WSR 01-12-035

PERMANENT RULES

DEPARTMENT OF

LABOR AND INDUSTRIES

[ Filed May 29, 2001, 1:44 p.m. ]

Date of Adoption: May 29, 2001.

Purpose: Fees for electrical (chapters 296-46A and 296-401B WAC), contractor registration (chapter 296-200A WAC), elevator (chapter 296-96 WAC) and factory assembled structures (chapters 296-150C, 296-150F, 296-150M, 296-150P, 296-150R, 296-150T, and 296-150V WAC). The last time the fees for any of these programs was reviewed or increased was in June of 1999. The purpose of this project is to increase fees by 2.87% (rounded down to the nearest tenth of a dollar) and to incorporate the fee increases that are the result of chapter 159, Laws of 2001 (SSB 5101) being signed into law. The 2.87% rate is the Office of Financial Management's maximum allowable fiscal growth rate factor for fiscal year 2001. Increasing the fees as a result of SSB 5101 will ensure that the appropriate fees are charged in compliance with the new law changes and will reduce possible confusion as to what fee is charged.

In addition to the general fee increases and the fee changes resulting from SSB 5101, a new fee is being proposed to cover the cost of FAS plan review requests submitted via electronic mail. This new fee is necessary to cover the additional costs associated with receipt of and review of plans submitted electronically. Also, minor technical changes are being made to the fees in the FAS rules to include correcting a reference to electrical plan review fees per WAC 296-46A-140 and that one free copy of the rules will be provided yearly upon request.

These fee increases are necessary to comply with the law and/or to maintain the operational effectiveness of the contractor registration, factory assembled structures (FAS), electrical and elevator programs.

Citation of Existing Rules Affected by this Order: Amending WAC 296-46A-910, 296-46A-915, 296-96-01010, 296-96-01027, 296-96-01030, 296-96-01035, 296-96-01040, 296-96-01045, 296-96-01050, 296-96-01055, 296-96-01060, 296-96-01065, 296-150C-3000, 296-150F-3000, 296-150M-3000, 296-150P-3000, 296-150R-3000, 296-150T-3000, 296-150V-3000, 296-200A-900, and 296-401B-700.

Statutory Authority for Adoption: RCW 43.22.350, 43.22.434, 43.22.480, 43.22.500, 18.27.070, 18.27.075, 70.87.030, 19.28.041, 19.28.051, 19.28.101, 19.28.121, 19.28.161, 19.28.201, 19.28.211, 19.28.341, and chapter 159, Laws of 2001 (SSB 5101).

Other Authority: Chapters 43.22, 19.28, 18.27, and 70.87 RCW.

Adopted under notice filed as WSR 01-09-090 on April 18, 2001.

Changes Other than Editing from Proposed to Adopted Version: WAC 296-46A-910 Inspection fees. The proposed fee in subsection (1)(b)(i) was changed from $162.53 to $162.50 in order to correct a rounding error.

WAC 296-200A-900 What fees does the department charge contractors for issuance, renewal and reinstatement of certificates of registration? A new fee structure was included for the issuance, renewal, and reinstatement of certificates of registration, effective August 1, 2001. This new fee structure is necessary to comply with chapter 159, Laws of 2001 (SSB 5101) that was signed into law and will take effect on July 22, 2001. This legislation requires the department to charge a fee of $100 for issuing, renewing, or reregistering a certificate of registration and a $20 fee to cover the costs for the service of process in an action against the contractor, the contractor's bond, or the deposit (the fee is currently $10.00). For purposes of administration, the department is requiring contractors with an even unified business identifier to pay $50 (one half of $100) for a certificate of registration that expires one year after issuance, renewal, or reinstatement or until suspended or revoked. Likewise, the department is requiring contractors with an odd unified business identifier to pay $100 for a certificate of registration that expires two years after issuance, renewal, or reinstatement or until suspended or revoked. After the first issuance, renewal or reinstatement of contractors at the $50 price all contractors will be required to comply with the two-year ($100) registration requirements.

Number of Sections Adopted in Order to Comply with Federal Statute: New 0, Amended 0, Repealed 0; Federal Rules or Standards: New 0, Amended 0, Repealed 0; or Recently Enacted State Statutes: New 0, Amended 0, Repealed 0.

Number of Sections Adopted at Request of a Nongovernmental Entity: New 0, Amended 0, Repealed 0.

Number of Sections Adopted on the Agency's Own Initiative: New 0, Amended 21, Repealed 0.

Number of Sections Adopted in Order to Clarify, Streamline, or Reform Agency Procedures: New 0, Amended 0, Repealed 0.

Number of Sections Adopted Using Negotiated Rule Making: New 0, Amended 0, Repealed 0; Pilot Rule Making: New 0, Amended 0, Repealed 0; or Other Alternative Rule Making: New 0, Amended 21, Repealed 0.
Effective Date of Rule: Thirty-one days after filing.

May 29, 2001

Gary Moore

Director

OTS-4771.3


AMENDATORY SECTION(Amending WSR 01-01-097, filed 12/15/00, effective 1/18/01)

WAC 296-46A-910   Inspection fees.   To calculate inspection fees, the amperage is based on the conductor ampacity or the overcurrent device rating. The total fee must not be less than the number of progress inspection (one-half hour) units times the progress inspection fee rate from subsection (8) PROGRESS INSPECTIONS below.


(1) RESIDENTIAL.
(a) Single and two-family residential (new construction).
Notes: Square footage is the area included within the surrounding exterior walls of a building exclusive of any interior courts. (This includes any floor area in an attached garage, basement, or unfinished living space.)
"Inspected with the service" means that a separate service inspection fee is included on the same electrical work permit and "inspected at the same time" means all wiring is to be ready for inspection during the initial inspection trip.
An "outbuilding" is a structure that serves a direct accessory function to the residence, such as a pump house or storage building. Outbuilding does not include buildings used for commercial type occupancies or additional dwelling occupancies.
(i) First 1300 sq. ft. (($ 67.00)) $ 68.90
Each additional 500 sq. ft. or portion of (($ 21.50)) $ 22.10
(ii) Each outbuilding or detached garage inspected at the same time as a dwelling unit on the property (($ 28.00)) $ 28.80
(iii) Each outbuilding or detached garage inspected separately (($ 44.25)) $ 45.50
(iv) Each swimming pool - inspected with the service (($ 44.25)) $ 45.50
(v) Each swimming pool - inspected separately (($ 67.00)) $ 68.90
(vi) Each hot tub, spa, or sauna - inspected with the service (($ 28.00)) $ 28.80
(vii) Each hot tub, spa, or sauna - inspected separately (($ 44.25)) $ 45.50
(viii) Each septic pumping system - inspected with the service (($ 28.00)) $ 28.80
(ix) Each septic pumping system - inspected separately (($ 44.25)) $ 45.50
(b) Multifamily residential and miscellaneous residential structures, services and feeders (new construction).
(i) Each service and/or feeder
Ampacity Service/Feeder Additional Feeder
0 to 200 (($ 72.25)) $74.30 (($ 21.50)) $ 22.10
201 to 400 (($ 89.75)) $ 92.30 (($ 44.25)) $ 45.50
401 to 600 (($ 123.25)) $ 126.70 (($ 61.50)) $ 63.20
601 to 800 (($ 158.00)) $ 162.50 (($ 84.25)) $ 86.60
801 and over (($ 225.25)) $ 231.70 (($ 169.00)) $ 173.80

(c) Single-family or multi-family altered services including circuits.
(i) Each altered service and/or altered feeder

Ampacity

Service or

Feeder

0 to 200 (($ 61.50)) $ 63.20
201 to 600 (($ 89.75)) $ 92.30
601 and over (($ 135.25)) $ 139.10

