PROPOSED RULES
PILOTAGE COMMISSIONERS
Original Notice.
Exempt from preproposal statement of inquiry under RCW 34.05.310(4).
Title of Rule and Other Identifying Information: WAC 363-116-300 Pilotage rates for the Puget Sound pilotage district.
Hearing Location(s): 2901 Third Avenue, 5th Floor, Alki Conference Room, Seattle, WA 98121, on November 15, 2012, at 9:30 a.m.
Date of Intended Adoption: November 15, 2012.
Submit Written Comments to: Captain Harry Dudley, Chairman, 2901 Third Avenue, Suite 500, Seattle, WA 98121, e-mail larsonp@wsdot.wa.gov, fax (206) 515-3906, by November 6, 2012.
Assistance for Persons with Disabilities: Contact Shawna Erickson by November 12, 2012, (206) 515-3647.
Purpose of the Proposal and Its Anticipated Effects, Including Any Changes in Existing Rules: The purpose of the proposal is to set a Puget Sound pilotage district annual tariff for the calendar year 2013.
The proposed rule reflects (1) a new tariff category and (2) a range of across-the-board tariff adjustments excluding the training surcharge category and the transportation to vessels on Puget Sound category. Both methods of establishing a tariff, which may be combined, are shown in the proposal in order to depict what options the board will be considering.
(1) The board will consider a new tariff category proposed by Puget Sound pilots (PSP) called the variable expense component (VEC). PSP is proposing a VEC charge to be levied by way of one or more charges up to the following amounts:
a. Surcharge of seventeen percent of the total other charges in the tariff;
b. Per assignment charge of $865;
c. Draft charge of $26.33 per foot;
d. Tonnage charge of $.0172 per gross ton;
e. LOA charge of $1.09 per foot;
f. Beam charge of $7.55 per foot;
g. Waterway charge of $728.56. (This would cover training and technology costs only.)
The Pacific Merchant Shipping Association (PMSA) is opposed to the addition of this new category of line items. The board will consider from $0.00 for each proposed charge (thus not creating a new category) up to the above amounts.
(2) The board will consider an overall range of tariff adjustments between a decrease of ten percent and an increase of fifteen percent. The low end of the range is proposed by the PMSA and the high end of the range is proposed by the PSP. The fifteen percent sought by PSP may be made up of across-the-board adjustments to the tariff and any or all of the VEC charges enumerated above. In total, PSP is not seeking increases in excess of the overall fifteen percent range.
Also, the board will consider an adjustment to the transportation charge portions of the British Columbia direct transit charge. PMSA proposes a ten percent decrease. PSP proposes a 5.5 percent increase. The range being considered is between a decrease of ten percent and an increase of 5.5 percent.
Reasons Supporting Proposal: Major stakeholders have contributed to the development of this proposal.
Statutory Authority for Adoption: Chapter 88.16 RCW.
Statute Being Implemented: RCW 88.16.035.
Rule is not necessitated by federal law, federal or state court decision.
Agency Comments or Recommendations, if any, as to Statutory Language, Implementation, Enforcement, and Fiscal Matters: Current rates for the Puget Sound pilotage district expire on December 31, 2012. New rates must be set annually.
The board may adopt a rule that varies from the proposed rule upon consideration of written and oral testimony; this includes the adoption of a rule reflecting no changes to the current tariff.
Name of Proponent: PSP and PMSA, private.
Name of Agency Personnel Responsible for Drafting: Peggy Larson, 2901 Third Avenue, Seattle, WA 98121, (206) 515-3904; Implementation and Enforcement: Board of Pilotage Commissioners, 2901 Third Avenue, Seattle, WA 98121, (206) 515-3904.
No small business economic impact statement has been prepared under chapter 19.85 RCW. The proposed rule is being considered in the context of the required annual review of the rates charged for pilotage services.
The application of the proposed revisions is clear in the description of the proposal and its anticipated effects as well as the attached proposed tariff.
