WSR 14-03-104 PERMANENT RULES DEPARTMENT OF COMMERCE (Lead-Based Paint Program) [Filed January 20, 2014, 10:48 a.m., effective February 20, 2014] Effective Date of Rule: Thirty-one days after filing.
Purpose: The United States Environmental Protection Agency amended its regulatory code – 40 C.F.R., Part 745 Subpart E and Subpart L, effective October 4, 2011. In summary, the amendment includes changes to: Work practice standards, training firm and renovator recordkeeping requirements, and renovator paint chip sampling/reporting.
Reasons for Supporting Proposal: Department of commerce, lead-based paint program, is required by the United States Environmental Protection Agency to adopt these amendments into chapter 365-230 WAC.
Citation of Existing Rules Affected by this Order: Amending chapter 365-230 WAC.
Statutory Authority for Adoption: RCW 70.103.030.
Adopted under notice filed as WSR 13-21-081 on October 14 [17], 2013.
Number of Sections Adopted in Order to Comply with Federal Statute: New 0, Amended 0, Repealed 0; Federal Rules or Standards: New 0, Amended 11, Repealed 0; or Recently Enacted State Statutes: New 0, Amended 0, Repealed 0.
Number of Sections Adopted at Request of a Nongovernmental Entity: New 0, Amended 0, Repealed 0.
Number of Sections Adopted on the Agency's Own Initiative: New 0, Amended 0, Repealed 0.
Number of Sections Adopted in Order to Clarify, Streamline, or Reform Agency Procedures: New 0, Amended 0, Repealed 0.
Number of Sections Adopted Using Negotiated Rule Making: New 0, Amended 0, Repealed 0; Pilot Rule Making: New 0, Amended 0, Repealed 0; or Other Alternative Rule Making: New 0, Amended 0, Repealed 0.
Date Adopted: January 15, 2014.
Nick Demerice
Director of
External Relations
AMENDATORY SECTION (Amending WSR 11-07-067, filed 3/21/11, effective 4/21/11)
WAC 365-230-035 Application process.
The following are procedures a training program must follow to receive accreditation by the department to offer lead-based paint activities training courses, or renovation and dust sampling technician courses:
(1) A training program seeking accreditation shall submit a complete written application to the department. To be considered complete, the application must be on the appropriate departmental form and include all required documentation and attachments.
(2) Information that must be provided with the application is as follows:
(a) Name, address, and phone number of training provider and training program manager.
(b) A list of course(s) for which accreditation is being applied. For the purposes of this section, courses taught in different languages and electronic learning courses are considered different courses, and each must independently meet the accreditation requirements.
(c) The name and documentation of the qualifications of the training manager.
(d) The name(s) and documentation of qualifications of any principal instructor(s).
(e) A statement signed by the training program manager certifying that the training program meets the requirements under WAC 365-230-040.
(f) If a training program uses EPA-recommended model training materials, or training materials approved by an EPA-authorized state or Indian tribe, the training manager shall include a statement certifying that. If the training program makes any changes or additions to the model curriculum, the training manager shall submit a statement indicating the changes or additions and shall submit a copy of the new or changed curriculum. It is not necessary to submit unchanged model training curriculum materials.
(g) If a training program does not use model training materials as described in (f) of this subsection, the training manager shall include: A copy of the entire course instruction curriculum, including, but not limited to: Learning objectives; documentation of course agenda with time allocation for each course topic; the sequence of topics to be covered during the course(s); student and instructor manuals, and any other materials to be used for the course.
(h) When applying for accreditation of a course in a language other than English, a signed statement from a qualified, independent translator that they had compared the course to the English language version and found the translation to be accurate.
(i) All applications for accreditation shall include:
(i) A copy of the course test blueprint describing the portion of test questions devoted to each major course topic.
(ii) A description of the facilities and equipment to be used for lecture and hands-on training, respectively.
(iii) A description of the activities and procedures that will be used for conducting the assessment of hands-on skills for each course.
(iv) A copy of the quality control plan developed by the training manager. The plan shall be used to maintain and improve the training program and contain at least the following elements:
(A) Procedures for periodic revision of training materials and course test to be current with innovations in the field.
(B) Procedures for the training manager's annual review of principal instructor competency.
(v) Documentation of accreditation by other state or federal agencies, if applicable.
(vi) A check or money order made out to the department of commerce in the amount as described in WAC 365-230-120.
AMENDATORY SECTION (Amending WSR 11-07-067, filed 3/21/11, effective 4/21/11)
WAC 365-230-040 Requirements for the accreditation of training programs.
For a training program to obtain accreditation from the department to offer lead-based paint activities courses, lead-based paint renovation courses or dust sampling technician courses, the program shall meet the following requirements:
(1) The training program shall employ a training manager who has:
(a) At least two years of experience, education, or training in teaching workers or adults; or
(b) A bachelor's or graduate degree in building construction technology, engineering, industrial hygiene, safety, public health, education, business administration or program management or a related field; or
(c) Two years of experience in managing a training program specializing in environmental hazards; and
(d) Demonstrated experience, education, or training in the construction industry including: Lead or asbestos abatement, painting, carpentry, renovation, remodeling, occupational safety and health, or industrial hygiene.
(2) The training manager shall designate a qualified principal instructor for each course who has:
(a) Demonstrated experience, education, or training in teaching workers or adults; and
(b) Successfully completed at least sixteen hours of any department-accredited, EPA-accredited or tribal-accredited lead-specific training for instructors of lead-based paint activities courses; or at least eight hours of any department-accredited, EPA-accredited or tribal-accredited lead-specific training for instructors of renovator or dust sampling technician courses; and
(c) Demonstrated experience, education, or training in lead or asbestos abatement, painting, carpentry, renovation, remodeling, occupational safety and health, or industrial hygiene.
(3) The principal instructor shall be responsible for the organization of the course, course delivery, and oversight of the teaching of all course material. The training manager may designate guest instructors as needed for a portion of the course to provide instruction specific to the lecture, hands-on activities, or work practice components of a course. However, the principal instructor is primarily responsible for teaching the course materials and must be present to provide instruction (or oversight of portions of the course taught by guest instructors) for the course for which he has been designated the principal instructor.
(4) The following documents shall be recognized by the department as evidence that training managers and principal instructors have the education, work experience, training requirements or demonstrated experience, specifically listed in subsections (1), (2), and (3) of this section. This documentation ((need not)) must be submitted with the accreditation application, ((but, if not submitted, shall be)) and retained by the training program as required by the recordkeeping requirements contained in WAC 365-230-090. Those documents include the following:
(a) Official academic transcripts or diploma as evidence of meeting the education requirements.
(b) Resumes, letters of reference, or documentation of work experience, as evidence of meeting the work experience requirements.
(c) Certificates from train-the-trainer courses and lead-specific training courses, as evidence of meeting the training requirements.
(5) The training program shall ensure the availability of, and provide adequate facilities for, the delivery of the lecture, course test, hands-on training, and assessment activities. This includes providing training equipment that reflects current work practices and maintaining or updating the equipment and facilities as needed.
(6) To become accredited in the following disciplines, the training program shall provide training courses that meet the following training hour requirements:
(a) The inspector course shall last a minimum of twenty-four training hours, with a minimum of eight hours devoted to hands-on training activities. The minimum curriculum requirements for the inspector course are contained in WAC 365-230-050.
(b) The risk assessor course shall last a minimum of sixteen training hours, with a minimum of four hours devoted to hands-on training activities. The minimum curriculum requirements for the risk assessor course are contained in WAC 365-230-050.
(c) The supervisor course shall last a minimum of thirty-two training hours, with a minimum of eight hours devoted to hands-on activities. The minimum curriculum requirements for the supervisor course are contained in WAC 365-230-050.
(d) The project designer course shall last a minimum of eight training hours. The minimum curriculum requirements for the project designer course are contained in WAC 365-230-050.
(e) The abatement worker course shall last a minimum of sixteen training hours, with a minimum of eight hours devoted to hands-on training activities. The minimum curriculum requirements for the abatement worker course are contained in WAC 365-230-050.
(f) The renovator course must last a minimum of eight training hours, with a minimum of two hours devoted to hands-on training activities. The minimum curriculum requirements for the renovator course are contained in WAC 365-230-050(6).
(g) The dust sampling technician course must last a minimum of eight training hours, with a minimum of two hours devoted to hands-on training activities. The minimum curriculum requirements for the dust sampling technician course are contained in WAC 365-230-050(7).
(7) Electronic learning and other alternative course delivery methods are permitted for the classroom portion of renovator, dust sampling technician, or lead-based paint activities courses but not the hands-on portion of these courses, or for final course tests or proficiency tests described in subsection (8) of this section.
(a) A unique identifier must be assigned to each student for them to use to launch and relaunch the course.
(b) The training provider must track each student's course log-ins, launches, progress, and completion, and maintain these records in accordance with WAC 365-230-090.
(c) The course must include periodic knowledge checks equivalent to the number and content of the knowledge checks contained in EPA's model course, but at least sixteen over the entire course. The knowledge checks must be successfully completed before the student can go on to the next module.
(d) There must be at least twenty questions at the end of the electronic learning portion of the course. The test must be designed so that students do not receive feedback on their test answers until after they have completed and submitted the test.
(e) Each student must be able to save or print a copy of an electronic learning course completion certificate. The electronic certificate must not be susceptible to easy editing.
(8) For each course offered, the training program shall conduct either a course test at the completion of the course, and if applicable, a hands-on skills assessment, or in the alternative, a proficiency test for that discipline. Each ((individual)) student must successfully complete the hands-on skills assessment and receive a passing score on the course test to pass any course, or successfully complete a proficiency test.