(ii) Maintenance or repair of meter or mast (no alterations to service or feeder) (($ 33.50)) $ 34.30
(d) Single or multi-family residential circuits only (no service inspection).
Note: Altered or added circuit fees are calculated per panelboard. Total cost of the alterations in an individual panel should not exceed the cost of a complete altered service or feeder of the same rating, as shown in subsection (1) RESIDENTIAL (c) (table) above.
(i) 1 to 4 circuits (see note) (($ 44.25)) $ 45.50
Except: Water heater load control devices installed in residences as part of an energy conservation program (($ 27.00)) $ 27.70
Note: The (($27.00)) $ 27.70 permit fee for water heater load control devices will expire on December 31, 2001.
(ii) Each additional circuit (see note) (($ 5.00)) $ 5.10
(e) Mobile homes, modular homes, mobile home parks, and RV parks.
(i) Mobile home or modular home service or feeder

only

(($ 44.25)) $ 45.50
(ii) Mobile home service and feeder (($ 72.25)) $ 74.30
(f) Mobile home park sites and RV park sites.
Note: For master service installations, see subsection (2).
(i) First site service or site feeder (($ 44.25)) $ 45.50
(ii) Each additional site service; or additional site feeder inspected at the same time as the first service or feeder (($ 28.00)) $28.80
(2) COMMERCIAL/INDUSTRIAL.
(a) New service or feeder and additional new feeders inspected at the same time (includes circuits).
Note: For large COMMERCIAL/INDUSTRIAL projects that include multiple feeders, "inspected at the same time" can be interpreted to include additional inspection trips for a single project. The additional inspections must be for electrical work specified on the permit at the time of purchase. The permit fee for such projects must be calculated from (2) (a) (i) (table) above. However, the total fee must not be less than the number of progress inspection (one-half hour) units times the progress inspection fee rate from subsection (8) PROGRESS INSPECTIONS below.
Ampacity Service/Feeder Additional Feeder
0 to 100 (($ 72.25))

$ 74.30

(($ 44.25))

$ 45.50

101 to 200 (($ 89.75))

$ 92.30

(($ 56.25))

$ 57.80

201 to 400 (($ 169.00))

$ 173.80

(($ 67.00))

$ 68.90

401 to 600 (($ 197.00))

$ 202.60

(($ 78.75))

$ 81.00

601 to 800 (($ 254.50))

$ 261.80

(($ 107.25))

$ 110.30

801 to 1000 (($ 310.75))

$ 319.60

(($ 129.75))

$ 133.40

1000 and over (($ 339.00))

$ 348.70

(($ 181.00))

$ 186.10

(b) Altered services or feeders (no circuits).
(i) Service/feeders
Ampacity Service or Feeder
0 to 200 (($ 72.25)) $ 74.30
201 to 600 (($ 169.00)) $ 173.80
601 to 1000 (($ 254.50)) $ 261.80
1000 and over (($ 282.75)) $ 290.80

(ii) Maintenance or repair of meter or mast (no alteration to the service or feeder) (($ 61.50)) $ 63.20
(c) Circuits only.
Note: Altered/added circuit fees are calculated per panelboard. Total cost of the alterations in a panel (or panels) should not exceed the cost of a new feeder (or feeders) of the same rating, as shown in subsection (2) COMMERCIAL/INDUSTRIAL (a)(i)(table) above.
(i) First five circuits per branch circuit panel (($ 56.25)) $ 57.80
(ii) Each additional circuit per branch circuit panel (($ 5.00)) $ 5.10
(d) Over 600 volts surcharge per permit. (($ 56.25)) $ 57.80
(3) TEMPORARY SERVICE(S).
Notes: Temporary electrical power and lighting installations must be used during the period of construction, remodeling, maintenance, repair, or demolition of buildings, structures, equipment, or similar activities.
Temporary electrical power and lighting installations are allowed during emergencies and for tests, experiments, and developmental work. Temporary electrical power and lighting installations are allowed for a period not to exceed 90 days for Christmas decorative lighting and similar purposes. Temporary wiring shall be removed immediately upon completion of construction or purpose for which the wiring was installed.
Temporary stage or concert inspections requested outside of normal business hours will be subject to the portal-to-portal hourly fees in subsection (11) OTHER INSPECTIONS. The fee for such after hours inspections shall be the greater of the fee from (3) TEMPORARY SERVICES (a) or the portal-to-portal fee.
(a) Temporary services, temporary stage or concert productions.

Ampacity Service/Feeder Additional Feeder
0 to 60 (($ 38.75)) $ 39.80 (($ 20.00)) $ 20.50
0 to 100 (($ 44.25)) $ 45.50 (($ 21.50)) $ 22.10
101 to 200 (($ 56.25)) $ 57.80 (($ 28.00)) $ 28.80
201 to 400 (($ 67.00)) $ 68.90 (($ 33.50)) $ 34.40
401 to 600 (($ 89.75)) $ 92.30 (($ 44.25)) $ 45.50
601 and over (($ 101.75)) $ 104.60 (($ 50.75)) $ 52.20

(4) IRRIGATION MACHINES, PUMPS AND EQUIPMENT.
(a) Irrigation machines.
(i) Each tower when inspected at the same time as a service and feeder from (2) COMMERCIAL/INDUSTRIAL (($ 5.00)) $5.10
(ii) Towers - when not inspected at the same time as a service and feeders - one to six towers (($ 67.00)) $ 68.90
(iii) Each additional tower (($ 5.00)) $ 5.10
(5) MISCELLANEOUS - commercial/industrial and residential.
(a) Low-voltage thermostats.
(i) First thermostat (($ 33.50)) $ 34.40
(ii) Each additional thermostat inspected at the same time as the first (($ 10.50)) $ 10.80
(b) Low-voltage systems and telecommunications systems. Includes all telecommunications installations, fire alarm and burglar alarm nurse call, intercom, security systems, energy management control systems, HVAC/refrigeration control systems (other than thermostats above), industrial and automation control systems, lighting control systems, stand-alone sound systems, public address, and similar low-energy circuits and equipment.
(i) First 2500 sq. ft. or less (($ 38.75)) $ 39.80
(ii) Each additional 2500 sq. ft. or portion of (($ 10.50)) $ 10.80
(c) Signs and outline lighting.
(i) First sign (no service included) (($ 33.50)) $ 34.40
(ii) Each additional sign inspected at the same time on the same building or structure (($ 16.00)) $ 16.40
(d) Berth at a marina or dock.
Note: Five berths or more shall be permitted to have the inspection fees based on appropriate service and feeder fees from section (2) COMMERCIAL/INDUSTRIAL (a)(i) above.
(i) Berth at a marina or dock (($ 44.25)) $ 45.50
(ii) Each additional berth inspected at the same time (($ 28.00)) $ 28.80
(e) Yard pole, pedestal, or other meter loops only.
(i) Yard pole, pedestal, or other meter loops only (($ 44.25)) $ 45.50
(ii) Meters installed remote from service equipment: Inspected at same time as service, temporary service or other installations (($ 10.50)) $ 10.80
(f) Emergency inspections requested outside normal work hours. Regular fee plus surcharge of: (($ 84.25)) $ 86.60
(g) Generators.
(i) Portable generators: Permanently installed transfer equipment for portable generators (($ 61.50)) $ 63.20
(ii) Permanently installed generators: Refer to appropriate residential or commercial new service or feeder section
(h) Annual permit fee for plant location employing regular electrical maintenance staff - each inspection two-hour maximum.

