GENERAL INFORMATION | |||||||
Manufacture: | Manufacturer # | ||||||
1. | Building use: | 2. | Building occupancy: | ||||
3. | Type of construction: VB | 4. | Square footage of building: | ||||
5. | Valuation of the building shall be based on the following: | ||||||
• | Square footage of the building multiplied by the amount in the BVD valuation table . . . . | $ | . . . . . | ||||
6. | Total valuation: . . . . | $ | . . . . . | ||||
PERMIT FEE | |||||||
7. | Calculate from building permit fee table using the total valuation . . . . | $ | . . . . . | ||||
STRUCTURAL PLAN REVIEW FEE* | |||||||
8. | One year design review: | (Valid for one year) multiply the total on line 7 by ((0.404))0.428. . . . | $ | . . . . . | |||
9. | Master plan review: | (Valid for the code cycle) multiply the total on line 7 by ((0.578))0.611. . . . | $ | . . . . . | |||
* | Minimum plan review fee is 2 1/2 hours x (($87.90))$93.00 per hour | ||||||
FIRE AND LIFE-SAFETY PLAN REVIEW FEE (if required) | |||||||
10. | Fire and life-safety plan review: | ||||||
a. | One year design—Multiply the total on line 7 by ((0.173))0.183. . . . | $ | . . . . . | ||||
b. | Master plan design—Multiply the total on line 7 by ((0.289))0.305. . . . | $ | . . . . . | ||||
• | Required for all structures that are more than 4,000 square feet and for all A and I occupancy | ||||||
PLUMBING PLAN-REVIEW FEE | |||||||
11. | Plumbing (($20.70 + $6.80))$21.90 + $7.10 per fixture . . . . | $ | . . . . . | ||||
12. | Medical gas (($20.70 + $6.80))$21.90 + $7.10 per gas outlet . . . . | $ | . . . . . | ||||
DESIGN RENEWAL OR ADDENDUM | |||||||
13. | ((11.56%))12.23% of building permit + (($87.90))$93.00. . . . | $ | . . . . . | ||||
RESUBMITTAL | |||||||
14. | ((11.56%))12.23% of building permit + (($87.90))$93.00. . . . | $ | . . . . . | ||||
ELECTRICAL PLAN-REVIEW FEE | |||||||
15. | See WAC 296-46B-906(9) for electrical review fees | ||||||
INSIGNIA FEES | |||||||
16. | FIRST SECTION | $ | ((26.30))27.80 | ||||
17. | EACH ADDITIONAL SECTION | $ | ((16.20))17.10 | ||||
TOTAL FEES | |||||||
18. | Total plan review fees: | Add lines 8 or 9 and 10 through 15 . . . . | $ | . . . . . | |||
19. | Total fees due: | Includes plan fees and insignia fees . . . . | $ | . . . . . | |||
20. | Total amount paid. . . . | $ | . . . . . |
Group (2009 International Building Code) | IA | IB | IIA | IIB | IIIA | IIIB | IV | VA | VB |
A-1 Assembly, theaters, with stage | 211.15 | 203.98 | 198.73 | 190.05 | 178.25 | 173.30 | 183.31 | 162.97 | 156.05 |
A-1 Assembly, theaters, without stage | 193.16 | 185.99 | 180.74 | 172.06 | 160.31 | 155.36 | 165.32 | 145.04 | 138.12 |
A-2 Assembly, nightclubs | 163.22 | 158.56 | 154.17 | 148.00 | 138.96 | 135.24 | 142.52 | 126.06 | 121.36 |
A-2 Assembly, restaurants, bars, banquet halls | 162.22 | 157.56 | 152.17 | 147.00 | 136.96 | 134.24 | 141.52 | 124.06 | 120.36 |
A-3 Assembly, churches | 195.10 | 187.93 | 182.68 | 174.00 | 162.21 | 157.26 | 167.26 | 146.94 | 140.02 |
A-3 Assembly, general, community halls, libraries, museums | 163.81 | 156.64 | 150.39 | 142.71 | 129.91 | 125.96 | 135.97 | 114.63 | 108.71 |
A-4 Assembly, arenas | 192.16 | 184.99 | 178.74 | 171.06 | 158.31 | 154.36 | 164.32 | 143.04 | 137.12 |
B Business | 164.76 | 158.78 | 153.49 | 145.97 | 132.45 | 127.63 | 139.92 | 116.43 | 110.93 |
E Educational | 176.97 | 170.85 | 165.64 | 158.05 | 146.37 | 138.98 | 152.61 | 127.91 | 123.09 |
F-1 Factory and industrial, moderate hazard | 97.87 | 93.28 | 87.66 | 84.46 | 75.44 | 72.26 | 80.79 | 62.17 | 58.48 |
F-2 Factory and industrial, low hazard | 96.87 | 92.28 | 87.66 | 83.46 | 75.44 | 71.26 | 79.79 | 62.17 | 57.48 |
H-1 High hazard, explosives | 91.74 | 87.15 | 82.53 | 78.33 | 70.49 | 66.31 | 74.66 | 57.22 | N.P. |
H-2, 3, 4 High hazard | 91.74 | 87.15 | 82.53 | 78.33 | 70.49 | 66.31 | 74.66 | 57.22 | 52.53 |
H-5 HPM | 164.76 | 158.78 | 153.49 | 145.97 | 132.45 | 127.63 | 139.92 | 116.43 | 110.93 |