(a) The training manager is responsible for maintaining the validity and integrity of the hands-on skills assessment or proficiency test to ensure that it accurately evaluates the trainees' performance of the work practices and procedures associated with the course topics contained in WAC 365-230-050.
(b) The training manager is responsible for maintaining the validity and integrity of the course test to ensure that it accurately evaluates the trainees' knowledge and retention of the course topics.
(c) The course test shall be developed in accordance with the test blueprint submitted with the training accreditation application.
(((8))) (9) The training program shall issue unique course completion certificates to each individual who passes the training course. The course completion certificate shall include:
(a) The name, address, and telephone number of the training program.
(b) The name, a unique identification number, and address of the individual.
(((b))) (c) The name of the particular course that the individual completed.
(((c))) (d) The language in which the course was taught.
(e) Dates of course completion/test passage.
(((d) The name, address, and telephone number of the training program.)) (f) Course completion certificates for initial inspector, risk assessor, project designer, supervisor, or abatement worker are proof of successful course completion to take the state exam for a period of six months from the date of course completion.
(g) For renovator and dust sampling technician course completion certificates, a photograph of the individual. The photograph must be an accurate and recognizable image of the individual. As reproduced on the certificate, the photograph must not be smaller than one square inch.
(((9))) (10) The training manager shall develop and implement a quality control plan. The plan shall be used to maintain and improve the quality of the training program over time. This plan shall contain at least the following elements:
(a) Procedures for periodic revision of training materials and the course test to reflect innovations in the field.
(b) Procedures for the training manager's annual review of principal instructor competency.
(((10) The training program shall offer)) (11) Courses ((that)) offered by the training program must teach the work practice standards ((for conducting lead-based paint activities)) contained in WAC 365-230-200((; and shall offer the renovator or dust sampling technician courses)) and 365-230-330 as applicable in such a manner that ((teach)) trainees are provided with the knowledge needed to perform the renovations or the ((applicable work practice standards contained in WAC 365-230-200 and 365-233-330, as well as other standards developed by EPA pursuant to Title IV of TSCA. These standards shall be taught in the appropriate courses to provide trainees with the knowledge needed to perform the)) lead-based paint activities ((and renovation or dust sampling they are)) they will be responsible for conducting.
(((11))) (12) The training manager shall be responsible for ensuring that the training program complies at all times with all of the requirements in this section.
(((12))) (13) The training manager shall allow the department to audit the training program to verify the contents of the application for accreditation as described in subsection (2) of this section.
(14) A course audit shall include, but not be limited to, a review of: Instructional curriculum; examination design, administration and security procedures, and results, including those of demonstration testing; classroom instruction; audio-visual materials; course content; coverage; and teaching facilities.
(((13))) (15) An accredited training provider may not implement changes in method or content that affects one half-hour or more of contact instruction without ten business days advance notice of the changes to department.
(((14))) (16) The training provider is responsible for ensuring that the training manager and principal instructor comply with the requirements of this rule.
(((15))) (17) Whenever there is a change in either the training manager or principal instructor for an accredited training course, the training provider shall notify the department of this change within thirty days, along with documentation demonstrating the appropriate qualifications as described in this section.
(((16))) (18) The training provider shall use a system for verifying the positive identification of all trainees. Trainees without proper identification may not take the course exam.
AMENDATORY SECTION (Amending WSR 11-07-067, filed 3/21/11, effective 4/21/11)
WAC 365-230-050 Minimum training curriculum requirements.
To become accredited to offer lead-based paint courses instruction in the specific disciplines listed below, training programs must ensure that their courses of study include, at a minimum, the following course topics. Requirements ending in an asterisk (*) indicate areas that require hands-on activities as an integral component of the course.
(1) Inspector.
(a) Role and responsibilities of an inspector.
(b) Background information on lead and its adverse health effects.
(c) Background information on federal, state, and local regulations and guidance that pertains to lead-based paint and lead-based paint activities.
(d) Lead-based paint inspection methods, including selection of rooms and components for sampling or testing.*
(e) Paint, dust, and soil sampling methodologies.*
(f) Clearance standards and testing, including random sampling.*
(g) Preparation of the final inspection report.*
(h) Recordkeeping.
(2) Risk assessor.
(a) Role and responsibilities of a risk assessor.
(b) Collection of background information to perform a risk assessment.
(c) Sources of environmental lead contamination such as paint, surface dust and soil, water, air, packaging, and food.
(d) Visual inspection for the purposes of identifying potential sources of lead-based paint hazards.*
(e) Lead hazard screen protocol.
(f) Sampling for other sources of lead exposure.*
(g) Interpretation of lead-based paint and other lead sampling results, including all applicable state or federal guidance or regulations pertaining to lead-based paint hazards.*
(h) Development of hazard control options, the role of interim controls, and operations and maintenance activities to reduce lead-based paint hazards.
(i) Preparation of a final risk assessment report.
(3) Supervisor.
(a) Role and responsibilities of a supervisor.
(b) Background information on lead and its adverse health effects.
(c) Background information on federal, state, and local regulations and guidance that pertain to lead-based paint abatement.
(d) Liability and insurance issues relating to lead-based paint abatement.
(e) Risk assessment and inspection report interpretation.*
(f) Development and implementation of an occupant protection plan and abatement report.
(g) Lead-based paint hazard recognition and control.*
(h) Lead-based paint abatement and lead-based paint hazard reduction methods, including restricted practices.*
(i) Interior dust abatement/cleanup or lead-based paint hazard control and reduction methods.*
(j) Soil and exterior dust abatement or lead-based paint hazard control and reduction methods.*
(k) Clearance standards and testing.
(l) Cleanup and waste disposal.
(m) Recordkeeping.
(4) Project designer.
(a) Role and responsibilities of a project designer.
(b) Development and implementation of an occupant protection plan for large scale abatement projects.
(c) Lead-based paint abatement and lead-based paint hazard reduction methods, including restricted practices for large-scale abatement projects.
(d) Interior dust abatement/cleanup or lead hazard control and reduction methods for large-scale abatement projects.
(e) Clearance standards and testing for large scale abatement projects.
(f) Integration of lead-based paint abatement methods with modernization and rehabilitation projects for large scale abatement projects.
(5) Abatement worker.
(a) Role and responsibilities of an abatement worker.
(b) Background information on lead and its adverse health effects.
(c) Background information on federal, state and local regulations and guidance that pertain to lead-based paint abatement.
(d) Lead-based paint hazard recognition and control.*
(e) Lead-based paint abatement and lead-based paint hazard reduction methods, including restricted practices.*
(f) Interior dust abatement methods/cleanup or lead-based paint hazard reduction.*
(g) Soil and exterior dust abatement methods or lead-based paint hazard reduction.*
(6) Renovator.
(a) Role and responsibilities of a renovator.
(b) Background information on lead and its adverse health effects.
(c) Background information on EPA, HUD, OSHA, and other federal, state and local regulations and guidance that pertains to lead-based paint and renovation activities.
(d) Procedures for using acceptable test kits to determine whether paint is lead-based paint.*
(e) Procedures for collecting a paint chip sample and sending it to a laboratory recognized by EPA under section 405(b) of TSCA.
(f) Renovation methods to minimize the creation of dust and lead-based paint hazards.*
(((f))) (g) Interior and exterior containment and clean-up methods.*
(((g))) (h) Methods to ensure that the renovation has been properly completed, including cleaning verification and clearance testing.*
(((h))) (i) Waste handling and disposal.
(((i))) (j) Providing on-the-job training to other workers.
(((j))) (k) Record preparation.
(7) Dust sampling technician.
(a) Role and responsibilities of a dust sampling technician.
(b) Background information on lead and its adverse health effects.
(c) Background information on EPA, HUD, OSHA, and other federal, state, and local regulations and guidance that pertains to lead-based paint and renovation activities.
(d) Dust sampling methodologies.*
(e) Clearance standards and testing.
(f) Report preparation.*
AMENDATORY SECTION (Amending WSR 11-07-067, filed 3/21/11, effective 4/21/11)
WAC 365-230-060 Requirements for the accreditation of refresher training courses.
A training program may seek accreditation to offer refresher training courses in any of the following disciplines: Inspector, risk assessor, supervisor, project designer, abatement worker, renovator, and dust sampling technician. A training program may apply for accreditation of a refresher training course concurrently with its application for accreditation of an initial training course. All applications for accreditation of a refresher training course must follow the application process as described in WAC 365-230-035. To obtain department accreditation to offer refresher training, a training program must meet the requirements for accreditation of a training program as described in WAC 365-230-040, except for the minimum training-hour requirements in WAC 365-230-040 (6)(a) through (g). In addition, applicants for accreditation of a refresher training course must meet the following minimum requirements:
(1) Each refresher course shall review the curriculum topics of the full-length courses listed in WAC 365-230-050, as appropriate. In addition, to become accredited to offer refresher training courses, training programs shall ensure that their courses of study include, at a minimum, the following:
(a) An overview of current safety practices relating to lead-based paint ((activities)) in general, as well as specific information pertaining to the appropriate discipline.
(b) Current laws and regulations relating to lead-based paint activities in general, as well as specific information pertaining to the appropriate discipline.
(c) Current technologies relating to lead-based paint in general, as well as specific information pertaining to the appropriate discipline.
(2) Each refresher course, except for the project designer, renovator, and dust sampling technician course, shall last a minimum of eight training hours. Project designer, renovator, and dust sampling technician refresher courses shall last a minimum of four training hours.
(3) For ((each)) all other courses offered, the training program shall conduct a hands-on assessment (((if applicable))), and at the completion of the course, a course test.
