PERMANENT RULES
ADMINISTRATION BOARD
Date of Adoption: January 10 [15], 2004.
Purpose: WAC 136-130-040, 136-130-060, and 136-130-070 have been amended to better define prioritization in the rural arterial program regions. WAC 136-28-010 has been amended to reflect an update of a name change of a national organization.
Citation of Existing Rules Affected by this Order: Amending WAC 136-130-040, 136-130-060, 136-130-070, and 136-28-010.
Statutory Authority for Adoption: Chapter 36.79 RCW.
Adopted under notice filed as WSR 03-21-135 on October 21, 2003.
Number of Sections Adopted in Order to Comply with Federal Statute: New 0, Amended 0, Repealed 0; Federal Rules or Standards: New 0, Amended 0, Repealed 0; or Recently Enacted State Statutes: New 0, Amended 0, Repealed 0.
Number of Sections Adopted at Request of a Nongovernmental Entity: New 0, Amended 0, Repealed 0.
Number of Sections Adopted on the Agency's Own Initiative: New 0, Amended 0, Repealed 0.
Number of Sections Adopted in Order to Clarify, Streamline, or Reform Agency Procedures: New 0, Amended 0, Repealed 0.
Number of Sections Adopted Using Negotiated Rule Making:
New 0,
Amended 0,
Repealed 0;
Pilot Rule Making:
New 0,
Amended 0,
Repealed 0;
or Other Alternative Rule Making:
New 0,
Amended 0,
Repealed 0.
Effective Date of Rule:
Thirty-one days after filing.
February 3, 2004
Jay P. Weber
Executive Director
OTS-6739.1
AMENDATORY SECTION(Amending WSR 01-09-077, filed 4/17/01,
effective 5/18/01)
WAC 136-130-040
Project prioritization in northwest
region (NWR).
Each county in the NWR may submit projects
requesting RATA funds not to exceed five hundred thousand
dollars per project, except that on one project for each
county there is a maximum RATA contribution of seven hundred
fifty thousand dollars; and ((fifty)) forty percent of the
forecasted regional apportionment. No bridge replacement
projects will be funded. Each project shall be rated in
accordance with the NWR RAP reconstruction or 3R rating
procedures. NWR RAP reconstruction rating points shall be
assigned on the basis of forty points for structural
condition, forty points for geometrics, ten points for traffic
volume, ten points for traffic accidents, five points for any
project on a major collector (07), and ten points for any
project on a rural principal arterial (02) or a rural minor
arterial (06). Prioritization of NWR projects shall be on the
basis of total NWR RAP rating points shown on the project
worksheet and the prospectus form of the project application.
NWR RAP 3R rating points shall be assigned on the basis of thirty points for structural condition, twenty points for geometrics, ten points for traffic volume, ten points for traffic accidents, ten points for any project on a minor collector (08), and thirty points for 3R safety. Prioritization of NWR 3R projects shall be on the basis of total NWR 3R RAP rating points shown on the project worksheet and the prospectus form of the project application.
A total of twenty points representing local significance may be added to one project in each county's biennial submittal.
[Statutory Authority: Chapter 36.79 RCW. 01-09-077, § 136-130-040, filed 4/17/01, effective 5/18/01; 99-01-021, § 136-130-040, filed 12/7/98, effective 1/7/99; 98-09-070, § 136-130-040, filed 4/20/98, effective 5/21/98. Statutory Authority: RCW 36.78.070 and 36.79.060. 96-17-013, § 136-130-040, filed 8/12/96, effective 9/12/96. Statutory Authority: RCW 36.79.060. 94-10-022, § 136-130-040, filed 4/27/94, effective 5/28/94. Statutory Authority: RCW 36.79.060 and 1983 1st ex.s. c 49. 90-22-083 (Order 82), § 136-130-040, filed 11/6/90, effective 12/7/90. Statutory Authority: Chapter 36.78 RCW. 84-16-065 (Order 56), § 136-130-040, filed 7/30/84.]