Inspections Fee
1 to 3 plant electricians 12 (($ 1,618.00))

$ 1,664.40

4 to 6 plant electricians 24 (($ 3,237.50))

$3,330.40

7 to 12 plant electricians 36 (($ 4,856.00))

$ 4,995.30

13 to 25 plant electricians 52 (($ 6,475.50))

$ 6,661.30

more than 25 plant electricians 52 (($ 8,095.00))

$ 8,327.30


(i) Telecommunications annual permit fee.
(i) For commercial/industrial location employing full-time telecommunications maintenance staff or having a yearly maintenance contract with a licensed electrical/telecommunications contractor.
Annual inspection time required may be estimated by the purchaser at the rate for "Other inspections" in this section, charged portal-to-portal per hour - two-hour minimum. (($ 134.00))

$ 137.80

Each additional hour, or portion thereof, of portal-to-portal inspection time (($ 67.00))

$ 68.90

(6) CARNIVAL INSPECTIONS.
(a) First carnival field inspection each year.
(i) Each ride and generator truck (($ 16.00))

$ 16.40

(ii) Each remote distribution equipment, concession or gaming show (($ 5.00))

$ 5.10

(iii) If the calculated fee for first field inspection of (a) and (b) above is less, the minimum inspection fee shall be: (($ 84.25))

$ 86.60

(b) Subsequent carnival inspections.
(i) First 10 rides, concessions, generators, remote distribution equipment or gaming show (($ 84.25))

$ 86.60

(ii) Each additional ride, concession, generator, remote distribution equipment or gaming show (($ 5.00))

$ 5.10

(c) Concession(s) or ride(s) not part of a carnival.
(i) First field inspection each year of a single concession or ride, not part of a carnival (($ 67.00))

$ 68.90

(ii) Subsequent inspection of a single concession or ride, not part of a carnival (($ 44.25))

$ 45.50

(7) TRIP FEES.
(a) Requests by property owners to inspect existing installations. (($ 67.00))

$ 68.90

(b) Submitter notifies the department that work is ready for inspection when it is not ready. (($ 33.50))

$ 34.40

(c) Additional inspection required because submitter has provided the wrong address. (($ 33.50))

$ 34.40

(d) More than one additional inspection required to inspect corrections; or for repeated neglect, carelessness, or improperly installed electrical work. (($ 33.50))

$ 34.40

(e) Each trip necessary to remove a noncompliance notice. (($ 33.50))

$ 34.40

(f) Corrections have not been made in the prescribed time, unless an exception has been requested and granted. (($ 33.50))

$ 34.40

(g) Installations that are covered or concealed before inspection. (($ 33.50)) $ 34.40
(8) PROGRESS INSPECTIONS.
Note: The fees calculated in subsections (1) through (6) must apply to all electrical work. This section must be applied to a permit where the permit holder has requested additional inspections beyond the number supported by the permit fee calculated at the rate in (1) through (6).
(a) On partial or progress inspections, each one-half hour. (($ 33.50))

$ 34.40

(9) PLAN REVIEW FEE.
(a) Fee is thirty-five percent of the electrical work permit fee as determined by WAC 296-46A-910, plus a plan review submission fee of: (($ 56.25))

$ 57.80

(b) Supplemental submissions of plans per hour or fraction of an hour. (($ 67.00))

$ 68.90

(c) Plan review shipping and handling fee. (($ 16.00))

$ 16.40

(10) OUT-OF-STATE INSPECTIONS.
(a) Permit fees will be charged according to the fees listed in this section.
(b) Travel expenses:
(i) All travel expenses and per diem for out-of-state inspections are billed following completion of each inspection(s). These expenses can include, but are not limited to: Inspector's travel time, travel cost and per diem at the state rate. Travel time is hourly based on the rate in subsection (11) of this section
(11) OTHER INSPECTIONS.
(a) Inspections not covered by above inspection fees must be charged portal-to-portal per hour: (($ 67.00)) $ 68.90
(12) REFUND PROCESSING FEE.
(a) All requests for permit fee refunds will be assessed a processing fee. (($ 10.50))

$ 10.80

(13) VARIANCE REQUEST PROCESSING FEE.
(a) Variance request processing fee. This fee is nonrefundable once the transaction has been made. (($ 67.00))

$ 68.90

[Statutory Authority: RCW 19.28.031, 19.28.551, 19.28.010, 19.28.101, 19.28.171, 19.28.191, 19.28.251, 19.28.470, 19.28.490, 67.42.050, 2000 c 238, and chapter 19.28 RCW. 01-01-097, 296-46A-910, filed 12/15/00, effective 1/18/01.]


AMENDATORY SECTION(Amending WSR 01-01-097, filed 12/15/00, effective 1/18/01)

WAC 296-46A-915   Electrical/telecommunications contractor license, administrator certificate and examination, and copy fees.  


(1) GENERAL OR SPECIALTY CONTRACTOR LICENSE (per twenty-

four month period)

(($ 216.25))

$ 222.40

(a) Reinstatement of a general or specialty contractor's license after a suspension (($ 43.50))

$ 44.70

(2) ADMINISTRATOR CERTIFICATE
Note: Failure to appear for an examination results in forfeiture of the examination fee.
(a) Administrator certificate examination application (nonrefundable) (($ 27.00))

$ 27.70

(b) Administrator first-time examination fee (($ 64.75))

$ 66.60

(c) Administrator retest examination fee (($ 75.75))

$ 77.90

(d) Administrator original certificate (request for certificate submitted with application) (($ 64.50))

$ 66.30

(e) Administrator certificate renewal (per twenty-four month period) (($ 81.00))

$ 83.80

(f) Late renewal of administrator certificate (per

twenty-four month period)

(($ 162.25))

$ 166.90

(g) Transfer of administrator designation (($ 32.25))

$ 33.10

(h) Certified copy of each document (maximum per file): (($ 45.75))

$ 47.00

First document: (($ 20.75))

$ 21.30

Each additional document: $ 2.00
(i) Reinstatement of an administrator's certificate after a suspension (($ 43.50))

$ 44.70

(3) REFUND PROCESSING FEE (($ 10.50))

$ 10.80

[Statutory Authority: RCW 19.28.031, 19.28.551, 19.28.010, 19.28.101, 19.28.171, 19.28.191, 19.28.251, 19.28.470, 19.28.490, 67.42.050, 2000 c 238, and chapter 19.28 RCW. 01-01-097, 296-46A-915, filed 12/15/00, effective 1/18/01.]

OTS-4772.1


AMENDATORY SECTION(Amending WSR 01-02-026, filed 12/22/00, effective 1/22/01)

WAC 296-96-01010   What are the permit fees for conveyances other than material lifts and hoists and how are they calculated?   Permit fees are based on the total cost of the conveyance and labor to install. The following permit fees apply to the construction, alteration, or relocation of all conveyances except for material lifts:

TOTAL COST OF CONVEYANCE FEE
$250 to and including $1,000 . . . . . . . . . . . . $((30.50)) 31.30
$1,001 to and including $15,000
For the first $1,001 . . . . . . . . . . . . ((43.00)) 44.20
Each additional $1,000 or fraction thereof . . . . . . . . . . . . ((8.50)) 8.70
$15,001 to and including $100,000
For first $15,001 . . . . . . . . . . . . ((165.25)) 169.90
For each additional $1,000 or fraction thereof . . . . . . . . . . . . ((5.50)) 5.60
OVER $100,001
For the first $100,001 . . . . . . . . . . . . ((694.50)) 714.40
For each additional $1,000 or fraction thereof . . . . . . . . . . . . ((4.50)) 4.60

[Statutory Authority: RCW 70.87.020, 70.87.030, 70.87.034, 70.87.120, 70.87.185 and chapter 70.87 RCW. 01-02-026, 296-96-01010, filed 12/22/00, effective 1/22/01.]


AMENDATORY SECTION(Amending WSR 01-02-026, filed 12/22/00, effective 1/22/01)

WAC 296-96-01027   Are initial installation permit fees refundable?   Your initial installation permit fees are refundable minus a processing fee unless your permits have expired. No refunds will be issued for expired permits. All requests for refunds must be submitted in writing to the elevator section and must identify the specific permits for which the refunds are requested.


The processing fee for a refund is . . . . . . . . . . . . $((26.00)) 26.70

[Statutory Authority: RCW 70.87.020, 70.87.030, 70.87.034, 70.87.120, 70.87.185 and chapter 70.87 RCW. 01-02-026, 296-96-01027, filed 12/22/00, effective 1/22/01.]