AMENDATORY SECTION (Amending WSR 07-07-044, filed 3/13/07, effective 4/13/07)
WAC 365-230-070 Reaccreditation of training programs.
(1) Unless reaccredited, a training program's accreditation for both initial and refresher training courses shall expire four years after the date of issuance of the course accreditation.
(2) A training provider seeking reaccreditation ((should)) shall submit an application to the department no later than one hundred eighty days before its accreditation expires. If a training program does not submit its application by that date, the department cannot guarantee that the program will be reaccredited before the end of the accreditation period.
(3) The training program's application for reaccreditation shall contain:
(a) The training program's name, address, and telephone number.
(b) A list of courses for which it is applying for reaccreditation.
(c) The qualifications of the training program manager.
(d) The name(s) and qualifications of the principal instructor(s).
(e) A description of any changes to the training facility, equipment or course materials since its last application was approved that adversely affects the students' ability to learn or that affects more than thirty minutes of a training hour.
(((d))) (f) A statement signed by the program manager stating:
(i) That the training program complies at all times with all the Requirements for the accreditation of training programs (WAC 365-230-040) and requirements for the accreditation of refresher training programs (WAC ((365-230-035 [365-230-060])) 365-230-060), as applicable; and
(ii) The training program recordkeeping (WAC 365-230-090) and ((notification)) reporting requirements ((()) of WAC 365-230-100(())) shall be followed.
(4) Upon request, the training program shall allow the department to audit the training program to verify the contents of the application for reaccreditation as described in subsection (3) of this section.
AMENDATORY SECTION (Amending WSR 07-07-044, filed 3/13/07, effective 4/13/07)
WAC 365-230-090 Training program recordkeeping requirements.
(1) Accredited training programs shall maintain, and make available to the department if requested, the following records:
(a) All documents specified in the Requirements for the accreditation of training programs (WAC 365-230-040) as set forth in these rules that demonstrate the qualifications for training manager and principal instructors.
(b) Current curriculum, course materials and documents reflecting any changes made to these materials.
(c) The course test blueprint.
(d) Information regarding how the hands-on assessment is conducted including, but not limited to, who conducts the assessment, how skills are graded, what facilities are used, and the pass/fail rate.
(e) The quality control plan as described in the Requirements for the accreditation of training programs (WAC 365-230-040) as set forth in these rules.
(f) Results of student's hands-on skills assessments and course tests, and a copy of each student's course completion certificate.
(g) Any other material submitted as part of the program's application for accreditation.
(h) For renovator refresher and dust sampling technician refresher courses, a copy of each trainee's prior course completion certificate showing that each trainee was eligible to take the refresher course.
(i) For course modules delivered in an electronic format, a record of each student's log-ins, launches, progress and completion, and a copy of the electronic learning completion certificate for each student.
(2) The training provider ((shall)) must retain these records at the address specified on the training provider's accreditation application (or as modified as the result of notification of change of address) shall be retained a minimum of three years and six months.
(a) Records pertaining to renovator or dust sampling technician courses offered before April 22, 2010, must be retained until July 1, 2015.
(b) Records pertaining to renovator or dust sampling technician courses offered on or after April 22, 2010, must be retained for a minimum of five years.
(3) A training provider shall notify the department in writing within thirty days of changing the address specified on its training program accreditation, or transferring the records from that address.
(4) Accreditation is transferable in the case of acquisition of the accredited training provider by another entity. The new entity must notify the department within thirty days of the change of ownership and any other changes to information included in the original application.
(5) A training ((provider shall submit to the department the two notifications described in WAC 365-230-100.)) program must amend its accreditation within ninety days of the date a change occurs to information included in the program's most recent application. If the training program fails to amend its accreditation within ninety days of the date the change occurs, the program may not provide renovator, dust sampling technician, or lead-based paint activities training until its accreditation is amended.
(6) To amend an accreditation, a training program must submit a completed "Accreditation Application for Training Providers," signed by an authorized agent of the training provider, noting on the form that it is submitted as an amendment and indicating the information that has changed.
(7) If the amendment includes a new training program manager, any new or additional principal instructor(s), or any permanent training locations, the training provider is not permitted to provide training under the new training manager or offer courses taught by any new principal instructor(s), or at the new training location(s) until the department either approves the amendment or thirty days have elapsed, whichever occurs earlier. Except:
(a) If the amendment includes a new training program manager or a new or additional principal instructor that was identified in a training provider accreditation application that the department has already approved under this section, the training provider may begin to provide training under the new training manager or offer courses taught by the new principal instructor on an interim basis as soon as the provider submits the amendment to the department. The training provider may continue to provide training under the new training or offer courses taught by the new principal instructor if the department approves the amendment or if the department does not disapprove the amendment within thirty days.
(b) If the amendment includes a new permanent training location, the training provider may begin to provide training at the new permanent location on an interim basis as soon as the provider submits the amendment to the department. The training provider may continue to provide training at the new permanent training location if the department approves the amendment or if the department does not disapprove the amendment within thirty days.
AMENDATORY SECTION (Amending WSR 11-07-067, filed 3/21/11, effective 4/21/11)
WAC 365-230-100 Notification of lead-based paint training activity.
(1) The training manager ((shall)) must provide notification of lead-based paint activities courses or renovator and dust sampling technician courses offered.
(a) The training manager must provide the department with notification of all renovator, dust sampling technician, or lead-based paint activities courses offered. The original ((notice)) notification must be received by the department at least seven business days prior to ((offering any lead-based paint activities or renovator and dust sampling technician)) the start date of any renovator, dust sampling technician, or lead-based paint activities courses.
(b) The training manager ((shall)) must provide the department updated ((notice)) notification when lead-based paint activities or renovator and dust sampling technician courses will begin on a date other than the ((one)) start date specified in the original notification, as follows:
(i) For lead-based paint activities or renovator and dust sampling technician courses beginning prior to the ((original)) start date provided to the department an updated ((notice)) notification must be received by the department at least seven business days before the ((revised)) new start date.
(ii) For lead-based paint activities or renovator and dust sampling technician courses beginning after the ((original)) start date ((an updated notice must be received by)) provided to the department, an updated notification must be received at least two business days before the ((original)) start date provided to the department.
(c) The training manager ((shall)) must update the department of any change in location of lead-based paint activities or renovator and dust sampling technician courses at least seven business days prior to the ((scheduled course)) start date provided to the department.
(d) The training manager ((shall also)) must update the department regarding any course cancellations, or any other change to the original ((notice)) notification. Updated ((notices)) notifications must be received by the department at least two business days prior to the ((scheduled course)) start date provided to the department.
(e) Each notice, including updates, shall include the following:
(i) Notification type (original, update, cancellation).
(ii) Training program name, department accreditation number, address, and phone number.
(iii) Course discipline, type (initial/refresher), and the language in which instruction will be given.
(iv) Date(s) and time(s) of training.
(v) Training location(s) phone number((,)) and ((street)) address.
(vi) Principal instructor's name.
(vii) Training manager's name and signature.
(f) Notification ((shall)) must be accomplished using ((one)) any of the following methods: Written notification or electronic. Notification of lead-based paint activities, renovator, or dust sampling technician course schedules can be accomplished by using either the sample form titled "Pre-Training Notification" or a similar form developed by the training program containing the required information. All written notices shall be delivered by U.S. Postal Service, fax, commercial delivery service, or hand delivery. (Persons submitting notification by U.S. Postal Service are reminded that they should allow three additional business days for delivery in order to ensure that the department receives the notification by the required date.) Instructions and sample forms can be obtained from the department at 360-586-5323, or on the internet at http://www.commerce.wa.gov/lead.
(g) Lead-based paint activities or renovator and dust sampling technician courses ((shall)) must not begin on a date, or at a location other than that specified in the original notice unless an updated ((notice)) notification identifying a new start date or location is submitted, in which case the course must begin on the new start date and/or location specified in the updated ((notice)) notification.
(h) No training program shall provide lead-based paint activities or renovator and dust sampling technician courses without first notifying the ((agency)) department of such activities in accordance with the requirements of this ((subsection (1)(h))) section.
(2) The training manager ((shall)) must provide notification following completion of lead-based paint activities or renovator and dust sampling technician courses.
(a) The training manager ((shall)) must provide the department with ((notice)) notification after the completion of any lead-based paint activities or renovator and dust sampling technician course that shall be received by the department no later than ten business days following course completion.
(b) The notice ((shall)) must include the following:
(i) Training program name, department accreditation number, address, and phone number.
(ii) Course discipline and type (initial/refresher).
(iii) Date(s) of training.
(iv) The following information for each student who took the course:
(A) Name.
(B) Address.
(C) Course completion certificate number.
(D) ((Student)) Course test score.
(v) Training manager's name and signature.
(c) Notification shall be accomplished using one of the following methods: Written or electronic. Notification following lead-based paint activities, renovator, or dust sampling technician courses can be accomplished by using either the sample form titled "Post-Training Notification" or a similar form developed by the training program containing the required information. All written notices shall be delivered by U.S. Postal Service, fax, commercial delivery service, or hand delivery. (Persons submitting notification by U.S. Postal Service are reminded that they should allow three additional business days for delivery in order to ensure that the department receives the notification by the required date.) Instructions and sample forms can be obtained from department at 360-586-5323, or on the internet at http://www.commerce.gov/lead.
AMENDATORY SECTION (Amending WSR 11-07-067, filed 3/21/11, effective 4/21/11)
WAC 365-230-200 Work practice standards.
(1) Only certified individuals and the certified firms employing such individuals shall perform or offer to perform lead-based paint activities.