I-1 Institutional, supervised environment | 164.82 | 159.04 | 154.60 | 147.90 | 135.84 | 132.25 | 144.15 | 121.88 | 117.55 |
I-2 Institutional, hospitals | 277.07 | 271.09 | 265.80 | 258.28 | 243.90 | N.P. | 252.23 | 227.88 | N.P. |
I-2 Institutional, nursing homes | 193.00 | 187.02 | 181.74 | 174.22 | 160.98 | N.P. | 168.16 | 144.96 | N.P. |
I-3 Institutional, restrained | 187.72 | 181.73 | 176.45 | 168.93 | 156.64 | 150.82 | 162.87 | 140.63 | 133.13 |
I-4 Institutional, day care facilities | 164.82 | 159.04 | 154.60 | 147.90 | 135.84 | 132.25 | 144.15 | 121.88 | 117.55 |
M Mercantile | 121.57 | 116.92 | 111.53 | 106.36 | 96.96 | 94.25 | 100.88 | 84.07 | 80.36 |
R-1 Residential, hotels | 166.21 | 160.43 | 155.99 | 149.29 | 137.39 | 133.80 | 145.70 | 123.43 | 119.10 |
R-2 Residential, multiple family | 139.39 | 133.61 | 129.17 | 122.47 | 111.23 | 107.64 | 119.54 | 97.27 | 92.94 |
R-3 Residential, one and two family | 131.18 | 127.60 | 124.36 | 121.27 | 116.43 | 113.53 | 117.42 | 108.79 | 101.90 |
R-4 Residential, care/assisted living facilities | 164.82 | 159.04 | 154.60 | 147.90 | 135.84 | 132.25 | 144.15 | 121.88 | 117.55 |
S-1 Storage, moderate hazard | 90.74 | 86.15 | 80.53 | 77.33 | 68.49 | 65.31 | 73.66 | 55.22 | 51.53 |
S-2 Storage, low hazard | 89.74 | 85.15 | 80.53 | 76.33 | 68.49 | 64.31 | 72.66 | 55.22 | 50.53 |
U Utility, miscellaneous | 71.03 | 67.02 | 62.71 | 59.30 | 52.86 | 49.43 | 56.33 | 41.00 | 39.06 |
a | Private garages use utility, miscellaneous |
b | Unfinished basements (all use group) = $15.00 per sq. ft. |
c | For shell only buildings deduct 20 percent |
d | N.P. = not permitted |
Total Valuation | Fee |
$1.00 to $500.00 | $23.50 |
$501.00 to $2,000.00 | $23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00 |
$2,001.00 to $25,000.00 | $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 |
$25,001.00 to $50,000.00 | $391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 |
$50,001.00 to $100,000.00 | $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 |
$100,001.00 to $500,000.00 | $993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 |
$500,001.00 to $1,000,000.00 | $3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 |
$1,000,001.00 and up | $5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof |
INITIAL FILING FEE (first time applicants) | (($43.40))$45.90 | |||
DESIGN PLAN FEES: | ||||
INITIAL FEE - MASTER DESIGN (code cycle), 50% of permit fee × ((1.156))1.223* | ||||
INITIAL FEE - ONE YEAR DESIGN, 35% of permit fee × ((1.156))1.223* | ||||
RENEWAL FEE - 10% of permit fee × ((1.156))1.223 + | (($87.90))$93.00 | |||
RESUBMIT FEE - 10% of permit fee × ((1.156))1.223 + | (($87.90))$93.00 | |||
ADDENDUM (approval expires on same date as original plan) - 10% of permit fee × ((1.156))1.223 + | (($87.90))$93.00 | |||
ELECTRONIC PLAN SUBMITTAL FEE (($6.10))$6.40 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section. | ||||
PLUMBING PLAN FEE, (($20.70))$21.90 + PER FIXTURE FEE of | (($6.80))$7.10 | |||
MEDICAL GAS PLAN FEE, (($20.70))$21.90 + PER OUTLET FEE of | (($6.80))$7.10 | |||
Note: Mechanical systems are included in the primary plan fee | ||||
FIRE SAFETY PLAN REVIEW AS REQUIRED (Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy) | ||||
MASTER DESIGN - 25% of permit fee × ((1.156))1.223 | ||||
One year design 15% of the permit fee × ((1.156))1.223 | ||||
ELECTRICAL PLAN REVIEW - Find fee @ http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906 | ||||
RECIPROCAL PLAN REVIEW: | ||||
INITIAL FEE - MASTER DESIGN (minimum 3 hours) | (($87.90))$93.00 per hour | |||
INITIAL FEE - ONE YEAR DESIGN (minimum 2 hours) | (($87.90))$93.00 per hour | |||
RENEWAL FEE (minimum 1 hour) | (($87.90))$93.00 per hour | |||
ADDENDUM (minimum 1 hour) | (($87.90))$93.00 per hour | |||
PLANS APPROVED BY PROFESSIONALS - 10% of permit fee × ((1.156))1.223 + | (($87.90))$93.00 | |||
