2552-S.E AMC CONF H5137.3

 

 

 

ESHB 2552 - CONF REPT

By Conference Committee

 

                                                   ADOPTED 3/12/92

 

    Strike everything after the enacting clause and insert the following:

 

                              "PART 1

                        GENERAL GOVERNMENT"

 

    "NEW SECTION.  Sec. 1.  A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:

FOR THE OFFICE OF THE SECRETARY OF STATE


(1) Central Washington Archives:  To design a regional archives facility at Central Washington University in Ellensburg (93-2-001)

 

     The appropriation in this subsection is subject to the following conditions and limitations:  No moneys may be spent until preplanning documents have been reviewed and approved by the office of financial management under section 33 of this act.

 

           Appropriation:

               St Bldg Constr Acct............... $...... 360,000

 

           Prior Biennia (Expenditures)........... $....... 17,500

           Future Biennia (Projected Costs)....... $.... 3,909,500

                                                     -------------

                    TOTAL......................... $... 4,287,000"

 

    "Sec. 2.  1991 sp.s. c 14 s 6 (uncodified) is amended to read as follows:

FOR THE OFFICE OF FINANCIAL MANAGEMENT


(1) Local jail facilities (88‑2‑001)

 

           Reappropriation:

               St Bldg Constr Acct............... $...... 308,000

 

           Prior Biennia (Expenditures)........... $.... 2,692,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 3,000,000

 

(2) For environmental cleanup related to underground storage tanks (92-5-003)

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) The moneys provided in this subsection shall be allocated to the agencies and institutions of the state for removal, replacement, and environmental cleanup projects related to underground storage tanks.

     (b) No moneys appropriated in this subsection or in any subsection specifically referencing this subsection may be expended unless the office of financial management, in consultation with the department of general administration, has reviewed and approved the cost estimates for the project.  Projects to replace underground storage tanks shall conform with guidelines to minimize the risk of environmental contamination and reduce unnecessary duplication of tanks.  The guidelines shall be adopted by the department of general administration and shall provide for consideration of environmental risks associated with tank installations, interagency agreements for sharing fueling facilities, and the feasibility of alternative fueling systems.

 

           Appropriation:

               St Bldg Constr Acct............... $ ((3,729,000))

                                                         4,755,000

               CEP & RI Acct..................... $...... 390,000

               For Dev Acct...................... $....... 37,000

                Res Mgmt Cost Acct................ $...... 118,000

                                                     -------------

                    Subtotal Appropriation........ $ ((4,274,000))

                                                         5,300,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $ ((4,274,000))

                                                         5,300,000

 

(3) For asbestos removal or abatement projects

 

     The appropriations in this subsection are subject to the following conditions and limitations:

     (a) The moneys provided in this subsection shall be allocated to agencies and institutions of the state for asbestos removal or abatement projects.

     (((c))) (b) Moneys may be allocated for an asbestos removal or abatement project only to the extent that the project is necessary to eliminate or reduce a hazard to human health and the project is completed in compliance with asbestos project standards adopted by the department of general administration.  The department of general administration shall adopt standards to restrict the amount of asbestos removal to the minimum amount necessary.

     (((d))) (c) Subsections (3)(b) ((and (c))) of this section do not apply to moneys reappropriated in this act for projects for which, before the effective date of this act, the design has been completed, bids have been requested, or a contract has been entered into.

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 4,919,000

               CEP & RI Acct..................... $....... 25,000

                                                     -------------

                    Subtotal Reappropriation...... $.... 4,944,000

 

           Appropriation:

               St Bldg Constr Acct............... $.... 9,588,000

               CEP & RI Acct..................... $...... 540,000

                                                     -------------

                    Subtotal Appropriation........ $... 10,128,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 14,448,000

 

(4) Higher education:  Branch campuses site acquisition and development (90‑5‑002)

 

     The appropriations in this subsection are subject to the following conditions and limitations:

     (a) The appropriations in this subsection are provided solely for the acquisition of land and/or construction of facilities for branch campuses recommended by the higher education coordinating board, and shall be allocated to appropriate public institutions of higher education upon approval of the board.

     (b) Allocations from the appropriation in this subsection for land acquisition in the Spokane area shall be subject to the provisions of chapter 205, Laws of 1991 (House Bill No. 2198) and approval by the higher education coordinating board.

     (c) No facility may be constructed on the Spokane riverfront property, other than the Spokane Intercollegiate Research and Technology Institute (SIRTI) building, until a master plan for facilities that incorporates the SIRTI building and provides for maximum joint use of facilities, is completed by the joint center board and approved by the higher education coordinating board.

     (((e))) (d) Any allocations made from the appropriation in this subsection for construction projects costing more than $4,000,000 shall not be expended on design documents or construction until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Reappropriation:

               St Bldg Constr Acct............... $... 31,301,667

           Appropriation:

               St Bldg Constr Acct............... $... 31,000,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $.. 109,000,000

                                                     -------------

                    TOTAL......................... $.. 171,301,667

 

(5) Capital plan improvements:  To develop state-wide capital cost standards, planning guidelines and policies, and internal rent strategies

 

     The appropriation in this subsection is subject to the following conditions and limitations:  The office of financial management shall establish state-wide guidelines to minimize funding of state agency staffing and overhead costs from capital budget appropriations.  The guidelines shall provide for uniform agency reporting of staffing and overhead costs charged to capital funds and accounts, including engineering and architectural services provided through the department of general administration.  The office of financial management shall report to the fiscal committees of the legislature by January 1, 1993, on the guidelines established pursuant to this subsection.

 

   

         Appropriation:

               St Bldg Constr Acct............... $...... 282,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $..... 282,000"

 

    "Sec. 3.  1991 sp.s. c 14 s 7 (uncodified) is amended to read as follows:

 


FOR THE DEPARTMENT OF GENERAL ADMINISTRATION


(1) Life and safety projects:  To improve life and safety deficiencies and correct code violations on the capitol campus (88‑1‑006)

 

           Reappropriation:

               Cap Bldg Constr Acct.............. $....... 23,000

 

           Prior Biennia (Expenditures)........... $....... 90,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 113,000

 

(2) Minor works:  To complete minor works and other projects, including inadequate building systems (88‑2‑008), Northern State facility repairs (90‑1‑012), boiler plant structural repairs (90‑1‑016), building exterior repairs (90‑2‑006), mechanical system repairs (90‑2‑009), and building interior repairs (90‑2‑010)

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 2,621,000

 

           Prior Biennia (Expenditures)........... $.... 6,178,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 8,799,000

 

(3) Capitol Campus minor works:  To complete minor works and other projects on the Capitol Campus, including boiler plant structural repairs (88‑1‑003), sidewalk and street repairs (90‑2‑005), building exterior repairs (90‑2‑006), and Capitol Lake shoreline repairs (90‑3‑013)

 

           Reappropriation:

               Cap Bldg Constr Acct.............. $.... 1,278,000

 

           Prior Biennia (Expenditures)........... $.... 1,587,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 2,865,000

 

(4) Burien criminal justice training center:  To complete renovations to the Burien criminal justice training center (90‑3‑025)

 

           Reappropriation:

                St Bldg Constr Acct............... $.... 5,000,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 5,000,000

 

(5) Natural Resources Building:  To complete construction of the Natural Resources Building (90‑5‑003)

 

           Reappropriation:

               East Cap Constr Acct.............. $... 45,400,000

 

           Prior Biennia (Expenditures)........... $... 27,600,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 73,000,000

 

(6) Remodel of the John A. Cherberg Building (88‑2‑040)

 

     The reappropriation in this subsection is subject to the following conditions and limitations:  The project shall include review and development of program requirements for current and future facilities needs, including furnishings and equipment, for the Washington State Senate whose offices are currently located in the Institutions, Legislative, and John A. Cherberg Buildings.  The project shall also include review and redesign, as necessary, of the proposed John A. Cherberg Building remodel, including construction and the acquisition of all furnishings and equipment required.

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 3,000,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 3,000,000

 

(7) Northern State Multi-Service Center:  To complete the design for and to construct a sixteen-bed evaluation and treatment facility at the Northern State Multi-Service Center to provide care for the mentally ill consistent with chapter 71.24 RCW (90-5-027)

 

     The reappropriation in this subsection is subject to the following conditions and limitations:

     (a) No moneys from this reappropriation may be expended for construction until the department secures a lease with a county or a group of counties for use of the facility.  The lease shall provide for payment to the department for all operations and management costs associated with the facility and a space rental charge.  In establishing the space rental charge, the department shall consider fair market rent or lease rates charged for comparable facilities used by regional support networks.

     (b) No moneys from this reappropriation may be expended for ((furnishings or)) equipment with a useful life expectancy of less than twenty years.

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 1,700,000

 

           Prior Biennia (Expenditures)........... $....... 50,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,750,000

 

(8) Olympia Archives Storage Building:  To complete design and construction of the archives storage building at Olympia Airdustrial Park (90‑4‑024)

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 1,800,000

           Appropriation:

               St Bldg Constr Acct............... $...... 671,000

 

           Prior Biennia (Expenditures)........... $...... 215,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 2,686,000

 

(9) Small and emergency repairs:  For unexpected small and emergency repairs on the Capitol Campus, and at other general administration facilities throughout the state (92‑1‑001)  (92‑2‑002)

 

           Appropriation:

               Cap Bldg Constr Acct.............. $...... 645,000

               St Bldg Constr Acct............... $...... 261,000

                                                     -------------

                    Subtotal Appropriation........ $...... 906,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $.... 2,571,000

                                                     -------------

                    TOTAL......................... $.... 3,477,000

 

(10)Underground storage tanks:  To remove and replace underground storage tanks on the Capitol Campus and at the Northern State multi-service center (92‑1‑005)

 

     The appropriation in this subsection may be expended only after compliance with section 6(2) ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St Bldg Constr Acct............... $...... 140,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $.... 1,371,000

                                                     -------------

                    TOTAL......................... $.... 1,511,000

 

(11)Highway-Licenses Building:  To complete the design for and to renovate the Highway-Licenses Building on the Capitol Campus (88‑5‑011) (92‑2‑003)

 

     The new appropriation in this subsection is subject to the following conditions and limitations:

     (a) No moneys may be spent for construction until the department of general administration develops a space rental charge to be assessed to agencies occupying the building being renovated with this appropriation.  The space rental charge shall be sufficient to fully reimburse the annual debt service costs of the new appropriation in this subsection, and shall be assessed until the department has developed and implemented space rental charges for facilities owned by the department on a state-wide basis.

     (b) No moneys may be spent until preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

     (c) $133,000 is provided solely to plan for and manage the temporary relocation and housing of tenants of the building renovated with this appropriation.

 

           Reappropriation:

               Cap Purch & Dev Acct.............. $...... 150,000

           Appropriation:

               St Bldg Constr Acct............... $... 22,438,000

 

           Prior Biennia (Expenditures)........... $...... 350,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 22,938,000

 

(12)General Administration Building:  To preplan renovation of the General Administration Building (92‑2‑005)

 

     The appropriation in this subsection shall not be expended for design documents until the project predesign documents have been reviewed and approved by the office of financial management under section 33 of this act.

 

           Appropriation:

               Cap Bldg Constr Acct.............. $.... 1,200,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $... 22,101,000

                                                     -------------

                    TOTAL......................... $... 23,301,000

 

(13)Minor works preplanning:  To develop preplans and studies of minor works projects on the Capitol Campus (92‑2‑026)

 

           Appropriation:

               Cap Bldg Constr Acct.............. $...... 750,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 750,000

 

(14)Capitol Lake:  To develop a dredging plan and dredge Capitol Lake, to repair lake dam gates, and to repair shoreline areas damaged by erosion (92‑2‑015) (92‑3‑019)

 

     $200,000 of the appropriation in this subsection is provided solely to develop a management plan and to implement projects to reduce sedimentation and other pollution in the Deschutes river watershed.  Eligible projects shall include, but are not limited to, stream corridor conservation, bank stabilization, agricultural soil conservation, silvicultural soil conservation, and sedimentation and pollution monitoring.  When implementing this subsection, the department shall coordinate with the departments of natural resources, ecology, fisheries, wildlife, and transportation, and with affected local governments and Indian tribes.

 

           Appropriation:

               St Bldg Constr Acct............... $.... 3,125,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 3,125,000

 

(15)Minor works:  For minor works, repair, and improvement projects on the Capitol Campus and at other facilities owned by the department, including campus high voltage loop improvements, plaza garage elevator repairs, Capitol Campus control system improvements, Governor's Mansion structural repairs, utilities and grounds improvements, interior and exterior building repairs, ((and)) building mechanical and electrical system improvements, employment security building elevator renovations, and heating, ventilation, and electrical repairs to the Legislative Building (92‑2‑008) (92‑2‑009) (92‑2‑013) (92‑2‑014) (92‑2‑016) (92‑2‑017) (92‑2‑018) (92‑2‑020) (92‑2‑024) (94-2-014)

 

           Appropriation:

               Cap Bldg Constr Acct.............. $ ((7,889,000))

                                                         4,467,000

               St Bldg Constr Acct............... $ ((2,595,000))

                                                         6,567,000

                                                     -------------

                    Subtotal Appropriation........ $ ((10,484,000))

                                                        11,034,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $... 13,188,000

                                                     -------------

                    TOTAL......................... $ ((23,672,000))

                                                        24,222,000

 

(16)Northern State facility repairs:  To repair the boiler and steam distribution system, trim trees, and repair roofing at the Northern State multi-service center (92‑2‑021)

 

           Appropriation:

               CEP & RI Acct..................... $...... 280,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $.... 1,278,000

                                                     -------------

                    TOTAL......................... $.... 1,558,000

 

(17)State facilities planning:  To develop designs and plans to accommodate agency housing needs in Thurston county (92‑5‑100) (92‑5‑101) (92‑5‑108)  (92‑5‑102)

 

     Of the appropriation in this subsection:

     (a) $750,000 is provided ((solely)) to develop master plans for satellite campuses to be located in the cities of Lacey and Tumwater, and a facility plan, developed in consultation with the city of Olympia, which includes mixed use in the downtown Olympia area.  The plans shall provide for the siting of consumer services within walking distance of the major areas of concentration of state employees;

     (b) $300,000 is provided ((solely)) to develop a facility implementation strategy for Thurston county.  The implementation strategy shall include, but not be limited to, identification of agency space requirements and opportunities for co-location with other agencies, and an organizational process for developing specific project proposals and establishing implementation timelines;

     (c) $250,000 is provided ((solely)) to develop a master plan for light industrial facility needs in Thurston county; and

     (d) $200,000 is provided ((solely)) for a geotechnical and hydrological survey of the Capitol Campus.

 

     The ((master)) plans and implementation strategy developed under this subsection shall incorporate transportation management and housing density principles designed to reduce commuter congestion and reliance on single-occupancy automobiles.

 

           Appropriation:

               St Bldg Constr Acct............... $.... 1,500,000

 

           Prior Biennia (Expenditures)........... $...... 500,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 2,000,000

 

(18)Thurston county landbank:  To purchase((, option, or otherwise control)) in fee simple, or acquire purchase options on, real property adjacent to, or in close proximity to, the department of ecology headquarters building in the city of Lacey or the department of labor and industries headquarters building in the city of Tumwater for future state facilities (92‑5‑000)

 

           Appropriation:

               St Bldg Constr Acct............... $.... 8,000,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 8,000,000

 

(19)Heritage Park:  To acquire property and begin planning for a park between the Capitol Campus and Budd Inlet (92‑5‑105)

 

     The appropriation in this subsection may not be spent to acquire the property parcel located in Olympia south of Seventh Avenue and approximately two and seven-tenths acres in size if such property parcel is sold to a party other than the state after January 1, 1991, and the state's acquisition price is substantially greater than the acquisition price paid by the other party.

     The department shall report to the fiscal committees of the house of representatives and the senate by December 15, 1991, on the status of property acquisitions and plans for the park.  The report shall also describe the status of any projects being developed by local governments or other state agencies that affect the design or development of the park.  Any expenditure made under this appropriation shall conform to the capital campus master plan.