(2) Documented methodologies that are appropriate for this section are found in the following: The U.S. Department of Housing and Urban Development (HUD) Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing (Revised, ((October, 1997)) July, 2012); the EPA Guidance on Residential Lead-Based Paint, Lead-Contaminated Dust, and Lead-Contaminated Soil; the EPA Residential Sampling for Lead: Protocols for Dust and Soil Sampling (EPA report number 7474-R-95-001); regulations, guidance, methods or protocols issued by this department; any other equivalent methods and guidelines.
(3) Clearance levels appropriate for the purposes of this section may be found in subsection (8)(g)(i) and (v) of this section or other equivalent guidelines.
(4) Work practice requirements. Applicable certification, occupant protection, and clearance requirements and work practice standards are found in regulations described in this section, and in regulations issued by the Department of Housing and Urban Development (HUD) at 24 C.F.R. part 35, subpart R.
(a) The work practice standards in those regulations do not apply when treating paint-lead hazards of less than:
(i) Two square feet of deteriorated lead-based paint per room or equivalent;
(ii) Twenty square feet of deteriorated paint on the exterior building; or
(iii) Ten percent of the total surface area of deteriorated paint on an interior or exterior type of component with a small surface area.
(b) When performing any lead-based paint activity described as a lead-based paint inspection, lead hazard screen, risk assessment or abatement, a certified individual must perform that activity in compliance with these rules, documented methodologies, work practice requirements, and the work practice standards described in this section.
(5) Inspection. Only a person certified by the department as an inspector or risk assessor may conduct an inspection.
(a) Locations shall be selected according to documented methodologies and tested for the presence of lead-based paint as follows:
(i) In target housing and child-occupied facilities, each interior and exterior component with a distinct painting history shall be tested for lead-based paint, except those components determined to have been replaced after 1978 or determined to not contain lead-based paint; and
(ii) In a multifamily dwelling or child-occupied facility, each component with a distinct painting history in every common area shall be tested, except those components determined to have been replaced after 1978 or determined to not contain lead-based paint.
(b) Paint shall be tested for the presence of lead using documented methodologies which incorporate sampling quality control procedures and all paint chip, dust, and soil samples shall be analyzed for detectable levels of lead by a laboratory accredited under the National Lead Laboratory Accreditation Program (NLLAP).
(c) Inspection reports shall be prepared and include at least:
(i) Inspection date;
(ii) Building address;
(iii) Date of construction;
(iv) Apartment identification (numbers, letters, names if applicable);
(v) Name, address and telephone number of owner or owners of each unit;
(vi) Name, signature, and certification number of each inspector or risk assessor conducting testing;
(vii) Name, address and telephone number of the certified firm employing each inspector or risk assessor;
(viii) Each testing method and device or sampling procedure employed for paint analysis, including sample quality control data, and if used, the serial number of any X-ray fluorescence (XRF) device; and
(ix) Specific locations of each painted component tested and the results of the inspection expressed in appropriate units for the sampling method used.
(6) Lead hazard screen. A lead hazard screen shall be conducted only by a person certified by the department as a risk assessor and shall be conducted as follows:
(a) Background information shall be collected about the physical characteristics of the target housing or child-occupied facility and occupant use patterns that may cause lead-based paint exposure to one or more children age six years and under shall be collected.
(b) A visual inspection shall be conducted to determine the presence of any deteriorated paint and locate at least two dust sampling locations.
(c) If deteriorated paint is present, each deteriorated paint surface determined using documented methodologies, and to have a distinct painting history shall be tested for the presence of lead.
(d) In residential dwellings, two composite dust samples shall be collected, one from the floors and the other from the windows, in rooms, hallways or stairwells where one or more children age six or under are likely to come in contact with dust.
(e) In multifamily dwellings and child-occupied facilities, floor and window composite dust sampling shall be conducted as specified for conducting lead hazard screens in residential dwellings in the Work Practice Standard section of these rules. In addition, composite dust samples shall be collected in common areas where one or more children age six or under are likely to come in contact with dust.
(f) All dust samples shall be collected using documented methodologies that incorporate sample quality control procedures and analyzed by a laboratory accredited under the National Lead Laboratory Accreditation Program (NLLAP) to determine detectable lead.
(g) A lead hazard screen report shall be prepared by the risk assessor and include:
(i) Information in a risk assessment report as specified in subsection (7) including (i)(i) through (xiv) and excluding (i)(xv) through (xviii). Additionally, any background information collected pursuant to the lead hazard screen shall be included.
(ii) Any recommendations for follow-up risk assessment and other further actions.
(7) Risk assessment. Only an individual certified by the department as a risk assessor may conduct a risk assessment of target housing or child-occupied facility. A risk assessment shall be conducted as follows:
(a) A visual inspection shall be conducted to locate the existence of deteriorated paint, assess the extent and cause of deterioration, and other potential lead-based hazards.
(b) Background information shall be collected regarding the physical characteristics and occupant use patterns that may cause lead-based paint exposure to one or more children age six years and under.
(c) The following surfaces which are determined, using documented methodologies, to have a distinct painting history, shall be tested for the presence of lead:
(i) Each friction surface or impact surface with visibly deteriorated paint.
(ii) All other surfaces with visibly deteriorated paint.
(d) In residential dwellings, dust samples (either composite or single-surface samples) from the interior window sill(s) and floor shall be collected and analyzed for lead concentration in all living areas where one or more children, age six and under, are most likely to come in contact with dust.
(e) For multifamily dwellings and child-occupied facilities, the samples required in "residential dwellings" as described in (b) of this subsection shall be taken. In addition, interior window sill and floor dust samples (either composite or single-surface samples) shall be collected and analyzed for lead concentration in the following locations:
(i) Common areas adjacent to sampled target house or child-occupied facility; and
(ii) Other common areas in the building where the risk assessor determines that one or more children, age six and under, are likely to come in contact with dust.
(f) For child-occupied facilities, interior window sill and floor dust samples (either composite or single-surface samples) shall be collected and analyzed in each room, hallway or stairwell utilized by one or more children, age six and under, and in other common areas in the child-occupied facility where the risk assessor determines one or more children, age six and under, are likely to come in contact with dust.
(g) Soil samples shall be collected and analyzed for lead concentrations from the following locations:
(i) Exterior play areas where bare soil is present; and
(ii) The rest of the yard (i.e., nonplay areas) where bare soil is present.
(h) Any paint, dust or soil sampling or testing shall be conducted using documented methodologies that incorporate sample quality control procedures and analyzed by a laboratory accredited under the National Lead Laboratory Accreditation Program (NLLAP) to determine detectable lead.
(i) The certified risk assessor shall prepare a risk assessment report which shall include as a minimum the following information:
(i) Assessment date.
(ii) Address of each building.
(iii) Date of construction of buildings.
(iv) Apartment identification (numbers, letters, names if applicable).
(v) Name, address and telephone number of each owner of each building.
(vi) Name, signature, and certification number of each risk assessor conducting the assessment.
(vii) Name, address and telephone number of the certified firm employing each risk assessor.
(viii) Name, address and telephone number of each laboratory conducting analysis of collected samples.
(ix) Results of the visual inspection.
(x) Testing method and sampling procedure employed for paint analysis.
(xi) Specific locations of each painted component tested for the presence of lead.
(xii) All data collected from on-site testing, including quality control data, and if used, the serial number of any X-ray fluorescence (XRF) device.
(xiii) All results of laboratory analysis on collected paint, soil, and dust samples.
(xiv) Any other sampling results.
(xv) Any background information collected pursuant to subsection background information portion of the risk assessment work practice standard of this section.
(xvi) To the extent used as part of the lead-based paint hazard determination, the results of any previous inspections or analyses for the presence of lead-based paint, or other assessments of lead-based paint related hazards.
(xvii) A description of the location, type, and severity of identified lead-based paint hazards and any other potential lead hazards.
(xviii) A description of interim controls and/or abatement options for each identified lead-based paint hazard and a recommended prioritization for addressing each hazard. If the use of an encapsulant or enclosure is recommended, the report shall recommend a maintenance and monitoring schedule for the encapsulant or enclosure.
(8) Abatement. An abatement project shall be conducted only by certified individuals and the certified firms employing such individuals. Abatement shall be conducted as follows:
(a) A certified supervisor or project designer is required for each abatement project and shall be on-site during all worksite preparation and during postabatement cleanup of work areas. At all other times, the certified supervisor or project designer shall be on-site or available by telephone, pager, or answering service, and be able to be present at the worksite in no more than two hours.
(b) The certified supervisor or project designer, as well as the certified firm employing that individual shall ensure that all abatement activities are conducted according to the requirements of these rules and all federal, state and local requirements.
(c) A certified project designer may replace and assume the responsibilities of a certified supervisor required for an abatement project. If a certified project designer provides supervision on an abatement project, the project designer shall be responsible for preparing the occupant protection plan and the abatement report.
(d) A written occupant protection plan shall be developed prior to all abatement projects, be prepared by a certified supervisor or project designer, be unique to each target housing or child-occupied facility, describe the measures and management procedures that will be taken during the abatement to protect the building occupants from exposure to any lead-based paint hazards. The written occupant protection plan shall be present at the project site and must be made available on demand for inspection.
(e) A scope of work for the abatement project shall be present at the project site and must be made available on demand for inspection.
