By Senators Baumgartner, Padden, Dansel

WITHDRAWN 03/04/2014

    On page 43, line 11, after "(8)" insert "(a)"

 

    On page 43, after line 17, insert the following:
    "(b) Any delays that result in cost overruns that exceed the total project cost for the SR 99/Alaskan Way Viaduct - Replacement project (809936Z) as listed in LEAP Transportation Document 2014-1 as developed February 24, 2014, that cannot be recovered from the contractors must be paid for by the responsible parties as listed in RCW 47.01.402 (6)(b)."

 

 

 

    EFFECT: Provides that any cost overruns on the SR 99/Alaskan Way Viaduct - Replacement project (809936Z) that are not the responsibility of the contractor must be borne by the property owners in Seattle who benefitted from the replacement of the viaduct with a tunnel.   

 

 