 

           Appropriation:

               St Bldg Constr Acct............... $.... 6,700,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $... 13,800,000

                                                     -------------

                    TOTAL......................... $... 20,500,000

 

(20)Condition assessment:  To develop a prototype condition assessment methodology, assess the condition of facilities owned by the department of general administration, and prepare a facility maintenance strategy that emphasizes preventative maintenance (92‑2‑007)

 

     The appropriations in this subsection may not be spent until a detailed scope of work consistent with the recommendations of the capital forum has been reviewed and approved by the office of financial management.

 

           Appropriation:

               Cap Bldg Constr Acct.............. $...... 591,000

               St Bldg Constr Acct............... $...... 500,000

                                                     -------------

                    Subtotal Appropriation........ $.... 1,091,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,091,000

 

 

(21)Ventilation system repair:  John L. O'Brien Building

 

     To replace existing heating, ventilation, and air conditioning system

 

           Appropriation:

               St Bldg Constr Acct............... $...... 650,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 650,000

 

(22)Office Building #2 air handling system:  To upgrade the air supply system by rebuilding the existing system, changing the emergency diesel exhaust system and investigating energy savings to reduce operating and maintenance costs (93‑2‑025)

 

           Appropriation:

               St Bldg Constr Acct............... $.... 1,000,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,000,000

 

(23)Puyallup land acquisition:  To reimburse the city of Puyallup for storm drainage improvements to land purchased by the state for a Pierce College extension (88‑3‑031)

 

           Appropriation:

               St Bldg Constr Acct............... $...... 221,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 221,000

 

 

(24)Library for the Blind and Physically Handicapped:  To acquire and begin renovating, or to acquire a purchase option on, space for the Washington library for the blind and physically handicapped (92-5-001)

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) The facility acquired with this appropriation shall be operated, managed, and maintained by the Seattle public library; and

     (b) The office of financial management, in consultation with the department of general administration, the Washington state library, and the Seattle public library, shall:  (i) Study the benefits and costs associated with Seattle public library ownership compared to state ownership of the library facility; and (ii) develop contractual conditions for any potential transfer of ownership of the library facility to the Seattle public library.  Based on the results of the study in this subsection, and after notifying the appropriate fiscal committees of the legislature, the office of financial management may authorize the transfer of ownership of the library facility from the department of general administration to the Seattle public library.

 

           Appropriation:

               St Bldg Constr Acct............... $.... 1,900,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $.... 1,400,000

                                                     -------------

                    TOTAL......................... $.... 3,300,000

 

 

(25)Co-location and consolidation of state facilities:  To identify the current locations of major concentrations of state facilities in the state and to determine where state facilities can be co-located and consolidated (92-5-004)

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) The department shall prepare policy recommendations and cost estimates for opportunities to co-locate and consolidate state facilities, including a comparison of the benefits and costs of purchasing or leasing such facilities and an analysis of private sector impacts; and

     (b) The appropriation shall not be spent until a detailed scope of work has been reviewed and approved by the office of financial management.

 

           Appropriation:

               St Bldg Constr Acct............... $...... 225,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 225,000

 

 

(26)Land acquisition:  To purchase in fee simple, or acquire purchase options on, real property for a data center and office building for the department of information services

 

     The appropriation in this subsection is subject to the following conditions and limitations:  The real property acquisition under this subsection shall be in conformance with the capitol campus master plan, as recommended by the capitol campus design advisory committee and approved by the state capitol committee.

 

           Appropriation:

               Data Processing Bldg Constr Acct.. $.... 2,100,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 2,100,000"

 

    "NEW SECTION.  Sec. 4.  A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:

FOR THE DEPARTMENT OF INFORMATION SERVICES


(1) Data center and office building:  To plan for and design a new data center and office building (93-2-001)

 

     The appropriation in this subsection shall not be expended for building design until:

     (a) The site has been recommended by the capitol campus design advisory committee and approved by the state capitol committee; and

     (b) The project predesign documents have been reviewed and approved by the office of financial management under section 33 of this act.  During the review and approval of predesign and design documents for this project, the office of financial management shall ensure that the sizing and design of the data center minimizes construction costs, provides for flexible facility use, and is consistent with the state's long-term requirements for centralized mainframe-based computing.

 

           Appropriation:

               Data Processing Bldg Constr Acct.. $.... 1,184,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $... 58,400,000

                                                     -------------

                    TOTAL......................... $.. 59,584,000"

 

 

 

                           (End of part)


 

 

                              "PART 2

                          HUMAN SERVICES"

 

    "Sec. 5.  1991 sp.s. c 14 s 10 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT


     For the purposes of this section, "capital cost" means land acquisition and project design and construction.  All projects funded in this section, except those under subsection (5) of this section, shall comply with section 54 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

(1) Development loan fund (88‑2‑002)

 

     The appropriation in this subsection shall be used for loans in timber-dependent communities as defined in Engrossed Substitute House Bill No. 1341.

 

           Appropriation:

               WA St Dev Loan Acct................. $   2,000,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $   2,000,000

 

(2) Grays Harbor dredging (88‑3‑006)

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) The appropriation is provided solely for the state's share of costs for Grays Harbor dredging, dike construction, bridge relocation, and related expenses.

     (b) Expenditure of moneys from this appropriation is contingent on the authorization of $40,000,000 and an initial appropriation of at least $13,000,000 from the United States army corps of engineers and the authorization of at least $10,000,000 from the local government for the project.  Up to $3,500,000 of the local government contribution for the first year on the project may be composed of property, easements, rent adjustments, and other expenditures specifically for the purposes of this appropriation if approved by the army corps of engineers.  State funds shall be disbursed at a rate not to exceed one dollar for every four dollars of federal funds expended by the army corps of engineers and one dollar from other nonstate sources.

     (c) Expenditure of moneys from this appropriation is contingent on a cost-sharing arrangement and the execution of a local cooperation agreement between the Port of Grays Harbor and the army corps of engineers pursuant to Public Law 99-662, the federal water resources development act of 1986, whereby the corps of engineers will construct the project as authorized by that federal act.

     (d) The Port of Grays Harbor shall make the best possible effort to acquire additional project funding from nonstate public grants and/or other governmental sources other than those in (b) of this subsection.  Any money, up to $10,000,000 provided from such sources other than those in (b) of this subsection, shall be used to reimburse or replace state building construction account money.  In the event the project cost is reduced, any resulting reduction or reimbursement of nonfederal costs realized by the Port of Grays Harbor shall be shared proportionally with the state.

 

           Reappropriation:

               St Bldg Constr Acct................. $   6,840,318

 

           Prior Biennia (Expenditures)............. $   3,159,682

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $  10,000,000

 

(3) Housing capital programs:  To construct, acquire, and rehabilitate low-income housing (88‑5‑015)

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) $8,000,000 is provided solely for the affordable housing program.  The department may not approve a request for assistance under this subsection for projects located in cities and counties that do not have an affordable housing needs assessment approved by the department.  The department shall by rule establish the content of the affordable housing needs assessment and criteria for the approval of the affordable housing needs assessment.

     (b) $8,000,000 is provided solely for the low-income weatherization program under chapter 70.164 RCW.

     (c) $34,000,000 is provided solely for the housing assistance program.  Effective July 1, 1992, the department may not approve loan or grant requests for projects under this subsection that are inconsistent with the city's or county's and state's comprehensive housing affordability strategy, as required under Title I, section 105, of the National Affordable Housing Act of 1990.

     (d) The Washington housing trust fund appropriation is provided solely for the department to contract with the University of Washington college of architecture for:  (i) A study of regulatory impediments to affordable housing; (ii) a study on various innovative design techniques that can be used to increase housing density; (iii) a recommendation to the legislature for a new building code and associated regulations that will substantially reduce the cost of housing.  No indirect costs of the contracting agent may be paid from this appropriation.

 

           Reappropriation:

               St Bldg Constr Acct................. $  10,000,000

           Appropriation:

               St Bldg Constr Acct................. $  50,000,000

               Washington Housing Trust Fund....... $     150,000

                                                       -----------

                    Subtotal Appropriation.......... $  50,149,500

 

           Prior Biennia (Expenditures)............. $   8,000,000

           Future Biennia (Projected Costs)......... $ 100,000,000

                                                       -----------

                    TOTAL........................... $ 168,149,500

 

(4) Columbia county courthouse (89‑4‑004)

    

     The appropriations in this subsection are provided solely to repair and restore the Columbia county courthouse and shall be matched by at least $100,000 in private donations and local funds from Columbia county.

 

 

           Reappropriation:

               St Bldg Constr Acct................. $     600,000

           Appropriation:

               St Bldg Constr Acct................. $      60,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     660,000

 

(5) Public works trust fund (90‑2‑001)

 

     The appropriation in this subsection is subject to the following conditions and limitations:

 

     (a) $7,000,000 of the appropriation ((in this subsection)) is provided solely for the purposes of chapter 314, Laws of 1991, (Engrossed Substitute House Bill No. 1341, timber-dependent communities); and

     (b) $150,000 of the appropriation is provided solely for the department to conduct a study of local government public works needs.  The department shall coordinate this study with the complementary needs assessments on water quality and drinking water being conducted by the departments of health and ecology.  The department shall report the findings of the study to the house of representatives capital facilities and financing committee and senate ways and means committee by January 1, 1993.

 

           Reappropriation:

               Public Works Assist................. $  85,734,000

           Appropriation:

               Public Works Assist................. $ ((88,491,000))

                                                        88,641,000

 

           Prior Biennia (Expenditures)............. $  54,534,447

           Future Biennia (Projected Costs)......... $ 231,877,000

                                                       -----------

                    TOTAL........................... $ ((460,636,447))

                                                       460,786,447

 

(6) Seventh Street Hoquiam Theatre (90‑2‑008)

 

           Reappropriation:

               St Bldg Constr Acct................. $     250,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     250,000

 

(7) Tall ships tourist attraction:  To design and construct a tall ship tourist attraction

 

     The reappropriation in this subsection is subject to the following conditions and limitations:

     (a) The reappropriation is provided solely to contract with the Grays Harbor Historical Seaport Authority to design and construct a tall ship tourist attraction.

     (b) The reappropriation shall be matched by at least $513,105 from nonstate sources provided solely for capital costs of the project.  The match may include cash and in-kind contributions, but may not include cash or in-kind contributions used to match other state moneys provided to the Grays Harbor Historical Seaport Authority.

     (c) The department shall ensure that the state's interest is protected by requiring that if the tall ship tourist attraction is sold or its use is changed, the Grays Harbor Historical Seaport Authority shall return to the state of Washington an amount equal to the state's total contribution to the project.

 

           Reappropriation:

               St Bldg Constr Acct................. $     513,105

 

           Prior Biennia (Expenditures)............. $     486,895

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $   1,000,000

 

(8) Port of Klickitat dredge spoils:  For site preparation and transport and deposit of Columbia river dredge spoils (90-2-013)

 

     The reappropriation in this subsection is subject to the following conditions and limitations:

     (a) The port of Klickitat shall sign an agreement to repay the reappropriation plus simple interest at three percent in eight annual installments beginning July 1, 1993; and

     (b) Expenditure of money from this reappropriation is contingent on at least $300,000 from port district funds being provided for the project.

 

           Reappropriation:

               St Bldg Constr Acct................. $     250,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     250,000

 

(9) Historic community theaters (90‑5‑014)

 

     The reappropriation in this subsection is provided solely for grants to preserve historic community theatres.  No portion of the reappropriation in this subsection may be spent unless an equal amount from nonstate sources is provided for the same purposes.  No more than $50,000 of the reappropriation shall be expended for renovation of the Admiral Theatre in west Seattle.

 

           Reappropriation:

               St Bldg Constr Acct................. $     250,000

 

           Prior Biennia (Expenditures)............. $     250,000

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     500,000

 

(10)Emergency management building minor works (92‑2‑009)

 

           Appropriation:

               St Bldg Constr Acct................. $     180,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     180,000

 

(11)Columbia river dredging:  For completing a study on the feasibility of deepening the navigation channel from Astoria to Vancouver (92‑5‑006)

 

     Expenditure of this appropriation is contingent on $1,200,000 from the federal government and $600,000 from the state of Oregon being appropriated for the same purpose.

 

           Appropriation:

               St Bldg Constr Acct................. $     600,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     600,000

 

(12)Building for the arts:  For grants to local performing arts and art museum organizations for facility improvements or additions (92‑5‑100)

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) Grants are limited to the following projects:

 

 

                                Estimated Total    State    State

                               Capital Cost      Grant    Portion

 

    Seattle Children's Theatre               $  8,000,000 $ 1,200,000   15%

    Admiral Theatre (Bremerton)$  4,261,000  $   639,000  15%

    Spokane Symphony          $  1,500,000   $   225,000  15%

    Pacific Northwest Ballet  $  7,500,000   $ 1,125,000  15%

    Seattle Symphony          $ 54,000,000   $ 8,100,000  15%

    Seattle Repertory Theatre $  4,000,000   $   600,000  15%

    Intiman Theatre           $    800,000   $   120,000  15%

    Broadway Theatre District

      (Tacoma)                (($  8,400,000 $ 1,260,000))    15%

                                $ 11,800,000 $ 1,770,000

    Allied Arts of Yakima     $    500,000   $    75,000  15%

    Spokane Art School        $    454,000   $    68,000  15%

    Seattle Art Museum        $  4,862,500   $   729,000  15%

 

    Total                     $ ((94,277,500 $ 14,141,000))

                                  97,677,500 $ 14,651,000

 

     (b) The state grant may provide no more than fifteen percent of the estimated total capital cost or actual total capital cost of the project, whichever is less.  The remaining portions of project capital costs shall be a match from nonstate sources.  The match may include cash and land value.

     (c) State funding shall be distributed to projects in the order in which matching requirements have been met.

 

 

           Appropriation:

               St Bldg Constr Acct................. $ ((10,738,900))

                                                        11,248,900

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $   3,402,100

                                                       -----------

                    TOTAL........................... $ ((14,141,000))

                                                        14,651,000

 

(13)Columbia Gorge interpretive center:  For construction of a facility in Stevenson with exhibits, classrooms, and a research library (92-5-101)

 

     The appropriation in this subsection shall be matched by at least $5,000,000 from nonstate sources provided for capital costs of the project.  The match may include cash, land value, and other in-kind contributions.

 

           Appropriation:

               St Bldg Constr Acct................. $   5,000,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $   5,000,000

 

(14)Seattle Center redevelopment:  For upgrading the Coliseum (including engineering and other studies to determine renovation alternatives for the Coliseum), the International Fountain mall, Memorial Stadium, the Center House, the Pacific Arts Center, the Opera House, and central plant; converting the northwest rooms to a conference and exhibit facility; adding parking; renovating and developing open space areas; making improvements to mechanical, electrical, and other high-priority building systems; and making general improvements to the site, including but not limited to signs, fountains, portable stages, and fencing

 

     The appropriation in this subsection shall be matched by moneys from nonstate sources sufficient to pay at least seventy-five percent of the total capital costs of these projects.

 

           Appropriation:

               St Bldg Constr Acct................. $   8,500,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $   8,500,000

 

(15)Spokane Food Bank:  For construction of a freezer/cooler

 

           Appropriation:

               St Bldg Constr Acct................. $     125,000

 

           Prior Biennia (Expenditures)............. $     150,000

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     275,000

 

(16)Carolyn Downs Family Medical Center:  To construct a new medical facility on the Odessa Brown Children's Clinic campus

 

     The appropriation in this subsection shall be matched by at least $2,050,000 provided from nonstate sources for capital costs of this project.

 

           Appropriation:

               St Bldg Constr Acct................. $     500,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     500,000

 

(17)Nordic Heritage Museum:  For building acquisition and improvements (90-2-007)

 

     The reappropriation in this section is contingent on the expenditure for the same purpose of at least two dollars from nonstate sources for each dollar spent from this reappropriation.

