FINAL BILL REPORT

ESSB 6091

This analysis was prepared by non-partisan legislative staff for the use of legislative members in their deliberations. This analysis is not a part of the legislation nor does it constitute a statement of legislative intent.

C 1 L 18

Synopsis as Enacted

Brief Description: Ensuring that water is available to support development.

Sponsors: Senate Committee on Agriculture, Water, Natural Resources & Parks (originally sponsored by Senators Van De Wege, Rolfes and Frockt).

Senate Committee on Agriculture, Water, Natural Resources & Parks

Background: Building Permits and Subdivision Approvals. Under the State Building Code, an applicant for a building permit for a building that requires potable water must provide evidence of an adequate water supply for the intended use of the building. The evidence may be in the form of a water right permit from Ecology, a letter from an approved water purveyor stating the purveyor's ability to provide water, or another form verifying the existence of an adequate water supply. The process by which land divisions, including subdivisions, dedications, and short subdivisions may occur is governed by state and local requirements. Local governments, the entities charged with receiving and determining land division proposals, must adopt associated ordinances and procedures in conforming with state requirements.

GMA. The GMA is the comprehensive land use planning framework for counties and cities in Washington. Originally enacted in 1990 and 1991, GMA establishes land use designation and environmental protection requirements for all Washington counties and cities, and additional planning duties for the 28 counties and the cities within them that fully plan under GMA. The GMA directs counties and cities that fully plan under GMA to adopt internally consistent comprehensive plans that are generalized, coordinated land use policy statements of the governing body. Comprehensive plans must address specified planning elements, including a land use element and a rural element, each of which is a subset of a comprehensive plan.

Water Rights. Washington operates under a water right permit system. With certain exceptions, new rights to use surface or ground water must be established according to the permit system. Exemptions include any withdrawal of public groundwater for stock watering purposes, for watering a lawn, or for a noncommercial garden less than one-half acre. Single or group domestic uses or industrial purposes not exceeding 5000 gallons a day are also exempt.

Ecology must consider a four-part test when deciding whether to issue a new water right, specifically whether: (1) water is available, (2) a beneficial use of water would be made, (3) granting the right would impair existing rights, and (4) the proposed use would detrimentally affect the public welfare. If an application passes this test, Ecology issues a permit which establishes a time table for constructing the infrastructure to access the water and for putting water to beneficial use. When the conditions of the permit are satisfied, Ecology issues a water right certificate.

Instream Flow Rules. Ecology has the authority to adopt rules establishing a minimum water flow for streams, lakes, or other public water bodies for the purposes of protecting fish, game, birds, and the recreational and aesthetic values of the waterways. These minimum water flow levels, commonly called instream flows, function as water rights with a priority date set at the adoption date of the corresponding rule. The instream flow cannot affect an existing water right with a senior priority date.

Watershed Planning. The Watershed Planning Act establishes a process through which local groups can develop and implement plans for managing and protecting local water resources and rights. The local groups authorized to develop watershed plans are organized by WRIAs.

Summary: Building Permits and Subdivisions. In WRIAs where Ecology has adopted rules pursuant to updated watershed plans or the watershed restoration and enhancement (WRE) plans, and in the WRIAs with instream flow rules that explicitly regulate permit-exempt groundwater withdrawals, evidence of an adequate water supply for a building permit must be consistent with the specific applicable rule requirements.

In WRIAs where instream flow rules do not explicitly regulate permit-exempt groundwater withdrawals and there is a completed watershed plan, evidence of an adequate water supply for a building permit must meet certain requirements or be consistent with the updated watershed plan process.

In WRIAs where instream flow rules do not explicitly regulate permit-exempt groundwater withdrawals and a watershed plan was not adopted, evidence of an adequate water supply for a building permit must meet certain requirements or be consistent with the watershed restoration and enhancement plan process, unless the applicant provides certain other evidence of an adequate water supply.

In WRIAs 37 through 39Lower Yakima, Naches, and Upper YakimaEcology may impose additional requirements related to evidence of an adequate water supply for a building permit.

Additional requirements apply in areas within WRIAs 3 and 4Lower Skagit-Samish and Upper Skagitas a result of a 2013 Supreme Court decision.

In other areas of the state, evidence of potable water may consist of a water well report.

Any permit-exempt groundwater withdrawal associated with a water well constructed before the effective date of this bill is deemed to be evidence of an adequate water supply for a building permit.

If water supply is to be provided by a permit-exempt groundwater withdrawal, the applicant's compliance with the groundwater statute and with applicable instream flow rules is sufficient in determining appropriate provisions for water supply for a subdivision, dedication, or short subdivision.

GMA and County Planning. For the purposes of complying with the GMA relating to surface and groundwater resources, a county or city may rely on or refer to applicable minimum instream flow rules adopted by Ecology. Development regulations must ensure that proposed water uses are consistent with the permit-exempt groundwater statute and with applicable rules when making building permit and subdivision decisions.

Updated Watershed Plans. Unless requirements are otherwise specified in applicable rules, impacts and impairments to instream flows are authorized for new permit-exempt domestic groundwater withdrawals in the WRIAs listed below by complying with the updated watershed plan process created by the act.

