SIXTY FOURTH LEGISLATURE - THIRD SPECIAL SESSION

 

 

THIRD DAY

 

 

House Chamber, Olympia, Tuesday, June 30, 2015

 


The House was called to order at 10:00 a.m. by the Speaker (Representative Kilduff presiding).  The Clerk called the roll and a quorum was present.

 

The flags were escorted to the rostrum by a Sergeant at Arms Color Guard, Jared Cunningham and Trever Czarnecki.  The Speaker (Representative Kilduff presiding) led the Chamber in the Pledge of Allegiance.  The prayer was offered by Representative Ed Orcutt, 20th District, Washington.

 

Reading of the Journal of the previous day was dispensed with and it was ordered to stand approved.

 

MESSAGES FROM THE SENATE

 

June 29, 2015

 

MR. SPEAKER:

 

The Senate has passed:

HOUSE BILL NO. 2195

HOUSE BILL NO. 2264

and the same are herewith transmitted.

Hunter G. Goodman, Secretary

 

June 29, 2015

 

MR. SPEAKER:

 

The Senate has passed:

ENGROSSED SUBSTITUTE SENATE BILL NO. 6096

and the same are herewith transmitted.

Hunter G. Goodman, Secretary

 

June 29, 2015

 

MR. SPEAKER:

 

The Senate has passed:

ENGROSSED SUBSTITUTE SENATE BILL NO. 6052

and the same are herewith transmitted.

Hunter G. Goodman, Secretary

 

There being no objection, the House advanced to the fourth order of business.

 

INTRODUCTION & FIRST READING

 

HB 2287  by Representatives McCabe, Appleton, Johnson, Wylie, Dye, Walsh, Dent, Wilson, Kagi, Caldier, Haler, Kochmar and Senn

 

AN ACT Relating to providing notice to first responders that a person with a disability may be present at the scene of an emergency; adding a new section to chapter 43.70 RCW; adding a new section to chapter 38.52 RCW; and creating a new section.

 

Referred to Committee on Judiciary.

 

There being no objection, the bill listed on the day’s introduction sheet under the fourth order of business was referred to the committee so designated.

 

FIRST SUPPLEMENTAL INTRODUCTION AND FIRST READING

 

ESSB 6096      by Senate Committee on Ways & Means (originally sponsored by Senators Becker, Litzow, Parlette, Bailey, Hill, Fain, Dammeier, Brown, Rivers, Roach and McAuliffe)

 

AN ACT Relating to cancer research; amending RCW 28A.400.350 and 41.05.065; and adding a new chapter to Title 43 RCW.

 

There being no objection, ENGROSSED SUBSTITUTE SENATE BILL NO. 6096 was read the first time, and under suspension of the rules was placed on the second reading calendar.

 

The Speaker assumed the chair.

 

SIGNED BY THE SPEAKER

 

The Speaker signed the following bills:

 

HOUSE BILL NO. 2195

HOUSE BILL NO. 2217

HOUSE BILL NO. 2264

ENGROSSED SUBSTITUTE SENATE BILL NO. 6052

SENATE CONCURRENT RESOLUTION NO. 8404

 

The Speaker called upon Representative Kilduff to preside.

 

There being no objection, the House advanced to the eighth order of business.

 

There being no objection, the Committee on Rules was relieved of the following bills and the bills were placed on the third reading calendar:

 

SECOND ENGROSSED HOUSE BILL NO. 1115

ENGROSSED SUBSTITUTE HOUSE BILL NO. 1166

ENGROSSED HOUSE BILL NO. 2212

 

There being no objection, the Committee on Rules was relieved of ENGROSSED SUBSTITUTE HOUSE BILL NO. 2156 and the bill was placed on the second reading calendar.

 

The Speaker (Representative Kilduff presiding) called upon Representative Moeller to preside.

 

MESSAGE FROM THE SENATE

 

June 29, 2015

 

MR. SPEAKER:

 

The Senate has passed:

SENATE BILL NO. 5180

SENATE BILL NO. 5442

SENATE BILL NO. 5581

SUBSTITUTE SENATE BILL NO. 6134

SENATE BILL NO. 6141

and the same are herewith transmitted.

Hunter G. Goodman, Secretary

 

There being no objection, the House reverted to the fourth order of business.

 

SECOND SUPPLEMENTAL INTRODUCTIONS AND FIRST READING

 

SSB 6134        by Senate Committee on Law & Justice (originally sponsored by Senator Padden)

 

AN ACT Relating to exempting pretrial electronic alcohol monitoring programs from statutory limitations on pretrial supervision costs; and amending RCW 10.01.160 and 46.61.50571.

 

There being no objection, SUBSTITUTE SENATE BILL NO. 6134 was read the first time, and under suspension of the rules was placed on the second reading calendar.

 

There being no objection, the House advanced to the sixth order of business.

 

SECOND READING

 

      SECOND ENGROSSED SUBSTITUTE SENATE BILL NO. 5992, by Senate Committee on Transportation (originally sponsored by Senators King, Hobbs, Fain, Liias, Litzow, Braun, Schoesler, Parlette, Warnick, Sheldon, Becker and Brown)

 

      Modifying certain requirements for ferry vessel construction.

 

      The bill was read the second time.

 

There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.

 

      Representatives Clibborn and Orcutt spoke in favor of the passage of the bill.

 

The Speaker (Representative Moeller presiding) stated the question before the House to be the final passage of Second Engrossed Substitute Senate Bill No. 5992.

 

MOTIONS

 

On motion of Representative Van De Wege, Representative Hurst was excused.

 

ROLL CALL

 

      The Clerk called the roll on the final passage of Second Engrossed Substitute Senate Bill No. 5992, and the bill passed the House by the following vote: Yeas, 97; Nays, 0; Absent, 0; Excused, 1.

      Voting yea: Representatives Appleton, Bergquist, Blake, Buys, Caldier, Carlyle, Chandler, Clibborn, Cody, Condotta, DeBolt, Dent, Dunshee, Dye, Farrell, Fey, Fitzgibbon, G. Hunt, Goodman, Gregerson, Gregory, Griffey, Haler, Hansen, Hargrove, Harmsworth, Harris, Hawkins, Hayes, Holy, Hudgins, Hunter, Jinkins, Johnson, Kagi, Kilduff, Kirby, Klippert, Kochmar, Kretz, Kristiansen, Lytton, MacEwen, Magendanz, Manweller, McBride, McCabe, McCaslin, Moeller, Morris, Moscoso, Muri, Nealey, Orcutt, Ormsby, Ortiz-Self, Orwall, Parker, Peterson, Pettigrew, Pike, Pollet, Reykdal, Riccelli, Robinson, Rodne, Ryu, S. Hunt, Santos, Sawyer, Schmick, Scott, Sells, Senn, Shea, Short, Smith, Springer, Stambaugh, Stanford, Stokesbary, Sullivan, Takko, Tarleton, Taylor, Tharinger, Van De Wege, Van Werven, Vick, Walkinshaw, Walsh, Wilcox, Wilson, Wylie, Young, Zeiger and Mr. Speaker.

      Excused: Representative Hurst.

 

SECOND ENGROSSED SUBSTITUTE SENATE BILL NO. 5992, having received the necessary constitutional majority, was declared passed.

 

      SECOND ENGROSSED SENATE BILL NO. 5995, by Senators King, Hobbs, Fain, Liias, Litzow, Braun, Schoesler, Parlette, Dammeier, Warnick, Sheldon, O'Ban, Becker, Brown and Bailey

 

      Modifying the transportation system policy goal of mobility.

 

      The bill was read the second time.

 

There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.

 

      Representatives Clibborn and Stambaugh spoke in favor of the passage of the bill.

 

The Speaker (Representative Moeller presiding) stated the question before the House to be the final passage of Second Engrossed Senate Bill No. 5995.

 

ROLL CALL

 

      The Clerk called the roll on the final passage of Second Engrossed Senate Bill No. 5995, and the bill passed the House by the following vote: Yeas, 98; Nays, 0; Absent, 0; Excused, 0.

      Voting yea: Representatives Appleton, Bergquist, Blake, Buys, Caldier, Carlyle, Chandler, Clibborn, Cody, Condotta, DeBolt, Dent, Dunshee, Dye, Farrell, Fey, Fitzgibbon, G. Hunt, Goodman, Gregerson, Gregory, Griffey, Haler, Hansen, Hargrove, Harmsworth, Harris, Hawkins, Hayes, Holy, Hudgins, Hunter, Hurst, Jinkins, Johnson, Kagi, Kilduff, Kirby, Klippert, Kochmar, Kretz, Kristiansen, Lytton, MacEwen, Magendanz, Manweller, McBride, McCabe, McCaslin, Moeller, Morris, Moscoso, Muri, Nealey, Orcutt, Ormsby, Ortiz-Self, Orwall, Parker, Peterson, Pettigrew, Pike, Pollet, Reykdal, Riccelli, Robinson, Rodne, Ryu, S. Hunt, Santos, Sawyer, Schmick, Scott, Sells, Senn, Shea, Short, Smith, Springer, Stambaugh, Stanford, Stokesbary, Sullivan, Takko, Tarleton, Taylor, Tharinger, Van De Wege, Van Werven, Vick, Walkinshaw, Walsh, Wilcox, Wilson, Wylie, Young, Zeiger and Mr. Speaker.

 

SECOND ENGROSSED SENATE BILL NO. 5995, having received the necessary constitutional majority, was declared passed.

 

      SECOND ENGROSSED SUBSTITUTE SENATE BILL NO. 5997, by Senate Committee on Transportation (originally sponsored by Senators King, Hobbs, Fain, Liias, Litzow, Braun, Schoesler, Parlette, Dammeier, Warnick, Sheldon, O'Ban, Hewitt, Becker and Brown)

 

      Concerning transportation project delivery.

 

      The bill was read the second time.

 

There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.

 

      Representatives Clibborn and Orcutt spoke in favor of the passage of the bill.

 

The Speaker (Representative Moeller presiding) stated the question before the House to be the final passage of Second Engrossed Substitute Senate Bill No. 5997.

 

ROLL CALL

 

      The Clerk called the roll on the final passage of Second Engrossed Substitute Senate Bill No. 5997, and the bill passed the House by the following vote: Yeas, 98; Nays, 0; Absent, 0; Excused, 0.

      Voting yea: Representatives Appleton, Bergquist, Blake, Buys, Caldier, Carlyle, Chandler, Clibborn, Cody, Condotta, DeBolt, Dent, Dunshee, Dye, Farrell, Fey, Fitzgibbon, G. Hunt, Goodman, Gregerson, Gregory, Griffey, Haler, Hansen, Hargrove, Harmsworth, Harris, Hawkins, Hayes, Holy, Hudgins, Hunter, Hurst, Jinkins, Johnson, Kagi, Kilduff, Kirby, Klippert, Kochmar, Kretz, Kristiansen, Lytton, MacEwen, Magendanz, Manweller, McBride, McCabe, McCaslin, Moeller, Morris, Moscoso, Muri, Nealey, Orcutt, Ormsby, Ortiz-Self, Orwall, Parker, Peterson, Pettigrew, Pike, Pollet, Reykdal, Riccelli, Robinson, Rodne, Ryu, S. Hunt, Santos, Sawyer, Schmick, Scott, Sells, Senn, Shea, Short, Smith, Springer, Stambaugh, Stanford, Stokesbary, Sullivan, Takko, Tarleton, Taylor, Tharinger, Van De Wege, Van Werven, Vick, Walkinshaw, Walsh, Wilcox, Wilson, Wylie, Young, Zeiger and Mr. Speaker.

 

SECOND ENGROSSED SUBSTITUTE SENATE BILL NO. 5997, having received the necessary constitutional majority, was declared passed.

 

      ENGROSSED SENATE BILL NO. 6013, by Senators Roach, Angel and Dammeier

 

      Providing use tax relief for individuals who support charitable activities.

 

      The bill was read the second time.

 

There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.

 

      Representative Tharinger spoke in favor of the passage of the bill.

 

The Speaker (Representative Moeller presiding) stated the question before the House to be the final passage of Engrossed Senate Bill No. 6013.

 

ROLL CALL

 

      The Clerk called the roll on the final passage of Engrossed Senate Bill No. 6013, and the bill passed the House by the following vote: Yeas, 97; Nays, 1; Absent, 0; Excused, 0.

      Voting yea: Representatives Appleton, Bergquist, Blake, Buys, Caldier, Chandler, Clibborn, Cody, Condotta, DeBolt, Dent, Dunshee, Dye, Farrell, Fey, Fitzgibbon, G. Hunt, Goodman, Gregerson, Gregory, Griffey, Haler, Hansen, Hargrove, Harmsworth, Harris, Hawkins, Hayes, Holy, Hudgins, Hunter, Hurst, Jinkins, Johnson, Kagi, Kilduff, Kirby, Klippert, Kochmar, Kretz, Kristiansen, Lytton, MacEwen, Magendanz, Manweller, McBride, McCabe, McCaslin, Moeller, Morris, Moscoso, Muri, Nealey, Orcutt, Ormsby, Ortiz-Self, Orwall, Parker, Peterson, Pettigrew, Pike, Pollet, Reykdal, Riccelli, Robinson, Rodne, Ryu, S. Hunt, Santos, Sawyer, Schmick, Scott, Sells, Senn, Shea, Short, Smith, Springer, Stambaugh, Stanford, Stokesbary, Sullivan, Takko, Tarleton, Taylor, Tharinger, Van De Wege, Van Werven, Vick, Walkinshaw, Walsh, Wilcox, Wilson, Wylie, Young, Zeiger and Mr. Speaker.

      Voting nay: Representative Carlyle.

 

ENGROSSED SENATE BILL NO. 6013, having received the necessary constitutional majority, was declared passed.

 

      ENGROSSED SUBSTITUTE SENATE BILL NO. 6096, by Senate Committee on Ways & Means (originally sponsored by Senators Becker, Litzow, Parlette, Bailey, Hill, Fain, Dammeier, Brown, Rivers, Roach and McAuliffe)

 

      Concerning cancer research.

 

      The bill was read the second time.

 

There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.

 

      Representatives Hunter, Nealey and DeBolt spoke in favor of the passage of the bill.

 

The Speaker (Representative Moeller presiding) stated the question before the House to be the final passage of Engrossed Substitute Senate Bill No. 6096.

 

ROLL CALL

 

      The Clerk called the roll on the final passage of Engrossed Substitute Senate Bill No. 6096, and the bill passed the House by the following vote: Yeas, 98; Nays, 0; Absent, 0; Excused, 0.

      Voting yea: Representatives Appleton, Bergquist, Blake, Buys, Caldier, Carlyle, Chandler, Clibborn, Cody, Condotta, DeBolt, Dent, Dunshee, Dye, Farrell, Fey, Fitzgibbon, G. Hunt, Goodman, Gregerson, Gregory, Griffey, Haler, Hansen, Hargrove, Harmsworth, Harris, Hawkins, Hayes, Holy, Hudgins, Hunter, Hurst, Jinkins, Johnson, Kagi, Kilduff, Kirby, Klippert, Kochmar, Kretz, Kristiansen, Lytton, MacEwen, Magendanz, Manweller, McBride, McCabe, McCaslin, Moeller, Morris, Moscoso, Muri, Nealey, Orcutt, Ormsby, Ortiz-Self, Orwall, Parker, Peterson, Pettigrew, Pike, Pollet, Reykdal, Riccelli, Robinson, Rodne, Ryu, S. Hunt, Santos, Sawyer, Schmick, Scott, Sells, Senn, Shea, Short, Smith, Springer, Stambaugh, Stanford, Stokesbary, Sullivan, Takko, Tarleton, Taylor, Tharinger, Van De Wege, Van Werven, Vick, Walkinshaw, Walsh, Wilcox, Wilson, Wylie, Young, Zeiger and Mr. Speaker.

 

ENGROSSED SUBSTITUTE SENATE BILL NO. 6096, having received the necessary constitutional majority, was declared passed.

 

The Speaker (Representative Moeller presiding) called upon Representative Kilduff to preside.

 

There being no objection, the House advanced to the eighth order of business.

 

There being no objection, the Committee on Rules was relieved of ENGROSSED SUBSTITUTE HOUSE BILL NO. 1570 and the bill was placed on the third reading calendar.

 

There being no objection, the House reverted to the fourth order of business.

 

THIRD SUPPLEMENTAL INTRODUCTIONS AND FIRST READING

 

ESSB 5355      by Senate Committee on Higher Education (originally sponsored by Senators Bailey, Kohl-Welles, Roach, Conway, Braun, Baumgartner, Rolfes, O'Ban, McAuliffe and Chase)

 

AN ACT Relating to modifying the definition of resident student to comply with federal requirements established by the veterans access, choice, and accountability act of 2014; amending RCW 28B.15.012; providing an effective date; and declaring an emergency.

 

Referred to Committee on Higher Education.

 

There being no objection, ENGROSSED SUBSTITUTE SENATE BILL NO. 5355 was read the first time, and under suspension of the rules was placed on the second reading calendar.

 

The Speaker (Representative Kilduff presiding) called upon Representative Lyton to preside.

 

There being no objection, the House advanced to the eighth order of business.

 

There being no objection, the Committee on Rules was relieved of HOUSE BILL NO. 1061 and the bill was placed on the second reading calendar.

 

The Speaker assumed the chair.

 

SIGNED BY THE SPEAKER

 

The Speaker signed the following bills:

 

ENGROSSED SECOND SUBSTITUTE SENATE BILL NO. 5315

ENGROSSED SUBSTITUTE SENATE BILL NO. 5681

SECOND ENGROSSED SUBSTITUTE SENATE BILL NO. 5992

SECOND ENGROSSED SENATE BILL NO. 5995

SECOND ENGROSSED SUBSTITUTE SENATE BILL NO. 5997

ENGROSSED SENATE BILL NO. 6013

SECOND ENGROSSED SENATE BILL NO. 6089

ENGROSSED SUBSTITUTE SENATE BILL NO. 6096

 

The Speaker called upon Representative Orwall to preside.

 

MESSAGES FROM THE SENATE

 

June 30, 2015

 

MR. SPEAKER:

 

The President has signed:

SECOND ENGROSSED SUBSTITUTE SENATE BILL NO. 5992

SECOND ENGROSSED SENATE BILL NO. 5995

SECOND ENGROSSED SUBSTITUTE SENATE BILL NO. 5997

ENGROSSED SENATE BILL NO. 6013

ENGROSSED SUBSTITUTE SENATE BILL NO. 6096

and the same are herewith transmitted.

Hunter G. Goodman, Secretary

 

June 30, 2015

 

MR. SPEAKER:

 

The President has signed:

HOUSE BILL NO. 2195

HOUSE BILL NO. 2217

HOUSE BILL NO. 2264

and the same are herewith transmitted.

Hunter G. Goodman, Secretary

 

June 30, 2015

 

MR. SPEAKER:

 

The President has signed:

ENGROSSED SECOND SUBSTITUTE SENATE BILL NO. 5315

ENGROSSED SUBSTITUTE SENATE BILL NO. 5681

SECOND ENGROSSED SENATE BILL NO. 6089

and the same are herewith transmitted.

Hunter G. Goodman, Secretary

 

There being no objection, the House advanced to the sixth order of business.

 

SECOND READING

 

      HOUSE BILL NO. 2156, by Representatives Reykdal, Carlyle and Tharinger

 

      Relating to promoting the fiscal sustainability of cities and counties. Revised for 1st Substitute: Promoting the fiscal sustainability of cities and counties.

 

      The bill was read the second time.

 

There being no objection, Substitute House Bill No. 2156 was substituted for House Bill No. 2156 and the substitute bill was placed on the second reading calendar.

 

SUBSTITUTE HOUSE BILL NO. 2156 was read the second time.

 

Representative Tharinger moved the adoption of amendment (568):

 

Beginning on page 13, line 7, strike all of section 303 and insert the following:

"Sec. 303.  RCW 41.05.050 and 2009 c 537 s 5 are each amended to read as follows:

(1) Every: (a) Department, division, or separate agency of state government; (b) county, municipal, school district, educational service district, or other political subdivisions; and (c) tribal governments as are covered by this chapter, shall provide contributions to insurance and health care plans for its employees and their dependents, the content of such plans to be determined by the authority. Contributions, paid by the county, the municipality, other political subdivision, or a tribal government for their employees, ((shall)) must include an amount determined by the authority to pay such administrative expenses of the authority as are necessary to administer the plans for employees of those groups, except as provided in subsection (4) of this section.

(2) ((If the authority at any time determines that the participation of a county, municipal, other political subdivision, or a tribal government covered under this chapter adversely impacts insurance rates for state employees, the authority shall implement limitations on the participation of additional county, municipal, other political subdivisions, or a tribal government.)) To account for increased cost of benefits for the state and state employees the authority may develop a rate surcharge applicable to participating counties, municipalities, other political subdivisions, and tribal governments.

(3) The contributions of any: (a) Department, division, or separate agency of the state government; (b) county, municipal, or other political subdivisions; and (c) any tribal government as are covered by this chapter, shall be set by the authority, subject to the approval of the governor for availability of funds as specifically appropriated by the legislature for that purpose. Insurance and health care contributions for ferry employees shall be governed by RCW 47.64.270.

(4)(a) The authority ((shall)) must collect from each participating school district and educational service district an amount equal to the composite rate charged to state agencies, plus an amount equal to the employee premiums by plan and family size as would be charged to state employees, for groups of district employees enrolled in authority plans. The authority may collect these amounts in accordance with the district fiscal year, as described in RCW 28A.505.030.

(b) For all groups of district employees enrolling in authority plans for the first time after September 1, 2003, the authority shall collect from each participating school district an amount equal to the composite rate charged to state agencies, plus an amount equal to the employee premiums by plan and by family size as would be charged to state employees, only if the authority determines that this method of billing the districts will not result in a material difference between revenues from districts and expenditures made by the authority on behalf of districts and their employees. The authority may collect these amounts in accordance with the district fiscal year, as described in RCW 28A.505.030.

(c) If the authority determines at any time that the conditions in (b) of this subsection cannot be met, the authority shall offer enrollment to additional groups of district employees on a tiered rate structure until such time as the authority determines there would be no material difference between revenues and expenditures under a composite rate structure for all district employees enrolled in authority plans.

(d) The authority may charge districts a one-time set-up fee for employee groups enrolling in authority plans for the first time.

(e) For the purposes of this subsection:

(i) "District" means school district and educational service district; and

(ii) "Tiered rates" means the amounts the authority must pay to insuring entities by plan and by family size.

(f) Notwithstanding this subsection and RCW 41.05.065(4), the authority may allow districts enrolled on a tiered rate structure prior to September 1, 2002, to continue participation based on the same rate structure and under the same conditions and eligibility criteria.

(5) The authority shall transmit a recommendation for the amount of the employer contribution to the governor and the director of financial management for inclusion in the proposed budgets submitted to the legislature."

 

      Representatives Tharinger and Nealey spoke in favor of the adoption of the amendment.

 

Amendment (568) was adopted.

 

The bill was ordered engrossed.

 

There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.

 

      Representatives Reykdal, Nealey and Holy spoke in favor of the passage of the bill.

 

The Speaker (Representative Orwall presiding) stated the question before the House to be the final passage of Engrossed Substitute House Bill No. 2156.

 

ROLL CALL

 

The Clerk called the roll on the final passage of Engrossed Substitute House Bill No. 2156, and the bill passed the House by the following vote: Yeas, 74; Nays, 24; Absent, 0; Excused, 0.

Voting yea: Representatives Appleton, Bergquist, Blake, Caldier, Carlyle, Clibborn, Cody, Dent, Dunshee, Farrell, Fey, Fitzgibbon, Goodman, Gregerson, Gregory, Haler, Hansen, Hawkins, Hayes, Hudgins, Hunter, Hurst, Jinkins, Johnson, Kagi, Kilduff, Kirby, Klippert, Kochmar, Kretz, Kristiansen, Lytton, Magendanz, McBride, Moeller, Morris, Moscoso, Muri, Nealey, Ormsby, Ortiz-Self, Orwall, Peterson, Pettigrew, Pike, Pollet, Reykdal, Riccelli, Robinson, Rodne, Ryu, S. Hunt, Santos, Sawyer, Sells, Senn, Short, Smith, Springer, Stambaugh, Stanford, Stokesbary, Sullivan, Takko, Tarleton, Tharinger, Van De Wege, Walkinshaw, Walsh, Wilcox, Wilson, Wylie, Zeiger and Mr. Speaker.

Voting nay: Representatives Buys, Chandler, Condotta, DeBolt, Dye, G. Hunt, Griffey, Hargrove, Harmsworth, Harris, Holy, MacEwen, Manweller, McCabe, McCaslin, Orcutt, Parker, Schmick, Scott, Shea, Taylor, Van Werven, Vick and Young.

 

ENGROSSED SUBSTITUTE HOUSE BILL NO. 2156, having received the necessary constitutional majority, was declared passed.

 

      SECOND ENGROSSED SUBSTITUTE SENATE BILL NO. 5994, by Senate Committee on Transportation (originally sponsored by Senators King, Hobbs, Fain, Liias, Litzow, Braun, Schoesler, Parlette, Dammeier, Warnick, Sheldon, Hewitt, Becker, Brown and Bailey)

 

      Concerning permits for state transportation corridor projects. Revised for 1st Substitute: Concerning permits for state transportation corridor projects. (REVISED FOR ENGROSSED: Concerning permits for state transportation projects. )

 

      The bill was read the second time.

 

There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.

 

      Representatives Hayes and Farrell spoke in favor of the passage of the bill.

 

The Speaker (Representative Orwall presiding) stated the question before the House to be the final passage of Second Engrossed Substitute Senate Bill No. 5994.

 

ROLL CALL

 

      The Clerk called the roll on the final passage of Second Engrossed Substitute Senate Bill No. 5994, and the bill passed the House by the following vote: Yeas, 91; Nays, 7; Absent, 0; Excused, 0.

      Voting yea: Representatives Appleton, Bergquist, Blake, Buys, Caldier, Carlyle, Chandler, Clibborn, Cody, Condotta, DeBolt, Dent, Dye, Farrell, Fey, G. Hunt, Gregerson, Gregory, Griffey, Haler, Hansen, Hargrove, Harmsworth, Harris, Hawkins, Hayes, Holy, Hudgins, Hunter, Hurst, Johnson, Kagi, Kilduff, Kirby, Klippert, Kochmar, Kretz, Kristiansen, Lytton, MacEwen, Magendanz, Manweller, McBride, McCabe, McCaslin, Moeller, Morris, Moscoso, Muri, Nealey, Orcutt, Ormsby, Ortiz-Self, Orwall, Parker, Peterson, Pettigrew, Pike, Pollet, Reykdal, Riccelli, Robinson, Rodne, Ryu, S. Hunt, Santos, Schmick, Scott, Sells, Senn, Shea, Short, Smith, Springer, Stambaugh, Stokesbary, Sullivan, Takko, Tarleton, Taylor, Tharinger, Van De Wege, Van Werven, Vick, Walsh, Wilcox, Wilson, Wylie, Young, Zeiger and Mr. Speaker.

      Voting nay: Representatives Dunshee, Fitzgibbon, Goodman, Jinkins, Sawyer, Stanford and Walkinshaw.

 

SECOND ENGROSSED SUBSTITUTE SENATE BILL NO. 5994, having received the necessary constitutional majority, was declared passed.

 

      SECOND ENGROSSED SUBSTITUTE SENATE BILL NO. 5996, by Senate Committee on Transportation (originally sponsored by Senators King, Hobbs, Fain, Liias, Litzow, Braun, Schoesler, Parlette, Dammeier, Warnick, Sheldon, O'Ban, Hewitt, Becker and Brown)

 

      Concerning Washington state department of transportation projects.

 

      The bill was read the second time.

 

There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.

 

      Representatives Fey and Zeiger spoke in favor of the passage of the bill.

 

The Speaker (Representative Orwall presiding) stated the question before the House to be the final passage of Second Engrossed Substitute Senate Bill No. 5996.

 

ROLL CALL

 

      The Clerk called the roll on the final passage of Second Engrossed Substitute Senate Bill No. 5996, and the bill passed the House by the following vote: Yeas, 98; Nays, 0; Absent, 0; Excused, 0.