 

           Reappropriation:

               St Bldg Constr Acct................. $     200,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     200,000

 

(18)Thorp Grist Mill:  Restoration (90-5-010)

 

     The reappropriation in this section is contingent on the expenditure for the same purpose of at least two dollars from nonstate sources for each dollar spent from this reappropriation.

 

           Reappropriation:

               St Bldg Constr Acct................. $      10,000

 

           Prior Biennia (Expenditures)............. $      20,000

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $      30,000

 

(19)Bremerton naval heritage redevelopment project

 

     The reappropriation in this section is subject to the following conditions and limitations:

     (a) This reappropriation is provided solely for capital improvements to the naval destroyer U.S.S. Turner Joy, in conjunction with the Bremerton naval heritage redevelopment project.

     (b) No portion of this reappropriation may be expended unless an equal amount from nonstate and nonfederal sources is expended for the same purpose.

     (c) Prior to the expenditure of this reappropriation, the recipient of the grant shall prepare and submit to the director of community development, for the director's approval, a financial plan that identifies the revenue sources for the completion of the project and for the long-term operation of the project.

 

           Reappropriation:

                St Bldg Constr Acct................. $     190,000

 

           Prior Biennia (Expenditures)............. $      66,000

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     256,000

 

(20)Marine science center construction

 

     The reappropriation in this section is subject to the following conditions and limitations:

     (a) This reappropriation is provided solely for a grant to the city of Poulsbo for construction of a marine science center to be operated by educational service district no. 114.

     (b) Expenditure of this reappropriation is contingent on site acquisition and at least $300,000 of construction costs contributed from nonstate sources.

 

           Reappropriation:

               St Bldg Constr Acct................. $     498,000

 

           Prior Biennia (Expenditures)............. $       2,500

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     500,000

 

(21)A Contemporary Theater (90-1-006)

 

     The reappropriation in this section is subject to the following conditions and limitations:

     (a) This reappropriation is provided solely for the construction of a new theater in Seattle.

     (b) No portion of this reappropriation may be expended unless at least $9,000,000 from nonstate sources, including the value of land, is provided for the same purpose.

 

           Reappropriation:

               St Bldg Constr Acct................. $   1,000,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $   1,000,000

 

(22)Liberty Theater:  To restore and rehabilitate Liberty Theater in Walla Walla

 

     The reappropriation in this section is subject to the following conditions and limitations:

     (a) Expenditure of moneys from this reappropriation is contingent on the expenditure for the same purpose of at least one dollar from nonstate sources, including in-kind contributions, for each four dollars spent from this reappropriation.

     (b) The reappropriation is provided solely for a grant to a nonprofit corporation for rehabilitation and restoration of the historic Liberty Theater building in Walla Walla.

     (c) The owner of the building shall grant to the state an historic preservation easement prior to the expenditure of any funds from this reappropriation.

     (d) The nonprofit corporation shall submit to the director of community development, for the director's approval, a financial plan for the long-term operation of the building.

 

           Reappropriation:

               St Bldg Constr Acct................. $     200,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     200,000

 

(23)Yakima county:  For construction and expansion of jail facilities in Yakima county

 

     The reappropriation in this subsection may not exceed eighty percent of the total capital cost of the project.  The remaining portion of project capital costs shall be a match from nonstate sources.

 

           Reappropriation:

               St Bldg Constr Acct................. $   2,400,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $   2,400,000

 

(24)Resource Center for the Handicapped:  To acquire ((the building)) and improve the facilities in which the center currently operates

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (((a) The appropriation may be used only to purchase the facility declared surplus by the Shoreline school district in which the center operates a program as of the effective date of this section; and

     (b))) No expenditure shall be made until an equal amount of ((private, nongovernmental)) nonstate moneys dedicated to the purchase of the facility have been raised.  The matching money may include lease-purchase payments made by the center prior to the effective date of this section.

 

           Appropriation:

               St Bldg Constr Acct................. $ ((1,500,000))

                                                         1,200,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $ ((1,500,000))

                                                         1,200,000

 

(25)Columbia river waterfront:  Planning and coordinating existing and future land use, park, transportation, historical, and utility improvements along the shoreline of the Columbia river between the flushing channel and the Interstate 205 bridge

 

     The appropriation in this subsection shall be matched by at least $100,000 from nonstate sources provided for the same purpose.

 

           Appropriation:

               St Bldg Constr Acct................. $     100,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     100,000

 

(26)Asian Resource Center:  To construct an Asian Resource Center in Seattle

 

     This appropriation shall be matched by at least $600,000 in cash provided from nonstate sources.

 

           Appropriation:

               St Bldg Constr Acct................. $     150,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     150,000

 

(27)Pike Place Market:  For a grant to the city of Seattle (the "city") for the Pike Place Market preservation and development authority (the "authority") to acquire the interests of what is known as the urban group partnerships (the "partnerships") in eleven properties located in the Pike Place Market historical district (the "district")

 

     (a) No portion of the appropriation in this subsection may be expended until the ((city)) authority certifies to the department that:

     (i) The settlement proposal agreement dated June 6, 1991, concerning the properties in the district is confirmed, including but not limited to provisions that:

     (A) The partnerships will receive not more than a total of $2,250,000 under the agreement;

     (B) All rights, clear title, and interest in the market property will be relinquished by the partnerships and conveyed to the authority; and

     (C) All pending litigation and related disputes will be dismissed with prejudice or otherwise finally resolved;

     (ii) ((The city has amended the authority's charter to preclude any future sales of interests in authority properties in the district that could result in loss of authority management responsibilities;

     (iii))) The authority has executed and recorded a conservation easement, which has been approved by the department, providing protection for the character-defining features of the district.  The term of the easement shall extend until the year 2012 or until the bonds sold to provide for this appropriation are retired, whichever is later.  The easement shall inure to the benefit of the state.

     (b) No portion of the appropriation in this subsection may be expended until:

     (i) The authority has executed an agreement with the department on behalf of the state to preclude any future sales of interest in the authority properties in the district that could result in loss of authority management responsibilities, except for reasonable encumbrances necessary for market-related purposes such as (A) repair, renovation, rehabilitation, or improvement of Pike Place Market historical district properties; (B) furthering a public market purpose as defined in the authority charter, the Pike Place Market historical district ordinance, the Pike Place Market urban renewal plan, or other applicable Seattle or state law; (C) fulfilling a requirement of federal, state, or city law; or (D) such other market-related purpose, as approved by the mayor.  Such agreement shall expire when the authority's charter is amended as provided in (b)(ii) of this subsection; or

     (ii) The city amends the authority's charter to preclude any future sales of the interests in authority properties in the district that could result in loss of authority management responsibilities, except for reasonable encumbrances necessary for market-related purposes such as (A) repair, renovation, rehabilitation, or improvement of Pike Place Market historical district properties; (B) furthering a public market purpose as defined in the authority charter, the Pike Place Market historical district ordinance, the Pike Place Market urban renewal plan, or other applicable Seattle or state law; (C) fulfilling a requirement of federal, state, or city law; or (D) such other market-related purpose, as approved by the mayor.  However, should the authority's council or its constituency fail to recommend such amendments to the mayor by June 1, 1992, or if the council and its constituency recommend different amendments, the mayor shall, in his sole discretion, promulgate charter amendments as he deems necessary to fulfill the requirements of this subsection (27)(b)(ii).

     (c) The appropriation in this subsection shall be matched by at least $750,000 provided from nonstate sources for the same purpose as this appropriation.

 

           Appropriation:

               St Bldg Constr Acct................. $   1,500,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $   1,500,000

 

(28)Keyport Naval Undersea Museum:  To complete an auditorium in the museum

 

           Appropriation:

               St Bldg Constr Acct................. $     300,000

 

           Prior Biennia (Expenditures)............. $     500,000

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     800,000

 

(29)Marcus Whitman Statue:  To provide a duplicate casting of the official statue of Marcus Whitman and to erect this statue in Walla Walla county

 

           Appropriation:

               St Bldg Constr Acct................. $      53,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $      53,000

 

(30)Mystic Lake flood assistance:  For mitigation of development-induced flooding of the lake

 

           Appropriation:

               St Bldg Constr Acct................. $      53,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $      53,000

 

(31)Maritime Museum:  For exhibit, architecture, and facility planning for a maritime museum on the Seattle waterfront

 

           Appropriation:

               St Bldg Constr Acct................. $     200,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     200,000

 

(32)Tacoma educational enrichment center

 

     The appropriation in this subsection shall be matched by a contribution of at least $2,200,000 provided from the Tacoma school district or other local government entity for capital costs of this project.  The appropriation in this subsection is provided to the Tacoma school district for a facility to be operated under contract by the metropolitan park district of Tacoma.  No funds may be expended until a facility plan has been jointly approved by the Tacoma school district and the metropolitan park district.

 

           Appropriation:

               St Bldg Constr Acct................. $   2,200,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $   2,200,000

 

(33)Meeker Mansion:  For acquisition of property adjacent to the Ezra Meeker mansion in Puyallup

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) The appropriation shall be matched by at least $((200,000)) 100,000 provided from the Ezra Meeker Historical Society for land acquisition and development.

     (b) ((None of the appropriation may be spent until the Ezra Meeker Historical Society demonstrates to the satisfaction of the department that it will be able to raise $200,000 through pledges and contributions.

     (c))) The department shall consult with the Washington State Historical Society before expending any portion of this appropriation.

 

           Appropriation:

               St Bldg Constr Acct................. $     200,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     200,000

 

(34)Almira and Coulee-Hartline school districts:  To make improvements to the Coulee-Hartline facility needed for a cooperative high school program with the Almira school district

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) No moneys may be expended until the boards of directors of the two school districts have provided to the department written confirmation that the moneys will be used solely to upgrade the Hartline facility for the purpose of implementing a cooperative high school district under chapter 28A.340 RCW;

     (b) The appropriation shall be matched by at least $100,000 provided by the Almira and Coulee-Hartline school districts for capital costs of the project.

 

           Appropriation:

               St Bldg Constr Acct................. $     240,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     240,000

 

(35)Yakima criminal justice facility:  For a grant to the city of Yakima for the construction of a new criminal justice facility

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) Before receiving the grant, the city shall demonstrate to the satisfaction of the department an ability to complete the construction of the facility and fund its operation.

     (b) The grant may not exceed sixty-six percent of the total project capital costs as determined by the department.  The remaining portion of project capital costs shall be a match provided from nonstate sources.

 

           Appropriation:

               St Bldg Constr Acct................. $   3,000,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $   3,000,000

 

(36)Bonney Lake Park:  For a grant to the city of Bonney Lake for the acquisition and development of such facilities as it deems necessary for a park at Bonney Lake

 

     The appropriation in this subsection shall be matched by at least $35,000 from nonstate sources provided for the same purpose.

 

           Appropriation:

               St Bldg Constr Acct................. $      35,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $      35,000

 

(37)Snohomish county drainage district number 6:  To purchase drainage district number 6 and construct a cross-levee on it, in order to decrease damaging flooding of adjacent lands and to reestablish wetlands

 

     The appropriation in this subsection shall be matched by at least $585,000 provided from nonstate sources for capital costs of this project.

 

           Appropriation:

               St Bldg Constr Acct................. $     350,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     350,000

 

(38)Tears of Joy Theatre:  For construction of an international puppetry center in Vancouver

 

     The appropriation in this subsection shall be matched by at least $1,950,000 from nonstate sources provided for capital costs of the project.  The match may include cash, land value, and other in-kind contributions.

 

           Appropriation:

               St Bldg Constr Acct................. $   1,950,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $   1,950,000

 

(39)Flood control structures:  Repair of damage from November 1990 floods

 

     The appropriation in this subsection is provided solely for the local share of matching funds required for federal assistance to repair flood control structures damaged in the November 1990 floods.  Local government jurisdictions in the following counties may receive up to 36.5% of the required local match, or the amount listed below, whichever is less:

 

     Chelan county       $ .................... 48,707

     Clallam county         .................... 7,954

     Grays Harbor county    2,755

     Island county            656

     Jefferson county       4,647

     King county          209,337

     Kitsap county          9,737

     Kittitas county       30,914

     Lewis county          14,802

     Mason county           1,732

     Pacific county         3,528

     Pierce county         65,671

     San Juan county          492

     Skagit county        416,903

     Snohomish county     188,005

     Whatcom county       229,160

 

     TOTAL              1,235,000

 

           Appropriation:

               St Bldg Constr Acct................. $   1,235,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $   1,235,000

 

(40) Fire Training Center:  For emergency repairs (93-2-001)

 

           Appropriation:

               St Bldg Constr Acct................. $      50,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $      50,000

 

(41)Columbia River Renaissance:  For a grant to the city of Vancouver to provide public access, park, and trails along the Columbia river

 

     The appropriation in this subsection shall be matched by an equal amount of money from nonstate sources for the same purpose.

 

           Appropriation:

               St Bldg Constr Acct................. $   1,800,000

 

           Prior Biennia (Expenditures)............. $     100,000

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   1,900,000

 

(42)Pacific Science Center:  For building renovation and repairs and for acquisition and renovation of exhibits

 

     Each dollar expended from the appropriation in this subsection shall be matched by at least three dollars from nonstate sources expended for the same purpose.

 

           Appropriation:

               St Bldg Constr Acct................. $   1,061,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   1,061,000

 

(43)Tri-Cities Trade, Recreation and Agriculture Center

 

     The appropriation in this subsection may be used only for capital development of an arena multi-purpose facility and adjacent recreation space in the city of Pasco.  This appropriation shall be matched by at least one million eight hundred thousand dollars provided from nonstate sources.

 

           Appropriation:

               St Bldg Constr Acct................. $   1,800,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   1,800,000

 

(44)Whatcom Museum:  For building and exhibit acquisition, repair, and renovation

 

     Expenditures from the appropriation in this subsection shall not exceed fifteen percent of the total estimated capital costs of the project. The remaining portions of the project costs shall be a match from nonstate sources.  The match may include cash and land value received after January 1, 1990.

 

           Appropriation:

               St Bldg Constr Acct................. $     300,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     300,000

 

(45)Martin Luther King Jr. Memorial:  For development of a public park around the memorial in Seattle.  Development includes but is not limited to street curbs, sidewalks, lighting, a parking lot, and landscaping

 

     Each dollar expended from the appropriation in this subsection shall be matched by at least one dollar from other sources expended for the same purpose.

 

           Appropriation:

               St Bldg Constr Acct................. $     100,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     100,000

 

(46)Challenger Learning Center -- Museum of Flight

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) The appropriation is provided solely for support of science education at the Challenger learning center at the museum of flight; and

     (b) Each dollar expended from the appropriation in this subsection shall be matched by at least one dollar from nonstate sources for the same purpose.

 

           Appropriation:

               St Bldg Constr Acct................. $     800,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     800,000

 

(47)Science Hall, Washington State Constitutional Convention site in Walla Walla

 

     The appropriation in this subsection is provided solely for a grant to the Downtown Walla Walla Foundation for facade restoration and preservation of Science Hall, the site of the 1878 constitutional convention.  The appropriation in this subsection shall be matched by an equal amount of nonstate moneys.

 

           Appropriation:

               St Bldg Constr Acct................. $      75,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     75,000"

 

    "NEW SECTION.  Sec. 6.  A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:

    (1) The department of community development shall issue grants to counties from moneys transferred to the department from the department of ecology under section 12(11) of this act to implement a property owner wetland notification program based on existing or upgraded wetland maps.  Counties shall be eligible for these grant funds if they agree to provide notice by mail, either prior to the adoption of regulations adopted pursuant to RCW 36.70A.060 or prior to the final adoption of regulations under RCW 36.70A.120, to property owners that can reasonably be determined by the maps to be affected by the wetland regulations.  Adequate notification shall be provided to other interested persons affected by these regulations.  Grants shall be issued so as to maximize county participation and notification.

