WSR 18-21-169
PROPOSED RULES
DEPARTMENT OF
LABOR AND INDUSTRIES
[Filed October 23, 2018, 10:22 a.m.]
Original Notice.
Preproposal statement of inquiry was filed as WSR 18-15-072.
Title of Rule and Other Identifying Information: Proposed fee increases for contractor registration, elevator, and factory assembled structures (FAS) programs. The proposed rules include: Chapter 296-200A WAC, Contractor certificate of registration renewalsSecurityInsurance; chapter 296-96 WAC, Safety regulations and fees for all elevators, dumbwaiters, escalators and other conveyances; chapter 296-150C WAC, Commercial coaches; chapter 296-150F WAC, Factory-built housing and commercial structures; chapter 296-150I WAC, Manufactured home installer training and certification program; chapter 296-150M WAC, Manufactured homes; chapter 296-150P WAC, Recreational park trailers; chapter 296-150R WAC, Recreational vehicles; chapter 296-150T WAC, Factory-built temporary worker housing structures; and chapter 296-150V WAC, Conversion vendor units and medical units.
Hearing Location(s): On November 27, 2018, at 8:30 a.m., at the Department of Labor and Industries, 7273 Linderson Way S.W., Tumwater, WA 98501.
Date of Intended Adoption: December 4, 2018.
Submit Written Comments to: Alicia Curry, Department of Labor and Industries, P.O. Box 44400, Olympia, WA 98504-4400, email Alicia.Curry@Lni.wa.gov, fax 360-902-5292, by 5 p.m. on November 27, 2018.
Assistance for Persons with Disabilities: Contact Alicia Curry, phone 360-902-6244, fax 360-902-5292, email Alicia.Curry@Lni.wa.gov, by 5 p.m. on November 13, 2018.
Purpose of the Proposal and Its Anticipated Effects, Including Any Changes in Existing Rules: The purpose of this rule making is to propose fee increases by the fiscal growth factor rate of four percent for the contractor registration, elevator, and FAS programs. This is the office of financial management's maximum allowable fiscal growth factor for fiscal year 2019. The fee increase is needed to support the programs' operating expenses for inspections and other public safety activities.
Reasons Supporting Proposal: The programs have not increased fees for several years. The last fee increases took effect June 30, 2007, for contractor registration, April 1, 2014, for elevator, and April 30, 2012, for FAS. Fee increases are necessary to ensure that revenues match expenditures; otherwise, services may need to be reduced.
Statutory Authority for Adoption: Chapters 18.27, 70.87, 43.22, and 43.22A RCW.
Statute Being Implemented: Chapters 18.27, 70.87, 43.22, and 43.22A RCW.
Rule is not necessitated by federal law, federal or state court decision.
Name of Proponent: Department of labor and industries, governmental.
Name of Agency Personnel Responsible for Drafting: Dean Simpson, Program Manager, Tumwater, Washington, 360-902-5571, Dotty Stanlaske, Program Manager, Tumwater, Washington, 360-902-6456, or Craig Sedlacek, Program Manager, Tumwater, Washington, 360-902-5218; Implementation and Enforcement: David Puente, Jr., Assistant Director, Tumwater, Washington, 360-902-6348.
A school district fiscal impact statement is not required under RCW 28A.305.135.
A cost-benefit analysis is not required under RCW 34.05.328. This rule is exempt from the cost-benefit analysis requirement under the Administrative Procedure Act, RCW 34.05.328 (5)(b)(vi) [states] rules that set or adjust fees under the authority of RCW 19.02.075 or that set or adjust fees or rates pursuant to legislative standards, including fees set or adjusted under the authority of RCW 19.80.045.
This rule proposal, or portions of the proposal, is exempt from requirements of the Regulatory Fairness Act because the proposal:
Is exempt under RCW 19.85.025(3) as the rules set or adjust fees under the authority of RCW 19.02.075 or that set or adjust fees or rates pursuant to legislative standards, including fees set or adjusted under the authority of RCW 19.80.045.
October 23, 2018
Joel Sacks
Director
AMENDATORY SECTION(Amending WSR 18-18-068, filed 8/31/18, effective 10/1/18)
WAC 296-96-00922Licensing fees.
The following are the department's elevator license fees:
Type of Fee
Period Covered by Fee
Dollar Amount
of Fee
Elevator contractor/mechanic application fee (not required for renewal of valid license)
Per application
$((64.30))
66.80
Elevator contractor/ mechanic examination fee
Per application
$((193.60))
201.30***
Reciprocity application fee
Per application*
$((64.30))
66.80
Elevator mechanic license
2 years
$((129.00))
134.10
Elevator contractor license
2 years
$((129.00))
134.10
Temporary elevator mechanic license
30 days
$((32.00))
33.20
Emergency elevator mechanic license
30 days
$((32.00))
33.20
Elevator mechanic/contractor timely renewal fee
2 years
$((129.00))
134.10
Elevator mechanic/contractor late renewal fee
2 years
$((258.30))
268.60
Training provider application/renewal fee
2 years
$((129.00))
134.10
Continuing education course fee by approved training provider
1 year**
Not applicable
Replacement of any licenses
 
$((19.20))
19.90
Refund processing fee
 
$((38.50))
40.00
Reciprocity application is only allowed for applicants who are applying for licensing based upon possession of a valid license that was obtained in state(s) with which the department has a reciprocity.
** 
This fee is paid directly to the continuing education training course provider approved by the department.
***
This fee may be collected by an outside vendor for some exams and may differ from the fee shown above.
AMENDATORY SECTION(Amending WSR 18-18-070, filed 8/31/18, effective 10/1/18)
WAC 296-96-01005Obtaining permits.
(1) See WAC 296-96-01000 for the permit process.
(2) Construction and alteration permits are valid for one year from the date of issue. However, permits may be renewed if:
(a) Application for a renewal permit is submitted before the current permit expires;
(b) The department approves the request for a renewal permit; and
(c) A renewal fee of $((58.30))60.60 is paid to the department for each permit renewed;
(3) If the permit has expired the applicant shall reapply for a new permit.
(4) See WAC 296-96-01006 for work requiring a permit.
AMENDATORY SECTION(Amending WSR 18-18-070, filed 8/31/18, effective 10/1/18)
WAC 296-96-01010Installation and alteration permit fees.
Permit fees are based on the total cost of the conveyance or alteration and the labor to install or alter the conveyance. The following permit fees apply to the construction, alteration, or relocation of all conveyances except personnel and material hoists (see WAC 296-96-01025):
TOTAL COST OF INSTALLATION OR ALTERATION
FEE
$0 to and including $1,000 . . . .
$((64.30))
66.80
$1,001 to and including $5,000 . . . .
$((96.50))
100.30
$5,001 to and including $7,000 . . . .
$((161.20))
167.60
$7,001 to and including $10,000 . . . .
$((193.60))
201.30
$10,001 to and including $15,000 . . . .
$((258.30))
268.60
OVER $15,000 for installation only*. . . .
$((361.60))
376.00 plus
OVER $15,000 for alteration only*. . . .
$((258.30))
268.60
 