(f) These work practices shall be restricted during abatement and paint removal:
(i) Open-flame burning or torching of lead-based paint is prohibited;
(ii) Uncontained hydro blasting or high-pressure washing of lead-based paint is prohibited;
(iii) Machine sanding or grinding or abrasive blasting or sandblasting of lead-based paint is prohibited unless used with high efficiency particulate air (HEPA) exhaust control which removes particles of 0.3 microns or larger from the air at 99.97 percent or greater efficiency;
(iv) Dry scraping of lead-based paint is permitted only in conjunction with heat guns or around electrical outlets or when treating defective paint spots totaling no more than two square feet in any room, hallway or stairwell or totaling no more than twenty square feet on exterior surfaces; and
(v) Operating a heat gun on lead-based paint is permitted only at temperatures below 1100°F.
(g) When soil abatement is conducted, if the soil is removed:
(i) The soil shall be replaced by soil with a lead concentration as close to local background as practicable, but less than 250 parts per million (<250 ppm).
(ii) The soil that is removed shall not be used as top soil at another residential property or child-occupied facility.
(iii) If the soil is not removed, the soil shall be permanently covered so as to be separated from human contact by the placement of a barrier consisting of solid, relatively impermeable materials, such as pavement, asphalt or concrete.
(h) Soil interim controls:
(i) Grass, mulch, shrubbery and other landscaping materials are not considered permanent covering, but may be used as interim controls that eliminate contact with bare soils.
(ii) Interim control measures are acceptable in areas where bare soils contain less than the current HUD abatement standard (see 24 C.F.R. part 35.1330 (f)(2)) for lead in soils, except in:
(A) A child's play area, or any bare soil area where a child under six years of age regularly plays. Interim control measures are not acceptable in these areas where soil lead levels exceed 250 ppm.
(B) A garden area, or any other area where bare soils produce edibles intended for human consumption. Interim controls are not acceptable in these areas where soil lead levels exceed 250 ppm.
(iii) On-going monitoring and evaluation of interim soil control measures must ((follow)) adhere to HUD Guidelines(( - Table 6.1, Standard Reevaluation Schedule Number 6, under the column header entitled, "Visual Survey," as a requirement for interim soils control. This requirement must be included in a written report provided to the owner and occupants of the property)), as found in chapter 6.
(i) The following clearance procedures shall be performed only by a certified and licensed inspector or risk assessor and according to the following procedures:
(i) A visual inspection shall be performed to determine if deteriorated painted surfaces and/or visible amounts of dust, debris or residue are still present. If deteriorated painted surfaces or visible amounts of dust, debris or residue are present, these conditions must be eliminated prior to the continuation of the clearance procedures.
(ii) If exterior work on a project cannot be completed due to inclement weather or other factors, the project supervisor or designer may apply in writing to the department for authorization of a preliminary clearance. The application must include the following:
(A) The project address.
(B) The name and certification number of the abatement project supervisor or project designer.
(C) A description of the conditions that justify issuance of a waiver.
(D) A description of the abatement work that remains to be done on the project.
(E) A schedule for completion of the abatement work that remains to be done.
(F) A plan for monitoring and controlling potential lead-based paint contamination until work can be completed.
(G) At the conclusion of all work on a project for which preliminary clearance has been authorized, the project supervisor or designer shall present the department with documentation that clearance testing has been performed on exterior and interior areas according to these rules and that all clearance test results are below clearance levels.
(iii) Following the visual inspection and any postabatement cleanup required in subsection (8)(i) of this section, clearance sampling for lead in dust shall be conducted. Clearance sampling may be conducted by employing single-surface sampling or composite sampling techniques.
(iv) Dust samples for clearance purposes shall be taken using documented methodologies that incorporate sample quality control procedures and shall be taken a minimum of one hour after completion of final cleanup activities.
(v) Postabatement clearance activities shall be conducted based upon the extent or manner of work activities conducted in or on the target housing or child-occupied facility as follows:
(j) After conducting an abatement with containment between containment and noncontainment areas, one dust sample shall be taken from one interior window sill and from one window trough (if present) and one dust sample shall be taken from the floors of no less than four rooms, hallways or stairwells within the containment area. In addition, one dust sample shall be taken from the floor outside the containment area. If there are fewer than four rooms, hallways or stairwells within the containment area, then all rooms, hallways or stairwells shall be sampled.
(i) After conducting abatement with no containment, two dust samples shall be taken from no fewer than four rooms, hallways or stairwells in the residential dwelling or child-occupied facility. One dust sample shall be taken from one interior window sill and from one window trough (if present) and one dust sample shall be taken from the floor of each room, hallway or stairwell selected. If there are fewer than four rooms, hallways or stairwells within the target housing or child-occupied facility then all rooms, hallways or stairwells shall be sampled.
(ii) Following exterior paint abatement, a visual inspection shall be conducted. All horizontal surfaces in the outdoor living area closest to the abated surfaces shall be found to be cleaned of visible dust and debris. The surfaces shall be recleaned when visible dust and debris is present. The visual inspection shall be conducted to determine the presence of paint chips on the dripline or next to the foundation below any exterior abated surface. Paint chips, if present, shall be removed from the site and disposed of according to federal, state and local requirements.
(iii) The rooms, hallways or stairwells selected for sampling shall be selected according to documented methodologies.
(iv) The certified and licensed inspector or risk assessor shall compare residual lead levels (as determined by laboratory analysis) from each single surface dust sample with clearance examination standards as defined in these rules for lead in dust on floors and interior window sills, and window troughs, divided by half the number of subsamples in the composite sample. If the residual lead level in a single surface dust sample equals or exceeds the applicable clearance examination refresher or if the residual lead level in a composite dust sample equals or exceeds the applicable clearance examination refresher divided by half the number of subsamples in the composite sample, the components represented by the failed sample shall be recleaned and retested until clearance examination standards are met.
(v) The clearance levels for lead in dust are less than 40 µg/ft2 for floors, less than 250 µg/ft2 for interior window sills, and less than 400 µg/ft2 for window troughs.
(k) In a multifamily dwelling with similarly constructed and maintained residential dwellings, random sampling for the purposes of clearance may be conducted provided:
(i) The certified individuals who work on or clean the residential dwellings do not know which residential dwelling will be selected for the random sample.
(ii) The randomly selected residential dwellings shall be sampled and evaluated for clearance according to subsection (8)(i) of this section.
(iii) A sufficient number of residential dwellings are selected for dust sampling to provide a ninety-five percent level of confidence that no more than five percent or fifty of the residential dwellings (whichever is smaller) in the randomly sampled population exceeds the appropriate clearance examination standards.
(l) An abatement report shall be prepared by a certified and licensed supervisor or project designer and shall include as a minimum the following information:
(i) Start and completion dates of abatement.
(ii) The name, address and telephone number of each certified firm conducting the abatement and the name of each supervisor or project designer assigned to the abatement project.
(iii) The occupant protection plan.
(iv) The name, address and signature of each certified and licensed inspector or risk assessor conducting clearance sampling and the date(s) that clearance sampling was performed.
(v) The results of clearance sampling and all soil analyses and the name of each laboratory conducting analysis of collected samples.
(vi) A detailed written description of the abatement, including abatement methods, location of rooms and/or components where abatement occurred, reason for selecting particular abatement methods for each component, and any suggested monitoring of encapsulants or enclosures.
(m) A clearance report shall be prepared by a certified inspector or risk assessor. The clearance report shall include the following information:
(i) The property address where the clearance sampling occurred.
(ii) The abatement clean-up completion date and time.
(iii) The date and time of clearance sampling.
(iv) Name and certification number of each inspector or risk assessor conducting the clearance.
(v) The signature of the inspector or risk assessor conducting the clearance.
(vi) Name, address, telephone number, and certification number of the certified firm employing the inspector or risk assessor.
(vii) Results of the visual inspection.
(viii) Identification of containment or noncontainment applications.
(ix) Identification of location(s) where clearance samples were collected.
(x) Name, address, and telephone number of the laboratory analyzing the collected samples.
(xi) All results of laboratory analysis on collected samples, including quality control results.
(xii) Documented methodology used for sampling.
(9) Sampling. Any paint chip, dust, or soil samples collected pursuant to this section shall be collected by a certified inspector or risk assessor. Such sampling shall incorporate sample quality control procedures and the samples shall be analyzed by a laboratory accredited under the National Lead Laboratory Accreditation Program (NLLAP).
(10) Composite sample. Composite dust sampling may only be conducted when conducting a lead hazard screen, risk assessment, or postabatement activities. If conducted, the composite dust samples shall consist of at least two subsamples, every component that is being tested shall be included in the sampling, and shall not consist of subsamples from more than one type of component.
(11) Reports or plans. All lead-based paint activity reports or plans shall be maintained by the certified firms or individual who prepared the report for no fewer than three years and six months.
(a) The following reports must be submitted to the department as specified in WAC 365-230-100 and 365-230-220:
(i) Notification of lead-based paint activities course to take place.
(ii) Notification of lead-based paint activities course that has taken place.
(iii) Notice of abatement.
(b) All reports required by these rules may be submitted on forms available from the department. The exhibit referred to in this rule is not printed in this WAC. Copies are available as follows from department of commerce:
Lead-Based Paint Program, P.O. Box 42525, Olympia, WA 98504-2525
Telephone number: 360-586-5323
Web site: www.commerce.wa.gov/lead.
AMENDATORY SECTION (Amending WSR 11-07-067, filed 3/21/11, effective 4/21/11)
WAC 365-230-300 Applicability.
This section applies to all renovations performed for compensation in target housing and child-occupied facilities, except for the following:
(1) Renovations in target housing or child-occupied facilities in which a written determination has been made by an inspector or risk assessor (certified pursuant to WAC 365-230-130) that the components affected by the renovation are free of paint or other surface coatings that contain lead equal to or in excess of 1.0 milligram per square centimeter (mg/cm2) or 0.5 percent by weight, where the firm performing the renovation has obtained a copy of the determination.