AMENDATORY SECTION(Amending WSR 01-02-026, filed 12/22/00, effective 1/22/01)

WAC 296-96-01030   What is the process for installation and alteration plan approval?   Prior to the start of construction, you must submit to the department for approval two copies of plans for new installations or major alterations. To be approved, the plan must comply with the latest adopted edition of the American Society of Mechanical Engineers (ASME) A17.1, the National Electrical Code (NEC) and applicable Washington Administrative Codes (WAC). In addition, the plans must include all information necessary in determining whether each installation/alteration complies with all applicable codes. You must keep a copy of the approved plan on the job site until the department has witnessed all acceptance tests. Any alterations to the approved plan must be submitted to the department for approval before a final inspection will be conducted. The nonrefundable fees for reviewing your plans are:


For each installation/major alteration . . . . . . . . . . . . $((22.25)) 22.80

If more than two sets of plans are submitted, the fee for each additional set . . . . . . . . . . . . $((22.25)) 22.80

[Statutory Authority: RCW 70.87.020, 70.87.030, 70.87.034, 70.87.120, 70.87.185 and chapter 70.87 RCW. 01-02-026, 296-96-01030, filed 12/22/00, effective 1/22/01.]


AMENDATORY SECTION(Amending WSR 01-02-026, filed 12/22/00, effective 1/22/01)

WAC 296-96-01035   Are there inspection fees?   The initial inspection of a conveyance or for the initial inspection of construction, alteration or relocation of a conveyance is included with your permit fee. Once the department has approved the conveyance you will be issued a permit that is valid for 30-days. Prior to the expiration of the 30-day permit the application for an annual operating permit and the appropriate fees must be paid to the department. Once the department has received the appropriate fees and application you will be issued your first annual operating permit. You are required to renew your annual operating permit yearly.

The following exceptions do require a fee:


RE-INSPECTION FEE
If a conveyance does not pass an initial inspection and a second inspection is required, the fee for each conveyance re-inspected

is . . . . . . . . . . . .

$((78.75)) 81.00
If any additional re-inspections are required, the fee for each conveyance re-inspected . . . . . . . . . . . . $((101.75)) 104.60
The department may waive re-inspection fees.

[Statutory Authority: RCW 70.87.020, 70.87.030, 70.87.034, 70.87.120, 70.87.185 and chapter 70.87 RCW. 01-02-026, 296-96-01035, filed 12/22/00, effective 1/22/01.]


AMENDATORY SECTION(Amending WSR 01-02-026, filed 12/22/00, effective 1/22/01)

WAC 296-96-01040   What is the fee for testing and inspecting regular elevators used as temporary personnel elevators?   (1) The fee for the inspecting and testing of regular elevators used as temporary personnel elevators is $((67.50)) 69.40, in addition to any other fees required in this chapter. This fee purchases a 30-day temporary use permit that may be renewed at the department's discretion.

(2) When this temporary use permit is purchased, a notice declaring that the equipment has not received final approval from the department must be conspicuously posted on the elevator.

[Statutory Authority: RCW 70.87.020, 70.87.030, 70.87.034, 70.87.120, 70.87.185 and chapter 70.87 RCW. 01-02-026, 296-96-01040, filed 12/22/00, effective 1/22/01.]


AMENDATORY SECTION(Amending WSR 01-02-026, filed 12/22/00, effective 1/22/01)

WAC 296-96-01045   What are the inspection requirements and fees for conveyances in private residences?   (1) Chapter 70.87 RCW requires the department to inspect all new, altered or relocated conveyances operated exclusively for single-family use in private residences. Prior to inspection, you must complete a permit application as described in WAC 296-96-01005 and pay the appropriate fee listed in WAC 296-96-01010.

(2) Chapter 70.87 RCW allows the department to inspect conveyances operated exclusively for single-family use in private residences when the department is investigating an accident or an alleged or apparent violation of the statute or these rules.

(3) No annual inspection and operating permit is required for a private residence conveyance operated exclusively for single-family use unless the owner requests it. When an owner requests an inspection and an annual operating permit, the following fee must be paid prior to an inspection:


TYPE OF CONVEYANCE FEE
Each inclined stairway chair lift in private residence . . . . . . . . . . . . $((16.50)) 16.90
Each inclined wheel chair lift in a private residence . . . . . . . . . . . . ((22.25)) 22.80
Each vertical wheel chair lift in a private residence . . . . . . . . . . . . ((28.00)) 28.80
Each dumbwaiter in a private residence . . . . . . . . . . . . ((22.25)) 22.80
Each inclined elevator at a private residence . . . . . . . . . . . . ((78.75)) 81.00
Each private residence elevator . . . . . . . . . . . . ((50.75)) 52.20
Duplication of a lost, damaged or stolen operating permit . . . . . . . . . . . . ((5.00)) 5.10

[Statutory Authority: RCW 70.87.020, 70.87.030, 70.87.034, 70.87.120, 70.87.185 and chapter 70.87 RCW. 01-02-026, 296-96-01045, filed 12/22/00, effective 1/22/01.]


AMENDATORY SECTION(Amending WSR 01-02-026, filed 12/22/00, effective 1/22/01)

WAC 296-96-01050   How do I get a supplemental inspection?   Any person, firm, corporation or governmental agency can request a supplemental inspection from the department by paying a fee of $((291.50)) 299.80 per day plus the standard per diem and mileage allowance granted to department inspectors.

[Statutory Authority: RCW 70.87.020, 70.87.030, 70.87.034, 70.87.120, 70.87.185 and chapter 70.87 RCW. 01-02-026, 296-96-01050, filed 12/22/00, effective 1/22/01.]


AMENDATORY SECTION(Amending WSR 01-02-026, filed 12/22/00, effective 1/22/01)

WAC 296-96-01055   Are technical services available and what is the fee?   You may request elevator field technical services from the department by paying a fee of $((56.25)) 57.80 per hour plus the standard per diem and mileage allowance granted to department inspectors. These field technical services may include code evaluation, code consultation, plan examination, code interpretation and clarification of technical data relating to the application of the department's conveyance rules. Field technical services do not include inspections.

[Statutory Authority: RCW 70.87.020, 70.87.030, 70.87.034, 70.87.120, 70.87.185 and chapter 70.87 RCW. 01-02-026, 296-96-01055, filed 12/22/00, effective 1/22/01.]


AMENDATORY SECTION(Amending WSR 01-02-026, filed 12/22/00, effective 1/22/01)

WAC 296-96-01060   Can I request an after hours inspection and what is the fee?   You may request an inspection outside of normal business hours, which are 7:00 a.m. to 5:00 p.m., if an inspector is available and the inspection is authorized by the department. The minimum fee for an after-hours inspection is $((70.75)) 72.70 per hour plus the standard per diem and mileage allowance granted to department inspectors. This fee is in addition to any other fees required for your project.

[Statutory Authority: RCW 70.87.020, 70.87.030, 70.87.034, 70.87.120, 70.87.185 and chapter 70.87 RCW. 01-02-026, 296-96-01060, filed 12/22/00, effective 1/22/01.]


