilla Bay Boat Launch (30000281)

Reappropriation:

      General Fund--Federal............................................... $100,000

      Prior Biennia (Expenditures)..................................... $220,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $320,000

NEW SECTION.  Sec. 3047.  FOR THE DEPARTMENT OF ECOLOGY

      Padilla Bay Federal Capital Projects (30000282)

Reappropriation:

      General Fund--Federal............................................... $800,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $800,000

NEW SECTION.  Sec. 3048.  FOR THE DEPARTMENT OF ECOLOGY

      Coastal Wetlands Federal Funds Administration (30000283)

Reappropriation:

      General Fund--Federal.......................................... $17,413,000

      Prior Biennia (Expenditures)................................... $5,787,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $23,200,000

NEW SECTION.  Sec. 3049.  FOR THE DEPARTMENT OF ECOLOGY

      Water Irrigation Efficiencies (30000285)

Reappropriation:

      State Building Construction Account--State............... $549,000

      Prior Biennia (Expenditures)..................................... $451,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,000,000

NEW SECTION.  Sec. 3050.  FOR THE DEPARTMENT OF ECOLOGY

      Statewide Storm Water Projects (30000294)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is provided solely for construction projects or design/construction projects statewide that result in the greatest improvements necessary to meet national pollution discharge elimination system requirements for communities least able to pay for those projects or for jurisdictions that are early adopters of new regulations and effective new technology.  The department must develop specific evaluative criteria to award grants on a competitive basis to projects that meet the policy objectives in this section, demonstrate readiness to proceed, and have a minimum cash match of twenty-five percent.

Reappropriation:

      Local Toxics Control Account--State.................... $29,334,000

      Prior Biennia (Expenditures)..................................... $666,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $30,000,000

NEW SECTION.  Sec. 3051.  FOR THE DEPARTMENT OF ECOLOGY

      Green River Flood Levee Improvements (30000295)

Reappropriation:

      State Building Construction Account--State............ $4,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,000,000

NEW SECTION.  Sec. 3052.  FOR THE DEPARTMENT OF ECOLOGY

      Mount Vernon Flood Protection (30000297)

Reappropriation:

      State Building Construction Account--State............... $700,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $700,000

NEW SECTION.  Sec. 3053.  FOR THE DEPARTMENT OF ECOLOGY

      Clean Up Toxics Sites - Puget Sound (91000032)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is provided solely for the following list of projects:

 

Project

Authorized Amount

Port Gamble Bay - Open up 90 acres of geoduck tracts

$2,000,000

Port Gamble Bay - Source control, habitat preservation

        and clean-up sustainability

$7,000,000

Administration

$180,000

TOTAL

$9,180,000

Reappropriation:

      State Toxics Control Account--State....................... $9,180,000

      Prior Biennia (Expenditures)....................................... $90,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $9,270,000

NEW SECTION.  Sec. 3054.  FOR THE DEPARTMENT OF ECOLOGY

      Eastern Washington Clean Sites Initiative (91000033)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 3003, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:

      State Toxics Control Account--State....................... $1,543,000

      Prior Biennia (Expenditures)......................................... $2,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,545,000

NEW SECTION.  Sec. 3055.  FOR THE DEPARTMENT OF ECOLOGY

      Fiscal Year 2012 Statewide Storm Water Grant Program (91000053)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 3004, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:

      Local Toxics Control Account--State.................... $23,161,000

      Prior Biennia (Expenditures)..................................... $912,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $24,073,000

NEW SECTION.  Sec. 3056.  FOR THE DEPARTMENT OF ECOLOGY

      Storm Water Retrofit and Local Improvement District Competitive Grants (91000054)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 3005, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:

      Local Toxics Control Account--State.................... $14,459,000

      Prior Biennia (Expenditures)......................................... $4,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $14,463,000

NEW SECTION.  Sec. 3057.  FOR THE DEPARTMENT OF ECOLOGY

      Columbia River Water Management Projects (91000179)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 502, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

      Columbia River Basin Water Supply Development

             Account--State................................................. $2,000,000

      Prior Biennia (Expenditures)................................... $2,500,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,500,000

NEW SECTION.  Sec. 3058.  FOR THE DEPARTMENT OF ECOLOGY

      Skagit Mitigation (91000181)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation in this section is provided solely for the department to develop mitigation options and alternative water sources or tools to make water available for stream flows and for rural domestic permit-exempt uses within the Carpenter/Fisher, East Nookachamps, and Upper Nookachamps subbasins.  Up to $500,000 of the amount specified shall be used to develop a rural domestic demonstration project to determine if surface or groundwater infiltration can mitigate for ground water use during low flow periods to meet the mitigation requirements of chapter 173-503 WAC.

Reappropriation:

      State Building Construction Account--State............ $2,156,000

      Prior Biennia (Expenditures)....................................... $69,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,225,000

NEW SECTION.  Sec. 3059.  FOR THE DEPARTMENT OF ECOLOGY

      Flood Levee Improvements (92000057)

      The reappropriations in this section are subject to the following conditions and limitations:

      (1) The reappropriation in this section from the state building construction account is provided solely for the Mt. Vernon flood protection project.

      (2) The reappropriation in this section from the local toxics control account is provided solely for the King county flood district for the Briscoe-Desimone levee improvement project.

Reappropriation:

      State Building Construction Account--State............ $1,500,000

      Local Toxics Control Account--State...................... $7,000,000

             Subtotal Reappropriation.................................. $8,500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $8,500,000

NEW SECTION.  Sec. 3060.  FOR THE DEPARTMENT OF ECOLOGY

      Ground Water Management Yakima Basin (92000061)

Reappropriation:

      Columbia River Basin Water Supply Development

             Account--State.................................................... $450,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $450,000

NEW SECTION.  Sec. 3061.  FOR THE DEPARTMENT OF ECOLOGY

      Coordinated Prevention Grants (30000321)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The department shall allocate the appropriation in this section through a distribution formula to eligible jurisdictions.

      (2) The department must grant the entire appropriation according to the distribution formula and match requirements in chapter 70.95 RCW.

      (3) The state grant funding must not be used to supplant local funds.

      (4) If eligible jurisdictions are unable to use their entire allocation, the department may offer competitive grants for solid waste enforcement and implementation.

Appropriation:

      Local Toxics Control Account--State.................... $28,240,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)......................... $131,520,000

             TOTAL........................................................ $159,760,000

NEW SECTION.  Sec. 3062.  FOR THE DEPARTMENT OF ECOLOGY

      Waste Tire Pile Cleanup and Prevention (30000322)

Appropriation:

      Waste Tire Removal Account--State....................... $1,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $4,000,000

             TOTAL............................................................ $5,000,000

NEW SECTION.  Sec. 3063.  FOR THE DEPARTMENT OF ECOLOGY

      Mercury Switch Removal (30000323)

Appropriation:

      State Toxics Control Account--State.......................... $500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $500,000

NEW SECTION.  Sec. 3064.  FOR THE DEPARTMENT OF ECOLOGY

      Reducing Toxic Diesel Emissions (30000324)

Appropriation:

      State Toxics Control Account--State....................... $4,500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $20,000,000

             TOTAL.......................................................... $24,500,000

NEW SECTION.  Sec. 3065.  FOR THE DEPARTMENT OF ECOLOGY

      Reducing Toxic Wood Stove Emissions (30000325)

Appropriation:

      State Toxics Control Account--State....................... $4,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $16,000,000

            TOTAL.......................................................... $20,000,000

NEW SECTION.  Sec. 3066.  FOR THE DEPARTMENT OF ECOLOGY

      Centennial Clean Water Program (30000326)

      The appropriations in this section are subject to the following conditions and limitations:

      (1) For projects involving repair, replacement, or improvement of a wastewater treatment plant or other public works facility for which an investment grade efficiency audit is obtainable, the department of ecology must require as a contract condition that the project sponsor undertake an investment grade efficiency audit.  The project sponsor may finance the costs of the audit as part of its centennial clean water program grant.

      (2) $3,000,000 of the appropriation in this section is provided solely for the Port of Walla Walla/Burbank school district septic system replacement project.

Appropriation:

      Environmental Legacy Stewardship Account--State $50,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)......................... $240,000,000

             TOTAL........................................................ $290,000,000

NEW SECTION.  Sec. 3067.  FOR THE DEPARTMENT OF ECOLOGY

      Water Pollution Control Revolving Program (30000327)

      The appropriations in this section are subject to the following conditions and limitations:

      (1) $7,750,000 for fiscal year 2014 and $7,750,000 for fiscal year 2015 of the state building construction account--state is provided solely as state match for federal clean water funds.

      (2) For projects involving repair, replacement, or improvement of a wastewater treatment plant or other public works facility for which an investment grade efficiency audit is obtainable, the department of ecology must require as a contract condition that the project sponsor undertake an investment grade efficiency audit.  The project sponsor may finance the costs of the audit as part of its water pollution control program loan.

Appropriation:

      State Building Construction Account--State.......... $15,500,000

      Water Pollution Control Revolving Account--State..................

             ..................................................................... $184,500,000

      Water Pollution Control Revolving

             Account--Federal........................................... $50,000,000

             Subtotal Appropriation................................. $250,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)......................... $510,000,000

             TOTAL........................................................ $760,000,000

NEW SECTION.  Sec. 3068.  FOR THE DEPARTMENT OF ECOLOGY

      Coastal Wetlands Federal Funds (30000328)

Appropriation:

      General Fund--Federal............................................ $9,800,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $40,000,000

             TOTAL.......................................................... $49,800,000

NEW SECTION.  Sec. 3069.  FOR THE DEPARTMENT OF ECOLOGY

      Floodplain Management and Control Grants (92000078)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) $11,250,000 of the appropriation in this section is provided solely for making grants for flood hazard reduction projects on a competitive basis to the following eligible entities:  Counties; cities; federally recognized Indian tribes; port districts; flood control zone districts; flood control districts; and diking and drainage districts.  Preference may be given to entities with approved comprehensive flood hazard management plans.  Applicants must provide a twenty percent match with nonstate dollars.  The department must evaluate, score, and rank applications according to the following criteria:

      (a) Projects that provide cost-effective hazard reduction to people, property, critical facilities, and transportation corridors.

      (b) Projects that achieve multiple benefits, including, but not limited to, salmon recovery, water quality improvements, habitat restoration, and channel migration zone protection.

      (c) Projects that minimize or eliminate future costs for maintenance, operation, or emergency response.

      (d) Projects that have been examined through a planning process that includes public comment, such as a comprehensive flood hazard management plan, a hazard mitigation plan, a comprehensive plan, a watershed plan, or other applicable plans.

      (e) Projects that are ready to proceed with the scope of work, and whose sponsors have the capacity to complete the project successfully.

      (2) $33,000,000 of the appropriation in this section is provided solely for floodplain restoration grants for the following specific projects and amounts:

      (a) Calistoga Reach Setback Levee and Side-Channel

Construction................................................................. $5,708,000

      (b) Canyon Creek Integrated Flood-Fish................. $2,086,000

      (c) Lower Cedar River Integrated Floodplain

Restoration.................................................................... $4,103,000

      (d) Lower Dungeness Floodplain Recovery............ $7,828,000

      (e) Lower Stillaguamish Fish, Farm, and Flood

Management................................................................. $4,272,000

      (f) Neadham Road Setback Levee........................... $3,394,000

      (g) Skokomish River Floodplain Restoration and Sediment

Management................................................................. $1,387,000

      (h) Lower Snohomish River Restoration and Infrastructure

Assessment...................................................................... $894,000

      (i)  Snoqualmie River Fall City Corridor............... $3,328,000

      (3) $5,000,000 of the appropriation in this section is provided solely for the Mt. Vernon protection project.

      (4) $750,000 of the appropriation is provided solely for the Prairie Creek Drainage Improvements.

Appropriation:

      State Building Construction Account--State.......... $50,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $24,000,000

             TOTAL.......................................................... $74,000,000

NEW SECTION.  Sec. 3070.  FOR THE DEPARTMENT OF ECOLOGY

      Watershed Plan Implementation and Flow Achievement (30000331)

 Appropriation:

      State Building Construction Account--State.......... $10,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $4,000,000

             TOTAL.......................................................... $14,000,000

NEW SECTION.  Sec. 3071.  FOR THE DEPARTMENT OF ECOLOGY

      Sunnyside Valley Irrigation District Water Conservation (30000332)

Appropriation:

      State Building Construction Account--State............ $3,055,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $5,900,000

             TOTAL............................................................ $8,955,000

NEW SECTION.  Sec. 3072.  FOR THE DEPARTMENT OF ECOLOGY

      ASARCO Cleanup (30000334)

      The appropriation in this section is subject to the following conditions and limitations:  $400,000 of the appropriation in this section is provided solely for the department to contract for the cleanup and remediation of the former Ruston Way tunnel.

Appropriation:

      Cleanup Settlement Account--State...................... $30,660,000

      State Building Construction Account--State............ $4,000,000

             Subtotal Appropriation................................... $34,660,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $34,660,000

NEW SECTION.  Sec. 3073.  FOR THE DEPARTMENT OF ECOLOGY

      Padilla Bay Federal Capital Projects - Programmatic (30000335)

Appropriation:

      General Fund--Federal............................................... $500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $2,000,000

             TOTAL............................................................ $2,500,000

NEW SECTION.  Sec. 3074.  FOR THE DEPARTMENT OF ECOLOGY

      Padilla Bay Federal Capital Projects - Preservation (30000336)

Appropriation:

      General Fund--Federal............................................... $100,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $2,000,000

             TOTAL............................................................ $2,100,000

NEW SECTION.  Sec. 3075.  FOR THE DEPARTMENT OF ECOLOGY

      Cleanup Toxics Sites - Puget Sound (30000337)

Appropriation:

      Environmental Legacy Stewardship Account--State $31,500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $35,517,000

             TOTAL.......................................................... $67,017,000

NEW SECTION.  Sec. 3076.  FOR THE DEPARTMENT OF ECOLOGY

      Eastern Washington Clean Sites Initiative (30000351)

Appropriation:

      Environmental Legacy Stewardship Account--State $10,300,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $9,047,000

             TOTAL.......................................................... $19,347,000

NEW SECTION.  Sec. 3077.  FOR THE DEPARTMENT OF ECOLOGY

      Yakima River Basin Water Supply (30000373)

Appropriation:

      State Building Construction Account--State.......... $32,100,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $85,000,000

             TOTAL........................................................ $117,100,000

NEW SECTION.  Sec. 3078.  FOR THE DEPARTMENT OF ECOLOGY

      Columbia River Water Supply Development Program (30000372)

Appropriation:

      Columbia River Basin Water Supply Development

             Account--State............................................... $43,955,000

      Columbia River Basin Taxable Bond Water Supply

             Development Account--State......................... $30,545,000

             Subtotal Appropriation................................... $74,500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $74,500,000

NEW SECTION.  Sec. 3079.  FOR THE DEPARTMENT OF ECOLOGY

      Remedial Action Grants (30000374)

Appropriation:

      Local Toxics Control Account--State.................... $62,537,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)......................... $260,000,000

             TOTAL........................................................ $322,537,000

NEW SECTION.  Sec. 3080.  FOR THE DEPARTMENT OF ECOLOGY

      Water Irrigation Efficiencies Program (30000389)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation is provided solely for technical assistance and grants to conservation districts for the purpose of implementing water conservation measures and irrigation efficiencies.  The department and the state conservation commission shall give preference in order of priority to projects located in the 16 fish critical basins, other water short basins, and basins with significant water resource and instream flow issues.  Projects that are not within basins as described in this subsection are also eligible to receive funding.

      (2) Conservation districts statewide are eligible for grants listed in subsection (1) of this section.  A conservation district receiving funds shall manage each grant to ensure that a portion of the water saved by the water conservation measure or irrigation efficiency will be placed as a purchase or a lease in the trust water rights program to enhance instream flows.  The proportion of saved water placed in the trust water rights program must be equal to the percentage of the public investment in the conservation measure or irrigation efficiency.  The percentage of the public investment may not exceed eighty-five percent of the total cost of the conservation measure or irrigation efficiency.

Appropriation:

      State Building Construction Account--State............ $4,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $13,000,000

             TOTAL.......................................................... $17,000,000

NEW SECTION.  Sec. 3081.  FOR THE DEPARTMENT OF ECOLOGY

      Storm Water Improvements (92000076)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) $81,081,000 of the appropriation in this section is provided solely for grants to cities and counties to perform project-specific planning, design, and construction of projects that reduce storm water impacts from existing infrastructure and development.  The grants are intended to build on and expand a city's or county's storm water program.

      (a) In consultation with storm water stakeholders, the department shall develop and implement a competitive grant program by July 1, 2014, that is designed to fund storm water projects and activities that have been proven effective at reducing environmental degradation from storm water.

      (b) In order to receive funding, projects must have a high water quality or ecological benefit and address pollution from existing development.

      (c) A project that relies on low-impact development retrofit techniques to reduce storm water impacts that is otherwise rated equally to a project that does not rely on low-impact development retrofit techniques must be given priority for grant funding.

      (d) Projects required by court or administrative order or for mitigation purposes are not eligible for funding.

      (e) Up to $15,000,000 of the appropriation provided in this subsection may be allocated to cities or counties covered by a phase I or II national pollutant discharge elimination system permit for project-specific planning and design activities that prepare projects for application to the competitive grant program to be implemented under subsection (1)(a) of this section.  As a condition for funding, cities or counties shall prepare low-impact development retrofit projects for the competitive grant program.  Cities or counties may also use project-specific planning and design funds for other projects that have high water quality and ecological benefits that address pollution from existing development.  The department must provide notice to all cities and counties that are eligible for planning and design grants.  The notice of eligibility must also include information on grant requirements so that those who elect to participate understand the requirements for funding.