A cost-benefit analysis is not required under RCW 34.05.328. RCW 34.05.328 does not apply to the adoption of these rules. The Washington state board of pilotage commissioners is not a listed agency in RCW 34.05.328 (5)(a)(i).
October 2, 2012
Peggy Larson
Executive Director
OTS-5058.1
AMENDATORY SECTION(Amending WSR 11-23-176, filed 11/23/11,
effective 1/1/12)
WAC 363-116-300
Pilotage rates for the Puget Sound
pilotage district.
Effective 0001 hours January 1, ((2012))
2013, through 2400 hours December 31, ((2012)) 2013.
CLASSIFICATION | RATE | |
Ship length overall (LOA) | ||
Charges: | ||
Per LOA rate schedule in this section. | ||
Boarding charge: | $(( |
|
Per each boarding/deboarding at the Port Angeles pilot station. | ||
Harbor shift - Live ship (Seattle Port) | LOA Zone I | |
Harbor shift - Live ship (other than Seattle Port) | LOA Zone I | |
Harbor shift - Dead ship | Double LOA Zone I | |
Towing charge - Dead ship: | Double LOA Zone | |
LOA of tug + LOA of tow + beam of tow |
Compass Adjustment | $(( |
Radio Direction Finder Calibration | $(( |
Launching Vessels | $(( |
Trial Trips, 6 hours or less (minimum $(( |
$(( |
Trial Trips, over 6 hours (two pilots) | $(( |
Shilshole Bay – Salmon Bay | $(( |
Salmon Bay – Lake Union | $(( |
Lake Union – Lake Washington (plus LOA zone from Webster Point) | $(( |
Cancellation Charge | LOA Zone I |
Cancellation Charge – Port Angeles: | LOA Zone II |
(When a pilot is ordered and vessel proceeds to a port outside the Puget Sound pilotage district without stopping for a pilot or when a pilot order is canceled less than twelve hours prior to the original ETA.) |
Ships up to 90' beam:
A charge of $((258.00)) 232.00 to 297.00 shall be in addition
to bridge charges for any vessel movements both inbound and
outbound required to transit south of Spokane Street in
Seattle, south of Eleventh Street in any of the Tacoma
waterways, in Port Gamble, or in the Snohomish River. Any
vessel movements required to transit through bridges shall
have an additional charge of $((123.00)) 111.00 to 141.00 per
bridge.
Ships 90' beam and/or over:
A charge of $((350.00)) 315.00 to 403.00 shall be in addition
to bridge charges for any vessel movements both inbound and
outbound required to transit south of Spokane Street in
Seattle and south of Eleventh Street in any of the Tacoma
waterways. Any vessel movements required to transit through
bridges shall have an additional charge of $((244.00)) 220.00
to 281.00 per bridge.
(The above charges shall not apply to transit of vessels from
Shilshole Bay to the limits of Lake Washington.)
Two or three pilots required:
In a case where two or three pilots are employed for a single vessel waterway or bridge transit, the second and/or third pilot charge shall include the bridge and waterway charge in addition to the harbor shift rate.
Docking Delay After Anchoring:
Applicable harbor shift rate to apply, plus $((266.00)) 239.00
to 306.00 per hour standby. No charge if delay is 60 minutes
or less. If the delay is more than 60 minutes, charge is
$((266.00)) 239.00 to 306.00 for every hour or fraction
thereof.
Sailing Delay:
No charge if delay is 60 minutes or less. If the delay is
more than 60 minutes, charge is $((266.00)) 239.00 to 306.00
for every hour or fraction thereof. The assessment of the
standby charge shall not exceed a period of twelve hours in
any twenty-four-hour period.
Slowdown:
When a vessel chooses not to maintain its normal speed
capabilities for reasons determined by the vessel and not the
pilot, and when the difference in arrival time is one hour, or
greater, from the predicted arrival time had the vessel
maintained its normal speed capabilities, a charge of
$((266.00)) 239.00 to 306.00 per hour, and each fraction
thereof, will be assessed for the resultant difference in
arrival time.