AMENDATORY SECTION(Amending WSR 01-02-026, filed 12/22/00, effective 1/22/01)

WAC 296-96-01065   What are the annual operating permits fees?   An annual operating permit will be issued to you upon payment of the appropriate fee:

TYPE OF CONVEYANCE FEE
Each hydraulic elevator . . . . . . . . . . . . $((78.75)) 80.90
Each roped-hydraulic elevator . . . . . . . . . . . . ((101.75)) 104.60
plus for each hoistway opening in excess of two . . . . . . . . . . . . (( 7.75)) 7.90
Each cable elevator . . . . . . . . . . . . ((101.75)) 104.60
plus for each hoistway opening in excess of two . . . . . . . . . . . . ((7.75)) 7.90
Each cable elevator traveling more than 25 feet without an opening--for each 25 foot traveled . . . . . . . . . . . . ((10.75)) 11.00
Each limited-use/limited-application (LULA) elevator . . . . . . . . . . . . ((78.75)) 80.90
Each escalator . . . . . . . . . . . . ((78.75)) 80.90
Each dumbwaiter in other than a private residence . . . . . . . . . . . . ((50.75)) 52.20
Each material lift . . . . . . . . . . . . ((67.50)) 69.40
Each incline elevator in other than a private residence . . . . . . . . . . . . ((101.75)) 104.60
Each belt manlift . . . . . . . . . . . . ((78.75)) 80.90
Each stair lift in other than a private residence . . . . . . . . . . . . ((50.75)) 52.20
Each wheel chair lift in other than a private residence . . . . . . . . . . . . ((50.75)) 52.20
Each personnel hoist . . . . . . . . . . . . ((78.75)) 80.90
Each grain elevator personnel lift . . . . . . . . . . . . ((78.75)) 80.90
Each material hoist . . . . . . . . . . . . ((78.75)) 80.90
Each special purpose elevator . . . . . . . . . . . . ((78.75)) 80.90
Each private residence elevator installed in other than a private residence . . . . . . . . . . . . ((78.75)) 80.90
Each casket lift . . . . . . . . . . . . ((78.75)) 80.90
Each sidewalk freight elevator . . . . . . . . . . . . ((78.75)) 80.90
Each hand-powered manlift or freight

elevator . . . . . . . . . . . .

((50.75)) 52.20
Each boat launching elevator . . . . . . . . . . . . ((78.75)) 80.90
Each auto parking elevator . . . . . . . . . . . . ((78.75)) 80.90
Each moving walk . . . . . . . . . . . . ((78.75)) 80.90
Duplication of a damaged, lost or stolen operating permit . . . . . . . . . . . . ((5.00)) 5.10

[Statutory Authority: RCW 70.87.020, 70.87.030, 70.87.034, 70.87.120, 70.87.185 and chapter 70.87 RCW. 01-02-026, 296-96-01065, filed 12/22/00, effective 1/22/01.]

OTS-4773.1


AMENDATORY SECTION(Amending WSR 99-12-080, filed 5/28/99, effective 6/28/99)

WAC 296-150C-3000   Commercial coach fees.  


WAC 296-150C-3000 COMMERCIAL COACH FEES
INITIAL FILING FEE $((28.00)) 28.80
DESIGN PLAN FEES:
INITIAL FEE - MASTER DESIGN $((192.00)) 197.50
INITIAL FEE - ONE YEAR DESIGN $((78.75)) 81.00
RENEWAL FEE $((33.50)) 34.40
RESUBMIT FEE $((56.25)) 57.80
ADDENDUM (Approval expires on same date as original plan) $((56.25)) 57.80
ELECTRONIC PLAN SUBMITTAL FEE $4.50 per page for the first set of plans and $0.30 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
ELECTRICAL PLAN REVIEW (When required by WAC 296-46A-140. Plan review
for educational, institutional or health care facilities and other buildings)
Electrical Plan submission fee $((56.25)) 57.80
Service/feeder Ampacity:
0 - 100 $((25.00)) 25.70
101 - 200 $((31.25)) 32.10
201 - 400 $((58.25)) 59.90
401 - 600 $((68.75)) 70.70
601 - 800 $((88.50)) 91.00
801 - 1000 $((108.25)) 111.30
Over 1000 $((117.50)) 120.80
Over 600 volts surcharge $((18.75)) 19.20
Thermostats:
First $((11.25)) 11.50
Each additional $3.00
Low voltage fire alarm and burglar alarm:
Each control panel and up to four circuits or zones $((10.25)) 10.50
Each additional circuit or zone $2.00
Generators, refer to appropriate service/feeder ampacity fees
Note: Altered services or feeders shall be charged the above rate per the service/feeder ampacity fees.
Supplemental submissions of plans (resubmittals, addendums, renewals,
code updates, etc.) shall be charged per hour or fraction of an hour* $((66.50)) 68.40
MEDICAL GAS PLAN REVIEW:
SUBMISSION FEE $((54.00)) 55.50
FIRST STATION $((54.00)) 55.50
EACH ADDITIONAL STATION $((20.00)) 20.50
RECIPROCAL PLAN REVIEW:
INITIAL FEE - MASTER DESIGN $((85.75)) 88.20
INITIAL FEE - ONE YEAR DESIGN $((52.00)) 53.40
RENEWAL FEE $((52.00)) 53.40
ADDENDUM $((52.00)) 53.40
PLANS APPROVED BY PROFESSIONALS $((39.25)) 40.30
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS $((10.75)) 11.00
DEPARTMENT INSPECTION FEES
INSPECTION/REINSPECTION (Per hour* plus travel time* and mileage**) $((56.25)) 57.80
TRAVEL (Per hour) $((56.25)) 57.80
PER DIEM**
HOTEL***
MILEAGE**
RENTAL CAR***
PARKING***
AIRFARE***
DEPARTMENT AUDIT FEES:
AUDIT (Per hour*) $((56.25)) 57.80
TRAVEL (Per hour*) $((56.25)) 57.80
PER DIEM**
HOTEL***
MILEAGE**
RENTAL CAR***
PARKING***
AIRFARE***
INSIGNIA FEES:
FIRST SECTION $((16.50)) 16.90
EACH ADDITIONAL SECTION $((10.75)) 11.00
ALTERATION $((28.00)) 28.80
REISSUED-LOST/DAMAGED $((10.75)) 11.00
OTHER FEES:
FIELD TECHNICAL SERVICE (Per hour* plus travel time* and mileage**) $((56.25)) 57.80
PUBLICATION PRINTING AND DISTRIBUTION OF RCW'S AND WAC'S (One free copy per year upon request) $((10.75)) 11.00
* Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments
** Per state guidelines
*** Actual charges incurred

[Statutory Authority: Chapters 43.22, 18.27, 70.87 and 19.28 RCW. 99-12-080, 296-150C-3000, filed 5/28/99, effective 6/28/99. Statutory Authority: Chapters 18.106, 18.27 and 43.22 RCW. 98-12-041, 296-150C-3000, filed 5/29/98, effective 6/30/98. Statutory Authority: RCW 70.87.030, 18.27.070, [18.27.]075, 43.22.350, [43.22.]355, [43.22.]434 and [43.22.]480(2). 97-11-053, 296-150C-3000, filed 5/20/97, effective 6/30/97. Statutory Authority: RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. 96-21-146, 296-150C-3000, filed 10/23/96, effective 11/25/96.]

OTS-4774.1


AMENDATORY SECTION(Amending WSR 99-12-080, filed 5/28/99, effective 6/28/99)

WAC 296-150F-3000   Factory-built housing and commercial structure fees.  