      Voting yea: Representatives Appleton, Bergquist, Blake, Buys, Caldier, Carlyle, Chandler, Clibborn, Cody, Condotta, DeBolt, Dent, Dunshee, Dye, Farrell, Fey, Fitzgibbon, G. Hunt, Goodman, Gregerson, Gregory, Griffey, Haler, Hansen, Hargrove, Harmsworth, Harris, Hawkins, Hayes, Holy, Hudgins, Hunter, Hurst, Jinkins, Johnson, Kagi, Kilduff, Kirby, Klippert, Kochmar, Kretz, Kristiansen, Lytton, MacEwen, Magendanz, Manweller, McBride, McCabe, McCaslin, Moeller, Morris, Moscoso, Muri, Nealey, Orcutt, Ormsby, Ortiz-Self, Orwall, Parker, Peterson, Pettigrew, Pike, Pollet, Reykdal, Riccelli, Robinson, Rodne, Ryu, S. Hunt, Santos, Sawyer, Schmick, Scott, Sells, Senn, Shea, Short, Smith, Springer, Stambaugh, Stanford, Stokesbary, Sullivan, Takko, Tarleton, Taylor, Tharinger, Van De Wege, Van Werven, Vick, Walkinshaw, Walsh, Wilcox, Wilson, Wylie, Young, Zeiger and Mr. Speaker.

 

SECOND ENGROSSED SUBSTITUTE SENATE BILL NO. 5996, having received the necessary constitutional majority, was declared passed.

 

      HOUSE BILL NO. 1061, by Representatives Hayes, Lytton, Smith, Gregerson, Moeller and Buys

 

      Increasing the number of district court judges in Skagit county.

 

      The bill was read the second time.

 

There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.

 

      Representatives Hayes and Jinkins spoke in favor of the passage of the bill.

 

      Representative Shea spoke against the passage of the bill.

 

The Speaker (Representative Orwall presiding) stated the question before the House to be the final passage of House Bill No. 1061.

 

ROLL CALL

 

      The Clerk called the roll on the final passage of House Bill No. 1061, and the bill passed the House by the following vote: Yeas, 94; Nays, 4; Absent, 0; Excused, 0.

      Voting yea: Representatives Appleton, Bergquist, Blake, Buys, Caldier, Carlyle, Chandler, Clibborn, Cody, Condotta, DeBolt, Dent, Dunshee, Dye, Farrell, Fey, Fitzgibbon, Goodman, Gregerson, Gregory, Griffey, Haler, Hansen, Hargrove, Harmsworth, Harris, Hawkins, Hayes, Holy, Hudgins, Hunter, Hurst, Jinkins, Johnson, Kagi, Kilduff, Kirby, Klippert, Kochmar, Kretz, Kristiansen, Lytton, MacEwen, Magendanz, Manweller, McBride, McCabe, Moeller, Morris, Moscoso, Muri, Nealey, Orcutt, Ormsby, Ortiz-Self, Orwall, Parker, Peterson, Pettigrew, Pike, Pollet, Reykdal, Riccelli, Robinson, Rodne, Ryu, S. Hunt, Santos, Sawyer, Schmick, Scott, Sells, Senn, Short, Smith, Springer, Stambaugh, Stanford, Stokesbary, Sullivan, Takko, Tarleton, Tharinger, Van De Wege, Van Werven, Vick, Walkinshaw, Walsh, Wilcox, Wilson, Wylie, Young, Zeiger and Mr. Speaker.

      Voting nay: Representatives G. Hunt, McCaslin, Shea and Taylor.

 

HOUSE BILL NO. 1061, having received the necessary constitutional majority, was declared passed.

 

There being no objection, the House advanced to the seventh order of business.

 

THIRD READING

 

There being no objection, the rules were suspended, and SUBSTITUTE HOUSE BILL NO. 1570 was returned to second reading for the purpose of amendment.

 

There being no objection, the House reverted to the sixth order of business.

 

SECOND READING

 

      SUBSTITUTE HOUSE BILL NO. 1570, by House Committee on Education (originally sponsored by Representatives Gregory, Bergquist, S. Hunt, Reykdal, Kilduff, Ortiz-Self and Pollet)

 

      Creating flexibility for the educator retooling conditional scholarship program.

 

      The bill was read the second time.

 

Representative Gregory moved the adoption of amendment (570):

 

Strike everything after the enacting clause and insert the following:

"Sec. 304.  RCW 28A.660.045 and 2015 1st sp.s. c 3 s 3 are each amended to read as follows:

(1) The educator retooling conditional scholarship program is created. Participation is limited to current K-12 teachers and individuals having an elementary education certificate but who are not employed in positions requiring an elementary education certificate. It is anticipated that candidates enrolled in this program will complete the requirements for an endorsement in two years or less.

(2) Entry requirements for candidates include:

(a) Current K-12 teachers shall pursue an endorsement in a subject or geographic endorsement shortage area, as defined by the professional educator standards board, including but not limited to, mathematics, science, special education, bilingual education, English language learner, computer science education, or environmental and sustainability education.

(b) Individuals having an elementary education certificate but who are not employed in positions requiring an elementary education certificate shall pursue an endorsement in a subject or geographic endorsement shortage area, as defined by the professional educator standards board, including but not limited to, mathematics, science, special education, bilingual education, English language learner, computer science education, or environmental and sustainability education.

Sec. 305.  RCW 28A.660.050 and 2015 1st sp.s. c 3 s 4 are each amended to read as follows:

Subject to the availability of amounts appropriated for these purposes, the conditional scholarship programs in this chapter are created under the following guidelines:

(1) The programs shall be administered by the student achievement council. In administering the programs, the council has the following powers and duties:

(a) To adopt necessary rules and develop guidelines to administer the programs;

(b) To collect and manage repayments from participants who do not meet their service obligations; and

(c) To accept grants and donations from public and private sources for the programs.

(2) Requirements for participation in the conditional scholarship programs are as provided in this subsection (2).

(a) The alternative route conditional scholarship program is limited to interns of professional educator standards board-approved alternative routes to teaching programs under RCW 28A.660.040. For fiscal year 2011, priority must be given to fiscal year 2010 participants in the alternative route partnership program. In order to receive conditional scholarship awards, recipients shall:

(i) Be accepted and maintain enrollment in alternative certification routes through a professional educator standards board-approved program;

(ii) Continue to make satisfactory progress toward completion of the alternative route certification program and receipt of a residency teaching certificate; and

(iii) Receive no more than the annual amount of the scholarship, not to exceed eight thousand dollars, for the cost of tuition, fees, and educational expenses, including books, supplies, and transportation for the alternative route certification program in which the recipient is enrolled. The council may adjust the annual award by the average rate of resident undergraduate tuition and fee increases at the state universities as defined in RCW 28B.10.016.

(b) The pipeline for paraeducators conditional scholarship program is limited to qualified paraeducators as provided by RCW 28A.660.042. In order to receive conditional scholarship awards, recipients shall:

(i) Be accepted and maintain enrollment at a community and technical college for no more than two years and attain an associate of arts degree;

(ii) Continue to make satisfactory progress toward completion of an associate of arts degree. This progress requirement is a condition for eligibility into a route one program of the alternative routes to teacher certification program for a mathematics, special education, or English as a second language endorsement; and

(iii) Receive no more than the annual amount of the scholarship, not to exceed four thousand dollars, for the cost of tuition, fees, and educational expenses, including books, supplies, and transportation for the alternative route certification program in which the recipient is enrolled. The student achievement council may adjust the annual award by the average rate of tuition and fee increases at the state community and technical colleges.

(c) The educator retooling conditional scholarship program is limited to current K-12 teachers. In order to receive conditional scholarship awards:

(i) Individuals currently employed as teachers shall pursue an endorsement in a subject or geographic endorsement shortage area, as defined by the professional educator standards board, including but not limited to, mathematics, science, special education, bilingual education, English language learner, computer science education, or environmental and sustainability education; or

(ii) Individuals who are certificated with an elementary education endorsement shall pursue an endorsement in a subject or geographic endorsement shortage area, as defined by the professional educator standards board, including but not limited to, mathematics, science, special education, bilingual education, English language learner, computer science education, or environmental and sustainability education; and

(iii) Individuals shall use one of the pathways to endorsement processes to receive an endorsement in a subject or geographic endorsement shortage area, as defined by the professional educator standards board, including but not limited to, mathematics, science, special education, bilingual education, English language learner, computer science education, or environmental and sustainability education, which shall include passing an endorsement test plus observation and completing applicable coursework to attain the proper endorsement; and

(iv) Individuals shall receive no more than the annual amount of the scholarship, not to exceed three thousand dollars, for the cost of tuition, test fees, and educational expenses, including books, supplies, and transportation for the endorsement pathway being pursued.

(3) The Washington professional educator standards board shall select individuals to receive conditional scholarships. In selecting recipients, preference shall be given to eligible veterans or national guard members. In awarding conditional scholarships to support additional bilingual education or English language learner endorsements, the board shall also give preference to teachers assigned to schools required under state or federal accountability measures to implement a plan for improvement, and to teachers assigned to schools whose enrollment of English language learner students has increased an average of more than five percent per year over the previous three years.

(4) For the purpose of this chapter, a conditional scholarship is a loan that is forgiven in whole or in part in exchange for service as a certificated teacher employed in a Washington state K-12 public school. The state shall forgive one year of loan obligation for every two years a recipient teaches in a public school. Recipients who fail to continue a course of study leading to residency teacher certification or cease to teach in a public school in the state of Washington in their endorsement area are required to repay the remaining loan principal with interest.

(5) Recipients who fail to fulfill the required teaching obligation are required to repay the remaining loan principal with interest and any other applicable fees. The student achievement council shall adopt rules to define the terms for repayment, including applicable interest rates, fees, and deferments.

(6) The student achievement council may deposit all appropriations, collections, and any other funds received for the program in this chapter in the future teachers conditional scholarship account authorized in RCW 28B.102.080."

Correct the title.

 

Representatives Gregory and Magendanz spoke in favor of the adoption of the striking amendment.

 

Amendment (570) was adopted.

 

The bill was ordered engrossed.

 

There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.

 

      Representatives Gregory, Magendanz and Santos spoke in favor of the passage of the bill.

 

The Speaker (Representative Orwall presiding) stated the question before the House to be the final passage of Engrossed Substitute House Bill No. 1570.

 

ROLL CALL

 

The Clerk called the roll on the final passage of Engrossed Substitute House Bill No. 1570, and the bill passed the House by the following vote: Yeas, 54; Nays, 44; Absent, 0; Excused, 0.

Voting yea: Representatives Appleton, Bergquist, Blake, Carlyle, Clibborn, Cody, Dunshee, Farrell, Fey, Fitzgibbon, Goodman, Gregerson, Gregory, Hansen, Hawkins, Hudgins, Hunter, Hurst, Jinkins, Johnson, Kagi, Kilduff, Kirby, Kochmar, Lytton, McBride, Moeller, Morris, Moscoso, Ormsby, Ortiz-Self, Orwall, Peterson, Pettigrew, Pollet, Reykdal, Riccelli, Robinson, Ryu, S. Hunt, Santos, Sawyer, Sells, Senn, Springer, Stanford, Sullivan, Takko, Tarleton, Tharinger, Van De Wege, Walkinshaw, Wylie and Mr. Speaker.

Voting nay: Representatives Buys, Caldier, Chandler, Condotta, DeBolt, Dent, Dye, G. Hunt, Griffey, Haler, Hargrove, Harmsworth, Harris, Hayes, Holy, Klippert, Kretz, Kristiansen, MacEwen, Magendanz, Manweller, McCabe, McCaslin, Muri, Nealey, Orcutt, Parker, Pike, Rodne, Schmick, Scott, Shea, Short, Smith, Stambaugh, Stokesbary, Taylor, Van Werven, Vick, Walsh, Wilcox, Wilson, Young and Zeiger.

 

ENGROSSED SUBSTITUTE HOUSE BILL NO. 1570, having received the necessary constitutional majority, was declared passed.

 

The Speaker (Representative Orwall presiding) called upon Representative Moeller to preside.

 

MESSAGE FROM THE SENATE

 

June 30, 2015

 

MR. SPEAKER:

 

The Senate has passed:

HOUSE BILL NO. 1219

ENGROSSED SUBSTITUTE HOUSE BILL NO. 1842

ENGROSSED SUBSTITUTE HOUSE BILL NO. 1965

ENGROSSED SUBSTITUTE HOUSE BILL NO. 2012

and the same are herewith transmitted.

Hunter G. Goodman, Secretary

 

There being no objection, the House advanced to the seventh order of business.

 

THIRD READING

 

ENGROSSED HOUSE BILL NO. 2212, by Representatives Cody, Schmick and Fagan.

 

Exempting hospitals licensed under chapter 70.41 RCW that receive capital funds to operate new psychiatric services from certain certificate of need requirements.

 

The bill was read the third time.

 

      Representatives Cody and Manweller spoke in favor of the passage of the bill.

 

The Speaker (Representative Moeller presiding) stated the question before the House to be the final passage of Engrossed House Bill No. 2212.

 

ROLL CALL

 

      The Clerk called the roll on the final passage of Engrossed House Bill No. 2212, and the bill passed the House by the following vote:  Yeas, 98; Nays, 0; Absent, 0; Excused, 0.

      Voting yea: Representatives Appleton, Bergquist, Blake, Buys, Caldier, Carlyle, Chandler, Clibborn, Cody, Condotta, DeBolt, Dent, Dunshee, Dye, Farrell, Fey, Fitzgibbon, G. Hunt, Goodman, Gregerson, Gregory, Griffey, Haler, Hansen, Hargrove, Harmsworth, Harris, Hawkins, Hayes, Holy, Hudgins, Hunter, Hurst, Jinkins, Johnson, Kagi, Kilduff, Kirby, Klippert, Kochmar, Kretz, Kristiansen, Lytton, MacEwen, Magendanz, Manweller, McBride, McCabe, McCaslin, Moeller, Morris, Moscoso, Muri, Nealey, Orcutt, Ormsby, Ortiz-Self, Orwall, Parker, Peterson, Pettigrew, Pike, Pollet, Reykdal, Riccelli, Robinson, Rodne, Ryu, S. Hunt, Santos, Sawyer, Schmick, Scott, Sells, Senn, Shea, Short, Smith, Springer, Stambaugh, Stanford, Stokesbary, Sullivan, Takko, Tarleton, Taylor, Tharinger, Van De Wege, Van Werven, Vick, Walkinshaw, Walsh, Wilcox, Wilson, Wylie, Young, Zeiger and Mr. Speaker.

 

ENGROSSED HOUSE BILL NO. 2212, having received the necessary constitutional majority, was declared passed.

 

There being no objection, the House reverted to the sixth order of business.

 

SECOND READING

 

      ENGROSSED SUBSTITUTE SENATE BILL NO. 5820, by Senate Committee on Transportation (originally sponsored by Senators King and Benton)

 

      Concerning the sale of certain department of transportation surplus property.

 

      The bill was read the second time.

 

There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.

 

      Representatives Clibborn and Orcutt spoke in favor of the passage of the bill.

 

The Speaker (Representative Moeller presiding) stated the question before the House to be the final passage of Engrossed Substitute Senate Bill No. 5820.

 

ROLL CALL

 

      The Clerk called the roll on the final passage of Engrossed Substitute Senate Bill No. 5820, and the bill passed the House by the following vote: Yeas, 69; Nays, 29; Absent, 0; Excused, 0.

      Voting yea: Representatives Appleton, Bergquist, Blake, Caldier, Carlyle, Clibborn, Cody, Dunshee, Farrell, Fey, Fitzgibbon, Goodman, Gregerson, Gregory, Griffey, Haler, Hansen, Hayes, Hudgins, Hunter, Hurst, Jinkins, Johnson, Kagi, Kilduff, Kirby, Kochmar, Kristiansen, Lytton, MacEwen, Magendanz, Manweller, McBride, Moeller, Morris, Moscoso, Muri, Orcutt, Ormsby, Ortiz-Self, Orwall, Parker, Peterson, Pettigrew, Pollet, Reykdal, Riccelli, Robinson, Rodne, Ryu, S. Hunt, Santos, Sawyer, Sells, Senn, Smith, Springer, Stambaugh, Stanford, Sullivan, Takko, Tarleton, Tharinger, Van De Wege, Walkinshaw, Walsh, Wylie, Zeiger and Mr. Speaker.

      Voting nay: Representatives Buys, Chandler, Condotta, DeBolt, Dent, Dye, G. Hunt, Hargrove, Harmsworth, Harris, Hawkins, Holy, Klippert, Kretz, McCabe, McCaslin, Nealey, Pike, Schmick, Scott, Shea, Short, Stokesbary, Taylor, Van Werven, Vick, Wilcox, Wilson and Young.

 

ENGROSSED SUBSTITUTE SENATE BILL NO. 5820, having received the necessary constitutional majority, was declared passed.

 

      SUBSTITUTE SENATE BILL NO. 6134, by Senate Committee on Law & Justice (originally sponsored by Senator Padden)

 

      Exempting pretrial electronic alcohol monitoring programs from statutory limitations on pretrial supervision costs.

 

      The bill was read the second time.

 

There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.

 

      Representatives Goodman and Klippert spoke in favor of the passage of the bill.

 

The Speaker (Representative Moeller presiding) stated the question before the House to be the final passage of Substitute Senate Bill No. 6134.

 

ROLL CALL

 

      The Clerk called the roll on the final passage of Substitute Senate Bill No. 6134, and the bill passed the House by the following vote: Yeas, 92; Nays, 6; Absent, 0; Excused, 0.

      Voting yea: Representatives Bergquist, Blake, Buys, Caldier, Carlyle, Chandler, Clibborn, Cody, DeBolt, Dent, Dunshee, Dye, Farrell, Fey, Fitzgibbon, G. Hunt, Goodman, Gregerson, Gregory, Griffey, Haler, Hansen, Hargrove, Harmsworth, Harris, Hawkins, Hayes, Holy, Hudgins, Hunter, Hurst, Jinkins, Johnson, Kagi, Kilduff, Kirby, Klippert, Kochmar, Kretz, Kristiansen, Lytton, MacEwen, Magendanz, Manweller, McBride, McCabe, McCaslin, Moeller, Moscoso, Muri, Nealey, Orcutt, Ormsby, Ortiz-Self, Orwall, Parker, Peterson, Pettigrew, Pike, Pollet, Reykdal, Riccelli, Robinson, Rodne, Ryu, S. Hunt, Schmick, Scott, Sells, Senn, Shea, Short, Smith, Springer, Stambaugh, Stanford, Stokesbary, Sullivan, Takko, Tarleton, Tharinger, Van De Wege, Van Werven, Vick, Walkinshaw, Walsh, Wilcox, Wilson, Wylie, Young, Zeiger and Mr. Speaker.

      Voting nay: Representatives Appleton, Condotta, Morris, Santos, Sawyer and Taylor.

 

SUBSTITUTE SENATE BILL NO. 6134, having received the necessary constitutional majority, was declared passed.

 

MESSAGES FROM THE SENATE

 

June 30, 2015

 

MR. SPEAKER:

 

The Senate has passed:

ENGROSSED HOUSE BILL NO. 2267

and the same are herewith transmitted.

Hunter G. Goodman, Secretary

 

June 30, 2015

 

MR. SPEAKER:

 

The Senate has passed:

SUBSTITUTE HOUSE BILL NO. 1897

ENGROSSED SUBSTITUTE HOUSE BILL NO. 2128

and the same are herewith transmitted.

Hunter G. Goodman, Secretary

 

June 30, 2015

 

MR. SPEAKER:

 

The President has signed:

SECOND ENGROSSED SUBSTITUTE SENATE BILL NO. 5994

SECOND ENGROSSED SUBSTITUTE SENATE BILL NO. 5996

and the same are herewith transmitted.

Hunter G. Goodman, Secretary

 

There being no objection, the House advanced to the sixth order of business.

 

SECOND READING

 

      ENGROSSED SUBSTITUTE SENATE BILL NO. 5355, by Senate Committee on Higher Education (originally sponsored by Senators Bailey, Kohl-Welles, Roach, Conway, Braun, Baumgartner, Rolfes, O'Ban, McAuliffe and Chase)

 

      Modifying the definition of resident student to comply with federal requirements established by the veterans access, choice, and accountability act of 2014.

 

      The bill was read the second time.

 

There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.

 

      Representatives Kilduff and Zeiger spoke in favor of the passage of the bill.

 

The Speaker (Representative Moeller presiding) stated the question before the House to be the final passage of Engrossed Substitute Senate Bill No. 5355.

 

ROLL CALL

 

      The Clerk called the roll on the final passage of Engrossed Substitute Senate Bill No. 5355, and the bill passed the House by the following vote: Yeas, 98; Nays, 0; Absent, 0; Excused, 0.

      Voting yea: Representatives Appleton, Bergquist, Blake, Buys, Caldier, Carlyle, Chandler, Clibborn, Cody, Condotta, DeBolt, Dent, Dunshee, Dye, Farrell, Fey, Fitzgibbon, G. Hunt, Goodman, Gregerson, Gregory, Griffey, Haler, Hansen, Hargrove, Harmsworth, Harris, Hawkins, Hayes, Holy, Hudgins, Hunter, Hurst, Jinkins, Johnson, Kagi, Kilduff, Kirby, Klippert, Kochmar, Kretz, Kristiansen, Lytton, MacEwen, Magendanz, Manweller, McBride, McCabe, McCaslin, Moeller, Morris, Moscoso, Muri, Nealey, Orcutt, Ormsby, Ortiz-Self, Orwall, Parker, Peterson, Pettigrew, Pike, Pollet, Reykdal, Riccelli, Robinson, Rodne, Ryu, S. Hunt, Santos, Sawyer, Schmick, Scott, Sells, Senn, Shea, Short, Smith, Springer, Stambaugh, Stanford, Stokesbary, Sullivan, Takko, Tarleton, Taylor, Tharinger, Van De Wege, Van Werven, Vick, Walkinshaw, Walsh, Wilcox, Wilson, Wylie, Young, Zeiger and Mr. Speaker.

 

ENGROSSED SUBSTITUTE SENATE BILL NO. 5355, having received the necessary constitutional majority, was declared passed.

 

The Speaker (Representative Moeller presiding) called upon Representative Orwall to preside.

 

The Speaker assumed the chair.

 

SIGNED BY THE SPEAKER

 

The Speaker signed the following bills:

 

HOUSE BILL NO. 1219

ENGROSSED SUBSTITUTE HOUSE BILL NO. 1842

ENGROSSED SUBSTITUTE HOUSE BILL NO. 1965

ENGROSSED SUBSTITUTE HOUSE BILL NO. 2012

SECOND ENGROSSED SUBSTITUTE SENATE BILL NO. 5994

SECOND ENGROSSED SUBSTITUTE SENATE BILL NO. 5996

SUBSTITUTE HOUSE BILL NO. 1897

ENGROSSED SUBSTITUTE HOUSE BILL NO. 2128

ENGROSSED HOUSE BILL NO. 2267

 

The Speaker called upon Representative Orwall to preside.

 

There being no objection, the House advanced to the seventh order of business.

 

THIRD READING

 

There being no objection, the rules were suspended, and SUBSTITUTE HOUSE BILL NO. 1166 was returned to second reading for the purpose of amendment.

 

There being no objection, the House reverted to the sixth order of business.

 

SECOND READING

 

      SUBSTITUTE HOUSE BILL NO. 1166, by House Committee on Capital Budget (originally sponsored by Representatives Dunshee, Gregerson and DeBolt)

 

      Concerning state general obligation bonds and related accounts.

 

      The bill was read the second time.

 

Representative Dunshee moved the adoption of amendment (583):

 

Strike everything after the enacting clause and insert the following:

"NEW SECTION.  Sec. 306.  For the purpose of providing funds to finance the projects described and authorized by the legislature in the omnibus capital and operating appropriations acts for the 2015-2017 fiscal biennium, and all costs incidental thereto, the state finance committee is authorized to issue general obligation bonds of the state of Washington in the sum of two billion three hundred thirty-two million four hundred fifty-six thousand dollars, or as much thereof as may be required, to finance these projects and all costs incidental thereto. Bonds authorized in this section may be sold at such price as the state finance committee shall determine. No bonds authorized in this section may be offered for sale without prior legislative appropriation of the net proceeds of the sale of the bonds.

NEW SECTION.  Sec. 307.  (1) The proceeds from the sale of bonds authorized in section 1 of this act shall be deposited in the state building construction account created by RCW 43.83.020. The proceeds shall be transferred as follows:

(a) Two billion one hundred eighty-five million five hundred sixty-two thousand dollars to remain in the state building construction account created by RCW 43.83.020;

(b) One hundred twenty-three million eight hundred thousand dollars to the state taxable building construction account. All receipts from taxable bonds issued are to be deposited into the account. If the state finance committee deems it necessary or advantageous to issue more than the amount specified in this subsection (1)(b) as taxable bonds in order to comply with federal internal revenue service rules and regulations pertaining to the use of nontaxable bond proceeds or in order to reduce the total financing costs for bonds issued, the proceeds of such additional taxable bonds shall be transferred to the state taxable building construction account in lieu of any transfer otherwise provided by this section. If the state finance committee determines that a portion of the amount specified in this subsection (1)(b) as taxable bonds may be issued as nontaxable bonds in compliance with federal internal revenue service rules and regulations pertaining to the use of nontaxable bond proceeds, then such bond proceeds shall be transferred to the state building construction account in lieu of the transfer to the state taxable building construction account otherwise provided by this subsection (1)(b). The state treasurer shall submit written notice to the director of financial management if it is determined that any such additional transfer to the state taxable building construction account is necessary or that a transfer from the state taxable building construction account to the state building construction account may be made. Moneys in the account may be spent only after appropriation.

(c) The treasurer shall transfer bond proceeds deposited in the state building construction account into the outdoor recreation account created by RCW 79A.25.060, the habitat conservation account created by RCW 79A.15.020, the riparian protection account created by RCW 79A.15.120, and the farmlands preservation account created by RCW 79A.15.130 at various times and in various amounts necessary to support authorized expenditures from those accounts.

(2) These proceeds shall be used exclusively for the purposes specified in this section and for the payment of expenses incurred in the issuance and sale of the bonds issued for the purposes of this section, and shall be administered by the office of financial management subject to legislative appropriation.

NEW SECTION.  Sec. 308.  (1) The debt-limit general fund bond retirement account shall be used for the payment of the principal of and interest on the bonds authorized in section 2(1) (a) through (c) of this act.

(2) The state finance committee shall, on or before June 30th of each year, certify to the state treasurer the amount needed in the ensuing twelve months to meet the bond retirement and interest requirements on the bonds authorized in section 2(1) (a) through (c) of this act.

(3) On each date on which any interest or principal and interest payment is due on bonds issued for the purposes of section 2(1) (a) through (c) of this act the state treasurer shall withdraw from any general state revenues received in the state treasury and deposit in the debt-limit general fund bond retirement account an amount equal to the amount certified by the state finance committee to be due on the payment date.

NEW SECTION.  Sec. 309.  (1) Bonds issued under sections 1 through 3 of this act shall state that they are a general obligation of the state of Washington, shall pledge the full faith and credit of the state to the payment of the principal thereof and the interest thereon, and shall contain an unconditional promise to pay the principal and interest as the same shall become due.

(2) The owner and holder of each of the bonds or the trustee for the owner and holder of any of the bonds may by mandamus or other appropriate proceeding require the transfer and payment of funds as directed in this section.

NEW SECTION.  Sec. 310.  The legislature may provide additional means for raising moneys for the payment of the principal of and interest on the bonds authorized in section 1 of this act, and sections 2 and 3 of this act shall not be deemed to provide an exclusive method for the payment.

NEW SECTION.  Sec. 311.  Sections 1 through 5 of this act constitute a new chapter in Title 43 RCW.

NEW SECTION.  Sec. 312.  If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected.

NEW SECTION.  Sec. 313.  This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately."

Correct the title.

 

Representatives Dunshee and Smith spoke in favor of the adoption of the striking amendment.

 

Amendment (583) was adopted.

 

The bill was ordered engrossed.

 

There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.

 

      Representatives Dunshee and Smith spoke in favor of the passage of the bill.

 

The Speaker (Representative Orwall presiding) stated the question before the House to be the final passage of Engrossed Substitute House Bill No. 1166.

 

ROLL CALL

 

The Clerk called the roll on the final passage of Engrossed Substitute House Bill No. 1166, and the bill passed the House by the following vote: Yeas, 96; Nays, 2; Absent, 0; Excused, 0.