(2)(a) Renovations in target housing or child-occupied facilities in which a certified renovator, using an EPA-recognized test kit as defined in WAC 365-230-350 and following the kit manufacturer's instructions, has tested each component affected by the renovation and determined that the components are free of paint or other surface coatings that contain lead equal to or in excess of 1.0 mg/cm2 or 0.5 percent by weight. If the components make up an integrated whole, such as the individual stair treads and risers of a single staircase, the renovator is required to test only one of the individual components, unless the individual components appear to have been repainted or refinished separately.
(b) Renovations in target housing or child-occupied facilities in which a certified renovator has collected a paint chip sample from each painted component affected by the renovation and a laboratory recognized by EPA pursuant to section 405(b) of TSCA as being capable of performing analyses for lead compounds in paint chip samples has determined that the samples are free of paint or other surface coatings that contain lead equal to or in excess of 1.0mg/cm2 or 0.5% by weight. If the components make up an integrated whole, such as the individual stair treads and risers of a single staircase, the renovator is required to test only one of the individual components, unless the individual components appear to have been repainted or refinished separately.
(c) The information distribution requirements in WAC 365-230-320 do not apply to emergency renovations, which are renovation activities that were not planned but result from a sudden, unexpected event (such as nonroutine failures of equipment) that, if not immediately attended to, presents a safety or public health hazard, or threatens equipment and/or property with significant damage. Interim controls performed in response to an elevated blood-lead level in a resident child are also emergency renovations. Emergency renovations other than interim controls are also exempt from the warning sign, containment, waste handling, training, and certification requirements in WAC 365-230-330, 365-230-360, and 365-230-380 to the extent necessary to respond to the emergency. Emergency renovations are not exempt from the cleaning requirements of WAC 365-230-330 (1)(e), which must be performed by certified renovators or individuals trained in accordance with WAC 365-230-385 (1)(b), the cleaning verification requirements of WAC 365-230-330(2), which must be performed by certified renovators, and the recordkeeping requirements of WAC 365-230-340 (2)(f).
AMENDATORY SECTION (Amending WSR 11-07-067, filed 3/21/11, effective 4/21/11)
WAC 365-230-310 Definitions.
For purposes of this chapter, the definitions in WAC 365-230-020 and the following definitions apply:
"Cleaning verification card" means a card developed and distributed, or otherwise approved, by EPA for the purpose of determining, through comparison of wet and dry disposable cleaning cloths with the card, whether postrenovation cleaning has been properly completed.
"Department" means the Washington department of commerce lead-based paint program.
"Dry disposable cleaning cloth" means a commercially available dry, electrostatically charged, white disposable cloth designed to be used for cleaning hard surfaces such as uncarpeted floors or countertops.
"Firm" means a company, partnership, corporation, sole proprietorship or individual doing business, association, or other business entity; a federal, state, tribal, or local government agency; or a nonprofit organization.
"HEPA vacuum" means a vacuum cleaner which has been designed with a high-efficiency particulate air (HEPA) filter as the last filtration stage. A HEPA filter is a filter that is capable of capturing ((particles)) particulates of 0.3 microns with 99.97 percent efficiency. The vacuum cleaner must be designed so that all the air drawn into the machine is expelled through the HEPA filter with none of the air leaking past it HEPA vacuums must be operated and maintained in accordance with the manufacturer's instructions.
"Minor repair and maintenance activities" means activities, including minor heating, ventilation or air conditioning work, electrical work, and plumbing, that disrupt six square feet or less of painted surface per room for interior activities or twenty square feet or less of painted surface for exterior activities where none of the work practices prohibited or restricted by WAC 365-230-330 (1)(c) are used and where the work does not involve window replacement or demolition of painted surface areas. When removing painted components, or portions of painted components, the entire surface area removed is the amount of painted surface disturbed. Jobs, other than emergency renovations, performed in the same room within the same thirty days must be considered the same job for the purpose of determining whether the job is a minor repair and maintenance activity.
"Painted surface" means a component surface covered in whole or in part with paint or other surface coatings.
"Painted surface to be disturbed" means a paint, or other surface coating that is to be scraped, sanded, cut, penetrated or otherwise affected by rehabilitation work in a manner that could potentially create a lead-based paint hazard by generating dust, fumes, or paint chips.
"Pamphlet" means the EPA pamphlet titled "The Lead-Safe Certified Guide to Renovate Right" developed under section 406(a) of TSCA for use in complying with section 406(b) of TSCA. This includes reproductions of the pamphlet when copied in full and without revision or deletion of material from the pamphlet.
"Recognized test kit" means a commercially available kit recognized by EPA under §745.88 as being capable of allowing a user to determine the presence of lead at levels equal to or in excess of 1.0 milligram per square centimeter, or more than 0.5 percent lead by weight, in a paint chip, paint powder, or painted surface.
"Renovation" means the modification of any existing structure, or portion thereof, that results in the disturbance of painted surfaces, unless that activity is performed as part of an abatement as defined under WAC 365-230-200. The term renovation includes, but is not limited to: The removal, modification or repair of painted surfaces or painted components (e.g., modification of painted doors, surface restoration, window repair, surface preparation activity (such as sanding, scraping, or other such activities that may generate paint dust)); the removal of building components (e.g., walls, ceilings, plumbing, windows); weatherization projects (e.g., cutting holes in painted surfaces to install blown-in insulation or to gain access to attics, planing thresholds to install weather-stripping), and interim controls that disturb painted surfaces. A renovation performed for the purpose of converting a building, or part of a building, into target housing or a child-occupied facility is a renovation under this section. The term renovation does not include minor repair and maintenance activities.
"Renovator" means an individual who either performs or directs workers who perform renovations. A certified renovator is a renovator who has successfully completed a renovator course accredited by EPA or an EPA-authorized state or tribal program.
"Vertical containment" means a vertical barrier consisting of plastic sheeting or other impermeable material over scaffolding or a rigid frame, or an equivalent system of containing the work area. Vertical containment is required for some exterior renovations but it may be used on any renovation.
"Wet disposable cleaning cloth" means a commercially available, premoistened white disposable cloth designed to be used for cleaning hard surfaces such as uncarpeted floors or counter tops.
"Wet mopping system" means a device with the following characteristics: A long handle, a mop head designed to be used with disposable absorbent cleaning pads, a reservoir for cleaning solution, and a built-in mechanism for distributing or spraying the cleaning solution onto a floor, or a method of equivalent efficacy.
"Work area" means the area that the certified renovator establishes to contain the dust and debris generated by a renovation.
AMENDATORY SECTION (Amending WSR 11-07-067, filed 3/21/11, effective 4/21/11)
WAC 365-230-330 Work practice standards.
(1) Standards for renovation activities. Renovations must be performed by certified firms using certified renovators as directed under WAC 365-230-370. The responsibilities of certified firms are set forth under WAC 365-230-360 and the responsibilities of certified renovators are set forth under WAC 365-230-380.
(a) Occupant protection. Firms must post signs clearly defining the work area and warning occupants and other persons not involved in renovation activities to remain outside of the work area. To the extent practicable, these signs must be in the primary language of the occupants. These signs must be posted before beginning the renovation and must remain in place and readable until the renovation and the postrenovation cleaning verification have been completed. If warning signs have been posted in accordance with 24 C.F.R. 35.1345 (b)(2) or 29 C.F.R. 1926.62(m), additional signs are not required by this section.
(b) Containing the work area. Before beginning the renovation, the firm must isolate the work area so that no dust or debris leaves the work area while the renovation is being performed. In addition, the firm must maintain the integrity of the containment by ensuring that any plastic or other impermeable materials are not torn or displaced, and taking any other steps necessary to ensure that no dust or debris leaves the work area while the renovation is being performed. The firm must also ensure that containment is installed in such a manner that it does not interfere with occupant and worker egress in an emergency.
(i) Interior renovations. The firm must:
(A) Remove all objects from the work area, including furniture, rugs, and window coverings, or cover them with plastic sheeting or other impermeable material with all seams and edges taped or otherwise sealed.
(B) Close and cover all ducts opening in the work area with taped-down plastic sheeting or other impermeable material.
(C) Close windows and doors in the work area. Doors must be covered with plastic sheeting or other impermeable material. Doors used as an entrance to the work area must be covered with plastic sheeting or other impermeable material in a manner that allows workers to pass through while confining dust and debris to the work area.
(D) Cover the floor surface, including installed carpet, with taped-down plastic sheeting or other impermeable material in the work area six feet beyond the perimeter of surfaces undergoing renovation or a sufficient distance to contain the dust, whichever is greater. Floor containment measures may stop at the edge of the vertical barrier when using a vertical containment system consisting of impermeable barriers that extend from the floor to the ceiling and are tightly sealed at joints with the floor, ceiling, and walls.
(E) Use precautions to ensure that all personnel, tools, and other items, including the exteriors of containers of waste, are free of dust and debris before leaving the work area.
(ii) Exterior renovations. The firm must:
(A) Close all doors and windows within twenty feet of the renovation. On multistory buildings, close all doors and windows within twenty feet of the renovation on the same floor as the renovation, and close all doors and windows on all floors below that are the same horizontal distance from the renovation.
(B) Ensure that doors within the work area that will be used while the job is being performed are covered with plastic sheeting or other impermeable material in a manner that allows workers to pass through while confining dust and debris to the work area.
(C) Cover the ground with plastic sheeting or other disposable impermeable material extending ten feet beyond the perimeter of surfaces undergoing renovation or a sufficient distance to collect falling paint debris, whichever is greater, unless the property line prevents ten feet of such ground covering. Ground containment measures may stop at the edge of the vertical barrier when using a vertical containment system.
