2031 AMH GRAN ADAI1

 


SHB 2031 - H AMD 166 Adopted 3-19-91

By Representatives Grant and Bray

     On page 12, line 28, after "to" strike "particular types of waste accepted at"

 


SHB 2031 - H AMD

By Representative Grant

     On page 13, line 4, after "generators" strike "of a particular type"

 


SHB 2031 - H AMD

By Representative Grant

     On page 13, line 7, after "sites" strike "for a particular type of waste"

 


SHB 2031 - H AMD

By Representative Grant

     On page 13, line 20, after "extent" strike "such discrimination is required by federal law" and insert ", through December 31, 1994, such discrimination is authorized by amendment of current federal law"

 

 

 


SHB 2031 - H AMD

By Representative Grant

     On page 13, line 23, after "receiving" strike "a particular type of"

 


SHB 2031 - H AMD

By Representative Grant

     On page 13, line 24, after "similar" strike "circumstances" and insert "terms and conditions"

 


SHB 2031 - H AMD

By Representative Grant

     On page 14, after line 5, insert "(3) When such an exemption is in effect, any increase in rates charged by the operator effective January 1, 1993 for services other than the base rate for disposal of solid material in packages of twelve cubic feet or less shall be no more than the percentage increase in said base rate in effect on January 1, 1993."

 


SHB 2031 - H AMD

By Representative Grant

     On page 14, line 8, after "competitive" strike "as to any or all services"

 


SHB 2031 - H AMD

By Representative Grant

     On page 14, line 13, after "as" insert "a"


SHB 2031 - H AMD

By Representative Grant

     On page 14, line 13, after "competitive" strike "as to a particular type of waste" and insert "company"

 


SHB 2031 - H AMD

By Representative Grant

     On page 14, line 17, after "a" strike "particular type of waste disposal operation" and insert "company"

 


EFFECT:  The conditions relative to determining whether a monopoly exists are modified to a rather limited extent.  These amendments are the result of further negotiations between the site operator, U. S. Ecology, Inc., and the Washington Public Power Supply System, who have conflicting interests.