Delayed Arrival – Port Angeles:
When a pilot is ordered for an arriving inbound vessel at Port
Angeles and the vessel does not arrive within two hours of its
ETA, or its ETA is amended less than six hours prior to the
original ETA, a charge of $((266.00)) 239.00 to 306.00 for
each hour delay, or fraction thereof, shall be assessed in
addition to all other appropriate charges.
When a pilot is ordered for an arriving inbound vessel at Port
Angeles and the ETA is delayed to six hours or more beyond the
original ETA, a cancellation charge shall be assessed, in
addition to all other appropriate charges, if the ETA was not
amended at least twelve hours prior to the original ETA.
Tonnage Charges:
0 to 20,000 gross tons:
Additional charge to LOA zone mileage of $((0.0082)) 0.0074 to
0.0094 a gross ton for all gross tonnage up to 20,000 gross
tons.
20,000 to 50,000 gross tons:
Additional charge to LOA zone mileage of $((0.0846)) 0.0761 to
0.0973 a gross ton for all gross tonnage in excess of 20,000
gross tons up to 50,000 gross tons.
50,000 gross tons and up:
In excess of 50,000 gross tons, the charge shall be
$((0.1012)) 0.0911 to 0.1164 per gross ton.
For vessels where a certificate of international gross tonnage
is required, the appropriate international gross tonnage shall
apply.
Transportation to Vessels on Puget Sound:
March Point or Anacortes | $195.00 | |
Bangor | 190.00 | |
Bellingham | 225.00 | |
Bremerton | 167.50 | |
Cherry Point | 260.00 | |
Dupont | 120.00 | |
Edmonds | 42.50 | |
Everett | 72.50 | |
Ferndale | 247.50 | |
Manchester | 162.50 | |
Mukilteo | 65.00 | |
Olympia | 155.00 | |
Point Wells | 42.50 | |
Port Gamble | 230.00 | |
Port Townsend (Indian Island) | 277.50 | |
Seattle | 18.75 | |
Tacoma | 87.50 |
(b) Interport shifts: Transportation paid to and from both points.
(c) Intraharbor shifts: Transportation to be paid both ways. If intraharbor shift is canceled on or before scheduled reporting time, transportation paid one way only.
(d) Cancellation: Transportation both ways unless notice of cancellation is received prior to scheduled reporting time in which case transportation need only be paid one way.
(e) Any new facilities or other seldom used terminals, not covered above, shall be based on mileage x $2.00 per mile.
Delinquent Payment Charge:
1 1/2% per month after 30 days from first billing.
Nonuse of Pilots:
Ships taking and discharging pilots without using their services through all Puget Sound and adjacent inland waters shall pay full pilotage charges on the LOA zone mileage basis from Port Angeles to destination, from place of departure to Port Angeles, or for entire distance between two ports on Puget Sound and adjacent inland waters.