      (2)(a) $150,000 of the appropriation in this section is provided solely to the department to develop an ongoing comprehensive, statewide storm water financial assistance program to be implemented beginning no later than July 1, 2015.  The program will provide grants to local governments for the protection and improvement of statewide water quality and to improve watershed functionality by reducing the transport of toxics and other pollutants through storm water runoff, and by reducing uncontrolled runoff flows.

      (b) The department must collaborate with storm water stakeholders to develop the funding criteria for the storm water financial assistance program, and include the new statewide storm water financial assistance program into the department's integrated water quality funding cycle process.

      (c) The storm water financial assistance program may include, but not be limited to:  Funding for retrofit capital improvement projects; low-impact development; research and development components and investments in learning; pass-through funding for local government storm water permit implementation, education, and outreach; prioritized watershed basin retrofit strategies; purchase of pooled equipment for local government use; and preconstruction awards solely for the planning and design of either new storm water facilities or a retrofit of existing storm water facilities.

      (3) $18,769,000 of the appropriation in this section is provided solely for the following list of projects.

 

Storm Water Improvements

 

Bellingham Shipping Terminal Storm Water Project

$1,500,000

Camas Storm Water Projects

$2,000,000

Centralia Station Storm Water Project

$750,000

Clark County Storm Water Projects

$1,531,000

Kennewick Storm Water Projects

$1,780,000

Tacoma Regional Stormwater Facility

$3,000,000

Port of Bellingham Marine Trades Storm Water Project

$1,000,000

15th Street Water Quality Infrastructure Project

$2,184,000

Richland Storm Water Projects

$900,000

Spanaway Lake Management Plan

$400,000

Spokane Storm Water Projects

$2,000,000

Sunnyside Storm Water Project

$455,000

Union Gap Storm Water Project

$495,000

West Richland Yakima River Outfall Elimination

$124,000

Zillah Storm Water Project

$650,000

TOTAL

$18,769,000

 

 

Appropriation:

      Environmental Legacy Stewardship Account--State.................

             ..................................................................... $100,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL........................................................ $100,000,000

NEW SECTION.  Sec. 3082.  FOR THE DEPARTMENT OF ECOLOGY

      Dungeness Water Supply and Mitigation (30000333)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation in this section is provided solely for the department to develop projects and acquire water rights to enhance flows and to mitigate for rural development within the basin. The department will work with the Dungeness local leaders workgroup to coordinate water supply and mitigation projects for implementation that have been developed in cooperation with local stakeholders.

Appropriation:

      State Building Construction Account--State............ $2,050,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,050,000

NEW SECTION.  Sec. 3083.  FOR THE DEPARTMENT OF ECOLOGY

      Lower Yakima GWMA Program Development (92000085)

Appropriation:

      State Building Construction Account--State............ $1,614,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,614,000

NEW SECTION.  Sec. 3084.  FOR THE DEPARTMENT OF ECOLOGY

      Veterans' Conservation Corps (91000237)

Appropriation:

      Environmental Legacy Stewardship Account--State $1,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,000,000

NEW SECTION.  Sec. 3085.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Bay View Park:  Wide Wastewater Treatment System (20082041)

Reappropriation:

      State Building Construction Account--State............... $370,000

      Prior Biennia (Expenditures)................................... $1,817,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,187,000

NEW SECTION.  Sec. 3086.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Ike Kinswa State Park:  Improvement (20082950)

Reappropriation:

      Parks Renewal and Stewardship Account--Private/Local..........

             ........................................................................... $490,000

      Prior Biennia (Expenditures)....................................... $10,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $500,000

NEW SECTION.  Sec. 3087.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Fish Barrier Removal (30000540)

Reappropriation:

      State Building Construction Account--State............... $700,000

      Prior Biennia (Expenditures)..................................... $538,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,238,000

NEW SECTION.  Sec. 3088.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Iron Horse Tunnel Hazard Repair (30000552)

Reappropriation:

      State Building Construction Account--State............... $600,000

      Prior Biennia (Expenditures)................................... $1,296,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,896,000

NEW SECTION.  Sec. 3089.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Minor Works - Health and Safety (30000667)

Reappropriation:

      State Building Construction Account--State............ $3,200,000

      Prior Biennia (Expenditures)................................... $1,800,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,000,000

NEW SECTION.  Sec. 3090.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Minor Works - Facilities and Infrastructure Preservation (30000766)

Reappropriation:

      State Building Construction Account--State............ $1,700,000

      Prior Biennia (Expenditures)................................... $1,300,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,000,000

NEW SECTION.  Sec. 3091.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Facility and Infrastructure Backlog Reduction (30000770)

Reappropriation:

      State Building Construction Account--State............... $400,000

      Prior Biennia (Expenditures)..................................... $900,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,300,000

NEW SECTION.  Sec. 3092.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Picnic Shelters (91000018)

Reappropriation:

      State Building Construction Account--State............... $490,000

      Prior Biennia (Expenditures)....................................... $10,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $500,000

NEW SECTION.  Sec. 3093.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Rocky Reach Trail (91000035)

Reappropriation:

      State Building Construction Account--State............... $325,000

      Prior Biennia (Expenditures)....................................... $75,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $400,000

NEW SECTION.  Sec. 3094.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Comfort Stations (91000036)

Reappropriation:

      State Building Construction Account--State............ $1,500,000

      Prior Biennia (Expenditures)..................................... $254,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,754,000

NEW SECTION.  Sec. 3095.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Deferred Maintenance (91000030)

Reappropriation:

      State Building Construction Account--State............... $400,000

      Prior Biennia (Expenditures)..................................... $670,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,070,000

NEW SECTION.  Sec. 3096.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Energy Conservation (91000040)

Reappropriation:

      State Building Construction Account--State............... $156,000

      Prior Biennia (Expenditures)....................................... $59,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $215,000

NEW SECTION.  Sec. 3097.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Culverts (91000046)

Reappropriation:

      State Building Construction Account--State............ $1,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,000,000

NEW SECTION.  Sec. 3098.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Wallace Falls:  Footbridge (91000047)

Reappropriation:

      State Building Construction Account--State............... $470,000

      Prior Biennia (Expenditures)....................................... $16,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $486,000

NEW SECTION.  Sec. 3099.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Spencer Spit:  Water System Replacement (30000140)

Appropriation:

      State Building Construction Account--State............... $983,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $983,000

NEW SECTION.  Sec. 3100.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Peace Arch:  Waterline Replacement and Upgrade (30000375)

Appropriation:

      State Building Construction Account--State............... $972,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $972,000

NEW SECTION.  Sec. 3101.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Dosewallips:  Wastewater Treatment System (30000523)

Appropriation:

      State Building Construction Account--State............ $4,079,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,079,000

NEW SECTION.  Sec. 3102.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Lewis and Clark:  Replace Wastewater System (30000544)

Appropriation:

      State Building Construction Account--State............ $1,077,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,077,000

NEW SECTION.  Sec. 3103.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Potholes:  Replace Failed Recreational Vehicle Campsites Electrical Hookups (30000549)

Appropriation:

      State Building Construction Account--State............... $997,000

 

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $997,000

NEW SECTION.  Sec. 3104.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Lake Sammamish State Park:  Sunset Beach Bathhouse Replacement (30000653)

      The appropriation in this section is subject to the following conditions and limitations:  The state parks and recreation commission shall enter into an interagency agreement with the office of financial management to provide funding for a budget evaluation study.  The office of financial management shall use a budget evaluation study team approach using value engineering techniques and life cycle cost analysis in conducting the study.  The office of financial management shall select the budget evaluation team members, contract for the study, and report the results to the legislature and agencies in a timely manner following the study.  Funds must not be allotted until the scope of work is approved by the office of financial management as recommended by the study.

Appropriation:

      State Building Construction Account--State............ $2,984,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,984,000

NEW SECTION.  Sec. 3105.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Flaming Geyser State Park:  Infrastructure (30000810)

Appropriation:

      State Building Construction Account--State............ $1,325,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,325,000

NEW SECTION.  Sec. 3106.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Flaming Geyser State Park:  Day Use Renovation (30000832)

Appropriation:

      State Building Construction Account--State............ $1,002,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,002,000

NEW SECTION.  Sec. 3107.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Parkland Acquisition Account (91000056)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation in this section is provided solely for the acquisition of property adjacent to existing state park property and shall not be used to purchase property to establish new parks.

      (2) The appropriation of state building construction account--state is provided solely for the development of a report that identifies parks and recreation commission lands that are poorly used and/or not well positioned for future directions of the commission.  The commission must identify estimated sale price, potential lease revenue, or other income that may be derived from disposal or alternative use of these lands.  The legislature intends to use these under used commission assets for development of undeveloped park lands that have significant potential as destination state parks.

Appropriation:

      State Building Construction Account--State............... $250,000

      Parkland Acquisition Account--State...................... $2,000,000

             Subtotal Appropriation..................................... $2,250,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $8,000,000

             TOTAL.......................................................... $10,250,000

NEW SECTION.  Sec. 3108.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Minor Works - Facility and Infrastructure Preservation (30000845)

Appropriation:

      State Building Construction Account--State.......... $10,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $10,000,000

NEW SECTION.  Sec. 3109.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Fish Barrier Removal (30000854)

Appropriation:

      State Building Construction Account--State............ $1,048,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $4,368,000

             TOTAL............................................................ $5,416,000

NEW SECTION.  Sec. 3110.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Rocky Reach - Chelan County Public Utility District Grant (30000855)

Appropriation:

      Parks Renewal and Stewardship Account--Private/Local..........

             ........................................................................... $600,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $600,000

NEW SECTION.  Sec. 3111.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Clean Vessel Boating Pump-out Grants (30000856)

Appropriation:

      General Fund--Federal............................................ $2,600,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,600,000

NEW SECTION.  Sec. 3112.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Local Grant Authority (30000857)

Appropriation:

      Parks Renewal and Stewardship Account--Private/Local..........

             ........................................................................ $1,200,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $4,000,000

             TOTAL............................................................ $5,200,000

NEW SECTION.  Sec. 3113.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Federal Grant Authority (30000858)

      The appropriations in this section are subject to the following conditions and limitations:  Prior to opening the Fudge Point state park area for public use, the commission shall work with the Mason County Board of Commissioners and local stakeholders to identify and appropriately mitigate environmental and public service impacts of park development and use.

Appropriation:

      General Fund--Federal............................................ $1,750,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $3,000,000

             TOTAL............................................................ $4,750,000

NEW SECTION.  Sec. 3114.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Backlog Repairs and Enhanced Amenities (92000007)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation is provided solely to reduce the backlog of deferred maintenance projects and for purchase, installation, and construction of park amenities that will produce additional park revenue.  The state parks commission must limit charges against these capital appropriations for state parks throughout this act for project management and indirect and overhead costs to no more than fifteen percent of total project costs.  The state parks commission must provide an annual progress report each December 1st on achieving these savings and the progress in reducing the backlog of deferred maintenance.

      (2) The state parks and recreation commission shall report to the appropriate legislative fiscal committees by November 30, 2014, on how many cabins and yurts have been installed, their locations, and the number of cabins and yurts contracted for completion by June 30, 2015.  Cabins or yurts may not have a total cost of more than $52,000 each.

Appropriation:

      State Building Construction Account--State............ $9,404,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $9,404,000

NEW SECTION.  Sec. 3115.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Cape Disappointment Trail Development (30000419)

Appropriation:

      State Building Construction Account--State............... $517,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $4,379,000

             TOTAL............................................................ $4,896,000

NEW SECTION.  Sec. 3116.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Cape Disappointment North Head Parking (30000522)

Appropriation:

      State Building Construction Account--State............... $925,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $1,365,000

             TOTAL............................................................ $2,290,000

NEW SECTION.  Sec. 3117.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Kopachuck Day Use Development Design and Permit (30000820)

Appropriation:

      State Building Construction Account--State............... $319,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $4,974,000

             TOTAL............................................................ $5,293,000

NEW SECTION.  Sec. 3118.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Twanoh State Park Storm Water Improvements Construction Phase 1 (30000851)

Appropriation:

      State Building Construction Account--State............... $354,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $1,578,000

             TOTAL............................................................ $1,932,000

NEW SECTION.  Sec. 3119.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Camano Island Day Use Access and Facility Renovation (30000782)

Appropriation:

      State Building Construction Account--State............... $301,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $1,549,000

             TOTAL............................................................ $1,850,000

NEW SECTION.  Sec. 3120.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Millersylvania Replace Environmental Learning Center Cabins (30000821)

Appropriation:

      State Building Construction Account--State............ $1,089,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,089,000

NEW SECTION.  Sec. 3121.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Minor Works - Revenue Generation (30000847)

Appropriation:

      State Building Construction Account--State............... $437,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $1,592,000

             TOTAL............................................................ $2,029,000

NEW SECTION.  Sec. 3122.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Rocky Reach State Park Trail Development (30000853)

Appropriation:

      State Building Construction Account--State............ $3,755,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,755,000

NEW SECTION.  Sec. 3123.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Deception Pass - Kukutali Access and Interpretation (30000774)

Appropriation:

      State Building Construction Account--State............... $225,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................... $525,000

             TOTAL.............................................................. $750,000

NEW SECTION.  Sec. 3124.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Ice Age Floods Interpretive Panels (30000827)

Appropriation:

      State Building Construction Account--State............... $154,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $154,000

NEW SECTION.  Sec. 3125.  FOR THE STATE PARKS AND RECREATION COMMISSION

      Lyons Ferry State Park (91000055)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation is provided solely for capital expenses associated with re-establishing Lyons Ferry State Park.  The operating costs for re-establishing the park will be offset by reduced services on Columbia Plateau Trail State Park.  Other than taking actions, both in operating expenditures and use of limited staff time, to minimize state liabilities, such as maintaining culverts, noxious weed controls, oversight to access and easements, and other legal obligations as landowner, the agency shall not spend any additional operating funds on improvements to the following 85.5 mile undeveloped portion of Columbia Plateau Trail State Park:  From Mile Post 256.5 to Mile Post 342, the Martin Road Trailhead.

Appropriation:

      State Building Construction Account--State............... $600,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $600,000

NEW SECTION.  Sec. 3126.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Salmon Recovery Funding Board Programs (20044001)

Reappropriation:

      General Fund--Federal............................................ $3,500,000

      State Building Construction Account--State............... $161,000

            Subtotal Reappropriation.................................. $3,661,000

      Prior Biennia (Expenditures)................................. $42,714,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $46,375,000

NEW SECTION.  Sec. 3127.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Washington Wildlife and Recreation Program (20044002)

      The reappropriations in this section are subject to the following conditions and limitations:  Any amount of the reappropriations that are not obligated to a specific project may be used to fund alternate projects approved by the legislature from the same account in biennia succeeding that in which the moneys were originally appropriated.

Reappropriation:

      Outdoor Recreation Account--State........................... $415,000

      Habitat Conservation Account--State......................... $200,000

             Subtotal Reappropriation..................................... $615,000

      Prior Biennia (Expenditures)................................. $43,915,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $44,530,000

NEW SECTION.  Sec. 3128.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Youth Athletic Fields (20062952)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 172, chapter 371, Laws of 2006.

Reappropriation:

      State Building Construction Account--State................. $63,000

      Prior Biennia (Expenditures)................................... $2,437,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,500,000

NEW SECTION.  Sec. 3129.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Salmon Recovery Funding Board Programs (20064001)

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations are subject to the provisions of section 403, chapter 488, Laws of 2005.

Reappropriation:

      General Fund--Federal............................................ $3,600,000

      State Building Construction Account--State............... $950,000

             Subtotal Reappropriation.................................. $4,550,000

      Prior Biennia (Expenditures)................................. $57,450,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $62,000,000

NEW SECTION.  Sec. 3130.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Washington Wildlife and Recreation Program (20064002)

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations are subject to the provisions of section 404, chapter 488, Laws of 2005.

Reappropriation:

      Outdoor Recreation Account--State........................... $928,000

      Habitat Conservation Account--State...................... $2,300,000

             Subtotal Reappropriation.................................. $3,228,000

      Prior Biennia (Expenditures)................................. $46,772,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $50,000,000

NEW SECTION.  Sec. 3131.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Nonhighway and Off-Road Vehicle Activities Program (20064004)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 170, chapter 371, Laws of 2006.

Reappropriation:

      NOVA Program Account--State................................ $437,000

      Prior Biennia (Expenditures)................................... $7,142,000

      Future Biennia (Projected Costs).......................................... $0

            TOTAL............................................................ $7,579,000

NEW SECTION.  Sec. 3132.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Family Forest and Fish Passage Program (20082001)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 3138, chapter 520, Laws of 2007.

Reappropriation:

      State Building Construction Account--State............... $239,000

      Prior Biennia (Expenditures)................................... $5,761,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $6,000,000

NEW SECTION.  Sec. 3133.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Boating Facilities Program (20084001)

Reappropriation:

      Recreation Resources Account--State........................ $469,000

      Prior Biennia (Expenditures)................................... $7,552,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $8,021,000

NEW SECTION.  Sec. 3134.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Firearms and Archery Range Recreation (20084003)

Reappropriation:

      Firearms Range Account--State................................... $48,000

      Prior Biennia (Expenditures)..................................... $424,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $472,000

NEW SECTION.  Sec. 3135.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Puget Sound Restoration and Acquisition (20084004)

Reappropriation:

      State Building Construction Account--State............... $783,000

      Prior Biennia (Expenditures)................................. $39,967,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $40,750,000

NEW SECTION.  Sec. 3136.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Aquatic Lands Enhancement Account (20084005)

Reappropriation:

      State Building Construction Account--State............... $264,000

      Prior Biennia (Expenditures)................................... $4,761,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,025,000

NEW SECTION.  Sec. 3137.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Nonhighway and Off-Road Vehicle Activities Program (20084008)

Reappropriation:

      NOVA Program Account--State................................ $425,000

      Prior Biennia (Expenditures)................................... $8,611,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $9,036,000

NEW SECTION.  Sec. 3138.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Washington Wildlife Recreation Grants (20084011)

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations are subject to the provisions of section 3146, chapter 520, Laws of 2007.