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS - 5% of permit fee × ((1.156))1.223 + | (($87.90))$93.00 | |||
DEPARTMENT INSPECTION FEES | ||||
INSPECTION/REINSPECTION (Per hour** plus travel time* and mileage***) | (($87.90))$93.00 | |||
TRAVEL (Per hour) | (($87.90))$93.00 | |||
PER DIEM*** | ||||
HOTEL**** | ||||
MILEAGE*** | ||||
RENTAL CAR**** | ||||
PARKING**** | ||||
AIRFARE**** | ||||
DEPARTMENT AUDIT FEES: | ||||
AUDIT (Per hour*) | (($87.90))$93.00 | |||
TRAVEL (Per hour**) | (($87.90))$93.00 | |||
PER DIEM*** | ||||
HOTEL**** | ||||
MILEAGE*** | ||||
RENTAL CAR**** | ||||
PARKING**** | ||||
AIRFARE**** | ||||
ALTERATION INSPECTION (one hour minimum + alteration insignia fee) | (($114.20))$120.80 | |||
INSIGNIA FEES: | ||||
FIRST SECTION (NEW or ALTERATION) | (($26.30))$27.80 | |||
EACH ADDITIONAL SECTION (NEW or ALTERATION) | (($16.20))$17.10 | |||
REISSUED-LOST/DAMAGED | (($16.20))$17.10 | |||
OTHER FEES: | ||||
FIELD TECHNICAL SERVICE (Per hour** plus travel time** and mileage***) | (($87.90))$93.00 | |||
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request) | (($16.20))$17.10 | |||
REFUND FEE | (($28.90))$30.50 |
* | Minimum plan review fee is 2 1/2 hours at the field technical service rate |
** | Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments |
*** | Per state guidelines |
**** | Actual charges incurred |
GENERAL INFORMATION | |||||||
Manufacture: | Manufacturer # | ||||||
1. | Building use: | 2. | Building occupancy: | ||||
3. | Type of construction: | 4. | Square footage of building: | ||||
5. | Valuation of the building shall be based on the following: | ||||||
• | Square footage of the building multiplied by the amount in the BVD valuation table . . . . | $ | . . . . . | ||||
6. | Total valuation: . . . . | $ | . . . . . | ||||
PERMIT FEE | |||||||
7. | Calculate from building permit fee table using the total valuation . . . . | $ | . . . . . | ||||
STRUCTURAL PLAN REVIEW FEE* | |||||||
8. | One year design review: | (Valid for one year) multiply the total on line 7 by ((0.404))0.428. . . . | $ | . . . . . | |||
9. | Master plan review: | (Valid for the code cycle) multiply the total on line 7 by ((0.578))0.611. . . . | $ | . . . . . | |||
* | Minimum plan review fee is 2 1/2 hours x (($98.90))$104.60 per hour | ||||||
FIRE AND LIFE-SAFETY PLAN REVIEW FEE (if required) | |||||||
10. | Fire and life-safety plan review: | ||||||
a. | One year design—Multiply the total on line 7 by ((0.173))0.183. . . . | $ | . . . . . | ||||
b. | Master plan design—Multiply the total on line 7 by ((0.289))0.305. . . . | $ | . . . . . | ||||
• | Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy | ||||||
PLUMBING PLAN-REVIEW FEE | |||||||
11. | Plumbing (($20.70 + $6.80))$21.90 + $7.10 per fixture . . . . | $ | . . . . . | ||||
12. | Medical gas (($20.70 + $6.80))$21.90 + $7.10 per gas outlet . . . . | $ | . . . . . | ||||
DESIGN RENEWAL OR ADDENDUM | |||||||
13. | ((11.56%))12.23% of building permit + (($98.90))$104.60. . . . | $ | . . . . . | ||||
RESUBMITTAL | |||||||
14. | ((11.56%))12.23% of building permit + (($98.90))$104.60. . . . | $ | . . . . . | ||||
ELECTRICAL PLAN-REVIEW FEE | |||||||
15. | See WAC 296-46B-906(9) for electrical review fees | ||||||
NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA) | |||||||
16. | Notification to local enforcement agency fee: | $ | ((42.60))45.00 | ||||
INSIGNIA FEES | |||||||
17. | FIRST SECTION | $ | ((316.30))334.80 | ||||
18. | EACH ADDITIONAL SECTION | $ | ((28.20))29.80 | ||||
TOTAL FEES | |||||||
19. | Total plan review fees: | Add lines 8 or 9 and 10 through 15 . . . . | $ | . . . . . | |||
20. | Total fees due: | Includes plan fees, insignia fees, and NLEA fees . . . . | $ | . . . . . | |||
21. | Total amount paid. . . . | $ | . . . . . |
Group (2009 International Building Code) | IA | IB | IIA | IIB | IIIA | IIIB | IV | VA | VB |
A-1 Assembly, theaters, with stage | 211.15 | 203.98 | 198.73 | 190.05 | 178.25 | 173.30 | 183.31 | 162.97 | 156.05 |