British Columbia Direct Transit Charge:
In the event that a pilot consents to board or deboard a vessel at a British Columbia port, which consent shall not unreasonably be withheld, the following additional charges shall apply in addition to the normal LOA, tonnage and other charges provided in this tariff that apply to the portion of the transit in U.S. waters:
Direct Transit Charge | $(( |
Sailing Delay Charge. Shall be levied for each hour or fraction thereof that the vessel departure is delayed beyond its scheduled departure from a British Columbia port, provided that no charge will be levied for delays of one hour or less and further provided that the charge shall not exceed a period of 12 hours in any 24 hour period. | $(( |
Slow Down Charge. Shall be levied for each hour or fraction thereof that a vessel's arrival at a U.S. or BC port is delayed when a vessel chooses not to maintain its normal safe speed capabilities for reasons determined by the vessel and not the pilot, and when the difference in arrival time is one hour, or greater from the arrival time had the vessel maintained its normal safe speed capabilities. | $(( |
Cancellation Charge. Shall be levied when a pilot arrives at a vessel for departure from a British Columbia port and the job is canceled. The charge is in addition to the applicable direct transit charge, standby, transportation and expenses. | $(( |
Transportation Charge Vancouver Area. Vessels departing or arriving at ports in the Vancouver-Victoria-New Westminster Range of British Columbia. | $(( |
Transportation Charge Outports. Vessels departing or arriving at British Columbia ports other than those in the Vancouver-Victoria-New Westminster Range. | $(( |
(a) Surcharge of 0.00% to 17.00% of the total other charges in the tariff;
(b) Per assignment charge of $0.00 to $865.00;
(c) Draft charge of $0.00 to $26.33 per foot;
(d) Tonnage charge of $0.0000 to $0.0172 per gross ton;
(e) LOA charge of $0.00 to $1.09 per foot;
(f) Beam charge of $0.00 to $7.55 per foot;
(g) Waterway charge of $0.00 to $728.56. (This would
cover training and technology costs only.)
Training Surcharge:
On January 1, 2011, a surcharge of $15.00 for each pilot trainee then receiving a stipend pursuant to the training program provided in WAC 363-116-078 shall be added to each pilotage assignment.
LOA Rate Schedule:
The following rate schedule is based upon distances furnished by National Oceanic and Atmospheric Administration, computed to the nearest half-mile and includes retirement fund contributions.
(( |
||||||
& Over |
||||||
ZONE | ZONE | ZONE | ZONE | ZONE | ZONE | |||||||
LOA | I | II | III | IV | V | VI | ||||||