Reappropriation:

      Outdoor Recreation Account--State........................ $1,174,000

      Habitat Conservation Account--State...................... $7,217,000

             Subtotal Reappropriation.................................. $8,391,000

      Prior Biennia (Expenditures)................................. $90,101,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $98,492,000

NEW SECTION.  Sec. 3139.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Salmon Recovery Funding Board Programs (20084851)

Reappropriation:

      State Building Construction Account--State............ $1,929,000

      Prior Biennia (Expenditures)................................. $58,071,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $60,000,000

NEW SECTION.  Sec. 3140.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Washington Wildlife Recreation Grants (30000002)

Reappropriation:

      Outdoor Recreation Account--State........................... $619,000

      Habitat Conservation Account--State...................... $6,721,000

      Riparian Protection Account--State......................... $3,600,000

      Farmlands Preservation Account--State.................. $1,040,000

             Subtotal Reappropriation................................ $11,980,000

      Prior Biennia (Expenditures)................................. $57,465,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $69,445,000

NEW SECTION.  Sec. 3141.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Salmon Recovery Funding Board Programs (30000003)

Reappropriation:

      General Fund--Federal.......................................... $10,300,000

      State Building Construction Account--State............... $213,000

             Subtotal Reappropriation................................ $10,513,000

      Prior Biennia (Expenditures)................................. $59,487,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $70,000,000

NEW SECTION.  Sec. 3142.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Land and Water Conservation Fund (30000005)

Reappropriation:

      General Fund--Federal............................................ $1,160,000

      Prior Biennia (Expenditures)................................... $2,840,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,000,000

NEW SECTION.  Sec. 3143.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Aquatic Lands Enhancement Account (30000007)

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations are provided solely for the list of projects in LEAP capital document No. 2009-3, developed March 9, 2009.

Reappropriation:

      Aquatic Lands Enhancement Account--State............. $390,000

      State Building Construction Account--State............... $324,000

             Subtotal Reappropriation..................................... $714,000

      Prior Biennia (Expenditures)................................... $4,311,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,025,000

NEW SECTION.  Sec. 3144.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Firearms and Archery Range Recreation (30000009)

Reappropriation:

      Firearms Range Account--State................................. $210,000

      Prior Biennia (Expenditures)..................................... $285,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $495,000

NEW SECTION.  Sec. 3145.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Puget Sound Acquisition and Restoration (30000080)

Reappropriation:

      State Building Construction Account--State............ $4,369,000

      Prior Biennia (Expenditures)................................. $28,631,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $33,000,000

NEW SECTION.  Sec. 3146.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Puget Sound Estuary and Salmon Restoration Program (30000081)

Reappropriation:

      State Building Construction Account--State............ $2,101,000

      Prior Biennia (Expenditures)................................... $4,899,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $7,000,000

NEW SECTION.  Sec. 3147.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Boating Facilities Program (30000138)

Reappropriation:

      Recreation Resources Account--State..................... $4,300,000

      Prior Biennia (Expenditures)................................... $3,700,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $8,000,000

NEW SECTION.  Sec. 3148.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Washington Wildlife Recreation Grants (30000139)

      The reappropriations in this section are subject to the following conditions and limitations:  The reappropriations are provided solely for the list of projects in LEAP capital document No. 2011-3A, developed May 24, 2011.

Reappropriation:

      Riparian Protection Account--State............................ $650,000

      Farmlands Preservation Account--State..................... $314,000

      Outdoor Recreation Account--State........................ $8,330,000

      Habitat Conservation Account--State...................... $7,567,000

             Subtotal Reappropriation................................ $16,861,000

      Prior Biennia (Expenditures)................................. $25,139,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $42,000,000

NEW SECTION.  Sec. 3149.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Salmon Recovery Funding Board Programs (30000140)

Reappropriation:

      General Fund--Federal.......................................... $50,000,000

      State Building Construction Account--State............ $7,350,000

             Subtotal Reappropriation................................ $57,350,000

      Prior Biennia (Expenditures)................................. $12,712,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $70,062,000

NEW SECTION.  Sec. 3150.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Nonhighway and Off-Road Vehicle Activities Program (30000141)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 3067, chapter 48, Laws of 2011 1st sp. sess.

Reappropriation:

      NOVA Program Account--State............................. $3,347,000

      Prior Biennia (Expenditures)................................... $2,153,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,500,000

NEW SECTION.  Sec. 3151.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Land and Water Conservation Fund (30000142)

Reappropriation:

      General Fund--Federal............................................ $3,750,000

 

      Prior Biennia (Expenditures)..................................... $250,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,000,000

NEW SECTION.  Sec. 3152.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Aquatic Lands Enhancement Account (30000143)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is provided solely for the list of projects in LEAP capital document No. 2011-3B, revised April 10, 2013.

Reappropriation:

      Aquatic Lands Enhancement Account--State.......... $2,601,000

      Prior Biennia (Expenditures)................................... $4,205,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $6,806,000

NEW SECTION.  Sec. 3153.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Firearms and Archery Range Recreation (30000144)

Reappropriation:

      Firearms Range Account--State................................... $45,000

      Prior Biennia (Expenditures)..................................... $320,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $365,000

NEW SECTION.  Sec. 3154.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Boating Improvement Grants (30000145)

Reappropriation:

      General Fund--Federal............................................... $359,000

      Prior Biennia (Expenditures)................................... $1,741,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,100,000

NEW SECTION.  Sec. 3155.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Recreational Trails Program (30000146)

Reappropriation:

      General Fund--Federal............................................ $3,960,000

      Prior Biennia (Expenditures)................................... $1,040,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,000,000

NEW SECTION.  Sec. 3156.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Puget Sound Estuary and Salmon Restoration Program (30000148)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation shall not be expended on the acquisition of lands by state agencies.

Reappropriation:

      State Building Construction Account--State............ $3,455,000

      Prior Biennia (Expenditures)................................... $1,545,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,000,000

NEW SECTION.  Sec. 3157.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Family Forest Fish Passage Program (91000001)

Reappropriation:

      State Building Construction Account--State............... $188,000

      Prior Biennia (Expenditures)................................... $4,812,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,000,000

NEW SECTION.  Sec. 3158.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Puget Sound Restoration (30000147)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation shall not be expended on the acquisition of lands by state agencies.

Reappropriation:

      State Building Construction Account--State.......... $10,684,000

 

      Prior Biennia (Expenditures)................................... $4,316,000

      Future Biennia (Projected Costs).......................................... $0

            TOTAL.......................................................... $15,000,000

NEW SECTION.  Sec. 3159.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Family Forest Fish Passage Program (30000203)

Reappropriation:

      State Building Construction Account--State............... $367,000

      Prior Biennia (Expenditures)................................. $16,633,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $17,000,000

NEW SECTION.  Sec. 3160.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Family Forest Fish Passage Program (91000097)

Reappropriation:

      State Toxics Control Account--State....................... $8,981,000

      Prior Biennia (Expenditures)................................... $1,019,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $10,000,000

NEW SECTION.  Sec. 3161.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Washington Wildlife Recreation Grants (30000205)

      The appropriations in this section are subject to the following conditions and limitations:

      (1) The appropriations in this section are provided solely for the list of projects in LEAP capital document No. 2013-6A, developed June 29, 2013.

      (2) Amounts allocated to the Okanogan Similkameen 2012 project must not be disbursed until the recreation conservation office has reevaluated the level of local support for the project, including consultation with the Okanogan county board of commissioners, reported to the appropriate committees of the legislature the results of the reevaluation, and the legislature has amended this appropriation to allow the project to move forward.

Appropriation:

      Outdoor Recreation Account--State...................... $25,500,000

      Habitat Conservation Account--State.................... $25,500,000

      Riparian Protection Account--State......................... $8,500,000

      Farmlands Preservation Account--State.................. $5,500,000

             Subtotal Appropriation................................... $65,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)......................... $360,000,000

             TOTAL........................................................ $425,000,000

NEW SECTION.  Sec. 3162.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Salmon Recovery Funding Board Programs (30000206)

      The appropriations in this section are subject to the following conditions and limitations:  $100,000 of the state building construction account--state appropriation is provided solely for the recreation and conservation office, in consultation with the department of transportation and using only existing state licensed technologies, to identify transportation mitigation projects that minimize permit delays and optimize salmon habitat restoration.

Appropriation:

      General Fund--Federal.......................................... $60,000,000

      State Building Construction Account--State.......... $15,000,000

             Subtotal Appropriation................................... $75,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)......................... $400,000,000

             TOTAL........................................................ $475,000,000

NEW SECTION.  Sec. 3163.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Boating Facilities Program (30000207)

Appropriation:

      Recreation Resources Account--State..................... $6,363,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $38,000,000

             TOTAL.......................................................... $44,363,000

NEW SECTION.  Sec. 3164.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Nonhighway Off-Road Vehicle Activities (30000208)

Appropriation:

      NOVA Program Account--State............................. $8,500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $34,000,000

             TOTAL.......................................................... $42,500,000

NEW SECTION.  Sec. 3165.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Aquatic Lands Enhancement Account (30000210)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation in this section is provided solely for the list of projects in LEAP capital document No. 2013-2B, developed April 10, 2013.

Appropriation:

      Aquatic Lands Enhancement Account--State.......... $6,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $26,400,000

             TOTAL.......................................................... $32,400,000

NEW SECTION.  Sec. 3166.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Puget Sound Acquisition and Restoration (30000211)

Appropriation:

      State Building Construction Account--State.......... $70,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)......................... $140,000,000

             TOTAL........................................................ $210,000,000

NEW SECTION.  Sec. 3167.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Puget Sound Estuary and Salmon Restoration Program (30000212)

Appropriation:

      State Building Construction Account--State.......... $10,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $25,000,000

             TOTAL.......................................................... $35,000,000

NEW SECTION.  Sec. 3168.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Firearms and Archery Range Recreation (30000213)

      The appropriations in this section are subject to the following conditions and limitations:  $35,000 of the appropriation is provided solely for a grant for improvements at Klickitat Co. law enforcement/public shooting range.

Appropriation:

      Firearms Range Account--State................................. $800,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $1,750,000

             TOTAL............................................................ $2,550,000

NEW SECTION.  Sec. 3169.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Recreational Trails Program (30000214)

Appropriation:

      General Fund--Federal............................................ $5,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $20,000,000

             TOTAL.......................................................... $25,000,000

NEW SECTION.  Sec. 3170.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Boating Infrastructure Grants (30000215)

Appropriation:

      General Fund--Federal............................................ $2,200,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $8,800,000

             TOTAL.......................................................... $11,000,000

NEW SECTION.  Sec. 3171.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Land and Water Conservation (30000216)

Appropriation:

      General Fund--Federal............................................ $4,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $16,000,000

             TOTAL.......................................................... $20,000,000

NEW SECTION.  Sec. 3172.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Family Forest Fish Passage Program (30000218)

Appropriation:

      State Building Construction Account--State............ $2,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $14,540,000

             TOTAL.......................................................... $16,540,000

NEW SECTION.  Sec. 3173.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Youth Recreation Grants (92000055)

      The appropriations in this section are subject to the following conditions and limitations:  The appropriation is provided solely for grants to the following list of projects:

      Bellingham Sports Fields........................................ $1,500,000

      Northshore Athletic Fields......................................... $750,000

      Playfields at Woodway High School.......................... $680,000

      Redmond Ridge Athletic Fields................................. $700,000

             TOTAL............................................................ $3,630,000

Appropriation:

      State Building Construction Account--State............ $3,630,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,630,000

NEW SECTION.  Sec. 3174.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Public Lands Inventory (91000445)

      The appropriation in this section is subject to the following conditions and limitations:  The recreation and conservation office, in collaboration with the joint legislative audit and review committee, shall:

      (1) Provide an updated, centralized inventory of lands in Washington owned by federal, state, and local governments, and by Native American tribes.

      (a) The inventory must be in a web-accessible format, including a GIS-based interactive map that allows users to find out information about specific areas.  The data must be standardized to allow summary information to be accessible.

      (b) The inventory must include the following information:

      (i) Ownership (federal; state, by state agency; local government; and tribal);

      (ii) Ownership type (fee simple or easements);

      (iii) Location;

      (iv) Acreage;

      (v) Principal use of these lands (intended use at the time of acquisition and current use) including, but not limited to, developed recreation land, habitat and passive recreation land, and revenue-generation uses; and

      (vi) Acquisition costs if acquired by state agencies over the last ten years, including acquisition funding sources.

      (2) Develop recommendations for standardization of acquisition and disposal recordkeeping on a biennial basis, including identifying a preferred process for centralizing acquisition data.

      (3) Submit a status report on the inventory to the appropriate committees of the legislature by January 1, 2014, and a final report by July 1, 2014.

Appropriation:

      State Building Construction Account--State............... $200,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $200,000

NEW SECTION.  Sec. 3175.  FOR THE STATE CONSERVATION COMMISSION

      Conservation Reserve Enhancement Program (91000007)

Reappropriation:

      State Building Construction Account--State............... $850,000

      Prior Biennia (Expenditures)..................................... $427,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,277,000

NEW SECTION.  Sec. 3176.  FOR THE STATE CONSERVATION COMMISSION

      Farms and Water Quality (91000004)

Reappropriation:

      State Building Construction Account--State............... $500,000

      Prior Biennia (Expenditures)................................... $4,500,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,000,000

NEW SECTION.  Sec. 3177.  FOR THE STATE CONSERVATION COMMISSION

      CREP Riparian Cost Share - State Match (30000009)

Appropriation:

      State Building Construction Account--State............ $2,590,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $11,000,000

             TOTAL.......................................................... $13,590,000

NEW SECTION.  Sec. 3178.  FOR THE STATE CONSERVATION COMMISSION

      Natural Resources Investment for the Economy and Environment (30000010)

      The appropriations in this section are subject to the following conditions and limitations:

      (1) $4,500,000 of the state building construction account--state appropriation and $500,000 of the general fund--federal appropriation are provided solely for grants to complete natural resource enhancement projects necessary to improve water quality in shellfish growing areas.

      (2) $4,500,000 of the state building construction account--state appropriation and $500,000 of the general fund--federal appropriation are provided solely for grants to complete natural resource enhancement projects necessary to improve water quality in non-shellfish growing areas.

Appropriation:

      State Building Construction Account--State............ $9,000,000

      General Fund--Federal............................................ $1,000,000

             Subtotal Appropriation................................... $10,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $20,000,000

             TOTAL.......................................................... $30,000,000

NEW SECTION.  Sec. 3179.  FOR THE STATE CONSERVATION COMMISSION

      CREP PIP Loan Program (30000011)

Appropriation:

      Conservation Assistance Revolving Account--State... $180,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................... $720,000

             TOTAL.............................................................. $900,000

NEW SECTION.  Sec. 3180.  FOR THE STATE CONSERVATION COMMISSION

      Conservation Reserve Enhancement Program Riparian Contract Funding (30000012)

Appropriation:

      State Building Construction Account--State............ $2,231,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $8,924,000

             TOTAL.......................................................... $11,155,000

NEW SECTION.  Sec. 3181.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Voights Creek Hatchery (20081003)

Reappropriation:

      State Building Construction Account--State.......... $13,300,000

      Prior Biennia (Expenditures)................................... $1,997,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $15,297,000

NEW SECTION.  Sec. 3182.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Stemilt Basin Acquisition (20082029)

Reappropriation:

      State Building Construction Account--State............... $153,000

      Prior Biennia (Expenditures)....................................... $47,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $200,000

NEW SECTION.  Sec. 3183.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works - Facility Preservation (30000300)

Reappropriation:

      State Building Construction Account--State............ $1,350,000

      Prior Biennia (Expenditures)................................... $1,207,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,557,000

NEW SECTION.  Sec. 3184.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works - Road Maintenance and Abandonment Plan (30000295)

Reappropriation:

      State Building Construction Account--State............ $1,505,000

      Prior Biennia (Expenditures)..................................... $321,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,826,000

NEW SECTION.  Sec. 3185.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works - Access Areas Preservation (30000296)

Reappropriation:

      State Building Construction Account--State............... $336,000

      Prior Biennia (Expenditures)..................................... $691,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,027,000

NEW SECTION.  Sec. 3186.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works - Dam and Dike (30000297)

Reappropriation:

      State Building Construction Account--State............... $750,000

      Prior Biennia (Expenditures)..................................... $293,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,043,000

NEW SECTION.  Sec. 3187.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Migratory Waterfowl Habitat (30000653)

Appropriation:

      State Wildlife Account--State.................................... $600,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $1,800,000

             TOTAL............................................................ $2,400,000

NEW SECTION.  Sec. 3188.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Lab Equipment (30000656)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation is provided solely for the department to purchase lab equipment for the Manchester and Mukilteo research stations as specified by the national oceanic and atmospheric administration to support the Washington state shellfish initiative.