*Each additional $1,000 or fraction thereof . . . .
$((8.90))
9.20
AMENDATORY SECTION(Amending WSR 18-18-070, filed 8/31/18, effective 10/1/18)
WAC 296-96-01025Permit fees for personnel and material hoists.
The fee for each personnel hoist or material hoist installation is ((. . . . $258.30))$268.60.
See WAC 296-96-01035(2) for requirements for jumps.
Note:
An operating certificate is also required for these types of conveyances.
AMENDATORY SECTION(Amending WSR 18-18-070, filed 8/31/18, effective 10/1/18)
WAC 296-96-01027Permit fee refunds.
The initial installation permit fees are refundable minus a processing fee if the installation work has not been performed. No refunds will be issued for expired permits. All requests for refunds shall be submitted in writing to the elevator section and shall identify the specific permits and the reasons for which the refunds are requested.
The processing fee for each refund is ((. . . . $38.50))$40.00.
AMENDATORY SECTION(Amending WSR 18-18-070, filed 8/31/18, effective 10/1/18)
WAC 296-96-01030Plan approval.
Prior to the start of construction and the issuance of a permit, the applicant shall submit to the department for approval plans for new installations or major alterations. To be approved, the plan shall comply with the latest adopted applicable standard and applicable Washington Administrative Code (WAC). In addition, the plans shall include all information necessary to determine whether each installation/alteration complies with all applicable codes. The permit holder shall keep a copy of the approved plan on the job site until the department has witnessed all acceptance tests. Any alterations to the approved plan shall be submitted to the department for approval before a final inspection will be conducted. The nonrefundable fees for reviewing the plans are $((32.00))33.20 for each installation/major alteration.
Exception:
Residential incline chair lifts will not require plan review. Equipment shall be listed and labeled by a product testing laboratory which is accredited by the department and plans supplied by the manufacturer shall be on-site. If the equipment is not listed and labeled as per RCW 19.28.010 it shall be field evaluated or replaced with equipment that is listed and labeled by a product testing laboratory which is accredited by the department.
AMENDATORY SECTION(Amending WSR 18-18-070, filed 8/31/18, effective 10/1/18)
WAC 296-96-01035Inspection fees.
The initial inspection of construction, alteration or relocation of a conveyance is included with the permit fee. Once the department has approved the initial installation of the conveyance a temporary 30-day operating certificate will be issued. Prior to the expiration of the 30-day temporary operating certificate the application for an annual operating certificate and the appropriate fees shall be paid to the department. Once the department has received the appropriate fees and application the owner will be issued the first annual operating certificate. The owner or owner's representative will receive an invoice from the department for renewal. The owner is required to renew the annual operating certificate yearly.
The following inspections require an additional inspection fee:
(1) Reinspection. If a conveyance does not pass an initial inspection and an additional inspection is required, the fee for each reinspection of a conveyance is $((129.00))134.10 per conveyance plus $((62.60))65.10 per hour for each hour in addition to the first hour.
The department may waive reinspection fees.
(2) Inspecting increases in the height (jumping) of personnel and material hoists.
The fee for inspecting an increase in the height (jumping) of each personnel hoist or material hoist is $((129.00))134.10 plus $((64.30))66.80 per hour for each hour in addition to 2 hours. This fee is for inspections occurring during regular working hours.
The permit holder may be allowed to operate a hoist prior to the jump inspection if:
(a) The electrical limits will not allow the lift to operate above the previously inspected landing; and
(b) The state elevator inspector is contacted, agrees and can schedule an inspection within 3 days.
(3) Variance inspections.
(a) The fee for an on-site variance inspection is $((193.60))201.30 per conveyance plus $((64.30))66.80 per hour for each hour in addition to 2 hours. This fee is for inspections occurring during regular working hours.
(b) The fee for a variance that does not require an on-site inspection is $((64.30))66.80 per conveyance. The individual requesting the variance shall provide the department with pictures, documentation, or other information necessary for the department to review the variance. The department may conduct an on-site variance inspection to verify the information provided or if it determines that an inspection is necessary. If an on-site variance inspection is performed, the fees in (a) of this subsection will apply.
(4) "Red tag" status fee. The annual fee for a conveyance in "Red tag" status is $((32.00))33.20.
Note:
The department shall be provided with written approval from the building official, indicating that the conveyance is not required for building occupancy, when applying to have the conveyance placed in voluntary red tag status.
(5) Decommission inspection. The fee for performing a decommission inspection is $((64.30))66.80. Once the decommission inspection has been performed and approved, the conveyance will no longer require annual inspections until such time that the conveyance is brought back into service. Prior to operating the conveyance, a new inspection and annual operating permit shall be obtained.
(6) Voluntary inspections by request. The owner or potential purchaser of a building within the department's jurisdiction may request a voluntary inspection of a conveyance. The fee for this inspection will be $((129.00))134.10 per conveyance and $((64.30))66.80 per hour for each hour in addition to 2 hours plus the standard per diem and mileage allowance granted to department inspectors. The owner/potential purchaser requesting the voluntary inspection will not be subject to any penalties based on the inspector's findings.
AMENDATORY SECTION(Amending WSR 18-18-070, filed 8/31/18, effective 10/1/18)
WAC 296-96-01040Construction-use inspection fee.
(1) The fee for the inspecting and testing of elevators used for construction is $((103.10))107.20, in addition to any other fees required in this chapter. This fee purchases a 30-day temporary use permit that may be renewed at the department's discretion.
(2) When this temporary use permit is purchased, a notice declaring that the equipment has not received final approval from the department shall be conspicuously posted in the elevator.
AMENDATORY SECTION(Amending WSR 18-18-070, filed 8/31/18, effective 10/1/18)
WAC 296-96-01045Residential elevator inspection and fees.
(1) Chapter 70.87 RCW requires the department to inspect all new, altered or relocated conveyances operated exclusively for single-family use in private residences. Prior to installation, a licensed elevator contractor shall complete a permit application as described in WAC 296-96-01005 and pay the appropriate fee listed in WAC 296-96-01010.
(2) Chapter 70.87 RCW allows the department to inspect conveyances operated exclusively for single-family use in private residences when the department is investigating an accident or an alleged or apparent violation of the statute or these rules.
(3) No annual inspection and operating certificate is required for a private residence conveyance operated exclusively for single-family use unless the owner requests it. When an owner requests an inspection and an annual operating certificate, the following fee shall be paid prior to an inspection:
TYPE OF CONVEYANCE
FEE
Each inclined stairway chair lift in private residence . . . .
$((30.00))
31.20
Each inclined wheel chair lift in a private residence . . . .
$((30.00))
31.20
Each vertical wheel chair lift in a private residence . . . .
$((37.80))
39.30
Each dumbwaiter in a private residence . . . .
$((30.00))
31.20
Each inclined elevator at a private residence . . . .
$((107.30))
111.50
Each private residence elevator . . . .
$((69.10))
71.80
Duplication of a lost, damaged or stolen operating permit . . . .
$((12.60))
13.10
AMENDATORY SECTION(Amending WSR 18-18-070, filed 8/31/18, effective 10/1/18)
WAC 296-96-01055Technical services and consultations.
A person, firm, corporation, or governmental agency may request elevator field technical services from the department by paying a fee of $((77.30))80.30 per hour (including travel time) plus the standard per diem and mileage allowance granted to department inspectors. These field technical services may include code evaluation, code consultation, plan examination, code interpretation and clarification of technical data relating to the application of the department's conveyance rules. Field technical services do not include inspections.
AMENDATORY SECTION(Amending WSR 18-18-070, filed 8/31/18, effective 10/1/18)
WAC 296-96-01057Accident investigations.
The department shall investigate an injury-related accident reported by the owner or owner's duly authorized agent. The department may charge at a rate of $((77.30))80.30 per hour (including travel time) plus the standard per diem and mileage allowance granted to department inspectors.
AMENDATORY SECTION(Amending WSR 18-18-070, filed 8/31/18, effective 10/1/18)
WAC 296-96-01060Inspections after normal business hours.
An inspection outside of normal business hours and business days (i.e., Monday through Friday excluding holidays; 7:00 a.m. to 5:00 p.m.) may be requested under the following conditions:
(1) An inspector is available; and
(2) The inspection is authorized by the department.
(3) The minimum fee for an after-hours inspection is $((96.50))100.30 and $((96.50))100.30 per hour for each hour in addition to the first hour plus the standard per diem and mileage allowance granted to department inspectors.
(4) This fee is in addition to any other fees required for the project.
AMENDATORY SECTION(Amending WSR 18-18-070, filed 8/31/18, effective 10/1/18)
WAC 296-96-01065Annual operating permit fees.
An annual operating certificate will be issued to the building owner upon payment of the appropriate fee. The owner of record shall be invoiced by the department. If a change of ownership has occurred, it is the new owner's responsibility to ensure the department has the corrected information. Below is the fee structure table:
TYPE OF CONVEYANCE
FEE
Each hydraulic elevator . . . .
$((129.00))
134.10
Each roped-hydraulic elevator . . . .
$((161.20))
167.60
plus for each hoistway opening in excess of two . . . .
$((12.60))
13.10
Each cable elevator . . . .
$((161.20))
167.60
plus for each hoistway opening in excess of two . . . .
$((12.60))
13.10
Each cable elevator traveling more than 25 feet without an opening—for each 25 foot traveled . . . .
$((12.60))
13.10
Each limited-use/limited-application
(—LULA) elevator . . . .
$((129.00))
134.10
Each escalator . . . .
$((107.20))
111.40
Each dumbwaiter in other than a private residence . . . .
$((69.10))
71.80
Each material lift. . . .
$((129.00))
134.10
Each incline elevator in other than a private residence . . . .
$((138.70))
144.20
Each belt manlift . . . .
$((129.00))
134.10
Each stair lift in other than a private residence . . . .
$((69.10))
71.80
Each wheel chair lift in other than a private residence . . . .
$((69.10))
71.80
Each personnel hoist . . . .
$((129.00))
134.10
Each grain elevator personnel lift . . . .
$((107.20))
111.40
Each material hoist . . . .
$((129.00))
134.10
Each special purpose elevator . . . .
$((129.00))
134.10
Each private residence elevator installed in other than a private residence . . . .
$((129.00))
134.10
Each casket lift . . . .
$((107.20))
111.40
Each sidewalk freight elevator . . . .
$((107.20))
111.40
Each hand-powered manlift or freight
elevator . . . .
$((72.60))
75.50
Each boat launching elevator . . . .
$((107.20))
111.40
Each auto parking elevator . . . .
$((107.20))
111.40
Each moving walk . . . .
$((107.20))
111.40
Duplication of a damaged, lost or stolen operating permit . . . .
$((12.60))
13.10
AMENDATORY SECTION(Amending WSR 12-06-069, filed 3/6/12, effective 4/30/12)
WAC 296-150C-3000Commercial coach fees.
GENERAL INFORMATION
Manufacture:
 