In WRIAs where instream flow rules do not explicitly regulate permit-exempt groundwater withdrawals and there is a completed watershed plan, the lead agency must invite a representative from each federally recognized Indian tribe that has a usual and accustomed harvest area within the water resource inventory to participate as part of the planning unit. In collaboration with the planning unit, the initiating governments must update the watershed plan for the WRIA. At a minimum, the updated watershed plan must include those actions that the planning units determine to be necessary to offset potential impacts to instream flows associated with permit-exempt domestic water use.

Prior to the adoption of the updated watershed plan, Ecology must determine that the actions identified in the plan, after accounting for new projected uses of water over the subsequent twenty years, will result in a net ecological benefit to instream water resources within the inventory area.

Potential impacts on a closed water body and potential impairment to an instream flow for domestic groundwater withdrawals exempt from permitting may be allowed under a watershed plan. Modification of fees or water use quantities may not be applied unless authorized by rules. The provisions related to domestic permit-exempt groundwater withdrawals in the bill only applies to new domestic groundwater withdrawals in certain WRIAs and does not restrict permit-exempt groundwater withdrawals for other use.

Until an updated watershed plan is adopted and new rules have been adopted in these WRIAs, a city, town, or county issuing a building permit or approving a subdivision in these WRIAs must:

If an updated watershed plan is not adopted in WRIA 1Nooksackby February 1, 2019, the Department of Ecology must adopt rules in that WRIA that meet the requirements of the act by August 1, 2020.

If an updated watershed plan is not adopted in WRIA 11Nisquallyby February 1, 2019, the Department of Ecology must adopt rules in that WRIA that meet the requirements of the act by August 1, 2020.

If an updated watershed plan is not adopted in other WRIAs where instream flow rules do not explicitly regulate permit-exempt groundwater withdrawals and there is a completed watershed plan by February 1, 2021, the Department of Ecology must adopt rules that meet the requirements of the act for any WRIA without an updated watershed plan.

WRE Committees and WRE Plans. Ecology must establish a WRE committee in WRIAs where instream flow rules have been adopted that do not explicitly regulate permit-exempt groundwater withdrawals and where a watershed plan was not completed. Ecology chairs the WRE committee and invites representatives from:

Ecology must adopt a WRE plan no later than June 30, 2021, in collaboration with the WRE committee. All members of the WRE committee must approve the plan.

At a minimum, the WRE plan must include those actions that the planning units determine to be necessary to offset potential impacts to instream flows associated with permit-exempt domestic water use.

Prior to the adoption of the WRE plan, Ecology must determine that the actions identified in the plan, after accounting for new projected uses of water over the subsequent twenty years, will result in a net ecological benefit to instream water resources within the inventory area.

Potential impacts on a closed water body and potential impairment to an instream flow for domestic groundwater withdrawals exempt from permitting may be allowed under a WRE plan. After adoption of a WRE plan, Ecology must evaluate the plan recommendations and initiate rule making if necessary. Modification of fees or water use quantities may not be applied unless authorized by rules.

If the WRE committee fails to approve the WRE plan by June 30, 2021, Ecology must submit the final draft plan to the Salmon Recovery Funding Board and request that the board provide a technical review and make recommendations. Ecology must consider the recommendations and may amend the WRE plan without WRE committee approval prior to adoption.

Until a WRE plan is approved and rules are adopted, a city, town, or county issuing a building permit or approving a subdivision in these WRIAs must:

Upon the issuance of a drought emergency order, Ecology may curtail these exempt groundwater withdrawals to no more than 350 gallons per day per connection for indoor use only. However, an applicant may use permit-exempt groundwater to maintain a fire control buffer. The provisions related to domestic permit-exempt groundwater withdrawals in the bill only applies to new domestic groundwater withdrawals in certain WRIAs and does not restrict permit-exempt groundwater withdrawals for other use.

Duties. Ecology must initiate a pilot project in two WRIAs to measure water use from all new domestic groundwater withdrawals and to determine the overall feasibility of measuring water use for all new groundwater withdrawals. Ecology must submit a report to the Legislature by December 31, 2020, and December 31, 2027, that includes the following elements, among others: progress in completing and adopting updated watershed plans and watershed restoration and enhancement plans; a description of program projects and expenditures; and an assessment of the streamflow restoration and enhancement benefits from program projects.

Joint Legislative Task Force. A Joint Legislative Task Force (Task Force) is established to review the treatment of surface water and groundwater appropriations as they relate to instream flows and fish habitat, to develop and recommend a mitigation sequencing process and scoring system to address such appropriations, and to review the Washington supreme court decision in Foster v. Department of Ecology, 184 Wn.2d 465, 362 P.3d 9599 (2015). The Task Force must make recommendations to the Legislature by November 15, 2019. Recommendations must be made by a 60 percent majority of the Task Force and the representatives from Ecology, Department of Fish & Wildlife, and Department of Agriculture are not eligible to vote.

Ecology must issue permit decisions for up to five water resource mitigation pilot projects. It is the intent of the Legislature to use the pilot projects to inform the Task Force process while also enabling the processing of water right applications that address water supply needs. Ecology must monitor the implementation of the pilot projects, including mitigation in each pilot project, at least annually through December 31, 2028.

Creation of New Accounts. The watershed restoration and enhancement account, the watershed restoration and enhancement taxable bond account and the watershed restoration and enhancement bond account are created. It is the intent of the Legislature to appropriate $300 million for projects until June 30, 2033.

Votes on Final Passage:

Senate

35

14

House

66

30

Effective:

January 19, 2018