    (2) The department of community development shall develop, in consultation with county assessors and the department of revenue, recommended guidelines for valuing property affected by development regulations protecting critical areas.  The department shall convene a task force including, but not limited to, assessors, property owners, technical experts, and local government officials to develop these guidelines and to provide recommendations for better coordination of land-use information and property tax administration.  County assessors are encouraged to use the guidelines in the next property revaluation.  $25,000 of the moneys transferred to the department of community development from the department of ecology under section 12(11) of this act may be used for the purpose of this subsection (2)."

 

    "NEW SECTION.  Sec. 7.  A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:

 

FOR THE DEPARTMENT OF LABOR AND INDUSTRIES

 

(1)Child care center:  For planning and design of a child care facility for state employees (93‑5‑005)

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) The appropriation shall not be expended until the site has been recommended by the capitol campus design advisory committee and approved by the state capitol committee; and

     (b) The operations of the child care facility shall be managed by the state employees who will utilize the facility.

 

           Appropriation:

               St Bldg Constr Acct................. $      70,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $     830,000

                                                       -----------

                    TOTAL........................... $    900,000"

 

    "Sec. 8.  1991 sp.s. c 14 s 13 (uncodified) is amended to read as follows:

 

FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES


(1) Rainier:  Renovate Evergreen Center (79‑1‑017)

 

           Reappropriation:

               St Bldg Constr Acct................. $     200,000

               DSHS Constr Acct.................... $     119,477

                                                     -------------

                    Subtotal Reappropriation........ $     319,477

 

           Prior Biennia (Expenditures)............. $   4,230,523

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   4,550,000

 

(2) Referendum 37:  For handicapped facilities construction pursuant to chapter 43.99C RCW (79‑3‑001)

 

     $9,529 of the appropriation may be used by Yakima county for improvements at the Community Center for the Deaf to permit increased service level to handicapped clients.  This amount may be expended only if the final application for the project is submitted to the department by December 31, 1991, and approved by March 31, 1992.

 

           Reappropriation:

               ((Hndcp Fac Constr Acct............. $   253,531))

               St Bldg Constr Acct................. $      88,556

 

           Prior Biennia (Expenditures)............. $      33,371

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $ ((286,902))

                                                           121,927

 

(3) Child study center:  Construct high school on the grounds of Western State Hospital (88‑1‑318)

 

           Reappropriation:

               St Bldg Constr Acct................. $     130,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     130,000

 

(4) Western State Hospital:  Sanitary sewer (88‑2‑400)

 

           Reappropriation:

               St Bldg Constr Acct................. $     200,000

 

           Prior Biennia (Expenditures)............. $   2,109,238

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   2,309,238

 

(5) Echo Glen:  Renovate eleven living units at Echo Glen Children's Center (90‑1‑210)

 

           Reappropriation:

               St Bldg Constr Acct................. $   2,600,000

 

           Prior Biennia (Expenditures)............. $     364,000

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   2,964,000

 

(6) Emergency capital repairs (90‑1‑007)

 

           Reappropriation:

               CEP & RI Acct....................... $      25,000

 

           Prior Biennia (Expenditures)............. $     444,578

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     469,578

 

(7) Western State Hospital:  Ward renovations, phase 4 (90‑1‑312)

 

           Reappropriation:

               St Bldg Constr Acct................. $   6,000,000

 

           Prior Biennia (Expenditures)............. $     192,000

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   6,192,000

 

(8) Eastern State Hospital:  Ward renovations, phase 2 (90‑1‑339)

 

           Reappropriation:

               St Bldg Constr Acct................. $ ((2,000,000))

                                                           467,784

 

           Prior Biennia (Expenditures)............. $   2,510,400

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $ ((4,510,400))

                                                         2,978,184

 

(9) Minor capital renewal:  Utilities and facilities (90‑2‑001), roads and grounds (90‑2‑002), roofs (90‑2‑003), fire and safety (90‑1‑004), and hazardous substances (90‑1‑005)

 

           Reappropriation:

               CEP & RI Acct....................... $     850,000

               St Bldg Constr Acct................. $     450,000

                                                     -------------

                    Subtotal Reappropriation........ $   1,300,000

 

           Prior Biennia (Expenditures)............. $   2,633,393

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   4,733,725

 

(10)Small repairs and improvements (90‑2‑008)

 

           Reappropriation:

               CEP & RI Acct....................... $      50,000

 

           Prior Biennia (Expenditures)............. $     140,000

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     190,000

 

(11)Minor projects:  Bureau of alcohol (90‑2‑010)

 

           Reappropriation:

               CEP & RI Acct....................... $     350,000

 

           Prior Biennia (Expenditures)............. $      92,400

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     442,400

 

(12)Minor projects:  Juvenile rehabilitation division (90‑2‑020)

 

           Reappropriation:

               CEP & RI Acct....................... $     200,000

               St Bldg Constr Acct................. $      25,000

                                                     -------------

                    Subtotal Reappropriation........ $     225,000

 

           Prior Biennia (Expenditures)............. $     285,781

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     510,781

 

(13)Minor projects:  Mental health division (90‑2‑030) and (90‑2‑032)

 

           Reappropriation:

               St Bldg Constr Acct................. $     200,000

               CEP & RI Acct....................... $      65,000

                                                     -------------

                    Subtotal Appropriation.......... $     265,000

 

           Prior Biennia (Expenditures)............. $     460,000

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     725,000

 

(14)Snohomish county:  Mental health evaluation and treatment facility (90‑2‑033)

 

     The reappropriation in this subsection is subject to the following conditions and limitations:

     (a) The reappropriation is provided solely for a mental health evaluation and treatment facility in Snohomish county.

     (b) No moneys from the reappropriation may be expended until the department enters into an agreement with Snohomish county or a group of counties for the facility.  The payments under the agreement shall be either at least equal to the facility component of the state average rate‑per‑patient day paid by the department to community mental health providers for comparable services, or at least equal to the amount of this reappropriation amortized over fifteen years.

     (c) No moneys from the reappropriation may be expended before adoption of a plan to provide mental health services through a regional  support network as required by chapter 205, Laws of 1989.

     (d) Other counties or regions that adopt plans for mental health services as required by chapter 205, Laws of 1989, shall be eligible for application to the state for future evaluation and treatment facility moneys under the same conditions as are provided in subsections (a) and (b) of this subsection, as long as no applicant receives appropriated moneys from state sources exceeding one million dollars.

 

           Reappropriation:

               St Bldg Constr Acct................. $     800,000

 

           Prior Biennia (Expenditures)............. $     200,000

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   1,000,000

 

(15)Minor projects:  Developmental disabilities division (90‑2‑040)

 

           Reappropriation:

               St Bldg Constr Acct................. $     250,000

 

           Prior Biennia (Expenditures)............. $     484,222

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     734,222

 

(16)Minor capital renewal, mental health (90‑2‑060)

 

           Reappropriation:

               St Bldg Constr Acct................. $     500,000

 

           Prior Biennia (Expenditures)............. $     500,000

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   1,000,000

 

(17)Child care facilities (90‑2‑300)

 

           Reappropriation:

               St Bldg Constr Acct................. $     350,000

 

           Prior Biennia (Expenditures)............. $     250,000

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     600,000

 

(18)Eastern State:  Electrical distribution system (90‑2‑345)

 

           Reappropriation:

               St Bldg Constr Acct................. $     600,000

 

           Prior Biennia (Expenditures)............. $     771,600

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   1,371,600

 

(19)Lakeland Village:  Steam plant replacement (90‑2‑425)

 

           Reappropriation:

               St Bldg Constr Acct................. $   3,000,000

 

           Prior Biennia (Expenditures)............. $   1,063,000

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   4,063,000

 

(20)Preplanning (90‑4‑009)

 

     The new appropriation in this subsection is provided solely for preplanning activities for the Administration Building at Lakeland Village, the security housing and treatment unit at Green Hill, and the vocational educational and administration buildings at Maple Lane.

 

 

           Reappropriation:

               CEP & RI Acct....................... $      50,000

           Appropriation:

               CEP & RI Acct....................... $     273,300

 

           Prior Biennia (Expenditures)............. $     141,400

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     464,700

 

(21)Maple Lane:  To add twenty-four new level 2 security beds (90‑5‑001)

 

           Reappropriation:

               St Bldg Constr Acct................. $   1,100,000

 

           Prior Biennia (Expenditures)............. $     156,000

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   1,256,000

 

(22)Echo Glen:  ((Perimeter fence)) Security improvements (90‑5‑002)

 

           Reappropriation:

               St Bldg Constr Acct................. $ ((850,000))

                                                           500,000

 

           Prior Biennia (Expenditures)............. $     106,000

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $ ((956,000))

                                                           606,000

 

(23)Fircrest:  Food bank facility (90‑5‑011)

 

           Reappropriation:

               St Bldg Constr Acct................. $     700,000

 

           Prior Biennia (Expenditures)............. $      88,000

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     788,000

 

(24)Minor capital renewal fire safety (92‑1‑004), utilities and facilities (92‑2‑001), roads and grounds (92‑2‑002), and roofs (92‑2‑003)

 

           Appropriation:

               CEP & RI Acct....................... $   3,284,000     

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $   7,136,000

                                                     -------------

                    TOTAL........................... $  10,420,000

 

(25)Environmental:  For minor works projects, including asbestos abatement, PCBs and other hazardous substances, and for planning functions pertaining to environmental/capital proposals (92‑1‑005)

 

           Appropriation:

               CEP & RI Acct....................... $     359,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $     664,000

                                                     -------------

                    TOTAL........................... $   1,023,000

 

(26)Emergency and unanticipated projects:  For emergency and unanticipated repairs to equipment, facilities, and infrastructures at state institutions (92‑1‑007)

 

           Appropriation:

               CEP & RI Acct....................... $     250,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $     538,100

                                                     -------------

                    TOTAL........................... $     788,100

 

(27)Underground storage tanks:  To test, replace, and/or remove underground storage tanks state-wide (92‑1‑060)

 

           Appropriation:

               CEP & RI Acct....................... $     145,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $     618,000

                                                     -------------

                    TOTAL........................... $     673,000

 

(28)Western State Hospital:  To complete phase 5 of 7 phases, including ward renovations, hospital administration and support spaces, and patient treatment areas (92‑1‑314)

 

     The appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St Bldg Constr Acct................. $  13,669,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $  13,669,000

 

(29)Eastern State Hospital:  To complete phase 3 of 5 phases, including ward treatment areas, hospital support space, and necessary utilities (92‑1‑340)

 

     The appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St Bldg Constr Acct................. $   7,578,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   7,578,000

 

(30)Small works:  For miscellaneous projects under $25,000 each at the various institutions (92‑2‑008)

 

           Appropriation:

               CEP & RI Acct....................... $     192,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $     430,500

                                                     -------------

                    TOTAL........................... $     622,500

 

(31)Minor projects, alcohol and substance abuse division:  For miscellaneous minor repairs, safety, and electrical repairs at Northern State Hospital (92‑2‑010)

 

           Appropriation:

               CEP & RI Acct....................... $     300,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     300,000

 

(32)Minor projects, juvenile rehabilitation division:  For the upgrade of the water supply, sewer treatment, and security (92‑2‑020)

 

           Appropriation:

               CEP & RI Acct....................... $     957,500

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $   1,849,731

                                                     -------------

                    TOTAL........................... $   2,807,231

 

(33)Minor projects, mental health division:  For minor projects including storm sewer, electrical system, air conditioning, food distribution system, loading dock cover, and new parking lots at Western State Hospital; administration renovation, window security screens, outdoor recreation restrooms at Eastern State Hospital; cemetery fence and kitchen improvements at the Portal facility (92‑2‑030)

 

           Appropriation:

               CEP & RI Acct....................... $   1,317,200

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $   2,656,600

                                                     -------------

                    TOTAL........................... $   3,973,800

 

(34)Minor projects, developmental disabilities division:  For minor projects, including the "Y" Building renovation at Fircrest; replacement of living unit floors at Lakeland Village, a state-wide facilities and land use plan; renovation of bathroom and kitchen floors at Rainier School; and added support space and playground expansion at Yakima Valley School (92‑2‑040)

 

           Appropriation:

               CEP & RI Acct....................... $     912,400

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $   1,472,000

                                                     -------------

                    TOTAL........................... $   2,384,400

 

(35)Maple Lane:  To add sixty-four new level 1 security beds (92‑2‑225)

 

     The appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St Bldg Constr Acct................. $   6,715,800

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   6,715,800

 

(36)Maple Lane:  To add forty-seven new level 2 security beds (92‑2‑230)

 

     The appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St Bldg Constr Acct................. $   3,107,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   3,107,000

 

(37)Child study:  For construction of a new education ((center (high school))) facility (primary and secondary) at the child study and treatment center (92‑2‑319)

 

           Appropriation:

               St Bldg Constr Acct................. $ ((2,642,300))

                                                         4,442,300

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $ ((2,642,300))

                                                         4,442,300

 

(38)Maintenance management:  For completion of the maintenance management system at Medical Lake and Olympia (92‑3‑050)

 

           Appropriation:

               CEP & RI Acct....................... $     292,800

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $     473,500

                                                     -------------

                    TOTAL........................... $     766,300

 

(39)Resource conservation:  For energy and water conservation projects (92‑4‑006)

 

           Appropriation:

               CEP & RI Acct....................... $     561,100

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $     442,600

                                                     -------------

                    TOTAL........................... $   1,003,700

 

(40)Child care facilities for state employees, including higher education employees (92‑4‑050)

 

     The appropriation in this subsection is subject to the following conditions and limitations:  The department shall report to the appropriate committees of the legislature by January 1, 1993, on grant guidelines which encourage proposals that provide for management oversight of a child care facility by the state employees who will utilize the facility.  Nothing in this subsection shall be construed to imply, or commit the state to, any liability for the acts or omissions of the state employees who provide management oversight at the facilities.

 

           Appropriation:

               St Bldg Constr Acct................. $   2,500,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   2,500,000

 

(41)Washington Institute for Mental Illness Research at Western State Hospital

 

           Appropriation:

               CEP & RI Acct....................... $     700,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $    700,000"

 

    "NEW SECTION.  Sec. 9.  A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:

    The provision of social and health services by a private nonprofit corporation operating in any county containing a population greater than forty thousand and less than seventy thousand people for an extended period of time constitutes consideration by the private nonprofit corporation acquiring property or property interests owned by a county, which property or property interests were acquired in whole or in part from money appropriated and authorized by chapter 43.83D RCW, if the property will be used for the provision of the social and health services."

 

    "NEW SECTION.  Sec. 10.  A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:

FOR THE DEPARTMENT OF VETERANS' AFFAIRS


 

(1)Alzheimer unit:  Design and remodel one wing of the Washington soldier's home for proper care and supervision of Alzheimer patients (93-2-001)

 

           Appropriation:

               St Bldg Constr Acct............... $...... 126,445

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 126,445

 

(2)Korean War memorial:  To build and erect a Korean War memorial on the capitol campus

 

     Expenditure of the appropriation in this subsection is contingent on a match of at least $200,000 from nonstate sources for the same purpose.

 

           Appropriation:

               St Bldg Constr Acct............... $....... 50,000

 

           Prior Biennia (Expenditures)........... $....... 25,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 75,000"


 

    "Sec. 11.  1991 sp.s. c 14 s 16 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS


     The appropriations in this section are subject to the following condition and limitation:  The department shall, to the extent possible, employ inmate labor in the construction of projects where such employment use will save money.

 

(1) Washington State Reformatory:  Continuation of cellblock renovations, and expansion of the industries and production areas and the gym (83‑3‑048)

 

     The new appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 1,800,000

           Appropriation:

               St Bldg Constr Acct............... $.... 9,687,000

 

           Prior Biennia (Expenditures)........... $... 19,513,213

           Future Biennia (Projected Costs)....... $.... 9,281,500

                                                     -------------

                    TOTAL......................... $... 40,281,713

 

(2) Washington State Penitentiary:  For improving security facilities and utilities (83‑3‑052)

 

     The new appropriation in this subsection is provided solely to renovate perimeter walls and towers.