Manufacturer #
 
1.
Building use:
 
2.
Building occupancy:
 
3.
Type of construction: VB
 
4.
Square footage of building:
 
5.
Valuation of the building shall be based on the following:
Square footage of the building multiplied by the amount in the
BVD valuation table . . . .
$
. . . . .
6.
Total valuation: . . . .
$
. . . . .
PERMIT FEE
7.
Calculate from building permit fee table using the total valuation . . . .
$
. . . . .
STRUCTURAL PLAN REVIEW FEE*
8.
One year design review:
(Valid for one year) multiply the total on line 7 by ((0.35))0.364. . . .
$
. . . . .
9.
Master plan review:
(Valid for the code cycle) multiply the total on line 7 by ((0.50))0.52. . . .
$
. . . . .
*
Minimum plan review fee is 2 1/2 hours x $((76.00))79.00 per hour
FIRE AND LIFE-SAFETY PLAN REVIEW FEE (if required)
10.
Fire and life-safety plan review:
 
 
 
a.
One year design—Multiply the total on line 7 by ((0.15))0.156. . . .
$
. . . . .
b.
Master plan design—Multiply the total on line 7 by ((0.25))0.26. . . .
$
. . . . .
Required for all structures that are more than 4,000 square feet and for all A and I occupancy
PLUMBING PLAN-REVIEW FEE
11.
Plumbing (($18.00 + $6.00))$18.70 + $6.20 per fixture . . . .
$
. . . . .
12.
Medical gas (($18.00 + $6.00))$18.70 + $6.20 per gas outlet . . . .
$
. . . . .
DESIGN RENEWAL OR ADDENDUM
13.
((10))10.4% of building permit + $((76.00))79.00. . . .
$
. . . . .
RESUBMITTAL
14.
((10))10.4% of building permit + $((76.00))79.00. . . .
$
. . . . .
ELECTRICAL PLAN-REVIEW FEE
15.
See WAC 296-46B-906(9) for electrical review fees
 
INSIGNIA FEES
16.
FIRST SECTION
$
((22.80))
23.70
17.
EACH ADDITIONAL SECTION
$
((14.10))
14.60
TOTAL FEES
18.
Total plan review fees:
Add lines 8 or 9 and 10 through 15 . . . .
$
. . . . .
19.
Total fees due:
Includes plan fees and insignia fees . . . .
$
. . . . .
20.
Total amount paid. . . .
$
. . . . .
Square Foot Construction Costs (BVD Table)a, b, c, and d
Group (2009 International Building Code)
IA
IB
IIA
IIB
IIIA
IIIB
IV
VA
VB
A-1 Assembly, theaters, with stage
211.15
203.98
198.73
190.05
178.25
173.30
183.31
162.97
156.05
A-1 Assembly, theaters, without stage
193.16
185.99
180.74
172.06
160.31
155.36
165.32
145.04
138.12
A-2 Assembly, nightclubs
163.22
158.56
154.17
148.00
138.96
135.24
142.52
126.06
121.36
A-2 Assembly, restaurants, bars, banquet halls
162.22
157.56
152.17
147.00
136.96
134.24
141.52
124.06
120.36
A-3 Assembly, churches
195.10
187.93
182.68
174.00
162.21
157.26
167.26
146.94
140.02
A-3 Assembly, general, community halls, libraries, museums
163.81
156.64
150.39
142.71
129.91
125.96
135.97
114.63
108.71
A-4 Assembly, arenas
192.16
184.99
178.74
171.06
158.31
154.36
164.32
143.04
137.12
B Business
164.76
158.78
153.49
145.97
132.45
127.63
139.92
116.43
110.93
E Educational
176.97
170.85
165.64
158.05
146.37
138.98
152.61
127.91
123.09
F-1 Factory and industrial, moderate hazard
97.87
93.28
87.66
84.46
75.44
72.26
80.79
62.17
58.48
F-2 Factory and industrial, low hazard
96.87
92.28
87.66
83.46
75.44
71.26
79.79
62.17
57.48
H-1 High hazard, explosives
91.74
87.15
82.53
78.33
70.49
66.31
74.66
57.22
N.P.
H-2, 3, 4 High hazard
91.74
87.15
82.53
78.33
70.49
66.31
74.66
57.22
52.53
H-5 HPM
164.76
158.78
153.49
145.97
132.45
127.63
139.92
116.43
110.93
I-1 Institutional, supervised environment
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
I-2 Institutional, hospitals
277.07
271.09
265.80
258.28
243.90
N.P.
252.23
227.88
N.P.
I-2 Institutional, nursing homes
193.00
187.02
181.74
174.22
160.98
N.P.
168.16
144.96
N.P.
I-3 Institutional, restrained
187.72
181.73
176.45
168.93
156.64
150.82
162.87
140.63
133.13
I-4 Institutional, day care facilities
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
M Mercantile
121.57
116.92
111.53
106.36
96.96
94.25
100.88
84.07
80.36
R-1 Residential, hotels
166.21
160.43
155.99
149.29
137.39
133.80
145.70
123.43
119.10
R-2 Residential, multiple family
139.39
133.61
129.17
122.47
111.23
107.64
119.54
97.27
92.94
R-3 Residential, one and two family
131.18
127.60
124.36
121.27
116.43
113.53
117.42
108.79
101.90
R-4 Residential, care/assisted living facilities
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
S-1 Storage, moderate hazard
90.74
86.15
80.53
77.33
68.49
65.31
73.66
55.22
51.53
S-2 Storage, low hazard
89.74
85.15
80.53
76.33
68.49
64.31
72.66
55.22
50.53
U Utility, miscellaneous
71.03
67.02
62.71
59.30
52.86
49.43
56.33
41.00
39.06
a
Private garages use utility, miscellaneous
b
Unfinished basements (all use group) = $15.00 per sq. ft.
c
For shell only buildings deduct 20 percent
d
N.P. = not permitted
Building Permit Fees
Total Valuation
Fee
$1.00 to $500.00
$23.50
$501.00 to $2,000.00
$23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00
$2,001.00 to $25,000.00
$69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00
$25,001.00 to $50,000.00
$391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00
$50,001.00 to $100,000.00
$643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00
$100,001.00 to $500,000.00
$993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and including $500,000.00
$500,001.00 to $1,000,000.00
$3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00
$1,000,001.00 and up
$5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof
 