A-1 Assembly, theaters, without stage | 193.16 | 185.99 | 180.74 | 172.06 | 160.31 | 155.36 | 165.32 | 145.04 | 138.12 |
A-2 Assembly, nightclubs | 163.22 | 158.56 | 154.17 | 148.00 | 138.96 | 135.24 | 142.52 | 126.06 | 121.36 |
A-2 Assembly, restaurants, bars, banquet halls | 162.22 | 157.56 | 152.17 | 147.00 | 136.96 | 134.24 | 141.52 | 124.06 | 120.36 |
A-3 Assembly, churches | 195.10 | 187.93 | 182.68 | 174.00 | 162.21 | 157.26 | 167.26 | 146.94 | 140.02 |
A-3 Assembly, general, community halls, libraries, museums | 163.81 | 156.64 | 150.39 | 142.71 | 129.91 | 125.96 | 135.97 | 114.63 | 108.71 |
A-4 Assembly, arenas | 192.16 | 184.99 | 178.74 | 171.06 | 158.31 | 154.36 | 164.32 | 143.04 | 137.12 |
B Business | 164.76 | 158.78 | 153.49 | 145.97 | 132.45 | 127.63 | 139.92 | 116.43 | 110.93 |
E Educational | 176.97 | 170.85 | 165.64 | 158.05 | 146.37 | 138.98 | 152.61 | 127.91 | 123.09 |
F-1 Factory and industrial, moderate hazard | 97.87 | 93.28 | 87.66 | 84.46 | 75.44 | 72.26 | 80.79 | 62.17 | 58.48 |
F-2 Factory and industrial, low hazard | 96.87 | 92.28 | 87.66 | 83.46 | 75.44 | 71.26 | 79.79 | 62.17 | 57.48 |
H-1 High hazard, explosives | 91.74 | 87.15 | 82.53 | 78.33 | 70.49 | 66.31 | 74.66 | 57.22 | N.P. |
H-2, 3, 4 High hazard | 91.74 | 87.15 | 82.53 | 78.33 | 70.49 | 66.31 | 74.66 | 57.22 | 52.53 |
H-5 HPM | 164.76 | 158.78 | 153.49 | 145.97 | 132.45 | 127.63 | 139.92 | 116.43 | 110.93 |
I-1 Institutional, supervised environment | 164.82 | 159.04 | 154.60 | 147.90 | 135.84 | 132.25 | 144.15 | 121.88 | 117.55 |
I-2 Institutional, hospitals | 277.07 | 271.09 | 265.80 | 258.28 | 243.90 | N.P. | 252.23 | 227.88 | N.P. |
I-2 Institutional, nursing homes | 193.00 | 187.02 | 181.74 | 174.22 | 160.98 | N.P. | 168.16 | 144.96 | N.P. |
I-3 Institutional, restrained | 187.72 | 181.73 | 176.45 | 168.93 | 156.64 | 150.82 | 162.87 | 140.63 | 133.13 |
I-4 Institutional, day care facilities | 164.82 | 159.04 | 154.60 | 147.90 | 135.84 | 132.25 | 144.15 | 121.88 | 117.55 |
M Mercantile | 121.57 | 116.92 | 111.53 | 106.36 | 96.96 | 94.25 | 100.88 | 84.07 | 80.36 |
R-1 Residential, hotels | 166.21 | 160.43 | 155.99 | 149.29 | 137.39 | 133.80 | 145.70 | 123.43 | 119.10 |
R-2 Residential, multiple family | 139.39 | 133.61 | 129.17 | 122.47 | 111.23 | 107.64 | 119.54 | 97.27 | 92.94 |
R-3 Residential, one and two family | 131.18 | 127.60 | 124.36 | 121.27 | 116.43 | 113.53 | 117.42 | 108.79 | 101.90 |
R-4 Residential, care/assisted living facilities | 164.82 | 159.04 | 154.60 | 147.90 | 135.84 | 132.25 | 144.15 | 121.88 | 117.55 |
S-1 Storage, moderate hazard | 90.74 | 86.15 | 80.53 | 77.33 | 68.49 | 65.31 | 73.66 | 55.22 | 51.53 |
S-2 Storage, low hazard | 89.74 | 85.15 | 80.53 | 76.33 | 68.49 | 64.31 | 72.66 | 55.22 | 50.53 |
U Utility, miscellaneous | 71.03 | 67.02 | 62.71 | 59.30 | 52.86 | 49.43 | 56.33 | 41.00 | 39.06 |
a | Private garages use utility, miscellaneous |
b | Unfinished basements (all use group) = $15.00 per sq. ft. |
c | For shell only buildings deduct 20 percent |
d | N.P. = not permitted |
Total Valuation | Fee |
$1.00 to $500.00 | $23.50 |
$501.00 to $2,000.00 | $23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00 |
$2,001.00 to $25,000.00 | $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 |
$25,001.00 to $50,000.00 | $391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 |
$50,001.00 to $100,000.00 | $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 |
$100,001.00 to $500,000.00 | $993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 |
$500,001.00 to $1,000,000.00 | $3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 |
$1,000,001.00 and up | $5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof |
INITIAL FILING FEE (first time applicants) | (($77.20))$81.70 | ||
DESIGN PLAN FEES: | |||
INITIAL FEE - MASTER DESIGN (code cycle), 50% of permit fee × ((1.156))1.223* | |||