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 1,300,000

           Appropriation:

               St Bldg Constr Acct............... $.... 1,609,000

 

           Prior Biennia (Expenditures)........... $... 11,536,721

           Future Biennia (Projected Costs)....... $.... 4,274,000

                                                     -------------

                    TOTAL......................... $... 18,719,721

 

(3) McNeil Island Corrections Center:  For replacement of water mains; installation of new telephone switch gear; purchase of an underwater power cable for emergency use; replacement of overhead power lines and poles; and projects related to regulation of the landfill (86‑1‑002)

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 4,800,000

           Appropriation:

               St Bldg Constr Acct............... $.... 3,230,500

 

           Prior Biennia (Expenditures)........... $.... 2,084,319

           Future Biennia (Projected Costs)....... $.... 4,780,000

                                                     -------------

                    TOTAL......................... $... 14,894,819

 

(4) McNeil Island Corrections Center: For repairs of roads and sea walls (86‑1‑004)

 

           Reappropriation:

               St Bldg Constr Acct............... $...... 700,000

           Appropriation:

               St Bldg Constr Acct............... $.... 1,922,500

 

           Prior Biennia (Expenditures)........... $.... 5,400,879

           Future Biennia (Projected Costs)....... $.... 3,737,000

                                                     -------------

                    TOTAL......................... $... 11,760,379

 

(5) McNeil Island Corrections Center:  For repair of island homes, replacement of the emergency generator, and fire and safety improvements to institutional buildings (86‑1‑008)

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 2,100,000

           Appropriation:

               St Bldg Constr Acct............... $.... 2,040,000

 

           Prior Biennia (Expenditures)........... $.... 6,084,008

           Future Biennia (Projected Costs)....... $.... 3,805,000

                                                     -------------

                    TOTAL......................... $... 14,029,008

 

(6) State-wide wastewater system improvements:  For improvements to the laboratory at the wastewater facilities at the Monroe Reformatory; for upgrades of the sewage pumping system at Twin rivers Correctional Center; and for renovation of sewer lines at several facilities (88‑1‑017)

 

           Reappropriation:

               St Bldg Constr Acct............... $...... 450,000

           Appropriation:

               St Bldg Constr Acct............... $.... 2,298,000

 

           Prior Biennia (Expenditures)........... $...... 863,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 3,611,000

 

(7) State-wide water system improvements:  To construct a new 120,000-gallon reservoir at Twin rivers Correctional Center; to upgrade storage tanks at the Washington Correctional Center at Shelton and the Larch Correctional Center; to drill a new well at Clearwater/Olympic Correctional Center; to increase reservoir capacity at Cedar Creek Correctional Center; and to upgrade water treatment and storage at the Washington State Reformatory Honor Farm (88‑1‑018)

 

           Reappropriation:

               St Bldg Constr Acct............... $...... 900,000

           Appropriation:

               St Bldg Constr Acct............... $.... 1,731,000

 

           Prior Biennia (Expenditures)........... $...... 461,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 3,092,000

 

(8) McNeil Island Corrections Center:  Continue major renovation and expansion of the McNeil Island Correction Center (88‑2‑003)

 

     The new appropriation in this subsection shall be not expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Reappropriation:

               St Bldg Constr Acct............... $... 27,000,000

           Appropriation:

               St Bldg Constr Acct............... $... 37,126,000

 

           Prior Biennia (Expenditures)........... $.... 5,012,222

           Future Biennia (Projected Costs)....... $... 12,708,000

                                                     -------------

                    TOTAL......................... $... 81,846,222

 

(9) Work and training release relocation and expansion:  To relocate and expand the work release facility currently located at Western State Hospital

 

     No portion of this appropriation may be expended to purchase land until the department conducts a life-cycle cost analysis for the operating and capital costs of a facility to be located on the land and reports the results of the analysis to the fiscal committees of the legislature.

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 4,000,000

 

           Prior Biennia (Expenditures)........... $...... 415,400

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 4,415,400

 

(10)Washington Corrections Center for Women:  For major renovation of existing facilities, including construction of thirty-bed special needs unit and addition of one hundred beds (88‑2‑006)

 

     The new appropriation in this subsection shall be not expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Reappropriation:

               St Bldg Constr Acct............... $...... 900,000

           Appropriation:

               St Bldg Constr Acct............... $ ((3,388,000))

                                                        11,097,000

 

           Prior Biennia (Expenditures)........... $...... 715,000

           Future Biennia (Projected Costs)....... $ ((7,709,000))

                                                                 0

                                                     -------------

                    TOTAL......................... $... 12,712,000

 

(11)Hazardous materials management (90‑1‑004)

 

           Reappropriation:

               St Bldg Constr Acct............... $...... 200,000

 

           Prior Biennia (Expenditures)........... $....... 79,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 279,000

 

(12)Washington Corrections Center/Washington Corrections Center for Women:  Perimeter security upgrade (90‑1‑007)

 

           Reappropriation:

               St Bldg Constr Acct............... $...... 600,000

 

           Prior Biennia (Expenditures)........... $.... 1,052,000

           Future Biennia (Projected Costs)....... $.... 1,183,000

                                                     -------------

                    TOTAL......................... $.... 2,835,000

 

(13)State-wide minor projects (90‑1‑009)

 

           Reappropriation:

               CEP & RI Acct..................... $...... 900,000

               St Bldg Constr Acct............... $.... 2,700,000

                                                     -------------

               Subtotal Reappropriation.......... $.    2,200,000

 

           Prior Biennia (Expenditures)........... $.... 1,749,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 5,349,000

 

(14)State-wide small repairs and improvements (90‑1‑010)

 

           Reappropriation:

               St Bldg Constr Acct............... $...... 300,000

 

           Prior Biennia (Expenditures)........... $...... 456,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 756,000

 

(15)State-wide emergency repair projects (90‑1‑013)

 

           Reappropriation:

               CEP & RI Acct..................... $...... 150,000

           Appropriation:

               CEP & RI Acct..................... $...... 750,000

 

           Prior Biennia (Expenditures)........... $...... 600,000

           Future Biennia (Projected Costs)....... $...... 750,000

                                                     -------------

                    TOTAL......................... $.... 2,250,000

 

(16)New facilities:  To design and construct a new 1,024-bed medium-security prison, and four minimum-security correctional facilities, for a total of 2,424 new beds (90‑2‑001)

 

     The appropriations in this subsection are subject to the following conditions and limitations:

     (a) The new appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

     (b) $10,045,000 is provided solely to construct a 300-bed correctional camp at the Dayton site.

 

           Reappropriation:

               St Bldg Constr Acct............... $... 51,550,000

               ((Drug Enf & Ed Acct.............. $.... 5,900,000

                                                     -------------

                    Subtotal Reappropriation...... $. 57,450,000))

 

           Appropriation:

               St Bldg Constr Acct............... $ ((96,036,000))

                                                       101,936,000

 

           Prior Biennia (Expenditures)........... $.... 3,038,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.. 156,524,000

 

(17)Washington State Penitentiary:  For minimum security unit double bunking (90‑2‑003)

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 1,050,000

 

           Prior Biennia (Expenditures)........... $...... 160,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,210,000

 

(18)Twin rivers Corrections Center:  Double bunking (90‑2‑004)

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 2,500,000

 

           Prior Biennia (Expenditures)........... $...... 481,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 2,981,000

 

(19)Washington State Penitentiary:  Medium-security complex double bunking (90‑2‑005)

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 1,000,000

 

           Prior Biennia (Expenditures)........... $...... 128,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,128,000

 

(20)Clearwater/Olympic Corrections Center:  100‑bed expansion (90‑2‑006)

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 1,200,000

 

           Prior Biennia (Expenditures)........... $...... 538,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,738,000

 

(21)Cedar Creek Corrections Center:  100‑bed expansion (90‑2‑007)

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 1,450,000

 

           Prior Biennia (Expenditures)........... $...... 187,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,637,000

 

(22)Washington State Penitentiary:  Expand medium-security complex industries building (90‑2‑016)

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 1,100,000

 

           Prior Biennia (Expenditures)........... $...... 113,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                     TOTAL......................... $.... 1,213,000

 

(23)State-wide roof repair:  For reroofing projects at the Corrections Center at Shelton, Cedar Creek Corrections Center, Indian Ridge Corrections Center, Clearwater/Olympic Corrections Center, Monroe Reformatory, and the Treatment Center for Women at Purdy facilities (90‑3‑011)

 

           Reappropriation:

               St Bldg Constr Acct............... $...... 150,000

           Appropriation:

               St Bldg Constr Acct............... $.... 2,631,000

 

           Prior Biennia (Expenditures)........... $.... 1,350,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 4,131,000

 

(24)Clallam Bay Corrections Center:  To expand program space and add three hundred forty-nine beds (90‑5‑026)

 

           Reappropriation:

               St Bldg Constr Acct............... $... 23,000,000

 

           Prior Biennia (Expenditures)........... $.... 2,301,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 25,301,000

 

(25)Camp labor pool funds (90‑5‑031)

 

     Moneys from the reappropriation in this subsection shall made available to the department for expanded capacity projects in the event inmate labor cannot be employed.

 

           Reappropriation:

               St Bldg Constr Acct............... $...... 229,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 229,000

 

(26)Underground storage tanks:  To test, replace, and/or remove underground storage tanks state-wide (92‑1‑002)

 

           Appropriation:

               St Bldg Constr Acct............... $...... 300,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $.... 1,000,000

                                                     -------------

                    TOTAL......................... $.... 1,300,000

 

(27)State-wide minor projects:  For projects less than $500,000 pertaining to life safety/code compliance, property protection, or essential program support (92‑1‑012)

 

           Appropriation:

               St Bldg Constr Acct............... $.... 7,500,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $.... 4,976,000

                                                     -------------

                    TOTAL......................... $... 12,476,000

 

(28)State-wide small repairs and improvements:  For miscellaneous state-wide projects, each under $25,000 (92‑1‑013)

 

           Appropriation:

               St Bldg Constr Acct............... $...... 497,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 497,000

 

(29)Washington Corrections Center:  To retrofit the boiler at Shelton (92‑1‑026)

 

     In retrofitting the boiler, the department shall consider using wood pellets or natural gas, whichever is the more economically competitive, as the primary fuel source for the boiler.

 

           Appropriation:

               St Bldg Constr Acct............... $.... 2,164,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 2,164,000

 

(30)Washington State Penitentiary:  To add space for recreation, legal libraries, medical/dental unit, property and a clothing room at medium-security facilities (92‑2‑021)

 

           Appropriation:

               St Bldg Constr Acct............... $.... 1,443,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,443,000

 

(31)Washington State Penitentiary:  To add space to the current gym, and upgrade systems for heating, ventilation, and air conditioning, fire protection, lighting, and electricity (92‑2‑022)

 

           Appropriation:

               St Bldg Constr Acct............... $...... 888,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 888,000

 

(32)Washington Corrections Center:  For installation of a new underground steam distribution/condensation return system (92‑2‑028)

 

           Appropriation:

               St Bldg Constr Acct............... $...... 729,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 729,000

 

(33)Washington State Reformatory:  For initiation of a feasibility study for relocation of program and living space at the honor farm (92‑2‑029)

 

           Appropriation:

               St Bldg Constr Acct............... $...... 230,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $.... 1,000,000

                                                     -------------

                    TOTAL......................... $.... 1,230,000

 

(34)Washington State Reformatory:  Restoration and repair of perimeter walls (92‑2‑031)

 

           Appropriation:

               St Bldg Constr Acct............... $.... 1,084,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,084,000

 

(35)Pilot preventive maintenance program:  For computer hardware and software for a computer-based preventative maintenance system (92‑4‑033)

 

     The appropriation in this subsection is subject to the following conditions and limitations:  The department of corrections shall, every six months, submit a progress report on this project to the department of general administration, the office of financial management, the senate committee on ways and means, and the house of representatives committee on capital facilities and financing.

 

           Appropriation:

               St Bldg Constr Acct............... $...... 325,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 325,000

 

(36)Cedar Creek Corrections Center upgrade:  Core facilities improvements and dormitory expansion (92‑2‑024)

 

           Appropriation:

               St Bldg Constr Acct............... $.... 1,426,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,426,000

 

(37)Mental health planning:  The department shall develop a facility plan for a mental health delivery system including outpatient treatment, short-term crisis beds, and acute long-term inpatient facilities.  The plan shall maximize outpatient and short-term crisis beds where appropriate through the utilization of current capacity including utilization of infirmary beds as short-term mental health crisis observation beds.  Plans for new long-term inpatient capacity shall supplement and not replace existing capacity at the Special Offender Center in Monroe (93-2-035)

 

           Appropriation:

               St Bldg Constr Acct............... $...... 200,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 200,000

 

(38)Land acquisition:  To acquire a purchase option on land adjacent to the Coyote Ridge Corrections Center (93-2-036)

 

           Appropriation:

               St Bldg Constr Acct............... $....... 24,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $.... 2,500,000

                                                     -------------

                    TOTAL......................... $... 2,524,000"

 

 

 

                           (End of part)


 

 

                              "PART 3

                        NATURAL RESOURCES"

 

    "Sec. 12.  1991 sp.s. c 14 s 18 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF ECOLOGY


(1) Referendum 26:  Waste disposal facilities (74‑5‑004)

 

           Reappropriation:

               LIRA, Waste Disp Fac.............. $... 15,660,673

 

           Prior Biennia (Expenditures)........... $.... 8,093,028

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 23,753,701

 

(2) Referendum 38:  Water supply facilities (74‑5‑006)

 

           Reappropriation:

               LIRA, Water Sup Fac............... $... 26,744,618

 

           Prior Biennia (Expenditures)........... $.... 2,466,576

           Future Biennia (Projected Costs)....... $... 29,763,000

                                                     -------------

                    TOTAL......................... $... 58,974,194

 

(3) State emergency water project revolving account (76‑5‑003)

 

           Reappropriation:

               Emergency Water Proj.............. $.... 7,599,337

           Appropriation:

               Emergency Water Proj.............. $.... 1,343,929

 

           Prior Biennia (Expenditures)........... $... 16,586,284

           Future Biennia (Projected Costs)....... $...... 224,761

                                                     -------------

                    TOTAL......................... $... 25,754,311

 

(4) Referendum 39:  Waste disposal facilities 1980 bond issue (82‑5‑005)

 

     No expenditure from the reappropriation  in this subsection shall be made for any grant valued over fifty million dollars to a city or county for solid waste disposal facilities unless the following conditions are met:

     (a) The city or county agrees to comply with all the terms of the grant contract between the city or county and the department of ecology;

     (b) The city or county agrees to implement curbside collection of recyclable materials as prescribed in the grant contract; and

     (c) The city or county does not begin actual construction of the solid waste disposal facility until it has obtained a permit for prevention of significant deterioration as required by the federal clean air act.

 

           Reappropriation:

               LIRA, Waste Disp Fac 1980......... $ ((61,598,000))

                                                        60,012,180

 

           Prior Biennia (Expenditures)........... $.. 401,402,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $ ((463,000,000))

                                                       461,414,180

 

(5) Water quality account (86‑5‑007)

 

     The appropriations in this subsection are subject to the following conditions and limitations:

     (a) In awarding grants, extending grant payments, or making loans from these appropriations for facilities that discharge directly into marine waters, the department shall:

     (i) Give first priority to secondary wastewater treatment facilities that are mandated by both federal and state law;

     (ii) Give second priority to projects that reduce combined sewer overflows; and

     (iii) Encourage economies that are derived from any simultaneous projects that achieve the purposes of both (a) and (b) of this subsection.

     (b) The following limitations shall apply to the department's total distribution of funds appropriated under this section:

     (i) Not more than fifty percent for water pollution control facilities that discharge directly into marine waters;

     (ii) Not more than twenty percent for water pollution control activities that prevent or mitigate pollution of underground waters and facilities that protect federally designated sole source aquifers with at least two-thirds for the Spokane-Rathdrum Prairie aquifer;

     (iii) Not more than ten percent for water pollution control activities that protect freshwater lakes and rivers including but not limited to Lake Chelan and the Yakima and Columbia rivers;

     (iv) Not more than ten percent for activities that control nonpoint source water pollution;

     (v) Ten percent and such sums as may be remaining from the categories specified in (i) through (iv) of this subsection for water pollution control activities or facilities as determined by the department.