Appropriation:

      State Building Construction Account--State............... $100,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $100,000

NEW SECTION.  Sec. 3189.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Leque Island Highway 532 Road Protection (92000019)

Reappropriation:

      State Building Construction Account--State............... $394,000

      Prior Biennia (Expenditures)..................................... $286,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $680,000

NEW SECTION.  Sec. 3190.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Mitchell Act Federal Grant (91000021)

Reappropriation:

      General Fund--Federal............................................ $2,328,000

      Prior Biennia (Expenditures)..................................... $672,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,000,000

NEW SECTION.  Sec. 3191.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Mitigation Projects and Dedicated Funding (20082048)

      The appropriations are subject to the following conditions and limitations:  The department must prepare an inventory of their agricultural land holdings.  Agricultural land holdings are department owned lands that support agricultural activities, including raising nonnative crops for sale or use by wildlife, or grazing of domestic animals.  The inventory must be submitted to the appropriate committees of the legislature by December 1, 2013.  The inventory must also be submitted to the recreation conservation office for inclusion in the office's computer system for lands the department acquired through grants from recreation conservation office programs.  The inventory must describe:

      (1) The size, location, and amount of any water right of each parcel used for agricultural activities;

      (2) The date of acquisition of the parcel, the amount and source of funds for the acquisition, and the intended purpose of the land at the time of acquisition;

      (3) The nature of the agricultural activities over the past five years;

      (4) Whether the activities are conducted by department employees or through a contract or lease to a private agricultural operator, and the terms of any lease;

      (5) The amount of the harvest and revenue received from the agricultural activities; and

      (6) A description of current leasing policies and procedures for leasing department lands for agricultural uses.

Reappropriation:

      General Fund--Federal.......................................... $12,778,000

      Special Wildlife Account--Federal............................. $300,000

      Special Wildlife Account--Private/Local................... $203,000

             Subtotal Reappropriation................................ $13,281,000

Appropriation:

      Special Wildlife Account--Federal............................. $800,000

      Special Wildlife Account--Private/Local................. $1,600,000

      State Wildlife Account--State................................. $1,500,000

      General Fund--Private/Local................................... $2,500,000

      General Fund--Federal.......................................... $29,600,000

             Subtotal Appropriation................................... $36,000,000

      Prior Biennia (Expenditures)................................. $81,515,000

      Future Biennia (Projected Costs).......................... $90,750,000

             TOTAL........................................................ $221,546,000

NEW SECTION.  Sec. 3192.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works - Health Safety and Code Requirements (30000284)

Reappropriation:

      State Building Construction Account--State............... $693,000

      Prior Biennia (Expenditures)..................................... $548,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,241,000

NEW SECTION.  Sec. 3193.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works - Infrastructure Preservation (30000298)

Reappropriation:

      State Building Construction Account--State............... $600,000

      Prior Biennia (Expenditures)................................... $1,930,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,530,000

NEW SECTION.  Sec. 3194.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works - Fish Passage Barrier Corrections (30000372)

Reappropriation:

      State Building Construction Account--State............... $841,000

      Prior Biennia (Expenditures)..................................... $439,000

      Future Biennia (Projected Costs).......................................... $0

            TOTAL............................................................ $1,280,000

NEW SECTION.  Sec. 3195.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Beebe Springs Development (92000026)

Reappropriation:

      State Building Construction Account--State............... $960,000

      Prior Biennia (Expenditures)..................................... $931,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,891,000

NEW SECTION.  Sec. 3196.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Fishway Improvements/Diversions (91000033)

Reappropriation:

      State Building Construction Account--State............ $7,300,000

      Prior Biennia (Expenditures)..................................... $700,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $8,000,000

NEW SECTION.  Sec. 3197.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Hatchery Improvements (91000036)

Reappropriation:

      State Building Construction Account--State.......... $32,250,000

      Prior Biennia (Expenditures)................................... $2,525,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $34,775,000

NEW SECTION.  Sec. 3198.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Dry Forest Restoration (91000039)

Reappropriation:

      State Building Construction Account--State............... $496,000

      Prior Biennia (Expenditures)..................................... $300,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $796,000

NEW SECTION.  Sec. 3199.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works - Dam and Dike (91000042)

Reappropriation:

      State Building Construction Account--State............... $197,000

      Prior Biennia (Expenditures)......................................... $3,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $200,000

NEW SECTION.  Sec. 3200.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works - Access Sites (91000044)

Reappropriation:

      State Building Construction Account--State............ $6,125,000

      Prior Biennia (Expenditures)................................... $1,281,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $7,406,000

NEW SECTION.  Sec. 3201.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works - Fish Passage Barriers (Culverts) (91000045)

Reappropriation:

      State Building Construction Account--State............ $1,300,000

      Prior Biennia (Expenditures)..................................... $195,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,495,000

NEW SECTION.  Sec. 3202.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works - Road Maintenance and Abandonment Plan (91000046)

Reappropriation:

      State Building Construction Account--State............... $495,000

      Prior Biennia (Expenditures)....................................... $21,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $516,000

NEW SECTION.  Sec. 3203.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Acquire Dryden Gravel Pit from Washington DOT (92000028)

Reappropriation:

      State Building Construction Account--State............... $251,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $251,000

NEW SECTION.  Sec. 3204.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works Programmatic (300000644)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) $150,000 of the appropriation is provided solely for expansion of the incubation room at the Hurd Creek Hatchery.

      (2) $350,000 of the appropriation is provided solely for net pens infrastructure and equipment at Mayfield Lake.

      (3) $25,000 of the appropriation is provided solely for the department to construct a primitive road, of a minimum of one mile, with no adverse impacts on streams or riparian areas, in the Naneum road planning area within Kittitas county.  This is to replace the lost general public access as a result of the Stray-Tekison road abandonment.  The department shall collaborate in the placement of the road with the Kittitas county field and stream club.  Further, as part of the Naneum to Columbia river recreational planning process, the department is instructed to adopt a plan that results in a net increase of green dot access roads in Kittitas county.

Appropriation:

      State Building Construction Account--State............... $500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $500,000

NEW SECTION.  Sec. 3205.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Deschutes Watershed Center (20062008)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) $6,000,000 of the appropriation is provided solely to renovate the existing Tumwater Falls facility.

      (2) $680,000 of the appropriation is provided solely for site work at the Pioneer Park site, including walking trails, educational or interpretive displays, a public feature, access, construction staging, parking and contouring.

      (3) $620,000 of the appropriation is provided solely for constructing the water delivery system for the future hatchery facility including development of existing well, constructing an aeration tower, and installing pumps and piping.

Reappropriation:

      State Building Construction Account--State............... $219,000

Appropriation:

      State Building Construction Account--State............ $7,300,000

      Prior Biennia (Expenditures)................................... $2,976,000

      Future Biennia (Projected Costs).......................... $31,234,000

             TOTAL.......................................................... $41,729,000

NEW SECTION.  Sec. 3206.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Minor Works Preservation (30000479)

Appropriation:

      State Building Construction Account--State............ $9,975,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)......................... $135,900,000

             TOTAL........................................................ $145,875,000

NEW SECTION.  Sec. 3207.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Wooten Wildlife Area Improve Flood Plain (30000481)

      The appropriations in this section are subject to the following conditions and limitations:  The state building construction account-- state appropriation is provided solely to relocate an existing campground out of the floodplain.  The general fund--federal appropriation is provided solely as authority to expend anticipated funding by the Bonneville power administration for habitat enhancement in the Wooten wildlife area.

Appropriation:

      General Fund--Federal............................................ $2,600,000

      State Building Construction Account--State............... $500,000

             Subtotal Appropriation..................................... $3,100,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $18,197,000

             TOTAL.......................................................... $21,297,000

NEW SECTION.  Sec. 3208.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Replace Fire Damaged Fencing (30000655)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation in this section is provided solely for repair and replacement of deer and elk fencing damaged in recent fires.  Up to $422,000 of this amount is provided for repair or replacement of fencing along state highway 97A destroyed in the 2012 Byrd complex fire.  The department must work with the department of natural resources to pursue possible insurance claims for the damaged fencing.  Any insurance payments received must be deposited in the state wildlife account.

Appropriation:

      State Building Construction Account--State............ $1,612,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,612,000

NEW SECTION.  Sec. 3209.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Cooperative Fencing (91000147)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation in this section is provided solely for a cooperative fencing program between the department and landowners who experience chronic crop damage caused by deer and elk.  Cooperative agreements shall be negotiated with landowners and materials provided, facilities constructed, or easements purchased to abate property damage.

      (2) $210,000 of the appropriation in this section is provided solely for the Stemilt wildlife fence.

Appropriation:

      State Building Construction Account--State............... $350,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $350,000

NEW SECTION.  Sec. 3210.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Derelict Net Removal (91000148)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation in this section is provided solely to the department of fish and wildlife to work cooperatively with the northwest straits foundation for the removal of shallow water legacy nets from high priority areas of Puget Sound.  The high priority areas are those where high historical fishing pressure coincides with sea bed characteristics likely to snag nets.  Legacy nets are those nets lost in previous years of fishing, rather than newly lost nets.

Appropriation:

      State Building Construction Account--State............ $3,500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,500,000

NEW SECTION.  Sec. 3211.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

      Beebe Springs (92000034)

Appropriation:

      State Building Construction Account--State............... $500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $500,000

NEW SECTION.  Sec. 3212.  FOR THE PUGET SOUND PARTNERSHIP

      Community Partnership Restoration Grants (30000007)

Reappropriation:

      General Fund--Federal............................................ $1,155,000

      Prior Biennia (Expenditures)..................................... $445,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,600,000

NEW SECTION.  Sec. 3213.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Land Acquisition Grants (20052021)

Reappropriation:

      General Fund--Federal............................................ $3,714,000

Appropriation:

      General Fund--Federal............................................ $4,000,000

      Prior Biennia (Expenditures)................................. $39,240,000

      Future Biennia (Projected Costs).......................... $16,000,000

             TOTAL.......................................................... $62,954,000

NEW SECTION.  Sec. 3214.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Marine Station (20081015)

Reappropriation:

      Resources Management Cost Account--State............. $318,000

      State Building Construction Account--State............... $316,000

             Subtotal Reappropriation..................................... $634,000

      Prior Biennia (Expenditures)..................................... $866,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,500,000

NEW SECTION.  Sec. 3215.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Forest Legacy (30000060)

Reappropriation:

      General Fund--Federal.......................................... $11,519,000

Appropriation:

      General Fund--Federal............................................ $7,000,000

      Prior Biennia (Expenditures)................................... $2,481,000

      Future Biennia (Projected Costs).......................... $28,000,000

             TOTAL.......................................................... $49,000,000

NEW SECTION.  Sec. 3216.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Hazardous Fuels Reduction, Forest Health, and Ecosystem Improvements (91000001)

Reappropriation:

      General Fund--Federal Stimulus................................ $100,000

      Prior Biennia (Expenditures)................................. $19,900,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $20,000,000

NEW SECTION.  Sec. 3217.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      National Coastal Wetland Conservation Program Lands Acquisition (91000007)

Reappropriation:

      General Fund--Federal............................................... $593,000

      Prior Biennia (Expenditures)..................................... $407,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,000,000

NEW SECTION.  Sec. 3218.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Replacing State Forest Lands with Productive Forests (91000029)

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The total reappropriation is provided solely to the department to transfer from state forest land status to natural resources conservation area status certain state forest lands in counties with a population of 25,000 or less that are subject to timber harvest deferrals greater than thirty years due to the presence of wildlife species listed as endangered or threatened under the federal endangered species act.  The approved list of properties for transfer is identified in the LEAP capital document No. 2011-5A, revised April 10, 2013.

      (2) Property transferred under this section must be appraised and transferred at fair market value, without consideration of management or regulatory encumbrances associated with wildlife species listed under the federal endangered species act.  The value of the timber and other valuable materials transferred must be distributed as provided in RCW 79.64.110, in the same manner as valuable material revenues from other state forest lands in the applicable counties.  The value of the land transferred must be deposited in the park land trust revolving account and be solely used to buy replacement state forest land within the same county as the property transferred, consistent with RCW 79.22.060.

      (3) Prior to or concurrent with conveyance of these properties, the department shall execute and record a real property instrument that dedicates the transferred properties to the purposes identified in subsection (1) of this section.  Transfer agreements for properties identified in subsection (1) of this section must include terms that restrict the use of the property to the intended purpose.

      (4) The department and applicable counties shall work in good faith to carry out the intent of this section.  However, the department or applicable counties may remove a property from the transfer list based on new, substantive information, if it is determined that transfer of the property is not in the statewide interest of either the state forest trust or the natural resources conservation area program.

Reappropriation:

      State Building Construction Account--State............... $727,000

      Prior Biennia (Expenditures)................................... $1,273,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,000,000

NEW SECTION.  Sec. 3219.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Puget SoundCorps (91000046)

Reappropriation:

      Aquatic Lands Enhancement Account--State.......... $3,000,000

      State Building Construction Account--State............ $8,436,000

             Subtotal Reappropriation................................ $11,436,000

      Prior Biennia (Expenditures)................................... $1,564,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $13,000,000

NEW SECTION.  Sec. 3220.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Derelict Vessel Removal and Disposal (91000049)

      The appropriations in this section are subject to the following conditions and limitations:  The appropriations are provided solely for the expedited removal and disposal of derelict vessels under RCW 79.100.100 and for vessels eligible for the voluntary vessel turn-in program established in chapter 291, Laws of 2013 (Engrossed Substitute House Bill No. 1245).

      (1) The department must streamline the process for removing and disposing of derelict vessels in order to expedite the elimination of the backlog of identified derelict vessels.  Department staff resources must prioritize their time on the legal process of identifying legal ownership and responsibility and contracting for the removal and disposal of identified derelict vessels.  The department must develop and execute contracts for removal and disposal of derelict vessels that:

      (a) Ensure proper management of any hazardous wastes;

      (b) Expedite the removal of identified derelict vessels; and

      (c) Balance costs of removal and disposal after accounting for salvage value with the need to develop contractor capacity to achieve the expedited elimination of the backlog of identified derelict vessels.

      (2) The department may expend up to three percent of the appropriations for administration of the project.

      (3) The department must submit a progress report each December 1st and May 1st of each year of the biennium.  The report must include a list of the vessels removed and disposed of, the costs incurred for administration, removal, and disposal, and the number of vessels remaining to be removed and disposed of at the end of the reporting period.

Reappropriation:

      State Building Construction Account--State............... $589,000

Appropriation:

      Environmental Legacy Stewardship Account--State $4,500,000

      Prior Biennia (Expenditures)................................... $2,411,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $7,500,000

NEW SECTION.  Sec. 3221.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Urban Forest Restoration (Puget Sound Basin) (91000051)

Reappropriation:

      State Building Construction Account--State............... $399,000

      Prior Biennia (Expenditures)......................................... $1,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $400,000

NEW SECTION.  Sec. 3222.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Large Debris Removal (91000052)

Reappropriation:

      State Building Construction Account--State............... $188,000

      Prior Biennia (Expenditures)....................................... $12,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $200,000

NEW SECTION.  Sec. 3223.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Secret Harbor Estuary Restoration - Cypress Island (91000053)

Reappropriation:

      State Building Construction Account--State............... $415,000

      Prior Biennia (Expenditures)..................................... $120,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $535,000

NEW SECTION.  Sec. 3224.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Restoration Projects to Improve Natural Resources (91000054)

Reappropriation:

      State Building Construction Account--State............ $1,200,000

      Prior Biennia (Expenditures)................................... $1,360,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,560,000

NEW SECTION.  Sec. 3225.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Point Ruston Sediment Capping/Shoreline Restoration Stabilization (91000065)

Reappropriation:

      Cleanup Settlement Account--State........................ $6,584,000

      Prior Biennia (Expenditures)..................................... $616,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $7,200,000

NEW SECTION.  Sec. 3226.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Forest Hazard Reduction and Safety (91000066)

Reappropriation:

      State Building Construction Account--State............ $3,941,000

      Prior Biennia (Expenditures)................................... $4,529,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $8,470,000

NEW SECTION.  Sec. 3227.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Shoreline Restoration Projects (92000011)

Reappropriation:

      State Building Construction Account--State............ $2,944,000

      Prior Biennia (Expenditures)................................... $1,022,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,966,000

NEW SECTION.  Sec. 3228.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Creosote Piling Removal (92000014)

Reappropriation:

      State Building Construction Account--State............... $880,000

      Prior Biennia (Expenditures)..................................... $770,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,650,000

NEW SECTION.  Sec. 3229.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Natural Areas Facilities Preservation and Access (30000208)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is provided solely for ecological restoration of the upland buffer areas within the Elk River natural resource conservation area.

Reappropriation:

      Aquatic Land Enhancement Account--State.............. $345,000

 

      Prior Biennia (Expenditures)................................... $1,500,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,845,000

NEW SECTION.  Sec. 3230.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Forest Riparian Easement Program (30000198)

Appropriation:

      State Building Construction Account--State............ $2,000,000

      Prior Biennia (Expenditures)................................... $1,000,000

      Future Biennia (Projected Costs).......................... $41,336,000

             TOTAL.......................................................... $44,336,000

NEW SECTION.  Sec. 3231.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Trust Land Transfer (30000200)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) $300,000 of the appropriation in this section is provided solely for a state trust land inventory evaluation.  The inventory evaluation shall determine the acreage of department managed trust lands, by asset class, that may be eligible for the trust land transfer program over the next several decades, based on currently available information.  The department shall provide an interim report to the legislature by January 31, 2014, on project scope, progress to date, and recommended criteria for the trust land transfer program.  The department shall provide a final report by January 1, 2015.

      (2) The remaining appropriation is provided solely to the department to transfer from trust status, or enter into fifty year leases for, certain trust lands of statewide significance deemed appropriate for state park, fish and wildlife habitat, natural area preserve, natural resources conservation area, open space, or recreation purposes.  The approved list of properties for lease or transfer is identified in the LEAP capital document No. 2013-3A, developed April 10, 2013.

      (3) Property transferred under this section must be appraised and transferred at fair market value.  By September 30, 2013, the department must deposit in the common school construction account the portion of the appropriation in this section that represents the estimated value of the timber on the transferred properties.  This transfer must be made in the same manner as timber revenues from other common school trust lands.  No deduction may be made for the resource management cost account under RCW 79.64.040.  The portion of the appropriation in this section that represents the value of the land transferred must be deposited in the natural resources real property replacement account.