INITIAL FEE - ONE YEAR DESIGN, 35% of permit fee × ((1.156))1.223* | |||
RENEWAL FEE - 10% of permit fee × ((1.156))1.223 + | (($98.90))$104.60 | ||
RESUBMIT FEE - 10% of permit fee × ((1.156))1.223 + | (($98.90))$104.60 | ||
ADDENDUM (approval expires on same date as original plan) - 10% of permit fee × ((1.156))1.223 + | (($98.90))$104.60 | ||
ELECTRONIC PLAN SUBMITTAL FEE (($6.10))$6.40 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section. | |||
PLUMBING PLAN FEE, (($20.70))$21.90 + PER FIXTURE FEE of | (($6.80))$7.10 | ||
MEDICAL GAS PLAN FEE, (($20.70))$21.90 + PER OUTLET FEE of | (($6.80))$7.10 | ||
Note: Mechanical systems are included in the primary plan fee | |||
FIRE SAFETY PLAN REVIEW AS REQUIRED (Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy) | |||
MASTER DESIGN - 25% of permit fee × ((1.156))1.223 | |||
One year design - 15% of the permit fee × ((1.156))1.223 | |||
ELECTRICAL PLAN REVIEW - Find fees @ http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906 | |||
RECIPROCAL PLAN REVIEW: | |||
INITIAL FEE-MASTER DESIGN (minimum 3 hours) | (($98.90))$104.60 per hour | ||
INITIAL FEE-ONE YEAR DESIGN (minimum 2 hours) | (($98.90))$104.60 per hour | ||
RENEWAL FEE (minimum 1 hour) | (($98.90))$104.60 | ||
ADDENDUM (minimum 1 hour) | (($98.90))$104.60 per hour | ||
PLANS APPROVED BY DESIGN PROFESSIONALS - 10% of permit fee × ((1.156))1.223 + | (($98.90))$104.60 | ||
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST THREE SETS - 5% of permit fee × ((1.156))1.223 + | (($98.90))$104.60 | ||
DEPARTMENT INSPECTION FEES | |||
INSPECTION/REINSPECTION (Per hour** plus travel time** and mileage***) | (($98.90))$104.60 | ||
TRAVEL (Per hour**) | (($98.90))$104.60 | ||
PER DIEM*** | |||
HOTEL**** | |||
MILEAGE*** | |||
RENTAL CAR**** | |||
PARKING**** | |||
AIRFARE**** | |||
DEPARTMENT AUDIT FEES: | |||
AUDIT (Per hour**) | (($98.90))$104.60 | ||
TRAVEL (Per hour**) | (($98.90))$104.60 | ||
PER DIEM*** | |||
HOTEL**** | |||
MILEAGE*** | |||
RENTAL CAR**** | |||
PARKING**** | |||
AIRFARE**** | |||
INSIGNIA FEES: | |||
FIRST SECTION | (($316.30))$334.80 | ||
EACH ADDITIONAL SECTION | (($28.20))$29.80 | ||
REISSUED-LOST/DAMAGED | (($77.20))$81.70 | ||
OTHER FEES: | |||
FIELD TECHNICAL SERVICE (Per hour** plus travel time** and mileage***) | (($98.90))$104.60 | ||
NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA) | (($42.60))$45.00 | ||
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request) | (($15.70))$16.60 | ||
REFUND FEE | (($28.90))$30.50 |
* | Minimum plan review fee is 2 1/2 hours at the field technical service rate. |
** | Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments. |
*** | Per state guidelines. |
**** | Actual charges incurred. |
(a) Failure to have a certified installer on the installation site whenever installation work is being performed: | ||
First Final Violation | $250.00 | |
Each Additional Final Violation | $1,000.00 | |
(b) Failure to correct all nonconforming aspects of the installation identified by the local enforcement agency or by an authorized representative of the department within thirty days of issuance of notice of the same: | ||
First Final Violation | Warning | |
Second Final Violation | $250.00 | |
Third Final Violation | $500.00 | |
Each Additional Final Violation | $1,000.00 | |
(c) Failure by a certified installer to affix a certification tag to an installed manufactured or mobile home: | ||
First Final Violation | Warning | |
Second Final Violation | $250.00 | |
Third Final Violation | $500.00 | |
Each Additional Final Violation | $1,000.00 | |
(d) Transfer of certification tag(s) from a certified installer to another certified installer without prior written approval of the department: | ||
First Final Violation | Warning | |
Each Additional Final Violation | $250.00 | |
(e) Transfer of certification tag(s) from a certified installer to a noncertified installer: | ||