WAC 296-150F-3000 FACTORY-BUILT HOUSING AND COMMERCIAL STRUCTURES
INITIAL FILING FEE $((39.25)) 40.30
DESIGN PLAN FEES:
INITIAL FEE - MASTER DESIGN (CODE CYCLE) $((192.00)) 197.50
INITIAL FEE - ONE YEAR DESIGN $((112.75)) 115.90
RENEWAL FEE $((39.25)) 40.30
RESUBMIT FEE $((56.25)) 57.80
ADDENDUM (Approval expires on same date as original plan.) $((56.25)) 57.80
ELECTRONIC PLAN SUBMITTAL FEE $4.50 per page for the first set of plans and $0.30 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
ELECTRICAL PLAN REVIEW (When required by WAC 296-46A-140, Plan review
for educational, institutional or health care facilities and other buildings):
Electrical Plan submission fee $((56.25)) 57.80
Service/feeder Ampacity:
0 - 100 $((25.00)) 25.70
101 - 200 $((31.25)) 32.10
201 - 400 $((58.25)) 59.90
401 - 600 $((68.75)) 70.70
601 - 800 $((88.50)) 91.00
801 - 1000 $((108.25)) 111.30
Over 1000 $((117.50)) 120.80
Over 600 volts surcharge $((18.75)) 19.20
Thermostats:
First $((11.25)) 11.50
Each additional $3.00
Low voltage fire alarm and burglar alarm:
Each control panel and up to four circuits or zones $((10.25)) 10.50
Each additional circuit or zone $2.00
Generators, refer to appropriate service/feeder ampacity fees
Note: Altered services or feeders shall be charged the above rate per the service/feeder ampacity fees.
Supplemental submissions of plans (resubmittals, addendums, renewals,code updates, etc.) will be charged per hour or fraction of an hour* $((66.50)) 68.40
MEDICAL GAS PLAN REVIEW:
SUBMISSION FEE $((54.00)) 55.50
FIRST STATION $((54.00)) 55.50
EACH ADDITIONAL STATION $((20.00)) 20.50
RECIPROCAL PLAN REVIEW:
INITIAL FEE-MASTER DESIGN $((85.75)) 88.20
INITIAL FEE-ONE YEAR DESIGN $((52.00)) 53.40
RENEWAL FEE $((52.00)) 53.40
ADDENDUM $((52.00)) 53.40
PLANS APPROVED BY PROFESSIONALS $((39.25)) 40.30
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS $((10.75)) 11.00
DEPARTMENT INSPECTION FEES
INSPECTION/REINSPECTION (Per hour* plus travel time* and mileage**) $((56.25)) 57.80
TRAVEL (Per hour*) $((56.25)) 57.80
PER DIEM**
HOTEL***
MILEAGE**
RENTAL CAR***
PARKING***
AIRFARE***
DEPARTMENT AUDIT FEES:
AUDIT (Per hour*) $((56.25)) 57.80
TRAVEL (Per hour*) $((56.25)) 57.80
PER DIEM**
HOTEL***
MILEAGE**
RENTAL CAR***
PARKING***
AIRFARE***
INSIGNIA FEES:
FIRST SECTION $((158.00)) 162.50
EACH ADDITIONAL SECTION $((15.50)) 15.90
REISSUED-LOST/DAMAGED $((39.25)) 40.30
OTHER FEES:
FIELD TECHNICAL SERVICE (Per hour* plus travel time* and mileage**) $((56.25)) 57.80
NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA) $((23.25)) 23.90
PUBLICATION PRINTING AND DISTRIBUTION OF RCW'S AND WAC'S (One free copy per year upon request) $((10.75)) 11.00
* Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
** Per state guidelines.
*** Actual charges incurred.

[Statutory Authority: Chapters 43.22, 18.27, 70.87 and 19.28 RCW. 99-12-080, 296-150F-3000, filed 5/28/99, effective 6/28/99. Statutory Authority: Chapters 18.106, 18.27 and 43.22 RCW. 98-12-041, 296-150F-3000, filed 5/29/98, effective 6/30/98. Statutory Authority: RCW 70.87.030, 18.27.070, [18.27.]075, 43.22.350, [43.22.]355, [43.22.]434 and [43.22.]480(2). 97-11-053, 296-150F-3000, filed 5/20/97, effective 6/30/97. Statutory Authority: RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. 96-21-146, 296-150F-3000, filed 10/23/96, effective 11/25/96.]

OTS-4775.1


AMENDATORY SECTION(Amending WSR 00-17-148, filed 8/22/00, effective 9/30/00)

WAC 296-150M-3000   Manufactured home fees.  


WAC 296-150M-3000 MANUFACTURED HOME FEES
INITIAL FILING FEE $((28.00)) 28.80
DESIGN PLAN FEES:
STRUCTURAL ALTERATION-MASTER DESIGN (CODE CYCLE) $((112.75)) 115.90
STRUCTURAL ALTERATION - ONE YEAR DESIGN $((78.75)) 81.00
RENEWAL FEE $((33.75)) 34.70
RESUBMITTAL FEE $((56.25)) 57.80
ADDENDUM (Approval expires on the same date as original plan.) $((56.25)) 57.80
ELECTRONIC PLAN SUBMITTAL FEE $4.50 per page for the first set of plans and $0.30 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
DEPARTMENT INSPECTION FEES:
INSPECTION (Per hour*) $((56.25)) 57.80
OTHER REQUIRED INSPECTIONS (Per hour*) $((56.25)) 57.80
ALL REINSPECTIONS (Per hour*) $((56.25)) 57.80
INSIGNIA FEES:
ALTERATION $((28.00)) 28.80
REISSUED - LOST/DAMAGED $((16.50)) 16.90
IPIA
DEPARTMENT AUDIT FEES
REGULARLY SCHEDULED IPIA AUDIT:
First inspection on each section (one time only) $((25.75)) 26.40
Second and succeeding inspections of unlabelled sections (Per hour*) $((56.25)) 57.80
OTHER IPIA FEES:
Red tag removal during a regularly scheduled IPIA audit (Per hour* separate from other fees) $((56.25)) 57.80
Red tag removal at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time* and
mileage**) $((56.25)) 57.80
Increased frequency surveillance (Per hour* plus travel time* and mileage**) $((56.25)) 57.80
Attendance at manufacturers training classes (Per hour* only) $((56.25)) 57.80
Subpart "I" investigations (Per hour* plus travel time* and mileage** $((56.25)) 57.80
Alterations to a labelled unit (Per hour* plus travel time* and mileage**) $((56.25)) 57.80
IPIA Issues/Responses (Per hour* Plus travel time* and mileage**) $((56.25)) 57.80
Monthly surveillance during a regularly scheduled IPIA audit (Per hour* plus travel time* and mileage**) $((56.25)) 57.80
Monthly surveillance at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time* and mileage**) $((56.25)) 57.80
Plant certifications, recertifications and addenda updates (Per hour* plus travel time* and mileage per each inspector) $((56.25)) 57.80
Response to HBT Audit during a regularly scheduled IPIA audit (Per hour*) $((56.25)) 57.80
Response to HBT Audit at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time* and mileage**) $((56.25)) 57.80
Alternative construction (AC) letter inspections at placement site (Per hour* plus travel time* and mileage**) $((56.25)) 57.80
Replacement of HUD labels (Per hour* plus travel time* and mileage**) $((56.25)) 57.80
OTHER FEES:
FIELD TECHNICAL SERVICE (Per hour plus travel time* and mileage**) $((56.25)) 57.80
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request) $((10.75)) 11.00
NOTE: Local jurisdictions may have other fees that apply.
* Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
** Per state guidelines.
*** Actual charges incurred.

[Statutory Authority: RCW 43.22.340, 43.22.350, 43.22.355, 43.22.360, 43.22.400, 43.22.432, 43.22.433, 43.22.434, 43.22.450, 43.22.480, and 43.22.485. 00-17-148, 296-150M-3000, filed 8/22/00, effective 9/30/00. Statutory Authority: Chapters 43.22, 18.27, 70.87 and 19.28 RCW. 99-12-080, 296-150M-3000, filed 5/28/99, effective 6/28/99. Statutory Authority: Chapters 18.106, 18.27 and 43.22 RCW. 98-12-041, 296-150M-3000, filed 5/29/98, effective 6/30/98. Statutory Authority: RCW 70.87.030, 18.27.070, [18.27.]075, 43.22.350, [43.22.]355, [43.22.]434 and [43.22.]480(2). 97-11-053, 296-150M-3000, filed 5/20/97, effective 6/30/97. Statutory Authority: RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. 96-21-146, 296-150M-3000, filed 10/23/96, effective 11/25/96.]

OTS-4776.1


AMENDATORY SECTION(Amending WSR 00-17-148, filed 8/22/00, effective 9/30/00)

WAC 296-150P-3000   Recreational park trailer fees.  