INITIAL FILING FEE (first time applicants)
$((37.60))
39.10
 
 
DESIGN PLAN FEES:
 
 
 
 
INITIAL FEE - MASTER DESIGN (code cycle), 50% of permit fee × 1.04*
 
 
 
 
INITIAL FEE - ONE YEAR DESIGN, 35% of permit fee × 1.04*
 
 
 
 
RENEWAL FEE - 10% of permit fee × 1.04 +
$((76.00))
79.00
 
 
 
RESUBMIT FEE - 10% of permit fee × 1.04 +
$((76.00))
79.00
 
 
 
ADDENDUM (approval expires on same date as original plan) - 10% of permit fee × 1.04 +
$((76.00))
79.00
 
 
 
ELECTRONIC PLAN SUBMITTAL FEE $((5.40))5.60 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
 
 
 
PLUMBING PLAN FEE, $((18.00))18.70 + PER FIXTURE FEE of
$((6.00))
6.20
 
 
 
MEDICAL GAS PLAN FEE, $((18.00))18.70 + PER OUTLET FEE of
$((6.00))
6.20
 
 
 
Note: Mechanical systems are included in the primary plan fee
 
 
 
FIRE SAFETY PLAN REVIEW AS REQUIRED (Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy)
 
 
 
 
MASTER DESIGN - 25% of permit fee × 1.04
 
 
 
 
One year design 15% of the permit fee × 1.04
 
 
 
ELECTRICAL PLAN REVIEW - Find fee @ http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906
 
 
 
RECIPROCAL PLAN REVIEW:
 
 
 
 
INITIAL FEE - MASTER DESIGN (minimum 3 hours)
$((76.00))
79.00 per hour
 
 
 
INITIAL FEE - ONE YEAR DESIGN (minimum 2 hours)
$((76.00))
79.00 per hour
 
 
 
RENEWAL FEE (minimum 1 hour)
$((76.00))
79.00 per hour
 
 
 
ADDENDUM (minimum 1 hour)
$((76.00))
79.00 per hour
 
 
PLANS APPROVED BY PROFESSIONALS - 10% of permit fee × 1.04 +
$((76.00))
79.00
 
 
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS - 5% of permit fee × 1.04 +
$((76.00))
79.00
 
 
DEPARTMENT INSPECTION FEES
 
 
 
 
INSPECTION/REINSPECTION (Per hour** plus travel time* and mileage***)
$((76.00))
79.00
 
 
 
TRAVEL (Per hour)
$((76.00))
79.00
 
 
 
PER DIEM***
 
 
 
 
HOTEL****
 
 
 
 
MILEAGE***
 
 
 
 
RENTAL CAR****
 
 
 
 
PARKING****
 
 
 
 
AIRFARE****
 
 
 
DEPARTMENT AUDIT FEES:
 
 
 
 
AUDIT (Per hour*)
$((76.00))
79.00
 
 
 
TRAVEL (Per hour**)
$((76.00))
79.00
 
 
 
PER DIEM***
 
 
 
 
HOTEL****
 
 
 
 
MILEAGE***
 
 
 
 
RENTAL CAR****
 
 
 
 
PARKING****
 
 
 
 
AIRFARE****
 
 
 
 
ALTERATION INSPECTION (one hour minimum + alteration insignia fee)
$((98.80))
102.70
 
 
INSIGNIA FEES:
 
 
 
 
FIRST SECTION (NEW or ALTERATION)
$((22.80))
23.70
 
 
 
EACH ADDITIONAL SECTION (NEW or ALTERATION)
$((14.10))
14.60
 
 
 
REISSUED-LOST/DAMAGED
$((14.10))
14.60
 
 
OTHER FEES:
 
 
 
 
FIELD TECHNICAL SERVICE (Per hour** plus travel time** and mileage***)
$((76.00))
79.00
 
 
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request)
$((14.10))
14.60
 
 
REFUND FEE
$((25.00))
26.00
 
*
Minimum plan review fee is 2 1/2 hours at the field technical service rate
 
 
**
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments
 
 
***
Per state guidelines
 
 
****
Actual charges incurred
 
 
AMENDATORY SECTION(Amending WSR 12-06-069, filed 3/6/12, effective 4/30/12)
WAC 296-150F-3000Factory-built housing and commercial structure fees.
GENERAL INFORMATION
Manufacture:
 
Manufacturer #
 
1.
Building use:
 
2.
Building occupancy:
 
3.
Type of construction:
 
4.
Square footage of building:
 
5.
Valuation of the building shall be based on the following:
Square footage of the building multiplied by the amount in the
BVD valuation table . . . .
$
. . . . .
6.
Total valuation: . . . .
$
. . . . .
PERMIT FEE
7.
Calculate from building permit fee table using the total valuation . . . .
$
. . . . .
STRUCTURAL PLAN REVIEW FEE*
8.
One year design review:
(Valid for one year) multiply the total on line 7 by ((0.35))0.364. . . .
$
. . . . .
9.
Master plan review:
(Valid for the code cycle) multiply the total on line 7 by ((0.50))0.52. . . .
$
. . . . .
*
Minimum plan review fee is 2 1/2 hours x $((85.50))88.90 per hour
FIRE AND LIFE-SAFETY PLAN REVIEW FEE (if required)
10.
Fire and life-safety plan review:
 