(D) ((In certain situations, the renovation firm must take extra precautions in containing the work area to ensure that dust and debris from the renovation does not contaminate other buildings or other areas of the property or migrate to adjacent properties.)) If the renovation will affect surfaces within ten feet of the property line, the renovation firm must erect vertical containment or equivalent extra precautions in containing the work area to ensure that dust and debris from the renovation does not contaminate adjacent buildings or migrate to adjacent properties. Vertical containment or equivalent extra precautions in containing the work area may also be necessary in other situations in order to prevent contamination of other buildings, other areas of the property, or adjacent buildings or properties.
(c) Prohibited and restricted practices. The work practices listed below ((shall be)) are prohibited or restricted during a renovation as follows:
(i) Open-flame burning or torching of painted surfaces is prohibited.
(ii) The use of machines designed to remove paint or other surface coatings through high speed operation such as sanding, grinding, power planing, needle gun, abrasive blasting, or sandblasting, is prohibited unless such machines ((are used with a)) have shrouds or containment systems and are equipped with a HEPA ((exhaust control)) vacuum attachment to collect dust and debris at the point of generation. Machines must be operated so that no visible dust or release of air occurs outside the shroud or containment system.
(iii) Operating a heat gun on painted surfaces is permitted only at temperatures below 1,100((°F)) degrees Fahrenheit.
(d) Waste from renovations.
(i) Waste from renovation activities must be contained to prevent releases of dust and debris before the waste is removed from the work area for storage or disposal. If a chute is used to remove waste from the work area, it must be covered.
(ii) At the conclusion of each work day and at the conclusion of the renovation, waste that has been collected from renovation activities must be stored under containment, in an enclosure, or behind a barrier that prevents release of dust and debris out of the work area and prevents access to dust and debris.
(iii) When the firm transports waste from renovation activities, the firm must contain the waste to prevent release of dust and debris.
(e) Cleaning the work area. After the renovation has been completed, the firm must clean the work area until no dust, debris or residue remains.
(i) Interior and exterior renovations. The firm must:
(A) Collect all paint chips and debris and, without dispersing any of it, seal this material in a heavy-duty bag.
(B) Remove the protective sheeting. Mist the sheeting before folding it, fold the dirty side inward, and either tape shut to seal or seal in heavy-duty bags. Sheeting used to isolate contaminated rooms from noncontaminated rooms must remain in place until after the cleaning and removal of other sheeting. Dispose of the sheeting as waste.
(ii) Additional cleaning for interior renovations. The firm must clean all objects and surfaces in the work area and within two feet of the work area in the following manner, cleaning from higher to lower:
(A) Walls. Clean walls starting at the ceiling and working down to the floor by either vacuuming with a HEPA vacuum or wiping with a damp cloth.
(B) Remaining surfaces. Thoroughly vacuum all remaining surfaces and objects in the work area, including furniture and fixtures, with a HEPA vacuum. The HEPA vacuum must be equipped with a beater bar when vacuuming carpets and rugs.
(C) Wipe all remaining surfaces and objects in the work area, except for carpeted or upholstered surfaces, with a damp cloth. Mop uncarpeted floors thoroughly, using a mopping method that keeps the wash water separate from the rinse water, such as the two-bucket mopping method, or using a wet mopping system.
(2) Standards for postrenovation cleaning verification.
(a) Interiors.
(i) A certified renovator must perform a visual inspection to determine whether dust, debris, or residue is still present. If dust, debris, or residue is present, these conditions must be removed by recleaning and another visual inspection must be performed.
(ii) After a successful visual inspection, a certified renovator must:
(A) Verify that each windowsill in the work area has been adequately cleaned, using the following procedure:
(I) Wipe the windowsill with a wet disposable cleaning cloth that is damp to the touch. If the cloth matches or is lighter than the cleaning verification card, the windowsill has been adequately cleaned.
(II) If the cloth does not match and is darker than the cleaning verification card, reclean the windowsill as directed in this section, then either use a new cloth or fold the used cloth in such a way that an unused surface is exposed, and wipe the surface again. If the cloth matches or is lighter than the cleaning verification card, that windowsill has been adequately cleaned.
(III) If the cloth does not match and is darker than the cleaning verification card, wait for one hour or until the surface has dried completely, whichever is longer.
(IV) After waiting for the windowsill to dry, wipe the windowsill with a dry disposable cleaning cloth. After this wipe, the windowsill has been adequately cleaned.
(B) Wipe uncarpeted floors and countertops within the work area with a wet disposable cleaning cloth. Floors must be wiped using an application device with a long handle and a head to which the cloth is attached. The cloth must remain damp at all times while it is being used to wipe the surface for postrenovation cleaning verification. If the surface within the work area is greater than forty square feet, the surface within the work area must be divided into roughly equal sections that are each less than forty square feet. Wipe each such section separately with a new wet disposable cleaning cloth. If the cloth used to wipe each section of the surface within the work area matches the cleaning verification card, the surface has been adequately cleaned.
(I) If the cloth used to wipe a particular surface section does not match the cleaning verification card, reclean that section of the surface as directed in this section, then use a new wet disposable cleaning cloth to wipe that section again. If the cloth matches the cleaning verification card, that section of the surface has been adequately cleaned.
(II) If the cloth used to wipe a particular surface section does not match the cleaning verification card after the surface has been recleaned, wait for one hour or until the entire surface within the work area has dried completely, whichever is longer.
(III) After waiting for the entire surface within the work area to dry, wipe each section of the surface that has not yet achieved postrenovation cleaning verification with a dry disposable cleaning cloth. After this wipe, that section of the surface has been adequately cleaned.
(iii) When the work area passes the postrenovation cleaning verification, remove the warning signs.
(b) Exteriors. A certified renovator must perform a visual inspection to determine whether dust, debris or residue is still present on surfaces in and below the work area, including windowsills and the ground. If dust, debris or residue is present, these conditions must be eliminated and another visual inspection must be performed. When the area passes the visual inspection, remove the warning signs.
(3) Optional dust clearance testing. Cleaning verification need not be performed if the contract between the renovation firm and the person contracting for the renovation or another federal, state, territorial, tribal or local law requires dust wipe sampling.
(a) The renovation firm to perform dust clearance sampling at the conclusion of a renovation covered by this section.
(b) The dust clearance samples are required to be collected by a certified inspector, risk assessor, or dust sampling technician.
(c) The renovation firm is required to reclean the work area until the dust clearance sample results are below the clearance standards in WAC 365-230-020 or any applicable local standard.
(4) Activities conducted after postrenovation cleaning verification. Activities that do not disturb paint such as applying paint to walls that have already been prepared, are not regulated by this subpart if they are conducted after postrenovation cleaning verification has been performed.
AMENDATORY SECTION (Amending WSR 11-07-067, filed 3/21/11, effective 4/21/11)
WAC 365-230-340 Recordkeeping and reporting requirements.
(1) Firms performing renovations must retain and, if requested, make available to the department all records necessary to demonstrate compliance with this section for a period of three years following completion of the renovation. This three-year retention requirement does not supersede longer obligations required by other provisions for retaining the same documentation, including any applicable state or tribal laws or regulations.
(2) Records that must be retained pursuant to subsection (a) of this section shall include (where applicable):
(a) Records or reports certifying that a determination had been made that lead-based paint was not present on the components affected by the renovation, as described under WAC 365-230-300. These records or reports include:
(i) Reports prepared by a certified inspector or certified risk assessor (certified pursuant to this chapter).
(ii) Records prepared by a certified renovator after using EPA-recognized test kits, including an identification of the manufacturer and model of any test kits used, a description of the components that were tested including their locations, and the result of each test kit used.
(iii) Records prepared by a certified renovator after collecting paint chip samples, including a description of the components that were tested including their locations, the name and address of the NLLAP-recognized entity performing the analysis, and the results for each sample.
(b) Signed and dated acknowledgments of receipt as described under WAC 365-230-320 (1)(a)(i) and (b)(i), (2)(a)(i), (3)(a)(i)(A) and (a)(ii)(A).
(c) Certifications of attempted delivery as described under WAC 365-230-320 (1)(a)(i) and (3)(a)(ii)(A).
(d) Certificates of mailing as described under WAC 365-230-320 (1)(a)(ii) and (b)(ii), (2)(a)(ii), (3)(a)(i)(B) and (a)(ii)(B).
(e) Records of notification activities performed regarding common area renovations, as described under WAC 365-230-320 (2)(c) and (d), and renovations in child-occupied facilities, as described under WAC 365-230-320 (3)(b).
(f) Documentation of compliance with the requirements under WAC 365-230-330, including documentation that a certified renovator was assigned to the project, that the certified renovator provided on-the-job training for workers used on the project, that the certified renovator performed or directed workers who performed all of the tasks described under WAC 365-230-330(1), and that the certified renovator performed the postrenovation cleaning verification described under WAC 365-230-330(2). If the renovation firm was unable to comply with all of the requirements of this rule due to an emergency as defined under WAC 365-230-330, the firm must document the nature of the emergency and the provisions of the rule that were not followed. This documentation must include a copy of the certified renovator's training certificate, and a certification by the certified renovator assigned to the project that:
(i) Training was provided to workers (topics must be identified for each worker).
(ii) Warning signs were posted at the entrances to the work area.
(iii) If test kits were used, that the specified brand of kits was used at the specified locations and that the results were as specified.
(iv) If paint chip samples were collected, that the samples were collected at the specified locations, that the specified NLLAP-recognized laboratory analyzed the samples, and that the results were as specified.
(v) The work area was contained by:
(A) Removing or covering all objects in the work area (interiors).