      (4) Property subject to lease agreements under this section must be appraised at fair market value.  Lease terms must be fifty years with options to renew for an additional fifty years.  Lease payments must be lump sum payments for the entire term of the lease at the beginning of the lease.  The department shall calculate such lump sum payments using professional appraisal standards.  These lease payments may not exceed the fee simple purchase price based on current fair market value and must be deposited by the department to the common school construction account in the same manner as lease revenues from other common school trust lands.  No deduction may be made for the resource management cost account under RCW 79.64.040.  No later than September 30, 2013, the department must transfer to the common school construction account the portion of the appropriation in this section that is attributable to receipts from lease payments.

      (5) All reasonable costs incurred by the department to implement this section are authorized to be paid out of the appropriations.  Authorized costs include the actual cost of appraisals, staff time, environmental reviews, surveys, and other similar costs and shall not exceed one and nine-tenths percent of the appropriation.

      (6) Intergrant exchanges between common school and other trust lands of equal value may occur if the exchange is in the interest of each trust, as determined by the board of natural resources.

      (7) Prior to or concurrent with conveyance of these properties, the department, with full cooperation of the receiving agencies, shall execute and record a real property instrument that dedicates the transferred properties to the purposes identified in subsection (1) of this section.  Transfer and lease agreements for properties identified in subsection (1) of this section must include terms that restrict the use of the property to the intended purpose.  Transfer and lease agreements may include provisions for receiving agencies to request alternative uses of the property, provided the alternative uses are compatible with the originally intended public purpose and the department and legislature approves such uses.

      (8) The department and receiving agencies shall work in good faith to carry out the intent of this section.  However, the department or receiving agencies may remove a property from the transfer list based on new, substantive information, if it is determined that transfer of the property is not in the statewide interest of either the common school trust or the receiving agency.

      (9) $39,232,000 of the appropriation must be deposited in the common school construction account by September 30, 2013.  The department shall execute trust land transfers so that after the deduction of reasonable costs as provided in subsection (4) of this section on an aggregate basis eighty percent of the total value of transferred property is timber value or lease payments and is deposited in the common school construction account.  To achieve the eighty percent requirement, the department may choose to lease properties originally intended as transfers or transfer properties originally intended as leases.

      (10) By June 30, 2015, the state treasurer shall transfer to the common school construction account any unexpended balance of the appropriation in this section.

Appropriation:

      State Building Construction Account--State.......... $56,345,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)......................... $240,000,000

             TOTAL........................................................ $296,345,000

NEW SECTION.  Sec. 3232.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Sustainable Recreation (30000207)

Appropriation:

      State Building Construction Account--State............ $1,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $4,000,000

             TOTAL............................................................ $5,000,000

NEW SECTION.  Sec. 3233.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Road Maintenance and Abandonment Plans (RMAP) (30000211)

Appropriation:

      State Building Construction Account--State............ $2,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,000,000

NEW SECTION.  Sec. 3234.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      2013-2015 Minor Works Preservation (30000213)

Appropriation:

      Resources Management Cost Account--State............. $743,000

      Forest Development Account--State.......................... $517,000

             Subtotal Appropriation..................................... $1,260,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $8,000,000

             TOTAL............................................................ $9,260,000

NEW SECTION.  Sec. 3235.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      2013-2015 Minor Works Programmatic (30000216)

Appropriation:

      Forest Development Account--State.......................... $442,000

      Resources Management Cost Account--State............. $961,000

             Subtotal Appropriation..................................... $1,403,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $31,700,000

             TOTAL.......................................................... $33,103,000

NEW SECTION.  Sec. 3236.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Natural Areas Preservation, Access, and Road Maintenance and Abandonment Plans (RMAP) (30000218)

Appropriation:

      State Building Construction Account--State............ $1,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $4,000,000

             TOTAL............................................................ $5,000,000

NEW SECTION.  Sec. 3237.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Rivers and Habitat Open Space Program (30000221)

Appropriation:

      State Building Construction Account--State............... $500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $2,000,000

             TOTAL............................................................ $2,500,000

NEW SECTION.  Sec. 3238.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Trust Land Replacement (30000222)

      The appropriations in this section are subject to the following conditions and limitations:  The appropriations in this section are provided solely for acquiring replacement trust lands.  Regarding the portion of state trust land that is known as "Pasco 16" that is south of Interstate 82 and west of Road 68 in undeveloped and/or in agricultural use, the legislature directs the department of natural resources to:

      (1) Coordinate with the city of Pasco to rezone current agriculture land in the area to reflect proposed residential and commercial land use that is consistent with the planning map held by the department and coordinate with the city in their efforts to finalize the plans for a frontage road and any other municipality improvements.  The costs for rezoning, road planning, and making municipality improvements shall be borne by the city and/or passed through to future development;

      (2) Sell at auction the areas of Pasco 16 that are designated as residential or multifamily as per chapter 79.11 RCW by June 30, 2015;

      (3) Reinvest the proceeds according to the department's current authorities; and

      (4) Manage the land north of the proposed frontage road designated as commercial land use through leases negotiated by the department to be consistent with the planned commercial land use.

Appropriation:

      Resources Management Cost Account--State........ $25,000,000

      Natural Resources Real Property

             Replacement--State........................................ $25,000,000

      Community and Technical College Forest Reserve

             Account--State.................................................... $500,000

             Subtotal Appropriation................................... $50,500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)......................... $202,000,000

             TOTAL........................................................ $252,500,000

NEW SECTION.  Sec. 3239.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      State Forest Land Replacement (30000223)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation in this section is provided solely to the department to transfer from state forest land status to natural resources conservation area status certain state forest lands in counties with a population of twenty-five thousand or less which are subject to timber harvest deferrals greater than thirty years due to the presence of wildlife species listed as endangered or threatened under the federal endangered species act.  The total appropriation is to be used equally for the transfer of qualifying state forest lands in the qualifying counties.

      (2) Property transferred under this section must be appraised and transferred at fair market value, without consideration of management or regulatory encumbrances associated with wildlife species listed under the federal endangered species act.  The value of the timber and other valuable materials transferred must be distributed as provided in RCW 79.64.110.  The value of the land transferred must be deposited in the park land trust revolving account and be used solely to buy replacement state forest land, consistent with RCW 79.22.060.

      (3) Prior to or concurrent with conveyance of these properties, the department shall execute and record a real property instrument that dedicates the transferred properties to the purposes identified in subsection (1) of this section.  Transfer agreements for properties identified in subsection (1) of this section must include terms that restrict the use of the property to the intended purpose.

      (4) The department and applicable counties shall work in good faith to carry out the intent of this section.  The department will identify eligible properties for transfer, consistent with subsection (1) of this section, in consultation with the applicable counties, and will not execute any property transfers that are not in the statewide interest of either the state forest trust or the natural resources conservation area program.

Appropriation:

      State Building Construction Account--State............ $1,500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,500,000

NEW SECTION.  Sec. 3240.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Forest Hazard Reduction (30000224)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation is provided solely for forest health hazard reduction treatments on state, federal, and private lands.  The appropriation may be used for mechanical treatments, project planning, site preparation, permitting, or prescribed burning.  The department, in consultation with the forest health technical advisory group, shall provide a report to the governor and the legislature by October 1, 2014, on its work to reduce forest health hazards from fiscal year 2010 through fiscal year 2014.  This report must include an estimate of work needed through fiscal year 2020 on state, federal, and private lands and recommended mechanisms to fund this work.

Appropriation:

      State Building Construction Account--State............ $4,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $20,000,000

             TOTAL.......................................................... $24,000,000

NEW SECTION.  Sec. 3241.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Road Maintenance and Abandonment Plan (RMAP) (91000040)

Reappropriation:

      State Building Construction Account--State............ $3,710,000

      Prior Biennia (Expenditures)................................... $3,124,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $6,834,000

NEW SECTION.  Sec. 3242.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Barbeque Flats Road Access (91000081)

Appropriation:

      State Building Construction Account--State............... $500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $500,000

NEW SECTION.  Sec. 3243.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Quinault Coastal Forest and Watershed Restoration Grant (92000019)

Appropriation:

      State Building Construction Account--State............ $1,800,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,800,000

NEW SECTION.  Sec. 3244.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Patterson Pipeline (92000020)

Appropriation:

      Resource Management Cost Account--State........... $2,500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,500,000

NEW SECTION.  Sec. 3245.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Yakima Basin Integrated Plan Land Purchase (92000018)

      The appropriations in this section are subject to the following conditions and limitations:

      (1) The appropriations are provided solely for acquisition of the approximately 50,272 acres in the upper Kittitas county known as the Teanaway Property, owned by American Forest Holdings, LLC at the agreed upon purchase price of $97 million plus $2,344,000 closing, and transaction costs, based on prior appraisals of the property.  The department must expedite the review and execution of the transaction by September 15, 2013.  The land must be held in the community forest trusts under chapter 79.155 RCW to serve the purposes of the community forest trust including the protection of Yakima river basin functioning as authorized in Second Substitute Senate Bill No. 5367.  If Second Substitute Senate Bill No. 5367 is not enacted by June 30, 2013, this section is null and void.

      (2) The legislature recognizes and declares that the appropriation in this section from the natural resource real property replacement account constitutes a loan from the irreducible principal of the common school trust.  The legislature finds that the provisions in Second Substitute Senate Bill No. 5367 regarding purchase review and approval, transitional management plans, and eventual loan repayment or land disposition requirements ensure that the interest of the common school trust beneficiaries are protected.

      (3) The department must propose to the board of natural resources a schedule for transfer of trust land inholdings within the land purchase by this appropriation through the trust land transfer program.

Appropriation:

      Natural Resources Real Property Replacement

             Account--State............................................... $10,000,000

      State Building Construction Account--State.......... $89,344,000

             Subtotal Appropriation................................... $99,344,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $99,344,000

NEW SECTION.  Sec. 3246.  FOR THE DEPARTMENT OF AGRICULTURE

      Health and Safety Improvements at Fairs (91000003)

Appropriation:

      State Building Construction Account--State............ $1,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,000,000

NEW SECTION.  Sec. 3247.  FOR THE DEPARTMENT OF AGRICULTURE

      Animal Disease Traceability (91000004)

Appropriation:

      Public Facility Construction Loan Revolving

             Account--State.................................................... $881,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $881,000

 

(End of part)

 

PART 4
TRANSPORTATION

 

NEW SECTION.  Sec. 4001.  FOR THE WASHINGTON STATE PATROL

      Emergency Repairs (30000031)

Appropriation:

      Fire Service Training Account--State......................... $200,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................... $800,000

             TOTAL............................................................ $1,000,000

NEW SECTION.  Sec. 4002.  FOR THE WASHINGTON STATE PATROL

      Burn Building Repair (30000032)

Appropriation:

      Fire Service Training Account--State......................... $300,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................... $300,000

             TOTAL.............................................................. $600,000

NEW SECTION.  Sec. 4003.  FOR THE WASHINGTON STATE PATROL

      Fire Training Academy Burn Building Replacement (30000071)

Appropriation:

      Fire Service Training Account--State...................... $1,500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $13,000,000

             TOTAL.......................................................... $14,500,000

 

(End of part)

 

PART 5
EDUCATION

 

NEW SECTION.  Sec. 5001.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      2007-2009 School Construction Assistance Grant Program (20084200)

      The reappropriation in this section is subject to the following conditions and limitations:  For school construction projects funded through the school construction assistance grant program, the superintendent of public instruction shall require mapping the design of new facilities and remapping the design of facilities to be remodeled.

Reappropriation:

      Common School Construction Account--State........... $650,000

 

      Prior Biennia (Expenditures)............................... $791,109,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL........................................................ $791,759,000

NEW SECTION.  Sec. 5002.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Northeast King County Skills Center (20084855)

Reappropriation:

      School Construction and Skill Centers Building

             Account--State...................................................... $41,000

      Prior Biennia (Expenditures)................................... $8,561,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $8,602,000

NEW SECTION.  Sec. 5003.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Pierce County Skills Center (20084856)

Reappropriation:

      State Building Construction Account--State............ $6,198,000

      School Construction and Skills Center Building

            Account--State...................................................... $50,000

             Subtotal Reappropriation.................................. $6,248,000

Appropriation:

      State Building Construction Account--State.......... $11,609,000

      Prior Biennia (Expenditures)................................. $17,688,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $35,545,000

NEW SECTION.  Sec. 5004.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      2009-2011 School Construction Assistance Grant Program (30000031)

      The reappropriations in this section are subject to the following conditions and limitations:  Up to $14,000,000 of the state building construction account--state reappropriation in this section is for the Grand Coulee Dam school district school project, contingent on the availability of sufficient contributions from federal, local, private, or other sources to make up the remainder of the total cost of the project.  The Grand Coulee Dam school district is faced with a unique set of local funding barriers and federal or other funds may substitute as the usual requirement for school district participation.  In the event sufficient matching contributions are not secured by the Grand Coulee Dam school district, these funds shall lapse.

Reappropriation:

      State Building Construction Account--State.......... $14,000,000

      Common School Construction Account--State...... $12,000,000

             Subtotal Reappropriation................................ $26,000,000

      Prior Biennia (Expenditures)............................... $490,595,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL........................................................ $516,595,000

NEW SECTION.  Sec. 5005.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Energy Efficiency and Small Repair Grants (91000007)

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 5007, chapter 36, Laws of 2010 1st sp. sess.

 Reappropriation:

      State Building Construction Account--State............ $2,424,000

      Prior Biennia (Expenditures)................................. $67,465,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $69,889,000

NEW SECTION.  Sec. 5006.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      2011-2013 School Construction Assistance Program (30000071)

Reappropriation:

      State Building Construction Account--State.......... $52,566,000

      Common School Construction Account--State.... $281,191,000

             Subtotal Reappropriation.............................. $333,757,000

      Prior Biennia (Expenditures)............................... $223,435,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL........................................................ $557,192,000

NEW SECTION.  Sec. 5007.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Yakima Valley Technical Skills Center (30000076)

Reappropriation:

      State Building Construction Account--State.......... $12,962,000

      Prior Biennia (Expenditures)................................. $12,481,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $25,443,000

NEW SECTION.  Sec. 5008.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      SEA-Tech Branch Campus of Tri-Tech Skills Center (30000078)

Reappropriation:

      State Building Construction Account--State.......... $10,570,000

      Prior Biennia (Expenditures)..................................... $949,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $11,519,000

NEW SECTION.  Sec. 5009.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Grant County Branch Campus of Wenatchee Valley Skills Center (30000091)

Reappropriation:

      State Building Construction Account--State.......... $18,861,000

      Prior Biennia (Expenditures)..................................... $547,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $19,408,000

NEW SECTION.  Sec. 5010.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Clark County Skills Center (30000093)

Reappropriation:

      State Building Construction Account--State............... $650,000

Appropriation:

      State Building Construction Account--State............ $7,151,000

      Prior Biennia (Expenditures)..................................... $100,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $7,901,000

NEW SECTION.  Sec. 5011.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Energy Operational Savings Project Grants (30000097)

 

      The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation is subject to the provisions of section 5011, chapter 49, Laws of 2011 1st sp.s.

Reappropriation:

      State Building Construction Account--State............ $4,351,000

      Prior Biennia (Expenditures)................................. $15,649,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $20,000,000

NEW SECTION.  Sec. 5012.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Energy Efficiency Grants for K-12 Schools (91000017)

Reappropriation:

      State Building Construction Account--State.......... $37,238,000

      Prior Biennia (Expenditures)................................... $2,762,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $40,000,000

NEW SECTION.  Sec. 5013.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Wenatchee Valley Skills Center (92000004)

Reappropriation:

      State Building Construction Account--State............ $9,386,000

      Prior Biennia (Expenditures)..................................... $114,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $9,500,000

NEW SECTION.  Sec. 5014.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Spokane Area Professional - Technical Skills Center (92000005)

Reappropriation:

      State Building Construction Account--State............ $1,800,000

Appropriation:

      State Building Construction Account--State.......... $11,887,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $13,687,000

NEW SECTION.  Sec. 5015.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      WA-NIC (Washington Network for Innovative Careers) Skills Center - Snoqualmie Valley School District/Bellevue Community College (92000006)

Reappropriation:

      State Building Construction Account--State............ $1,715,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,715,000

NEW SECTION.  Sec. 5016.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Puget Sound Skills Center (92000007)

      The reappropriation in this section is subject to the following conditions and limitations:  The office of the superintendent of public instruction and the Puget Sound skills center shall enter into an interagency agreement with the office of financial management to provide funding for a budget evaluation study.  The office of financial management shall use a budget evaluation study team approach using value engineering techniques and life cycle cost analysis in conducting the study.  The office of financial management shall select the budget evaluation team members, contract for the study, and report the results to the legislature, the office of the superintendent of public instruction, and the Puget Sound skills center in a timely manner following completion of the study.  The study must also include a review of land acquisitions for the project site, including whether there was adequate disclosure of fill materials that contained toxic substances or substandard soils that would require disposal prior to construction, and whether those disclosed conditions were accounted for in setting the purchase price and other considerations for the land acquisition.

Reappropriation:

      State Building Construction Account--State............ $1,500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,500,000

NEW SECTION.  Sec. 5017.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Distressed Schools (92000009)

Reappropriation:

      State Building Construction Account--State.......... $22,415,000

      Prior Biennia (Expenditures)................................... $4,985,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $27,400,000

NEW SECTION.  Sec. 5018.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Yakima Valley Technical Skills Center Sunnyside Satellite (92000013)

Reappropriation:

      State Building Construction Account--State............ $5,938,000

      Prior Biennia (Expenditures)..................................... $287,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $6,225,000

NEW SECTION.  Sec. 5019.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Capital Program Administration (30000128)

Appropriation:

      Common School Construction Account--State........ $3,854,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $16,246,000

             TOTAL.......................................................... $20,100,000

NEW SECTION.  Sec. 5020.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      2013-2015 School Construction Assistance Program - Maintenance (30000145)

      The appropriations in this section are subject to the following conditions and limitations:

      (1) $1,340,000 of the common school construction account--state appropriation is provided solely for study and survey grants and for completing inventory and building condition assessments for all public school districts once every six years.