First Final Violation to Each Contractor in Violation | $250.00 | |
Each Additional Final Violation to Each Contractor in Violation | $1,000.00 |
The following fees are payable to the department in advance: | ||
Installer test and certification | (($286.30))$303.00 | |
Homeowner test and approval | (($143.10))$151.40 | |
Manufactured home installation inspector test and certificate | (($143.10))$151.40 | |
Refund | (($28.50))$30.10 | |
Certification renewal | (($143.10))$151.40 | |
Continuing education class | (($57.10))$60.40 | |
Retake failed examination and training at scheduled class | (($42.80))$45.30 | |
Manufactured home installer training manual (on thumb drive) | (($14.20))$15.00 | |
Installer certification tag | (($9.90))$10.40 | |
L&I manufactured home installation inspection permit* | See WAC 296-150M-3000 for fee |
* | Only available when L&I has an interagency agreement with the local enforcement agency in accordance with WAC 296-150I-0370. |
DESIGN PLAN FEES: | |||
STRUCTURAL ALTERATION | (($192.20))$203.40 | ||
RESUBMITTAL FEE | (($84.90))$89.80 | ||
ADDENDUM (Approval expires on the same date as original plan.) | (($84.90))$89.80 | ||
ELECTRONIC PLAN SUBMITTAL FEE (($5.90))$6.20 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section. | |||
DEPARTMENT INSPECTION FEES: | |||
Combination permit - Mechanical and electrical inspections | (($210.00))$222.30 | ||
Heat pump | (($210.00))$222.30 | ||
Air conditioning | (($210.00))$222.30 | ||
Air conditioning with replacement furnace | (($210.00))$222.30 | ||
Gas furnace installation includes gas piping | (($210.00))$222.30 | ||
Fire safety inspection | (($210.00))$222.30 | ||
MECHANICAL | |||
Gas*** piping | (($93.30))$98.70 | ||
Wood stove | (($93.30))$98.70 | ||
Pellet stove | (($93.30))$98.70 | ||
Gas*** Room heater | (($93.30))$98.70 | ||
Gas*** Decorative appliance | (($93.30))$98.70 | ||
Range: Changing from electric to gas*** | (($93.30))$98.70 | ||
Gas*** Water heater replacement | (($69.90))$73.90 | ||
ELECTRICAL | |||
Electric water heater replacement | (($116.80))$123.60 | ||
Electric water heater ((ipeplacing))replacing gas*** water heater | (($116.80))$123.60 | ||
Each added or modified 120 volt circuit (maximum charge is two circuits) | (($116.80))$123.60 | ||
Each added 240 volt circuit (for other than heat pumps, air conditioners, furnaces, water heaters, ranges, hot tubs or spas) | (($116.80))$123.60 | ||
Hot tub or spa (power from home electrical panel) | (($116.80))$123.60 | ||
Replace main electrical panel/permanently installed transfer equipment | (($116.80))$123.60 | ||
Low voltage fire/intrusion alarm | (($116.80))$123.60 | ||
Any combination of furnace, range and water heater changing from electric to gas*** | (($116.80))$123.60 | ||
PLUMBING | |||
Fire sprinkler system | (($262.40))$277.70 | ||
Each added fixture | (($69.90))$73.90 | ||
Replacement of water piping system (this includes two inspections) | (($234.20))$247.90 | ||
STRUCTURAL | |||
Inspection as part of a mechanical/fire safety installation (cut truss/floor joist, sheet rocking) | (($104.70))$110.80 | ||
Reroofs (may require a plan review) | (($187.10))$198.00 | ||
Changes to home when additions bear loads on home per the design of a professional (also requires a plan review) | (($187.10))$198.00 | ||
Other structural changes (may require a plan review) | (($187.10))$198.00 | ||
MISCELLANEOUS | |||
OTHER REQUIRED INSPECTIONS (per hour*) | (($76.60))$81.00 | ||
ALL REINSPECTIONS (per hour*) | (($76.60))$81.00 | ||
Manufactured home installation inspection permit (only available in cities and counties with L&I inspection contract) | (($536.20))$567.60 | ||
Refund | (($23.10))$24.40 | ||
INSIGNIA FEES: | |||
REISSUED - LOST/DAMAGED | (($23.10))$24.40 | ||
IPIA | |||
DEPARTMENT AUDIT FEES | |||
REGULARLY SCHEDULED IPIA AUDIT: | |||
First inspection on each section (one time only) | (($38.40))$40.60 | ||