(B) Closing and covering all HVAC ducts in the work area (interiors).
(C) Closing all windows in the work area (interiors) or closing all windows in and within twenty feet of the work area (exteriors).
(D) Closing and sealing all doors in the work area (interiors) or closing and sealing all doors in and within twenty feet of the work area (exteriors).
(E) Covering doors in the work area that were being used to allow passage but prevent spread of dust.
(F) Covering the floor surface, including installed carpet, with taped-down plastic sheeting or other impermeable material in the work area six feet beyond the perimeter of surfaces undergoing renovation or a sufficient distance to contain the dust, whichever is greater (interiors) or covering the ground with plastic sheeting or other disposable impermeable material anchored to the building extending ten feet beyond the perimeter of surfaces undergoing renovation or a sufficient distance to collect falling paint debris, whichever is greater, unless the property line prevents ten feet of such ground covering, weighted down by heavy objects (exteriors).
(G) Installing (if necessary) vertical containment to prevent migration of dust and debris to adjacent property (exteriors).
(((v))) (vi) Waste was contained on-site and while being transported off-site.
(((vi))) (vii) The work area was properly cleaned after the renovation by:
(A) Picking up all chips and debris, misting protective sheeting, folding it dirty side inward, and taping it for removal.
(B) Cleaning the work area surfaces and objects using a HEPA vacuum and/or wet cloths or mops (interiors).
(((vii))) (viii) The certified renovator performed the postrenovation cleaning verification (the results of which must be briefly described, including the number of wet and dry cloths used).
(3)(a) When the final invoice for the renovation is delivered or within thirty days of the completion of the renovation, whichever is earlier, the renovation firm must provide information pertaining to compliance with this section to the following persons.
(i) The owner of the building; and, if different;
(ii) An adult occupant of the residential dwelling, if the renovation took place within a residential dwelling, or an adult representative of the child-occupied facility, if the renovation took place within a child-occupied facility.
(b) When performing renovations in common areas of multiunit target housing, renovation firms must post the information required by this section or instructions on how interested occupants can obtain a copy of this information. This information must be posted in areas where it is likely to be seen by the occupants of all of the affected units.
(c) The information required to be provided by this subsection may be provided by completing the sample form titled "Sample Renovation Recordkeeping Checklist" or a similar form containing the test kit information required under subsection (2)(a)(ii) of this section and the training and work practice compliance information required under subsection (2)(f) of this section.
(4) If dust clearance sampling is performed in lieu of cleaning verification as permitted under WAC 365-230-330(3), the renovation firm must provide, when the final invoice for the renovation is delivered or within thirty days of the completion of the renovation, whichever is earlier, a copy of the dust sampling report to:
(a) The owner of the building; and, if different;
(b) An adult occupant of the residential dwelling, if the renovation took place within a residential dwelling, or an adult representative of the child-occupied facility, if the renovation took place within a child-occupied facility;
(c) When performing renovations in common areas of multiunit target housing, renovation firms must post these dust sampling reports or information on how interested occupants of the housing being renovated can obtain a copy of the report. This information must be posted in areas where they are likely to be seen by the occupants of all the affected units.
AMENDATORY SECTION (Amending WSR 11-07-067, filed 3/21/11, effective 4/21/11)
WAC 365-230-380 Renovator and dust sampling technician certification and recertification.
(1) No individual shall perform lead-based paint renovation or dust sampling technician activities as described in this section unless they are certified by the department. Individuals seeking initial certification by the department to engage in lead-based paint renovation activities must successfully complete a dust sampling technician or renovator course accredited by the department. The course completion certificate serves as proof of training. Certified individuals may perform only lead-based paint renovation activities for which they are certified. To become certified as a renovator or dust sampling technician, an individual must:
(a) Submit a completed application to the department as described under WAC 365-230-150 and must provide documentation that the applicant has either:
(i) Met the certification requirements as described in this subsection for renovator or dust sampling technician.
(ii) Hold a valid certification issued by EPA or by a state or tribal program that has been authorized by EPA according to 40 C.F.R. 745.324.
(A) Applicants for certification based on certification from another state or tribal program must document to the department that they have read and understand the certification and work practice standards as described in these rules.
(B) Certification based on a valid lead-based paint renovator or renovation dust sampling technician certification issued by EPA or by an EPA-authorized state or tribal program shall be issued with an expiration date not to exceed the date of expiration listed on the EPA or EPA-authorized state or tribal certification.
(b) Submit two passport-size photos.
(c) A signed and dated renovator or dust sampling technician application.
(d) A check or money order made out to the department in the amount as described in the certification fees section of these rules.
(e) Application materials can be obtained by mail from Department of Commerce, Lead-Based Paint Program, P.O. Box 42525, Olympia, WA 98504-2525, by telephone, 360-586-5323, electronically at http://www.commerce.wa.gov/lead.
(2) Individuals who have successfully completed an accredited abatement worker or supervisor course, or individuals who successfully completed an EPA, HUD, or EPA/HUD model renovation training course before October 4, 2011, may take an accredited refresher renovator training course in lieu of the initial renovator training course to become a certified renovator.
(3) Individuals who have successfully completed an accredited lead-based paint inspector or risk assessor course before October 4, 2011, may take an accredited refresher dust ((wipe)) sampling technician course in lieu of the initial training to become a certified dust sampling technician. Individuals who are currently certified as lead-based paint inspectors or risk assessors may act as certified dust sampling technicians without further training.
(4) Individuals may first apply to the department for certification to engage in lead-based paint renovation or dust sampling pursuant to this section on or after the effective date of these rules.
(5) Following the submission of an application demonstrating that all the requirements of this section have been met, the department shall certify an applicant as renovator, or dust sampling technician.
(6) Upon receiving the department certification, individuals conducting lead-based paint renovator or dust sampling technician activities shall comply with the work practice standards for performing the appropriate lead-based paint renovation activities as established in the work practice standards, WAC 365-230-330.
(7) It shall be a violation of these rules for an individual to conduct any of the lead-based paint renovator or dust sampling technician activities described in the work practice standards under WAC 365-230-330 who has not been certified by the department.
(8) To maintain renovator certification or dust sampling technician, an individual must complete a renovator refresher course or a dust sampling refresher course accredited by the department within five years of the date the individual completed the initial course as described in subsection (1) of this section, or within five years of the date of his/her last refresher course for the discipline. If the individual does not complete a refresher course within this time, the individual must retake the initial course to become certified again.
AMENDATORY SECTION (Amending WSR 11-07-067, filed 3/21/11, effective 4/21/11)
WAC 365-230-385 Renovator and dust sampling technician responsibilities.
(1) Renovator responsibilities. Certified renovators are responsible for ensuring compliance under WAC 365-230-330 at all renovations to which they are assigned. A certified renovator:
(a) Must perform all of the tasks described under WAC 365-230-330(2) and must either perform or direct workers who perform all of the tasks described under WAC 365-230-330(1).
(b) Must provide training to ((uncertified)) workers on the work practices ((that they will be using in performing their assigned tasks)) required by WAC 365-230-330(1).
(c) Must be physically present at the worksite when signs required by WAC 365-230-330 (1)(a) are posted, while the work area containment required by WAC 365-230-330 (1)(b) is being established, and while the work area cleaning required by WAC 365-230-330 (1)(e) is performed.
(d) Must regularly direct work being performed by other individuals to ensure that the work practices required by WAC 365-230-330(1) are being followed, including maintaining the integrity of the containment barriers and ensuring that dust or debris does not spread beyond the work area.
(e) Must be available, either on-site or by telephone, at all times that renovations are being conducted.
(f) When requested by the party contracting for renovation services, must use an acceptable test kit to determine whether components to be affected by the renovation contain lead-based paint.
(g) Must have with them at the worksite copies of their initial course completion certificate and their most recent refresher course completion certificate.
(h) Must prepare the records required by WAC 365-230-340 (2)(a)(ii) and (f).
(2) Dust sampling technician responsibilities. When performing optional dust clearance sampling under WAC 365-230-330, a certified dust sampling technician:
(a) Must collect dust samples in accordance with WAC 365-230-200 (8)(f)(i) through (iv), must send the collected samples to a laboratory recognized under TSCA section 405(b) (National Lead Laboratory Accreditation Program (NLLAP)) as found under WAC 365-230-200 (7)(h), and must compare the results to the clearance levels in dust less than 40 µg/ft2 on floors, less than 250 µg/ft2 on windowsills, and less than 400 µg/ft2 on troughs.
(b) Must have with them at the worksite copies of their initial course completion certificate and their most recent refresher course completion certificate.
AMENDATORY SECTION (Amending WSR 11-07-067, filed 3/21/11, effective 4/21/11)
WAC 365-230-360 Certification of renovation firms.
(1) No firm ((shall offer to)) may perform, offer, or claim to perform renovations for compensation any of the lead-based paint renovation activities described in WAC 365-230-330 without first being certified by the department. All certified firms shall employ only appropriately certified individuals to conduct lead-based paint renovation activities. The firm is responsible for ensuring that its employees follow the work practice requirements for renovation as described in WAC 365-230-330.
(2) A firm seeking certification shall submit to the department a completed application as described in this section.
(3) The firm shall maintain all records pursuant to WAC 365-230-340.
(4) Certification is transferable in the instance of acquisition of a certified firm by another entity. The acquiring firm must notify the department within thirty days of the change of ownership, and of any changes to information submitted on the original application.
(5) The certification period for renovation firms is five years from the date certification is issued. To maintain its renovation firm certification, a firm must be recertified by the department every five years.
(6) To retain certification, a firm shall submit to the department an application as described above prior to the expiration date listed on the firm's certification.
|