     (c) In determining compliance schedules for the greatest reasonable reduction of combined sewer overflows, the department shall consider the amount of grant or loan moneys available to assist local governments in the planning, design, acquisition, construction, and improvement of combined sewer overflow facilities.

     (d) $330,000 of the water quality account appropriation is provided solely for the department to evaluate water quality, solid and hazardous waste, and toxics cleanup needs of the state.  The amount provided in this subsection represents the water quality account share of funding the evaluation.  The department shall include in the evaluation information regarding existing needs and recommendations on how to address those needs within existing state financial assistance programs.  The evaluation shall include options that rely solely on existing tax sources.  The department shall also evaluate long-range financial options, including a greater reliance on loans, which take into account local financial resources.  The evaluation shall be done in coordination with the state agency coordinating council established in Engrossed Substitute House Bill No. 1025 (Growth Management Strategies).  If the bill is not enacted by July 31, 1991, the director of the department shall coordinate with the department of community development, the department of health, and the Puget Sound water quality authority as well as with other appropriate state and local agencies.  By November 1, 1991, the department shall submit to the chairs of the house capital facilities and financing committee and the senate ways and means committee, a detailed work plan, budget, and schedule for completion of the evaluation.

 

           Reappropriation:

               Water Quality Acct................ $.. 134,422,504

           Appropriation:

               Water Quality Acct................ $ ((85,607,310))

                                                        72,686,310

 

           Prior Biennia (Expenditures)........... $... 53,036,533

           Future Biennia (Projected Costs)....... $.. 157,835,000

                                                     -------------

                    TOTAL......................... $ ((430,901,347))

                                                       417,980,347

 

(6) Nisqually River Interpretive Center

 

           Appropriation:

               St Bldg Constr Acct............... $...... 150,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 150,000

 

(7) Local toxics control account (88‑5‑008)

 

     $270,000 of the new appropriation in this subsection is provided solely for the evaluation required in subsection (5)(d) of this section.

     $300,000 of the new appropriation in this subsection is provided solely for a pilot grant program to address remedial actions involving the contamination of drinking water supplies from hazardous substances.  The pilot grant program is limited to remedial action where a responsible party has not been identified or held responsible.  The department may establish an appropriate local match requirement for the pilot grant program.  The department shall report to the appropriate committees of the legislature regarding the state-wide need for programs to clean up drinking water supplies contaminated by hazardous substances.  This report shall be consolidated into the evaluation required in subsection (5)(d) of this section.

 

           Reappropriation:

               Local Toxics Control.............. $... 27,653,297

           Appropriation:

               Local Toxics Control.............. $... 59,183,607

 

           Prior Biennia (Expenditures)........... $... 18,467,142

           Future Biennia (Projected Costs)....... $.. 106,984,641

                                                     -------------

                    TOTAL......................... $.. 212,288,687

 

(8) Methow Basin water conservation

 

     This appropriation in this subsection shall be used to fund water use efficiency improvements in this Methow Basin, including the installation of headworks, weirs, and fish screens on existing irrigation diversions, metering of miscellaneous water uses, and lining of irrigation canals and ditches in identified high priority irrigation systems.

 

           Appropriation:

               St Bldg Constr Acct............... $...... 400,000

               LIRA, Water Sup Fac............... $...... 800,000

                                                     -------------

                    Subtotal Appropriation........ $.... 1,200,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,200,000

 

(9)Flood control assistance:  For the purpose of flood control assistance under RCW 86.26.040 through 86.26.105

 

     The appropriation in this subsection is subject to the following conditions and limitations:  Moneys from this appropriation shall be used solely for capital purposes.

 

           Appropriation:

               St Bldg Constr Acct............... $.... 4,000,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 4,000,000

 

 

(10)Water pollution control facility loans

 

           Reappropriation:

               Water Pollution Cont Rev Fund..... $... 33,106,000

           Appropriation:

               Water Pollution Cont Rev Fund..... $... 83,047,000

 

           Prior Biennia (Expenditures)........... $.... 7,400,000

           Future Biennia (Projected Costs)....... $... 71,000,000

                                                     -------------

                    TOTAL......................... $.. 194,553,000

 

 

(11)Transfer to department of community development

 

     The appropriation in this subsection is provided solely for transfer to the department of community development for grants to counties to implement a property owner wetland notification program.

 

           Appropriation:

               Water Quality Account............. $...... 350,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $..... 350,000"


 

    "NEW SECTION.  Sec. 13.  A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:

 

FOR THE STATE PARKS AND RECREATION COMMISSION


(1) Sewer facilities:  For sewer improvements at the following state parks:  Ike Kinswa, Millersylvania, Lewis and Clark Trail, Bayview, Sequim Bay, Penrose Point, Tolmie, Fort Casey, Fort Ebey, and Maryhill

 

           Appropriation:

               LIRA, Waste Fac 1980.............. $.... 1,585,820

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,585,820

 

 

(2) Flaming Geyser:  Bridge relocation, phase 2 (87-2-029)

 

     The appropriation in this section is in addition to the appropriations in section 19(7), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               ORA-State......................... $....... 90,000

 

 

(3) Deception Pass:  Repair failed water system

 

           Appropriation:

               St Bldg Constr Acct............... $...... 283,180

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 283,180

 

 

(4) Bogachiel Park:  Repair storm damage to comfort stations

 

           Appropriation:

               St Bldg Constr Acct............... $....... 50,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $....... 50,000

 

(5) Chuckanut Hill:  Planning and acquisition for addition to Larrabee state park

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) The appropriation in this subsection is provided solely for property acquisition, may not be used to acquire development rights, and is subject to chapter 43.99 RCW.

     (b) Prior to the expenditure of any funds provided from this subsection, Whatcom county shall have acquired under forest board ownership a majority of the 1200-acre parcel of privately owned land adjacent and to the north of Larrabee state park.  The county shall also have entered into an agreement with the board of natural resources committing the county to manage these lands, adjacent to Larrabee state park, as county park land under RCW 76.12.072.

     (c) Prior to the expenditure of any funds provided from this subsection, either the city of Bellingham or Whatcom county shall have made application to the interagency committee for outdoor recreation for funding available through the wildlife and recreation program so that the city or county may acquire park lands adjacent to Larrabee state park.  The application may provide for management of the lands by the State Parks and Recreation Commission.

     (d) No additional state funds may be expended for this acquisition unless authorized by the interagency committee for outdoor recreation in accordance with chapter 43.98A RCW.

 

 

         Appropriation:

               ORA  .............................. $...... 500,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 500,000

 

 

(6) Olmstead Place--Senator Frank "Tub" Hansen Memorial Interpretive Center, including parking facilities, restrooms, and display kiosk

 

           Appropriation:

               St Bldg Constr Acct............... $....... 93,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 93,000"

 

    "NEW SECTION.  Sec. 14.  A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:

FOR THE STATE PARKS AND RECREATION COMMISSION


     The appropriation in this section is provided to make payment for timber in Bogachiel, Scenic Beach, and Rockport state parks, which payment remains as an obligation from the transfers of trust lands to the state parks and recreation commission.  It is the intent of the legislature that all moneys expended under this section result in revenue to the common school construction fund.  The department of natural resources may use intergrant exchanges to accomplish the intent of this section.  Any moneys from this appropriation that remain unexpended on December 31, 1992, shall be deposited in the common school construction fund.

 

           Appropriation

               Common School Reimb Constr Acct... $.... 8,000,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

 

                                                     -------------

                    TOTAL......................... $... 8,000,000"

 

    "NEW SECTION.  Sec. 15.  A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:

    The state parks and recreation commission may sell to a city or county for one dollar existing park lands or interpretive centers that are closed because of budgetary constraints.  The purchasing city or county must agree to keep the park land or interpretive center open for public access and use.  The conveyance agreement shall contain a reversionary interest held by the commission that takes effect if the property is ever used for any purpose other than a public park or interpretive center."

 

    "NEW SECTION.  Sec. 16.  A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:

FOR THE WASHINGTON STATE DAIRY PRODUCTS COMMISSION


(1) Acquire permanent facility:  To acquire a permanent facility to house the offices and operations of the commission (92-5-001)

 

     The appropriation in this subsection is subject to the following conditions and limitations:  At least one dollar from the commission's operating funds shall be spent for each three dollars spent from this appropriation.

 

           Appropriation:

               WA St Dairy Prod Comm Fac Acct.... $...... 900,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $..... 900,000"

 

    "Sec. 17.  1991 sp.s. c 14 s 20 (uncodified) is amended to read as follows:

 


FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION

 

(1)Grants to public agencies (90‑2‑001)

 

           Reappropriation:

               St Bldg Constr Acct............... $...... 498,000

               ORA-Federal....................... $...... 637,000

               ORA-State......................... $.... 1,911,000

               Firearms Range Acct............... $...... 405,000 -----------

                    Subtotal Reappropriation...... $... 3,451,000

 

           Prior Biennia (Expenditures)........... $.... 6,254,000

           Future Biennia (Projected Costs)....... $............ 0

                                                       -----------

                    TOTAL......................... $.... 9,705,000

 

(2)Wildlife conservation and recreation (90‑5‑002)

 

           Reappropriation:

               ORA-State......................... $... 22,000,000

               Habitat Conservation Acct......... $... 21,830,000

                                                       -----------

                    Subtotal Reappropriation...... $... 43,830,000

 

           Prior Biennia (Expenditures)........... $.... 9,170,000

           Future Biennia (Projected Costs)....... $............ 0

                                                       -----------

                    TOTAL......................... $... 53,000,000

 

(3)Grants to public agencies (92‑2‑001)

 

     The appropriations in this section are subject to the following conditions and limitations:

     (a) (($10,400,000)) $11,150,000 of the state building and construction account appropriation in this subsection is provided solely for matching grants to local governments for projects contained in the governor's Washington wildlife and recreation submittal list from categories designated for local governments.  The committee shall require a match of at least fifty percent.

     (b) $138,000 of the state outdoor recreation account may be used for additional program staff for administration.

     (c) The legislature hereby approves, without exception, the list of local projects dated October 1, 1991, submitted by the interagency committee for outdoor recreation to the office of financial management.

 

           Appropriation:

               ORA-Federal....................... $.... 2,000,000

               ORA-State......................... $.... 7,738,000

               Firearms Range Acct............... $...... 222,000

               St Bldg Constr Acct............... $ ((10,400,000))

                                                        11,150,000

                                                       -----------

                    Subtotal Appropriation........ $ ((20,360,000))

                                                        21,360,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $... 21,764,000

                                                       -----------

                    TOTAL......................... $ ((42,124,000))

                                                        42,874,000

 

(4)Washington wildlife and recreation program

 

     (a) One-half of the appropriation in this subsection shall be deposited into and is hereby appropriated from the habitat conservation account and one-half shall be deposited into and is hereby appropriated from the state outdoor recreation account, for the Washington wildlife and recreation program, as established under chapter 43.98A RCW.

     (b) All land acquired by a state agency with moneys from this appropriation shall comply with class A, B, and C weed control provisions of chapter 17.10 RCW.

     (c) The following projects are deleted from the approved list of projects established under chapter 43.98A RCW:

     (i) Hatten-Tracy rock acquisitions (project #925033)

     (ii) Yakima river canyon acquisition (project #925055)

     (iii) Okanogan sharp-tailed grouse habitat (project #925040)

     (iv) Southeast Washington critical habitat acquisition (project #925042)

     (v) Esquaztel coulee acquisition (project #935064)

 

           Appropriation:

               St Bldg Constr Acct............... $... 50,000,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $.. 105,000,000

                                                       -----------

                    TOTAL......................... $.. 155,000,000

 

 

(5) Clear creek dam:  To rebuild the dam according to plans approved by the United States bureau of reclamation (93-2-002)

 

     The appropriation in this subsection is contingent on at least $3,250,000 being provided from federal and local sources.  The state shall not be obligated for project costs that exceed this appropriation.

 

 

           Appropriation:

               St Bldg Constr Acct............... $.... 1,550,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,550,000

 

    "NEW SECTION.  Sec. 18.  A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:

FOR THE DEPARTMENT OF TRADE AND ECONOMIC DEVELOPMENT


 

(1) Washington Technology Center (92-5-001)

 

     The appropriation in this subsection is provided solely for the design and outfitting of the first and second floor laboratory spaces in Fluke Hall.

 

           Appropriation:

               St Bldg Constr Acct............... $.... 1,000,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 1,000,000"

 

    "NEW SECTION.  Sec. 19.  A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:

FOR THE DEPARTMENT OF FISHERIES


(1) Coast and Puget Sound salmon enhancement (92‑5‑001)

 

           Appropriation:

               St Bldg Constr Acct............... $...... 513,311

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 513,311

 

(2) Habitat management (92-2-001)

 

           Appropriation:

               General Fund‑Federal.............. $...... 800,000

               General Fund‑Priv/Loc............. $...... 800,000

                                                     -------------

                     Subtotal Appropriation........ $.... 1,600,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 1,600,000"

 

    "NEW SECTION.  Sec. 20.  A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:

 

FOR THE DEPARTMENT OF WILDLIFE


(1)Repair of flood damage on Luhrs Landing

 

           Appropriation:

               St Bldg Constr Acct............... $....... 40,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $....... 40,000

 

 

(2)Hood Canal Wetlands Interpretive Center:  For a grant to the North Mason School District to construct a wetlands education center at the Mary E. Theler wetlands

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) The school district shall provide and maintain public access, education, and passive recreation opportunities.

     (b) The appropriation in this subsection shall be matched by an equal amount of money from other sources for the purposes described in this subsection.

 

 

           Appropriation:

               St Bldg Constr Acct............... $...... 500,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 500,000

 

 

(3)Skagit wildlife area dike repair (92-3-008)

 

           Appropriation:

               St Bldg Constr Acct............... $...... 145,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $..... 145,000"

 

    "Sec. 21.  1991 sp.s. c 14 s 26 (uncodified) is amended to read as follows:

 

FOR THE PARKS AND RECREATION COMMISSION:  TIMBERLAND PURCHASES AND COMMON SCHOOL PURCHASES


     The appropriation in this section is subject to the following conditions and limitations:

     (1) This appropriation is provided to the state parks and recreation commission ("commission") solely to acquire trust lands that have been identified by the department of natural resources ("department") as appropriate for state park use and development.  Except as specifically otherwise provided in this section, the commission shall acquire the following parcels:

     (a) Lord Hill, in Snohomish county, west of Monroe;

     (b) Beacon Rock, in Skamania county, adjacent to Beacon Rock State Park;

     (c) Larrabee Addition, (1 and 2) in Whatcom county, northeast of Larrabee State Park and Chuckanut Mountain;

     (d) South Whidbey, in Island county, adjacent to South Whidbey State Park;

     (e) Wallace Falls Addition, in Snohomish county, adjacent to Wallace Falls State Park;

     (f) Soleduck corridor, in Clallam county, on the Soleduck river at Sappho;

     (g) Dugualia Bay property, in Island county, on the northeast shore of Whidbey Island;

     (h) Rasar property, in Skagit county, west of Birdsview, near the Skagit river;

     (i) Wallace Falls Addition (Northwest) property, in Snohomish county, adjacent to the northwestern side of the designated park property;

     (j) Wallace Falls Addition (Southwest) property, in Snohomish county, adjacent to the southwestern side of Wallace Falls State Park;

     (k) Hoypus Hill in Island county south of Hoypus Point Natural Forest Area at Deception Pass State Park;

     (l) Lake Easton in Easton in Kittitas county west of Lake Easton State park near the town of Easton;

     (m) Diamond Point, in Clallam county, on the Strait of Juan de Fuca; and

     (n) Skykomish river property, along Highway 2, near Index.