Voting yea: Representatives Appleton, Bergquist, Blake, Buys, Caldier, Carlyle, Chandler, Clibborn, Cody, Condotta, DeBolt, Dent, Dunshee, Dye, Farrell, Fey, Fitzgibbon, G. Hunt, Goodman, Gregerson, Gregory, Griffey, Haler, Hansen, Hargrove, Harmsworth, Harris, Hawkins, Hayes, Holy, Hudgins, Hunter, Hurst, Jinkins, Johnson, Kagi, Kilduff, Kirby, Klippert, Kochmar, Kretz, Kristiansen, Lytton, MacEwen, Magendanz, Manweller, McBride, McCabe, McCaslin, Moeller, Morris, Moscoso, Muri, Nealey, Orcutt, Ormsby, Ortiz-Self, Orwall, Parker, Peterson, Pettigrew, Pike, Pollet, Reykdal, Riccelli, Robinson, Rodne, Ryu, S. Hunt, Santos, Sawyer, Schmick, Sells, Senn, Shea, Short, Smith, Springer, Stambaugh, Stanford, Stokesbary, Sullivan, Takko, Tarleton, Tharinger, Van De Wege, Van Werven, Vick, Walkinshaw, Walsh, Wilcox, Wilson, Wylie, Young, Zeiger and Mr. Speaker.

Voting nay: Representatives Scott and Taylor.

 

ENGROSSED SUBSTITUTE HOUSE BILL NO. 1166, having received the necessary constitutional majority, was declared passed.

 

There being no objection, the rules were suspended, and ENGROSSED HOUSE BILL NO. 1115 was returned to second reading for the purpose of amendment.

 

There being no objection, the House reverted to the sixth order of business.

 

SECOND READING

 

      ENGROSSED HOUSE BILL NO. 1115, by Representatives Dunshee, DeBolt, Gregerson, Morris and Reykdal

 

      Concerning the capital budget.

 

      The bill was read the second time.

 

Representative Dunshee moved the adoption of amendment (582):

 

FORMATTING CHANGED TO ACCOMMODATE TEXT


Strike everything after the enacting clause and insert the following:

"NEW SECTION.  Sec. 314.  (1) A capital budget is hereby adopted and, subject to the provisions set forth in this act, the several dollar amounts hereinafter specified, or so much thereof as shall be sufficient to accomplish the purposes designated, are hereby appropriated and authorized to be incurred for capital projects during the period beginning with the effective date of this act and ending June 30, 2017, out of the several funds specified in this act.

(2) The definitions in this subsection apply throughout this act unless the context clearly requires otherwise.

(a) "Fiscal year 2016" or "FY 2016" means the period beginning July 1, 2015, and ending June 30, 2016.

(b) "Fiscal year 2017" or "FY 2017" means the period beginning July 1, 2016, and ending June 30, 2017.

(c) "Lapse" or "revert" means the amount shall return to an unappropriated status.

(d) "Provided solely" means the specified amount may be spent only for the specified purpose.

(3) Unless otherwise specifically authorized in this act, any portion of an amount provided solely for a specified purpose that is not expended subject to the specified conditions and limitations to fulfill the specified purpose shall lapse.

(4) The amounts shown under the headings "Prior Biennia," "Future Biennia," and "Total" in this act are for informational purposes only and do not constitute legislative approval of these amounts. "Prior biennia" typically refers to the immediate prior biennium for reappropriations, but may refer to multiple biennia in the case of specific projects. A "future biennia" amount is an estimate of what may be appropriated for the project or program in the 2017-2019 biennium and the following three biennia; an amount of zero does not necessarily constitute legislative intent to not provide funding for the project or program in the future.

(5) "Reappropriations" in this act are appropriations and, unless the context clearly provides otherwise, are subject to the relevant conditions and limitations applicable to appropriations. Reappropriations shall be limited to the unexpended balances remaining on June 30, 2015, from the 2013-2015 biennial appropriations for each project.

PART 1

GENERAL GOVERNMENT

NEW SECTION.  Sec. 1001.  FOR THE HOUSE OF REPRESENTATIVES

House of Representatives Interim Task Force on Washington Waters (91000002)

(1) The house of representatives finds that low water supply in portions of eastern Washington, catastrophic flood damage, and storm water runoff polluting state waterways have reached crisis levels, endangering the health and safety of our citizens and the environment.

(2) The house of representatives interim task force on Washington waters is established to build upon the foundation of Senate Bill No. 5628 that was introduced in the 2015 regular session and provided for storm water, flood control, and water supply infrastructure in the state. The objective of the task force is to prepare a report and draft legislation for consideration in the 2016 legislative session that:

(a) Quantifies the level of funding needed through fiscal year 2026 to address the three water priorities;

(b) Develops and recommends state funding options that address the three water priorities equally;

(c) Develops and recommends local funding options that generate revenues from municipal and agricultural beneficiaries;

(d) Develops and recommends criteria and mechanisms for managing, prioritizing and distributing the funding;

(e) Analyzes and reports on the metrics and variables associated with water market pricing, including the costs per acre-foot of water supply developed and delivered for irrigation; and

(f) Addresses other relevant issues as determined by the task force.

(3) The house of representatives interim task force on Washington waters must consist of ten members:

(a) Five members from the majority caucus appointed by the speaker of the house, including the chair of the capital budget committee; one member each from the appropriations, finance, and transportation committees; and one member at large; and

(b) Five members from the minority caucus appointed by the minority leader, including the ranking minority member of the capital budget committee; one member each from the appropriations, finance, and transportation committees; and one member at large.

(c) The chair and the ranking minority member of the capital budget committee shall cochair the task force.

(d) Appointments to the task force must be completed within fifteen days of the effective date of this section.

(4) Principal staff support for the task force must be provided by the house of representatives office of program research. The task force may:

(a) Request the participation of the office of financial management and other relevant executive branch agencies;

(b) Enter into contracts with persons who have specific technical expertise; and

(c) Solicit information and perspectives from representatives of public and private organizations.

(5) Legislative members of the task force must be reimbursed for travel expenses in accordance with RCW 44.04.120. Task force expenditures are subject to approval by the house of representatives executive rules committee, or its successor committee.

(6) The task force must report its findings and recommendations to appropriate legislative committees by November 15, 2015.

(7) The task force expires on June 30, 2016.

(8) The appropriation in this section is provided solely for any technical research and analysis required to carry out the task force objectives in subsection (2) of this section.

Appropriation:

State Building Construction Account—State......................... $75,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL........................................................... $75,000

NEW SECTION.  Sec. 1002.  FOR THE SECRETARY OF STATE

Library - Archives Building (30000033)

The appropriation in this section is subject to the following conditions and limitations:

(1) The appropriation is provided solely for a predesign to determine: (a) Necessary program space for the state library currently located in Tumwater, and additional archive space; (b) capital budget requirements, including the use of fees collected by the secretary of state that will support a certificate of participation for the financing of the construction of the facility, and future operating costs; and (c) projected efficiencies of electronic document storage in determining necessary space.

(2) The study must consider the use of the general administration building site as a possible location; and any benefits or consequences may be identified at this site or other sites considered; and lease options.

(3) The office of financial management shall determine the maximum use of the site and consider the consolidation of other state agencies, including separately elected officials.

(4) The building must be a high performance building as described in section 7008 of this act and the construction must be procured using a performance based method including design-build or design-build-operate-maintain.

Appropriation:

State Building Construction Account—State....................... $400,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $55,428,000

TOTAL.................................................... $55,828,000

NEW SECTION.  Sec. 1003.  FOR THE SECRETARY OF STATE

Minor Works (91000007)

Appropriation:

State Building Construction Account—State.................... $1,007,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,007,000

NEW SECTION.  Sec. 1004.  FOR THE DEPARTMENT OF COMMERCE

Local and Community Projects (20064008)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions in section 131, chapter 488, Laws of 2005.

Reappropriation:

State Building Construction Account—State....................... $434,000

Prior Biennia (Expenditures)........................................... $45,458,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $45,892,000

NEW SECTION.  Sec. 1005.  FOR THE DEPARTMENT OF COMMERCE

Rural Washington Loan Fund (20064010)

Reappropriation:

Rural Washington Loan Account—State.......................... $2,383,000

Prior Biennia (Expenditures)............................................. $1,744,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $4,127,000

NEW SECTION.  Sec. 1006.  FOR THE DEPARTMENT OF COMMERCE

Rural Washington Loan Fund (20074008)

Reappropriation:

Rural Washington Loan Account—State.......................... $1,822,000

Prior Biennia (Expenditures)................................................ $205,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,027,000

NEW SECTION.  Sec. 1007.  FOR THE DEPARTMENT OF COMMERCE

Housing Assistance, Weatherization, and Affordable Housing (20074009)

Reappropriation:

State Taxable Building Construction Account—

State........................................................................... $1,405,000

Washington Housing Trust Account—State.......................... $86,000

Subtotal Reappropriation........................... $1,491,000

Prior Biennia (Expenditures)......................................... $198,509,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................. $200,000,000

NEW SECTION.  Sec. 1008.  FOR THE DEPARTMENT OF COMMERCE

Job Development Fund Grants (20074010)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1032, chapter 520, Laws of 2007 and section 1005, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:

State Building Construction Account—State.................... $3,987,000

Prior Biennia (Expenditures)........................................... $44,943,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $48,930,000

NEW SECTION.  Sec. 1009.  FOR THE DEPARTMENT OF COMMERCE

Local and Community Projects (20084001)

The reappropriation in this section is subject to the following conditions and limitations: Except as directed otherwise prior to the effective date of this section, the department shall not expend the reappropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature. This requirement does not apply to projects where a share of the reappropriation is released for design costs only.

Reappropriation:

State Building Construction Account—State....................... $113,000

Prior Biennia (Expenditures)......................................... $127,577,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................. $127,690,000

NEW SECTION.  Sec. 1010.  FOR THE DEPARTMENT OF COMMERCE

Community Development Fund (20084850)

Reappropriation:

State Building Construction Account—State.................... $1,213,000

Prior Biennia (Expenditures)........................................... $19,703,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $20,916,000

NEW SECTION.  Sec. 1011.  FOR THE DEPARTMENT OF COMMERCE

Housing Assistance, Weatherization, and Affordable Housing (30000013)

Reappropriation:

Washington Housing Trust Account—State........................ $276,000

Prior Biennia (Expenditures)......................................... $129,724,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................. $130,000,000

NEW SECTION.  Sec. 1012.  FOR THE DEPARTMENT OF COMMERCE

2010 Local and Community Projects (30000082)

The reappropriation in this section is subject to the following conditions and limitations: The projects must comply with RCW 43.63A.125 and other requirements for community projects administered by the department.

Reappropriation:

State Building Construction Account—State.................... $1,991,000

Prior Biennia (Expenditures)........................................... $11,431,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $13,422,000

NEW SECTION.  Sec. 1013.  FOR THE DEPARTMENT OF COMMERCE

Drinking Water State Revolving Fund Loan Program (30000095)

Reappropriation:

Drinking Water Assistance Account—State..................... $6,451,000

Drinking Water Assistance Repayment Account—State $90,368,000

Subtotal Reappropriation......................... $96,819,000

Prior Biennia (Expenditures)........................................... $10,863,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................. $107,682,000

NEW SECTION.  Sec. 1014.  FOR THE DEPARTMENT OF COMMERCE

Community Economic Revitalization Board (30000097)

Reappropriation:

Public Facility Construction Loan Revolving Account—

State........................................................................... $2,104,000

Prior Biennia (Expenditures)............................................. $2,896,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $5,000,000

NEW SECTION.  Sec. 1015.  FOR THE DEPARTMENT OF COMMERCE

Housing Assistance, Weatherization, Affordable Housing Trust Fund (30000098)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1026, chapter 49, Laws of 2011 1st sp. sess.

Reappropriation:

State Taxable Building Construction Account—State...... $6,907,000

Prior Biennia (Expenditures)........................................... $43,093,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $50,000,000

NEW SECTION.  Sec. 1016.  FOR THE DEPARTMENT OF COMMERCE

Public Works Assistance Account Program (30000103)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1021, chapter 48, Laws of 2011 1st sp. sess.

Reappropriation:

Public Works Assistance Account—State....................... $90,734,000

Prior Biennia (Expenditures)......................................... $233,851,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................. $324,585,000

NEW SECTION.  Sec. 1017.  FOR THE DEPARTMENT OF COMMERCE

Building Communities Fund Grants (30000102)

The reappropriation in this section is subject to the following conditions and limitations:

(1) The reappropriation is subject to the provisions of section 1027, chapter 49, Laws of 2011, 1st sp. sess.

(2) $573,000 of the reappropriation is provided solely for the University District food bank project.

(3) $815,000 of the reappropriation is provided solely for the Village Green foundation project.

Reappropriation:

State Building Construction Account—State.................... $1,388,000

Prior Biennia (Expenditures)........................................... $12,830,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $14,218,000

NEW SECTION.  Sec. 1018.  FOR THE DEPARTMENT OF COMMERCE

Local and Community Projects (30000166)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1002, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................... $1,887,000

Prior Biennia (Expenditures)........................................... $14,930,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $16,817,000

NEW SECTION.  Sec. 1019.  FOR THE DEPARTMENT OF COMMERCE

Financing Energy/Water Efficiency (30000180)

Reappropriation:

Public Works Assistance Account—State......................... $4,886,000

Prior Biennia (Expenditures)................................................ $114,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $5,000,000

NEW SECTION.  Sec. 1020.  FOR THE DEPARTMENT OF COMMERCE

Public Works Assistance Account Program 2013 Loan List (30000184)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1016, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:

Public Works Assistance Account—State....................... $82,786,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $82,786,000

NEW SECTION.  Sec. 1021.  FOR THE DEPARTMENT OF COMMERCE

Building for the Arts Grants (30000186)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1063, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................... $3,301,000

Prior Biennia (Expenditures)............................................. $6,903,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $10,204,000

NEW SECTION.  Sec. 1022.  FOR THE DEPARTMENT OF COMMERCE

Drinking Water State Revolving Fund Loan Program (30000189)

The reappropriations in this section are subject to the following conditions and limitations: For projects involving repair, replacement, or improvement of a clean water infrastructure facility or other public works facility for which an investment grade efficiency audit is obtainable, the public works board must require as a contract condition that the project sponsor undertake an investment grade efficiency audit. The project sponsor may finance the costs of the audit as part of its drinking water state revolving fund program loan.

Reappropriation:

Drinking Water Assistance Account—State..................... $4,000,000

Drinking Water Assistance Repayment Account—

State....................................................................... $200,000,000

Subtotal Reappropriation....................... $204,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)................................... $680,000,000

TOTAL.................................................. $884,000,000

NEW SECTION.  Sec. 1023.  FOR THE DEPARTMENT OF COMMERCE

Community Economic Revitalization Board (30000190)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1070, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

Public Facility Construction Loan Revolving Account—

State........................................................................... $8,882,000

Prior Biennia (Expenditures)................................................ $118,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $9,000,000

NEW SECTION.  Sec. 1024.  FOR THE DEPARTMENT OF COMMERCE

Weatherization (30000192)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1076, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................... $4,291,000

Prior Biennia (Expenditures)........................................... $15,709,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $20,000,000

NEW SECTION.  Sec. 1025.  FOR THE DEPARTMENT OF COMMERCE

2013-2015 Energy Efficiency Grants (30000193)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1075, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................. $21,714,000

Prior Biennia (Expenditures)............................................. $3,286,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $25,000,000

NEW SECTION.  Sec. 1026.  FOR THE DEPARTMENT OF COMMERCE

Renton Aerospace Training Center Construction (30000724)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3, chapter 1, Laws of 2013 3rd sp. sess.

Reappropriation:

State Building Construction Account—State.................. $10,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $10,000,000

NEW SECTION.  Sec. 1027.  FOR THE DEPARTMENT OF COMMERCE

ARRA SEP Revolving Loans (30000725)

Appropriation:

Energy Recovery Act Account—State.............................. $2,500,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $10,000,000

TOTAL.................................................... $12,500,000

NEW SECTION.  Sec. 1028.  FOR THE DEPARTMENT OF COMMERCE

Clean Energy and Energy Freedom Program (30000726)

The appropriations in this section are subject to the following conditions and limitations:

(1) The appropriations are provided solely for projects that provide a benefit to the public through development, demonstration, and deployment of clean energy technologies that save energy and reduce energy costs, reduce harmful air emissions or otherwise increase energy independence for the state.

(2) In soliciting and evaluating proposals, awarding contracts, and monitoring projects under this section, the department must:

(a) Ensure that competitive bidding processes, rather than sole source contracting processes, are used to select all projects;

(b) Require that all expenditures be used for projects that develop and acquire asset that have a useful life of at least thirteen years; and

(c) Conduct due diligence activities associated with the use of public funds including, but not limited to, oversight of the project selection process, project monitoring and ensuring that all applications and contracts fully comply with all applicable laws including disclosure and conflict of interest statutes.

(3)(a) Pursuant to chapter 42.52 RCW, the ethics in public service act, the department must require an applicant to identify in application materials any state of Washington employees or former state employees employed or on the firm's governing board during the past twenty-four months. Application materials must identify the individual by name, the agency previously or currently employed by, job title or position held, and separation date. If it is determined by the department that a conflict of interest exists, the applicant may be disqualified from further consideration for award of a contract.

(b) If the department finds, after due notice and examination, that there is a violation of chapter 42.52 RCW, or any similar statute involving a contractor either in procuring or performing under the contract, the department in its sole discretion may terminate the contract by written notice. If the contract is terminated, the department must be entitled to pursue the same remedies against the contractor as it could pursue in the event of a breach of the contract by the contractor.

(4) The requirements in subsections (2) and (3) of this section must be specified in funding agreements issued by the department.

(5) The department may not obligate or expend any of the amounts provided in this section on new projects that involve the Snohomish county public utilities district or its subcontractors until the executive ethics board responds to the department's June 17, 2015, request for an advisory opinion on poststate employment.

(6)(a) $10,000,000 of the state taxable building construction account is provided solely to create a revolving loan fund to support the widespread use of proven energy efficiency and renewable energy technologies now inhibited by lack of access to capital.

(b) The department shall provide grant funds to one or more competitively selected nonprofit lenders that will provide matching private capital and will administer the loan fund. The department must select the loan fund administrator or administrators through a competitive process, with scoring conducted by a group of qualified experts, applying criteria specified by the department.

(c) The department must establish guidelines that specify applicant eligibility, the screening process, and evaluation and selection criteria. The guidelines must be used by the nonprofit lenders.

(d) Loan applications must disclose all sources of public funds invested in the project. The nonprofit lender must make loans available to the following types of projects that include, but are not limited to: Residential, commercial, industrial, and agricultural energy retrofits, residential and community-scale solar installations, anaerobic digesters to treat dairy and organic waste, and combined heat and power projects using woody biomass as a fuel source.

(e) State funds may not exceed fifty percent of the estimated cost of a project, and funding preference must be provided to projects that offer a higher percentage of nonstate match funds.

(7) $6,600,000 of the state taxable building construction account is provided solely for credit enhancements of advanced solar and renewable energy manufacturing within Washington state. The department shall develop an application process to competitively select projects.

(8)(a) $13,000,000 of the state building construction account is provided solely for grants to advance clean and renewable energy technologies and advance transmission and distribution control system improvements for increased reliability, resiliency, and enabling integration of distributed and renewable resources and technology by public and private electrical utilities that serve retail customers in the state. Eligible utilities may partner with other public and private sector research organizations and businesses in applying for funding.

(b) The department shall develop a grant application process to competitively select projects for grant awards, to include scoring conducted by a group of qualified experts with application of criteria specified by the department. In development of the application criteria, the department shall, to the extent possible, allow smaller utilities or consortia of small utilities to apply for funding.

(c) The department shall convene an advisory panel of electric utility representatives to identify program objectives, near term priorities and long term goals.

(d) Applications for grants must disclose all sources of public funds invested in a project.

(e) Grant funds must be used for research, development, or demonstration projects that integrate intermittent renewables through energy storage, information technology or other smart grid technologies, dispatch energy storage resources from utility control rooms, use demand response, transactive control, or the thermal properties and electric load of commercial buildings and district energy systems to store energy, reduce transmission congestion or otherwise improve system reliability and resiliency and enable integration of distributed and renewable energy sources.

(9)(a) $10,000,000 of the state building construction account is provided solely for grants to match federal funds or other nonstate funding sources used to research, develop, and demonstrate clean energy technologies.

(b) The department shall consult with the University of Washington, Washington State University, the Pacific Northwest national laboratory and other clean energy organizations to design the program. The program shall offer matching funds for competitively selected clean energy projects including, but not limited to: Advancing energy storage and solar technologies, advancing bioenergy, developing new lightweight materials, and advancing renewable energy and energy efficiency technologies.

(10) $400,000 of the state building construction account—state is provided solely for capital funding of competitively selected wood energy conversion projects at public facilities.

(11) The department must report on number and results of projects that receive grants or loans through the clean energy fund, including the number of job hours created and the number of jobs maintained and created, to the governor and the legislature, by November 1, 2016.

(12) The department shall develop metrics that indicate the performance of energy efficiency efforts and provide a report of the metrics, including at a minimum the current energy used by the building, the energy use after efficiencies are completed, and cost of energy saved, to the house of representatives technology & economic development committee and the senate energy, environment & telecommunications committee. The report must include these metrics from other states.

Appropriation:

State Taxable Building Construction Account—State.... $17,000,000

State Building Construction Account—State.................. $23,400,000

Subtotal Appropriation............................ $40,400,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)................................... $240,000,000

TOTAL.................................................. $280,400,000

NEW SECTION.  Sec. 1029.  FOR THE DEPARTMENT OF COMMERCE

Building for the Arts Program (30000731)

The appropriation in this section is subject to the following conditions and limitations:

(1) The appropriation is subject to the provisions of RCW 43.63A.750.

(2) Except as directed otherwise prior to the effective date of this section, the department may not expend the appropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature. This requirement does not apply to projects where a share of the appropriation is released for design costs only.

(3) The appropriation is provided solely for the following list of projects:

Spokane children's theatre.............................................................. $18,000

KEXP's new home at Seattle center.......................................... $1,866,000

Admiral theatre renovation 2.0..................................................... $100,000

Kirkland arts center - capital improvements project...................... $48,000

Uniontown creativity center addition and site

improvements....................................................................... $123,000

San Juan islands museum of art.................................................... $650,000

KidsQuest children's museum - good to grow capital

campaign............................................................................ $2,000,000

Cornish playhouse........................................................................ $232,000

ACT theatre eagles auditorium restoration and renovation.......... $303,000

Music works northwest park 118 building renovation................... $64,000

New hands on children's museum................................................ $393,000

TOTAL...................................................................................... $5,797,000

Appropriation:

State Building Construction Account—State.................... $5,797,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $21,600,000

TOTAL.................................................... $27,397,000

NEW SECTION.  Sec. 1030.  FOR THE DEPARTMENT OF COMMERCE

Youth Recreational Facilities Program (30000792)

The appropriation in this section is subject to the following conditions and limitations:

(1) The appropriation is subject to the provisions of RCW 43.63A.135.

(2) Except as directed otherwise prior to the effective date of this section, the department may not expend the appropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature. This requirement does not apply to projects where a share of the appropriation is released for design costs only.

(3) The appropriation is provided solely for the following list of projects:

Youth activity wing at the Tom Taylor family YMCA................ $515,000

BGCB main club project........................................................... $1,200,000

BGCB hidden valley fieldhouse project.................................... $1,200,000

Sultan boys & girls club............................................................... $340,000

Stanwood-Camano family YMCA............................................ $1,200,000

YMCA camp Terry environmental recreation center................... $500,000

Mukilteo boys & girls club........................................................ $1,200,000

Lummi youth wellness center renovation project..................... $1,200,000

TOTAL...................................................................................... $7,355,000

Appropriation:

State Building Construction Account—State.................... $7,355,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $32,000,000

TOTAL.................................................... $39,355,000

NEW SECTION.  Sec. 1031.  FOR THE DEPARTMENT OF COMMERCE

Building Communities Fund Program (30000803)

The appropriation in this section is subject to the following conditions and limitations:

(1) The appropriation is subject to the provisions of RCW 43.63A.125.

(2) Except as directed otherwise prior to the effective date of this section, the department may not expend the appropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature. This requirement does not apply to projects where a share of the appropriation is released for design costs only.

(3) The appropriation is provided solely for the following list of projects:

Rainier Beach urban farm and wetlands....................................... $307,000

Whatcom county emergency food hub......................................... $575,000

Hopelink Redmond integrated services center.......................... $2,400,000

Riverside drive building purchase................................................ $138,000

Centerforce..................................................................................... $98,000

Eritrean association community kitchen........................................ $58,000

Tonasket food bank building acquisition....................................... $22,000

Building for the future.................................................................. $300,000

Entiat Valley community services resource center...................... $100,000

Pike market neighborhood center................................................. $500,000

Opportunity council renovation project........................................ $170,000

FareStart facility expansion to the Pacific tower.......................... $438,000

Walla Walla community teen center............................................ $475,000

El Centro de la Raza community access & parking

improvements....................................................................... $600,000

Good ground capital campaign..................................................... $300,000

Renewed hope capital campaign.................................................... $66,000

International community health services (ICHS)...................... $3,500,000

Casa latina: A home for opportunity............................................ $150,000

Centerstone building renovation................................................ $1,500,000

PSRS office building conversion.................................................. $212,000

Prairie oaks................................................................................... $200,000

Leschi center renovation............................................................ $1,000,000

Everett family YMCA............................................................... $2,000,000

Behavioral healthcare center for children, youth and

families.............................................................................. $2,000,000

Phoenix rising............................................................................... $250,000

Gordon family YMCA (Sumner, WA)...................................... $2,000,000

Community grief support and recovery center.......................... $1,000,000

Auburn youth resources campus expansion................................. $500,000

TOTAL.................................................................................... $20,859,000

Appropriation:

State Building Construction Account—State.................. $20,859,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)................................... $120,000,000

TOTAL.................................................. $140,859,000

NEW SECTION.  Sec. 1032.  FOR THE DEPARTMENT OF COMMERCE

Housing Trust Fund Appropriation (30000833)

The appropriation in this section is subject to the following conditions and limitations:

(1) The appropriation in this section is provided solely for the department to award loans and grants on a competitive basis to affordable housing projects statewide that will produce, at a minimum, a total of 1,900 homes and 500 seasonal beds, in the following categories and amounts:

(a) For people with chronic mental illness, 281 homes;

(b) For homeless families with children, 529 homes;

(c) For people with disabilities, developmental disabilities, veterans, and others, 400 homes; of that number, a minimum of 80 must be for veterans;

(d) For homeless youth, 200 homes;

(e) For farmworkers, 176 homes and 500 seasonal beds;

(f) For seniors, 200 homes;

(g) For homeownership, 100 homes.

(2) If upon review of completed applications, the department determines there are not adequate suitable projects in a category, the department may allocate funds to projects serving other low-income and special needs populations, provided those projects are located in an area with an identified need for the type of housing proposed.

(3) In evaluating projects for homes for homeless families with children specified in subsection (1)(b) of this section, consistent with Engrossed House Bill No. 1633, the department must give preference for applications based on some or all of the criteria in chapter 43.185.070(5), including projects involving collaborative partnerships between local school districts and either public housing authorities or nonprofit housing providers, that help children of low-income families succeed in school.

(4) $625,000 of the appropriation in this section is provided solely for designing, engineering, constructing, installing, and other costs and fees associated with connecting existing and future farmworker housing in Skagit county to the city of Burlington sewer system.

(5)(a) $2,500,000 of the appropriation in this section is provided solely as a grant to the Puget Sound regional council for a revolving loan fund to support the development of affordable housing opportunities related to equitable transit-oriented development in accordance with Second Engrossed Substitute Senate Bill No. 5987 (transportation revenue). This amount must be provided in the form of a direct grant without a requirement that the grant be a reimbursement for local expenditures.

(b) Amounts provided in this section must be used to plan, predesign, design, provide technical assistance and financial services, and build low-income housing units in underserved communities of concern. "Underserved communities of concern" are persons and families who: (i) Have incomes at or below thirty percent of the median family income for the county or standard metropolitan statistical area where the project is located; (ii) experience chronic homelessness; and (iii) lack affordable housing. Underserved communities of concern include veterans, immigrants, and refugee communities.