(Length Overall) | Intra Harbor | 0-30 Miles | 31-50 Miles | 51-75 Miles | 76-100 Miles | 101 Miles & Over |
||||||
Low | High | Low | High | Low | High | Low | High | Low | High | Low | High | |
UP to 449 | 230 | 293 | 356 | 455 | 608 | 776 | 905 | 1,157 | 1,219 | 1,557 | 1,581 | 2,021 |
450 - 459 | 239 | 306 | 363 | 463 | 611 | 781 | 919 | 1,174 | 1,238 | 1,582 | 1,589 | 2,031 |
460 - 469 | 241 | 308 | 366 | 468 | 621 | 794 | 934 | 1,194 | 1,256 | 1,604 | 1,597 | 2,040 |
470 - 479 | 249 | 319 | 377 | 482 | 628 | 803 | 953 | 1,218 | 1,259 | 1,609 | 1,599 | 2,044 |
480 - 489 | 257 | 328 | 383 | 490 | 631 | 806 | 970 | 1,240 | 1,267 | 1,619 | 1,607 | 2,053 |
490 - 499 | 260 | 332 | 389 | 497 | 641 | 819 | 988 | 1,263 | 1,282 | 1,638 | 1,615 | 2,063 |
500 - 509 | 274 | 350 | 396 | 506 | 650 | 830 | 999 | 1,277 | 1,292 | 1,651 | 1,625 | 2,076 |
510 - 519 | 275 | 352 | 403 | 515 | 656 | 838 | 1,014 | 1,296 | 1,306 | 1,669 | 1,631 | 2,084 |
520 - 529 | 279 | 357 | 418 | 534 | 666 | 851 | 1,019 | 1,302 | 1,318 | 1,684 | 1,643 | 2,100 |
530 - 539 | 287 | 367 | 423 | 541 | 674 | 861 | 1,031 | 1,317 | 1,338 | 1,710 | 1,662 | 2,124 |
540 - 549 | 292 | 373 | 428 | 547 | 689 | 881 | 1,041 | 1,331 | 1,359 | 1,737 | 1,678 | 2,144 |
550 - 559 | 298 | 381 | 443 | 566 | 694 | 887 | 1,057 | 1,350 | 1,370 | 1,750 | 1,694 | 2,164 |
560 - 569 | 309 | 394 | 461 | 589 | 707 | 904 | 1,067 | 1,363 | 1,382 | 1,766 | 1,709 | 2,184 |
570 - 579 | 315 | 403 | 462 | 590 | 710 | 907 | 1,071 | 1,369 | 1,397 | 1,785 | 1,721 | 2,199 |
580 - 589 | 329 | 420 | 472 | 603 | 727 | 929 | 1,079 | 1,379 | 1,405 | 1,795 | 1,738 | 2,221 |
590 - 599 | 344 | 439 | 482 | 616 | 732 | 935 | 1,085 | 1,386 | 1,426 | 1,822 | 1,759 | 2,247 |
600 - 609 | 356 | 455 | 470 | 600 | 742 | 948 | 1,088 | 1,390 | 1,444 | 1,845 | 1,767 | 2,257 |
610 - 619 | 376 | 481 | 501 | 641 | 754 | 964 | 1,093 | 1,396 | 1,457 | 1,862 | 1,783 | 2,278 |
620 - 629 | 391 | 499 | 508 | 649 | 761 | 973 | 1,106 | 1,413 | 1,474 | 1,884 | 1,804 | 2,305 |
630 - 639 | 409 | 522 | 517 | 660 | 770 | 983 | 1,109 | 1,417 | 1,487 | 1,900 | 1,819 | 2,324 |
640 - 649 | 425 | 543 | 528 | 675 | 778 | 994 | 1,111 | 1,419 | 1,499 | 1,916 | 1,832 | 2,341 |
650 - 659 | 455 | 581 | 537 | 687 | 792 | 1,012 | 1,120 | 1,431 | 1,517 | 1,939 | 1,851 | 2,366 |
660 - 669 | 464 | 592 | 545 | 696 | 798 | 1,020 | 1,126 | 1,439 | 1,535 | 1,961 | 1,866 | 2,384 |
670 - 679 | 481 | 614 | 558 | 713 | 806 | 1,030 | 1,147 | 1,465 | 1,552 | 1,983 | 1,877 | 2,399 |
680 - 689 | 487 | 622 | 567 | 725 | 817 | 1,044 | 1,156 | 1,477 | 1,565 | 2,000 | 1,895 | 2,422 |
690 - 699 | 501 | 641 | 576 | 736 | 830 | 1,060 | 1,176 | 1,503 | 1,581 | 2,021 | 1,935 | 2,473 |