 
 
a.
One year design—Multiply the total on line 7 by ((0.15))0.156. . . .
$
. . . . .
b.
Master plan design—Multiply the total on line 7 by ((0.25))0.26. . . .
$
. . . . .
Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy
PLUMBING PLAN-REVIEW FEE
11.
Plumbing (($18.00 + $6.00))$18.70 + $6.20 per fixture . . . .
$
. . . . .
12.
Medical gas (($18.00 + $6.00))$18.70 + $6.20 per gas outlet . . . .
$
. . . . .
DESIGN RENEWAL OR ADDENDUM
13.
((10))10.4% of building permit + $((85.50))88.90. . . .
$
. . . . .
RESUBMITTAL
14.
((10))10.4% of building permit + $((85.50))88.90. . . .
$
. . . . .
ELECTRICAL PLAN-REVIEW FEE
15.
See WAC 296-46B-906(9) for electrical review fees
 
NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA)
16.
Notification to local enforcement agency fee:
$
((37.00))
38.40
INSIGNIA FEES
17.
FIRST SECTION
$
((273.40))
284.30
18.
EACH ADDITIONAL SECTION
$
((24.60))
25.50
TOTAL FEES
19.
Total plan review fees:
Add lines 8 or 9 and 10 through 15 . . . .
$
. . . . .
20.
Total fees due:
Includes plan fees, insignia fees, and NLEA fees . . . .
$
. . . . .
21.
Total amount paid. . . .
$
. . . . .
Square Foot Construction Costs (BVD Table)a, b, c, and d
Group (2009
International Building Code)
IA
IB
IIA
IIB
IIIA
IIIB
IV
VA
VB
A-1 Assembly, theaters, with stage
211.15
203.98
198.73
190.05
178.25
173.30
183.31
162.97
156.05
A-1 Assembly, theaters, without stage
193.16
185.99
180.74
172.06
160.31
155.36
165.32
145.04
138.12
A-2 Assembly, nightclubs
163.22
158.56
154.17
148.00
138.96
135.24
142.52
126.06
121.36
A-2 Assembly, restaurants, bars, banquet halls
162.22
157.56
152.17
147.00
136.96
134.24
141.52
124.06
120.36
A-3 Assembly, churches
195.10
187.93
182.68
174.00
162.21
157.26
167.26
146.94
140.02
A-3 Assembly, general, community halls, libraries, museums
163.81
156.64
150.39
142.71
129.91
125.96
135.97
114.63
108.71
A-4 Assembly, arenas
192.16
184.99
178.74
171.06
158.31
154.36
164.32
143.04
137.12
B Business
164.76
158.78
153.49
145.97
132.45
127.63
139.92
116.43
110.93
E Educational
176.97
170.85
165.64
158.05
146.37
138.98
152.61
127.91
123.09
F-1 Factory and industrial, moderate hazard
97.87
93.28
87.66
84.46
75.44
72.26
80.79
62.17
58.48
F-2 Factory and industrial, low hazard
96.87
92.28
87.66
83.46
75.44
71.26
79.79
62.17
57.48
H-1 High hazard, explosives
91.74
87.15
82.53
78.33
70.49
66.31
74.66
57.22
N.P.
H-2, 3, 4 High hazard
91.74
87.15
82.53
78.33
70.49
66.31
74.66
57.22
52.53
H-5 HPM
164.76
158.78
153.49
145.97
132.45
127.63
139.92
116.43
110.93
I-1 Institutional, supervised environment
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
I-2 Institutional, hospitals
277.07
271.09
265.80
258.28
243.90
N.P.
252.23
227.88
N.P.
I-2 Institutional, nursing homes
193.00
187.02
181.74
174.22
160.98
N.P.
168.16
144.96
N.P.
I-3 Institutional, restrained
187.72
181.73
176.45
168.93
156.64
150.82
162.87
140.63
133.13
I-4 Institutional, day care facilities
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
M Mercantile
121.57
116.92
111.53
106.36
96.96
94.25
100.88
84.07
80.36
R-1 Residential, hotels
166.21
160.43
155.99
149.29
137.39
133.80
145.70
123.43
119.10
R-2 Residential, multiple family
139.39
133.61
129.17
122.47
111.23
107.64
119.54
97.27
92.94
R-3 Residential, one and two family
131.18
127.60
124.36
121.27
116.43
113.53
117.42
108.79
101.90
R-4 Residential, care/assisted living facilities
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
S-1 Storage, moderate hazard
90.74
86.15
80.53
77.33
68.49
65.31
73.66
55.22
51.53
S-2 Storage, low hazard
89.74
85.15
80.53
76.33
68.49
64.31
72.66
55.22
50.53
U Utility, miscellaneous
71.03
67.02
62.71
59.30
52.86
49.43
56.33
41.00
39.06
a
Private garages use utility, miscellaneous
b
Unfinished basements (all use group) = $15.00 per sq. ft.
c
For shell only buildings deduct 20 percent
d
N.P. = not permitted
Table 1-A - Building Permit Fees
Total Valuation
Fee
$1.00 to $500.00
$23.50
$501.00 to $2,000.00
$23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00
$2,001.00 to $25,000.00
$69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00
$25,001.00 to $50,000.00
$391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00
$50,001.00 to $100,000.00
$643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00
$100,001.00 to $500,000.00
$993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and including $500,000.00
$500,001.00 to $1,000,000.00
$3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00
$1,000,001.00 and up
$5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof
INITIAL FILING FEE (first time applicants)
$((66.80))
69.40
DESIGN PLAN FEES:
 
 
INITIAL FEE - MASTER DESIGN (code cycle), 50% of permit fee × 1.04*
 
 
INITIAL FEE - ONE YEAR DESIGN, 35% of permit fee × 1.04*
 
 
RENEWAL FEE - 10% of permit fee × 1.04 +
$((85.50))
88.90
 
RESUBMIT FEE - 10% of permit fee × 1.04 +
$((85.50))
88.90
 
ADDENDUM (approval expires on same date as original plan) - 10% of permit fee × 1.04 +
$((85.50))
88.90
 
ELECTRONIC PLAN SUBMITTAL FEE $((5.40))5.60 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
 
PLUMBING PLAN FEE, $((18.00))18.70 + PER FIXTURE FEE of
$((6.00))
6.20
 
MEDICAL GAS PLAN FEE, $((18.00))18.70 + PER OUTLET FEE of
$((6.00))
6.20
 
Note: Mechanical systems are included in the primary plan fee
 
FIRE SAFETY PLAN REVIEW AS REQUIRED (Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy)
 
 
MASTER DESIGN - 25% of permit fee × 1.04
 
 
One year design - 15% of the permit fee × 1.04
 
ELECTRICAL PLAN REVIEW - Find fees @ http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906
 
RECIPROCAL PLAN REVIEW:
 
 
INITIAL FEE-MASTER DESIGN (minimum 3 hours)
$((85.50))
88.90 per hour
 
INITIAL FEE-ONE YEAR DESIGN (minimum 2 hours)
$((85.50))
88.90 per hour
 
RENEWAL FEE (minimum 1 hour)
$((85.50))
88.90
 
ADDENDUM (minimum 1 hour)
$((85.50))
88.90 per hour
PLANS APPROVED BY DESIGN PROFESSIONALS - 10% of permit fee × 1.04 +
$((85.50))
88.90
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST THREE SETS - 5% of permit fee × 1.04 +
$((85.50))
88.90
DEPARTMENT INSPECTION FEES
 
 
INSPECTION/REINSPECTION (Per hour** plus travel time** and mileage***)
$((85.50))
88.90
 