(c) Amounts provided in this section must be matched by local government nonstate cash resources.

Appropriation:

State Taxable Building Construction Account—State.... $75,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)................................... $220,000,000

TOTAL.................................................. $295,000,000

NEW SECTION.  Sec. 1033.  FOR THE DEPARTMENT OF COMMERCE

Ultra-Efficient Affordable Housing Demonstration (30000836)

The appropriation in this section is subject to the following conditions and limitations:

(1) The appropriation in this section is provided solely for loans or grants to low-income housing developers to design and construct ultra-high energy efficient housing projects including single and multifamily units;

(2) By December 1, 2015, in consultation with professional building, energy efficiency and housing finance organizations, the office of financial management, and appropriate legislative staff, the department shall develop a process that is designed to solicit, evaluate, and fund ultra-high energy efficient housing projects as part of the housing trust fund competitive program.

(3) To receive funding, a project must demonstrate energy-saving and renewable energy systems designed to reach net-zero energy use after housing is fully occupied and must provide a life-cycle cost analysis report to the department.

(4) The department must consider, at a minimum and in any order, the following factors in assigning a numerical ranking to a project:

(a) Whether the proposed design has demonstrated that the project will achieve net-zero energy use when fully occupied;

(b) The life-cycle cost of the project;

(c) That the project demonstrates a design, use of materials, and construction process that can be replicated by the Washington building industry;

(d) The extent to which the project leverages nonstate funds;

(e) The extent to which the project is ready to proceed to construction;

(f) Whether the project promotes sustainable use of resources and environmental quality;

(g) Whether the project is being well-managed to fund maintenance and capital depreciation;

(h) Reduction of housing and utilities carbon footprint; and

(i) Other criteria that the department considers necessary to achieve the purpose of this program.

(5) The department must monitor and track the results of the housing projects that receive ultra-high energy efficiency funding under this section. By December 1, 2018, the department must submit a report to appropriate legislative committees documenting:

(a) Project costs compared to the costs of traditional design and construction;

(b) Life-cycle costs;

(c) Use of sustainable resources;

(d) Energy savings and reduction of carbon footprint;

(e) Any lessons learned; and

(f) A data collection plan to monitor actual performance in order to validate projected savings.

Appropriation:

Washington Housing Trust Account—State..................... $2,500,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,500,000

NEW SECTION.  Sec. 1034.  FOR THE DEPARTMENT OF COMMERCE

2015-2017 Community Economic Revitalization Board Program (30000834)

Appropriation:

Public Facility Construction Loan Revolving Account—

State......................................................................... $10,600,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $28,000,000

TOTAL.................................................... $38,600,000

NEW SECTION.  Sec. 1035.  FOR THE DEPARTMENT OF COMMERCE

Energy Efficiency and Solar Grants (30000835)

The appropriation in this section is subject to the following conditions and limitations:

(1)(a) $8,000,000 for fiscal year 2016 and $8,000,000 for fiscal year 2017 is provided solely for grants to be awarded in competitive rounds to local agencies, public higher education institutions, school districts, and state agencies for operational cost savings improvements to facilities and related projects that result in energy and operational cost savings.

(b) At least ten percent of each competitive grant round must be awarded to small cities or towns with a population of five thousand or fewer residents.

(c) In each competitive round, the higher the leverage ratio of nonstate funding sources to state grant and the higher the energy savings, the higher the project ranking.

(d) For school district applicants, priority consideration must be given to school districts that demonstrate improved health and safety through (i) reduced exposure to polychlorinated biphenyl; or (ii) replacing outdated heating systems that use oil or propane as fuel sources as identified by the Washington State University extension energy program; (iii) prior grant award: Priority consideration must be given to applicants that did not receive grant awards from appropriations provided in section 5023, chapter 19, Laws of 2013 2nd sp. sess.

(2) $5,775,000 is provided solely for grants to be awarded in competitive rounds to local agencies, public higher education institutions, school districts, and state agencies for projects that involve the purchase and installation of solar energy systems, including solar modules and inverters, with a preference for Washington-manufactured products.

(3) $3,000,000 is provided solely for energy efficiency improvements to minor works and stand-alone projects at state-owned facilities that repair or replace existing building systems including but not limited to HVAC, lighting, insulation, windows, and other mechanical systems. Eligibility for this funding is dependent on an analysis using the office of financial management's life-cycle cost tool that compares project design alternatives for initial and long-term cost-effectiveness. Assuming a reasonable return on investment, the cost to improve the project's energy efficiency compared to the original project request will be added to the project appropriation after construction bids are received. The department of commerce shall coordinate with the office of financial management to develop a process for project submittal, review, approval criteria, tracking project budget adjustments, and performance measures.

(4) $225,000 is provided solely for resource conservation managers in the department of enterprise services to coordinate with state agencies and school districts to assess and adjust existing building systems and operations to optimize the efficiency in use of energy and other resources in state-owned facilities. The department of commerce will oversee an interagency agreement with the department of enterprise services to fund the resource conservation managers.

(5) The department shall develop metrics that indicate the performance of energy efficiency efforts and provide a report of the metrics, including at a minimum the current energy used by the building, the energy use after efficiencies are completed, and cost of energy saved, to the house of representatives technology & economic development committee and the senate energy, environment & telecommunications committee. The report must include these metrics from other states.

Appropriation:

State Building Construction Account—State.................. $25,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)................................... $120,000,000

TOTAL.................................................. $145,000,000

NEW SECTION.  Sec. 1036.  FOR THE DEPARTMENT OF COMMERCE

Community Behavioral Health Bed - Acute & Residential (92000344)

The appropriation in this section is subject to the following conditions and limitations:

(1) The appropriation in this section is provided solely for the department of commerce, in collaboration with the department of social and health services, to issue grants to hospitals or other entities to establish new community hospital inpatient psychiatric beds, free-standing evaluation and treatment facilities, enhanced services facilities, triage facilities, or crisis stabilization facilities with sixteen or fewer beds for the purpose of providing short-term detention services through the publicly funded mental health system. Funds may be used for construction and equipment costs associated with establishment of the community hospital inpatient psychiatric beds, free-standing evaluation and treatment facilities, enhanced services facilities, triage facilities, or crisis stabilization facilities. These funds may not be used for operating costs associated with the treatment of patients using these services. The department shall establish criteria for the issuance of grants and priority must be given to those proposals to establish new community hospital inpatient psychiatric beds or free-standing evaluation and treatment facilities. The criteria must include:

(a) Evidence that the application was developed in collaboration with one or more regional support networks, as defined in RCW 71.24.025;

(b) Evidence that the applicant has assessed and would meet gaps in geographical access to short-term detention services under chapter 71.05 RCW in their region;

(c) A commitment by applicants to serve persons who are publicly funded and persons detained under the involuntary treatment act under chapter 71.05 RCW;

(d) A commitment by the applicant to maintain the beds or facility for at least a ten-year period;

(e) The date upon which structural modifications or construction would begin and the anticipated date of completion of the project;

(f) A detailed estimate of the costs associated with opening the beds;

(g) The applicant's commitment to work with local courts and prosecutors to ensure that prosecutors and courts in the area served by the hospital or facility will be available to conduct involuntary commitment hearings and proceedings under chapter 71.05 RCW; and

(h) A lack of local resources, including nonmedicaid operating reserves, and regional fund balances that are not contractually encumbered.

(2) To accommodate the emergent need for inpatient psychiatric services, the department of health and the department of commerce, in collaboration with the department of social and health services shall establish a concurrent and expedited process for the purpose of grant applicants meeting any applicable regulatory requirements necessary to operate inpatient psychiatric beds, free-standing evaluation and treatment facilities, enhanced services facilities, triage facilities, or crisis stabilization facilities.

(3) The following list is subject to the criteria in subsection (1) of this section:

Cascade mental health............................................................... $3,000,000

Woodmont recovery center....................................................... $5,000,000

Parkside conversion to behavioral health beds.......................... $3,000,000

Navos behavioral health center for children, youth &

families.............................................................................. $2,000,000

Central Washington comprehensive mental health................... $2,000,000

Swedish Ballard psychiatric unit............................................... $3,000,000

Substance abuse & mental health facilities............................... $2,000,000

Fairfax behavioral health - Providence health &

services facility......................................................................... $1,000

Daybreak Youth Services.......................................................... $1,500,000

(4) Multicare-Franciscan joint venture.............................. $5,000,000

Appropriation:

State Building Construction Account—State.................. $32,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $32,000,000

NEW SECTION.  Sec. 1037.  FOR THE DEPARTMENT OF COMMERCE

Weatherization Matchmaker Program (30000838)

The appropriation in this section is subject to the following conditions and limitations: The department shall develop metrics that indicate the performance of energy efficiency efforts and provide a report of the metrics, including at a minimum the current energy used by the building, the energy use after efficiencies are completed, and cost of energy saved, to the house of representatives technology & economic development committee and the senate energy, environment & telecommunications committee. The report must include these metrics from other states.

Appropriation:

State Building Construction Account—State.................. $15,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $60,000,000

TOTAL.................................................... $75,000,000

NEW SECTION.  Sec. 1038.  FOR THE DEPARTMENT OF COMMERCE

2015-2017 Drinking Water State Revolving Fund Loan Program (30000840)

The appropriation in this section is subject to the following conditions and limitations:

(1) $4,000,000 of the drinking water assistance account for fiscal year 2016 and $4,000,000 of the drinking water assistance account for fiscal year 2017 is provided as state match for federal safe drinking water funds.

(2) For projects involving repair, replacement, or improvement of a clean water infrastructure facility or other public works facility for which an investment grade efficiency audit is obtainable, the public works board must require as a contract condition that the project sponsor undertake an investment grade efficiency audit. The project sponsor may finance the costs of the audit as part of its drinking water state revolving fund program loan.

(3) The agency must encourage local government use of federally funded drinking water infrastructure programs operated by the United States department of agriculture - rural development.

Appropriation:

Drinking Water Assistance Account—State................. $135,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)................................... $480,000,000

TOTAL.................................................. $615,000,000

NEW SECTION.  Sec. 1039.  FOR THE DEPARTMENT OF COMMERCE

Community Energy Efficiency Program (30000845)

The appropriation in this section is subject to the following conditions and limitations: The department shall develop metrics that indicate the performance of energy efficiency efforts and provide a report of the metrics, including at a minimum the current energy used by the building, the energy use after efficiencies are completed, and cost of energy saved, to the house of representatives technology & economic development committee and the senate energy, environment & telecommunications committee. The report must include these metrics from other states.

Appropriation:

State Building Construction Account—State.................... $5,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $40,000,000

TOTAL.................................................... $45,000,000

NEW SECTION.  Sec. 1040.  FOR THE DEPARTMENT OF COMMERCE

Local and Community Projects 2016 (92000369)

The appropriation in this section is subject to the following conditions and limitations:

(1) Except as directed otherwise prior to the effective date of this section, the department may not expend the appropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature. This requirement does not apply to projects where a share of the appropriation is released for design costs only.

(2) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease. This requirement does not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.

(3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.

(4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.

(5) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(6).

(6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay state prevailing wages.

(7) $2,209,000 of the appropriation in this section is provided solely for the Fairchild air force base protection and community empowerment project, including the purchase of twenty acres of land for development of affordable housing and the county's purchase of mobile home parks in order to reduce the use of the accident potential zone for residential purposes. If the county subsequently rezones, develops, and leases the mobile home park property for commercial or industrial uses contrary to the allowed uses in the accident potential zone, the county must repay to the state the amount spent on the purchase of mobile home parks in its entirety within ten years.

(8) $850,000 of the appropriation in this section is provided solely for the White River restoration project. Design solutions for flooding reductions in the lower White River must include a floodplain habitat design that both reduces flood risks and restores salmon habitat by reconnecting the river with its floodplain and a sustainable riparian corridor. Project designs and plans must also identify lands for acquisition needed for floodplain reconnection where pending or existing development eliminates the potential for riparian and aquatic habitat restoration. The city shall work cooperatively with the Muckleshoot Indian Tribe and the Puyallup Tribe of Indians, and develop a plan collaboratively to achieve both flood reduction and habitat restoration.

(9) Up to $150,000 of the appropriation in this section for the veterans helping veterans: Emergency transition shelter project may be spent on preconstruction or pre-acquisition activities, including, but not limited to, building inspections, design of necessary renovations, cost estimation, and other activities necessary to identify and select a facility appropriate for the program. The remainder of the appropriation must be used for eventual acquisition and renovations of a facility.

(10) $2,500,000 of the appropriation in this section is provided solely for the mercy housing and health care center at Sand Point. During the 2015-2017 fiscal biennium, the center may not house any community health care training organization that has been investigated by and has paid settlement fees to the attorney general's office for alleged medicaid fraud.

(11) The Lake Chelan land use plan must be developed without adverse impacts on agricultural operations.

(12) The appropriation is provided solely for the following list of projects:

Algona senior center

$500,000

All-accessible destination playground

$750,000

Appleway trail

$1,000,000

Basin 3 sewer rehabilitation

$1,500,000

Bellevue downtown park inspiration playground and sensory garden

$1,000,000

Bender fields parking lot and restrooms

$1,000,000

Blackhills community soccer complex safety projects

$750,000

Bremerton children's dental clinic

$396,000

Brewster reservoir replacement

$1,250,000

Brookville gardens

$1,200,000

Camas-Washougal Babe Ruth youth baseball improve Louis Bloch park

$10,000

Cancer immunotherapy facility-Seattle children's research inst.

$7,000,000

Caribou trail apartments

$100,000

Carnegie library imprv for the rapid recidivism reduction program

$1,000,000

Cavelero park - regional park facility/skateboard park

$500,000

CDM caregiving services: Clark county aging resource center

$1,200,000

Centerville school heating upgrades

$46,000

Chambers Creek regional park pier extension and moorage

$1,750,000

City of LaCenter parks & rec community center

$1,500,000

City of Lynden pipeline

$2,000,000

City of Lynden-Riverview road construction

$850,000

City of Lynden-safe rtes to school and Kaemingk trail gap elim.

$300,000

City of Mt. Vernon downtown flood protect project & riverfront trail

$1,500,000

City of Olympia - Percival Landing renovation

$950,000

City of Pateros water system

$1,838,000

City of Stanwood police station/city hall relocation

$300,000

Classroom door barricade - nightlock

$45,000

Confluence area parks upgrade and restoration

$1,000,000

Corbin senior center elevator

$300,000

Covington community park

$5,000,000

Cross Kirkland corridor trail connection 52nd St.

$1,069,000

Dawson place child advocacy center building completion project

$161,000

Dekalb street pier

$500,000

DNR/City of Castle Rock exchange

$80,000

Dr. Sun Yat Sen memorial statue

$10,000

Drug abuse and prevention center - Castle Rock

$96,000

DuPont historical museum renovation

$46,000

East Tacoma community center

$1,000,000

Edmonds center for the arts: Gym climate control & roof repairs

$250,000

Edmonds senior & community center

$1,250,000

Emergency generator for kidney resource center

$226,000

Enumclaw expo center

$350,000

Fairchild air force base protection & comm empowerment project

$2,209,000

Federal Way PAC center

$2,000,000

Filipino community of Seattle village (innovative learning center)

$1,200,000

Franklin Pierce early learning center

$2,000,000

Gateway center project

$1,000,000

Gilda club repairs

$800,000

Granite Falls boys & girls club

$1,000,000

Gratzer park ball fields

$200,000

Grays Harbor navigation improvement project

$2,500,000

Green river gorge open space buffer, Kummer connection

$750,000

Guy Cole center revitalization

$450,000

Historic renovation Maryhill museum

$1,000,000

Hopelink at Ronald commons

$750,000

Irvine slough storm water separation

$500,000

Kahlotus highway sewer force main

$2,625,000

Kennewick boys and girls club

$500,000

Kent east hill YMCA

$500,000

Key Pen civics center

$50,000

KiBe high school parking

$125,000

Kitsap humane society - shelter renovation

$90,000

Lacey boys & girls club

$29,000

Lake Chelan land use plan

$75,000

LeMay car museum ADA access improvements

$500,000

Lyman city park renovation

$167,000

Lyon creek flood reduction project

$400,000

Main street revitalization project

$1,300,000

Marine terminal rail investments

$1,000,000

Martin Luther King Jr. family outreach center expansion project

$85,000

Mason county Belfair wastewater system rate relief

$1,500,000

McAllister museum

$660,000

Mercer arena energy savings & sustainability funding

$450,000

Mercy housing and health center at Sand Point

$2,500,000

Meridian center for health

$2,500,000

Minor Road water reservoir replacement

$1,500,000

Mountains to Sound Greenway Tiger Mountain access improvements

$300,000

Mt. Spokane guest services building & preservation/maintenance of existing facilities

$520,000

Mukilteo boys & girls club

$1,000,000

Mukilteo tank farm clean-up

$250,000

New Shoreline medical-dental clinic

$1,500,000

Nordic heritage museum

$2,000,000

North Kitsap fishline foodbank

$625,000

Northwest native canoe center project

$250,000

Oak Harbor clean water facility

$2,500,000

Okanogan emergency communications

$400,000

Onalaska community tennis and sports courts

$80,000

Opera house ADA elevator

$357,000

Orcas Island library expansion

$1,400,000

Pacific community center

$250,000

PCAF's building for the future

$350,000

Pe Ell second street

$197,000

Perry technical school

$1,000,000

Pike Place Market front project

$800,000

Police station security/hardening

$38,000

Port of Centralia - Centralia station

$500,000

Port of Sunnyside demolish the carnation building

$450,000

PROVAIL TBI residential facility

$450,000

Quincy water reuse

$1,500,000

Redmond downtown park

$3,000,000

Redondo boardwalk repairs

$1,500,000

Renovate senior center

$400,000

Rochester boys & girls club

$38,000

Rockford wastewater treatment

$1,200,000

Roslyn renaissance-NW improve company bldg renovation project

$900,000

Sammamish rowing association boathouse

$500,000

SE 240th St. watermain system improvement project

$700,000

SE Seattle financial & economic opportunity center

$1,500,000

SeaTac international marketplace & transit-oriented community

$1,250,000

Seattle theatre group

$131,000

Snohomish veterans memorial rebuild

$10,000

Snoqualmie riverfront project

$1,520,000

South 228th street inter-urban trail connector

$500,000

Splash pad/foundation: Centralia outdoor pool restoration project

$200,000

Spokane women's club

$300,000

Springbrook park neighborhood connection project

$300,000

SR 532 flood berm and bike/ped path

$85,000

St. Vincent food bank & community services construction project

$400,000

Stan & Joan cross park

$750,000

Steilacoom Sentinel Way repairs

$450,000

Stilly Valley youth project Arlington B&G club

$2,242,000

Sunset neighborhood park

$1,750,000

Support, advocacy & resource center for victims of violence

$750,000

The gathering house job training café

$14,000

The Salvation Army Clark County: Corps community center

$1,200,000

Thurston county food bank

$500,000

Tulalip water pipeline, (final of 8 segments)

$2,000,000

Twin Bridges museum rehab Lyle Wa

$64,000

Twisp civic building

$500,000

Vancouver, Columbia waterfront project

$2,500,000

Vantage point senior apartments

$2,000,000

Veterans center

$500,000

Veterans helping veterans: Emergency transition shelter

$600,000

Waitsburg Main Street bridge replacement

$1,700,000

Washington green schools

$105,000

Washougal roof repair

$350,000

Water meter and system improvement program

$500,000

Water reservoir and transmission main

$500,000

Wayne golf course land preservation

$500,000

White River restoration project

$850,000

Willapa behavioral health safety improvement project

$75,000

WSU LID frontage - local and economic benefits

$500,000

Yakima children's museum center

$50,000

Yakima SunDome

$2,000,000

Yelm community center

$500,000

Yelm senior center

$80,000

Youth wellness campus gymnasium renovation

$1,000,000

 

 

Total

$130,169,000

Appropriation:

State Building Construction Account—State................ $130,169,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................. $130,169,000

NEW SECTION.  Sec. 1041.  FOR THE DEPARTMENT OF COMMERCE

Youth Recreational Facilities Grants (30000185)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1062, chapter 19, Laws of 2013 2nd sp. sess. provided that the "New Life Community Development Agency" project may be combined with the "New Life CDA" project in project number 30000188.

Reappropriation:

State Building Construction Account—State.................... $2,568,000

Prior Biennia (Expenditures)............................................. $1,563,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $4,131,000

NEW SECTION.  Sec. 1042.  FOR THE DEPARTMENT OF COMMERCE

Building Communities Fund Grants (30000188)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1072, chapter 19, Laws of 2013 2nd sp. sess. provided that the "New Life CDA" project may be combined with the "New Life Community Development Agency" project in project number 30000185.

Reappropriation:

State Building Construction Account—State.................... $2,692,000

Prior Biennia (Expenditures)............................................. $2,587,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $5,279,000

NEW SECTION.  Sec. 1043.  FOR THE DEPARTMENT OF COMMERCE

Energy Efficiency Grants for Local Governments (91000241)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 301, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................... $1,732,000

Prior Biennia (Expenditures)........................................... $16,268,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $18,000,000

NEW SECTION.  Sec. 1044.  FOR THE DEPARTMENT OF COMMERCE

Energy Efficiency Grants for Higher Education (91000242)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 307, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................... $5,077,000

Prior Biennia (Expenditures)........................................... $14,923,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $20,000,000

NEW SECTION.  Sec. 1045.  FOR THE DEPARTMENT OF COMMERCE

Public Works Pre-Construction Loan Program (91000319)

Reappropriation:

Public Works Assistance Account—State............................ $767,000

Prior Biennia (Expenditures)............................................. $2,233,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $3,000,000

NEW SECTION.  Sec. 1046.  FOR THE DEPARTMENT OF COMMERCE

Housing for Families with Children (91000409)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 310, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

State Taxable Building Construction Account—State...... $2,472,000

Prior Biennia (Expenditures)............................................. $5,778,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $8,250,000

NEW SECTION.  Sec. 1047.  FOR THE DEPARTMENT OF COMMERCE

Housing for Seniors and People with Physical Disabilities (91000411)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 311, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

State Taxable Building Construction Account—State...... $4,350,000

Prior Biennia (Expenditures)............................................. $5,316,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $9,666,000

NEW SECTION.  Sec. 1048.  FOR THE DEPARTMENT OF COMMERCE

Housing for People with Chronic Mental Illness (91000412)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1010, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:

State Taxable Building Construction Account—State......... $190,000

Prior Biennia (Expenditures)................................................ $935,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,125,000

NEW SECTION.  Sec. 1049.  FOR THE DEPARTMENT OF COMMERCE

Housing for the Homeless (91000413)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1011, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:

State Taxable Building Construction Account—State...... $5,996,000

Prior Biennia (Expenditures)........................................... $22,948,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $28,944,000

NEW SECTION.  Sec. 1050.  FOR THE DEPARTMENT OF COMMERCE

Housing for Farmworkers (91000414)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1012, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:

State Taxable Building Construction Account—State...... $5,160,000

Prior Biennia (Expenditures)............................................. $1,055,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $6,215,000

NEW SECTION.  Sec. 1051.  FOR THE DEPARTMENT OF COMMERCE

Housing for People At Risk of Homelessness (91000415)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 312, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

State Taxable Building Construction Account—State......... $959,000

Prior Biennia (Expenditures)............................................. $1,541,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,500,000

NEW SECTION.  Sec. 1052.  FOR THE DEPARTMENT OF COMMERCE

Housing for Low-Income Households (91000416)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1013, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:

State Taxable Building Construction Account—State...... $2,689,000

Prior Biennia (Expenditures)................................................ $293,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,982,000

NEW SECTION.  Sec. 1053.  FOR THE DEPARTMENT OF COMMERCE

2012 Local and Community Projects (91000417)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 302, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................... $1,889,000

Prior Biennia (Expenditures)............................................. $7,734,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $9,623,000

NEW SECTION.  Sec. 1054.  FOR THE DEPARTMENT OF COMMERCE

Local and Community Projects 2012 (91000437)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1003, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:

State Taxable Building Construction Account—State...... $1,800,000

Prior Biennia (Expenditures)............................................. $1,035,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,835,000

NEW SECTION.  Sec. 1055.  FOR THE DEPARTMENT OF COMMERCE

Pacific Medical Center (91000445)

Reappropriation:

State Taxable Building Construction Account—State...... $2,405,000

State Building Construction Account—State.................... $9,818,000

Subtotal Reappropriation......................... $12,223,000

Appropriation:

State Taxable Building Construction Account—State...... $6,000,000

Prior Biennia (Expenditures)............................................. $7,777,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $26,000,000

NEW SECTION.  Sec. 1056.  FOR THE DEPARTMENT OF COMMERCE

Sand Point Building 9 (91000446)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1068, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

State Taxable Building Construction Account—State...... $9,802,000

Prior Biennia (Expenditures)............................................. $4,198,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $14,000,000

NEW SECTION.  Sec. 1057.  FOR THE DEPARTMENT OF COMMERCE

Mental Health Beds (91000447)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1071, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................... $3,644,000

Prior Biennia (Expenditures)............................................. $1,356,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $5,000,000

NEW SECTION.  Sec. 1058.  FOR THE DEPARTMENT OF COMMERCE

Housing for Homeless Veterans (91000455)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1065, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

State Taxable Building Construction Account—State...... $9,001,000

Prior Biennia (Expenditures)................................................ $366,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $9,367,000

NEW SECTION.  Sec. 1059.  FOR THE DEPARTMENT OF COMMERCE

Housing for Farmworkers (91000457)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1066, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

State Taxable Building Construction Account—State.... $19,723,000

Prior Biennia (Expenditures)............................................. $7,327,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $27,050,000

NEW SECTION.  Sec. 1060.  FOR THE DEPARTMENT OF COMMERCE

Housing for People with Developmental Disabilities (91000458)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1067, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

State Taxable Building Construction Account—State...... $6,392,000

Prior Biennia (Expenditures)............................................. $2,627,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $9,019,000

NEW SECTION.  Sec. 1061.  FOR THE DEPARTMENT OF COMMERCE

Housing for People with Chronic Mental Illness (91000459)

Reappropriation:

State Taxable Building Construction Account—State...... $5,735,000

Prior Biennia (Expenditures)................................................ $329,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $6,064,000

NEW SECTION.  Sec. 1062.  FOR THE DEPARTMENT OF COMMERCE

Public Works Assistance Account Project Backfill (91000581)

Reappropriation:

State Building Construction Account—State.................... $3,263,000

Prior Biennia (Expenditures)......................................... $154,737,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................. $158,000,000

NEW SECTION.  Sec. 1063.  FOR THE DEPARTMENT OF COMMERCE

Clean Energy and Energy Freedom Program (91000582)

The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 1074, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

Energy Recovery Act Account—State.............................. $4,000,000

State Taxable Building Construction Account—State...... $8,924,000

State Building Construction Account—State.................. $19,069,000

Subtotal Reappropriation......................... $31,993,000

Prior Biennia (Expenditures)............................................. $8,007,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $40,000,000

NEW SECTION.  Sec. 1064.  FOR THE DEPARTMENT OF COMMERCE

Innovation Partnership Zones - Facilities and Infrastructure (92000089)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 309, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................... $3,725,000

Prior Biennia (Expenditures)............................................. $9,795,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $13,520,000

NEW SECTION.  Sec. 1065.  FOR THE DEPARTMENT OF COMMERCE

Community Economic Revitalization Board Administered Economic Development, Innovation, and Export Grants (92000096)

The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 304, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................... $4,267,000

Public Works Assistance Account—State....................... $14,595,000

Subtotal Reappropriation......................... $18,862,000

Prior Biennia (Expenditures)........................................... $13,736,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $32,598,000

NEW SECTION.  Sec. 1066.  FOR THE DEPARTMENT OF COMMERCE

Main Street Improvement Grants (92000098)

The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 305, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

Public Works Assistance Account—State............................ $355,000

State Building Construction Account—State.................... $3,115,000

Subtotal Reappropriation........................... $3,470,000

Prior Biennia (Expenditures)........................................... $11,380,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $14,850,000

NEW SECTION.  Sec. 1067.  FOR THE DEPARTMENT OF COMMERCE

Brownfield Redevelopment Grants (92000100)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely for redevelopment of the Bellingham waterfront.