700 - 719 | 524 | 669 | 595 | 760 | 845 | 1,080 | 1,192 | 1,523 | 1,612 | 2,060 | 1,957 | 2,500 |
720 - 739 | 554 | 708 | 611 | 781 | 867 | 1,107 | 1,208 | 1,543 | 1,643 | 2,100 | 1,989 | 2,542 |
740 - 759 | 576 | 736 | 641 | 819 | 884 | 1,129 | 1,219 | 1,557 | 1,678 | 2,144 | 2,025 | 2,588 |
760 - 779 | 599 | 765 | 661 | 844 | 905 | 1,157 | 1,238 | 1,582 | 1,709 | 2,184 | 2,051 | 2,621 |
780 - 799 | 628 | 803 | 690 | 882 | 919 | 1,174 | 1,256 | 1,604 | 1,738 | 2,221 | 2,088 | 2,668 |
800 - 819 | 653 | 835 | 710 | 907 | 937 | 1,197 | 1,262 | 1,612 | 1,767 | 2,257 | 2,120 | 2,708 |
820 - 839 | 674 | 861 | 736 | 941 | 959 | 1,225 | 1,282 | 1,638 | 1,804 | 2,305 | 2,144 | 2,739 |
840 - 859 | 703 | 898 | 766 | 979 | 977 | 1,249 | 1,297 | 1,657 | 1,831 | 2,339 | 2,181 | 2,786 |
860 - 879 | 729 | 932 | 792 | 1,012 | 995 | 1,271 | 1,330 | 1,700 | 1,866 | 2,384 | 2,212 | 2,827 |
880 - 899 | 754 | 964 | 815 | 1,041 | 1,014 | 1,296 | 1,361 | 1,739 | 1,895 | 2,422 | 2,245 | 2,868 |
900 - 919 | 777 | 992 | 842 | 1,075 | 1,031 | 1,318 | 1,396 | 1,784 | 1,935 | 2,473 | 2,275 | 2,907 |
920 - 939 | 801 | 1,024 | 867 | 1,107 | 1,057 | 1,350 | 1,426 | 1,822 | 1,955 | 2,498 | 2,307 | 2,947 |
940 - 959 | 830 | 1,060 | 889 | 1,136 | 1,072 | 1,370 | 1,457 | 1,862 | 1,989 | 2,542 | 2,335 | 2,983 |
960 - 979 | 849 | 1,084 | 915 | 1,170 | 1,091 | 1,394 | 1,487 | 1,900 | 2,025 | 2,588 | 2,370 | 3,028 |
980 - 999 | 877 | 1,120 | 937 | 1,197 | 1,110 | 1,418 | 1,517 | 1,939 | 2,051 | 2,621 | 2,400 | 3,067 |
1000 - 1019 | 931 | 1,189 | 997 | 1,274 | 1,159 | 1,481 | 1,598 | 2,042 | 2,148 | 2,745 | 2,504 | 3,199 |
1020 - 1039 | 956 | 1,221 | 1,027 | 1,312 | 1,195 | 1,527 | 1,643 | 2,100 | 2,213 | 2,828 | 2,577 | 3,292 |
1040 - 1059 | 985 | 1,258 | 1,052 | 1,344 | 1,230 | 1,572 | 1,694 | 2,164 | 2,276 | 2,908 | 2,653 | 3,390 |
1060 - 1079 | 1,014 | 1,296 | 1,089 | 1,392 | 1,266 | 1,618 | 1,744 | 2,229 | 2,347 | 2,999 | 2,732 | 3,490 |
1080 - 1099 | 1,045 | 1,335 | 1,120 | 1,431 | 1,303 | 1,665 | 1,795 | 2,293 | 2,416 | 3,087 | 2,814 | 3,596 |
1100 - 1119 | 1,075 | 1,373 | 1,154 | 1,474 | 1,343 | 1,716 | 1,850 | 2,364 | 2,489 | 3,180 | 2,899 | 3,704 |
1120 - 1139 | 1,108 | 1,416 | 1,191 | 1,521 | 1,384 | 1,769 | 1,904 | 2,433 | 2,563 | 3,275 | 2,985 | 3,815 |
1140 - 1159 | 1,139 | 1,456 | 1,224 | 1,564 | 1,424 | 1,819 | 1,961 | 2,506 | 2,641 | 3,374 | 3,076 | 3,931 |
1160 - 1179 | 1,174 | 1,500 | 1,259 | 1,609 | 1,469 | 1,877 | 2,021 | 2,582 | 2,719 | 3,474 | 3,166 | 4,046 |
1180 - 1199 | 1,210 | 1,546 | 1,298 | 1,658 | 1,511 | 1,931 | 2,081 | 2,659 | 2,802 | 3,580 | 3,263 | 4,169 |