TRAVEL (Per hour**)
$((85.50))
88.90
 
PER DIEM***
 
 
HOTEL****
 
 
MILEAGE***
 
 
RENTAL CAR****
 
 
PARKING****
 
 
AIRFARE****
 
DEPARTMENT AUDIT FEES:
 
 
AUDIT (Per hour**)
$((85.50))
88.90
 
TRAVEL (Per hour**)
$((85.50))
88.90
 
PER DIEM***
 
 
HOTEL****
 
 
MILEAGE***
 
 
RENTAL CAR****
 
 
PARKING****
 
 
AIRFARE****
 
INSIGNIA FEES:
 
 
FIRST SECTION
$((273.40))
284.30
 
EACH ADDITIONAL SECTION
$((24.60))
25.50
 
REISSUED-LOST/DAMAGED
$((66.80))
69.40
OTHER FEES:
 
 
FIELD TECHNICAL SERVICE (Per hour** plus travel time** and mileage***)
$((85.50))
88.90
 
NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA)
$((37.00))
38.40
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request)
$((13.70))
14.20
REFUND FEE
$((25.00))
26.00
*
Minimum plan review fee is 2 1/2 hours at the field technical service rate.
 
**
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
 
***
Per state guidelines.
 
****
Actual charges incurred.
 
AMENDATORY SECTION(Amending WSR 17-23-173, filed 11/21/17, effective 1/1/18)
WAC 296-150I-3000Penalties, fees, and refunds.
Penalties
(1) Monetary penalties for infractions listed in WAC 296-150I-0210 shall be assessed for each violation of chapter 43.22A RCW in the following amount:
(a) Failure to have a certified installer on the installation site whenever installation work is being performed:
 
First Final Violation
$250.00
 
Each Additional Final Violation
$1,000.00
(b) Failure to correct all nonconforming aspects of the installation identified by the local enforcement agency or by an authorized representative of the department within thirty days of issuance of notice of the same:
 
First Final Violation
Warning
 
Second Final Violation
$250.00
 
Third Final Violation
$500.00
 
Each Additional Final Violation
$1,000.00
(c) Failure by a certified installer to affix a certification tag to an installed manufactured/mobile home:
 
First Final Violation
Warning
 
Second Final Violation
$250.00
 
Third Final Violation
$500.00
 
Each Additional Final Violation
$1,000.00
(d) Transfer of certification tag(s) from a certified installer to another certified installer without prior written approval of the department:
 
First Final Violation
Warning
 
Each Additional Final Violation
$250.00
(e) Transfer of certification tag(s) from a certified installer to a noncertified installer:
 
First Final Violation to Each Contractor in Violation
$250.00
 
Each Additional Final Violation to Each Contractor in Violation
$1,000.00
(f) Transfer of unused installer certification tags by a manufactured home retailer to a new ownership without prior written approval of the department:
 
First Final Violation
Warning
 
Each Additional Final Violation
$250.00
Fees and Refunds
The following fees are payable to the department in advance:
 
Training and certification
$((260.00))
270.40
 
Training only 10 hours
$((130.00))
135.20
 
Manufactured/mobile home installation inspector training
$((130.00))
135.20
 
Refund
$((26.00))
27.00
 
Certification renewal
$((130.00))
135.20
 
Continuing education class
$((52.00))
54.00
 
Retake failed examination and training
$((39.00))
40.50
 
Manufactured home installer training manual
$((13.00))
13.50
 
Installer certification tag
$((9.10))
9.40
(2) The department shall refund fees paid for training and certification or certification renewal as a manufactured home installer if the application is denied for failure of the applicant to comply with the requirements of chapter 43.22A RCW or these rules.
(3) If an applicant has paid fees to attend training or to take an examination and is unable to attend the scheduled training or examination, the applicant may:
(a) Change to another scheduled training and examination; or
(b) Request a refund.
(4) An applicant who fails the examination shall not be entitled to a refund.
AMENDATORY SECTION(Amending WSR 12-06-069, filed 3/6/12, effective 4/30/12)
WAC 296-150M-3000Manufactured/mobile home fees.
DESIGN PLAN FEES:
 
 
STRUCTURAL ALTERATION
$((166.20))
172.80
 
RESUBMITTAL FEE
$((73.50))
76.40
 
ADDENDUM (Approval expires on the same date as original plan.)
$((73.50))
76.40
 
ELECTRONIC PLAN SUBMITTAL FEE $((5.20))5.40 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
DEPARTMENT INSPECTION FEES:
 
 
Combination permit - Mechanical and electrical inspections
$((181.60))
188.80
 
Heat pump
$((181.60))
188.80
 
Air conditioning
$((181.60))
188.80
 
Air conditioning with replacement furnace
$((181.60))
188.80
 
Gas furnace installation includes gas piping
$((181.60))
188.80
 
Fire safety inspection
$((181.60))
188.80
MECHANICAL
$((80.70))
83.90
 
Gas*** Piping
$((80.70))
83.90
 
Wood Stove
$((80.70))
83.90
 
Pellet Stove
$((80.70))
83.90
 
Gas*** Room Heater
$((80.70))
83.90
 
Gas*** Decorative Appliance
$((80.70))
83.90
 
Range: Changing from electric to gas***
$((80.70))
83.90
 
Gas*** Water Heater Replacement
$((60.50))
62.90
ELECTRICAL
$((101.00))
105.00
 
Electric Water Heater Replacement
$((101.00))
105.00
 
Electric Water Heater replacing Gas*** Water Heater
$((101.00))
105.00
 
Each added or modified 120 volt circuit (maximum charge is two circuits)
$((101.00))
105.00
 
Each added 240 volt circuit (for other than Heat Pumps, Air Conditioners, Furnaces, Water Heaters, Ranges, Hot Tubs or Spas)
$((101.00))
105.00
 
Hot Tub or Spa (power from home electrical panel)
$((101.00))
105.00
 
Replace main electrical panel/permanently installed transfer equipment
$((101.00))
105.00
 
Low voltage fire/intrusion alarm
$((101.00))
105.00
 
Any combination of Furnace, Range and Water Heater changing from electric to gas***
$((101.00))
105.00
PLUMBING
 
 
Fire sprinkler system
$((226.90))
235.90
 
Each added fixture
$((60.50))
62.90
 
Replacement of water piping system (this includes two inspections)
$((202.50))
210.60
STRUCTURAL
 
 
Inspection as part of a mechanical/fire safety installation (cut truss/floor joist, sheet rocking)
$((90.60))
94.20
 
Reroofs (may require a plan review)
$((161.90))
168.30
 
Changes to home when additions bear loads on home per the design of a professional (also requires a plan review)
$((161.90))
168.30
 
Other structural changes (may require a plan review)
$((161.90))
168.30
MISCELLANEOUS
 
 
OTHER REQUIRED INSPECTIONS (Per hour*)
$((66.30))
68.90
 
ALL REINSPECTIONS (Per hour*)
$((66.30))
68.90
 
Refund
$((20.10))
20.90
INSIGNIA FEES:
 
 
REISSUED - LOST/DAMAGED
$((20.10))
20.90
IPIA
 
DEPARTMENT AUDIT FEES
 
 
REGULARLY SCHEDULED IPIA AUDIT:
 
 
 
First inspection on each section (one time only)
$((33.30))
34.60
 
 
Second and succeeding inspections of unlabeled sections (Per hour*)
$((73.50))
76.40
 
OTHER IPIA FEES:
 
 
 
Red tag removal during a regularly scheduled IPIA audit (Per hour*separate from other fees)
$((73.50))
76.40
 
