1095-S2 AMH MORR HUGH 073

                

2SHB 1095 - H AMD 549

By Representative Morris

 

    On page 5, line 8, after "(e)" strike "A" and insert "For a critical governmental facility, a"

 

    On page 5, line 9, after "evaluation" strike "of whether" and insert "of: (i) Whether"

 

    On page 5, line 13, after "period" insert "; and (ii) the cost of integrating the variability of combined heat and power resources"

 

    On page 7, line 4, after "to" strike "value" and insert "assess"

    On page 7, line 6, after "resource" strike "results" and insert "may result"

 

    On page 7, line 9, after "value" insert ", pursuant to RCW 19.280.030,"

   

    On page 7, line 13, after "planning" insert "only if an assessment of combined heat and power identifies opportunities for combined heat and power that are dispatchable and that may provide capacity value"

 

    On page 7, beginning on line 16, after "(1)" strike all material through "(2)" on line 26 and insert the following:

    "The legislature finds that power purchase agreements of a minimum of fifteen years for the electric output of combined heat and power systems may be advantageous to both electric utilities and the owners or operators of combined heat and power systems.

    (2) Electric utilities with over twenty-five thousand customers in the state of Washington are encouraged to offer a minimum term of fifteen years for new power purchase agreements for the electric output of combined heat and power systems beginning December 31, 2016.

    (3)"

 

    Renumber the remaining subsection consecutively and correct any internal references accordingly.

 

    On page 13, beginning on line 13, strike all of section 13

   

    Renumber the remaining sections consecutively and correct any internal references accordingly.

 

    On page 16, line 6, after "January 31," strike "2016" and insert "2018"

 

    On page 16, line 10, after "January" strike "1, 2017" and insert "31, 2018"

 

    On page 16, line 22, after "heater" strike all material through "section" on line 24 and insert "if:

    (a) The owner or operator is not required to complete an energy assessment under 40 C.F.R. Part 63 subpart DDDDD as it existed on the effective date of this section; or

    (b) Prior to the dates in subsection 1 of this section, the owner or operator is no longer required to complete an energy assessment under 40 C.F.R. Part 63 subpart DDDDD"

 

    Correct the title.

 

 

 

    EFFECT: (1) Specifies that the requirement to include a combined heat and power system feasibility assessment in an energy-consumption analysis applies to critical governmental facilities and not other major facilities.

(2) Authorizes a combined heat and power system feasibility assessment to include the cost of integrating the variability of combined heat and power resources.

(3) Requires an electric utility with over 25,000 customers to value combined heat and power as having both energy and capacity value only if an assessment of combined heat and power identifies opportunities for combined heat and power that are dispatchable and that may provide capacity value.

(4) Establishes a legislative finding that power purchase agreements of at least 15 years for the electric output of combined heat and power systems may be advantageous to both electric utilities and the owners or operators of combined heat and power systems.

(5) Removes from the underlying bill provisions requiring specified electric utilities to offer 15-year power purchase agreements for the electric output of combined heat and power systems, and instead encourages utilities to do so beginning December 31, 2016.

(6) Removes from the underlying bill the section requiring the Utilities and Transportation Commission to establish a voluntary emission reduction program.

(7) Delays the dates for certain reporting requirements for owners and operators of industrial, commercial, or institutional boilers or process heaters until January 31, 2018.

(8) Exempts owners or operators of industrial, commercial, or institutional boilers or process heaters from the reporting requirements established in the bill if prior to the dates of the requirements, an owner or operator is no longer required to complete an energy assessment under federal regulations.

  

 

 