WAC 296-150P-3000 RECREATIONAL PARK TRAILER FEES
INITIAL FILING FEE $((28.00)) 28.80
DESIGN PLAN FEES:
NEW PLAN REVIEW FEE WITHOUT STRUCTURAL REQUIREMENTS $((78.75)) 81.00
NEW PLAN REVIEW FEE WITH STRUCTURAL REQUIREMENTS $((104.00)) 106.90
RESUBMITTAL FEE $((56.25)) 57.80
ADDENDUM (Approval expires on same date as original plan.) $((56.25)) 57.80
ELECTRONIC PLAN SUBMITTAL FEE $4.50 per page for the first set of plans and $0.30 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
QUALITY CONTROL/MANUAL FEES:
INITIAL APPROVAL $((10.75)) 11.00
RESUBMITTAL FEE $((56.25)) 57.80
ADDENDUM $((56.25)) 57.80
DEPARTMENT AUDIT FEES:
AUDIT (per hour)* $((56.25)) 57.80
TRAVEL (per hour)* $((56.25)) 57.80
PER DIEM**
HOTEL***
MILEAGE**
RENTAL CAR***
PARKING***
AIRFARE***
DEPARTMENT INSPECTION FEES:
INSPECTION (per hour)* $((56.25)) 57.80
TRAVEL (per hour)* $((56.25)) 57.80
PER DIEM**
HOTEL***
MILEAGE**
RENTAL CAR***
PARKING***
AIRFARE***
INSIGNIA FEES:
STATE CERTIFIED $((10.50)) 10.80
ALTERATION $((28.00)) 28.80
REISSUED-LOST/DAMAGED $((10.50)) 10.80
OTHER FEES:
FIELD TECHNICAL SERVICE (per hour* plus travel time* and mileage**) $((56.25)) 57.80
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request) $((10.75)) 11.00
* Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
** Per state guidelines.
*** Actual charges incurred.

[Statutory Authority: RCW 43.22.340, 43.22.350, 43.22.355, 43.22.360, 43.22.400, 43.22.432, 43.22.433, 43.22.434, 43.22.450, 43.22.480, and 43.22.485. 00-17-148, 296-150P-3000, filed 8/22/00, effective 9/30/00. Statutory Authority: Chapters 43.22, 18.27, 70.87 and 19.28 RCW. 99-12-080, 296-150P-3000, filed 5/28/99, effective 6/28/99. Statutory Authority: Chapters 18.106, 18.27 and 43.22 RCW. 98-12-041, 296-150P-3000, filed 5/29/98, effective 6/30/98. Statutory Authority: RCW 43.22.340 and 43.22.420. 97-16-043, 296-150P-3000, filed 7/31/97, effective 12/1/97.]

OTS-4777.1


AMENDATORY SECTION(Amending WSR 00-17-148, filed 8/22/00, effective 9/30/00)

WAC 296-150R-3000   Recreational vehicle fees.  


WAC 296-150R-3000 RECREATIONAL VEHICLE FEES
STATE PLAN
INITIAL FILING FEE $((28.00)) 28.80
DESIGN PLAN FEES:
NEW PLAN REVIEW FEE $((78.75)) 81.00
RESUBMITTAL FEE $((56.25)) 57.80
ADDENDUM (Approval expires on same date as original plan.) $((56.25)) 57.80
QUALITY CONTROL/MANUAL FEES:
INITIAL APPROVAL $((10.75)) 11.00
RESUBMITTAL FEE $((56.25)) 57.80
ADDENDUM $((56.25)) 57.80
ELECTRONIC PLAN SUBMITTAL FEE $4.50 per page for the first set of plans and $0.30 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
DEPARTMENT AUDIT FEES:
AUDIT (per hour)* $((56.25)) 57.80
TRAVEL (per hour)* $((56.25)) 57.80
PER DIEM**
HOTEL***
MILEAGE**
RENTAL CAR***
PARKING
AIRFARE***
DEPARTMENT INSPECTION FEES:
INSPECTION (per hour)* $((56.25)) 57.80
TRAVEL (per hour)* $((56.25)) 57.80
PER DIEM**
HOTEL***
MILEAGE**
RENTAL CAR***
PARKING***
AIRFARE***
INSIGNIA FEES:
STATE CERTIFIED $((10.25)) 10.50
ALTERATION $((28.00)) 28.80
REISSUED-LOST/DAMAGED $((10.25)) 10.50
OTHER FEES:
FIELD TECHNICAL SERVICE (per hour* plus travel time* and mileage**) $((56.25)) 57.80
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year) $((10.75)) 11.00
* Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
** Per state guidelines.
***Actual charges incurred.


WAC 296-150R-3000 RECREATIONAL VEHICLE FEES
SELF CERTIFICATION
INITIAL FILING FEE $((28.00)) 28.80
DESIGN PLAN FEES:
NEW PLAN REVIEW FEE (one time fee) $((78.75)) 81.00
RESUBMITTAL FEE $((56.25)) 57.80
ADDENDUM (Approval expires on same date as original plan.) $((56.25)) 57.80
ELECTRONIC PLAN SUBMITTAL FEE $4.50 per page for the first set of plans and $0.30 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
SELF CERTIFICATION/MANUAL FEES:
INITIAL APPROVAL $((10.75)) 11.00
RESUBMITTAL FEE $((56.25)) 57.80
ADDENDUM $((56.25)) 57.80
DEPARTMENT AUDIT FEES:
AUDIT (per hour)* $((56.25)) 57.80
TRAVEL (per hour)* $((56.25)) 57.80
PER DIEM**
HOTEL***
MILEAGE**
RENTAL CAR***
PARKING
AIRFARE***
DEPARTMENT INSPECTION FEES:
INSPECTION (per hour)* $((56.25)) 57.80
TRAVEL (per hour)* $((56.25)) 57.80
PER DIEM**
HOTEL***
MILEAGE**
RENTAL CAR***
PARKING***
AIRFARE***
INSIGNIA FEES:
SELF CERTIFIED $((10.25)) 10.50
ALTERATION $((28.00)) 28.80
REISSUED-LOST/DAMAGED $((10.25)) 10.50
OTHER FEES:
FIELD TECHNICAL SERVICE (per hour* plus travel time* and mileage**) $((56.25)) 57.80
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year) $((10.75)) 11.00
* Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
** Per state guidelines.
***Actual charges incurred.

[Statutory Authority: RCW 43.22.340, 43.22.350, 43.22.355, 43.22.360, 43.22.400, 43.22.432, 43.22.433, 43.22.434, 43.22.450, 43.22.480, and 43.22.485. 00-17-148, 296-150R-3000, filed 8/22/00, effective 9/30/00. Statutory Authority: Chapters 43.22, 18.27, 70.87 and 19.28 RCW. 99-12-080, 296-150R-3000, filed 5/28/99, effective 6/28/99. Statutory Authority: Chapters 18.106, 18.27 and 43.22 RCW. 98-12-041, 296-150R-3000, filed 5/29/98, effective 6/30/98. Statutory Authority: RCW 43.22.340 and 43.22.420. 97-16-043, 296-150R-3000, filed 7/31/97, effective 12/1/97. Statutory Authority: RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. 96-21-146, 296-150R-3000, filed 10/23/96, effective 11/25/96.]

OTS-4778.1


AMENDATORY SECTION(Amending WSR 99-12-079, filed 5/28/99, effective 6/28/99)

WAC 296-150T-3000   Factory-built temporary worker housing fees.  


WAC 296-150T-3000 TEMPORARY WORKER HOUSING FEES
INITIAL FILING FEE $((39.25)) 40.30
DESIGN PLAN FEES:
INITIAL ONE YEAR DESIGN $((112.75)) 115.90
RENEWAL FEE $((39.25)) 40.30
RESUBMIT FEE $((56.25)) 57.80
ADDENDUM (Approval expires on same date as original plan) $((56.25)) 57.80
ELECTRONIC PLAN SUBMITTAL FEE $4.50 per page for the first set of plans and $0.30 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
Supplemental submissions of plans (resubmittals, addendums, renewals, code updates, etc.) shall be charged per hour or fraction of an hour*

$((66.50)) 68.40

APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS $((10.75)) 11.00
DEPARTMENT INSPECTION FEES
INSPECTION/REINSPECTION (Per hour* plus travel time* and mileage**) $((56.25)) 57.80
TRAVEL (Per hour)* $((56.25)) 57.80
PER DIEM**
HOTEL***
MILEAGE**
RENTAL CAR***
PARKING***
AIRFARE***
DEPARTMENT AUDIT FEES:
AUDIT (Per hour*) $((56.25)) 57.80
TRAVEL (Per hour*) $((56.25)) 57.80
PER DIEM**
HOTEL***
MILEAGE**
RENTAL CAR***
PARKING***
AIRFARE***
INSIGNIA FEES:
FIRST SECTION $((158.00)) 162.50
EACH ADDITIONAL SECTION $((15.50)) 15.90
REISSUED-LOST/DAMAGED $((39.25)) 40.30
OTHER FEES:
FIELD TECHNICAL SERVICE (Per hour* plus travel time* and mileage**) $((56.25)) $57.80
NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA) $((23.25)) 23.90
PUBLICATION PRINTING AND DISTRIBUTION OF RCW'S AND WAC''S (One free per year) $((10.75)) 11.00
* Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments
** Per state guidelines
*** Actual charges incurred

[Statutory Authority: RCW 43.22.480. 99-12-079, 296-150T-3000, filed 5/28/99, effective 6/28/99.]

