PROPOSED RULES
Original Notice.
Exempt from preproposal statement of inquiry under RCW 34.05.310(4).
Title of Rule and Other Identifying Information: WAC 246-358-990 and 246-361-990, amending sections to increase fees for temporary worker housing (TWH).
Hearing Location(s): Department of Health, Point Plaza East, Rooms 152 and 153, 310 Israel Road S.E., Tumwater, WA 98501, on April 26, 2011, at 9:00.
Date of Intended Adoption: May 24, 2011.
Submit Written Comments to: John Hilger, P.O. Box 47852, Olympia, WA, web site http://www3.doh.wa.gov/policyreview/, fax (360) 236-2901, by April 26, 2011.
Assistance for Persons with Disabilities: Contact John Hilger by April 21, 2011, TTY (800) 833-6388 or 711.
Purpose of the Proposal and Its Anticipated Effects, Including Any Changes in Existing Rules: The proposed rules increase fees for TWH.
Reasons Supporting Proposal: RCW 43.70.340 requires the department to collect fees to pay costs of administering and regulating construction and operation of TWH. ESSB 6444 (chapter 37, Laws of 2010) reduced general fund state dollars for the TWH program and gave the department the authority to increase fees to cover the loss of funding. In order to maintain the viability of the TWH program, the department must increase fees.
Statutory Authority for Adoption: RCW 43.70.340, ESSB 6444 (chapter 37, Laws of 2010).
Statute Being Implemented: RCW 43.70.340, ESSB 6444 (chapter 37, Laws of 2010).
Rule is not necessitated by federal law, federal or state court decision.
Name of Proponent: Department of health, governmental.
Name of Agency Personnel Responsible for Drafting: Debra Fisher, 310 Israel Road S.E., Tumwater, WA 98501, (360) 236-2942; Implementation and Enforcement: Lisa Hodgson, 310 Israel Road S.E., Tumwater, WA 98501, (360) 236-2927.
No small business economic impact statement has been prepared under chapter 19.85 RCW. Under RCW 19.85.025 and 34.05.310 (4)(f), a small business economic impact statement is not required for proposed rules that set or adjust fees or rates pursuant to legislative standards.
A cost-benefit analysis is not required under RCW 34.05.328. Under RCW 34.05.328 (5)(b)(vi) of the Administrative Procedure Act, a cost-benefit analysis is not required for rules that set or adjust fees or rates pursuant to legislative standards.
March 22, 2011
Mary C. Selecky
Secretary
OTS-3838.4
AMENDATORY SECTION(Amending WSR 99-24-095, filed 11/30/99,
effective 12/31/99)
WAC 246-358-990
Fees.
(((1) License fees. An operator
must submit to the department a license fee of twenty-five
dollars and an on-site survey fee as specified in Table 990.))
(a) An annual licensing fee, according to Table 990; and
(b) An on-site survey fee every third year.
(3) Follow-up surveys. An operator will be charged an additional on-site survey fee for any follow-up surveys, when the department determines additional on-site surveys are necessary to confirm compliance with this chapter.
(4) Complaint investigation fees. An operator will be charged for each on-site survey conducted by the department when a complaint investigation results in the complaint being found valid. This fee will be charged according to Table 990 for on-site survey.
(5) Water test fees. An operator who cannot provide written proof that the water system serving the camp is in compliance with WAC 246-358-055 at the time of survey will be:
(a) Directly billed for the cost of each required water sample collected by department staff;
(b) Cited for noncompliance with WAC 246-358-055; and
(c) If substantiated, cited for operating an unlicensed camp.
(6) Late fees. An operator who does not submit the fee and application as required by WAC 246-358-025, Licensing, may be charged a late fee of one-half the cost of the license fee. If the license fee and the application are not received by the time of the preoccupancy survey, an additional late fee of one-half the cost of the license fee may be charged. If the fee and application are not received within ten days of the preoccupancy survey the TWH may be considered unlicensed and subject to fines according to WAC 246-358-900.
(7) Refunds. The license and on-site survey fee may be refunded when the operator submits:
(a) A written request to the department; and
(b) Provides documentation that the housing was not occupied during the license period.
(( |
Survey +License |
||
51 to 100 occupants |
|||
101 to 150 occupants |
|||
(2) Technical assistance fee. An operator may be charged for each technical assistance visit conducted by the department when requested or approved by the operator or their designee. This fee will be charged according to WAC 246-359-990 Table 1, Part G.
(3) Late fees. A late fee may be charged according to Table 1 of this section when:
(a) The initial application and licensing fee, as required by WAC 246-358-025(2), are not received by the department at least forty-five days prior to the TWH opening operation date;
(b) The renewal application and licensing fee, as required by WAC 246-358-025(2), are not received by the department by the TWH renewal due date.
(4) TWH civil fine. An operator may be assessed a civil fine for failure or refusal to obtain a license prior to occupancy of TWH. Civil fines for TWH are provided for in RCW 43.70.335.