Reappropriation:

Local Toxics Control Account—State.............................. $1,194,000

Prior Biennia (Expenditures)................................................ $306,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,500,000

NEW SECTION.  Sec. 1068.  FOR THE DEPARTMENT OF COMMERCE

Port and Export Related Infrastructure (92000102)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 306, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................. $13,603,000

Prior Biennia (Expenditures)........................................... $19,547,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $33,150,000

NEW SECTION.  Sec. 1069.  FOR THE DEPARTMENT OF COMMERCE

Projects for Jobs and Economic Development (92000151)

The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 1077, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

Public Facility Construction Loan Revolving

Account—State.......................................................... $7,100,000

State Building Construction Account—State.................. $22,256,000

Subtotal Reappropriation......................... $29,356,000

Prior Biennia (Expenditures)............................................. $7,753,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $37,109,000

NEW SECTION.  Sec. 1070.  FOR THE DEPARTMENT OF COMMERCE

Projects that Strengthen Youth and Families (92000227)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1079, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................. $12,695,000

Prior Biennia (Expenditures)............................................. $6,982,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $19,677,000

NEW SECTION.  Sec. 1071.  FOR THE DEPARTMENT OF COMMERCE

Projects that Strengthen Communities and Quality of Life (92000230)

The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 1078, chapter 19, Laws of 2013 2nd sp.s. and section 6006 of this act.

Reappropriation:

Environmental Legacy Stewardship Account—State.......... $395,000

State Building Construction Account—State.................. $22,372,000

Subtotal Reappropriation......................... $22,767,000

Prior Biennia (Expenditures)............................................. $9,361,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $32,128,000

NEW SECTION.  Sec. 1072.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

Appropriations to Public Works Assistance Account for Previously Authorized Loans (92000011)

The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely for expenditure into the public works assistance account—state. The office of financial management shall consult with the state treasurer's office to determine the timing of the expenditures into the public works assistance account to return it to a positive balance and accommodate authorized expenditures and transfers from the account.

Appropriation:

State Taxable Building Construction Account—State.... $11,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $11,000,000

NEW SECTION.  Sec. 1073.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

Cowlitz River Dredging (20082856)

Reappropriation:

State Building Construction Account—State....................... $246,000

Prior Biennia (Expenditures)............................................. $1,254,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,500,000

NEW SECTION.  Sec. 1074.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

Catastrophic Flood Relief (20084850)

The appropriation in this section is subject to the following conditions and limitations:

(1) Up to $26,800,000 of the appropriation is for advancing the long-term strategy for the Chehalis Basin projects to reduce flood damage and restore aquatic species including a programmatic environmental impact statement, data collection, engineering design of future construction projects, feasibility analysis, and engagement of state agencies, tribes, and other parties.

(2) Up to $23,200,000 of the appropriation is for construction of local priority flood protection and habitat restoration projects.

(3) Up to one percent of the appropriation provided in this section may be used by the recreation and conservation office to administer contracts associated with the subprojects funded through this section. Contract administration includes, but is not limited to: Drafting and amending contracts, reviewing and approving invoices, tracking expenditures, and performing field inspections to assess project status when conducting similar assessments related to other agency contracts in the same geographic area.

Reappropriation:

State Building Construction Account—State.................. $12,484,000

Appropriation:

State Building Construction Account—State.................. $50,000,000

Prior Biennia (Expenditures)........................................... $25,203,000

Future Biennia (Projected Costs)................................... $120,000,000

TOTAL.................................................. $207,687,000

NEW SECTION.  Sec. 1075.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

Office of Financial Management Capital Budget Staff (30000045)

Appropriation:

State Building Construction Account—State.................... $1,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $4,000,000

TOTAL...................................................... $5,000,000

NEW SECTION.  Sec. 1076.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

Oversight of State Facilities (30000046)

The appropriations in this section are subject to the following conditions and limitations:

(1) The office of financial management, with assistance from the department of enterprise services and other state agencies as needed, shall conduct space studies and make recommendations to the legislature on the state's space standards including alternative workplace strategies. State agencies shall provide space use data in a format prescribed by the office of financial management to support this effort. The office of financial management shall report the results and recommendations to the legislative fiscal committees by July 1, 2016.

(2) The office of financial management, with assistance from the department of enterprise services and other state agencies as needed, shall update the lease space requirements to reflect high performance building standards and any other components that may improve the conditions of leased space.

Appropriation:

State Building Construction Account—State.................... $1,040,000

Thurston County Capital Facilities Account—State......... $1,120,000

Subtotal Appropriation.............................. $2,160,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,160,000

NEW SECTION.  Sec. 1077.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

Construction Contingency Pool (90000300)

The appropriation in this section is subject to the following conditions and limitations:

(1) The appropriation in this section is provided solely for construction projects that confront emergent and unavoidable costs in excess of the construction contingency included in the project appropriation. For requests occurring during a legislative session, an agency must notify the legislative fiscal committees before requesting contingency funds from the office of financial management. Eligible agencies that may apply to the pool include higher education institutions, the department of corrections, the department of social and health services, the department of enterprise services, the criminal justice training commission, the department of veterans affairs, the parks and recreation commission, and the department of fish and wildlife. Eligible construction projects are only projects that had cost reductions as kept on file with the office of financial management. The office of financial management must notify the legislative evaluation and accountability program committee, the house capital budget committee, and senate ways and means committee as projects are approved for funding.

(2)(a) The legislature intends to use the 1063 Block building development project as a model of efficient space and energy use for both owned and leased state office buildings.

(b) To achieve this intent, the office of financial management must reconsider tenants for the building, including consideration of the utilities and transportation commission, all current tenants of the general administration building with operations compatible with a high density office building, and other possible tenants. The measure of achieving a higher space efficiency is measured by the average square feet per housed employee.

(c) The office of financial management must provide a report to the appropriate committees of the legislature on the redesign and the increase space efficiency by October 15, 2015.

Appropriation:

State Building Construction Account—State.................... $8,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $8,000,000

NEW SECTION.  Sec. 1078.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

Emergency Repairs (90000301)

The appropriation in this section is subject to the following conditions and limitations: Emergency repair funding is provided solely to address unexpected building or grounds failures that will impact public health and safety and the day-to-day operations of the facility. To be eligible for funds from the emergency repair pool, an emergency declaration signed by the affected agency director must be submitted to the office of financial management and the appropriate legislative fiscal committees. The emergency declaration must include a description of the health and safety hazard, the possible cause, the proposed scope of emergency repair work and related cost estimate, and identification of other funding that may be applied to the project. For emergencies occurring during a legislative session, an agency must notify the legislative fiscal committees before requesting emergency funds from the office of financial management. The office of financial management must notify the legislative evaluation and accountability program committee, the house capital budget committee, and senate ways and means committee as emergency projects are approved for funding.

Appropriation:

State Building Construction Account—State.................... $5,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $5,000,000

NEW SECTION.  Sec. 1079.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

Emergency Repair Pool for K-12 Public Schools (90000302)

The appropriation in this section is subject to the following conditions and limitations: Emergency repair funding is provided solely to address unexpected and imminent health and safety hazards at K-12 public schools, including skill centers, that will impact the day-to-day operations of the school facility. To be eligible for funds from the emergency repair pool, an emergency declaration must be signed by the school district board of directors and the superintendent of public instruction, and submitted to the office of financial management for consideration. The emergency declaration must include a description of the imminent health and safety hazard, the possible cause, the proposed scope of emergency repair work and related cost estimate, and identification of local funding to be applied to the project. Grants of emergency repair moneys must be conditioned upon the written commitment and plan of the school district board of directors to repay the grant with any insurance payments or other judgments that may be awarded, if applicable. The office of financial management must notify the legislative evaluation and accountability program committee, the house capital budget committee, and the senate ways and means committee as emergency projects are approved for funding.

Appropriation:

Common School Construction Account—State................ $5,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $5,000,000

NEW SECTION.  Sec. 1080.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

Chehalis River Basin Flood Relief Projects (91000398)

Reappropriation:

State Building Construction Account—State....................... $206,000

Prior Biennia (Expenditures)............................................. $4,794,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $5,000,000

NEW SECTION.  Sec. 1081.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

Higher Education Preservation Information (91000431)

The appropriations in this section are subject to the following conditions and limitations: The appropriations are provided solely to refresh preservation information that reside in the state's comparable framework for higher education buildings including any necessary revisions or adjustments that will enable more direct translation of information, updates for last renewal or replacement or major systems, and quality assurance field sampling. In executing this continued capital study, the office of financial management shall consult the legislative fiscal committees about its workplan to ensure field sampling of facilities prioritized for renovation or replacement, and timely delivery of assembled facilities information and related capital models in an easy to understand format. Prior to submitting any higher education institution renovation or replacement building project for consideration for funding as part of a capital budget request, to the office of financial management or directly to the legislature, colleges and universities must have completed and submitted all necessary information as required by the state facility inventory and condition assessment systems. As a general condition, upon appropriations provided to higher education agencies in this act, the state board for community and technical colleges and each state baccalaureate institution shall provide requested facilities information in a timely manner to enable the office of financial management to complete the tasks and oversight assigned in this section.

Appropriation:

University of Washington Building Account—State........... $116,000

Washington State University Building

Account—State............................................................... $85,000

Eastern Washington University Capital Projects

Account—State............................................................... $21,000

Central Washington University Capital Projects

Account—State............................................................... $17,000

The Evergreen State College Capital Projects

Account—State............................................................... $12,000

Western Washington University Capital Projects

Account—State............................................................... $19,000

Subtotal Appropriation................................. $270,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $270,000

NEW SECTION.  Sec. 1082.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

Construction Contingency Pool (91000428)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1091, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................... $1,875,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,875,000

NEW SECTION.  Sec. 1083.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

Equipment Benchmarks for Capital Projects Study (92000010)

The appropriation in this section is subject to the following conditions and limitations: The office of financial management shall submit a higher education and skill center capital project equipment cost study to the governor and the appropriate legislative fiscal committees by December 1, 2015. The study must include benchmarks for standard ranges of fixed and nonfixed equipment expenditures in different types of facilities and an examination of alternatives for financing equipment costs where the equipment has a life expectancy that is less than the length of bond financing. The alternative analysis must include a life-cycle cost analysis of the competing alternatives to determine the most cost-effective options to the state bond and general fund budget.

Appropriation:

State Building Construction Account—State....................... $250,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $250,000

NEW SECTION.  Sec. 1084.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

Culverts in Three State Agencies (92000004)

Reappropriation:

State Building Construction Account—State.................... $4,516,000

Prior Biennia (Expenditures)............................................. $2,484,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $7,000,000

NEW SECTION.  Sec. 1085.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

East Plaza - Water Infiltration and Elevator Repairs (30000548)

Reappropriation:

State Building Construction Account—State....................... $500,000

Prior Biennia (Expenditures)............................................. $2,603,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $3,103,000

NEW SECTION.  Sec. 1086.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

NRB Garage Fire Suppression System Repairs (30000578)

Reappropriation:

State Building Construction Account—State....................... $500,000

Prior Biennia (Expenditures)............................................. $1,738,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,238,000

NEW SECTION.  Sec. 1087.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

Minor Works Preservation (30000635)

Reappropriation:

State Building Construction Account—State.................... $1,477,000

Thurston County Capital Facilities Account—State............ $501,000

Subtotal Reappropriation........................... $1,978,000

Prior Biennia (Expenditures)............................................. $2,050,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $4,028,000

NEW SECTION.  Sec. 1088.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

Minor Works Preservation (30000722)

The appropriations in this section are subject to the following conditions and limitations: No minor works funds may be allotted until the action part of the plan is provided. Up to $300,000 of the appropriation in this section is provided for the department to develop an implementation plan for a capitol campus parking strategy. The action part of the plan must include: (1) During the legislative sessions a reduction of agency reserve stalls from twenty-six percent to fifteen percent as recommended by the 2014 state of Washington parking and transportation study; (2) cost-benefit of incorporating parking attendants or parking arms to accept payment for campus parking during the legislative sessions; (3) installation of at least two electronic boards, or other methods of providing the available parking capacity in the east plaza garage. The department shall work in cooperation with the city of Olympia, and the city may provide a proposal to enforce parking on the capitol campus. The department shall report to all fiscal committees on its progress by November 1, 2015.

Appropriation:

Thurston County Capital Facilities Account—State............ $850,000

State Building Construction Account—State.................... $5,608,000

State Vehicle Parking Account—State................................. $900,000

Subtotal Appropriation.............................. $7,358,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $19,000,000

TOTAL.................................................... $26,358,000

NEW SECTION.  Sec. 1089.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

Old Capitol - Exterior and Interior Repairs (30000724)

Appropriation:

Thurston County Capital Facilities Account—State......... $1,000,000

State Building Construction Account—State.................... $2,000,000

Subtotal Appropriation.............................. $3,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $3,000,000

NEW SECTION.  Sec. 1090.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

West Campus Historic Buildings Exterior Preservation (30000727)

Appropriation:

State Building Construction Account—State.................... $2,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,000,000

NEW SECTION.  Sec. 1091.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

Capitol Campus Heating Systems Repairs - Phase 1 (30000730)

The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely for the department to competitively contract an energy audit on the capitol campus steam system. The audit must consider converting to centralized hot water boilers and using a heat recovery power system.

Appropriation:

Thurston County Capital Facilities Account—State............ $500,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $500,000

NEW SECTION.  Sec. 1092.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

Expansion of Legislative Gift Center (92000014)

The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely for building modifications and space improvements required for the purpose of expanding the retail space allocated to the legislative gift center created in chapter 44.73 RCW in the legislative building. The office of legislative support services, the house of representatives, and the senate shall cooperate to accomplish this expansion within the existing space allocations, up to and including the use of all or part of room 112, on the first floor of the legislative building, no later than October 30, 2015.

Appropriation:

State Building Construction Account—State....................... $150,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $150,000

NEW SECTION.  Sec. 1093.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

Capitol Campus Critical Network Standardization and Connectivity (30000732)

The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely for installing any remaining building meters as needed on the capitol campus, and providing building performance data electronically. Dashboard displays must be installed in the three legislative buildings.

Appropriation:

Thurston County Capital Facilities Account—State............ $250,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $250,000

NEW SECTION.  Sec. 1094.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

Capitol Court Major Exterior and Building Systems Renewal (30000738)

The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely for development of a plan that identifies the existing building deficiencies and recommended project specific improvements with cost estimates to be completed as funding becomes available. Urgent repairs to this building will be prioritized against the other projects in the department of enterprise services' minor works project list.

Appropriation:

Enterprise Services Account—State..................................... $150,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $1,220,000

TOTAL...................................................... $1,370,000

NEW SECTION.  Sec. 1095.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

Capitol Lake Long-term Management Planning (30000740)

The appropriation in this section is subject to the following conditions and limitations:

(1) The appropriation is provided solely to make tangible progress on reaching broad agreement on a long-term plan for the management of Capitol Lake/Deschutes Estuary/Lower Budd Inlet/Deschutes River watershed, building on the recommendations of the 2014 situation assessment for Capitol Lake management prepared by the Ruckleshaus center and prior related reports.

The department shall:

(a) Identify and summarize the findings of the best available science concerning water quality and habitat as they relate to conceptual options of retaining or removing the dam;

(b) Identify multiple hybrid options for future management of Capitol Lake, which options must include substantial improvement in fish and wildlife habitat and ecosystem functions, maintaining a historic reflecting pool at the north end of the lake/estuary, and adaptive management strategies;

(c) Identify general cost estimates for construction and maintenance of each conceptual option, in consultation with the office of financial management;

(d) Identify the range of public support for or concerns about each option;

(e) Identify conceptual options and degree of general support for shared funding by state, local, and federal governments and potentially other entities;

(f) Identify one or more conceptual options for long-term shared governance of a future management plan, including consideration of an option similar to state lake management districts, chapter 36.61 RCW or shellfish protection districts, chapter 90.72 RCW.

(g) Engage in other related activities which would contribute to reaching broad agreement on the long-term management plan.

The department shall conduct its information gathering and report preparation with a pro-active approach to public engagement, and may create such advisory entities as it determines would be helpful.

(2) The department may contract for facilitation, research, or other services to assist in the preparation of this report.

(3) The department shall make periodic reports to the state capitol committee, the office of financial management, and fiscal committees of the legislature, with a final report to be submitted no later than January 1, 2017. The reports must include visual representations of proposals to aid the public and decision-makers to understand and evaluate them.

Appropriation:

Enterprise Services Account—State..................................... $250,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $250,000

NEW SECTION.  Sec. 1096.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

Engineering and Architectural Services: Staffing (30000762)

The appropriations in this section are subject to the following conditions and limitations:

(1) The appropriations in this section are provided solely for architectural and engineering services to manage public works contracting for all state facilities pursuant to RCW 43.19.450. The service charge is increased from 2.15 percent to 2.27 percent of total project costs to reduce the number of projects assigned to each manager. The intended results of the increased fee are improved accountability, reduced project delays, and reduced the number and cost of change orders. At the end of each fiscal year, the department must report to the office of financial management and the fiscal committees of the legislature on performance improvements resulting from the increased management fee, including the following:

(a) The number of projects managed by each manager compared to previous biennia;

(b) Projects that were not completed on schedule and the reasons for delays; and

(c) The number and cost of the change orders and the reason for each change order.

(2) The department shall convene a group of private sector architects and contractors with state agency facilities personnel, at a minimum of twice per year, to share at a minimum, information on high performance methods, ideas, operating and maintenance issues, and cost. The facility personnel must be from the community and technical colleges, the four-year institutions of higher education, and any other state agencies that have recently completed a new building or are currently in the construction phase.

(3) The department, with assistance from the capital projects authority review board, shall provide recommendations to the governor, house capital budget committee, and senate ways and means committee, on ways to improve the project delivery methods. It must include, at a minimum, methods to incorporate more architectural and engineering firms and contractors to be eligible for design build projects, and methods for including high performance criteria with incentives for the architectural and engineering firm and contractor to meet the performance measures in design-bid-build project delivery methods.

Appropriation:

State Building Construction Account—State.................... $9,800,000

Thurston County Capital Facilities Account—State......... $3,000,000

Charitable, Educational, Penal, and Reformatory

Institutions Account—State....................................... $2,000,000

Subtotal Appropriation............................ $14,800,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $14,800,000

NEW SECTION.  Sec. 1097.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

Campus Steam System and Chiller Upgrades (91000014)

The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 1106, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

Thurston County Capital Facilities Account—State......... $1,074,000

State Building Construction Account—State.................... $1,802,000

Subtotal Reappropriation........................... $2,876,000

Prior Biennia (Expenditures)............................................. $1,121,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $3,997,000

NEW SECTION.  Sec. 1098.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

Capitol Campus Exterior Lighting Upgrades (30000736)

The appropriation in this section is subject to the following conditions and limitations: The department shall pursue energy services contracts as much as is feasible to provide funding.

Appropriation:

Thurston County Capital Facilities Account—State......... $1,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,000,000

NEW SECTION.  Sec. 1099.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

Archives Building and Capitol Court HVAC Upgrades (91000015)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1107, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

State Building Construction Account—State......................... $70,000

Prior Biennia (Expenditures)................................................ $930,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,000,000

NEW SECTION.  Sec. 1100.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

Capitol Campus Predesign (91000436)

The appropriation in this section is subject to the following conditions and limitations: The department shall develop a predesign that will include at a minimum, uses for the pritchard building and the pro arts site, the general administration building replacement or rehabilitation, and the newhouse building replacement. The predesign must include potential tenants, project costs, and schedules.

Appropriation:

State Building Construction Account—State....................... $200,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $200,000

NEW SECTION.  Sec. 1101.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

State Capitol Master Plan (30000760)

The appropriation in this section is subject to the following conditions and limitations:

(1) The appropriation in this section is provided solely for the department to identify potential development sites, and any infrastructure that may be needed for further development.

(2) The department shall provide a list to all fiscal committees of designated parking areas with: (a) Capitol campus employees; (b) state agency reserve spaces; (c) state agency vehicles; (d) state agency motor pool vehicles; and (e) nonstate agency vehicles. The department shall also provide a prioritized list of parking spaces that ranks campus employees as the highest priority. Other parking locations in Thurston county may also be considered.

Appropriation:

Thurston County Capital Facilities Account—State............ $250,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $250,000

NEW SECTION.  Sec. 1102.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

1063 Block Replacement (91000016)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for design, redesign, demolition and other costs required for the project to replace the state building on the 1063 block. The building will be alternatively financed as authorized by and subject to the conditions of section 7002 of this act.

Reappropriation:

State Building Construction Account—State.................... $8,017,000

Prior Biennia (Expenditures)............................................. $4,983,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $13,000,000

NEW SECTION.  Sec. 1103.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

Dolliver - Critical Building Repairs (30000726)

The appropriation in this section is provided solely for development of a plan that identifies the existing building deficiencies and recommended project specific improvements with cost estimates to be completed as funding becomes available. Urgent repairs to this building will be prioritized against the other projects in the department of enterprise services' minor works project list.

Appropriation:

Enterprise Services Account—State....................................... $50,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL........................................................... $50,000

NEW SECTION.  Sec. 1104.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

Feasibility Study for Restoring Skylights in Legislative Building (92000010)

The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely for a study to determine the feasibility and requirements of replacing the materials covering the original skylight openings that are located above the house of representatives and senate chambers in the legislative building with safety glass to allow as much natural light as possible into the chambers as originally intended. The study must determine the cost, including the relocation of existing equipment; the impact upon the sound, HVAC system(s) and light levels within each chamber; any other requirements needed to replace the materials with safety glass; and an estimated schedule needed for the work. The replacement glass must be of a quality that will provide for a reasonable assurance of safety in the event of an earthquake.

Appropriation:

State Building Construction Account—State....................... $125,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $125,000

NEW SECTION.  Sec. 1105.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

Capitol Campus Utility Renewal Plan (92000012)

The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for assessing the current condition of underground utilities on the Capitol campus and developing a plan of renewal that stages the work so that the systems and segments at highest risk of failure are replaced or repaired in a sequence of work that is the most cost effective. The plan must be submitted to the appropriate committees of the legislature by October 1, 2016.

Appropriation:

State Building Construction Account—State....................... $650,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $650,000

NEW SECTION.  Sec. 1106.  FOR THE DEPARTMENT OF ENTERPRISE SERVICES

Capital Furnishings Preservation Committee Projects (92000013)

Appropriation:

State Building Construction Account—State......................... $68,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL........................................................... $68,000

NEW SECTION.  Sec. 1107.  FOR THE MILITARY DEPARTMENT

Pierce County Readiness Center (30000593)

Reappropriation:

Military Department Capital Account—State................... $2,758,000

State Building Construction Account—State.................... $3,269,000

General Fund—Federal................................................... $24,876,000

Subtotal Reappropriation......................... $30,903,000

Prior Biennia (Expenditures)............................................. $2,698,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $33,601,000

NEW SECTION.  Sec. 1108.  FOR THE MILITARY DEPARTMENT

Thurston County Readiness Center (30000594)

The reappropriation and appropriations in this section are subject to the following conditions and limitations: The legislature intends to support the transfer of the Olympia armory to the Thurston county boys and girls club. The military department must execute an agreement to transfer title of the property to the Thurston county boys and girls club if the club agrees to use the facility as a boys and girls club for a minimum of ten years. The transfer agreement must specify a mutually agreed transfer date following the completion of the Thurston county readiness center. The transfer agreement must require the club to cover any closing costs and must specify a purchase price of one dollar. The agreement must be reported to the house of representatives capital budget committee, senate ways and means committee, and the governor's office by January 1, 2016.

Reappropriation:

State Building Construction Account—State.................... $2,750,000

Appropriation:

State Building Construction Account—State.................... $7,883,000

General Fund—Federal................................................... $34,207,000

Subtotal Appropriation............................ $42,090,000

Prior Biennia (Expenditures).................................................. $50,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $44,890,000

NEW SECTION.  Sec. 1109.  FOR THE MILITARY DEPARTMENT

Minor Works Preservation - 2013-2015 Biennium (30000602)

Reappropriation:

State Building Construction Account—State....................... $307,000

General Fund—Federal..................................................... $1,082,000

Subtotal Reappropriation........................... $1,389,000

Prior Biennia (Expenditures)............................................. $3,837,000

Future Biennia (Projected Costs)....................................... $2,500,000

TOTAL...................................................... $7,726,000

NEW SECTION.  Sec. 1110.  FOR THE MILITARY DEPARTMENT

Minor Works Program - 2013-2015 Biennium (30000605)

Reappropriation:

General Fund—Federal..................................................... $8,893,000

Prior Biennia (Expenditures)............................................. $4,032,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $12,925,000

NEW SECTION.  Sec. 1111.  FOR THE MILITARY DEPARTMENT

Minor Works Preservation - 2015-2017 Biennium (30000702)

Appropriation:

State Building Construction Account—State.................... $5,110,000

General Fund—Federal..................................................... $7,488,000

Subtotal Appropriation............................ $12,598,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $12,598,000

NEW SECTION.  Sec. 1112.  FOR THE MILITARY DEPARTMENT

Minor Works Program - 2015-2017 Biennium (30000744)

Appropriation:

State Building Construction Account—State.................... $5,663,000

General Fund—Federal................................................... $15,953,000

Subtotal Appropriation............................ $21,616,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $21,616,000

NEW SECTION.  Sec. 1113.  FOR THE MILITARY DEPARTMENT

Montesano Readiness Center Roof Replacement and Tenant Improvements (30000805)

Appropriation:

General Fund—Federal..................................................... $1,500,000

State Building Construction Account—State.................... $3,750,000

Subtotal Appropriation.............................. $5,250,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $5,250,000

NEW SECTION.  Sec. 1114.  FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION

National Parks Service Maritime Heritage Grants (91000008)

The appropriation in this section is subject to the following conditions and limitations:

(1) $28,000 of the appropriation is provided solely for the center for wooden boats' historic small craft project.

(2) $87,000 of the appropriation is provided solely for the Northwest seaport's preservation of the national historic landmark 1889 tugboat Arthur Foss.

Appropriation:

General Fund—Federal........................................................ $105,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $105,000

NEW SECTION.  Sec. 1115.  FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION

Historic County Courthouse Grants Program (30000010)

Appropriation:

State Building Construction Account—State.................... $2,500,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $10,400,000

TOTAL.................................................... $12,900,000

NEW SECTION.  Sec. 1116.  FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION

Historic Courthouse Preservation Grants (92000001)

Reappropriation:

State Building Construction Account—State.................... $1,696,000

Prior Biennia (Expenditures)................................................ $304,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,000,000

NEW SECTION.  Sec. 1117.  FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION

Heritage Barn Preservation Program (92000002)

Reappropriation:

State Building Construction Account—State....................... $256,000

Prior Biennia (Expenditures)................................................ $244,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $500,000

NEW SECTION.  Sec. 1118.  FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION

Acquisition/Rehabilitation of Historic Matsuda and Mukai Sites (91000006)

Appropriation:

State Building Construction Account—State....................... $500,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $500,000

NEW SECTION.  Sec. 1119.  FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION

Heritage Barn Preservation Program (30000009)

Appropriation:

State Building Construction Account—State....................... $450,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $2,000,000

TOTAL...................................................... $2,450,000

PART 2

HUMAN SERVICES

NEW SECTION.  Sec. 2001.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Naselle Youth Camp - Three Cottages: Renovation (20081222)

Reappropriation:

State Building Construction Account—State.................... $1,703,000

Prior Biennia (Expenditures)................................................ $197,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,900,000

NEW SECTION.  Sec. 2002.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Western State Hospital New Kitchen and Commissary Building (20081319)

Appropriation:

State Building Construction Account—State.................. $29,000,000

Prior Biennia (Expenditures)................................................ $828,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $29,828,000

NEW SECTION.  Sec. 2003.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Medical Lake Campus - Laundry Building: New Construction (20082371)

Appropriation:

State Building Construction Account—State....................... $150,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $10,100,000

TOTAL.................................................... $10,250,000

NEW SECTION.  Sec. 2004.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Minor Works Preservation Projects: Statewide (91000037)

The appropriation in this section is subject to the following conditions and limitations: Up to $600,000 may be used for necessary renovations at the Maple Lane facility for the purpose of temporary forensic beds.