OTS-4779.1


AMENDATORY SECTION(Amending WSR 99-18-069, filed 8/31/99, effective 10/1/99)

WAC 296-150V-3000   Conversion vendor units and medical units--Fees.  


WAC 296-150V-3000 CONVERSION VENDOR UNITS AND MEDICAL UNITS
INITIAL FILING FEE $((28.00)) 28.80
DESIGN PLAN FEES:
INITIAL FEE - MASTER DESIGN $((192.00)) 197.50
INITIAL FEE - ONE YEAR DESIGN $((78.75)) 81.00
RENEWAL FEE $((33.75)) 34.70
RESUBMIT FEE $((56.25)) 57.80
ADDENDUM (Approval expires on same date as original plan) $((56.25)) 57.80
ELECTRONIC PLAN SUBMITTAL FEE $4.50 per page for the first set of plans and $0.30 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
RECIPROCAL PLAN REVIEW: (Pending)
INITIAL FEE - MASTER DESIGN $((85.75)) 88.20
INITIAL FEE - ONE YEAR DESIGN $((52.00)) 53.40
RENEWAL FEE $((52.00)) 53.40
ADDENDUM $((52.00)) 53.40
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS $((10.75)) 11.00
DEPARTMENT INSPECTION FEES:
INSPECTION/REINSPECTION (Per hour* plus travel time* and mileage**) $((56.25)) 57.80
TRAVEL (Per hour)* $((56.25)) 57.80
PER DIEM**
HOTEL***
MILEAGE**
RENTAL CAR***
PARKING***
AIRFARE***
DEPARTMENT AUDIT FEES:
AUDIT (Per hour*) $((56.25)) 57.80
TRAVEL (Per hour*) $((56.25)) 57.80
PER DIEM**
HOTEL***
MILEAGE**
RENTAL CAR***
PARKING***
AIRFARE***
INSIGNIA FEES:
FIRST SECTION $((16.50)) 16.90
ALTERATION $((28.00)) 28.80
REISSUED-LOST/DAMAGED $((10.75)) 11.00
OTHER FEES:
FIELD TECHNICAL SERVICE (Per hour* plus travel time* and mileage**) $((56.25)) 57.80
PUBLICATION PRINTING AND DISTRIBUTION OF RCW'S AND WAC'S (One free copy per year upon request) $((10.75)) 11.00
* Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
** Per state guidelines.
*** Actual charges incurred.

[Statutory Authority: Chapter 43.22 RCW. 99-18-069, 296-150V-3000, filed 8/31/99, effective 10/1/99.]

OTS-4770.2


AMENDATORY SECTION(Amending WSR 99-12-080, filed 5/28/99, effective 6/28/99)

WAC 296-200A-900   What fees does the department charge contractors for issuance, renewal and reinstatement of certificates of registration?   (1) For the purposes of this chapter:

(a) A contractor's registration is renewed before it expires.

(b) A contractor's registration is reinstated after the registration:

(i) Has expired; or

(ii) Has been suspended because the contractor's insurance has expired; or

(iii) Has been suspended because the contractor's bond has been canceled or impaired.

(c) A contractor reregisters when his or her business structure changes.

(2) The department charges the following fees:

(a) Before August 1, 2001:

(i) $45.00 for each issuance, renewal or reregistration of a certificate of registration.

(((b) $45.00)) (ii) $46.20 for the reinstatement of a certificate of registration.

(b) On or after August 1, 2001:

(i) $50.00 for each issuance, renewal or reregistration of a certificate of registration for contractors with an even numbered Unified Business Identifier number. This registration is valid for one year from date of issuance, renewal or reregistration or until it is suspended or revoked.

(ii) $100.00 for each issuance, renewal or reregistration of a certificate of registration for contractors with an odd numbered Unified Business Identifier number or those who are not required to have a Unified Business Identifier by the department of revenue. This registration is valid for two years from date of issuance, renewal or reregistration or until it is suspended or revoked.

(iii) $46.20 for the reinstatement of a certificate of registration.

(iv) After the issuance, renewal or reregistration of a certificate of registration granted under (b)(i) and (ii) of this subsection all contractors (regardless of Unified Business Identifier number) must comply with the two-year registration provisions established under (b)(ii) of this subsection.

(c) (($10.75)) $11.00 for providing a duplicate certificate of registration.

(d) (($21.50)) $22.10 for each requested certified letter prepared by the department.

(e) $2.00 per copy for documents copied from a contractor's file. The maximum copy charge for copies from one contractor's file will be (($25.00)) $25.70.

(f) On or after July 22, 2001, a fee of $20.00 is required to cover the costs for the service of process in an action against the contractor, the contractor's bond, or the deposit under RCW 18.27.040.

[Statutory Authority: Chapters 43.22, 18.27, 70.87 and 19.28 RCW. 99-12-080, 296-200A-900, filed 5/28/99, effective 6/28/99. Statutory Authority: Chapters 18.106, 18.27 and 43.22 RCW. 98-12-041, 296-200A-900, filed 5/29/98, effective 6/30/98. Statutory Authority: Chapter 18.27 RCW. 97-24-071, 296-200A-900, filed 12/2/97, effective 1/5/98.]

OTS-4782.1


AMENDATORY SECTION(Amending WSR 01-01-097, filed 12/15/00, effective 1/18/01)

WAC 296-401B-700   Fees for certificates of competency, examination and reciprocity.   When an individual applies to take a competency examination or to obtain a certificate of competency, the individual must pay the appropriate fee(s) listed below.


Type of Certificate
Fee
(1) Journeyman or specialty electrician certificate renewal (per 36-month period) $((64.50)) 66.30
(2) Late renewal of journeyman or specialty electrician certificate (per 36-month period) $((130.00)) 133.70
(3) Journeyman or specialty electrician examination application (nonrefundable) $((27.00)) 27.70
(4) Journeyman or specialty electrician original certificate $((42.50)) 43.70
(5) Training certificate (expires one year after purchase) $((20.75)) 21.30
(6) Training certificate renewal or update of hours $((20.75)) 21.30
(7) Unsupervised electrical training certificate $((20.75)) 21.30
(8) Journeyman or specialty electrician test or retest $((48.75)) 50.10
(9) Reciprocal journeyman or specialty certificate $((69.50)) 71.40
(10) Reinstatement of journeyman or specialty certificate $((20.75)) 21.30
(11) Continuing education course submittal and approval, per course $((41.50)) 42.60
(12) Continuing education course renewal, per course $((20.75)) 21.30
(13) Refund processing fee. All requests for refunds will be assessed a processing fee $((10.50)) 10.80

Note: Failure to appear for an examination results in forfeiture of the examination fee.

[Statutory Authority: RCW 19.28.031, 19.28.551, 19.28.010, 19.28.101, 19.28.171, 19.28.191, 19.28.251, 19.28.470, 19.28.490, 67.42.050, 2000 c 238, and chapter 19.28 RCW. 01-01-097, 296-401B-700, filed 12/15/00, effective 1/18/01.]

Washington State Code Reviser's Office