WSR 20-04-081
PERMANENT RULES
DEPARTMENT OF
LABOR AND INDUSTRIES
[Filed February 4, 2020, 11:49 a.m., effective March 6, 2020]
Effective Date of Rule: Thirty-one days after filing.
Purpose: The purpose of this rule making is to increase fees by 5.08 percent for the factory assembled structures (FAS) program. This is the office of financial management's maximum allowable fiscal growth rate for fiscal year 2020. The fee increase is necessary to support operating expenses for inspections and other public safety activities for the FAS program.
Citation of Rules Affected by this Order: Amending WAC 296-150C-3000 Commercial coach fees, 296-150F-3000 Factory-built housing and commercial structure fees, 296-150M-3000 Manufactured/mobile home fees, 296-150P-3000 Recreational park trailer fees, 296-150R-3000 Recreational vehicle fees, 296-150T-3000 Factory-built temporary worker housing fees, and 296-150V-3000 Conversion vendor units and medical unitsFees.
Statutory Authority for Adoption: Chapters 43.22 and 43.22A RCW.
Adopted under notice filed as WSR 20-01-158 on December 17, 2019.
Number of Sections Adopted in Order to Comply with Federal Statute: New 0, Amended 0, Repealed 0; Federal Rules or Standards: New 0, Amended 0, Repealed 0; or Recently Enacted State Statutes: New 0, Amended 0, Repealed 0.
Number of Sections Adopted at the Request of a Nongovernmental Entity: New 0, Amended 0, Repealed 0.
Number of Sections Adopted on the Agency's own Initiative: New 0, Amended 7, Repealed 0.
Number of Sections Adopted in Order to Clarify, Streamline, or Reform Agency Procedures: New 0, Amended 0, Repealed 0.
Number of Sections Adopted using Negotiated Rule Making: New 0, Amended 0, Repealed 0; Pilot Rule Making: New 0, Amended 0, Repealed 0; or Other Alternative Rule Making: New 0, Amended 7, Repealed 0.
Date Adopted: February 4, 2020.
Joel Sacks
Director
AMENDATORY SECTION(Amending WSR 18-24-102, filed 12/4/18, effective 1/4/19)
WAC 296-150C-3000Commercial coach fees.
GENERAL INFORMATION
Manufacture:
 
Manufacturer #
 
1.
Building use:
 
2.
Building occupancy:
 
3.
Type of construction: VB
 
4.
Square footage of building:
 
5.
Valuation of the building shall be based on the following:
Square footage of the building multiplied by the amount in the
BVD valuation table . . . .
$
. . . . .
6.
Total valuation: . . . .
$
. . . . .
PERMIT FEE
7.
Calculate from building permit fee table using the total valuation . . . .
$
. . . . .
STRUCTURAL PLAN REVIEW FEE*
8.
One year design review:
(Valid for one year) multiply the total on line 7 by ((0.364))0.382. . . .
$
. . . . .
9.
Master plan review:
(Valid for the code cycle) multiply the total on line 7 by ((0.52))0.546. . . .
$
. . . . .
*
Minimum plan review fee is 2 1/2 hours x $((79.00))83.00 per hour
FIRE AND LIFE-SAFETY PLAN REVIEW FEE (if required)
10.
Fire and life-safety plan review:
 
 
 
a.
One year design—Multiply the total on line 7 by ((0.156))0.163. . . .
$
. . . . .
b.
Master plan design—Multiply the total on line 7 by ((0.26))0.273. . . .
$
. . . . .
Required for all structures that are more than 4,000 square feet and for all A and I occupancy
PLUMBING PLAN-REVIEW FEE
11.
Plumbing (($18.70 + $6.20))$19.60 + $6.50 per fixture . . . .
$
. . . . .
12.
Medical gas (($18.70 + $6.20))$19.60 + $6.50 per gas outlet . . . .
$
. . . . .
DESIGN RENEWAL OR ADDENDUM
13.
((10.4))10.92% of building permit + $((79.00))83.00. . . .
$
. . . . .
RESUBMITTAL
14.
((10.4))10.92% of building permit + $((79.00))83.00. . . .
$
. . . . .
ELECTRICAL PLAN-REVIEW FEE
15.
See WAC 296-46B-906(9) for electrical review fees
 
INSIGNIA FEES
16.
FIRST SECTION
$
((23.70))24.90
17.
EACH ADDITIONAL SECTION
$
((14.60))15.30
TOTAL FEES
18.
Total plan review fees:
Add lines 8 or 9 and 10 through 15 . . . .
$
. . . . .
19.
Total fees due:
Includes plan fees and insignia fees . . . .
$
. . . . .
20.
Total amount paid. . . .
$
. . . . .
Square Foot Construction Costs (BVD Table)a, b, c, and d
Group (2009 International Building Code)
IA
IB
IIA
IIB
IIIA
IIIB
IV
VA
VB
A-1 Assembly, theaters, with stage
211.15
203.98
198.73
190.05
178.25
173.30
183.31
162.97
156.05
A-1 Assembly, theaters, without stage
193.16
185.99
180.74
172.06
160.31
155.36
165.32
145.04
138.12
A-2 Assembly, nightclubs
163.22
158.56
154.17
148.00
138.96
135.24
142.52
126.06
121.36
A-2 Assembly, restaurants, bars, banquet halls
162.22
157.56
152.17
147.00
136.96
134.24
141.52
124.06
120.36
A-3 Assembly, churches
195.10
187.93
182.68
174.00
162.21
157.26
167.26
146.94
140.02
A-3 Assembly, general, community halls, libraries, museums
163.81
156.64
150.39
142.71
129.91
125.96
135.97
114.63
108.71
A-4 Assembly, arenas
192.16
184.99
178.74
171.06
158.31
154.36
164.32
143.04
137.12
B Business
164.76
158.78
153.49
145.97
132.45
127.63
139.92
116.43
110.93
E Educational
176.97
170.85
165.64
158.05
146.37
138.98
152.61
127.91
123.09
F-1 Factory and industrial, moderate hazard
97.87
93.28
87.66
84.46
75.44
72.26
80.79
62.17
58.48
F-2 Factory and industrial, low hazard
96.87
92.28
87.66
83.46
75.44
71.26
79.79
62.17
57.48
H-1 High hazard, explosives
91.74
87.15
82.53
78.33
70.49
66.31
74.66
57.22
N.P.
H-2, 3, 4 High hazard
91.74
87.15
82.53
78.33
70.49
66.31
74.66
57.22
52.53
H-5 HPM
164.76
158.78
153.49
145.97
132.45
127.63
139.92
116.43
110.93
I-1 Institutional, supervised environment
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
I-2 Institutional, hospitals
277.07
271.09
265.80
258.28
243.90
N.P.
252.23
227.88
N.P.
I-2 Institutional, nursing homes
193.00
187.02
181.74
174.22
160.98
N.P.
168.16
144.96
N.P.
I-3 Institutional, restrained
187.72
181.73
176.45
168.93
156.64
150.82
162.87
140.63
133.13
I-4 Institutional, day care facilities
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
M Mercantile
121.57
116.92
111.53
106.36
96.96
94.25
100.88
84.07
80.36
R-1 Residential, hotels
166.21
160.43
155.99
149.29
137.39
133.80
145.70
123.43
119.10
R-2 Residential, multiple family
139.39
133.61
129.17
122.47
111.23
107.64
119.54
97.27
92.94
R-3 Residential, one and two family
131.18
127.60
124.36
121.27
116.43
113.53
117.42
108.79
101.90
R-4 Residential, care/assisted living facilities
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
S-1 Storage, moderate hazard
90.74
86.15
80.53
77.33
68.49
65.31
73.66
55.22
51.53
S-2 Storage, low hazard
89.74
85.15
80.53
76.33
68.49
64.31
72.66
55.22
50.53
U Utility, miscellaneous
71.03
67.02
62.71
59.30
52.86
49.43
56.33
41.00
39.06
a
Private garages use utility, miscellaneous
b
Unfinished basements (all use group) = $15.00 per sq. ft.
c
For shell only buildings deduct 20 percent
d
N.P. = not permitted
Building Permit Fees
Total Valuation
Fee
$1.00 to $500.00
$23.50
$501.00 to $2,000.00
$23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00
$2,001.00 to $25,000.00
$69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00
$25,001.00 to $50,000.00
$391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00
$50,001.00 to $100,000.00
$643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00
$100,001.00 to $500,000.00
$993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and including $500,000.00
$500,001.00 to $1,000,000.00
$3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00
$1,000,001.00 and up
$5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof
 
INITIAL FILING FEE (first time applicants)
$((39.10))
41.00
 
DESIGN PLAN FEES:
 
 
 
INITIAL FEE - MASTER DESIGN (code cycle), 50% of permit fee × ((1.04))1.092*
 
 
 
INITIAL FEE - ONE YEAR DESIGN, 35% of permit fee × ((1.04))1.092*
 
 
 
RENEWAL FEE - 10% of permit fee × ((1.04))1.092 +
$((79.00))
83.00
 
 
RESUBMIT FEE - 10% of permit fee × ((1.04))1.092 +
$((79.00))
83.00
 
 
ADDENDUM (approval expires on same date as original plan) - 10% of permit fee × ((1.04))1.092 +
$((79.00))
83.00
 
 
ELECTRONIC PLAN SUBMITTAL FEE $((5.60))5.80 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
 
 
PLUMBING PLAN FEE, $((18.70))19.60 + PER FIXTURE FEE of
$((6.20))
6.50
 
 
MEDICAL GAS PLAN FEE, $((18.70))19.60 + PER OUTLET FEE of
$((6.20))
6.50
 
 
Note: Mechanical systems are included in the primary plan fee
 
 
FIRE SAFETY PLAN REVIEW AS REQUIRED (Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy)
 
 
 
MASTER DESIGN - 25% of permit fee × ((1.04))1.092
 
 
 
One year design 15% of the permit fee × ((1.04))1.092
 
 
ELECTRICAL PLAN REVIEW - Find fee @ http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906
 
 
RECIPROCAL PLAN REVIEW:
 
 
 
INITIAL FEE - MASTER DESIGN (minimum 3 hours)
$((79.00))
83.00 per hour
 
 
INITIAL FEE - ONE YEAR DESIGN (minimum 2 hours)
$((79.00))
83.00 per hour
 
 
RENEWAL FEE (minimum 1 hour)
$((79.00))
83.00 per hour
 
 
ADDENDUM (minimum 1 hour)
$((79.00))
83.00 per hour
 
PLANS APPROVED BY PROFESSIONALS - 10% of permit fee × ((1.04))1.092 +
$((79.00))
83.00
 
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS - 5% of permit fee × ((1.04))1.092 +
$((79.00))
83.00
 
DEPARTMENT INSPECTION FEES
 
 
 
INSPECTION/REINSPECTION (Per hour** plus travel time* and mileage***)
$((79.00))
83.00
 
 
TRAVEL (Per hour)
$((79.00))
83.00
 
 
PER DIEM***
 
 
 
HOTEL****
 
 
 
MILEAGE***
 
 
 
RENTAL CAR****
 
 
 
PARKING****
 
 
 
AIRFARE****
 
 
DEPARTMENT AUDIT FEES:
 
 
 
AUDIT (Per hour*)
$((79.00))
83.00
 
 
TRAVEL (Per hour**)
$((79.00))
83.00
 
 
PER DIEM***
 
 
 
HOTEL****
 
 
 
MILEAGE***
 
 
 
RENTAL CAR****
 
 
 
PARKING****
 
 
 
AIRFARE****
 
 
 
ALTERATION INSPECTION (one hour minimum + alteration insignia fee)
$((102.70))
107.90
 
INSIGNIA FEES:
 
 
 
FIRST SECTION (NEW or ALTERATION)
$((23.70))
24.90
 
 
EACH ADDITIONAL SECTION (NEW or ALTERATION)
$((14.60))
15.30
 
 
REISSUED-LOST/DAMAGED
$((14.60))
15.30
 
OTHER FEES:
 
 
 
FIELD TECHNICAL SERVICE (Per hour** plus travel time** and mileage***)
$((79.00))
83.00
 
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request)
$((14.60))
15.30
 
REFUND FEE
$((26.00))
27.30
*
Minimum plan review fee is 2 1/2 hours at the field technical service rate
**
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments
***
Per state guidelines
****
Actual charges incurred
AMENDATORY SECTION(Amending WSR 18-24-102, filed 12/4/18, effective 1/4/19)
WAC 296-150F-3000Factory-built housing and commercial structure fees.
GENERAL INFORMATION
Manufacture:
 
Manufacturer #
 
1.
Building use:
 
2.
Building occupancy:
 
3.
Type of construction:
 
4.
Square footage of building:
 
5.
Valuation of the building shall be based on the following:
Square footage of the building multiplied by the amount in the
BVD valuation table . . . .
$
. . . . .
6.
Total valuation: . . . .
$
. . . . .
PERMIT FEE
7.
Calculate from building permit fee table using the total valuation . . . .
$
. . . . .
STRUCTURAL PLAN REVIEW FEE*
8.
One year design review:
(Valid for one year) multiply the total on line 7 by ((0.364))0.382. . . .
$
. . . . .
9.
Master plan review:
(Valid for the code cycle) multiply the total on line 7 by ((0.52))0.546. . . .
$
. . . . .
*
Minimum plan review fee is 2 1/2 hours x $((88.90))93.40 per hour
FIRE AND LIFE-SAFETY PLAN REVIEW FEE (if required)
10.
Fire and life-safety plan review:
 
 
 
a.
One year design—Multiply the total on line 7 by ((0.156))0.163. . . .
$
. . . . .
b.
Master plan design—Multiply the total on line 7 by ((0.26))0.273. . . .
$
. . . . .
Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy
PLUMBING PLAN-REVIEW FEE
11.
Plumbing (($18.70 + $6.20))$19.60 + $6.50 per fixture . . . .
$
. . . . .
12.
Medical gas (($18.70 + $6.20))$19.60 + $6.50 per gas outlet . . . .
$
. . . . .
DESIGN RENEWAL OR ADDENDUM
13.
((10.4))10.92% of building permit + $((88.90))93.40. . . .
$
. . . . .
RESUBMITTAL
14.
((10.4))10.92% of building permit + $((88.90))93.40. . . .
$
. . . . .
ELECTRICAL PLAN-REVIEW FEE
15.
See WAC 296-46B-906(9) for electrical review fees
 
NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA)
16.
Notification to local enforcement agency fee:
$
((38.40))
40.30
INSIGNIA FEES
17.
FIRST SECTION
$
((284.30))298.70
18.
EACH ADDITIONAL SECTION
$
((25.50))26.70
TOTAL FEES
19.
Total plan review fees:
Add lines 8 or 9 and 10 through 15 . . . .
$
. . . . .
20.
Total fees due:
Includes plan fees, insignia fees, and NLEA fees . . . .
$
. . . . .
21.
Total amount paid. . . .
$
. . . . .
Square Foot Construction Costs (BVD Table)a, b, c, and d
Group (2009
International Building Code)
IA
IB
IIA
IIB
IIIA
IIIB
IV
VA
VB
A-1 Assembly, theaters, with stage
211.15
203.98
198.73
190.05
178.25
173.30
183.31
162.97
156.05
A-1 Assembly, theaters, without stage
193.16
185.99
180.74
172.06
160.31
155.36
165.32
145.04
138.12
A-2 Assembly, nightclubs
163.22
158.56
154.17
148.00
138.96
135.24
142.52
126.06
121.36
A-2 Assembly, restaurants, bars, banquet halls
162.22
157.56
152.17
147.00
136.96
134.24
141.52
124.06
120.36
A-3 Assembly, churches
195.10
187.93
182.68
174.00
162.21
157.26
167.26
146.94
140.02
A-3 Assembly, general, community halls, libraries, museums
163.81
156.64
150.39
142.71
129.91
125.96
135.97
114.63
108.71
A-4 Assembly, arenas
192.16
184.99
178.74
171.06
158.31
154.36
164.32
143.04
137.12
B Business
164.76
158.78
153.49
145.97
132.45
127.63
139.92
116.43
110.93
E Educational
176.97
170.85
165.64
158.05
146.37
138.98
152.61
127.91
123.09
F-1 Factory and industrial, moderate hazard
97.87
93.28
87.66
84.46
75.44
72.26
80.79
62.17
58.48
F-2 Factory and industrial, low hazard
96.87
92.28
87.66
83.46
75.44
71.26
79.79
62.17
57.48
H-1 High hazard, explosives
91.74
87.15
82.53
78.33
70.49
66.31
74.66
57.22
N.P.
H-2, 3, 4 High hazard
91.74
87.15
82.53
78.33
70.49
66.31
74.66
57.22
52.53
H-5 HPM
164.76
158.78
153.49
145.97
132.45
127.63
139.92
116.43
110.93
I-1 Institutional, supervised environment
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
I-2 Institutional, hospitals
277.07
271.09
265.80
258.28
243.90
N.P.
252.23
227.88
N.P.
I-2 Institutional, nursing homes
193.00
187.02
181.74
174.22
160.98
N.P.
168.16
144.96
N.P.
I-3 Institutional, restrained
187.72
181.73
176.45
168.93
156.64
150.82
162.87
140.63
133.13
I-4 Institutional, day care facilities
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
M Mercantile
121.57
116.92
111.53
106.36
96.96
94.25
100.88
84.07
80.36
R-1 Residential, hotels
166.21
160.43
155.99
149.29
137.39
133.80
145.70
123.43
119.10
R-2 Residential, multiple family
139.39
133.61
129.17
122.47
111.23
107.64
119.54
97.27
92.94
R-3 Residential, one and two family
131.18
127.60
124.36
121.27
116.43
113.53
117.42
108.79
101.90
R-4 Residential, care/assisted living facilities
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
S-1 Storage, moderate hazard
90.74
86.15
80.53
77.33
68.49
65.31
73.66
55.22
51.53
S-2 Storage, low hazard
89.74
85.15
80.53
76.33
68.49
64.31
72.66
55.22
50.53
U Utility, miscellaneous
71.03
67.02
62.71
59.30
52.86
49.43
56.33
41.00
39.06
a
Private garages use utility, miscellaneous
b
Unfinished basements (all use group) = $15.00 per sq. ft.
c
For shell only buildings deduct 20 percent
d
N.P. = not permitted
Table 1-A - Building Permit Fees
Total Valuation
Fee
$1.00 to $500.00
$23.50
$501.00 to $2,000.00
$23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00
$2,001.00 to $25,000.00
$69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00
$25,001.00 to $50,000.00
$391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00
$50,001.00 to $100,000.00
$643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00
$100,001.00 to $500,000.00
$993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and including $500,000.00
$500,001.00 to $1,000,000.00
$3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00
$1,000,001.00 and up
$5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof
INITIAL FILING FEE (first time applicants)
$((69.40))
72.90
DESIGN PLAN FEES:
 
 
INITIAL FEE - MASTER DESIGN (code cycle), 50% of permit fee × ((1.04))1.092*
 
 
INITIAL FEE - ONE YEAR DESIGN, 35% of permit fee × ((1.04))1.092*
 
 
RENEWAL FEE - 10% of permit fee × ((1.04))1.092 +
$((88.90))
93.40
 
RESUBMIT FEE - 10% of permit fee × ((1.04))1.092 +
$((88.90))
93.40
 
ADDENDUM (approval expires on same date as original plan) - 10% of permit fee × ((1.04))1.092 +
$((88.90))
93.40
 
ELECTRONIC PLAN SUBMITTAL FEE $((5.60))5.80 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
 
PLUMBING PLAN FEE, $((18.70))19.60 + PER FIXTURE FEE of
$((6.20))
6.50
 
MEDICAL GAS PLAN FEE, $((18.70))19.60 + PER OUTLET FEE of
$((6.20))
6.50
 
Note: Mechanical systems are included in the primary plan fee
 
FIRE SAFETY PLAN REVIEW AS REQUIRED (Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy)
 
 
MASTER DESIGN - 25% of permit fee × ((1.04))1.092
 
 
One year design - 15% of the permit fee × ((1.04))1.092
 
ELECTRICAL PLAN REVIEW - Find fees @ http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906
 
RECIPROCAL PLAN REVIEW:
 
 
INITIAL FEE-MASTER DESIGN (minimum 3 hours)
$((88.90))93.40 per hour
 
INITIAL FEE-ONE YEAR DESIGN (minimum 2 hours)
$((88.90))93.40 per hour
 
RENEWAL FEE (minimum 1 hour)
$((88.90))
93.40
 
ADDENDUM (minimum 1 hour)
$((88.90))93.40 per hour
PLANS APPROVED BY DESIGN PROFESSIONALS - 10% of permit fee × ((1.04))1.092 +
$((88.90))
93.40
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST THREE SETS - 5% of permit fee × ((1.04))1.092 +
$((88.90))
93.40
DEPARTMENT INSPECTION FEES
 
 
INSPECTION/REINSPECTION (Per hour** plus travel time** and mileage***)
$((88.90))
93.40
 
TRAVEL (Per hour**)
$((88.90))
93.40
 
PER DIEM***
 
 
HOTEL****
 
 
MILEAGE***
 
 
RENTAL CAR****
 
 
PARKING****
 
 
AIRFARE****
 
DEPARTMENT AUDIT FEES:
 
 
AUDIT (Per hour**)
$((88.90))
93.40
 
TRAVEL (Per hour**)
$((88.90))
93.40
 
PER DIEM***
 
 
HOTEL****
 
 
MILEAGE***
 
 
RENTAL CAR****
 
 
PARKING****
 
 
AIRFARE****
 
INSIGNIA FEES:
 
 
FIRST SECTION
$((284.30))
298.70
 
EACH ADDITIONAL SECTION
$((25.50))
26.70
 
REISSUED-LOST/DAMAGED
$((69.40))
72.90
OTHER FEES:
 
 
FIELD TECHNICAL SERVICE (Per hour** plus travel time** and mileage***)
$((88.90))
93.40
 
NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA)
$((38.40))
40.30
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request)
$((14.20))
14.90
REFUND FEE
$((26.00))
27.30
*
Minimum plan review fee is 2 1/2 hours at the field technical service rate.
**
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
***
Per state guidelines.
****
Actual charges incurred.
AMENDATORY SECTION(Amending WSR 18-24-102, filed 12/4/18, effective 1/4/19)
WAC 296-150M-3000Manufactured/mobile home fees.
DESIGN PLAN FEES:
 
 
STRUCTURAL ALTERATION
$((172.80))
181.50
 
RESUBMITTAL FEE
$((76.40))
80.20
 
ADDENDUM (Approval expires on the same date as original plan.)
$((76.40))
80.20
 
ELECTRONIC PLAN SUBMITTAL FEE $((5.40))5.60 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
DEPARTMENT INSPECTION FEES:
 
 
Combination permit - Mechanical and electrical inspections
$((188.80))
198.30
 
Heat pump
$((188.80))
198.30
 
Air conditioning
$((188.80))
198.30
 
Air conditioning with replacement furnace
$((188.80))
198.30
 
Gas furnace installation includes gas piping
$((188.80))
198.30
 
Fire safety inspection
$((188.80))
198.30
MECHANICAL
$((83.90))
88.10
 
Gas*** Piping
$((83.90))
88.10
 
Wood Stove
$((83.90))
88.10
 
Pellet Stove
$((83.90))
88.10
 
Gas*** Room Heater
$((83.90))
88.10
 
Gas*** Decorative Appliance
$((83.90))
88.10
 
Range: Changing from electric to gas***
$((83.90))
88.10
 
Gas*** Water Heater Replacement
$((62.90))
66.00
ELECTRICAL
$((105.00))
110.30
 
Electric Water Heater Replacement
$((105.00))
110.30
 
Electric Water Heater replacing Gas*** Water Heater
$((105.00))
110.30
 
Each added or modified 120 volt circuit (maximum charge is two circuits)
$((105.00))
110.30
 
Each added 240 volt circuit (for other than Heat Pumps, Air Conditioners, Furnaces, Water Heaters, Ranges, Hot Tubs or Spas)
$((105.00))
110.30
 
Hot Tub or Spa (power from home electrical panel)
$((105.00))
110.30
 
Replace main electrical panel/permanently installed transfer equipment
$((105.00))
110.30
 
Low voltage fire/intrusion alarm
$((105.00))
110.30
 
Any combination of Furnace, Range and Water Heater changing from electric to gas***
$((105.00))
110.30
PLUMBING
 
 
Fire sprinkler system
$((235.90))
247.80
 
Each added fixture
$((62.90))
66.00
 
Replacement of water piping system (this includes two inspections)
$((210.60))
221.20
STRUCTURAL
 
 
Inspection as part of a mechanical/fire safety installation (cut truss/floor joist, sheet rocking)
$((94.20))
98.90
 
Reroofs (may require a plan review)
$((168.30))
176.70
 
Changes to home when additions bear loads on home per the design of a professional (also requires a plan review)
$((168.30))
176.70
 
Other structural changes (may require a plan review)
$((168.30))
176.70
MISCELLANEOUS
 
 
OTHER REQUIRED INSPECTIONS (Per hour*)
$((68.90))
72.40
 
ALL REINSPECTIONS (Per hour*)
$((68.90))
72.40
 
Refund
$((20.90))
21.90
INSIGNIA FEES:
 
 
REISSUED - LOST/DAMAGED
$((20.90))
21.90
IPIA
 
DEPARTMENT AUDIT FEES
 
 
REGULARLY SCHEDULED IPIA AUDIT:
 
 
 
First inspection on each section (one time only)
$((34.60))
36.30
 
 
Second and succeeding inspections of unlabeled sections (Per hour*)
$((76.40))
80.20
 
OTHER IPIA FEES:
 
 
 
Red tag removal during a regularly scheduled IPIA audit (Per hour*separate from other fees)
$((76.40))
80.20
 
 
Red tag removal at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time* and mileage**)
$((76.40))
80.20
 
 
Increased frequency surveillance (Per hour* plus travel time* and mileage**)
$((76.40))
80.20
 
 
Attendance at manufacturers training classes (Per hour* only)
$((76.40))
80.20
 
 
Subpart "I" investigations (Per hour* plus travel time* and mileage**)
$((76.40))
80.20
 
 
Alterations to a labeled unit (Per hour* plus travel time* and mileage**)
$((76.40))
80.20
 
 
IPIA Issues/Responses (Per hour* Plus travel time* and mileage**)
$((76.40))
80.20
 
 
Monthly surveillance during a regularly scheduled IPIA audit (Per hour*plus travel time* and mileage**)
$((76.40))
80.20
 
 
Monthly surveillance at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time* and mileage**)
$((76.40))
80.20
 
 
Plant certifications, recertifications and addenda updates (Per hour* plus travel time* and mileage** per each inspector)
$((76.40))
80.20
 
 
Response to HBT Audit during a regularly scheduled IPIA audit (Per hour*)
$((76.40))
80.20
 
 
Response to HBT Audit at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time*and mileage**)
$((76.40))
80.20
 
 
Alternative construction (AC) letter inspections at placement site (Per hour* plus travel time*and mileage**)
$((76.40))
80.20
 
 
Replacement of HUD labels (Per hour* plus travel time* and mileage**)
$((76.40))
80.20
 
 
State Administrative Agency (SAA) inspection fee (Per hour* plus travel time* and mileage**)
$((76.40))
80.20
 
 
State Administrative Agency (SAA) dispute resolution filing fee
$((76.40))
80.20
 
 
State Administrative Agency (SAA) dispute resolution (Per hour*)
$((76.40))
80.20
OTHER FEES:
 
 
FIELD TECHNICAL SERVICE (Per hour plus travel time* and mileage**)
$((70.90))
74.50
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request)
$((13.90))
14.60
 
VARIANCE INSPECTION FEE
$((168.20))
176.70
 
HOMEOWNER REQUESTED INSPECTION
$((168.20))
176.70
 
DECERTIFICATION OF A MOBILE/MANUFACTURED HOME
$((168.20))
176.70
 
DEMOLITION OF A MOBILE/MANUFACTURED HOME
$((168.20))
176.70
 
ENERGY CONSERVATION PERMIT
$((28.70))
30.10
NOTE: 
Local jurisdictions may have other fees that apply.
*
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
**
Per state guidelines.
***
Gas means all gases; natural, propane, etc.
AMENDATORY SECTION(Amending WSR 18-24-102, filed 12/4/18, effective 1/4/19)
WAC 296-150P-3000Recreational park trailer fees.
INITIAL FILING FEE
$((36.00))
37.80
DESIGN PLAN FEES:
 
 
NEW PLAN REVIEW FEE WITHOUT STRUCTURAL REQUIREMENTS
$((102.10))
107.20
 
NEW PLAN REVIEW FEE WITH STRUCTURAL REQUIREMENTS
$((135.00))
141.80
 
RESUBMITTAL FEE
$((73.00))
76.70
 
ADDENDUM (Approval expires on same date as original plan.)
$((73.00))
76.70
 
ELECTRONIC PLAN SUBMITTAL FEE $((5.40))5.60 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
DEPARTMENT AUDIT FEES:
 
 
AUDIT (per hour)*
$((73.00))
76.70
 
TRAVEL (per hour)*
$((73.00))
76.70
 
PER DIEM**
 
 
HOTEL***
 
 
MILEAGE**
 
 
RENTAL CAR***
 
 
PARKING***
 
 
AIRFARE***
 
DEPARTMENT INSPECTION FEES:
 
 
INSPECTION (per hour)*
$((73.00))
76.70
 
TRAVEL (per hour)*
$((73.00))
76.70
 
PER DIEM**
 
 
HOTEL***
 
 
MILEAGE**
 
 
RENTAL CAR***
 
 
PARKING***
 
 
AIRFARE***
 
 
ALTERATION INSPECTION (One hour plus insignia alteration fee)
$((109.00))
114.50
INSIGNIA FEES:
 
 
STATE CERTIFIED
$((26.00))
27.30
 
ALTERATION
$((36.00))
37.80
 
REISSUED-LOST/DAMAGED
$((13.40))
14.00
OTHER FEES:
 
 
FIELD TECHNICAL SERVICE (per hour* plus travel time* and mileage**)
$((73.00))
76.70
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request)
$((13.60))
14.20
REFUND FEE
$((26.00))
27.30
*
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
**
Per state guidelines.
***
Actual charges incurred.
AMENDATORY SECTION(Amending WSR 18-24-102, filed 12/4/18, effective 1/4/19)
WAC 296-150R-3000Recreational vehicle fees.
STATE PLAN
INITIAL FILING FEE
$((35.00))
36.70
DESIGN PLAN FEES:
 
 
NEW PLAN REVIEW FEE
$((97.60))
102.50
 
RESUBMITTAL FEE
$((70.50))
74.00
 
ADDENDUM (Approval expires on same date as original plan.)
$((70.50))
74.00
 
ELECTRONIC PLAN SUBMITTAL FEE $((5.30))5.50 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
DEPARTMENT AUDIT FEES:
 
 
AUDIT (per hour)*
$((70.60))
74.10
 
TRAVEL (per hour)*
$((70.60))
74.10
 
PER DIEM**
 
 
HOTEL***
 
 
MILEAGE**
 
 
RENTAL CAR***
 
 
PARKING
 
 
AIRFARE***
 
DEPARTMENT INSPECTION FEES:
 
 
INSPECTION (per hour)*
$((70.60))
74.10
 
TRAVEL (per hour)*
$((70.60))
74.10
 
PER DIEM**
 
 
HOTEL***
 
 
MILEAGE**
 
 
RENTAL CAR***
 
 
PARKING***
 
 
AIRFARE***
 
 
ALTERATION INSPECTION (One hour plus insignia alteration fee)
$((105.60))
110.90
INSIGNIA FEES:
 
 
STATE CERTIFIED
$((26.00))
27.30
 
ALTERATION
$((35.00))
36.70
 
REISSUED-LOST/DAMAGED
$((12.50))
13.10
OTHER FEES:
 
 
FIELD TECHNICAL SERVICE (per hour* plus travel time* and mileage**)
$((70.60))
74.10
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year)
$((13.20))
13.80
*
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
**
Per state guidelines.
***
Actual charges incurred.
SELF CERTIFICATION
INITIAL FILING FEE
$((35.00))
36.70
DESIGN PLAN FEES:
 
 
NEW PLAN REVIEW FEE (one time fee)
$((98.90))
103.90
 
RESUBMITTAL FEE
$((70.60))
74.10
 
ADDENDUM (Approval expires on same date as original plan.)
$((70.60))
74.10
 
ELECTRONIC PLAN SUBMITTAL FEE $((5.30))5.50 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
DEPARTMENT AUDIT FEES:
 
 
AUDIT (per hour)*
$((70.60))
74.10
 
TRAVEL (per hour)*
$((70.60))
74.10
 
PER DIEM**
 
 
HOTEL***
 
 
MILEAGE**
 
 
RENTAL CAR***
 
 
PARKING
 
 
AIRFARE***
 
DEPARTMENT INSPECTION FEES:
 
 
INSPECTION (per hour)*
$((70.60))
74.10
 
TRAVEL (per hour)*
$((70.60))
74.10
 
PER DIEM**
 
 
HOTEL***
 
 
MILEAGE**
 
 
RENTAL CAR***
 
 
PARKING***
 
 
AIRFARE***
 
INSIGNIA FEES:
 
 
SELF CERTIFIED
$((26.00))
27.30
 
ALTERATION
$((35.00))
36.70
 
REISSUED-LOST/DAMAGED
$((12.50))
13.10
OTHER FEES:
 
 
FIELD TECHNICAL SERVICE (per hour* plus travel time* and mileage**)
$((70.60))
74.10
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year)
$((13.20))
13.80
REFUND FEE
$((26.00))
27.30
*
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
**
Per state guidelines.
***
Actual charges incurred.
AMENDATORY SECTION(Amending WSR 18-24-102, filed 12/4/18, effective 1/4/19)
WAC 296-150T-3000Factory-built temporary worker housing fees.
 
INITIAL FILING FEE
$((54.80))
57.50
 
DESIGN PLAN FEES:
 
 
 
INITIAL ONE YEAR DESIGN
$((158.80))
166.80
 
 
RENEWAL FEE
$((54.80))
57.50
 
 
RESUBMIT FEE
$((79.00))
83.00
 
 
ADDENDUM (Approval expires on same date as original plan)
$((79.00))
83.00
 
 
ELECTRONIC PLAN SUBMITTAL FEE $((5.50))5.70 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
 
Supplemental submissions of plans (resubmittals, addendums, renewals, code updates, etc.) shall be charged per hour or fraction of an hour*
$((93.70))
98.40
 
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS
$((14.60))
15.30
 
DEPARTMENT INSPECTION FEES:
 
 
 
INSPECTION/REINSPECTION (Per hour* plus travel time* and mileage**)
$((79.00))
83.00
 
 
TRAVEL (Per hour)*
$((79.00))
83.00
 
 
PER DIEM**
 
 
 
HOTEL***
 
 
 
MILEAGE**
 
 
 
RENTAL CAR***
 
 
 
PARKING***
 
 
 
AIRFARE***
 
 
DEPARTMENT AUDIT FEES:
 
 
 
AUDIT (Per hour*)
$((79.00))
83.00
 
 
TRAVEL (Per hour*)
$((79.00))
83.00
 
 
PER DIEM**
 
 
 
HOTEL***
 
 
 
MILEAGE**
 
 
 
RENTAL CAR***
 
 
 
PARKING***
 
 
 
AIRFARE***
 
 
INSIGNIA FEES:
 
 
 
FIRST SECTION
$((222.70))
234.00
 
 
EACH ADDITIONAL SECTION
$((21.50))
22.50
 
 
REISSUED-LOST/DAMAGED
$((54.80))
57.50
 
ELECTRICAL COMMERCIAL/INDUSTRIAL
 
 
 
Electrical Service/feeders 200 Amperage plus
 
 
 
Service/feeder
$((230.70))
242.40
 
 
Additional Feeder
$((43.70))
45.90
 
ELECTRICAL MULTIFAMILY RESIDENTIAL
 
 
 
Electrical Service/feeders 200 Amperage plus
 
 
 
Service/feeder
$((122.30))
128.50
 
 
Additional Feeder
$((31.00))
32.50
 
OTHER FEES:
 
 
 
FIELD TECHNICAL SERVICE (Per hour* plus travel time* and mileage**)
$((79.00))
83.00
 
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free per year)
$((14.60))
15.30
 
REFUND FEE
$((26.00))
27.30
*
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments
**
Per state guidelines
***
Actual charges incurred
AMENDATORY SECTION(Amending WSR 18-24-102, filed 12/4/18, effective 1/4/19)
WAC 296-150V-3000Conversion vendor units and medical units—Fees.
INITIAL FILING FEE
$((39.10))
41.00
DESIGN PLAN FEES:
 
 
INITIAL FEE - MASTER DESIGN
$((270.90))
284.60
 
INITIAL FEE - ONE YEAR DESIGN
$((110.70))
116.30
 
RENEWAL FEE
$((47.00))
49.30
 
RESUBMIT FEE
$((79.00))
83.00
 
ADDENDUM (Approval expires on same date as original plan)
$((79.00))
83.00
 
ELECTRONIC PLAN SUBMITTAL FEE $((5.50))5.70 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
ELECTRICAL PLAN REVIEW - For medical units, find fees at http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906
 
RECIPROCAL PLAN REVIEW:
 
 
INITIAL FEE - MASTER DESIGN
$((120.70))
126.80
 
INITIAL FEE - ONE YEAR DESIGN
$((72.90))
76.60
 
RENEWAL FEE
$((72.90))
76.60
 
ADDENDUM
$((72.90))
76.60
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS
$((14.60))
15.30
DEPARTMENT INSPECTION FEES:
 
 
INSPECTION/REINSPECTION (Per hour* plus travel time* and mileage**)
$((79.00))
83.00
 
TRAVEL (Per hour)*
$((79.00))
83.00
 
PER DIEM**
 
 
HOTEL***
 
 
MILEAGE**
 
 
RENTAL CAR***
 
 
PARKING***
 
 
AIRFARE***
 
 
ALTERATION INSPECTION (One hour plus insignia alteration fee)
$((118.30))
124.30
INSIGNIA FEES:
 
 
FIRST SECTION/ALTERATION
$((22.70))
23.80
 
REISSUED-LOST/DAMAGED
$((14.60))
15.30
 
EXEMPT
$((39.10))
41.00
OTHER FEES:
 
 
FIELD TECHNICAL SERVICE (Per hour* plus travel time* and mileage**)
$((79.00))
83.00
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request)
$((14.60))
15.30
REFUND FEE
$((26.00))
27.30
*
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
**
Per state guidelines.
***
Actual charges incurred.