Second and succeeding inspections of unlabeled sections (per hour*) | (($84.90))$89.80 | ||
OTHER IPIA FEES: | |||
Red tag removal during a regularly scheduled IPIA audit (per hour* separate from other fees) | (($84.90))$89.80 | ||
Red tag removal at a time other than a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | (($84.90))$89.80 | ||
Increased frequency surveillance (per hour* plus travel time* and mileage**) | (($84.90))$89.80 | ||
Attendance at manufacturers training classes (per hour* only) | (($84.90))$89.80 | ||
Subpart "I" investigations (per hour* plus travel time* and mileage**) | (($84.90))$89.80 | ||
Alterations to a labeled unit (per hour* plus travel time* and mileage**) | (($84.90))$89.80 | ||
IPIA Issues/Responses (per hour* plus travel time* and mileage**) | (($84.90))$89.80 | ||
Monthly surveillance during a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | (($84.90))$89.80 | ||
Monthly surveillance at a time other than a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | (($84.90))$89.80 | ||
Plant certifications, recertifications and addenda updates (per hour* plus travel time* and mileage** per each inspector) | (($84.90))$89.80 | ||
Response to HBT audit during a regularly scheduled IPIA audit (per hour*) | (($84.90))$89.80 | ||
Response to HBT audit at a time other than a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | (($84.90))$89.80 | ||
Alternative construction (AC) letter inspections at placement site (per hour* plus travel time* and mileage**) | (($84.90))$89.80 | ||
Replacement of HUD labels (per hour* plus travel time* and mileage**) | (($84.90))$89.80 | ||
State administrative agency (SAA) inspection fee (per hour* plus travel time* and mileage**) | (($84.90))$89.80 | ||
State administrative agency (SAA) dispute resolution filing fee | (($84.90))$89.80 | ||
State administrative agency (SAA) dispute resolution (per hour*) | (($84.90))$89.80 | ||
OTHER FEES: | |||
FIELD TECHNICAL SERVICE (per hour plus travel time* and mileage**) | (($78.90))$83.50 | ||
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (one free copy per year upon request) | (($15.40))$16.30 | ||
VARIANCE INSPECTION FEE | (($187.10))$198.00 | ||
HOMEOWNER REQUESTED INSPECTION | (($187.10))$198.00 | ||
DECERTIFICATION OF A MOBILE/MANUFACTURED HOME | (($187.10))$198.00 | ||
DEMOLITION OF A MOBILE/MANUFACTURED HOME | (($187.10))$198.00 | ||
ENERGY CONSERVATION PERMIT | (($31.80))$33.60 |
NOTE: | Local jurisdictions may have other fees that apply. |
* | Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments. |
** | Per state guidelines. |
*** | Gas means all gases; natural, propane, etc. |
INITIAL FILING FEE | (($40.00))$42.30
| ||
DESIGN PLAN FEES: | |||
NEW PLAN REVIEW FEE WITHOUT STRUCTURAL REQUIREMENTS | (($113.50))$120.10
| ||
NEW PLAN REVIEW FEE WITH STRUCTURAL REQUIREMENTS | (($150.10))$158.80
| ||
RESUBMITTAL FEE | (($81.20))$85.90 | ||
ADDENDUM (Approval expires on same date as original plan.) | (($81.20))$85.90 | ||
ELECTRONIC PLAN SUBMITTAL FEE (($5.90))$6.20 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section. | |||
DEPARTMENT AUDIT FEES: | |||
AUDIT (per hour)* | (($81.20))$85.90 | ||
TRAVEL (per hour)* | (($81.20))$85.90 | ||
PER DIEM** | |||
HOTEL*** | |||
MILEAGE** | |||
RENTAL CAR*** | |||
PARKING*** | |||
AIRFARE*** | |||
DEPARTMENT INSPECTION FEES: | |||
INSPECTION (per hour)* | (($81.20))$85.90 | ||
TRAVEL (per hour)* | (($81.20))$85.90 | ||
PER DIEM** | |||
HOTEL*** | |||
MILEAGE** | |||
RENTAL CAR*** | |||
PARKING*** | |||
AIRFARE*** | |||
ALTERATION INSPECTION (One hour plus insignia alteration fee) | (($121.20))$128.30 | ||
INSIGNIA FEES: | |||
STATE CERTIFIED | (($28.90))$30.50 | ||
ALTERATION | (($40.00))$42.30 | ||
REISSUED-LOST/DAMAGED | (($14.80))$15.60 | ||
OTHER FEES: | |||
FIELD TECHNICAL SERVICE (per hour* plus travel time* and mileage**) | (($81.20))$85.90 | ||
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request) | (($15.00))$15.80 | ||
