WSR 24-17-099
EXPEDITED RULES
DEPARTMENT OF AGRICULTURE
[Filed August 19, 2024, 8:47 a.m.]
Title of Rule and Other Identifying Information: Chapter 16-236 WAC, SEPA procedures.
Purpose of the Proposal and Its Anticipated Effects, Including Any Changes in Existing Rules: In response to a petition for rule making, the department of agriculture (department) is proposing to clarify current rule language by replacing all gender-specific pronouns with modern gender-inclusive pronouns.
Reasons Supporting Proposal: RCW
43.01.160 requires state agencies to use gender-neutral terms in rules unless a specification of gender is intended. Replacing gender-specific terminology supports the department's commitment to integrate inclusive policies and procedures as outlined in the department's 22-25 strategic plan.
Gender-inclusive pronouns are pronouns that are not specifically gendered and can be utilized when referring to each other in the third person. They are linguistic tools that we use to refer to people. Using gender-neutral pronouns can help create a more inclusive and welcoming environment and show respect for people's gender identities.
Statute Being Implemented: Chapter
43.21C RCW.
Rule is not necessitated by federal law, federal or state court decision.
Name of Proponent: Skye Theriot, private.
Name of Agency Personnel Responsible for Drafting, Implementation, and Enforcement: Gloriann Robinson, 1111 Washington Street S.E., Olympia, WA, 360-902-1802.
This notice meets the following criteria to use the expedited adoption process for these rules:
Corrects typographical errors, makes address or name changes, or clarifies language of a rule without changing its effect.
Explanation of the Reason the Agency Believes the Expedited Rule-Making Process is Appropriate: The amendments in this proposal meet the criteria for expedited rule making specified in RCW
34.05.353 (1)(c) by clarifying the rule, without changing its effect, by replacing gender-specific pronouns with gender-inclusive pronouns.
NOTICE
THIS RULE IS BEING PROPOSED UNDER AN EXPEDITED RULE-MAKING PROCESS THAT WILL ELIMINATE THE NEED FOR THE AGENCY TO HOLD PUBLIC HEARINGS, PREPARE A SMALL BUSINESS ECONOMIC IMPACT STATEMENT, OR PROVIDE RESPONSES TO THE CRITERIA FOR A SIGNIFICANT LEGISLATIVE RULE. IF YOU OBJECT TO THIS USE OF THE EXPEDITED RULE-MAKING PROCESS, YOU MUST EXPRESS YOUR OBJECTIONS IN WRITING AND THEY MUST BE SENT TO Gloriann Robinson, Rules Coordinator, Washington State Department of Agriculture, P.O. Box 42560, Olympia, WA 98504-2560, phone 360-902-1802, fax 360-902-2092, email wsdarulescomments@agr.wa.gov, AND RECEIVED BY October 22, 2024.
August 19, 2024
Jason Ferrante
Deputy Director
OTS-5743.1
AMENDATORY SECTION(Amending WSR 84-24-033, filed 11/30/84)
WAC 16-236-050Designation of responsible official.
Within the department of agriculture the ultimate responsible official is the director. The responsible official for a specific proposal shall be the assistant to the director in charge of environmental affairs or ((his/her))their designee.
AMENDATORY SECTION(Amending WSR 84-24-033, filed 11/30/84)
WAC 16-236-060EIS preparation.
(1) Preparation of draft and final EISs and SEISs is the responsibility of the assistant to the director in charge of environmental affairs or ((his/her))their designee. The responsible official shall be satisfied that all EISs and SEISs issued by the department are in compliance with these rules and chapter 197-11 WAC.
(2) Any draft or final EIS or SEIS shall be prepared by the department, the applicant, or by a consultant mutually agreed upon by the department and applicant.
(3) Whenever someone other than the department prepares a draft or final EIS or SEIS, the responsible official shall:
(a) Coordinate scoping to ensure that the individual preparing the document receives all substantive information submitted by any agency or person.
(b) Direct the areas of research and study to be undertaken and the content and organization of the document.
(c) Assist in obtaining information on file with another agency that is needed by the person preparing the document.
(d) Allow the person preparing the document access to department records relating to the document, as prescribed in chapter 16-06 WAC, Public records.
(4) Nothing herein shall be construed to prohibit the department from charging any fee of an applicant that the department is otherwise authorized to charge (see WAC 197-11-914). A performance bond in amount specified by the department may be required of the applicant to ensure payment of department expenses in preparing, in whole or in part, a draft or final EIS or SEIS.
AMENDATORY SECTION(Amending WSR 84-24-033, filed 11/30/84)
WAC 16-236-100Public notice requirements.
(1) When these rules require notice of environmental document preparation or availability, as a lead agency and taking into consideration the geographic area affected by the proposal, the size and complexity of the proposal, the public notice requirements for the permit or approval required from the department, public interest expressed in the proposal, and whether the proposal is a project or regulation, the department shall give public notice by using at least one of the following methods:
(a) Posting the property, for site-specific proposals;
(b) Publishing notice in a newspaper of general circulation in the county, city, or general area where the proposal is located;
(c) Notifying public or private groups which have expressed interest in a certain proposal or in the type of proposal being considered;
(d) Notifying the news media; and/or
(e) Publishing notice in a department newsletter.
(2) Whenever possible, the department shall integrate these public notice requirements with existing notice procedures for any department permits or approvals required for the proposal.
(3) The department may require an applicant to complete the public notice requirements for the applicant's proposal at ((his or her))their expense.