Appropriation:

State Building Construction Account—State.................. $10,645,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $10,645,000

NEW SECTION.  Sec. 2005.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Fircrest School Electrical Service Rehabilitation (30000415)

The appropriation in this section is provided solely for electrical service rehabilitation and improvements on campus. The department of social and health services will also coordinate with the department of health to install a new and separate electrical service for the public health laboratory.

Appropriation:

State Building Construction Account—State.................... $5,200,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $5,200,000

NEW SECTION.  Sec. 2006.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Minor Works Program Projects: Statewide (30001859)

Appropriation:

State Building Construction Account—State....................... $755,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $20,000,000

TOTAL.................................................... $20,755,000

NEW SECTION.  Sec. 2007.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Minor Works Preservation Projects: Statewide (30002235)

Reappropriation:

State Building Construction Account—State.................... $4,000,000

Prior Biennia (Expenditures)........................................... $10,155,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $14,155,000

NEW SECTION.  Sec. 2008.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Child Study and Treatment Center - Orcas: Acute Treatment Addition (30002733)

Appropriation:

State Building Construction Account—State.................... $1,100,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,100,000

NEW SECTION.  Sec. 2009.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Western State Hospital - South Hall: Building Systems Replacement (30002735)

Appropriation:

Charitable, Educational, Penal, and Reformatory

Institutions Account—State....................................... $4,450,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $4,450,000

NEW SECTION.  Sec. 2010.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Fircrest School: Campus Master Plan (30002738)

Appropriation:

Charitable, Educational, Penal, and Reformatory

Institutions Account—State.......................................... $100,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $100,000

NEW SECTION.  Sec. 2011.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Eastern State Hospital - Westlake: Nurse Call System (30002739)

Appropriation:

State Building Construction Account—State.................... $1,200,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,200,000

NEW SECTION.  Sec. 2012.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Rainier School: Campus Master Plan and Forest Management Plan (30002740)

Appropriation:

Charitable, Educational, Penal, and Reformatory

Institutions Account—State.......................................... $200,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $200,000

NEW SECTION.  Sec. 2013.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Yakima Valley School - Main Building: Roofing Replacement (30002742)

Appropriation:

State Building Construction Account—State.................... $1,500,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,500,000

NEW SECTION.  Sec. 2014.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Green Hill School: New Acute Mental Health Unit (30002745)

Appropriation:

State Building Construction Account—State.................... $4,950,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $4,950,000

NEW SECTION.  Sec. 2015.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Western State Hospital - Forensic Services: Two Wards Addition (30002765)

Appropriation:

State Building Construction Account—State.................... $1,800,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $20,700,000

TOTAL.................................................... $22,500,000

NEW SECTION.  Sec. 2016.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Western State Hospital - East Campus: Psychiatric Intensive Care Unit and Competency Restoration (30002773)

Appropriation:

State Building Construction Account—State.................... $2,200,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,200,000

NEW SECTION.  Sec. 2017.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Eastern State Hospital - Water System: Improvements (30003215)

Appropriation:

State Building Construction Account—State.................... $2,115,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,115,000

NEW SECTION.  Sec. 2018.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Yakima Valley School: Center for Excellence (30003236)

Appropriation:

Charitable, Educational, Penal, and Reformatory

Institutions Account—State.......................................... $200,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $200,000

NEW SECTION.  Sec. 2019.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Western State Hospital - South Hall: Wards Preservation and Renewal (30003240)

Appropriation:

State Building Construction Account—State.................... $1,350,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,350,000

NEW SECTION.  Sec. 2020.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Western State Hospital - East Campus: Wards Preservation and Renewal (30003241)

Appropriation:

State Building Construction Account—State.................... $1,600,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,600,000

NEW SECTION.  Sec. 2021.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Western State Hospital - East Campus: Building Systems Replacement (30003244)

Appropriation:

State Building Construction Account—State.................... $3,400,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $3,400,000

NEW SECTION.  Sec. 2022.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

Eastern State Hospital and Western State Hospital - All Wards: Patient Safety Improvements (91000019)

Reappropriation:

Charitable, Educational, Penal, and Reformatory

Institutions Account—State....................................... $2,000,000

Appropriation:

Charitable, Educational, Penal, and Reformatory

Institutions Account—State....................................... $2,569,000

Prior Biennia (Expenditures)............................................. $2,800,000

Future Biennia (Projected Costs)....................................... $3,180,000

TOTAL.................................................... $10,549,000

NEW SECTION.  Sec. 2023.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

ESH-15 Bed Addition for Substitute Senate Bill No. 5889 (92000016)

Appropriation:

State Building Construction Account—State.................... $1,400,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,400,000

NEW SECTION.  Sec. 2024.  FOR THE DEPARTMENT OF HEALTH

Newborn Screening Wing Addition (30000301)

Appropriation:

State Building Construction Account—State.................... $3,049,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $3,049,000

NEW SECTION.  Sec. 2025.  FOR THE DEPARTMENT OF HEALTH

Newborn Screening Lab Conversion (30000302)

Appropriation:

State Building Construction Account—State.................... $1,141,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,141,000

NEW SECTION.  Sec. 2026.  FOR THE DEPARTMENT OF HEALTH

Minor Works - Program (30000315)

Appropriation:

State Building Construction Account—State....................... $322,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $322,000

NEW SECTION.  Sec. 2027.  FOR THE DEPARTMENT OF HEALTH

Drinking Water Assistance Program (30000323)

Reappropriation:

Drinking Water Assistance Account—Federal............... $23,225,000

Prior Biennia (Expenditures)............................................. $5,575,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $28,800,000

NEW SECTION.  Sec. 2028.  FOR THE DEPARTMENT OF HEALTH

Minor Works - Facility Preservation (30000328)

Appropriation:

State Building Construction Account—State....................... $277,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $277,000

NEW SECTION.  Sec. 2029.  FOR THE DEPARTMENT OF HEALTH

Drinking Water Preconstruction Loans (30000334)

Appropriation:

Drinking Water Assistance Repayment Account—State.. $6,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $24,000,000

TOTAL.................................................... $30,000,000

NEW SECTION.  Sec. 2030.  FOR THE DEPARTMENT OF HEALTH

Drinking Water Assistance Program (30000336)

Appropriation:

Drinking Water Assistance Account—Federal............... $32,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)................................... $128,000,000

TOTAL.................................................. $160,000,000

NEW SECTION.  Sec. 2031.  FOR THE DEPARTMENT OF HEALTH

Safe Reliable Drinking Water Grants (92000002)

Reappropriation:

State Building Construction Account—State.................... $1,428,000

Prior Biennia (Expenditures)........................................... $10,210,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $11,638,000

NEW SECTION.  Sec. 2032.  FOR THE DEPARTMENT OF VETERANS AFFAIRS

Walla Walla Nursing Facility (20082008)

Reappropriation:

State Building Construction Account—State.................. $14,357,000

General Fund—Federal................................................... $24,000,000

Subtotal Reappropriation......................... $38,357,000

Prior Biennia (Expenditures)............................................. $2,568,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $40,925,000

NEW SECTION.  Sec. 2033.  FOR THE DEPARTMENT OF VETERANS AFFAIRS

Minor Works Facilities Preservation (30000094)

Reappropriation:

State Building Construction Account—State....................... $675,000

Prior Biennia (Expenditures)................................................ $638,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,313,000

NEW SECTION.  Sec. 2034.  FOR THE DEPARTMENT OF VETERANS AFFAIRS

Feasibility Study/Predesign for Washington Soldiers Home Skilled Nursing Replacement (30000090)

Appropriation:

Charitable, Educational, Penal, and Reformatory

Institutions Account—State.......................................... $125,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $125,000

NEW SECTION.  Sec. 2035.  FOR THE DEPARTMENT OF VETERANS AFFAIRS

Minor Works Facilities Preservation (30000174)

The appropriation in this section is subject to the following conditions and limitations: $250,000 of the appropriation in this section is provided solely for the restoration and preservation of the Washington soldiers home cemetery.

Appropriation:

State Building Construction Account—State.................... $3,095,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $9,690,000

TOTAL.................................................... $12,785,000

NEW SECTION.  Sec. 2036.  FOR THE DEPARTMENT OF VETERANS AFFAIRS

South Central Washington State Veterans Cemetery Feasibility (30000151)

Appropriation:

Charitable, Educational, Penal, and Reformatory

Institutions Account—State.......................................... $100,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $100,000

NEW SECTION.  Sec. 2037.  FOR THE DEPARTMENT OF VETERANS AFFAIRS

Eastern Washington Cemetery Upgrade (30000152)

Appropriation:

State Building Construction Account—State....................... $270,000

General Fund—Federal..................................................... $2,422,000

Subtotal Appropriation.............................. $2,692,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,692,000

NEW SECTION.  Sec. 2038.  FOR THE DEPARTMENT OF CORRECTIONS

Monroe Correctional Complex: Close Sewer Lagoon (20082022)

Reappropriation:

State Building Construction Account—State....................... $214,000

Prior Biennia (Expenditures)............................................. $1,177,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,391,000

NEW SECTION.  Sec. 2039.  FOR THE DEPARTMENT OF CORRECTIONS

Washington Corrections Center: Transformers and Switches (30000143)

Appropriation:

State Building Construction Account—State....................... $150,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $12,699,000

TOTAL.................................................... $12,849,000

NEW SECTION.  Sec. 2040.  FOR THE DEPARTMENT OF CORRECTIONS

Washington Corrections Center: Roof and Equipment Replacement (30000195)

Appropriation:

State Building Construction Account—State.................... $5,658,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $5,658,000

NEW SECTION.  Sec. 2041.  FOR THE DEPARTMENT OF CORRECTIONS

Clallam Bay Corrections Center: MSC and Rec Building Roofs (30000548)

Appropriation:

State Building Construction Account—State.................... $1,808,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,808,000

NEW SECTION.  Sec. 2042.  FOR THE DEPARTMENT OF CORRECTIONS

Monroe Correctional Complex: WSR Replace Fire Alarm System (30000724)

Reappropriation:

State Building Construction Account—State.................... $2,001,000

Prior Biennia (Expenditures)................................................ $615,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,616,000

NEW SECTION.  Sec. 2043.  FOR THE DEPARTMENT OF CORRECTIONS

Airway Heights Corrections Center: Replace Fire Alarm System (30000725)

Reappropriation:

State Building Construction Account—State.................... $2,007,000

Prior Biennia (Expenditures)............................................. $1,392,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $3,399,000

NEW SECTION.  Sec. 2044.  FOR THE DEPARTMENT OF CORRECTIONS

Airway Heights Corrections Center: Security Electronics Renovations (30000726)

Reappropriation:

State Building Construction Account—State.................... $3,830,000

Prior Biennia (Expenditures)............................................. $1,217,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $5,047,000

NEW SECTION.  Sec. 2045.  FOR THE DEPARTMENT OF CORRECTIONS

Washington Corrections Center for Women: Replace Fire Alarm System (30000727)

Reappropriation:

State Building Construction Account—State....................... $950,000

Prior Biennia (Expenditures)............................................. $1,699,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,649,000

NEW SECTION.  Sec. 2046.  FOR THE DEPARTMENT OF CORRECTIONS

Monroe Correctional Complex: TRU Support Building Repair Fire Detection System (30000733)

Reappropriation:

State Building Construction Account—State....................... $250,000

Prior Biennia (Expenditures)................................................ $808,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,058,000

NEW SECTION.  Sec. 2047.  FOR THE DEPARTMENT OF CORRECTIONS

Monroe Correctional Complex: TRU Security Video System (30000801)

Reappropriation:

State Building Construction Account—State.................... $2,908,000

Prior Biennia (Expenditures)................................................ $968,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $3,876,000

NEW SECTION.  Sec. 2048.  FOR THE DEPARTMENT OF CORRECTIONS

Washington Corrections Center: Security Video System (30000791)

Reappropriation:

State Building Construction Account—State.................... $6,000,000

Prior Biennia (Expenditures)................................................ $972,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $6,972,000

NEW SECTION.  Sec. 2049.  FOR THE DEPARTMENT OF CORRECTIONS

Monroe Correctional Complex: WSR Security Video System (30000795)

Reappropriation:

State Building Construction Account—State.................... $4,200,000

Prior Biennia (Expenditures)............................................. $1,033,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $5,233,000

NEW SECTION.  Sec. 2050.  FOR THE DEPARTMENT OF CORRECTIONS

Minor Works Preservation (30000734)

Reappropriation:

State Building Construction Account—State.................... $1,500,000

Prior Biennia (Expenditures)............................................. $8,600,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $10,100,000

NEW SECTION.  Sec. 2051.  FOR THE DEPARTMENT OF CORRECTIONS

Clallam Bay Corrections Center: Security Video System (30000800)

Appropriation:

State Building Construction Account—State.................... $6,038,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $6,038,000

NEW SECTION.  Sec. 2052.  FOR THE DEPARTMENT OF CORRECTIONS

Washington Corrections Center for Women: Security Video System (30000802)

Reappropriation:

State Building Construction Account—State.................... $2,917,000

Prior Biennia (Expenditures)................................................ $504,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $3,421,000

NEW SECTION.  Sec. 2053.  FOR THE DEPARTMENT OF CORRECTIONS

Monroe Correctional Complex: SOU IMU Security Video (30000803)

Reappropriation:

State Building Construction Account—State.................... $2,000,000

Prior Biennia (Expenditures)................................................ $640,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,640,000

NEW SECTION.  Sec. 2054.  FOR THE DEPARTMENT OF CORRECTIONS

Washington State Penitentiary: Education Building Roof (30000820)

Appropriation:

State Building Construction Account—State.................... $1,525,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,525,000

NEW SECTION.  Sec. 2055.  FOR THE DEPARTMENT OF CORRECTIONS

Monroe Correctional Complex: MSU Bathroom Renovation (30000975)

Appropriation:

State Building Construction Account—State.................... $1,720,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,720,000

NEW SECTION.  Sec. 2056.  FOR THE DEPARTMENT OF CORRECTIONS

Statewide: Minor Works - Preservation Projects (30001013)

Appropriation:

State Building Construction Account—State.................. $11,396,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $65,095,000

TOTAL.................................................... $76,491,000

NEW SECTION.  Sec. 2057.  FOR THE DEPARTMENT OF CORRECTIONS

Clallam Bay Corrections Center: Access Road Culvert Replacement and Road Resurfacing (30001078)

Appropriation:

State Building Construction Account—State.................... $1,500,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,500,000

NEW SECTION.  Sec. 2058.  FOR THE DEPARTMENT OF CORRECTIONS

Washington State Penitentiary: Program and Support Building (30001101)

Appropriation:

State Building Construction Account—State.................... $1,900,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $15,014,000

TOTAL.................................................... $16,914,000

NEW SECTION.  Sec. 2059.  FOR THE DEPARTMENT OF CORRECTIONS

Prison Capacity Expansion (30001105)

The appropriation in this section is subject to the following conditions and limitations:

(1) The department shall research best practices for treatment of mental illness for offenders, and design and construct the facility to provide this treatment. The department shall also include costs for continuing mental health supervision with community supervision in the predesign. The department may assign minimum security offenders for maintenance or other activities as needed.

(2) The department shall report to the senate ways and means committee, the house of representatives capital budget committee, and the governor's office options on methods of converting existing minimum security housing units to medium security housing units. The report must contain methods, construction cost estimates, length of time to complete, facility locations where this is feasible, and changes to capacity.

(3) The department, in cooperation with the department of social and health services, shall report to the senate ways and means committee, the house of representatives capital budget committee, and the governor's office, options for including juveniles diagnosed with a mental illness that are housed at a juvenile rehabilitation facility at the maple lane facility. The report must include cost benefits, added construction costs, and any changes required in state or federal law.

Appropriation:

State Building Construction Account—State.................... $4,800,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)................................... $184,000,000

TOTAL.................................................. $188,800,000

NEW SECTION.  Sec. 2060.  FOR THE CRIMINAL JUSTICE TRAINING COMMISSION

Omnibus Minor Works (30000017)

Appropriation:

State Building Construction Account—State....................... $456,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $456,000

PART 3

NATURAL RESOURCES

NEW SECTION.  Sec. 3001.  FOR THE DEPARTMENT OF ECOLOGY

Water Supply Facilities (19742006)

Reappropriation:

State and Local Improvements Revolving Account (Water

Supply Facilities)—State.............................................. $345,000

Prior Biennia (Expenditures)........................................... $20,205,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $20,550,000

NEW SECTION.  Sec. 3002.  FOR THE DEPARTMENT OF ECOLOGY

Low-Level Nuclear Waste Disposal Trench Closure (19972012)

The appropriations in this section are subject to the following conditions and limitations: The department of ecology and department of health shall work with the Yakama nation to engage a third party to evaluate the specific technical concerns the tribe has identified with respect to the timing of the phase 1 cover. Funds may not be expended to place a cover over the trenches which are releasing or are projected to release contaminants until the third party review is completed and collaboratively resolved. A report on the above referenced work, including recommendations and the means for meeting health and cancer risks, must be delivered to the appropriate committees of the legislature by December 1, 2015.

Reappropriation:

Site Closure Account—State........................................... $10,917,000

Appropriation:

Site Closure Account—State............................................. $3,675,000

Prior Biennia (Expenditures)............................................. $4,516,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $19,108,000

NEW SECTION.  Sec. 3003.  FOR THE DEPARTMENT OF ECOLOGY

Twin Lake Aquifer Recharge Project (20042951)

Reappropriation:

State Building Construction Account—State....................... $156,000

Prior Biennia (Expenditures)................................................ $594,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $750,000

NEW SECTION.  Sec. 3004.  FOR THE DEPARTMENT OF ECOLOGY

Water Supply Facilities (20044006)

Reappropriation:

State and Local Improvements Revolving Account (Water

Supply Facilities)—State................................................ $50,000

Prior Biennia (Expenditures)........................................... $13,468,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $13,518,000

NEW SECTION.  Sec. 3005.  FOR THE DEPARTMENT OF ECOLOGY

Quad Cities Water Right Mitigation (20052852)

Reappropriation:

State Building Construction Account—State....................... $421,000

Prior Biennia (Expenditures)............................................. $1,179,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,600,000

NEW SECTION.  Sec. 3006.  FOR THE DEPARTMENT OF ECOLOGY

Watershed Plan Implementation and Flow Achievement (20062003)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions in section 136, chapter 371, Laws of 2006.

Reappropriation:

State Building Construction Account—State....................... $317,000

Prior Biennia (Expenditures)........................................... $12,483,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $12,800,000

NEW SECTION.  Sec. 3007.  FOR THE DEPARTMENT OF ECOLOGY

Columbia River Basin Water Supply Development Program (20062950)

The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 3008, chapter 49, Laws of 2011 1st sp. sess.

Reappropriation:

Columbia River Basin Taxable Bond Water Supply

Development Account—State................................... $1,770,000

Columbia River Basin Water Supply Development Account—

State........................................................................... $6,075,000

Subtotal Reappropriation........................... $7,845,000

Prior Biennia (Expenditures)........................................... $83,655,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $91,500,000

NEW SECTION.  Sec. 3008.  FOR THE DEPARTMENT OF ECOLOGY

Transfer of Water Rights for Cabin Owners (20081951)

Reappropriation:

State Building Construction Account—State....................... $161,000

Prior Biennia (Expenditures)................................................ $289,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $450,000

NEW SECTION.  Sec. 3009.  FOR THE DEPARTMENT OF ECOLOGY

Remedial Action Grants (20084008)

Reappropriation:

State Building Construction Account—State.................. $11,754,000

Prior Biennia (Expenditures)........................................... $81,121,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $92,875,000

NEW SECTION.  Sec. 3010.  FOR THE DEPARTMENT OF ECOLOGY

Centennial Clean Water Program (20084010)

Reappropriation:

State Building Construction Account—State....................... $221,000

Water Quality Capital Account—State.................................. $43,000

State Toxics Control Account—State.................................. $570,000

Subtotal Reappropriation.............................. $834,000

Prior Biennia (Expenditures)........................................... $66,036,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $66,870,000

NEW SECTION.  Sec. 3011.  FOR THE DEPARTMENT OF ECOLOGY

Water Pollution Control Loan Program (20084011)

Reappropriation:

Water Pollution Control Revolving Account—State...... $14,581,000

Prior Biennia (Expenditures)......................................... $125,419,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................. $140,000,000

NEW SECTION.  Sec. 3012.  FOR THE DEPARTMENT OF ECOLOGY

Yakima River Basin Water Storage Feasibility Study (20084026)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions in section 3035, chapter 497, Laws of 2009.

Reappropriation:

State Building Construction Account—State......................... $82,000

Prior Biennia (Expenditures)............................................. $5,168,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $5,250,000

NEW SECTION.  Sec. 3013.  FOR THE DEPARTMENT OF ECOLOGY

Watershed Plan Implementation and Flow Achievement (20084029)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions in section 3054, chapter 520, Laws of 2007.

Reappropriation:

State Building Construction Account—State.................... $1,456,000

Prior Biennia (Expenditures)........................................... $12,544,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $14,000,000

NEW SECTION.  Sec. 3014.  FOR THE DEPARTMENT OF ECOLOGY

Water Pollution Control Revolving Fund Program (30000007)

Reappropriation:

Water Pollution Control Revolving Account—Federal

ARRA........................................................................... $766,000

Water Pollution Control Revolving Account—State........ $3,970,000

Subtotal Reappropriation........................... $4,736,000

Prior Biennia (Expenditures)......................................... $173,964,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................. $178,700,000

NEW SECTION.  Sec. 3015.  FOR THE DEPARTMENT OF ECOLOGY

Centennial Clean Water Program (30000008)

Reappropriation:

State Building Construction Account—State.................... $3,838,000

Prior Biennia (Expenditures)........................................... $26,162,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $30,000,000

NEW SECTION.  Sec. 3016.  FOR THE DEPARTMENT OF ECOLOGY

Watershed Plan Implementation and Flow Achievement (30000028)

Reappropriation:

State Building Construction Account—State....................... $715,000

Prior Biennia (Expenditures)............................................. $5,285,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $6,000,000

NEW SECTION.  Sec. 3017.  FOR THE DEPARTMENT OF ECOLOGY

Kittitas Groundwater Study (30000029)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions in section 3001, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:

State and Local Improvements Revolving Account (Water

Supply Facilities)—State................................................ $76,000

Prior Biennia (Expenditures)................................................ $624,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $700,000

NEW SECTION.  Sec. 3018.  FOR THE DEPARTMENT OF ECOLOGY

Remedial Action Grant Program (30000039)

The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 3006, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:

State Building Construction Account—State.................... $1,327,000

Local Toxics Control Account—State.............................. $9,165,000

Subtotal Reappropriation......................... $10,492,000

Prior Biennia (Expenditures)........................................... $65,419,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $75,911,000

NEW SECTION.  Sec. 3019.  FOR THE DEPARTMENT OF ECOLOGY

Water Pollution Control Revolving Fund Program (30000142)

Reappropriation:

Water Pollution Control Revolving Account—Federal.... $1,792,000

Water Pollution Control Revolving Account—State...... $21,050,000

Subtotal Reappropriation......................... $22,842,000

Prior Biennia (Expenditures)........................................... $14,158,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $37,000,000

NEW SECTION.  Sec. 3020.  FOR THE DEPARTMENT OF ECOLOGY

Clean Up Toxics Sites - Puget Sound (30000144)

The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 3021, chapter 48, Laws of 2011 1st sp. sess.

Reappropriation:

Cleanup Settlement Account—State................................. $1,959,000

State Toxics Control Account—State............................... $3,666,000

Subtotal Reappropriation........................... $5,625,000

Prior Biennia (Expenditures)........................................... $35,573,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $41,198,000

NEW SECTION.  Sec. 3021.  FOR THE DEPARTMENT OF ECOLOGY

Settlement Funding to Clean Up Toxic Sites (30000145)

Reappropriation:

Cleanup Settlement Account—State.................................... $185,000

Prior Biennia (Expenditures)............................................. $8,315,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $8,500,000

NEW SECTION.  Sec. 3022.  FOR THE DEPARTMENT OF ECOLOGY

Centennial Clean Water Program (30000208)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3024, chapter 48, Laws of 2011 1st sp. sess.

Reappropriation:

State Toxics Control Account—State............................. $12,341,000

Prior Biennia (Expenditures)........................................... $21,759,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $34,100,000

NEW SECTION.  Sec. 3023.  FOR THE DEPARTMENT OF ECOLOGY

Water Pollution Control Revolving Fund Program (30000209)

Reappropriation:

Water Pollution Control Revolving Account—Federal.. $51,095,000

Water Pollution Control Revolving Account—State...... $85,631,000

Subtotal Reappropriation....................... $136,726,000

Prior Biennia (Expenditures)........................................... $55,418,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................. $192,144,000

NEW SECTION.  Sec. 3024.  FOR THE DEPARTMENT OF ECOLOGY

Watershed Plan Implementation and Flow Achievement (30000213)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3030, chapter 49, Laws of 2011 1st sp. sess.

Reappropriation:

State Building Construction Account—State.................... $2,254,000

Prior Biennia (Expenditures)............................................. $5,746,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $8,000,000

NEW SECTION.  Sec. 3025.  FOR THE DEPARTMENT OF ECOLOGY

Remedial Action Grant Program (30000216)

Reappropriation:

Local Toxics Control Account—State............................ $32,216,000

Prior Biennia (Expenditures)........................................... $31,618,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $63,834,000

NEW SECTION.  Sec. 3026.  FOR THE DEPARTMENT OF ECOLOGY

Eastern Washington Clean Sites Initiative (30000217)

Reappropriation:

State Toxics Control Account—State............................... $2,117,000

Prior Biennia (Expenditures)............................................. $3,883,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $6,000,000

NEW SECTION.  Sec. 3027.  FOR THE DEPARTMENT OF ECOLOGY

Safe Soils Remediation Program - Central Washington (30000263)

Reappropriation:

State Toxics Control Account—State.................................. $682,000

Prior Biennia (Expenditures)............................................. $3,029,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $3,711,000

NEW SECTION.  Sec. 3028.  FOR THE DEPARTMENT OF ECOLOGY

Clean Up Toxics Sites - Puget Sound (30000265)

Reappropriation:

State Toxics Control Account—State............................... $1,896,000

Prior Biennia (Expenditures)........................................... $14,504,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $16,400,000

NEW SECTION.  Sec. 3029.  FOR THE DEPARTMENT OF ECOLOGY

Yakima Basin Integrated Water Management Plan Implementation (30000278)

Reappropriation:

State Building Construction Account—State....................... $208,000

Prior Biennia (Expenditures)............................................. $1,792,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,000,000

NEW SECTION.  Sec. 3030.  FOR THE DEPARTMENT OF ECOLOGY

ASARCO - Tacoma Smelter Plume and Mines (30000280)

Reappropriation:

Cleanup Settlement Account—State................................. $6,841,000

Prior Biennia (Expenditures)........................................... $13,806,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $20,647,000

NEW SECTION.  Sec. 3031.  FOR THE DEPARTMENT OF ECOLOGY

Padilla Bay Federal Capital Projects (30000282)

Reappropriation:

General Fund—Federal........................................................ $791,000

Prior Biennia (Expenditures).................................................... $9,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $800,000

NEW SECTION.  Sec. 3032.  FOR THE DEPARTMENT OF ECOLOGY

Coastal Wetlands Federal Funds Administration (30000283)

Reappropriation:

General Fund—Federal................................................... $10,695,000

Prior Biennia (Expenditures)........................................... $12,505,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $23,200,000

NEW SECTION.  Sec. 3033.  FOR THE DEPARTMENT OF ECOLOGY

Statewide Storm Water Projects (30000294)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3041, chapter 4, Laws of 2011 1st sp. sess.