      (2) $933,000 of the common school construction account--state appropriation is provided solely for mapping the design of new facilities and remapping the design of facilities to be remodeled, for school construction projects funded through the school construction assistance program.

      (3) $250,000 of the common school construction account--state appropriation is provided solely for the superintendent of public instruction to create interagency agreements for the following purposes:

      (a) An interagency agreement with The Evergreen State College for a study by the Washington state institute for public policy on the relationship between school design and student performance.  The institute must review available research on the relationship between school design and quality of school facilities and student performance.  The institute must develop recommendations on how the school construction assistance program can better support state policy objectives to reform and improve public education if the review finds credible research that supports those recommendations.  The institute must prepare a report describing the recommendations and their projected costs and benefits.  The report must be submitted to the appropriate committees of the legislature by September 1, 2014.  The institute must convene an advisory group to assist in the development of these recommendations.  The advisory group must include representation from general classroom teachers at various grade levels, teachers of subjects that require specialized facilities such as science laboratories and vocational facilities, school facility managers, school facility designers, and other experts on the relationship between the quality and design of educational facilities, the efficacy of teaching and instruction, and student academic performance.  The advisory group must review and consider findings and recommendations in the 2009 joint legislative task force on school construction funding.  The recommendations must consider ways to provide financial assistance to develop and improve educational facilities to support at least the following policy objectives:

      (i) Greater access and more effective instruction in science, technology, engineering, and math;

      (ii) Improved instruction;

      (iii) Class size reduction in grades K-3;

      (iv) Expanded college and career readiness programs that require specialized facilities like skill centers.

      (b) An interagency agreement with the office of financial management to coordinate a review and make recommendations regarding the financing of specialized school facilities such as skill centers.  A report to the appropriate committees of the legislature must be submitted by September 1, 2014.  The review and recommendations must include:

      (i) Brief overview of current funding mechanisms;

      (ii) Options for improving consistency, predictability, and cost- sharing;

      (iii) Options for revising the school construction assistance program and/or local levy authority to accommodate skill centers, facilities shared among districts, or other specialized educational program needs;

      (iv) A review of siting decision factors; financial incentives; education demands; and recommendations for maximizing the appropriate statewide siting of specialized facilities;

      (v) An evaluation of the benefit-cost of skill center expansion to satellite and branch campuses as implemented under RCW 28A.245.030;

      (vi) Options for increasing efficiency in the use of high-cost specialized school facilities, such as the shared use of specialized facilities at skill centers and community colleges, and ways to share funding responsibilities between multiple school districts and the state.

      (4) The office of the superintendent of public instruction must improve web-based access by taxpayers to school capacity and actual enrollment in order to understand possible opportunities to increase efficiency through consolidation.  The office of the superintendent of public instruction must post this capacity and enrollment information on its web site.

      (5) Funds from this appropriation may be used to match federal dollars provided by the office of economic adjustment for school replacement facilities located on military bases.

      (6) The office of the superintendent of public instruction must expedite allocation and distribution of any eligible funds under the school construction assistance grant program to the Evergreen (Clark County) School District to address the school construction emergency resulting from the fire that destroyed the Crestline School.

      (7) The space allocations for state funding assistance purposes for districts with senior or four-year high schools with fewer than four hundred students, as outlined in WAC 392-343-035, must be computed in accordance with the following formula:

 

Number of Headcount
Student-Grades 9-12

Maximum Space
Allocation Per Facility

0-200

42,000 square feet

201-300

48,000 square feet

301-or more

52,000 square feet

Appropriation:

      State Building Construction Account--State........ $285,355,000

      Common School Construction Account--State.... $208,232,000

      Common School Construction Account--Federal.... $1,500,000

             Subtotal Appropriation................................. $495,087,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)...................... $3,099,310,000

             TOTAL..................................................... $3,594,397,000

NEW SECTION.  Sec. 5021.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Distressed Schools (91000024)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation in this section is provided solely for renovation of Cedar Park elementary school and to accelerate the replacement of Arbor Heights elementary school.

Appropriation:

      State Building Construction Account--State.......... $10,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $10,000,000

NEW SECTION.  Sec. 5022.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Tahoma School District (91000023)

      The appropriation in this section is subject to the following conditions and limitations:  Up to $4,000,000 of the appropriation in this section is for the purchase of property from King county for the siting of a school within the Tahoma school district.

Appropriation:

      State Building Construction Account--State............ $4,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,000,000

NEW SECTION.  Sec. 5023.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Energy Efficiency Grants for K-12 Schools (91000025)

Appropriation:

      State Building Construction Account--State............ $7,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $7,000,000

NEW SECTION.  Sec. 5024.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Spokane Valley Tech (91000026)

Appropriation:

      State Building Construction Account--State............ $1,500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,500,000

NEW SECTION.  Sec. 5025.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      School Security Improvement Grants (92000015)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation is provided solely for nonrecurring costs associated with school facility safety projects consistent with chapter 233, Laws of 2013 (Second Engrossed Substitute Senate Bill No. 5197).

Appropriation:

      State Building Construction Account--State.......... $10,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $10,000,000

NEW SECTION.  Sec. 5026.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      Delta High School (92000017)

Appropriation:

      State Building Construction Account--State............ $5,400,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,400,000

NEW SECTION.  Sec. 5027.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      San Juan School District STEM Vocational Building Renovation (91000027)

Appropriation:

      State Building Construction Account--State............ $1,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,000,000

NEW SECTION.  Sec. 5028.  FOR THE STATE SCHOOL FOR THE BLIND

      General Campus Preservation (30000018)

Reappropriation:

      State Building Construction Account--State............... $149,000

      Prior Biennia (Expenditures)..................................... $401,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $550,000

NEW SECTION.  Sec. 5029.  FOR THE STATE SCHOOL FOR THE BLIND

      General Campus Preservation (30000033)

Appropriation:

      State Building Construction Account--State............... $500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................ $2,215,000

             TOTAL............................................................ $2,715,000

NEW SECTION.  Sec. 5030.  FOR THE WASHINGTON STATE CENTER FOR CHILDHOOD DEAFNESS AND HEARING LOSS

      Minor Public Works (30000023)

Appropriation:

      State Building Construction Account--State............ $1,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,000,000

NEW SECTION.  Sec. 5031.  FOR THE UNIVERSITY OF WASHINGTON

      UW Bothell (20082006)

Reappropriation:

      State Building Construction Account--State............ $1,700,000

      University of Washington Building Account--State $12,963,000

             Subtotal Reappropriation................................ $14,663,000

      Prior Biennia (Expenditures)................................. $23,337,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $38,000,000

NEW SECTION.  Sec. 5032.  FOR THE UNIVERSITY OF WASHINGTON

      House of Knowledge Longhouse (30000021)

Reappropriation:

      State Building Construction Account--State............ $2,400,000

      Prior Biennia (Expenditures)..................................... $600,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,000,000

NEW SECTION.  Sec. 5033.  FOR THE UNIVERSITY OF WASHINGTON

      Odegaard Undergraduate Learning Center (30000370)

Reappropriation:

      State Building Construction Account--State............... $900,000

      Prior Biennia (Expenditures)................................. $15,675,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $16,575,000

NEW SECTION.  Sec. 5034.  FOR THE UNIVERSITY OF WASHINGTON

      High Voltage Infrastructure Improvement Project (30000371)

Reappropriation:

      State Building Construction Account--State............... $200,000

      Prior Biennia (Expenditures)................................... $4,165,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,365,000

NEW SECTION.  Sec. 5035.  FOR THE UNIVERSITY OF WASHINGTON

      University of Washington Minor Capital Repairs (30000372)

Reappropriation:

      State Building Construction Account--State............... $500,000

      University of Washington Building Account--State $2,000,000

             Subtotal Reappropriation.................................. $2,500,000

      Prior Biennia (Expenditures)................................. $36,487,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $38,987,000

NEW SECTION.  Sec. 5036.  FOR THE UNIVERSITY OF WASHINGTON

      University of Washington Tacoma Campus Development and Soil Remediation (92000002)

Reappropriation:

      State Building Construction Account--State............ $4,300,000

      State Toxics Control Account--State.......................... $700,000

             Subtotal Reappropriation.................................. $5,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,000,000

NEW SECTION.  Sec. 5037.  FOR THE UNIVERSITY OF WASHINGTON

      Denny Hall Renovation (20081002)

      The appropriation in this section is subject to the following conditions and limitations:  In conjunction with the appropriation in this section, the University of Washington is authorized to issue a bond or bonds in an amount not to exceed $20,000,000 in value for the renovation of Denny hall identified in this section.  The bond shall be financed from building fee and trust land revenues deposited into the university's bond retirement account, in accordance with RCW 28B.20.700 through 28B.20.740.

Appropriation:

      State Building Construction Account--State.......... $30,590,000

      Prior Biennia (Expenditures)................................... $2,302,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $32,892,000

NEW SECTION.  Sec. 5038.  FOR THE UNIVERSITY OF WASHINGTON

      Lewis Hall Renovation (20081003)

Appropriation:

      State Building Construction Account--State............ $2,587,000

      Prior Biennia (Expenditures)................................... $1,478,000

      Future Biennia (Projected Costs).......................... $19,095,000

             TOTAL.......................................................... $23,160,000

NEW SECTION.  Sec. 5039.  FOR THE UNIVERSITY OF WASHINGTON

      Burke Museum Renovation (20082850)

Reappropriation:

      State Building Construction Account--State............ $3,000,000

      Prior Biennia (Expenditures)..................................... $800,000

      Future Biennia (Projected Costs).......................... $14,000,000

             TOTAL.......................................................... $17,800,000

NEW SECTION.  Sec. 5040.  FOR THE UNIVERSITY OF WASHINGTON

      University of Washington Tacoma - Soils Remediation (20082852)

Reappropriation:

      State Toxics Control Account--State.......................... $500,000

      Prior Biennia (Expenditures)..................................... $500,000

      Future Biennia (Projected Costs).......................... $20,000,000

             TOTAL.......................................................... $21,000,000

NEW SECTION.  Sec. 5041.  FOR THE UNIVERSITY OF WASHINGTON

      University of Washington Magnuson Health Sciences Center Roofing Replacement Project (30000483)

Appropriation:

      State Building Construction Account--State............ $5,794,000

      University of Washington Building Account--State... $735,000

             Subtotal Appropriation..................................... $6,529,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $6,529,000

NEW SECTION.  Sec. 5042.  FOR THE UNIVERSITY OF WASHINGTON

      Minor Capital Repairs - Preservation (30000494)

Appropriation:

      State Building Construction Account--State............ $3,539,000

      University of Washington Building Account--State..................

             ...................................................................... $43,215,000

             Subtotal Appropriation................................... $46,754,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)......................... $208,000,000

             TOTAL........................................................ $254,754,000

NEW SECTION.  Sec. 5043.  FOR THE UNIVERSITY OF WASHINGTON

      Preventive Facility Maintenance and Building System Repairs (91000013)

Appropriation:

      University of Washington Building Account--State $25,825,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $25,825,000

NEW SECTION.  Sec. 5044.  FOR THE UNIVERSITY OF WASHINGTON

      University of Washington Tacoma Urban/Science Education Facility (91000014)

Appropriation:

      State Building Construction Account--State............ $1,900,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,900,000

NEW SECTION.  Sec. 5045.  FOR THE WASHINGTON STATE UNIVERSITY

      Washington State University Spokane - Riverpoint Biomedical and Health Sciences (20162953)

Reappropriation:

      State Building Construction Account--State............ $5,230,000

      Washington State University Building Account--State..............

             ........................................................................ $3,770,000

             Subtotal Reappropriation.................................. $9,000,000

      Prior Biennia (Expenditures)................................. $41,140,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $50,140,000

NEW SECTION.  Sec. 5046.  FOR THE WASHINGTON STATE UNIVERSITY

      Minor Works - Preservation (30000525)

Reappropriation:

      Washington State University Building Account--State..............

             ........................................................................ $6,300,000

      Prior Biennia (Expenditures)................................. $18,015,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $24,315,000

NEW SECTION.  Sec. 5047.  FOR THE WASHINGTON STATE UNIVERSITY

      Preventive Maintenance and Building System Repairs (91000024)

Appropriation:

      Washington State University Building

             Account--State............................................... $10,115,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $10,115,000

NEW SECTION.  Sec. 5048.  FOR THE WASHINGTON STATE UNIVERSITY

      Washington State University Pullman - Troy Hall Renovation (20061030)

Appropriation:

      State Building Construction Account--State............ $1,527,000

      Washington State University Building Account--State $494,000

             Subtotal Appropriation..................................... $2,021,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $34,550,000

             TOTAL.......................................................... $36,571,000

NEW SECTION.  Sec. 5049.  FOR THE WASHINGTON STATE UNIVERSITY

      Clean Technology Laboratory (30000069)

      The appropriation in this section is subject to the following conditions and limitations:  In conjunction with the appropriation in this section, the Washington State University is authorized to issue a bond or bonds in an amount not to exceed $20,000,000 in value for construction of the clean technology laboratory identified in this section.  The bond shall be financed from building fee and trust land revenues deposited into the university's bond retirement account, in accordance with RCW 28B.30.700 through 28B.30.780.

Appropriation:

      State Building Construction Account--State.......... $30,335,000

      Prior Biennia (Expenditures)................................... $2,500,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $32,835,000

NEW SECTION.  Sec. 5050.  FOR THE WASHINGTON STATE UNIVERSITY

      Washington State University Prosser - Viticulture and Enology Facility (30000500)

Appropriation:

      Washington State University Building Account--State..............

             ........................................................................ $2,792,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,792,000

NEW SECTION.  Sec. 5051.  FOR THE WASHINGTON STATE UNIVERSITY

      Washington State University Prosser - Agriculture Technology Building Addition (30000518)

Appropriation:

      Washington State University Building Account--State..............

             ........................................................................ $2,114,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,114,000

NEW SECTION.  Sec. 5052.  FOR THE WASHINGTON STATE UNIVERSITY

      Washington State University Pullman - Plant Sciences Building (REC#5) (30000519)

Appropriation:

      Washington State University Building Account--State..............

             ........................................................................... $500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $65,500,000

             TOTAL.......................................................... $66,000,000

NEW SECTION.  Sec. 5053.  FOR THE WASHINGTON STATE UNIVERSITY

      Plant Growth (Greenhouse) Facilities, Phase 1 (30000835)

Appropriation:

      Washington State University Building Account--State..............

             ........................................................................... $225,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $14,775,000

             TOTAL.......................................................... $15,000,000

NEW SECTION.  Sec. 5054.  FOR THE WASHINGTON STATE UNIVERSITY

      2013-2015 Minor Works - Preservation, Safety, and Infrastructure (30000849)

Appropriation:

      State Building Construction Account--State.......... $12,214,000

      Washington State University Building

             Account--State............................................... $16,350,000

             Subtotal Appropriation................................... $28,564,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $28,564,000

NEW SECTION.  Sec. 5055.  FOR THE WASHINGTON STATE UNIVERSITY

      Washington State University Pullman Pedestrian Bridge (91000028)

Appropriation:

      Washington State University Building

             Account--State................................................. $1,500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

            TOTAL............................................................ $1,500,000

NEW SECTION.  Sec. 5056.  FOR THE WASHINGTON STATE UNIVERSITY

      Everett University Center (91000026)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The building must be delivered using design build, as defined by chapter 39.10 RCW, with a guarantee for energy, operations, and maintenance performance.

      (2) To ensure that the total cost of the project is accounted for and the most reasonable and cost efficient design is used, Washington State University shall develop life cycle costs for this project.  The life cycle costs shall represent the present value sum of capital costs, installation costs, operating costs, and maintenance costs over the life expectancy of the project.  The legislature further finds the most effective approach to the life cycle cost analysis is to integrate it into the early part of the design process.

      (3) Washington State University shall develop a minimum of three project alternatives for use in the life cycle cost analysis.  These alternatives must be both distinctly different and viable solutions to the issue being addressed.  The chosen alternative must be the most reasonable and cost-effective solution.  A brief description of each project alternative and why it was chosen must be included in the life cycle cost analysis.

      (4) The office of financial management shall:  (a) Make available a life cycle cost model to be used for analysis; and (b) in consultation with the department of enterprise services, provide assistance in using the life cycle cost model.

      (5) The Washington State University shall consider architectural and engineering firms' and general contractors' experience using life cycle costs, operating costs, and energy efficiency measures when selecting an architectural and engineering firm, or when selecting a contractor using alternative contracting methods.

Appropriation:

      State Building Construction Account--State.......... $10,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

            TOTAL.......................................................... $10,000,000

NEW SECTION.  Sec. 5057.  FOR THE WASHINGTON STATE UNIVERSITY

      Benefit-Cost Analyses of the Yakima River Basin Integrated Plan Projects (91000027)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation in this section is provided solely for the state of Washington water research center to prepare separate benefit-cost analyses for each of the projects proposed in the 2012 Yakima river basin integrated water resources management plan (Yakima integrated plan), as listed in subsection (7) of this section.

      (2) To the greatest extent possible, the center must use information from existing studies, supplemented by primary research, to measure and evaluate each project's benefits and costs.

      (3) The center must measure and report the economic benefits of each project on a disaggregated basis, so that it is clear the extent to which an individual project is expected to result in increases in fish populations, increases in the reliability of irrigation water during severe drought years, and improvements in municipal and domestic water supply.