     (2) The commission may expend moneys from this appropriation for acquisition of the Skykomish river property under subsection (1)(n) of this section only to the extent that moneys remain available after the commission has made all reasonable efforts to acquire the other properties identified in this subsection.  If funds remain available after all properties in subsections (1)(a) through (1)(n) of this section have been purchased, the commission may purchase additional properties from the following list:

     (a) Squak Mountain trust property, King county, south of existing Squak Mountain State Park;

     (b) Doug's Beach trust property, Klickitat county, east of Lyle on the Columbia river;

     (c) Point Lawrence Addition trust property, San Juan county, adjacent to designated park property on the eastern most point of Orcas Island;

     (d) Obstruction Pass trust property, San Juan county near Obstruction Island on the southeast point of Orcas Island;

     (e) Bottle Beach trust property, Grays Harbor county, southeast of Westport along the Ocasta-Bay City Road; and

     (f) R.F. Kennedy Recreation Site trust property, Pierce county, on Whitman Cove along Case Inlet.

     (3) To achieve the purposes of this section, intergrant exchanges between common school trust lands and parcels of noncommon school trust lands shall occur on an equal-value basis.

     (4) Proceeds from the transfer of the timber shall be deposited by the department in the same manner as timber revenues from other common school trust lands.  No deduction may be made for the resource management cost account under RCW 79.64.040.  The proceeds from the transfer of the land shall be used by the department to acquire timber land of equal value to be managed as common school trust land and to maintain a sustainable yield.

     (5) The department shall attempt to maintain an aggregate ratio of ((approximately)) 85:15 timber-to-land value in these transactions.  If the aggregate value of timber-to-land varies by more than plus or minus five percent of that ratio, individual land acquisitions ((may)) shall be dropped in order to maintain ((the approximate)) a ratio in this range.

     (6) It is the intent of the legislature that, insofar as feasible, the full parcels identified in subsection (1) of this section be acquired for park purposes.  However, to the extent authorized by the commission, House Bill No. 2990, or Senate Bill No. 6509, the boundaries of the Diamond Point property under subsection (1)(m) of this section may vary from the property boundaries as described in the joint study conducted by the commission and the department under section 4, chapter 163, Laws of 1985.

 

           Appropriation:

               St Bldg Constr Acct............... $... 50,000,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                       -----------

                    TOTAL......................... $.. 50,000,000"

 

    "NEW SECTION.  Sec. 22.  A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:

 

FOR THE DEPARTMENT OF NATURAL RESOURCES


(1)Land transfers:  For acquisition of replacement lands as authorized by House Bill No. 2533 or Senate Bill No. 6161

 

           Appropriation:

               Nat Res Prop Repl Acct............ $... 30,000,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $... 20,000,000

                                                     -------------

                    TOTAL......................... $.. 50,000,000"

 

 

    "NEW SECTION.  Sec. 23.  A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:

 

FOR THE STATE CONVENTION AND TRADE CENTER


(1) Minor works:  For minor works improvement projects, including security improvements, lighting enhancements, and space expansions (93-2-001)

 

     The appropriation in this subsection is subject to the following conditions and limitations:  Before expending the appropriation in this subsection, the Washington State Convention and Trade Center shall report to the office of financial management and to the fiscal committees of the legislature a status report on the convention and trade center account and the convention and trade center operations account.  The status report shall include, but not be limited to:  Amounts borrowed under RCW 67.40.045 and 67.40.055 and corresponding repayment schedules, projections of future revenues and expenditures, transfers between accounts, and compliance with provisions of RCW 67.40.040.

 

           Appropriation:

               St Conv & Trade Ctr Acct.......... $.... 1,050,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 1,050,000"

 

 

 

                           (End of part)


 

 

 

                              "PART 4

                            EDUCATION"

 

    "Sec. 24.  1991 sp.s. c 14 s 30 (uncodified) is amended to read as follows:

FOR THE STATE BOARD OF EDUCATION


     The appropriations in subsections (1) through (9) of this section are subject to the following condition and limitation:  Total cash disbursed from the common school construction fund may not exceed the available cash balance.

 

(1) Public school building construction (79‑3‑002)

 

           Reappropriation:

               Common School Constr Fund......... $.......... 500

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.......... 500

 

(2) Public school building construction (83‑3‑001)

 

           Reappropriation:

               Common School Constr Fund......... $...... 110,000

 

           Prior Biennia (Expenditures)........... $...... 490,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 600,000

 

(3) Public school building construction (86‑4‑001)

 

           Reappropriation:

               Common School Constr Fund......... $.... 1,100,000

 

           Prior Biennia (Expenditures)........... $.... 1,400,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 2,500,000

 

(4) Public school building construction (86‑4‑008)

 

           Reappropriation:

               Common School Constr Fund......... $....... 70,000

 

           Prior Biennia (Expenditures)........... $....... 75,298

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 145,298

 

(5) Public school building construction (88‑2‑001)

 

           Reappropriation:

               Common School Constr Fund......... $.... 4,000,000

 

           Prior Biennia (Expenditures)........... $... 61,328,022

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 65,328,022

 

(6) Public school building construction (89‑2‑004)

 

           Reappropriation:

               Common School Constr Fund......... $....... 80,000

 

           Prior Biennia (Expenditures)........... $.... 2,920,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 3,000,000

 

(7) Public school building construction (90‑2‑001)

 

           Reappropriation:

               Common School Constr Fund......... $.. 156,000,000

 

           Prior Biennia (Expenditures)........... $.. 252,527,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.. 408,527,000

 

(8) Public school building construction (91‑2‑001)

 

     The appropriations in this subsection are subject to the following conditions and limitations:

     (a) A maximum of $1,200,000 may be spent for state administration of school construction funding.

     (b) A maximum of $225,000 may be expended for two full-time equivalent field staff with construction/architectural experience to assist in evaluating project requests and reviewing information reported by school districts.

     (c) A maximum of $100,000 may be expended for development of a new priority system pursuant to (f) of this subsection.

     (d) Funding ((for common school construction and modernization)) is provided first for projects approved for state assistance by the state board as of January 26, 1991, and ready to receive a commitment of state funds on July 1, 1992.  The remaining funding is provided for projects approved for state assistance by the state board after January 26, 1991, subject to (e) of this subsection.  ((Of the funds available for obligation by the state board after state administration costs and after the costs incurred under (b) and (c) of this subsection, fifty-eight percent is provided solely for approved new construction projects to serve unhoused students, four percent is provided solely for approved condemnation projects, and thirty-four percent is provided solely for approved modernization projects.  The remaining funds shall be allocated at the discretion of the state board.))

     (e) Projects approved for state assistance by the state board after January 26, 1991, pursuant to WAC 180-25-040((,)) shall be placed on a new priority system developed by the state board pursuant to (f) of this subsection.  In approving projects for construction of new school facilities to meet enrollment growth, after July 1, 1992, the board shall give priority to districts that have implemented a modified school calendar or schedule that is designed to increase the pupil capacity of the district's school buildings.  The state board may allocate funds for financial assistance to school districts for capital planning related to the implementation of a modified school calendar or schedule as authorized in Engrossed Substitute House Bill No. 2631.

     (f)(i) The state board shall develop a new priority system for allocating state assistance for school construction and modernization projects.  The priority system shall include evaluation of projects according to objective criteria established by the state board and a process for review of data submitted by school districts.  In developing the system and the criteria, the state board shall consider the following factors:  Type of space requested; current space availability, age, and condition; cost benefit considerations of new construction as compared to modernization; impacts of maintenance on the condition of facilities; impacts of delay of receipt of state assistance; and short and long-range demographic projections.

     (ii) The state board shall present a progress report and implementation plan to the governor and the appropriate fiscal committees of the legislature by February 15, 1992.

     (g) The common school reimbursable construction account appropriation in this section serves as compensation to the common school construction fund for any obligation owed the fund as a result of vocational technical institutes being transferred from the authority of a local school district and the superintendent of public instruction to the state board for community and technical colleges as directed by chapter 238, Laws of 1991 (Engrossed Substitute Senate Bill No. 5184, workforce training and education).

 

           Appropriation:

               Common School Constr Fund.......... $ ((135,500,000))

                                                       164,300,000

               Common School Reimb Constr Acct... $ ((120,000,000))

                                                       247,500,000

                                                     -------------

                    Subtotal Appropriation........ $ ((255,500,000))

                                                       411,800,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $.. 350,000,000

                                                     -------------

                    TOTAL......................... $ ((605,500,000))

                                                       761,800,000

 

(((9)    Public school building construction (91‑2‑001)

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) This appropriation is subject to all conditions and limitations contained in subsection (8) of this section.

 

           Appropriation:

               Common School Constr Fund......... $... 21,000,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $ 21,000,000))"

 

    "NEW SECTION.  Sec. 25.  A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:

 

FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION


(1) Before-and-after-school child care facility grants:  To establish or expand before-and-after-school child care programs housed within public elementary schools (93-5-001)

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) Grants shall be awarded to public school districts on a competitive basis, and shall be used to support the capital costs of establishing or expanding a before-and-after-school child care program.  Eligible capital costs shall include facility improvements and acquisition of equipment with a long-term useful life.

     (b) The superintendent of public instruction shall, in consultation with the child care coordinating committee under RCW 74.13.090, establish criteria for the awarding of grants.  Such criteria shall include, but not be limited to, the percentage of nonstate funding to be contributed to the project, the number of children to be served, the cost per child care slot, and the projected lifespan  of the before-and-after-school child care program.  The operation of child care programs conducted in facilities funded by this appropriation shall be contracted through private or not-for-profit child care providers.

 

 

           Appropriation:

               St Bldg Constr Acct............... $...... 375,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $..... 375,000"

 

 

    "Sec. 26.  1991 sp.s. c 14 s 34 (uncodified) is amended to read as follows:

FOR THE UNIVERSITY OF WASHINGTON


(1) Safety:  Fire code, PCB, and life safety (86‑1‑001)

 

           Reappropriation:

               UW Bldg Acct...................... $.... 6,890,000

 

           Prior Biennia (Expenditures)........... $.... 2,298,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 9,188,000

 

(2) Safety:  Asbestos removal (86‑1‑002)

 

           Reappropriation:

               UW Bldg Acct...................... $.... 4,900,000

 

           Prior Biennia (Expenditures)........... $...... 600,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 5,500,000

 

(3) Minor works:  Building renewal (86‑1‑004)

 

           Reappropriation:

               UW Bldg Acct...................... $.... 6,200,000

 

           Prior Biennia (Expenditures)........... $.... 5,983,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 12,183,000

 

(4) Health Science Center G Court, H Wing, and I Court addition (86‑2‑021) and H Wing renovation (88‑2‑015)

 

           Reappropriation:

               St Bldg Constr Acct............... $... 43,508,000

               UW Bldg Acct...................... $.... 3,500,000

                                                     -------------

                    Subtotal Reappropriation...... $... 47,008,000

 

           Prior Biennia (Expenditures)........... $.... 7,856,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 54,864,000

 

(5) Minor works:  Program renewal (86‑3‑005)

 

     The reappropriations in this subsection are provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget.

 

           Reappropriation:

               UW Bldg Acct...................... $.... 3,800,000

 

           Prior Biennia (Expenditures)........... $.... 9,540,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 13,340,000

 

(6) Power plant boiler:  To replace boiler number four with a gas and oil fixed boiler, including upgrades in the central heating plant (88‑2‑022)

 

     The appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Reappropriation:

               St Bldg Constr Acct............... $...... 360,000

               UW Bldg Acct...................... $...... 240,000

                                                     -------------

                    Subtotal Reappropriation...... $...... 600,000

 

           Appropriation:

               St Bldg Constr Acct............... $... 19,872,000

 

           Prior Biennia (Expenditures)........... $...... 468,495

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 20,340,495

 

(7) K Wing addition (90‑1‑001)

 

     The reappropriation in this subsection is provided from the proceeds of state general obligation bonds reimbursed from university indirect cost revenues from federal research grants and contracts pursuant to RCW 43.99H.020(18).

 

           Reappropriation:

               H Ed Constr Acct.................. $... 45,000,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 45,000,000

 

(8) Emergency power generation (90‑2‑001)

 

           Reappropriation:

               St Bldg Constr Acct............... $... 10,500,000

 

           Prior Biennia (Expenditures)........... $...... 610,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 11,110,000

 

(9) Physics:  To construct and equip a new building for the physics and astronomy departments (90‑2‑009)

 

     The project funded by the appropriations in this subsection shall be constructed on campus.  The new appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 4,000,000

           Appropriation:

               H Ed Reimb Constr Acct............ $... 64,786,000

 

           Prior Biennia (Expenditures)........... $.... 3,778,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 72,564,000

 

(10)Chemistry I:  Design and construction (90‑2‑011)

 

     The reappropriation in this subsection is subject to the following conditions and limitations:

     (a) The reappropriation shall not be expended for construction until the project predesign and design documents have been reviewed and approved by the office of financial management under section 33 of this act.

     (b) The project funded by the reappropriation in this subsection shall be constructed on campus.

 

           Reappropriation:

               St Bldg Constr Acct............... $... 37,200,000

 

           Prior Biennia (Expenditures)........... $.... 1,952,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 39,152,000

 

(11)Electrical engineering and computer science building:  To complete the design of a replacement building for the departments of electrical engineering and computer science and engineering (90‑2‑013) (92‑2‑024)

 

     The project funded by the appropriations in this subsection shall be constructed on campus.  Other than for preplanning, the reappropriation shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 3,450,000

           Appropriation

               St Bldg Constr Acct............... $.... 1,147,000

                                                     -------------

                    Subtotal Appropriation........ $ ((5,597,000))

                                                         4,597,000

 

           Prior Biennia (Expenditures)........... $...... 661,000

           Future Biennia (Projected Costs)....... $... 93,500,000

                                                     -------------

                    TOTAL......................... $... 98,758,000

 

(12)Electrical distribution system (88‑1‑011), power plant chiller (88‑1‑012), power plant stack replacement (88‑1‑023)

 

           Reappropriation:

               St Bldg Constr Acct............... $...... 830,000

               UW Bldg Acct...................... $...... 770,000

                                                     -------------

                    Subtotal Reappropriation...... $.... 1,600,000

 

           Prior Biennia (Expenditures)........... $.... 7,539,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 9,139,000

 

(13)Safety:  Fire code, PCB, and life safety projects including:  Cleanup of asbestos, compliance with federal regulations for PCB removal and contaminated soil, ((and)) life and physical safety, and fire code regulations (92‑1‑004)

 

           Appropriation:

               St Bldg Constr Acct............... $ ((10,640,000))

                                                        10,700,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $... 33,333,000

                                                     -------------

                    TOTAL......................... $ ((43,973,000))

                                                        44,033,000

 

(14)Minor capital renewal: To complete minor projects costing under $500,000 that renew or bring campus facilities into code compliance (92‑1‑005)

 

     The appropriations in this subsection are provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget.