 
Red tag removal at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time* and mileage**)
$((73.50))
76.40
 
 
Increased frequency surveillance (Per hour* plus travel time* and mileage**)
$((73.50))
76.40
 
 
Attendance at manufacturers training classes (Per hour* only)
$((73.50))
76.40
 
 
Subpart "I" investigations (Per hour* plus travel time* and mileage**)
$((73.50))
76.40
 
 
Alterations to a labeled unit (Per hour* plus travel time* and mileage**)
$((73.50))
76.40
 
 
IPIA Issues/Responses (Per hour* Plus travel time* and mileage**)
$((73.50))
76.40
 
 
Monthly surveillance during a regularly scheduled IPIA audit (Per hour*plus travel time* and mileage**)
$((73.50))
76.40
 
 
Monthly surveillance at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time* and mileage**)
$((73.50))
76.40
 
 
Plant certifications, recertifications and addenda updates (Per hour* plus travel time* and mileage** per each inspector)
$((73.50))
76.40
 
 
Response to HBT Audit during a regularly scheduled IPIA audit (Per hour*)
$((73.50))
76.40
 
 
Response to HBT Audit at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time*and mileage**)
$((73.50))
76.40
 
 
Alternative construction (AC) letter inspections at placement site (Per hour* plus travel time*and mileage**)
$((73.50))
76.40
 
 
Replacement of HUD labels (Per hour* plus travel time* and mileage**)
$((73.50))
76.40
 
 
State Administrative Agency (SAA) inspection fee (Per hour* plus travel time* and mileage**)
$((73.50))
76.40
 
 
State Administrative Agency (SAA) dispute resolution filing fee
$((73.50))
76.40
 
 
State Administrative Agency (SAA) dispute resolution (Per hour*)
$((73.50))
76.40
OTHER FEES:
 
 
FIELD TECHNICAL SERVICE (Per hour plus travel time* and mileage**)
$((68.20))
70.90
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request)
$((13.40))
13.90
 
VARIANCE INSPECTION FEE
$((161.80))
168.20
 
HOMEOWNER REQUESTED INSPECTION
$((161.80))
168.20
 
DECERTIFICATION OF A MOBILE/MANUFACTURED HOME
$((161.80))
168.20
 
DEMOLITION OF A MOBILE/MANUFACTURED HOME
$((161.80))
168.20
 
ENERGY CONSERVATION PERMIT
$((27.60))
28.70
NOTE: Local jurisdictions may have other fees that apply.
 
*
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
 
**
Per state guidelines.
 
***
Gas means all gases; natural, propane, etc.
 
AMENDATORY SECTION(Amending WSR 12-06-069, filed 3/6/12, effective 4/30/12)
WAC 296-150P-3000Recreational park trailer fees.
INITIAL FILING FEE
$((34.70))
36.00
DESIGN PLAN FEES:
 
 
NEW PLAN REVIEW FEE WITHOUT STRUCTURAL REQUIREMENTS
$((98.20))
102.10
 
NEW PLAN REVIEW FEE WITH STRUCTURAL REQUIREMENTS
$((129.90))
135.00
 
RESUBMITTAL FEE
$((70.20))
73.00
 
ADDENDUM (Approval expires on same date as original plan.)
$((70.20))
73.00
 
ELECTRONIC PLAN SUBMITTAL FEE $((5.20))5.40 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
DEPARTMENT AUDIT FEES:
 
 
AUDIT (per hour)*
$((70.20))
73.00
 
TRAVEL (per hour)*
$((70.20))
73.00
 
PER DIEM**
 
 
HOTEL***
 
 
MILEAGE**
 
 
RENTAL CAR***
 
 
PARKING***
 
 
AIRFARE***
 
DEPARTMENT INSPECTION FEES:
 
 
INSPECTION (per hour)*
$((70.20))
73.00
 
TRAVEL (per hour)*
$((70.20))
73.00
 
PER DIEM**
 
 
HOTEL***
 
 
MILEAGE**
 
 
RENTAL CAR***
 
 
PARKING***
 
 
AIRFARE***
 
 
ALTERATION INSPECTION (One hour plus insignia alteration fee)
$((104.90))
109.00
INSIGNIA FEES:
 
 
STATE CERTIFIED
$((25.00))
26.00
 
ALTERATION
$((34.70))
36.00
 
REISSUED-LOST/DAMAGED
$((12.90))
13.40
OTHER FEES:
 
 
FIELD TECHNICAL SERVICE (per hour* plus travel time* and mileage**)
$((70.20))
73.00
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request)
$((13.10))
13.60
REFUND FEE
$((25.00))
26.00
*
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
 
**
Per state guidelines.
 
***
Actual charges incurred.
 
AMENDATORY SECTION(Amending WSR 12-06-069, filed 3/6/12, effective 4/30/12)
WAC 296-150R-3000Recreational vehicle fees.
STATE PLAN
INITIAL FILING FEE
$((33.70))
35.00
DESIGN PLAN FEES:
 
 
NEW PLAN REVIEW FEE
$((93.90))
97.60
 
RESUBMITTAL FEE
$((67.80))
70.50
 
ADDENDUM (Approval expires on same date as original plan.)
$((67.80))
70.50
 
ELECTRONIC PLAN SUBMITTAL FEE $((5.10))5.30 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
DEPARTMENT AUDIT FEES:
 
 
AUDIT (per hour)*
$((67.90))
70.60
 
TRAVEL (per hour)*
$((67.90))
70.60
 
PER DIEM**
 
 
HOTEL***
 
 
MILEAGE**
 
 
RENTAL CAR***
 
 
PARKING
 
 
AIRFARE***
 
DEPARTMENT INSPECTION FEES:
 
 
INSPECTION (per hour)*
$((67.90))
70.60
 
TRAVEL (per hour)*
$((67.90))
70.60
 
PER DIEM**
 
 
HOTEL***
 
 
MILEAGE**
 
 
RENTAL CAR***
 
 
PARKING***
 
 
AIRFARE***
 
 
ALTERATION INSPECTION (One hour plus insignia alteration fee)
$((101.60))
105.60
INSIGNIA FEES:
 
 
STATE CERTIFIED
$((25.00))
26.00
 
ALTERATION
$((33.70))
35.00
 
REISSUED-LOST/DAMAGED
$((12.10))
12.50
OTHER FEES:
 
 
FIELD TECHNICAL SERVICE (per hour* plus travel time* and mileage**)
$((67.90))
70.60
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year)
$((12.70))
13.20
*
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
 
**
Per state guidelines.
 
***
Actual charges incurred.
 
SELF CERTIFICATION
INITIAL FILING FEE
$((33.70))
35.00
DESIGN PLAN FEES:
 
 
NEW PLAN REVIEW FEE (one time fee)
$((95.10))
98.90
 
RESUBMITTAL FEE
$((67.90))
70.60
 
ADDENDUM (Approval expires on same date as original plan.)
$((67.90))
70.60
 
ELECTRONIC PLAN SUBMITTAL FEE $((5.10))5.30 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
DEPARTMENT AUDIT FEES:
 
 
AUDIT (per hour)*
$((67.90))
70.60
 
TRAVEL (per hour)*
$((67.90))
70.60
 
PER DIEM**
 
 
HOTEL***
 
 
MILEAGE**
 
 
RENTAL CAR***
 
 
PARKING
 
 
AIRFARE***
 
DEPARTMENT INSPECTION FEES:
 
 
INSPECTION (per hour)*
$((67.90))
70.60
 
TRAVEL (per hour)*
$((67.90))
70.60
 
PER DIEM**
 
 
HOTEL***
 
 
MILEAGE**
 
 
RENTAL CAR***
 
 
PARKING***
 
 
AIRFARE***
 
INSIGNIA FEES:
 
 
SELF CERTIFIED
$((25.00))
26.00
 
ALTERATION
$((33.70))
35.00
 
REISSUED-LOST/DAMAGED
$((12.10))
12.50
OTHER FEES:
 
 
FIELD TECHNICAL SERVICE (per hour* plus travel time* and mileage**)
$((67.90))
70.60
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year)
$((12.70))
13.20
REFUND FEE
$((25.00))
26.00
*
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
 
**
Per state guidelines.
 
***
Actual charges incurred.
 
AMENDATORY SECTION(Amending WSR 12-06-069, filed 3/6/12, effective 4/30/12)
WAC 296-150T-3000Factory-built temporary worker housing fees.
 