1200 - 1219 | 1,247 | 1,593 | 1,337 | 1,708 | 1,555 | 1,987 | 2,144 | 2,739 | 2,885 | 3,687 | 3,359 | 4,292 |
1220 - 1239 | 1,282 | 1,638 | 1,377 | 1,760 | 1,601 | 2,046 | 2,208 | 2,821 | 2,970 | 3,795 | 3,460 | 4,421 |
1240 - 1259 | 1,320 | 1,687 | 1,418 | 1,811 | 1,648 | 2,106 | 2,273 | 2,905 | 3,060 | 3,910 | 3,562 | 4,552 |
1260 - 1279 | 1,359 | 1,737 | 1,459 | 1,864 | 1,698 | 2,170 | 2,342 | 2,992 | 3,153 | 4,028 | 3,669 | 4,689 |
1280 - 1299 | 1,400 | 1,788 | 1,504 | 1,922 | 1,751 | 2,237 | 2,412 | 3,082 | 3,245 | 4,146 | 3,780 | 4,830 |
1300 - 1319 | 1,443 | 1,843 | 1,546 | 1,976 | 1,801 | 2,301 | 2,483 | 3,173 | 3,343 | 4,271 | 3,892 | 4,973 |
1320 - 1339 | 1,486 | 1,899 | 1,594 | 2,037 | 1,857 | 2,372 | 2,558 | 3,268 | 3,442 | 4,398 | 4,010 | 5,123 |
1340 - 1359 | 1,528 | 1,953 | 1,642 | 2,098 | 1,912 | 2,443 | 2,633 | 3,365 | 3,545 | 4,530 | 4,130 | 5,277 |
1360 - 1379 | 1,575 | 2,013 | 1,689 | 2,159 | 1,968 | 2,515 | 2,714 | 3,468 | 3,650 | 4,663 | 4,252 | 5,433 |
1380 - 1399 | 1,621 | 2,071 | 1,740 | 2,223 | 2,029 | 2,592 | 2,794 | 3,570 | 3,760 | 4,805 | 4,381 | 5,598 |
1400 - 1419 | 1,670 | 2,134 | 1,793 | 2,291 | 2,087 | 2,667 | 2,876 | 3,675 | 3,872 | 4,947 | 4,512 | 5,765 |
1420 - 1439 | 1,720 | 2,198 | 1,847 | 2,360 | 2,150 | 2,747 | 2,964 | 3,787 | 3,990 | 5,098 | 4,647 | 5,937 |
1440 - 1459 | 1,773 | 2,266 | 1,903 | 2,431 | 2,216 | 2,831 | 3,052 | 3,900 | 4,109 | 5,250 | 4,785 | 6,115 |
1460 - 1479 | 1,823 | 2,329 | 1,958 | 2,501 | 2,281 | 2,914 | 3,143 | 4,016 | 4,232 | 5,407 | 4,927 | 6,295 |
1480 - 1499 | 1,878 | 2,400 | 2,016 | 2,576 | 2,348 | 3,000 | 3,236 | 4,135 | 4,357 | 5,567 | 5,075 | 6,485 |
1500 & Over | 1,935 | 2,473 | 2,077 | 2,654 | 2,417 | 3,089 | 3,335 | 4,262 | 4,487 | 5,733 | 5,226 | 6,678 |
[Statutory Authority: RCW 88.16.035. 11-23-176, § 363-116-300, filed 11/23/11, effective 1/1/12; 11-10-051, § 363-116-300, filed 4/29/11, effective 5/30/11. Statutory Authority: Chapter 88.16 RCW. 10-24-085, § 363-116-300, filed 11/30/10, effective 12/31/10. Statutory Authority: RCW 88.16.035. 10-12-059, § 363-116-300, filed 5/27/10, effective 7/1/10; 09-12-072, § 363-116-300, filed 5/29/09, effective 7/1/09; 08-12-018, § 363-116-300, filed 5/28/08, effective 7/1/08; 07-12-028, § 363-116-300, filed 5/30/07, effective 7/1/07; 07-01-084, § 363-116-300, filed 12/19/06, effective 1/20/07; 06-12-009, § 363-116-300, filed 5/26/06, effective 7/1/06. Statutory Authority: Chapter 88.16 RCW and 2005 c 26. 05-18-021, § 363-116-300, filed 8/29/05, effective 10/1/05. Statutory Authority: RCW 88.16.035. 