PDFWAC 250-14-050

Board compliance with flexible thresholds.

The board will use the flexible thresholds established by the particular jurisdiction in which an HECB project is located.
[Statutory Authority: RCW 43.21C.020 and WAC 197-11-904. WSR 94-24-028, § 250-14-050, filed 11/30/94, effective 12/31/94.]