REFUND FEE | (($28.90))$30.50 |
* | Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments. |
** | Per state guidelines. |
*** | Actual charges incurred. |
INITIAL FILING FEE | (($60.80))$64.30 | |||
DESIGN PLAN FEES: | ||||
INITIAL ONE YEAR DESIGN | (($176.60))$186.90 | |||
RENEWAL FEE | (($60.80))$64.30 | |||
RESUBMIT FEE | (($87.90))$93.00 | |||
ADDENDUM (Approval expires on same date as original plan) | (($87.90))$93.00 | |||
ELECTRONIC PLAN SUBMITTAL FEE (($6.00))$6.30 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section. | ||||
Supplemental submissions of plans (resubmittals, addendums, renewals, code updates, etc.) shall be charged per hour or fraction of an hour* | (($104.20))$110.30 | |||
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS | (($16.20))$17.10 | |||
DEPARTMENT INSPECTION FEES: | ||||
INSPECTION/REINSPECTION (Per hour* plus travel time* and mileage**) | (($87.90))$93.00 | |||
TRAVEL (Per hour)* | (($87.90))$93.00 | |||
PER DIEM** | ||||
HOTEL*** | ||||
MILEAGE** | ||||
RENTAL CAR*** | ||||
PARKING*** | ||||
AIRFARE*** | ||||
DEPARTMENT AUDIT FEES: | ||||
AUDIT (Per hour*) | (($87.90))$93.00 | |||
TRAVEL (Per hour*) | (($87.90))$93.00 | |||
PER DIEM** | ||||
HOTEL*** | ||||
MILEAGE** | ||||
RENTAL CAR*** | ||||
PARKING*** | ||||
AIRFARE*** | ||||
INSIGNIA FEES: | ||||
FIRST SECTION | (($247.80))$262.30 | |||
EACH ADDITIONAL SECTION | (($23.80))$25.10 | |||
REISSUED-LOST/DAMAGED | (($60.80))$64.30 | |||
ELECTRICAL COMMERCIAL/INDUSTRIAL | ||||
Electrical Service/feeders 200 Amperage plus | ||||
Service/feeder | (($256.70))$271.70 | |||
Additional Feeder | (($48.60))$51.40 | |||
ELECTRICAL MULTIFAMILY RESIDENTIAL | ||||
Electrical Service/feeders 200 Amperage plus | ||||
Service/feeder | (($136.00))$143.90 | |||
Additional Feeder | (($34.40))$36.40 | |||
OTHER FEES: | ||||
FIELD TECHNICAL SERVICE (Per hour* plus travel time* and mileage**) | (($87.90))$93.00 | |||
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free per year) | (($16.20))$17.10 | |||
REFUND FEE | (($28.90))$30.50 |
* | Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments. |
** | Per state guidelines. |
*** | Actual charges incurred. |
INITIAL FILING FEE | (($43.40))$45.90 | ||
DESIGN PLAN FEES: | |||
INITIAL FEE - MASTER DESIGN | (($301.40))$319.00 | ||
INITIAL FEE - ONE YEAR DESIGN | (($123.10))$130.30 | ||
RENEWAL FEE | (($52.20))$55.20 | ||
RESUBMIT FEE | (($87.90))$93.00 | ||
ADDENDUM (Approval expires on same date as original plan) | (($87.90))$93.00 | ||
ELECTRONIC PLAN SUBMITTAL FEE (($6.00))$6.30 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section. | |||
ELECTRICAL PLAN REVIEW - For medical units, find fees at http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906 | |||
RECIPROCAL PLAN REVIEW: | |||
INITIAL FEE - MASTER DESIGN | (($134.20))$142.00 | ||
INITIAL FEE - ONE YEAR DESIGN | (($81.10))$85.80 | ||
RENEWAL FEE | (($81.10))$85.80 | ||
ADDENDUM | (($81.10))$85.80 | ||
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS | (($16.20))$17.10 | ||
DEPARTMENT INSPECTION FEES: | |||
INSPECTION/REINSPECTION (Per hour* plus travel time* and mileage**) | (($87.90))$93.00 | ||
TRAVEL (Per hour)* | (($87.90))$93.00 | ||
PER DIEM** | |||
HOTEL*** | |||
MILEAGE** | |||
RENTAL CAR*** | |||
PARKING*** | |||
AIRFARE*** | |||
ALTERATION INSPECTION (One hour plus insignia alteration fee) | (($131.60))$139.30 | ||
INSIGNIA FEES: | |||
FIRST SECTION/ALTERATION | (($25.20))$26.60 | ||
REISSUED-LOST/DAMAGED | (($16.20))$17.10 | ||
EXEMPT | (($43.40))$45.90 | ||
OTHER FEES: | |||
FIELD TECHNICAL SERVICE (Per hour* plus travel time* and mileage**) | (($87.90))$93.00 | ||
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request) | (($16.20))$17.10 | ||
REFUND FEE | (($28.90))$30.50 |
* | Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments. |
** | Per state guidelines. |
*** | Actual charges incurred. |