05-12-055, § 363-116-300, filed 5/26/05, effective 7/1/05; 04-12-014, § 363-116-300, filed 5/24/04, effective 7/1/04; 03-12-019, § 363-116-300, filed 5/28/03, effective 7/1/03; 02-12-008, § 363-116-300, filed 5/23/02, effective 7/1/02; 01-18-050, § 363-116-300, filed 8/30/01, effective 9/30/01; 01-12-032, § 363-116-300, filed 5/29/01, effective 7/1/01; 00-11-119, § 363-116-300, filed 5/22/00, effective 7/1/00; 99-12-027, § 363-116-300, filed 5/25/99, effective 7/1/99; 98-12-008, § 363-116-300, filed 5/22/98, effective 7/1/98; 97-12-017, § 363-116-300, filed 5/28/97, effective 7/1/97. 97-08-042, recodified as § 363-116-300, filed 3/28/97, effective 3/28/97. Statutory Authority: RCW 88.16.035. 96-12-017, § 296-116-300, filed 5/29/96, effective 7/1/96; 95-12-018, § 296-116-300, filed 5/30/95, effective 7/1/95; 94-12-044, § 296-116-300, filed 5/27/94, effective 7/1/94; 93-12-133, § 296-116-300, filed 6/2/93, effective 7/3/93; 92-14-007, § 296-116-300, filed 6/19/92, effective 7/20/92; 91-11-074, § 296-116-300, filed 5/20/91, effective 6/20/91; 90-20-116, § 296-116-300, filed 10/2/90, effective 11/2/90; 90-08-095, § 296-116-300, filed 4/4/90, effective 5/5/90; 89-08-041 (Order 89-2, Resolution No. 89-2), § 296-116-300, filed 3/31/89. Statutory Authority: RCW 88.16.050. 88-05-039 (Order 88-1, Resolution No. 88-1), § 296-116-300, filed 2/16/88, effective 3/18/88. Statutory Authority: RCW 88.16.035(4). 87-01-081 (Orders 86-9 and 86-10, Resolution Nos. 86-9 and 86-10), § 296-116-300, filed 12/19/86; 86-19-066 (Order 86-6, Resolution No. 86-6), § 296-116-300, filed 9/16/86; 86-02-035 (Order 86-1, Resolution No. 86-1), § 296-116-300, filed 12/30/85; 85-02-048 (Order 84-5, Resolution No. 84-5), § 296-116-300, filed 12/31/84; 84-04-006 (Order 84-1, Resolution No. 84-1), § 296-116-300, filed 1/20/84; 83-17-055 (Order 83-6, Resolution No. 83-6), § 296-116-300, filed 8/17/83; 82-13-065 (Order 82-4, Resolution No. 82-4), § 296-116-300, filed 6/16/82. Statutory Authority: RCW 88.16.035. 81-12-017 (Order 81-2, Resolution No. 81-2), § 296-116-300, filed 5/29/81; 80-06-084 (Order 80-1, Resolution No. 80-1), § 296-116-300, filed 5/28/80. Statutory Authority: RCW 88.16.035(4). 79-07-033 (Order 79-4, Resolution No. 79-4), § 296-116-300, filed 6/19/79. Statutory Authority: Chapter 88.16 RCW and 1977 ex. sess. c 337, §§ 1 and 4. 78-02-008 (Order 78-1), § 296-116-300, filed 1/6/78, effective 2/10/78; Order 77-18, § 296-116-300, filed 9/20/77, effective 11/1/77; Order 76-24, § 296-116-300, filed 7/22/76; Order 75-3, § 296-116-300, filed 2/10/75; Order 74-2, § 296-116-300, filed 1/8/74; Order 73-8, § 296-116-300, filed 6/20/73 and Emergency Order 73-10, filed 7/19/73, effective 8/14/73; Order 70-7, § 296-116-300, filed 7/16/70; 7/25/67; 2/18/64; 10/29/62; 12/28/60; 3/23/60.]