Asotin County | ten percent |
Benton County | fourteen percent |
Columbia County | eleven percent |
Franklin County | thirteen percent |
Garfield County | ten percent |
Kittitas County | thirteen percent |
Klickitat County | fourteen percent |
Walla Walla County | fourteen percent |
Yakima County | twenty percent |
SER RAP reconstruction rating points shall be assigned on the basis of forty-five points for structural condition, thirty points for geometrics, twenty-two points for traffic volume, five points for traffic accidents.
SER RAP 3R rating points shall be assigned on the basis of twenty points for structural condition, twenty-five points for geometrics, twelve points for traffic volume, ten points for traffic accidents, twenty-five points for roadside safety, and ten points for intersection operation.
A total of twenty points representing local significance may be added to one project in each county's biennial submittal. Prioritization of SER projects shall be on the basis of total SER RAP bridge, reconstruction or 3R rating points shown on the project worksheet and the prospectus form of the project application.
[Statutory Authority: Chapter 36.79 RCW. 01-05-009, § 136-130-060, filed 2/8/01, effective 3/11/01; 99-01-021, § 136-130-060, filed 12/7/98, effective 1/7/99. Statutory Authority: RCW 36.79.060. 97-06-006, § 136-130-060, filed 2/24/97, effective 3/27/97; 94-10-020, § 136-130-060, filed 4/27/94, effective 5/28/94; 92-13-038 (Order 88), § 136-130-060, filed 6/10/92, effective 7/11/92. Statutory Authority: RCW 36.79.060 and 1983 1st ex.s. c 49. 90-22-083 (Order 82), § 136-130-060, filed 11/6/90, effective 12/7/90. Statutory Authority: Chapter 36.78 RCW. 88-05-040 (Order 68), § 136-130-060, filed 2/16/88; 84-16-065 (Order 56), § 136-130-060, filed 7/30/84.]
[Statutory Authority: Chapter 36.79 RCW. 02-11-008, § 136-130-070, filed 5/2/02, effective 6/2/02; 01-05-009, § 136-130-070, filed 2/8/01, effective 3/11/01; 99-24-057, § 136-130-070, filed 11/29/99, effective 12/30/99; 99-01-021, § 136-130-070, filed 12/7/98, effective 1/7/99. Statutory Authority: RCW 36.79.060. 92-13-038 (Order 88), § 136-130-070, filed 6/10/92, effective 7/11/92. Statutory Authority: RCW 36.79.060 and 1983 1st ex.s. c 49. 90-22-083 (Order 82), § 136-130-070, filed 11/6/90, effective 12/7/90. Statutory Authority: Chapter 36.78 RCW. 88-05-040 (Order 68), § 136-130-070, filed 2/16/88; 86-06-005 (Order 61), § 136-130-070, filed 2/20/86; 84-16-065 (Order 56), § 136-130-070, filed 7/30/84.]
OTS-6738.1
AMENDATORY SECTION(Amending WSR 99-01-021, filed 12/7/98,
effective 1/7/99)
WAC 136-28-010
Purpose and authority.
RCW 36.78.070(1)
authorizes the county road administration board to establish
standards of good practice for the administration of county
roads and the efficient movement of people and goods over
county roads. In order to implement the requirement of the
National Highway Safety Act of 1966 that requires all states,
in cooperation with their various local governments, to
collect, compile and make reports to the National Highway
Traffic Safety ((Bureau of Accident Statistics))
Administration in each state, the county road administration
board has acted to coordinate the activities of the county
engineers and the state patrol. Each county engineer is to
cooperate in this effort by following the procedure outlined
below.
[Statutory Authority: Chapter 36.79 RCW. 99-01-021, § 136-28-010, filed 12/7/98, effective 1/7/99. Statutory Authority: RCW 36.78.070 and 36.79.060. 96-17-013, § 136-28-010, filed 8/12/96, effective 9/12/96. Statutory Authority: RCW 36.78.070. 90-17-076 (Order 79), § 136-28-010, filed 8/16/90, effective 9/16/90; Order 5, § 136-28-010, filed 4/23/68.]