      (4) The center may enter into agreements with other state universities and with private consultants as needed to accomplish the scope of work.

      (5) The center may consult, as necessary, with the department of ecology and the Yakima river basin water enhancement project workgroup.

      (6) No more than twelve percent of the total appropriation may be retained for administrative overhead expenses.

      (7) The center must submit the benefit-cost analyses, findings and any recommendations on the following projects by December 15, 2014, to appropriate legislative fiscal committees:

      (a) Tributary/mainstem enhancement

      (b) Box canyon creek

      (c) Subordination of power generation (Roza and Chandler)

      (d) Aquifer storage and recovery projects

      (e) Agricultural conservation

      (f) Municipal conservation

      (g) Water bank exchange programs

      (h) Cle Elum reservoir

      (i) Keechelus, Kachess, Tieton reservoir

      (j) Keechelus to Kachess pipeline

      (k) Wymer reservoir

      (l) Bumping reservoir enlargement

Appropriation:

      State Building Construction Account--State............... $300,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $300,000

NEW SECTION.  Sec. 5058.  FOR THE EASTERN WASHINGTON UNIVERSITY

      Patterson Hall Remodel (20062002)

Reappropriation:

      State Building Construction Account--State.......... $13,885,000

      Prior Biennia (Expenditures)................................. $42,958,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $56,843,000

NEW SECTION.  Sec. 5059.  FOR THE EASTERN WASHINGTON UNIVERSITY

      Upgrade/Repair Campus Water System (30000422)

Appropriation:

      State Building Construction Account--State............ $5,508,000

      Eastern Washington University Capital Projects

             Account--State................................................. $1,770,000

             Subtotal Appropriation..................................... $7,278,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $7,278,000

NEW SECTION.  Sec. 5060.  FOR THE EASTERN WASHINGTON UNIVERSITY

      Minor Works - Preservation (30000427)

Reappropriation:

      State Building Construction Account--State............ $1,320,000

      Eastern Washington University Capital Projects

             Account--State................................................. $5,654,000

            Subtotal Reappropriation.................................. $6,974,000

      Prior Biennia (Expenditures)................................... $9,666,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $16,640,000

NEW SECTION.  Sec. 5061.  FOR THE EASTERN WASHINGTON UNIVERSITY

      University Science Center - Science II (30000466)

Appropriation:

      State Building Construction Account--State............... $350,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $86,970,000

             TOTAL.......................................................... $87,320,000

NEW SECTION.  Sec. 5062.  FOR THE EASTERN WASHINGTON UNIVERSITY

      Eastern Washington University Minor Works Preservation (30000468)

Appropriation:

      State Building Construction Account--State............ $1,434,000

      Eastern Washington University Capital Projects

             Account--State................................................. $7,066,000

             Subtotal Appropriation..................................... $8,500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $8,500,000

NEW SECTION.  Sec. 5063.  FOR THE EASTERN WASHINGTON UNIVERSITY

      Preventive Maintenance and Building System Repairs (30000500)

Appropriation:

      Eastern Washington University Capital Projects

             Account--State................................................. $2,217,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,217,000

NEW SECTION.  Sec. 5064.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Science Building (30000045)

Reappropriation:

      State Building Construction Account--State............... $900,000

Appropriation:

      State Building Construction Account--State.......... $61,193,000

      Prior Biennia (Expenditures)................................... $1,678,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $63,771,000

NEW SECTION.  Sec. 5065.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Minor Works Preservation (30000444)

Reappropriation:

      Central Washington University Capital Projects

             Account--State................................................. $3,500,000

      Prior Biennia (Expenditures)................................... $3,930,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $7,430,000

NEW SECTION.  Sec. 5066.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Combined Utilities (30000448)

Reappropriation:

      State Building Construction Account--State............... $700,000

Appropriation:

      State Building Construction Account--State............ $5,730,000

      Central Washington University Capital Projects

             Account--State.................................................... $480,000

             Subtotal Appropriation..................................... $6,210,000

      Prior Biennia (Expenditures)................................... $3,300,000

      Future Biennia (Projected Costs).......................... $19,600,000

             TOTAL.......................................................... $29,810,000

NEW SECTION.  Sec. 5067.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Samuelson Communication and Technology Center (SCTC) (30000451)

Reappropriation:

      State Building Construction Account--State............ $3,000,000

      Prior Biennia (Expenditures)................................... $2,000,000

      Future Biennia (Projected Costs).......................... $65,481,000

             TOTAL.......................................................... $70,481,000

NEW SECTION.  Sec. 5068.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Minor Works Preservation (30000615)

Appropriation:

      Central Washington University Capital Projects

             Account--State................................................. $7,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $7,000,000

NEW SECTION.  Sec. 5069.  FOR THE CENTRAL WASHINGTON UNIVERSITY

      Preventive Maintenance and Building System Repairs (30000677)

Appropriation:

      Central Washington University Capital Projects

             Account--State................................................. $2,422,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,422,000

NEW SECTION.  Sec. 5070.  FOR THE EVERGREEN STATE COLLEGE

      Communications Laboratory Building Preservation and Renovation (30000002)

Reappropriation:

      The Evergreen State College Capital Projects

             Account--State.................................................... $350,000

      Prior Biennia (Expenditures)................................. $10,631,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $10,981,000

NEW SECTION.  Sec. 5071.  FOR THE EVERGREEN STATE COLLEGE

      Facilities Preservation (30000051)

Reappropriation:

      The Evergreen State College Capital Projects

             Account--State.................................................... $375,000

      Prior Biennia (Expenditures)................................... $6,560,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $6,935,000

NEW SECTION.  Sec. 5072.  FOR THE EVERGREEN STATE COLLEGE

      Facility Preservation (30000084)

Appropriation:

      State Building Construction Account--State............ $1,580,000

      The Evergreen State College Capital Projects

             Account--State................................................. $5,120,000

             Subtotal Appropriation..................................... $6,700,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................... $212,000

             TOTAL............................................................ $6,912,000

NEW SECTION.  Sec. 5073.  FOR THE EVERGREEN STATE COLLEGE

      Science Center - Lab I, 2nd Floor Renovation (30000116)

Reappropriation:

      State Building Construction Account--State............... $375,000

      Prior Biennia (Expenditures)................................... $4,575,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,950,000

NEW SECTION.  Sec. 5074.  FOR THE EVERGREEN STATE COLLEGE

      Science Center - Lab II, 2nd Floor Renovation (30000117)

Appropriation:

      State Building Construction Account--State............ $3,544,000

      The Evergreen State College Capital Projects

             Account--State................................................. $1,150,000

             Subtotal Appropriation..................................... $4,694,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,694,000

NEW SECTION.  Sec. 5075.  FOR THE EVERGREEN STATE COLLEGE

      Science Center - Lab I Basement Renovation (30000118)

Appropriation:

      State Building Construction Account--State............ $1,805,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

            TOTAL............................................................ $1,805,000

NEW SECTION.  Sec. 5076.  FOR THE EVERGREEN STATE COLLEGE

      Lecture Hall Remodel (30000493)

Appropriation:

      State Building Construction Account--State............ $1,308,000

      Prior Biennia (Expenditures)..................................... $300,000

      Future Biennia (Projected Costs).......................... $15,457,000

             TOTAL.......................................................... $17,065,000

NEW SECTION.  Sec. 5077.  FOR THE EVERGREEN STATE COLLEGE

      Preventive Facility Maintenance and Building System Repair (30000503)

Appropriation:

      The Evergreen State College Capital Projects

             Account--State.................................................... $760,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $760,000

NEW SECTION.  Sec. 5078.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Carver Academic Renovation (20081060)

Reappropriation:

      State Building Construction Account--State............ $2,000,000

      Prior Biennia (Expenditures)................................... $5,374,000

      Future Biennia (Projected Costs).......................... $73,531,000

             TOTAL.......................................................... $80,905,000

NEW SECTION.  Sec. 5079.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Classroom and Lab Upgrades (30000425)

Reappropriation:

      State Building Construction Account--State................. $50,000

      Western Washington University Capital Projects

             Account--State.................................................... $489,000

             Subtotal Reappropriation..................................... $539,000

      Prior Biennia (Expenditures)................................... $4,260,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,799,000

NEW SECTION.  Sec. 5080.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Fraser Hall Renovation (30000427)

Reappropriation:

      State Building Construction Account--State............ $2,500,000

      Prior Biennia (Expenditures)................................... $2,440,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,940,000

NEW SECTION.  Sec. 5081.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Minor Works - Preservation (30000431)

Reappropriation:

      Western Washington University Capital Projects

             Account--State................................................. $2,508,000

      Prior Biennia (Expenditures)................................... $7,286,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $9,794,000

NEW SECTION.  Sec. 5082.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Preventive Facility Maintenance and Building System Repairs (91000006)

Appropriation:

      Western Washington University Capital Projects

             Account--State................................................. $3,614,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,614,000

NEW SECTION.  Sec. 5083.  FOR THE WESTERN WASHINGTON UNIVERSITY

      North Campus Utility Upgrade (30000426)

Appropriation:

      State Building Construction Account--State............ $3,462,000

      Western Washington University Capital Projects

             Account--State.................................................... $120,000

            Subtotal Appropriation..................................... $3,582,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,582,000

NEW SECTION.  Sec. 5084.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Classroom and Lab Upgrades Phase 2 (30000518)

Appropriation:

      State Building Construction Account--State............ $3,830,000

      Western Washington University Capital Projects

             Account--State.................................................... $916,000

             Subtotal Appropriation..................................... $4,746,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,746,000

NEW SECTION.  Sec. 5085.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Minor Works - Preservation (30000524)

Appropriation:

      Western Washington University Capital Projects

             Account--State................................................. $7,500,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $30,000,000

             TOTAL.......................................................... $37,500,000

NEW SECTION.  Sec. 5086.  FOR THE WESTERN WASHINGTON UNIVERSITY

      Performing Arts Exterior Renewal (30000428)

Appropriation:

      State Building Construction Account--State............ $2,947,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,947,000

NEW SECTION.  Sec. 5087.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

      Pacific-Lewis and Clark Station Camp Park Project (2002S001)

Reappropriation:

      State Building Construction Account--State............... $226,000

      Prior Biennia (Expenditures)................................... $4,261,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,487,000

NEW SECTION.  Sec. 5088.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

      Washington Heritage Grants (20074004)

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The reappropriation in this section is subject to the provisions of RCW 27.34.330.

      (2) The reappropriation in this section is subject to the project list in section 5137, chapter 520, Laws of 2007.

      (3) The reappropriation in this section is subject to the provisions of section 5044, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:

      State Building Construction Account--State............... $626,000

      Prior Biennia (Expenditures)................................... $9,279,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $9,905,000

NEW SECTION.  Sec. 5089.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

      Washington Heritage Project Capital Grants (30000011)

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The reappropriation in this section is subject to the provisions of section 5120, chapter 497, Laws of 2009.

      (2) The reappropriation in this section is subject to the provisions of section 5045, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:

      State Building Construction Account--State............ $1,152,000

      Prior Biennia (Expenditures)................................... $8,273,000

      Future Biennia (Projected Costs).......................................... $0

            TOTAL............................................................ $9,425,000

NEW SECTION.  Sec. 5090.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

      Building Preservation (30000111)

Reappropriation:

      State Building Construction Account--State............... $414,000

      Prior Biennia (Expenditures)..................................... $386,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $800,000

NEW SECTION.  Sec. 5091.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

      Washington Heritage Grants (30000117)

      The reappropriation in this section is subject to the following conditions and limitations:

      (1) The reappropriation in this section is subject to the provisions of RCW 27.34.330.

      (2) The reappropriation in this section is subject to the provisions of section 622, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

      State Building Construction Account--State............ $3,729,000

      Prior Biennia (Expenditures)................................... $3,353,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $7,082,000

NEW SECTION.  Sec. 5092.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

      Facilities Preservation - Minor Works Projects (30000164)

Appropriation:

      State Building Construction Account--State............ $2,483,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,483,000

NEW SECTION.  Sec. 5093.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

      Heritage Capital Grants (30000170)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The appropriation is subject to the provisions of RCW 27.34.330.

      (2) The appropriation is provided solely for the following list of projects:

 

Project

Authorized Amount

Tacoma Chinese Reconciliation Park

$400,000

Mabton High School Historic Restoration

$800,000

1912 Metaline Falls School

$34,000

Restoration of Duwamish Hill Preserve

$515,000

Coastal Salish Institute at Northwest Indian College

$1,000,000

Washington Hall Restoration

$290,000

Maritime Heritage Education Center at Lake Union

$990,000

Public Access to the Mary Olsen Farm

$286,000

Paramount Theatre

$146,000

Chambers Prairie Schoolhouse

$39,000

Vancouver National Historic Reserve Trust

$283,000

Archives Building at the Island Heritage Museum

$52,000

Western Forest Industries Museum

$385,000

Jacob & Emma Reard House

$40,000

Chinook School Rehabilitation

$115,000

Shoreline Historical Museum

$219,000

Eddon Boat Restoration

$128,000

Yamasaki Courtyard Renewal

$654,000

Railway History Center

$789,000

Covenant Beach Bible Camp Historic Dining Hall

$850,000

Virginia V Hull Restoration

$221,000

Coastal Heritage Alliance

$82,000

Historical Dash Point School

$25,000

Nordic Heritage Museum

$1,000,000

Washington State Holocaust Museum

$150,000

Highline Heritage Museum

$338,000

Total

$9,831,000

Appropriation:

      State Building Construction Account--State............ $9,831,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $9,831,000

NEW SECTION.  Sec. 5094.  FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY

      Minor Works - Campbell House Preservation (30000021)

Appropriation:

      State Building Construction Account--State............... $240,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................... $124,000

             TOTAL.............................................................. $364,000

NEW SECTION.  Sec. 5095.  FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY

      Minor Works - Northwest Museum of Arts and Culture (30000026)

Appropriation:

      State Building Construction Account--State................. $55,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)............................... $193,000

             TOTAL.............................................................. $248,000

NEW SECTION.  Sec. 5096.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Olympic College:  Humanities and Student Services (20061204)

Reappropriation:

      State Building Construction Account--State................. $83,000

      Prior Biennia (Expenditures)................................. $41,305,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $41,388,000

NEW SECTION.  Sec. 5097.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Spokane Falls Community College:  Campus Classrooms (20062696)

Reappropriation:

      State Building Construction Account--State.......... $12,629,000

      Prior Biennia (Expenditures)................................... $6,987,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $19,616,000

NEW SECTION.  Sec. 5098.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      South Puget Sound Community College:  Learning Resource Center (20062698)

Reappropriation:

      State Building Construction Account--State.......... $18,185,000

      Prior Biennia (Expenditures)................................. $15,476,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $33,661,000

NEW SECTION.  Sec. 5099.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Clover Park Technical College:  Allied Health Care Facility (20062699)

Reappropriation:

      State Building Construction Account--State.......... $11,450,000

      Prior Biennia (Expenditures)................................. $10,883,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $22,333,000

NEW SECTION.  Sec. 5100.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Seattle Central Community College:  Wood Construction Center (20081216)

Reappropriation:

      State Building Construction Account--State............... $942,000

      Prior Biennia (Expenditures)................................. $21,367,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $22,309,000

NEW SECTION.  Sec. 5101.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Spokane Community College:  Technical Education Building (20081220)

Reappropriation:

      State Building Construction Account--State............ $4,804,000

      Prior Biennia (Expenditures)................................. $21,626,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $26,430,000

NEW SECTION.  Sec. 5102.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Everett Community College:  Index Hall Replacement (20081221)

Reappropriation:

      State Building Construction Account--State............ $8,652,000

      Prior Biennia (Expenditures)................................. $27,662,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $36,314,000

NEW SECTION.  Sec. 5103.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Green River Community College:  Trades and Industry Building (20081222)

Reappropriation:

      State Building Construction Account--State............... $573,000

Appropriation:

      State Building Construction Account--State.......... $26,774,000

      Prior Biennia (Expenditures)................................... $1,272,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $28,619,000

NEW SECTION.  Sec. 5104.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Grays Harbor College:  Science and Math Building (20081226)

Appropriation:

      State Building Construction Account--State.......... $41,576,000

      Prior Biennia (Expenditures)................................... $2,568,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $44,144,000

NEW SECTION.  Sec. 5105.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Pierce College Fort Steilacoom:  Cascade Core (20081321)

Reappropriation:

      State Building Construction Account--State............... $568,000

      Community/Technical College Capital Projects

             Account--State.................................................... $219,000

             Subtotal Reappropriation..................................... $787,000

      Prior Biennia (Expenditures)................................. $23,054,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $23,841,000

NEW SECTION.  Sec. 5106.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Tacoma Community College:  Health Careers Center (20082701)

Reappropriation:

      State Building Construction Account--State.......... $34,971,000

      Prior Biennia (Expenditures)................................... $6,202,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $41,173,000

NEW SECTION.  Sec. 5107.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Bellevue Community College:  Health Science Building (20082702)

Reappropriation:

      State Building Construction Account--State............... $170,000

Appropriation:

      State Building Construction Account--State.......... $28,672,000

      Prior Biennia (Expenditures)................................... $2,884,000

      Future Biennia (Projected Costs).......................................... $0

            TOTAL.......................................................... $31,726,000

NEW SECTION.  Sec. 5108.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Bates Technical College:  Mohler Communications Technology Center (20082703)

Reappropriation:

      State Building Construction Account--State............... $219,000

Appropriation:

      State Building Construction Account--State.......... $23,808,000

      Prior Biennia (Expenditures)................................... $1,709,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $25,736,000

NEW SECTION.  Sec. 5109.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Columbia Basin College:  Social Science Center (20082704)

Appropriation:

      State Building Construction Account--State............... $965,000

      Prior Biennia (Expenditures)..................................... $109,000

      Future Biennia (Projected Costs).......................... $14,758,000

             TOTAL.......................................................... $15,832,000

NEW SECTION.  Sec. 5110.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Clark College:  Health and Advanced Technologies Building (20082705)

Reappropriation:

      State Building Construction Account--State............ $1,335,000

Appropriation:

      State Building Construction Account--State.......... $33,784,000

      Prior Biennia (Expenditures)................................... $1,239,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $36,358,000

NEW SECTION.  Sec. 5111.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Peninsula College:  Fort Worden Building 202 (30000114)

Reappropriation:

      State Building Construction Account--State............ $4,191,000

      Prior Biennia (Expenditures)..................................... $186,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $4,377,000

NEW SECTION.  Sec. 5112.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Bellingham Technical College:  Fisheries Program (30000117)

Reappropriation:

      State Building Construction Account--State............ $1,590,000

      Prior Biennia (Expenditures)..................................... $410,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,000,000

NEW SECTION.  Sec. 5113.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Lower Columbia College:  Myklebust Gymnasium (30000118)

Reappropriation:

      State Building Construction Account--State............ $1,712,000

      Prior Biennia (Expenditures)..................................... $288,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,000,000

NEW SECTION.  Sec. 5114.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Seattle Central Community College:  Seattle Maritime Academy (30000120)

Reappropriation:

      State Building Construction Account--State............... $220,000

Appropriation:

      State Building Construction Account--State.......... $15,491,000

      Prior Biennia (Expenditures)................................... $1,117,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $16,828,000

NEW SECTION.  Sec. 5115.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Yakima Valley Community College:  Palmer Martin Building (30000121)

Reappropriation:

      State Building Construction Account--State................... $3,000

Appropriation:

      State Building Construction Account--State.......... $19,243,000

      Prior Biennia (Expenditures)..................................... $994,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $20,240,000

NEW SECTION.  Sec. 5116.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Olympic College:  College Instruction Center (30000122)

      The reappropriation in this section is subject to the following conditions and limitations:  Olympic community college shall enter into an interagency agreement with the office of financial management to provide funding for a budget evaluation study.  The office of financial management shall use a budget evaluation study team approach using value engineering techniques and life cycle cost analysis in conducting the study.  The office of financial management shall select the budget evaluation team members, contract for the study, and report the results to the legislature and agencies in a timely manner following the study.

Reappropriation:

      State Building Construction Account--State............ $3,212,000

      Prior Biennia (Expenditures)..................................... $412,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $3,624,000

NEW SECTION.  Sec. 5117.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Centralia Community College:  Student Services (30000123)

Appropriation:

      State Building Construction Account--State............ $2,517,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $33,075,000

             TOTAL.......................................................... $35,592,000

NEW SECTION.  Sec. 5118.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Peninsula College:  Allied Health and Early Childhood Development Center (30000126)

Appropriation:

      State Building Construction Account--State............ $1,810,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $26,756,000

             TOTAL.......................................................... $28,566,000

NEW SECTION.  Sec. 5119.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      North Seattle Community College:  Technology Building Renewal (30000129)

Reappropriation:

      State Building Construction Account--State.......... $22,159,000

      Prior Biennia (Expenditures)................................... $3,260,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $25,419,000

NEW SECTION.  Sec. 5120.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Green River Community College:  Science, Math, and Technology Building (30000130)

Reappropriation:

      State Building Construction Account--State............ $8,271,000

      Prior Biennia (Expenditures)................................. $11,606,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $19,877,000

NEW SECTION.  Sec. 5121.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Renton Technical College:  Automotive Complex Renovation (30000134)

Appropriation:

      State Building Construction Account--State............ $1,583,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $16,716,000

             TOTAL.......................................................... $18,299,000

NEW SECTION.  Sec. 5122.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Edmonds Community College:  Science Engineering Technology Building (30000137)

Appropriation:

      State Building Construction Account--State............ $7,820,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $30,000,000

             TOTAL.......................................................... $37,820,000

NEW SECTION.  Sec. 5123.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Whatcom Community College:  Learning Commons (30000138)

Appropriation:

      State Building Construction Account--State............ $1,822,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $29,802,000

             TOTAL.......................................................... $31,624,000

NEW SECTION.  Sec. 5124.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Site Repairs "A" (30000504)

Reappropriation:

      State Building Construction Account--State............ $1,620,000

      Community/Technical College Capital Projects

             Account--State................................................. $2,379,000

             Subtotal Reappropriation.................................. $3,999,000

      Prior Biennia (Expenditures)................................... $1,046,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $5,045,000

NEW SECTION.  Sec. 5125.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Facility Repairs "A" (30000505)

Reappropriation:

      Community/Technical College Capital Projects

             Account--State................................................. $7,676,000

      Prior Biennia (Expenditures)................................... $8,153,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $15,829,000

NEW SECTION.  Sec. 5126.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      South Seattle Community College:  Cascade Court (30000128)

Appropriation:

      State Building Construction Account--State............ $2,087,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $32,684,000

             TOTAL.......................................................... $34,771,000

NEW SECTION.  Sec. 5127.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Roof Repairs "A" (30000434)

Reappropriation:

      Community/Technical College Capital Projects

             Account--State................................................. $3,708,000

      Prior Biennia (Expenditures)................................... $5,417,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $9,125,000

NEW SECTION.  Sec. 5128.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Minor Works - Preservation (30000461)

Reappropriation:

      Community/Technical College Capital Projects

             Account--State............................................... $10,544,000

      Prior Biennia (Expenditures)................................... $5,457,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $16,001,000

NEW SECTION.  Sec. 5129.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Minor Works - Program (30000674)

Reappropriation:

      State Building Construction Account--State............ $7,270,000

      Prior Biennia (Expenditures)................................. $12,730,000

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $20,000,000

NEW SECTION.  Sec. 5130.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Preventive Maintenance and Building System Repairs (91000043)

Appropriation:

      Community/Technical College Capital Projects

             Account--State............................................... $22,800,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $22,800,000

NEW SECTION.  Sec. 5131.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Minor Works - Program (30000723)

Appropriation:

      State Building Construction Account--State............... $354,000

      Community/Technical College Capital Projects

             Account--State............................................... $14,236,000

      State Higher Education Construction Account--State. $620,000

      Community and Technical College Forest Reserve

             Account--State.................................................... $582,000

      Gardner-Evans Higher Education Construction

             Account--State................................................. $3,000,000

             Subtotal Appropriation................................... $18,792,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $18,792,000

NEW SECTION.  Sec. 5132.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Minor Works - Preservation (30000779)

Appropriation:

      Community/Technical College Capital Projects

             Account--State............................................... $17,600,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $17,600,000

NEW SECTION.  Sec. 5133.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Roof Repairs (30000844)

 

Appropriation:

      Community/Technical College Capital Projects

             Account--State................................................. $7,785,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $7,785,000

NEW SECTION.  Sec. 5134.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Facility Repairs (30000897)

Appropriation:

      State Building Construction Account--State.......... $20,852,000

      Community/Technical College Capital Projects

             Account--State................................................. $1,282,000

             Subtotal Appropriation................................... $22,134,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.......................................................... $22,134,000

NEW SECTION.  Sec. 5135.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Site Repairs (30000941)

Appropriation:

      Community/Technical College Capital Projects

             Account--State................................................. $2,574,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,574,000

 

(End of part)

 

PART 6
2013 SUPPLEMENTAL CAPITAL BUDGET

 

Sec. 6001.  2012 2nd sp.s. c 2 s 1022 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Engineering and Architectural Services:  Staffing (91000005)

      The appropriation in this section is subject to the following conditions and limitations:

      Up to $75,000 is for the department of enterprise services to conduct a review of the state's current public works procurement processes and provide a report by December 15, 2012, to the appropriate committees of the legislature and the governor with procurement reform recommendations.  For recommendations that require a statutory change, the report should include draft legislation needed to accomplish the report's recommendations.  The director may contract with a private entity for assistance to conduct the study.  The capital projects advisory review board will provide advice and assistance as required by the director.  The report will include historical data on (1) the use of change orders; (2) the use of job order contracting; (3) how are competitive public works contracts advertised; and (4) contract closeout procedures.  State agencies that will participate include one research university, one natural resource agency, and one general government agency.

Appropriation:

      State Building Construction Account--State....... (($7,751,000))

      $8,541,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................... $34,250,000

             TOTAL..................................................... (($42,001,000))

      $42,791,000

Sec. 6002.  2012 2nd sp.s. c 2 s 1024 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Natural Resource Building Roof Replacement and Exterior Foam Insulation System Repairs (30000546)

Appropriation:

      State Building Construction Account--State.......... (($982,000))

      $4,482,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL......................................................... (($982,000))

      $4,482,000

Sec. 6003.  2012 2nd sp.s. c 2 s 1025 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Natural Resource Building Roof Replacement and Exterior Foam Insulation System Repairs (30000546)

Appropriation:

      Capitol Building Construction Account--State... (($3,500,000))

      $0

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL....................................................... (($3,500,000))

      $0

Sec. 6004.  2011 1st sp. s. c 48 s 1022 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ((GENERAL ADMINISTRATION)) ENTERPRISE SERVICES

      Engineering and Architectural Services:  Staffing (91000005)

Appropriation:

      Charitable, Educational, Penal and Reformatory

             Institutions Account--State.................................. $928,000

      ((Capitol Building Construction Account--State........ $790,000
             Subtotal Appropriation.................................. $1,718,000))

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL....................................................... (($1,718,000))

      $928,000

Sec. 6005.  2011 1st sp.s. c 48 s 1023 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ((GENERAL ADMINISTRATION)) ENTERPRISE SERVICES

      Legislative Building Critical Hydronic Loop Repairs (30000584)

Appropriation:

      Capitol Building Construction Account--State... (($1,179,000))

      $0

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL....................................................... (($1,179,000))

      $0

NEW SECTION.  Sec. 6006.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

      Legislative Building Critical Hydronic Loop Repairs (30000584)

Appropriation:

      State Building Construction Account--State............ $1,179,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $1,179,000

Sec. 6007.  2012 2nd sp.s. c 2 s 3002 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ECOLOGY

      Clean Up Toxic Sites - Puget Sound (91000032)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation in this section is provided solely for the following ranked list of projects.  ((If a specified project has not met the requirements for executing a contract with the department by April 30, 2013, the department may allocate the amount specified to additional projects awarded on a competitive basis provided that the awardee is ready to proceed with the project.))

 

Project

Authorized
Amount

Port Gamble Bay - Open up 90

acres of geoduck ((tracks)) tracts

$2,000,000

Port Gamble Bay - Source

control, habitat preservation, and

cleanup sustainability

$7,000,000

Administration

$270,000

Total

$9,270,000

Appropriation:

      State Toxics Control Account--State....................... $9,270,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $9,270,000

Sec. 6008.  2011 1st sp.s. c 49 s 3052 (uncodified) is amended to read as follows:

FOR THE STATE PARKS AND RECREATION COMMISSION

      Fort Worden State Park:  Building 202 Rehabilitation (30000027)

Appropriation:

      State Building Construction Account--State....... (($2,377,000))

      $0

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL....................................................... (($2,377,000))

      $0

Sec. 6009.  2011 1st sp.s. c 48 s 3070 (uncodified) is amended to read as follows:

FOR THE RECREATION AND CONSERVATION FUNDING BOARD

      Aquatic Lands Enhancement Account (30000143)

      The appropriations in this section are subject to the following conditions and limitations:  The appropriations are provided solely for the list of projects in LEAP capital document No. 2011-3B, ((developed April 6, 2011)) revised April 10, 2013.

Appropriation:

      Aquatic Lands Enhancement Account--State..... (($6,806,000))

      $6,461,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL....................................................... (($6,806,000))

      $6,461,000

Sec. 6010.  2011 1st sp s. c 49 s 3112 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF NATURAL RESOURCES

      Replacing State Forest Lands with Productive Forests (91000029)

      The appropriation in this section is subject to the following conditions and limitations:

      (1) The total appropriation is provided solely to the department to transfer from state forest land status to natural resources conservation area status certain state forest lands in counties with a population of 25,000 or less which are subject to timber harvest deferrals greater than thirty years due to the presence of wildlife species listed as endangered or threatened under the federal endangered species act.  The approved list of properties for transfer is identified in the LEAP capital document No. 2011-5A, ((developed March 24, 2011)) revised April 10, 2013.

      (2) Property transferred under this section must be appraised and transferred at fair market value, without consideration of management or regulatory encumbrances associated with wildlife species listed under the federal endangered species act.  The value of the timber and other valuable materials transferred must be distributed as provided in RCW 79.64.110, in the same manner as valuable material revenues from other state forest lands in the applicable counties.  The value of the land transferred must be deposited in the park land trust revolving account and be solely used to buy replacement state forest land within the same county as the property transferred, consistent with RCW 79.22.060.

      (3) Prior to or concurrent with conveyance of these properties, the department shall execute and record a real property instrument that dedicates the transferred properties to the purposes identified in subsection (1) of this section.  Transfer agreements for properties identified in subsection (1) of this section must include terms that restrict the use of the property to the intended purpose.

      (4) The department and applicable counties shall work in good faith to carry out the intent of this section.  However, the department or applicable counties may remove a property from the transfer list based on new, substantive information, if it is determined that transfer of the property is not in the statewide interest of either the state forest trust or the natural resources conservation area program.

Appropriation:

      State Building Construction Account--State............ $2,000,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL............................................................ $2,000,000

NEW SECTION.  Sec. 6011.  FOR THE DEPARTMENT OF NATURAL RESOURCES

      Natural Areas Facilities Preservation and Access (30000208)

      The appropriation in this section is subject to the following conditions and limitations:  The appropriation is provided solely for ecological restoration of the upland buffer areas within the Elk River natural resource conservation area.

Appropriation:

      Aquatic Lands Enhancement Account--State............. $345,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL.............................................................. $345,000

Sec. 6012.  2012 2nd sp.s. c 2 s 5005 (uncodified) is amended to read as follows:

FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

      2011-13 School Construction Assistance Program (30000071)

      The appropriations in this section are subject to the following conditions and limitations:

      (1) $1,337,000 of the common school construction account--state appropriation is provided solely for study and survey grants and for completing inventory and building condition assessments for all public school districts once every six years.

      (2) In calculating square foot eligibility for state assistance grants, kindergarten student headcount shall not be reduced by fifty percent.

      (3) $952,000 of the common school construction account--state appropriation is provided solely for mapping the design of new facilities and remapping the design of facilities to be remodeled, for school construction projects funded through the school construction assistance program.

Appropriation:

      Common School Construction Account--State.... $307,558,000

      Common School Construction Account--Federal (($1,600,000))

      $2,230,000

             Subtotal Appropriation............................ (($309,158,000))

      $309,788,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs)...................... $1,351,139,000

             TOTAL................................................ (($1,660,297,000))

      $1,660,927,000

Sec. 6013.  2011 1st sp.s. c 49 s 5101 (uncodified) is amended to read as follows:

FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

      Peninsula College:  Fort Worden Building 202 (30000114)

Appropriation:

      State Building Construction Account--State....... (($2,000,000))

      $4,377,000

      Prior Biennia (Expenditures)................................................ $0

      Future Biennia (Projected Costs).......................................... $0

             TOTAL....................................................... (($2,000,000))

      $4,377,000

NEW SECTION.  Sec. 6014.  COLUMBIA RIVER BASIN NONTAXABLE AND TAXABLE BOND PROCEEDS.

      Portions of the appropriation authority granted by this act from the Columbia river basin water supply development account may be transferred to the Columbia river basin taxable bond water supply development account as deemed necessary by the state finance committee to comply with the federal internal revenue service rules and regulations pertaining to the use of nontaxable bond proceeds.  The state treasurer shall submit written notification to the director of financial management if it is determined that a shift of appropriation authority between the Columbia river basin water supply development account and the Columbia river basin taxable bond water supply development account is necessary, or that a shift of appropriation authority from the Columbia river basin taxable bond water supply development account to the Columbia river basin water supply development account may be made.

 

(End of part)

 

PART 7
MISCELLANEOUS PROVISIONS

 

NEW SECTION.  Sec. 7001.  RCW 43.88.031 requires the disclosure of the estimated debt service costs associated with new capital bond appropriations.  The estimated debt service costs for the appropriations contained in this act are twenty-eight million dollars for the 2013-2015 biennium, one hundred ninety million dollars for the 2015-2017 biennium, and two hundred seventy-eight million dollars for the 2017-2019 biennium.

NEW SECTION.  Sec. 7002.  (1) Allotments for appropriations in this act shall be provided in accordance with the capital project review requirements adopted by the office of financial management and in compliance with RCW 43.88.110.  Projects that will be employing alternative public works construction procedures under chapter 39.10 RCW are subject to the allotment procedures defined in this section and RCW 43.88.110.

      (2) Each project is defined as proposed in the legislative budget notes or in the governor's budget document.

NEW SECTION.  Sec. 7003.  (1) The legislature finds that use of life cycle cost analysis will aid public entities, architects, engineers, and contractors in making design and construction decisions that positively impact both the initial construction cost and the ongoing operating and maintenance cost of a project.  To ensure that the total cost of a project is accounted for and the most reasonable and cost efficient design is used, agencies shall develop life cycle costs for any construction project over $5,000,000.  The life cycle costs shall represent the present value sum of capital costs, installation costs, operating costs, and maintenance costs over the life expectancy of the project.  The legislature further finds the most effective approach to the life cycle cost analysis is to integrate it into the early part of the design process.

      (2) Agencies shall develop a minimum of three project alternatives for use in the life cycle cost analysis.  These alternatives must be both distinctly different and viable solutions to the issue being addressed.  The chosen alternative must be the most reasonable and cost-effective solution.  A brief description of each project alternative and why it was chosen must be included in the life cycle cost analysis section of the predesign.

      (3)