Reappropriation:

Local Toxics Control Account—State............................ $14,411,000

Prior Biennia (Expenditures)........................................... $15,589,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $30,000,000

NEW SECTION.  Sec. 3034.  FOR THE DEPARTMENT OF ECOLOGY

Waste Tire Pile Cleanup and Prevention (30000322)

Reappropriation:

Waste Tire Removal Account—State.................................. $388,000

Prior Biennia (Expenditures)................................................ $612,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,000,000

NEW SECTION.  Sec. 3035.  FOR THE DEPARTMENT OF ECOLOGY

Mercury Switch Removal (30000323)

Reappropriation:

State Toxics Control Account—State.................................. $365,000

Prior Biennia (Expenditures)................................................ $135,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $500,000

NEW SECTION.  Sec. 3036.  FOR THE DEPARTMENT OF ECOLOGY

Reducing Toxic Diesel Emissions (30000324)

Reappropriation:

State Toxics Control Account—State............................... $2,380,000

Prior Biennia (Expenditures)............................................. $2,120,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $4,500,000

NEW SECTION.  Sec. 3037.  FOR THE DEPARTMENT OF ECOLOGY

Reducing Toxic Wood Stove Emissions (30000325)

Reappropriation:

State Toxics Control Account—State............................... $2,180,000

Prior Biennia (Expenditures)............................................. $1,820,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $4,000,000

NEW SECTION.  Sec. 3038.  FOR THE DEPARTMENT OF ECOLOGY

Centennial Clean Water Program (30000326)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3066, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

Environmental Legacy Stewardship Account—State..... $36,634,000

Prior Biennia (Expenditures)........................................... $13,366,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $50,000,000

NEW SECTION.  Sec. 3039.  FOR THE DEPARTMENT OF ECOLOGY

Water Pollution Control Revolving Program (30000327)

The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 3067, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

Water Pollution Control Revolving Account—Federal.. $50,000,000

Water Pollution Control Revolving Account—State.... $184,110,000

Subtotal Reappropriation....................... $234,110,000

Prior Biennia (Expenditures)........................................... $15,890,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................. $250,000,000

NEW SECTION.  Sec. 3040.  FOR THE DEPARTMENT OF ECOLOGY

Coastal Wetlands Federal Funds (30000328)

Reappropriation:

General Fund—Federal..................................................... $9,800,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $9,800,000

NEW SECTION.  Sec. 3041.  FOR THE DEPARTMENT OF ECOLOGY

Watershed Plan Implementation and Flow Achievement (30000331)

Reappropriation:

State Building Construction Account—State.................... $8,695,000

Prior Biennia (Expenditures)............................................. $1,305,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $10,000,000

NEW SECTION.  Sec. 3042.  FOR THE DEPARTMENT OF ECOLOGY

Sunnyside Valley Irrigation District Water Conservation (30000332)

Reappropriation:

State Building Construction Account—State.................... $3,048,000

Prior Biennia (Expenditures).................................................... $7,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $3,055,000

NEW SECTION.  Sec. 3043.  FOR THE DEPARTMENT OF ECOLOGY

Dungeness Water Supply and Mitigation (30000333)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions in section 3082, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................... $2,003,000

Prior Biennia (Expenditures).................................................. $47,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,050,000

NEW SECTION.  Sec. 3044.  FOR THE DEPARTMENT OF ECOLOGY

ASARCO Cleanup (30000334)

The appropriation and reappropriations in this section are subject to the following conditions and limitations: Up to $400,000 of the reappropriation in this section is provided solely for the department to contract, after a competitive bidding process, for the clean up and remediation of the former Ruston Way tunnel.

Reappropriation:

State Building Construction Account—State....................... $717,000

Cleanup Settlement Account—State............................... $26,672,000

Subtotal Reappropriation......................... $27,389,000

Appropriation:

State Building Construction Account—State.................... $2,000,000

Prior Biennia (Expenditures)............................................. $7,271,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $36,660,000

NEW SECTION.  Sec. 3045.  FOR THE DEPARTMENT OF ECOLOGY

Padilla Bay Federal Capital Projects - Programmatic (30000335)

Reappropriation:

General Fund—Federal........................................................ $500,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $500,000

NEW SECTION.  Sec. 3046.  FOR THE DEPARTMENT OF ECOLOGY

Clean Up Toxics Sites - Puget Sound (30000337)

Reappropriation:

Environmental Legacy Stewardship Account—State..... $19,100,000

Prior Biennia (Expenditures)........................................... $12,400,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $31,500,000

NEW SECTION.  Sec. 3047.  FOR THE DEPARTMENT OF ECOLOGY

Eastern Washington Clean Sites Initiative (30000351)

Reappropriation:

Environmental Legacy Stewardship Account—State....... $6,735,000

Prior Biennia (Expenditures)............................................. $3,565,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $10,300,000

NEW SECTION.  Sec. 3048.  FOR THE DEPARTMENT OF ECOLOGY

Columbia River Water Supply Development Program (30000372)

Reappropriation:

Columbia River Basin Water Supply Development Account—

State......................................................................... $16,052,000

Columbia River Basin Taxable Bond Water Supply

Development Account—State................................. $28,113,000

Subtotal Reappropriation......................... $44,165,000

Prior Biennia (Expenditures)........................................... $30,335,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $74,500,000

NEW SECTION.  Sec. 3049.  FOR THE DEPARTMENT OF ECOLOGY

Local Toxics Grants for Cleanup and Prevention (20064008)

Reappropriation:

State Building Construction Account—State.................... $8,296,000

Prior Biennia (Expenditures)........................................... $90,604,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $98,900,000

NEW SECTION.  Sec. 3050.  FOR THE DEPARTMENT OF ECOLOGY

Yakima River Basin Water Supply (30000373)

Reappropriation:

State Building Construction Account—State.................. $12,162,000

Prior Biennia (Expenditures)........................................... $19,938,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $32,100,000

NEW SECTION.  Sec. 3051.  FOR THE DEPARTMENT OF ECOLOGY

Remedial Action Grants (30000374)

Reappropriation:

Local Toxics Control Account—State............................ $45,779,000

Prior Biennia (Expenditures)........................................... $16,758,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $62,537,000

NEW SECTION.  Sec. 3052.  FOR THE DEPARTMENT OF ECOLOGY

Water Irrigation Efficiencies Program (30000389)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3080, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................... $3,804,000

Prior Biennia (Expenditures)................................................ $196,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $4,000,000

NEW SECTION.  Sec. 3053.  FOR THE DEPARTMENT OF ECOLOGY

Coordinated Prevention Grants (CPG) (30000426)

Appropriation:

State Building Construction Account—State.................. $15,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)................................... $120,000,000

TOTAL.................................................. $135,000,000

NEW SECTION.  Sec. 3054.  FOR THE DEPARTMENT OF ECOLOGY

Centennial Clean Water Program (30000427)

The appropriations in this section are subject to the following conditions and limitations:

(1) For projects involving repair, replacement, or improvement of a wastewater treatment plant or other public works facility for which an investment grade efficiency audit is obtainable, the department of ecology must require as a contract condition that the project sponsor undertake an investment grade efficiency audit. The project sponsor may finance the costs of the audit as part of its centennial clean water program grant.

(2) The agency must encourage local government use of federally funded water pollution control infrastructure programs operated by the United States department of agriculture - rural development.

Appropriation:

State Building Construction Account—State.................. $10,000,000

Local Toxics Control Account—State............................ $10,000,000

Subtotal Appropriation............................ $20,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)................................... $160,000,000

TOTAL.................................................. $180,000,000

NEW SECTION.  Sec. 3055.  FOR THE DEPARTMENT OF ECOLOGY

Reducing Toxic Diesel Emissions (30000428)

Appropriation:

State Toxics Control Account—State............................... $1,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $8,000,000

TOTAL...................................................... $9,000,000

NEW SECTION.  Sec. 3056.  FOR THE DEPARTMENT OF ECOLOGY

Reducing Toxic Woodstove Emissions (30000429)

Appropriation:

State Toxics Control Account—State............................... $2,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $8,000,000

TOTAL.................................................... $10,000,000

NEW SECTION.  Sec. 3057.  FOR THE DEPARTMENT OF ECOLOGY

Waste Tire Pile Cleanup and Prevention (30000431)

Appropriation:

Waste Tire Removal Account—State............................... $1,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $4,000,000

TOTAL...................................................... $5,000,000

NEW SECTION.  Sec. 3058.  FOR THE DEPARTMENT OF ECOLOGY

Eastern Washington Clean Sites Initiative (30000432)

Appropriation:

State Toxics Control Account—State............................. $11,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $13,772,000

TOTAL.................................................... $24,772,000

NEW SECTION.  Sec. 3059.  FOR THE DEPARTMENT OF ECOLOGY

Remedial Action Grants (30000458)

Appropriation:

Local Toxics Control Account—State............................ $65,050,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)................................... $300,000,000

TOTAL.................................................. $365,050,000

NEW SECTION.  Sec. 3060.  FOR THE DEPARTMENT OF ECOLOGY

Leaking Tank Model Remedies (30000490)

Appropriation:

State Toxics Control Account—State............................... $2,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $8,000,000

TOTAL.................................................... $10,000,000

NEW SECTION.  Sec. 3061.  FOR THE DEPARTMENT OF ECOLOGY

Water Pollution Control Revolving Program (30000534)

The appropriations in this section are subject to the following conditions and limitations:

(1) $12,000,000 of the water pollution control revolving account—state is provided solely as state match for federal clean water funds.

(2) For projects involving repair, replacement, or improvement of a wastewater treatment plant or other public works facility for which an investment grade efficiency audit is obtainable, the department of ecology must require as a contract condition that the project sponsor undertake an investment grade efficiency audit. The project sponsor may finance the costs of the audit as part of its water pollution control program loan.

(3) The agency must encourage local government use of federally funded water pollution control infrastructure programs operated by the United States department of agriculture - rural development.

Appropriation:

Water Pollution Control Revolving Account—Federal.. $50,000,000

Water Pollution Control Revolving Account—State.... $153,000,000

Subtotal Appropriation.......................... $203,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)................................... $800,000,000

TOTAL............................................... $1,003,000,000

NEW SECTION.  Sec. 3062.  FOR THE DEPARTMENT OF ECOLOGY

Storm Water Financial Assistance Program (30000535)

The appropriations in this section are subject to the following conditions and limitations:

(1) The appropriations are provided solely for the storm water financial assistance program.

(2) $981,000 of the appropriation is provided solely for the Washington State University LID frontage - water quality project.

Appropriation:

Local Toxics Control Account—State............................ $33,000,000

State Building Construction Account—State.................. $20,000,000

Subtotal Appropriation............................ $53,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)................................... $280,000,000

TOTAL.................................................. $333,000,000

NEW SECTION.  Sec. 3063.  FOR THE DEPARTMENT OF ECOLOGY

Coastal Wetlands Federal Funds (30000536)

Appropriation:

General Fund—Federal................................................... $10,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $40,000,000

TOTAL.................................................... $50,000,000

NEW SECTION.  Sec. 3064.  FOR THE DEPARTMENT OF ECOLOGY

Floodplains by Design (30000537)

Appropriation:

State Building Construction Account—State.................. $35,560,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $92,000,000

TOTAL.................................................. $127,560,000

NEW SECTION.  Sec. 3065.  FOR THE DEPARTMENT OF ECOLOGY

ASARCO Cleanup (30000538)

Appropriation:

Cleanup Settlement Account—State............................... $12,146,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $67,900,000

TOTAL.................................................... $80,046,000

NEW SECTION.  Sec. 3066.  FOR THE DEPARTMENT OF ECOLOGY

Cleanup Toxics Sites – Puget Sound (30000542)

Appropriation:

State Toxics Control Account—State............................. $22,550,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $72,763,000

TOTAL.................................................... $95,313,000

NEW SECTION.  Sec. 3067.  FOR THE DEPARTMENT OF ECOLOGY

Water Irrigation Efficiencies Program (30000587)

The appropriation in this section is subject to the following conditions and limitations:

(1) The appropriation is provided solely for technical assistance and grants to conservation districts for the purpose of implementing water conservation measures and irrigation efficiencies. The department of ecology and the state conservation commission shall give preference in order of priority to projects located in the 16 fish critical basins, other water short basins, and basins with significant water resource and instream flow problems. Projects that are not within basins as described in this subsection are also eligible to receive funding.

(2) Conservation districts statewide are eligible for grants listed in subsection (1) of this section. A conservation district receiving funds shall manage each grant to ensure that a portion of the water saved by the water conservation measure or irrigation efficiency will be placed as a purchase or a lease in the trust water rights program to enhance instream flows. The proportion of saved water placed in the trust water rights program must be equal to the percentage of the public investment in the conservation measure or irrigation efficiency. The percentage of the public investment may not exceed eighty-five percent of the total cost of the conservation measure or irrigation efficiency.

(3) Up to $300,000 of the appropriation in this section may be allocated for the purchase and installation of flow meters that are implemented in cooperation with the Washington State Department of Fish and Wildlife fish screening program authorized under RCW 77.57.070.

Appropriation:

State Building Construction Account—State.................... $4,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $16,000,000

TOTAL.................................................... $20,000,000

NEW SECTION.  Sec. 3068.  FOR THE DEPARTMENT OF ECOLOGY

Columbia River Water Supply Development Program (30000588)

The appropriations in this section are subject to the following conditions and limitations:

(1) $2,000,000 of the Columbia River basin water supply development account—state is provided solely for the Sullivan Lake water supply project to replace funds that were diverted to fund repairs to the Moses Lake irrigation and reclamation district dam.

(2) The balance of the appropriations are provided solely for: Coordinated water conservation plan projects; Walla Walla integrated planning; Icicle Creek integrated planning; new water supply projects; the Methow Valley irrigation district instream flow improvement project; the port of Walla Walla water leasing project; the 2016 water supply and demand forecast; Columbia River off-channel storage feasibility project development; the HHH Switzler storage project environmental impact statement; water acquisitions; the Stemilt WRIA 40A storage study; office of Columbia River staffing costs; department of fish and wildlife support; a water service contract with the United States bureau of reclamation to provide water from Lake Roosevelt to end users; and other projects under the Columbia River water supply development program.

(3) In any future requests for project funding under the Columbia River water supply development program, the department must prepare and submit with the budget request an analysis that estimates the total costs of developing and delivering water through the project. For each project, the department must:

(a) Identify the project beneficiaries;

(b) Estimate the project timeline, from feasibility through water development and delivery;

(c) Delineate the total estimated public and private costs and fund sources for developing the water; and

(d) Delineate the total estimated public and private costs and fund sources for delivering the water.

(4) The department must prepare and submit the same analysis as required in subsection (3) of this section for existing water development projects, including those in the feasibility phase.

Appropriation:

Columbia River Basin Water Supply Revenue Recovery

Account—State.......................................................... $2,200,000

Columbia River Basin Water Supply Development Account—

State......................................................................... $16,800,000

Subtotal Appropriation............................ $19,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $19,761,000

TOTAL.................................................... $38,761,000

NEW SECTION.  Sec. 3069.  FOR THE DEPARTMENT OF ECOLOGY

Sunnyside Valley Irrigation District Water Conservation (30000589)

Appropriation:

State Building Construction Account—State.................... $3,055,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $15,600,000

TOTAL.................................................... $18,655,000

NEW SECTION.  Sec. 3070.  FOR THE DEPARTMENT OF ECOLOGY

Yakima River Basin Water Supply (30000590)

The appropriations in this section are subject to the following conditions and limitations:

(1) The appropriations in this section are provided solely for: Tributary/mainstem enhancement and watershed acquisitions; fish passage projects at the Cle Elum, Keechelus, Kachess, and Tieton reservoirs; the Keechelus to Kachess pipeline; the Cle Elum pool raise and Kachess reservoir drought relief pumping plant projects; selected aquifer storage and recovery projects; agricultural and municipal conservation projects; water bank and exchange programs; and other projects under the Yakima integrated plan.

(2)(a) The legislature finds that it is important to apportion financial responsibility for the substantial capital projects proposed under the Yakima River basin integrated plan consistent with RCW 90.38.120 which directs that "at least one-half of the total costs to finance the implementation of the \\sanjuan\ATLASMACROS\DATA\2015 JOURNAL\Journal2015\LegDay003\Yakima.doc integrated plan. . . be funded through federal, private, and other nonstate sources, including a significant contribution of funding from local project beneficiaries."

(b) By December 15, 2015, the department must prepare and submit a report to the legislature estimating the cost per acre of land and the cost per acre-foot of water to finance the construction of the Keechelus to Kachess pipeline project and the Kachess Reservoir drought relief pumping plant project. The primary objective is to inform the long-term financial planning of the project beneficiaries, the proratable irrigation districts and their ratepayers, who will bear the construction, maintenance and operation costs.

Appropriation:

State Building Construction Account—State.................... $9,800,000

State Taxable Building Construction

Account—State........................................................ $20,200,000

Subtotal Appropriation............................ $30,000,000

Prior Biennia (Expenditures)........................................... $32,100,000

Future Biennia (Projected Costs)................................... $120,000,000

TOTAL.................................................. $182,100,000

NEW SECTION.  Sec. 3071.  FOR THE DEPARTMENT OF ECOLOGY

Watershed Plan Implementation and Flow Achievement (30000591)

Appropriation:

State Building Construction Account—State.................... $5,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $20,000,000

TOTAL.................................................... $25,000,000

NEW SECTION.  Sec. 3072.  FOR THE DEPARTMENT OF ECOLOGY

Habitat Mitigation (91000007)

Reappropriation:

State Building Construction Account—State.................... $3,051,000

Prior Biennia (Expenditures)............................................. $1,349,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $4,400,000

NEW SECTION.  Sec. 3073.  FOR THE DEPARTMENT OF ECOLOGY

Clean Up Toxics Sites - Puget Sound (91000032)

Reappropriation:

State Toxics Control Account—State............................... $6,637,000

Prior Biennia (Expenditures)............................................. $2,633,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $9,270,000

NEW SECTION.  Sec. 3074.  FOR THE DEPARTMENT OF ECOLOGY

FY 2012 Statewide Stormwater Grant Program (91000053)

Reappropriation:

Local Toxics Control Account—State............................ $14,789,000

Prior Biennia (Expenditures)............................................. $9,284,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $24,073,000

NEW SECTION.  Sec. 3075.  FOR THE DEPARTMENT OF ECOLOGY

Stormwater Retrofit and LID Competitive Grants (91000054)

Reappropriation:

Local Toxics Control Account—State.............................. $6,952,000

Prior Biennia (Expenditures)............................................. $7,511,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $14,463,000

NEW SECTION.  Sec. 3076.  FOR THE DEPARTMENT OF ECOLOGY

Skagit Mitigation (91000181)

Reappropriation:

State Building Construction Account—State.................... $1,423,000

Prior Biennia (Expenditures)................................................ $802,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,225,000

NEW SECTION.  Sec. 3077.  FOR THE DEPARTMENT OF ECOLOGY

Protect Communities from Flood and Drought (92000002)

Reappropriation:

State Building Construction Account—State....................... $228,000

Prior Biennia (Expenditures)........................................... $14,747,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $14,975,000

NEW SECTION.  Sec. 3078.  FOR THE DEPARTMENT OF ECOLOGY

Wastewater Treatment and Water Reclamation (92000041)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3016, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:

State Building Construction Account—State....................... $151,000

Prior Biennia (Expenditures)............................................. $3,279,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $3,430,000

NEW SECTION.  Sec. 3079.  FOR THE DEPARTMENT OF ECOLOGY

Flood Levee Improvements (92000057)

The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 503, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:

State Building Construction Account—State....................... $301,000

Local Toxics Control Account—State.............................. $2,510,000

Subtotal Reappropriation........................... $2,811,000

Prior Biennia (Expenditures)............................................. $5,689,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $8,500,000

NEW SECTION.  Sec. 3080.  FOR THE DEPARTMENT OF ECOLOGY

Ground Water Management Yakima Basin (92000061)

Reappropriation:

Columbia River Basin Water Supply Development Account—

State.............................................................................. $189,000

Prior Biennia (Expenditures)................................................ $261,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $450,000

NEW SECTION.  Sec. 3081.  FOR THE DEPARTMENT OF ECOLOGY

Storm Water Improvements (92000076)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3081, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

Environmental Legacy Stewardship Account—State..... $91,456,000

Prior Biennia (Expenditures)............................................. $8,544,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................. $100,000,000

NEW SECTION.  Sec. 3082.  FOR THE DEPARTMENT OF ECOLOGY

Floodplain Management and Control Grants (92000078)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3069, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................. $40,389,000

Prior Biennia (Expenditures)............................................. $9,611,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $50,000,000

NEW SECTION.  Sec. 3083.  FOR THE DEPARTMENT OF ECOLOGY

Lower Yakima GWMA Program Development (92000085)

Reappropriation:

State Building Construction Account—State.................... $1,614,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,614,000

NEW SECTION.  Sec. 3084.  FOR THE DEPARTMENT OF ECOLOGY

Drought Response (92000142)

Appropriation:

State Building Construction Account—State.................... $2,000,000

State Drought Preparedness Account—State.................. $14,000,000

Subtotal Appropriation............................ $16,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $16,000,000

NEW SECTION.  Sec. 3085.  FOR THE POLLUTION LIABILITY INSURANCE AGENCY

Underground Storage Tank Capital Program Demonstration and Design (30000001)

The appropriation in this section is subject to the following conditions and limitations:

(1) The appropriation in this section must be used for projects that provide a benefit to the public through removal, replacement or upgrade of underground storage tank fuel systems, retrofit existing systems to disperse renewable or alternative fuels, and cleanup of contamination caused by legacy petroleum releases. All projects must develop and acquire assets that have a useful life of at least thirteen years. These requirements must be specified in funding agreements issued by the agency.

(2)(a) $1,800,000 of the appropriation is provided solely to design a capital financial assistance program to provide underground storage tank owners and operators with financial resources to remove, replace or upgrade underground storage tank fuel systems, retrofit existing systems to disperse renewable or alternative fuels, and to clean up contamination caused by legacy petroleum releases.

(b) The design must:

(i) Assess options for program structure and administration, and develop a recommended program design, financial management plan and staffing model;

(ii) Include data and legal analysis of statewide need, availability of existing fund sources for grants and loans, assessment of owner and operator willingness to participate and potential environmental and economic impacts of the loan program.

(iii) As part of the program design, the agency must conduct a pilot demonstration of a capital grant program that includes three study sites with aging tanks, demonstrated impact to either soil or groundwater, or both, and serious financial hardship, as defined in chapter 374-60 WAC. Each study site may not cost more than $600,000.

(3) The agency shall conduct the study in consultation with the office of financial management, and internal and external agency stakeholders.

(4) The agency must provide a final report of the program design, as well as any associated legislative and budget recommendations, to the governor and legislature by October 1, 2015.

Appropriation:

Pollution Liability Insurance Program Trust

Account—State.......................................................... $1,800,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,800,000

NEW SECTION.  Sec. 3086.  FOR THE STATE PARKS AND RECREATION COMMISSION

Dosewallips Wastewater Treatment System (30000523)

Reappropriation:

State Building Construction Account—State......................... $27,000

Prior Biennia (Expenditures)............................................. $4,505,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $4,532,000

NEW SECTION.  Sec. 3087.  FOR THE STATE PARKS AND RECREATION COMMISSION

Lewis & Clark Replace Wastewater System (30000544)

Reappropriation:

State Building Construction Account—State....................... $947,000

Prior Biennia (Expenditures)................................................ $130,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,077,000

NEW SECTION.  Sec. 3088.  FOR THE STATE PARKS AND RECREATION COMMISSION

Deception Pass - Kukutali Access and Interpretation (30000774)

Reappropriation:

State Building Construction Account—State....................... $161,000

Prior Biennia (Expenditures).................................................. $64,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $225,000

NEW SECTION.  Sec. 3089.  FOR THE STATE PARKS AND RECREATION COMMISSION

Flaming Geyser State Park Infrastructure (30000810)

Reappropriation:

State Building Construction Account—State....................... $848,000

Prior Biennia (Expenditures)................................................ $477,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,325,000

NEW SECTION.  Sec. 3090.  FOR THE STATE PARKS AND RECREATION COMMISSION

Millersylvania Replace Environmental Learning Center Cabins (30000821)

Reappropriation:

State Building Construction Account—State....................... $481,000

Prior Biennia (Expenditures)................................................ $608,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,089,000

NEW SECTION.  Sec. 3091.  FOR THE STATE PARKS AND RECREATION COMMISSION

Minor Works - Facility and Infrastructure Preservation (30000845)

Reappropriation:

State Building Construction Account—State.................... $1,797,000

Prior Biennia (Expenditures)............................................. $8,203,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $10,000,000

NEW SECTION.  Sec. 3092.  FOR THE STATE PARKS AND RECREATION COMMISSION

Wallace Falls Footbridge (91000047)

Reappropriation:

State Building Construction Account—State....................... $150,000

Prior Biennia (Expenditures)................................................ $336,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $486,000

NEW SECTION.  Sec. 3093.  FOR THE STATE PARKS AND RECREATION COMMISSION

Spencer Spit Water System Replacement (30000140)

Reappropriation:

State Building Construction Account—State....................... $695,000

Prior Biennia (Expenditures)................................................ $288,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $983,000

NEW SECTION.  Sec. 3094.  FOR THE STATE PARKS AND RECREATION COMMISSION

Fort Worden - Housing Areas Exterior Improvements (30000287)

Appropriation:

State Building Construction Account—State....................... $500,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $2,858,000

TOTAL...................................................... $3,358,000

NEW SECTION.  Sec. 3095.  FOR THE STATE PARKS AND RECREATION COMMISSION

Mount Spokane Road Improvements, Stage 2D (30000693)

Appropriation:

State Building Construction Account—State.................... $2,400,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,400,000

NEW SECTION.  Sec. 3096.  FOR THE STATE PARKS AND RECREATION COMMISSION

Camano Island Day Use Access and Facility Renovation (30000782)

Reappropriation:

State Building Construction Account—State....................... $107,000

Appropriation:

State Building Construction Account—State.................... $1,212,000

Prior Biennia (Expenditures)................................................ $194,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,513,000

NEW SECTION.  Sec. 3097.  FOR THE STATE PARKS AND RECREATION COMMISSION

Belfair Replace Failing Electrical Supply to Main Camp Loop (30000813)

Appropriation:

State Building Construction Account—State.................... $1,180,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,180,000

NEW SECTION.  Sec. 3098.  FOR THE STATE PARKS AND RECREATION COMMISSION

Fort Flagler - Replace Failing Electrical Power Historic District (30000815)

Appropriation:

State Building Construction Account—State.................... $1,173,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,173,000

NEW SECTION.  Sec. 3099.  FOR THE STATE PARKS AND RECREATION COMMISSION

Kopachuck Day Use Development (30000820)

Reappropriation:

State Building Construction Account—State......................... $10,000

Prior Biennia (Expenditures)................................................ $309,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $319,000

NEW SECTION.  Sec. 3100.  FOR THE STATE PARKS AND RECREATION COMMISSION

Flaming Geyser Day Use Renovation (30000832)

Reappropriation:

State Building Construction Account—State....................... $642,000

Prior Biennia (Expenditures)................................................ $360,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,002,000

NEW SECTION.  Sec. 3101.  FOR THE STATE PARKS AND RECREATION COMMISSION

Minor Works - Health and Safety (30000839)

Appropriation:

State Building Construction Account—State.................... $5,160,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $5,160,000

NEW SECTION.  Sec. 3102.  FOR THE STATE PARKS AND RECREATION COMMISSION

Fort Worden Maintenance Shop Relocation (30000960)

Appropriation:

State Building Construction Account—State.................... $1,600,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,600,000

NEW SECTION.  Sec. 3103.  FOR THE STATE PARKS AND RECREATION COMMISSION

Twanoh State Park Stormwater Improvements (30000851)

Reappropriation:

State Building Construction Account—State....................... $160,000

Prior Biennia (Expenditures)................................................ $194,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $354,000

NEW SECTION.  Sec. 3104.  FOR THE STATE PARKS AND RECREATION COMMISSION

Rocky Reach - Trail Development (30000853)

Reappropriation:

State Building Construction Account—State....................... $535,000

Prior Biennia (Expenditures)............................................. $3,220,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $3,755,000

NEW SECTION.  Sec. 3105.  FOR THE STATE PARKS AND RECREATION COMMISSION

Lake Sammamish State Park: Sunset Beach Bathhouse Replacement (30000653)

Reappropriation:

State Building Construction Account—State......................... $50,000

Prior Biennia (Expenditures)............................................. $2,439,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,489,000

NEW SECTION.  Sec. 3106.  FOR THE STATE PARKS AND RECREATION COMMISSION

Minor Works - Revenue Generation (30000847)

Reappropriation:

State Building Construction Account—State......................... $25,000

Prior Biennia (Expenditures)............................................. $2,959,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,984,000

NEW SECTION.  Sec. 3107.  FOR THE STATE PARKS AND RECREATION COMMISSION

Fish Barrier Removal (30000854)