INITIAL FILING FEE
$((52.70))
54.80
 
DESIGN PLAN FEES:
 
 
 
INITIAL ONE YEAR DESIGN
$((152.70))
158.80
 
 
RENEWAL FEE
$((52.70))
54.80
 
 
RESUBMIT FEE
$((76.00))
79.00
 
 
ADDENDUM (Approval expires on same date as original plan)
$((76.00))
79.00
 
 
ELECTRONIC PLAN SUBMITTAL FEE $((5.30))5.50 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
 
Supplemental submissions of plans (resubmittals, addendums, renewals, code updates, etc.) shall be charged per hour or fraction of an hour*
$((90.10))
93.70
 
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS
$((14.10))
14.60
 
DEPARTMENT INSPECTION FEES:
 
 
 
INSPECTION/REINSPECTION (Per hour* plus travel time* and mileage**)
$((76.00))
79.00
 
 
TRAVEL (Per hour)*
$((76.00))
79.00
 
 
PER DIEM**
 
 
 
HOTEL***
 
 
 
MILEAGE**
 
 
 
RENTAL CAR***
 
 
 
PARKING***
 
 
 
AIRFARE***
 
 
DEPARTMENT AUDIT FEES:
 
 
 
AUDIT (Per hour*)
$((76.00))
79.00
 
 
TRAVEL (Per hour*)
$((76.00))
79.00
 
 
PER DIEM**
 
 
 
HOTEL***
 
 
 
MILEAGE**
 
 
 
RENTAL CAR***
 
 
 
PARKING***
 
 
 
AIRFARE***
 
 
INSIGNIA FEES:
 
 
 
FIRST SECTION
$((214.20))
222.70
 
 
EACH ADDITIONAL SECTION
$((20.70))
21.50
 
 
REISSUED-LOST/DAMAGED
$((52.70))
54.80
 
ELECTRICAL COMMERCIAL/INDUSTRIAL
 
 
 
Electrical Service/feeders 200 Amperage plus
 
 
 
Service/feeder
$((221.90))
230.70
 
 
Additional Feeder
$((42.04))
43.70
 
ELECTRICAL MULTIFAMILY RESIDENTIAL
 
 
 
Electrical Service/feeders 200 Amperage plus
 
 
 
Service/feeder
$((117.60))
122.30
 
 
Additional Feeder
$((29.90))
31.00
 
OTHER FEES:
 
 
 
FIELD TECHNICAL SERVICE (Per hour* plus travel time* and mileage**)
$((76.00))
79.00
 
 
PUBLICATION PRINTING AND DISTRIBUTION OF ((RCW'S AND WAC'S))RCWs AND WACs (One free per year)
$((14.10))
14.60
 
REFUND FEE
$((25.00))
26.00
 
*
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments
 
 
**
Per state guidelines
 
 
***
Actual charges incurred
 
AMENDATORY SECTION(Amending WSR 12-06-069, filed 3/6/12, effective 4/30/12)
WAC 296-150V-3000Conversion vendor units and medical units—Fees.
INITIAL FILING FEE
$((37.60))
39.10
DESIGN PLAN FEES:
 
 
INITIAL FEE - MASTER DESIGN
$((260.50))
270.90
 
INITIAL FEE - ONE YEAR DESIGN
$((106.50))
110.70
 
RENEWAL FEE
$((45.20))
47.00
 
RESUBMIT FEE
$((76.00))
79.00
 
ADDENDUM (Approval expires on same date as original plan)
$((76.00))
79.00
 
ELECTRONIC PLAN SUBMITTAL FEE $((5.30))5.50 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
ELECTRICAL PLAN REVIEW - For medical units, find fees at http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906
 
RECIPROCAL PLAN REVIEW:
 
 
INITIAL FEE - MASTER DESIGN
$((116.10))
120.70
 
INITIAL FEE - ONE YEAR DESIGN
$((70.10))
72.90
 
RENEWAL FEE
$((70.10))
72.90
 
ADDENDUM
$((70.10))
72.90
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS
$((14.10))
14.60
DEPARTMENT INSPECTION FEES:
 
 
INSPECTION/REINSPECTION (Per hour* plus travel time* and mileage**)
$((76.00))
79.00
 
TRAVEL (Per hour)*
$((76.00))
79.00
 
PER DIEM**
 
 
HOTEL***
 
 
MILEAGE**
 
 
RENTAL CAR***
 
 
PARKING***
 
 
AIRFARE***
 
 
ALTERATION INSPECTION (One hour plus insignia alteration fee)
$((113.80))
118.30
INSIGNIA FEES:
 
 
FIRST SECTION/ALTERATION
$((21.90))
22.70
 
REISSUED-LOST/DAMAGED
$((14.10))
14.60
 
EXEMPT
$((37.60))
39.10
OTHER FEES:
 
 
FIELD TECHNICAL SERVICE (Per hour* plus travel time* and mileage**)
$((76.00))
79.00
 
PUBLICATION PRINTING AND DISTRIBUTION OF ((RCW'S AND WAC'S))RCWs AND WACs (One free copy per year upon request)
$((14.10))
14.60
REFUND FEE
$((25.00))
26.00
*
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
 
**
Per state guidelines.
 
***
Actual charges incurred.
 
AMENDATORY SECTION(Amending WSR 08-16-091, filed 8/4/08, effective 9/4/08)
WAC 296-200A-900What fees does the department charge contractors for issuance, renewal, reregistration, and reinstatement of certificates of registration?
The department charges the following fees:
(1) $((113.40))117.90 for each issuance, renewal or reregistration of a certificate of registration for contractors. This registration is valid for two years from date of issuance, renewal or reregistration or until it is suspended or revoked.
(2) $((53.60))55.70 for the reinstatement of a certificate of registration.
(3) $((12.60))13.10 for providing a duplicate certificate of registration.
(4) $((25.60))26.60 for each requested certified letter prepared by the department.
(5) $((162.00))168.40 for the construction and electrical contractor listing publication on CD ROM per year, prorated according to the number of issues left in the subscription year, which runs from November 1 through October 31. Each issue costs $((13.50))14.00.
(6) $2.00 per copy for documents copied from a contractor's file. The maximum copy charge for copies from one contractor's file will be $((28.10))29.20.
(7) $((50.00))52.00 is required to cover the costs for the service of process in an action against a contractor, the contractor's bond, or the deposit under RCW 18.27.040.
(8) $((25.00))26.00 is required to cover the costs for the service of processing refunds.