PDFWAC 296-54-52003

Cutting system inspection.

(1) The cutting system must be inspected before initial use during each workshift. Inspections must include:
(a) The lubrication system for leaks or damage.
(b) The chain for cracks or worn/damaged parts.
(c) The bar for wear and straightness and ensure the tip is properly secured.
(d) Sprocket.
(e) Chain catcher if equipped; and
(f) Chain shot guard if equipped.
(2) You must repair defects or damage or the unserviceable machine must be replaced before beginning work.
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.060, and chapter 49.17 RCW. WSR 17-17-131, § 296-54-52003, filed 8/22/17, effective 10/22/17.]