Reappropriation:

State Building Construction Account—State....................... $767,000

Prior Biennia (Expenditures)................................................ $281,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,048,000

NEW SECTION.  Sec. 3108.  FOR THE STATE PARKS AND RECREATION COMMISSION

Clean Vessel Boating Pump-Out Grants (30000856)

Appropriation:

General Fund—Federal..................................................... $2,600,000

Prior Biennia (Expenditures)............................................. $2,600,000

Future Biennia (Projected Costs)..................................... $10,400,000

TOTAL.................................................... $15,600,000

NEW SECTION.  Sec. 3109.  FOR THE STATE PARKS AND RECREATION COMMISSION

Local Grant Authority (30000857)

Appropriation:

Parks Renewal and Stewardship Account—Private/Local $1,000,000

Prior Biennia (Expenditures)............................................. $1,200,000

Future Biennia (Projected Costs)....................................... $4,000,000

TOTAL...................................................... $6,200,000

NEW SECTION.  Sec. 3110.  FOR THE STATE PARKS AND RECREATION COMMISSION

Federal Grant Authority (30000858)

Appropriation:

General Fund—Federal........................................................ $750,000

Prior Biennia (Expenditures)............................................. $1,750,000

Future Biennia (Projected Costs)....................................... $3,000,000

TOTAL...................................................... $5,500,000

NEW SECTION.  Sec. 3111.  FOR THE STATE PARKS AND RECREATION COMMISSION

Sequim Bay Address Failing Retaining Wall (30000861)

Appropriation:

State Building Construction Account—State.................... $1,122,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,122,000

NEW SECTION.  Sec. 3112.  FOR THE STATE PARKS AND RECREATION COMMISSION

Mount Spokane - Nordic Area Improvements and Horse Camp Development (30000877)

Appropriation:

State Building Construction Account—State....................... $182,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $182,000

NEW SECTION.  Sec. 3113.  FOR THE STATE PARKS AND RECREATION COMMISSION

Statewide - Cabins, Yurts, and Associated Park Improvement (30000883)

Appropriation:

State Building Construction Account—State.................... $1,153,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,153,000

NEW SECTION.  Sec. 3114.  FOR THE STATE PARKS AND RECREATION COMMISSION

Fish Barrier Removal (Lawsuit) (30000944)

Appropriation:

State Building Construction Account—State.................... $2,034,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,034,000

NEW SECTION.  Sec. 3115.  FOR THE STATE PARKS AND RECREATION COMMISSION

Statewide - Facility and Infrastructure Backlog Reduction (30000946)

Appropriation:

State Building Construction Account—State.................... $6,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $18,000,000

TOTAL.................................................... $24,000,000

NEW SECTION.  Sec. 3116.  FOR THE STATE PARKS AND RECREATION COMMISSION

Fort Flagler - WWI Historic Facilities Preservation (30000100)

Appropriation:

State Building Construction Account—State....................... $430,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $430,000

NEW SECTION.  Sec. 3117.  FOR THE STATE PARKS AND RECREATION COMMISSION

Riverside Fisk Property Lake Spokane (Long Lake) Initial Park Access (30000971)

Appropriation:

State Building Construction Account—State.................... $1,072,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,072,000

NEW SECTION.  Sec. 3118.  FOR THE STATE PARKS AND RECREATION COMMISSION

Minor Works - Facilities and Infrastructures (30000947)

Appropriation:

State Building Construction Account—State.................. $11,117,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs).......................................... $250,000

TOTAL.................................................... $11,367,000

NEW SECTION.  Sec. 3119.  FOR THE STATE PARKS AND RECREATION COMMISSION

Steamboat Rock - Replace Failing Sewage Lift Stations (30000948)

Appropriation:

State Building Construction Account—State.................... $1,229,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,229,000

NEW SECTION.  Sec. 3120.  FOR THE STATE PARKS AND RECREATION COMMISSION

Mount Spokane - Maintenance Facility Relocation from Harms Way (30000959)

Appropriation:

State Building Construction Account—State....................... $384,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $384,000

NEW SECTION.  Sec. 3121.  FOR THE STATE PARKS AND RECREATION COMMISSION

Parkland Acquisition (30000976)

The appropriation in this section is subject to the following conditions and limitations:

(1) Except for subsection (2) of this section, the appropriation is provided solely to acquire land that is adjacent or within existing state parks. For this purpose, adjacent means a parcel of real property that shares a border with a state park. The state parks and recreation commission may dispose of property that is surplus to the needs of the state parks and recreation commission by June 30, 2017. Disposal may include sale of the surplus property or long-term lease of the property if such a lease is negotiated and managed by the commercial lands portfolio management unit of the department of natural resources. The commission and the department must agree on an appropriate management fee for the department's land management services.

(2) $225,000 of the appropriation is provided solely for the purchase of Young Island.

(3) In order to improve noxious weed control and achieve improved land stewardship and wild fire response, the parks and recreation commission must transfer property ownership of segments of unused trails, specified below, to adjacent property owners, who request such a transfer, in exchange for those adjacent property owners granting the parks and recreation commission a permanent easement for any future utilities the commission desires to place on the transferred property. No other compensation is required for the transfers. If the trail is ever developed upon legislative approval ownership will revert to the parks and recreation commission. The unused trail segments are those along the trail from Whitman county trailhead at Williams lake road up to Martin road trail head in Spokane county.

Appropriation:

Parkland Acquisition Account—State............................... $2,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $8,000,000

TOTAL.................................................... $10,000,000

NEW SECTION.  Sec. 3122.  FOR THE STATE PARKS AND RECREATION COMMISSION

Backlog Repairs and Enhanced Amenities (92000007)

Reappropriation:

State Building Construction Account—State....................... $794,000

Prior Biennia (Expenditures)............................................. $8,610,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $9,404,000

NEW SECTION.  Sec. 3123.  FOR THE STATE PARKS AND RECREATION COMMISSION

Goldendale Observatory - Phase 3 Expansion (30000709)

Appropriation:

State Building Construction Account—State.................... $2,649,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $2,650,000

TOTAL...................................................... $5,299,000

NEW SECTION.  Sec. 3124.  FOR THE STATE PARKS AND RECREATION COMMISSION

Sun Lakes State Park: Dry Falls Campground Renovation (30000305)

Appropriation:

State Building Construction Account—State....................... $402,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $3,951,000

TOTAL...................................................... $4,353,000

NEW SECTION.  Sec. 3125.  FOR THE STATE PARKS AND RECREATION COMMISSION

Lake Chelan State Park Moorage Dock Pile Replacement (30000416)

Appropriation:

State Building Construction Account—State....................... $248,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $1,448,000

TOTAL...................................................... $1,696,000

NEW SECTION.  Sec. 3126.  FOR THE STATE PARKS AND RECREATION COMMISSION

Cape Disappointment North Head Parking (30000522)

Appropriation:

State Building Construction Account—State.................... $1,365,000

Prior Biennia (Expenditures)................................................ $925,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,290,000

NEW SECTION.  Sec. 3127.  FOR THE STATE PARKS AND RECREATION COMMISSION

Steamboat Rock Build Dunes Campground (30000729)

Appropriation:

State Building Construction Account—State.................... $3,499,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $3,499,000

NEW SECTION.  Sec. 3128.  FOR THE STATE PARKS AND RECREATION COMMISSION

Dosewallips Replace Failing Electrical Supply (30000814)

Appropriation:

State Building Construction Account—State.................... $1,040,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,040,000

NEW SECTION.  Sec. 3129.  FOR THE STATE PARKS AND RECREATION COMMISSION

Fort Worden - Replace Failing Sewer Lines (30000860)

Appropriation:

State Building Construction Account—State....................... $234,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $2,406,000

TOTAL...................................................... $2,640,000

NEW SECTION.  Sec. 3130.  FOR THE STATE PARKS AND RECREATION COMMISSION

Iron Horse - Tunnel 46 and 47 Repairs (30000870)

Appropriation:

State Building Construction Account—State.................... $1,481,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $1,600,000

TOTAL...................................................... $3,081,000

NEW SECTION.  Sec. 3131.  FOR THE STATE PARKS AND RECREATION COMMISSION

Lake Sammamish Dock Grant Match (30000872)

Appropriation:

State Building Construction Account—State.................... $1,100,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,100,000

NEW SECTION.  Sec. 3132.  FOR THE STATE PARKS AND RECREATION COMMISSION

Field Spring Replace Failed Sewage System and Non-ADA Comfort Station (30000951)

Appropriation:

State Building Construction Account—State....................... $101,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs).......................................... $959,000

TOTAL...................................................... $1,060,000

NEW SECTION.  Sec. 3133.  FOR THE STATE PARKS AND RECREATION COMMISSION

Sun Lakes - Dry Falls - Upgrade Failing Water Supply Systems (30000962)

Appropriation:

State Building Construction Account—State....................... $750,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs).......................................... $881,000

TOTAL...................................................... $1,631,000

NEW SECTION.  Sec. 3134.  FOR THE STATE PARKS AND RECREATION COMMISSION

Statewide - Depression Era Structures Restoration Assessment (30000966)

Appropriation:

State Building Construction Account—State....................... $121,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $4,963,000

TOTAL...................................................... $5,084,000

NEW SECTION.  Sec. 3135.  FOR THE STATE PARKS AND RECREATION COMMISSION

Ocean City - Replace Noncompliant Comfort Stations (30000970)

Appropriation:

State Building Construction Account—State....................... $152,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $1,291,000

TOTAL...................................................... $1,443,000

NEW SECTION.  Sec. 3136.  FOR THE STATE PARKS AND RECREATION COMMISSION

Minor Works - Program (30000975)

Appropriation:

State Building Construction Account—State....................... $491,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $491,000

NEW SECTION.  Sec. 3137.  FOR THE STATE PARKS AND RECREATION COMMISSION

Dash Point - Replace Bridge (Pedestrian) (30000972)

Appropriation:

State Building Construction Account—State....................... $165,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $1,443,000

TOTAL...................................................... $1,608,000

NEW SECTION.  Sec. 3138.  FOR THE STATE PARKS AND RECREATION COMMISSION

Mount Spokane Guest Services (91000429)

Appropriation:

State Building Construction Account—State.................... $1,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $1,000,000

NEW SECTION.  Sec. 3139.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Washington Wildlife Recreation Grants (20084011)

The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 3146, chapter 520, Laws of 2007.

Reappropriation:

Outdoor Recreation Account—State.................................... $291,000

Habitat Conservation Account—State.............................. $2,523,000

Subtotal Reappropriation........................... $2,814,000

Prior Biennia (Expenditures)........................................... $95,678,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $98,492,000

NEW SECTION.  Sec. 3140.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Salmon Recovery Funding Board Programs (20084851)

Reappropriation:

State Building Construction Account—State....................... $639,000

Prior Biennia (Expenditures)........................................... $59,361,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $60,000,000

NEW SECTION.  Sec. 3141.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Washington Wildlife Recreation Grants (30000002)

Reappropriation:

Farmlands Preservation Account—State.............................. $257,000

Outdoor Recreation Account—State.................................... $307,000

Riparian Protection Account—State.................................... $911,000

Habitat Conservation Account—State.............................. $3,672,000

Subtotal Reappropriation........................... $5,147,000

Prior Biennia (Expenditures)........................................... $64,298,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $69,445,000

NEW SECTION.  Sec. 3142.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Puget Sound Acquisition and Restoration (30000080)

Reappropriation:

State Building Construction Account—State....................... $366,000

Prior Biennia (Expenditures)........................................... $32,634,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $33,000,000

NEW SECTION.  Sec. 3143.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Boating Facilities Program (30000138)

Reappropriation:

Recreation Resources Account—State.............................. $1,589,000

Prior Biennia (Expenditures)............................................. $6,411,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $8,000,000

NEW SECTION.  Sec. 3144.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Washington Wildlife Recreation Grants (30000139)

The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are provided solely for the list of projects in LEAP capital document No. 2011-3A, developed May 24, 2011.

Reappropriation:

Farmlands Preservation Account—State.............................. $195,000

Outdoor Recreation Account—State................................. $3,694,000

Habitat Conservation Account—State.............................. $3,985,000

Subtotal Reappropriation........................... $7,874,000

Prior Biennia (Expenditures)........................................... $34,126,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $42,000,000

NEW SECTION.  Sec. 3145.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Salmon Recovery Funding Board Programs (30000140)

Reappropriation:

State Building Construction Account—State.................... $3,497,000

General Fund—Federal................................................... $23,169,000

Subtotal Reappropriation......................... $26,666,000

Prior Biennia (Expenditures)........................................... $43,396,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $70,062,000

NEW SECTION.  Sec. 3146.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Land and Water Conservation Fund (30000142)

Reappropriation:

General Fund—Federal..................................................... $1,313,000

Prior Biennia (Expenditures)............................................. $2,687,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $4,000,000

NEW SECTION.  Sec. 3147.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Aquatic Lands Enhancement Account (30000143)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for the list of projects in LEAP capital document No. 2011-3B, revised April 10, 2013.

Reappropriation:

Aquatic Lands Enhancement Account—State..................... $845,000

Prior Biennia (Expenditures)............................................. $5,616,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $6,461,000

NEW SECTION.  Sec. 3148.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Recreational Trails Program (30000146)

Reappropriation:

General Fund—Federal..................................................... $1,328,000

Prior Biennia (Expenditures)............................................. $3,672,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $5,000,000

NEW SECTION.  Sec. 3149.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Puget Sound Restoration (30000147)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation may not be expended on the acquisition of lands by state agencies.

Reappropriation:

State Building Construction Account—State.................... $2,975,000

Prior Biennia (Expenditures)........................................... $12,025,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $15,000,000

NEW SECTION.  Sec. 3150.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Puget Sound Estuary and Salmon Restoration Program (30000148)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation may not be expended on the acquisition of lands by state agencies.

Reappropriation:

State Building Construction Account—State....................... $560,000

Prior Biennia (Expenditures)............................................. $4,440,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $5,000,000

NEW SECTION.  Sec. 3151.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Washington Wildlife Recreation Grants (30000205)

The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 3161, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

Farmlands Preservation Account—State........................... $3,218,000

Riparian Protection Account—State................................. $4,973,000

Habitat Conservation Account—State............................ $14,918,000

Outdoor Recreation Account—State............................... $14,918,000

Subtotal Reappropriation......................... $38,027,000

Prior Biennia (Expenditures)........................................... $26,973,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $65,000,000

NEW SECTION.  Sec. 3152.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Salmon Recovery Funding Board Programs (30000206)

The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 3162, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................... $7,886,000

General Fund—Federal................................................... $37,278,000

Subtotal Reappropriation......................... $45,164,000

Prior Biennia (Expenditures)........................................... $29,836,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $75,000,000

NEW SECTION.  Sec. 3153.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Boating Facilities Program (30000207)

Reappropriation:

Recreation Resources Account—State.............................. $3,309,000

Prior Biennia (Expenditures)............................................. $3,054,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $6,363,000

NEW SECTION.  Sec. 3154.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Nonhighway Off-Road Vehicle Activities (30000208)

Reappropriation:

NOVA Program Account—State...................................... $5,100,000

Prior Biennia (Expenditures)............................................. $3,400,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $8,500,000

NEW SECTION.  Sec. 3155.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Aquatic Lands Enhancement Account (30000210)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely for the list of projects in LEAP capital document No. 2013-2B, developed April 10, 2013.

Reappropriation:

Aquatic Lands Enhancement Account—State.................. $3,900,000

Prior Biennia (Expenditures)............................................. $2,100,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $6,000,000

NEW SECTION.  Sec. 3156.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Puget Sound Acquisition and Restoration (30000211)

Reappropriation:

State Building Construction Account—State.................. $44,058,000

Prior Biennia (Expenditures)........................................... $25,942,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $70,000,000

NEW SECTION.  Sec. 3157.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Puget Sound Estuary and Salmon Restoration Program (30000212)

Reappropriation:

State Building Construction Account—State.................... $5,500,000

Prior Biennia (Expenditures)............................................. $4,500,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $10,000,000

NEW SECTION.  Sec. 3158.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Firearms and Archery Range Recreation (30000213)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3168, chapter 19, Laws of 2013 2nd sp. sess.

Reappropriation:

Firearms Range Account—State.......................................... $315,000

Prior Biennia (Expenditures)................................................ $485,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL......................................................... $800,000

NEW SECTION.  Sec. 3159.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Recreational Trails Program (30000214)

Reappropriation:

General Fund—Federal..................................................... $1,500,000

Prior Biennia (Expenditures)............................................. $3,500,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $5,000,000

NEW SECTION.  Sec. 3160.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Boating Infrastructure Grants (30000215)

Reappropriation:

General Fund—Federal........................................................ $880,000

Prior Biennia (Expenditures)............................................. $1,320,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,200,000

NEW SECTION.  Sec. 3161.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Land and Water Conservation (30000216)

Reappropriation:

General Fund—Federal..................................................... $3,400,000

Prior Biennia (Expenditures)................................................ $600,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $4,000,000

NEW SECTION.  Sec. 3162.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Family Forest Fish Passage Program (30000218)

Reappropriation:

State Building Construction Account—State....................... $990,000

Prior Biennia (Expenditures)............................................. $1,010,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $2,000,000

NEW SECTION.  Sec. 3163.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Washington Wildlife Recreation Grants (30000220)

The appropriations in this section are subject to the following conditions and limitations:

(1) The appropriations in this section are provided solely for the list of projects in LEAP capital document No. 2015-1, developed June 30, 2015.

(2)(a) $60,000 of the appropriation is provided solely for the Washington state recreation and conservation office to convene and facilitate a stakeholder process to review and make recommendations for statutory revisions to the Washington wildlife and recreation program. The review must be conducted with consideration of the potential impacts to existing and future relationships with local governments, the federal government, and Tribal Nations. The review must include analysis of the program design, including criteria, information and coordination required for projects to proceed through the ranking and selection processes. Existing allocation categories and percentages must be evaluated to determine how well the system balances the many current statewide needs, including effectiveness in assessing and serving the needs of smaller and traditionally underserved populations, as well as communities with lower per-capita income levels. The ability of the general public to access program-funded projects must also be considered, as well as support for projects and landscapes with multiple values. The review must include examination of ways in which lands are acquired by state agencies through the program, such as gifts, mitigation, acquisition through direct negotiation with landowners, acquisition from land trusts and other nongovernmental organizations that are intermediaries or short-term owners for which long-term ownership and management by a public agency was the purpose of the nongovernmental organization's acquisition, easement acquisitions, and other pathways by which habitat lands are either acquired or managed, or both, by the state. Advantages and disadvantages of all approaches used by the program must be considered, including acquisition and stewardship costs, timing of land availability when compared to funding availability by the state, and other conservation alternatives that could be considered instead of state ownership, such as long-term management by a nongovernmental organization, another public agency, or conservation through less-than-fee approaches such as by easement or other landowner agreements.

(b) The recreation and conservation office may convene stakeholders and facilitate activities as needed. The agency must seek input and meaningfully involve a broad base of interested stakeholders that includes Tribal governments and those with specific subject-matter expertise relevant to the project categories of the Washington wildlife and recreation program. They shall seek broad and diverse legislative input and invite interested legislators to provide information and ideas, including, at a minimum, the majority and minority leadership of the capital committees in the senate and house of representatives. They shall coordinate with the appropriate standing committees of the legislature and may consult with other interested parties, as may be appropriate, for technical advice and assistance.

(c) The final report must include recommended statutory and policy changes to the appropriate committees of the legislature on or before December 1, 2015.

Appropriation:

Farmlands Preservation Account—State........................... $4,379,000

Riparian Protection Account—State................................. $5,548,000

Habitat Conservation Account—State............................ $22,699,000

Outdoor Recreation Account—State............................... $22,697,000

Subtotal Appropriation............................ $55,323,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)................................... $300,000,000

TOTAL.................................................. $355,323,000

NEW SECTION.  Sec. 3164.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Salmon Recovery Funding Board Programs (30000221)

The appropriations in this section are subject to the following conditions and limitations: $500,000 of the state building construction account—state is provided solely for the city of Bothell to preserve the Wayne golf course land, situated along the Sammamish river and Burke-Gilman trail, for fish habitat.

Appropriation:

State Building Construction Account—State.................. $16,500,000

General Fund—Federal................................................... $50,000,000

Subtotal Appropriation............................ $66,500,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)................................... $400,000,000

TOTAL.................................................. $466,500,000

NEW SECTION.  Sec. 3165.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Boating Facilities Program (30000222)

Appropriation:

Recreation Resources Account—State.............................. $9,360,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $37,800,000

TOTAL.................................................... $47,160,000

NEW SECTION.  Sec. 3166.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Nonhighway Off-Road Vehicle Activities (30000223)

Appropriation:

NOVA Program Account—State...................................... $8,670,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $34,770,000

TOTAL.................................................... $43,440,000

NEW SECTION.  Sec. 3167.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Youth Athletic Facilities (30000224)

The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for grants for acquisition, development or renovation of youth athletic fields. The recreation conservation office must require grant recipients of youth recreation field grants to have a fee waiver policy for youth athletic clubs who use the fields acquired, developed or renovation with funds from this appropriation. The fee waiver policy must discount or waive fees based on the youth athletic club's rates charged and scholarships provided to low-income athletes compared to other clubs using the fields. $7,000,000 of the appropriation is provided for grants awarded through the recreation conservation office's competitive grant program. $3,000,000 of the appropriation is provided for the following projects:

Marymoor park/Lake Washington youth soccer association.... $1,000,000

Northwest soccer park turf project............................................ $2,000,000

Appropriation:

State Building Construction Account—State.................. $10,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $12,000,000

TOTAL.................................................... $22,000,000

NEW SECTION.  Sec. 3168.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Aquatic Lands Enhancement Account (30000225)

The appropriations in this section are subject to the following conditions and limitations: The appropriations in this section are provided solely for the list of projects in LEAP capital document No. 2015-2, developed June 30, 2015.

Appropriation:

Aquatic Lands Enhancement Account—State.................. $5,269,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $14,400,000

TOTAL.................................................... $19,669,000

NEW SECTION.  Sec. 3169.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Puget Sound Acquisition and Restoration (30000226)

The appropriation in this section is subject to the following conditions and limitations: $300,000 is provided solely to the Illahee forest preserve for the purchase of the twenty-five acre forested parcel adjacent to the southwest border of the Illahee preserve.

Appropriation:

State Building Construction Account—State.................. $37,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)................................... $160,000,000

TOTAL.................................................. $197,000,000

NEW SECTION.  Sec. 3170.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Puget Sound Estuary and Salmon Restoration Program (30000227)

Appropriation:

State Building Construction Account—State.................... $8,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $40,000,000

TOTAL.................................................... $48,000,000

NEW SECTION.  Sec. 3171.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Firearms and Archery Range Recreation (30000228)

Appropriation:

Firearms Range Account—State.......................................... $580,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $2,320,000

TOTAL...................................................... $2,900,000

NEW SECTION.  Sec. 3172.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Recreational Trails Program (30000229)

Appropriation:

General Fund—Federal..................................................... $5,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $20,000,000

TOTAL.................................................... $25,000,000

NEW SECTION.  Sec. 3173.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Boating Infrastructure Grants (30000230)

Appropriation:

General Fund—Federal..................................................... $2,200,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)....................................... $8,800,000

TOTAL.................................................... $11,000,000

NEW SECTION.  Sec. 3174.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Land and Water Conservation (30000231)

Appropriation:

General Fund—Federal..................................................... $4,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $16,000,000

TOTAL.................................................... $20,000,000

NEW SECTION.  Sec. 3175.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Family Forest Fish Passage Program (30000233)

Appropriation:

State Building Construction Account—State.................... $5,000,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................... $20,000,000

TOTAL.................................................... $25,000,000

NEW SECTION.  Sec. 3176.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Family Forest Fish Passage Program (91000097)

Reappropriation:

State Toxics Control Account—State............................... $1,118,000

Prior Biennia (Expenditures)............................................. $8,882,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $10,000,000

NEW SECTION.  Sec. 3177.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Coastal Restoration Grants (91000448)

The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for the following list of projects:

Project

Authorized Amount

Black river watershed conservation and restoration

$650,000

Cathlamet selective fisheries

$300,000

Coal creek culvert to bridge

$162,000

Darlin creek conservation and restoration

$1,300,000

Ellsworth creek watershed restoration

$950,000

Greenhead slough barrier removal

$75,000

Improved gears for the lower Columbia fishery

$200,000

Lower Forks creek restoration

$2,150,000

Makah tribe salmon restoration

$174,000

Middle fork Hoquiam culvert correction

$76,000

Middle fork Satsop culvert correction

$97,000

Moses Prairie Restoration

$64,000

Pulling together: Jobs in restoration

$550,000

Quinault nearshore habitat restoration

$343,000

Restoration of Elochoman and Grays river basins

$535,000

Restoration of prairies and wetlands

$200,000

Rue Creek salmon restoration

$982,000

Satsop river watershed restoration

$150,000

Scammon creek barrier removal

$188,000

Sullivan ponds restoration

$43,000

Upper Quinault river restoration

$1,900,000

West fork Satsop culvert correction

$96,000

Total

$11,185,000

Appropriation:

State Building Construction Account—State.................. $11,185,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $11,185,000

NEW SECTION.  Sec. 3178.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Youth Recreation Grants (92000055)

The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3173, chapter 19, Laws of 2013, 2nd sp. sess.

Reappropriation:

State Building Construction Account—State.................... $1,942,000

Prior Biennia (Expenditures)............................................. $1,688,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL...................................................... $3,630,000

NEW SECTION.  Sec. 3179.  FOR THE RECREATION AND CONSERVATION FUNDING BOARD

Recreation and Conservation Office Recreation Grants (92000131)

The appropriations in this section are subject to the following conditions and limitations: The recreation and conservation office may retain up to four percent of these appropriations to administer the grants.

Appropriation:

State Building Construction Account—State.................. $32,785,000

Outdoor Recreation Account—State................................. $5,611,000

Subtotal Appropriation............................ $38,396,000

Prior Biennia (Expenditures)........................................................... $0

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $38,396,000

NEW SECTION.  Sec. 3180.  FOR THE STATE CONSERVATION COMMISSION

CREP Riparian Cost Share - State Match (30000009)

Reappropriation:

State Building Construction Account—State....................... $800,000

Appropriation:

State Building Construction Account—State.................... $2,600,000

Prior Biennia (Expenditures)............................................. $1,790,000

Future Biennia (Projected Costs)..................................... $11,400,000

TOTAL.................................................... $16,590,000

NEW SECTION.  Sec. 3181.  FOR THE STATE CONSERVATION COMMISSION

Natural Resources Investment for the Economy and Environment (30000010)

The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for grants to complete natural resource enhancement projects necessary to improve water quality in nonshellfish growing areas.

Reappropriation:

General Fund—Federal..................................................... $1,000,000

State Building Construction Account—State.................... $1,250,000

Subtotal Reappropriation........................... $2,250,000

Appropriation:

State Building Construction Account—State.................... $4,000,000

Prior Biennia (Expenditures)............................................. $7,750,000

Future Biennia (Projected Costs)..................................................... $0

TOTAL.................................................... $14,000,000

NEW SECTION.  Sec. 3182.  FOR THE STATE CONSERVATION COMMISSION

CREP PIP Loan Program (30000011)

Reappropriation:

Conservation Assistance Revolving Account—State.......... $150,000

Prior Biennia (Expenditures).................................................. $30,000

Future Biennia (Projected Costs).......................................... $400,000

TOTAL......................................................... $580,000

NEW SECTION.  Sec. 3183.  FOR THE STATE CONSERVATION COMMISSION

CREP Riparian Contract Funding (30000012)

Reappropriation:

State Building Construction Account—State....................... $500,000

Appropriation:

State Building Construction Account—State.................... $2,231,000

Prior Biennia (Expenditures)............................................. $1,731,000

Future Biennia (Projected Costs)....................................... $8,924,000

TOTAL.................................................... $13,386,000

NEW SECTION.  Sec. 3184.  FOR THE STATE CONSERVATION COMMISSION

Match for Federal RCPP Program (30000017)

The appropriations in this section are subject to the following conditions and limitations:

(1) The general fund—federal appropriation is provided solely for implementation of the five conservation projects in Washington state approved for grant awards as part of the United States department of agriculture regional conservation partnership program authorized under the 2014 farm bill: