WSR 20-23-094
EXPEDITED RULES
BUILDING CODE COUNCIL
[Filed November 17, 2020, 3:15 p.m.]
Title of Rule and Other Identifying Information: Chapter 51-11C WAC, 2018 Washington state energy code, commercial.
Purpose of the Proposal and Its Anticipated Effects, Including Any Changes in Existing Rules: This filing corrects errors in the minimum efficiency tables.
Reasons Supporting Proposal: It was brought to our attention that Table C403.3.2(3), filed with the adoption of the 2018 Energy Code under WSR 19-24-040, contains some errors where the efficiency does not match that in ASHRAE 90.1 as was intended.
Statutory Authority for Adoption: RCW 19.27A.025, 19.27A.045.
Statute Being Implemented: Chapter 19.27A RCW.
Rule is necessary because of federal law, [no information supplied].
Name of Proponent: [No information supplied], governmental.
Name of Agency Personnel Responsible for Drafting and Implementation: Krista Braaksma, 1500 Jefferson Street S.E., Olympia, 360-407-9278; Enforcement: Local jurisdictions.
This notice meets the following criteria to use the expedited adoption process for these rules:
Corrects typographical errors, make address or name changes, or clarify language of a rule without changing its effect.
NOTICE
THIS RULE IS BEING PROPOSED UNDER AN EXPEDITED RULE-MAKING PROCESS THAT WILL ELIMINATE THE NEED FOR THE AGENCY TO HOLD PUBLIC HEARINGS, PREPARE A SMALL BUSINESS ECONOMIC IMPACT STATEMENT, OR PROVIDE RESPONSES TO THE CRITERIA FOR A SIGNIFICANT LEGISLATIVE RULE. IF YOU OBJECT TO THIS USE OF THE EXPEDITED RULE-MAKING PROCESS, YOU MUST EXPRESS YOUR OBJECTIONS IN WRITING AND THEY MUST BE SENT TO Diane Glenn, Chair, Washington State Building Code Council, P.O. Box 41449, Olympia WA 98504-1449, phone 360-407-9255, email sbcc@des.wa.gov, AND RECEIVED BY January 19, 2021.
November 16, 2020
Diane Glenn
Council Chair
AMENDATORY SECTION(Amending WSR 19-24-040, filed 11/26/19, effective 7/1/20)
WAC 51-11C-403233Table C403.3.2(3)Minimum efficiency requirementsElectrically operated PTAC, PTHP, SPVAC, SPVHP, room air conditioners.
Table C403.3.2(3)
Minimum Efficiency RequirementsElectrically Operated Packaged Terminal Air Conditioners, Packaged Terminal Heat Pumps, Single-Package Vertical Air Conditioners, Single-Package Vertical Heat Pumps, Room Air Conditioners and Room Air-Conditioner Heat Pumps
 
 
 
Minimum Efficiency
 
Equipment Type
Size Category (Input)
Subcategory or Rating Condition
 
 
Test Procedurea
PTAC (cooling mode) new construction
All Capacities
95°F db outdoor air
 
14.0 - (0.300 × Cap/1000) EER
AHRI 310/380
PTAC (cooling mode) replacementsb
All Capacities
95°F db outdoor air
 
10.9 - (0.213 × Cap/1000) EER
 
PTHP (cooling mode) new construction
All Capacities
95°F db outdoor air
 
14.0 - (0.300 × Cap/1000) EER
 
PTHP (cooling mode) replacementsb
All Capacities
95°F db outdoor air
 
10.8 - (0.213 × Cap/1000) EER
 
PTHP (heating mode) new construction
All Capacities
 
3.7 - (0.052 × Cap/1000) COP
 
PTHP (heating mode) replacementsb
All Capacities
 
2.9 - (0.026 × Cap/1000) COP
 
SPVAC (cooling mode)
< 65,000 Btu/h
95°F db/75°F wb outdoor air
 
11.0 EER
AHRI 390
 
≥ 65,000 Btu/h and
< 135,000 Btu/h
95°F db/75°F wb outdoor air
 
((11.0))10.0 EER
 
 
≥ 135,000 Btu/h and
< 240,000 Btu/h
95°F db/75°F wb outdoor air
 
((11.0))10.0 EER
 
SPVHP (cooling mode)
< 65,000 Btu/h
95°F db/75°F wb outdoor air
 
11.0 EER
 
 
≥ 65,000 Btu/h and
< 135,000 Btu/h
95°F db/75°F wb outdoor air
 
((11.0))10.0 EER
 
 
≥ 135,000 Btu/h and
< 240,000 Btu/h
95°F db/75°F wb outdoor air
 
((11.0))10.0 EER
 
SPVHP (heating mode)
<65,000 Btu/h
47°F db/43°F wb outdoor air
 
3.3 COP
AHRI 390
 
≥ 65,000 Btu/h and
< 135,000 Btu/h
47°F db/43°F wb outdoor air
 
((3.3))3.0 COP
 
 
≥ 135,000 Btu/h and
< 240,000 Btu/h
47°F db/43°F wb outdoor air
 
((3.3))3.0 COP
 
Room air conditioners, with louvered sides
< 6,000 Btu/h
 
11.0 CEER
ANSI/AHA-MRAC-1
 
≥ 6,000 Btu/h and
< 8,000 Btu/h
 
11.0 CEER
 
 
≥ 8,000 Btu/h and
< 14,000 Btu/h
 
10.9 CEER
 
 
≥ 14,000 Btu/h and
< 20,000 Btu/h
 
10.7 CEER
 
 
≥ 20,000 Btu/h and
< 25,000 Btu/h
 
9.4 CEER
 
 
≥ 25,000 Btu/h
 
9.0 CEER
 
Room air conditioners, without louvered sides
< 6,000 Btu/h
 
10.0 CEER
 
 
≥ 6,000 Btu/h and
< 8,000 Btu/h
 
10.0 CEER
 
 
≥ 8,000 Btu/h and
< 11,000 Btu/h
 
9.6 CEER
 
 
≥ 11,000 Btu/h and
<  14,000 Btu/h
 
9.5 CEER
 
 
≥ 14,000 Btu/h and
< 20,000 Btu/h
 
9.3 CEER
 
 
≥ 20,000 Btu/h
 
9.4 CEER
 
Room air-conditioner heat pumps with louvered sides
< 20,000 Btu/h
 
9.8 CEER
 
 
≥ 20,000 Btu/h
 
9.3 CEER
 
Room air-conditioner heat pumps without louvered sides
< 14,000 Btu/h
 
9.3 CEER
 
 
≥ 14,000 Btu/h
 
8.7 CEER
 
Room air conditioner casement only
All capacities
 
9.5 CEER
 
Room air conditioner casement-slider
All capacities
 
10.4 CEER
 
For SI:
1 British thermal unit per hour = 0.2931 W, °C = [(°F) - 32]/1.8.
 
"Cap" = The rated cooling capacity of the product in Btu/h. If the unit's capacity is less than 7000 Btu/h, use 7000 Btu/h in the calculation. If the unit's capacity is greater than 15,000 Btu/h, use 15,000 Btu/h in the calculations.
a
Chapter 12 of the referenced standard contains a complete specification of the referenced test procedure, including the referenced year version of the test procedure.
b
Replacement unit shall be factory labeled as follows: "manufactured for nonstandard size applications only; not to be installed in new standard projects" or "manufactured for replacement applications only: not to be installed in new construction projects." Replacement efficiencies apply only to units with existing sleeves less than 16 inches (406 mm) in height and less than 42 inches (1067 mm) in width.
Reviser's note: The brackets and enclosed material in the text of the above section occurred in the copy filed by the agency and appear in the Register pursuant to the requirements of RCW 34.08.040.