2ESHB 1365  - S AMD4
     By Senator Chase

     On page 4, beginning on line 9, after "output if" strike all material through "Has" on line 14 and insert "the following conditions are met:
     (a) One hundred percent of the system's solar modules are manufactured in Washington by a manufacturer that has at least two years of experience manufacturing modules for high wind and high snow load locations in the state;
     (b) One hundred percent of the system's solar modules have a class A fire rating;
     (c) One hundred percent of the system's inverters are manufactured in Washington;
     (d) The system is located in Washington;
     (e) The system is capable of generating not more than twenty average megawatts in a calendar year; and
     (f) The system has"

EFFECT:  A solar system must meet the following additional conditions before receiving the double multiplier: (1) One hundred percent of the system's solar modules are manufactured in Washington by a manufacturer that has at least two years of experience manufacturing modules for high wind and high snow load locations in the state; (2) one hundred percent of the system's solar modules have a class A fire rating; (3) one hundred percent of the system's inverters are manufactured in Washington.