(5) Refunds.
(a) The department will refund fees paid by the operator if:
(i) The operator submits a written request to the department for a refund; and
(ii) The operator provides documentation to the department that the housing was not occupied during the license period.
(b) The department will refund two-thirds of the licensing fees paid, less a fifty dollar processing fee, if an application has been received but no preoccupancy survey has been performed by the department.
(c) The department will refund one-third of the licensing fees paid, less a fifty dollar processing fee, if an application has been received and a preoccupancy survey has been performed by the department.
(d) The department will not refund applicant licensing fees under the following conditions:
(i) The department has performed more than one on-site survey for any purpose; or
(ii) One year has elapsed since a license application was
received by the department, but no license was issued because
the applicant failed to complete requirements for licensure.
Fees, Regular Temporary Worker Housing
Fee Type | Fee |
License fee | $11 per occupant, at maximum occupancy |
($110 minimum fee) | |
Late fee | $100 |
[Statutory Authority: RCW 43.70.340. 99-24-095, § 246-358-990, filed 11/30/99, effective 12/31/99. Statutory Authority: RCW 43.70.340 and 43.70.040. 93-03-031 (Order 324), § 246-358-990, filed 1/12/93, effective 2/12/93. Statutory Authority: RCW 43.70.040. 91-02-049 (Order 121), recodified as § 246-358-990, filed 12/27/90, effective 1/31/91. Statutory Authority: RCW 43.20A.055. 87-24-074 (Order 2564), § 440-44-100, filed 12/2/87; 86-05-029 (Order 2342), § 440-44-100, filed 2/19/86.]
OTS-3840.4
AMENDATORY SECTION(Amending WSR 00-06-082, filed 3/1/00,
effective 3/1/00)
WAC 246-361-990
Fees for cherry harvest camps.
(((1)
License and survey fees. A cherry camp operator must submit
to the department a license fee of twenty-five dollars and an
on-site survey fee as specified in Table 990.
Note: The on-site survey fee for licensing includes four surveys (one prior to camp being occupied, two while camp is occupied, and one to verify the camp has been closed).
(2) Additional survey fees. An operator will be charged an additional on-site survey fee for any follow-up surveys, when the department determines additional on-site surveys are necessary to confirm compliance with this chapter. The additional survey will be one-half the cost of the on-site survey fee as stated in Table 990.
(3) Complaint investigation fees. Operators will be charged for each on-site survey conducted by the department when a complaint investigation results in the complaint being found valid. This fee will be charged according to Table 990 for on-site survey.
(4) Water test fees. An operator will be directly billed for each water sample collected by the department when the operator has not submitted the water tests as required by WAC 246-361-025 and 246-361-055.
(5) Refunds. The license and on-site survey fee may be refunded when the operator submits:
(a) A written request to the department; and
(b) Provides documentation that the housing was not occupied during the license period.
TABLE 990
(( |
(includes cost of all survey types: Initial, annual, follow-up, complaint) |
||
$25.00 for each 50 persons |
(2) Technical assistance fee. An operator may be charged for each technical assistance visit conducted by the department when requested or approved by the operator or their designee. This fee will be charged according to WAC 246-359-990 Table 1, Part G.
(3) Late fees. A late fee may be charged according to Table 1 of this section when:
(a) The initial application and licensing fee, as required by WAC 246-361-025(2), are not received by the department at least forty-five days prior to the TWH opening operation date;
(b) The renewal application and licensing fee, as required by WAC 246-361-025(2), are not received by the department by the TWH renewal due date.
(4) TWH civil fine. An operator may be assessed a civil fine for failure or refusal to obtain a license prior to occupancy of TWH. Civil fines for TWH are provided for in RCW 43.70.335.
(5) Refunds.
(a) The department will refund fees paid by the operator if:
(i) The operator submits a written request to the department for a refund; and
(ii) The operator provides documentation to the department that the housing was not occupied during the license period.
(b) The department will refund two-thirds of the licensing fees paid, less a fifty dollar processing fee, if an application has been received but no preoccupancy survey has been performed by the department.
(c) The department will refund one-third of the licensing fees paid, less a fifty dollar processing fee, if an application has been received and a preoccupancy survey has been performed by the department.
(d) The department will not refund applicant licensing fees under the following conditions:
(i) The department has performed more than one on-site survey for any purpose; or
(ii) One year has elapsed since a license application was
received by the department, but no license was issued because
the applicant failed to complete requirements for licensure.
Fees, Cherry Harvest Camps
Fee Type | Fee |
License fee | $11 per occupant, at maximum occupancy |
($110 minimum fee) | |
Late fee | $100 |
[Statutory Authority: RCW 70.114A.065 and 70.114A.110. 00-06-082, § 246-361-990, filed 3/1/00, effective 3/1/00.]