 

           Appropriation:

               St Bldg Constr Acct............... $.... 3,525,000

               UW Bldg Acct...................... $.... 5,000,000

                                                     -------------

                    Subtotal Appropriation........ $.... 8,525,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $... 40,200,000

                                                     -------------

                    TOTAL......................... $... 48,725,000

 

(15)Communications Building Renovation (88‑2‑014)

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 2,015,000

               UW Bldg Acct...................... $.... 1,167,000

                                                     -------------

                    Subtotal Reappropriation...... $.... 3,182,000

 

           Prior Biennia (Expenditures)........... $.... 3,555,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 6,737,000

 

(16)Nuclear reactor decommission:  To design the removal and decontamination of the nuclear reactor on campus (92‑1‑022)

 

           Appropriation:

               St Bldg Constr Acct............... $...... 235,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $.... 2,488,000

                                                     -------------

                    TOTAL......................... $.... 2,723,000

 

(17)Kincaid basement:  To build twenty-two thousand-square feet of basement space between the Kincaid Building and the new Physics Building (92‑2‑002)

 

           Appropriation:

               St Bldg Constr Acct............... $.... 3,314,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 3,314,000

 

(18)Physics Hall renovation, program:  To complete the design for renovation of the existing Physics Hall (92‑2‑008)

 

     The appropriation in this subsection shall not be expended on design documents until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St Bldg Constr Acct............... $.... 2,543,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $... 37,800,000

                                                     -------------

                    TOTAL......................... $... 40,343,000

 

(19)Chiller addition:  To add one central power plant chiller unit (92‑2‑009)

 

           Appropriation:

               St Bldg Constr Acct............... $.... 2,459,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 2,459,000

 

(20)Data communications:  To complete several data communications projects involving infrastructure, wiring, and building modifications (92‑2‑010)

 

           Appropriation:

               St Bldg Constr Acct............... $.... 2,700,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 2,700,000

 

(21)Electrical distribution:  To upgrade the campus electrical distribution (92‑2‑012)

 

           Appropriation:

               St Bldg Constr Acct............... $.... 1,300,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,300,000

 

(22)Other utility projects:  To remove and decontaminate underground storage tanks and other repair projects (92‑2‑013)

 

     The appropriation in this subsection may be expended only after compliance with section 6(2) ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St Bldg Constr Acct............... $...... 460,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $... 20,000,000

                                                     -------------

                    TOTAL......................... $... 20,460,000

 

(23)Comparative medicine facility:  To construct an animal laboratory facility (92‑2‑017)

 

           Appropriation:

               St Bldg Constr Acct............... $...... 700,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 700,000

 

(24)Minor capital improvements:  To complete minor remodeling projects costing under $500,000 that improve space usage and make repairs for specific campus programs or buildings (92‑3‑006)

 

     The appropriations in this subsection are provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget.

 

           Appropriation:

               St Bldg Constr Acct............... $.... 5,703,000

               UW Bldg Acct...................... $.... 5,000,000

                                                     -------------

                    Subtotal Appropriation........ $... 10,703,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $... 40,250,000

                                                     -------------

                    TOTAL......................... $... 50,953,000

 

(25)Parrington Hall exterior:  To repair the exterior of Parrington Hall (92‑3‑018)

 

           Appropriation:

               UW Bldg Acct...................... $.... 1,759,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,759,000

 

(26)Meany Hall exterior renovation:  To replace the leaking exterior of Meany Hall (92‑3‑019)

 

     The appropriation in this subsection shall not be expended for design documents until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               UW Bldg Acct...................... $.... 7,238,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 7,238,000

 

(27)Denny Hall exterior repair:  To repair and seismically improve the exterior of Denny Hall (92‑3‑020)

 

           Reappropriation:

               St Bldg Constr Acct............... $...... 215,000

           Appropriation:

               UW Bldg Acct...................... $.... 1,670,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,885,000

 

(28)Fisheries II/utilities:  To prepare plans for extending the utilities infrastructure to the west campus, constructing a new fisheries building, and replacing the facility for police and custodial units (92‑2‑027)

 

     The appropriation in this subsection shall not be expended on design documents until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St((ate)) Bldg Constr Acct........ $.... 1,850,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $... 91,528,000

                                                     -------------

                    TOTAL......................... $... 93,378,000

 

(29)Olympic Natural Resources Center

 

     The appropriation in this subsection shall not be expended for design documents until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St Bldg Constr Acct............... $.... 5,675,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 5,675,000

 

(30)Employee day care facility‑-Preplanning

 

     The appropriation in this subsection is provided solely for the purpose of acquiring, preparing a site for meeting the needs identified in the November 1987 child-care study conducted for the higher education coordinating board.  In acquiring a site, the University shall make every effort to locate the child-care facility within a two-mile radius of the main Seattle campus and shall give a high priority to the use of buildings owned, but not used by, the Seattle school district.

 

           Appropriation:

               St Bldg Constr Acct............... $...... 150,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

 

                                                     -------------

                    TOTAL......................... $...... 150,000

 

(31)School of Business expansion:  Predesign and design (93-4-001)

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) The appropriation shall not be expended for design documents until the project predesign documents have been reviewed and approved by the office of financial management under section 33 of this act.

     (b) The appropriation in this subsection shall be matched by and spent concurrently with at least $650,000 in cash provided from nonstate sources.

 

           Appropriation:

               St Bldg Constr Acct............... $...... 650,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $.... 5,350,000

                                                     -------------

                    TOTAL......................... $.... 6,000,000

 

(32)Henry Art Gallery expansion and renovation:  For predesign and design phase

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) The appropriation shall be not expended for design documents until the project predesign documents have been reviewed and approved by the office of financial management under section 33 of this act.

     (b) The appropriation in this subsection shall be matched by $1,500,000 from nonstate sources.  Phase II construction shall be matched by at least $4,200,000 from nonstate sources.

 

           Appropriation:

               St Bldg Constr Acct............... $...... 300,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $.... 8,316,000

                                                     -------------

                    TOTAL......................... $.... 8,616,000

 

 

(33)Burke Memorial Washington State Museum:  For building renovations and new exhibits

 

     The appropriation in this subsection shall be matched by at least $733,000 from other sources for the same purpose.

 

           Appropriation:

               St Bldg Constr Acct............... $.... 2,200,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 2,200,000"

 

    "Sec. 27.  1991 sp.s. c 14 s 35 (uncodified) is amended to read as follows:

FOR WASHINGTON STATE UNIVERSITY


(1) Science Hall renewal, phase 2 (86‑1‑006)

 

           Reappropriation:

               H Ed Constr Acct.................. $...... 400,000

 

           Prior Biennia (Expenditures)........... $... 10,804,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 11,204,000

 

(2) Minor capital improvements (90‑1‑001)

 

     The reappropriation in this subsection is provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget.

 

           Reappropriation:

               WSU Bldg Acct..................... $.... 1,788,000

 

           Prior Biennia (Expenditures)........... $.... 3,212,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 5,000,000

 

(3) Minor capital renewal (90‑1‑002)

 

     The reappropriation in this subsection is provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget.

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 1,950,000

 

           Prior Biennia (Expenditures)........... $.... 3,050,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 5,000,000

 

(4) Washington higher education telecommunications system:  To convert one of two analog channels to digital (90‑2‑021)

 

      Any expenditure under this reappropriation shall be consistent with the plan being developed by the department of information services for the 1991 legislative session for the cost-effective, incremental implementation of a coordinated state-wide video telecommunications system.

 

           Reappropriation:

               WSU Bldg Acct..................... $.... 2,700,000

 

           Prior Biennia (Expenditures)........... $....... 55,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 2,755,000

 

(5) Land acquisition (Branch Campus) (90‑5‑002)

 

           Reappropriation:

               St Bldg Constr Acct............... $...... 250,000

 

           Prior Biennia (Expenditures)........... $.... 1,095,333

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,345,333

 

(6) Tri-Cities University Center (90‑5‑901)

 

           Reappropriation:

               St Bldg Constr Acct............... $.... 2,850,000

 

           Prior Biennia (Expenditures)........... $.... 9,548,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 12,398,000

 

(7) Minor capital improvements:  To complete minor remodeling projects costing under $500,000 that improve space usage and make repairs for specific campus programs or buildings (92‑1‑001)

 

     The appropriation in this subsection is provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget.

 

           Appropriation:

               WSU Bldg Acct..................... $.... 6,500,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $... 21,300,000

                                                     -------------

                    TOTAL......................... $... 27,800,000

 

(8) Expansion of east campus substation:  To provide an additional 15,000 KVA electrical power capacity to the existing east campus substation (92‑1‑015)

 

           Reappropriation:

               WSU Bldg Acct..................... $...... 525,100

           Appropriation:

               WSU Bldg Acct..................... $...... 670,000

 

           Prior Biennia (Expenditures)........... $........ 7,900

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,203,000

 

(9) Smith Gym electrical system replacement:  To replace the entire building-wide electrical system (92‑1‑017)

 

           Reappropriation:

               WSU Bldg Acct..................... $...... 638,300

           Appropriation:

               WSU Bldg Acct..................... $...... 542,000

 

           Prior Biennia (Expenditures)........... $........ 9,700

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,190,000

 

(10)Hazardous, pathological, and radioactive waste handling facilities:  To provide centralized facilities to prepare, package, and ship biomedical, pathological, hazardous, low-level, and nonradioactive waste (92‑1‑019)

 

     The appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Reappropriation:

                WSU Bldg Acct..................... $....... 21,700

           Appropriation:

               St Bldg Constr Acct............... $.... 1,343,000

 

           Prior Biennia (Expenditures)........... $...... 130,300

           Future Biennia (Projected Costs)....... $.... 5,570,000

                                                     -------------

                    TOTAL......................... $.... 7,065,000

 

(11)Asbestos removal:  To remove asbestos contaminated fireproofing from the roof beams and support structures of the Coliseum (92‑1‑020)

 

     The appropriation in this subsection may be expended only after compliance with section 6(3) ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               WSU Bldg Acct..................... $.... 1,513,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,513,000

 

(12)Fulmer Hall:  To design renovations of Fulmer Hall Annex to meet fire, safety, and handicap access code requirements and to make changes in functional use of space (92‑1‑023)

 

     The appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St Bldg Constr Acct............... $...... 957,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $.... 7,943,000

                                                     -------------

                    TOTAL......................... $.... 8,900,000

 

(13)Nuclear radiation center study (92‑1‑025)

 

           Reappropriation:

               WSU Bldg Acct..................... $....... 13,400

 

           Prior Biennia (Expenditures)........... $....... 39,600

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $....... 53,000

 

(14)Minor capital renewal:  To complete minor projects costing under $500,000 that renew or bring campus facilities into code compliance (92‑2‑002)

 

     The appropriation in this subsection is provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget.

 

           Appropriation:

               St Bldg Constr Acct............... $.... 5,500,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 5,500,000

 

(15)Preplanning:  To complete preplanning documents for the following projects:  Engineering teaching-research building, animal sciences laboratory building, Thompson Hall renewal, Heald Hall renewal, Holland Library renewal, Bohler Gym addition/renewal, Kimbrough Hall addition, and classroom auditorium building (92‑2‑003)

 

     The preplanning document shall include but not be limited to projected workload, site conditions, user requirements, current space available, and an overall budget and cost estimate breakdown in a form prescribed by the office of financial management.

 

           Appropriation:

               WSU Bldg Acct..................... $...... 869,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $...... 869,000

 

(16)Holland Library addition:  To furnish and equip the library addition (92‑2‑012)

 

           Reappropriation:

               St Bldg Constr Acct............... $... 29,500,000

               WSU Bldg Acct..................... $....... 48,600

                                                     -------------

                    Subtotal Reappropriation...... $... 29,548,600

 

           Appropriation:

                St Bldg Constr Acct............... $.... 2,580,000

 

           Prior Biennia (Expenditures)........... $.... 4,992,400

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 37,121,000

 

(17)Veterinary teaching hospital:  To construct and furnish a new teaching hospital for the department of veterinary medicine and surgery (92‑2‑013)

 

     The appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Reappropriation:

               St Bldg Constr Acct............... $...... 970,000

               WSU Bldg Acct..................... $...... 110,000

                                                     -------------

                    Subtotal Reappropriation...... $.... 1,080,000

 

           Appropriation:

               H Ed Reimb Constr Acct............ $... 26,835,000

 

           Prior Biennia (Expenditures)........... $...... 747,000

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 28,662,000

 

(18)Child care facility:  To design, construct, and furnish a child care facility by remodeling the vacated Rogers-Orton Dining Hall (92‑2‑014)

 

           Appropriation:

               St Bldg Constr Acct............... $.... 2,171,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 2,171,000

 

(19)Carpenter Hall completion (renewal):  To complete the renovation of Carpenter Hall (92‑2‑016)

 

           Reappropriation:

               H Ed Constr Acct.................. $...... 500,000

           Appropriation:

               WSU Bldg Acct..................... $...... 810,000

 

           Prior Biennia (Expenditures)........... $.... 6,289,715

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 7,599,715

 

(20)Communication infrastructure renewal:  To design and construct university-wide communications facilities for telephone, computer, and audio-visual services (92‑2‑018)

 

     The appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St Bldg Constr Acct............... $... 10,000,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 10,000,000

 

(21)Todd Hall renewal:  To renovate the entire building, including upgrading electrical and other building-wide systems, modernizing and refurnishing of classrooms and offices (92‑2‑021)

 

     The appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Reappropriation:

               WSU Bldg Acct..................... $....... 37,000

           Appropriation:

               St Bldg Constr Acct............... $.... 1,143,000

 

           Prior Biennia (Expenditures)........... $...... 145,000

           Future Biennia (Projected Costs)....... $... 14,795,000

                                                     -------------

                    TOTAL......................... $... 16,120,000

 

(22)Student services addition:  To design and construct a building for consolidated student service functions (92‑2‑027)

 

     The appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St Bldg Constr Acct............... $... 15,000,000

               WSU Bldg Acct..................... $...... 967,000

                                                     -------------

                    Subtotal Appropriation........ $... 15,967,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 15,967,000

 

(23)Records, maintenance materials storage, and recycling, phase 1:  To construct a storage structure for inactive records, physical plant storage, and recycling storage (92‑2‑028)

 

           Appropriation:

               WSU Bldg Acct..................... $.... 1,761,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 1,761,000

 

(24)WHETS expansion:  To add a fourth channel to the network that serves the Tri-Cities, Spokane, and Vancouver branch campuses, to add two classrooms in Pullman, Tri-Cities, and Vancouver, to add one classroom in Spokane, and to extend the network and add one classroom ((at the Tree Fruit Research and Extension Center)) at Wenatchee Valley College in Wenatchee (92‑2‑908)

 

     Any extension of educational telecommunications to the Wenatchee area shall be planned to allow for the possible future participation of multiple higher education institutions, especially those having direct program responsibility for the Wenatchee area.  Implementation plans shall be approved by the higher education coordinating board, in conjunction with the department of information services.

 

           Appropriation:

               WSU Bldg Acct..................... $.... 2,321,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 2,321,000

 

(25)Dairy and forage facility:  To design and construct a facility that includes a new dairy center and milking parlor, a freestall building, and offices and classrooms (92‑3‑024)

 

           Appropriation:

               WSU Bldg Acct..................... $.... 2,714,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $.... 2,714,000

 

(26)Chilled water storage facility:  To design and construct a 2,820,000-gallon chilled water storage tank (92‑4‑022)

 

           Appropriation:

               St Bldg Constr Acct............... $.... 2,850,000

 

           Prior Biennia (Expenditures)........... $............ 0

           Future Biennia (Projected Costs)....... $............ 0

                                                     -------------

                    TOTAL......................... $... 2,850,000"

 

    "NEW SECTION.  Sec. 28.  A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:

 


FOR EASTERN WASHINGTON UNIVERSITY


 

(1) To acquire property within the campus boundary from the Department of Natural Resources (92-5-001)

 

    The appropriation in this subsection is in addition to the appropriation for same purpose in section 36, chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               EWU Cap Proj Acct................... $     175,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $     175,000

 

(2) To remodel space in the Spokane Center to provide a student computer center (92-5-008)

 

           Appropriation:

               EWU Cap Proj Acct................... $     600,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                       -----------

                    TOTAL........................... $    600,000"

 

 

    "Sec. 29.  1991 sp.s. c 14 s 44 (uncodified) is amended to read as follows:

FOR THE COMMUNITY COLLEGE SYSTEM


(1) Extension facility (Puyallup) (86‑3‑021)

 

           Reappropriation:

               St Bldg Constr Acct................. $      99,211

 

           Prior Biennia (Expenditures)............. $   5,276,789

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   5,376,000

 

(2) Tech building and remodeling (Skagit Valley) (86‑3‑022)

 

           Reappropriation:

               St Bldg Constr Acct................. $      30,085

 

           Prior Biennia (Expenditures)............. $   3,369,915

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   3,400,000

 

(3) Heavy equipment building (South Seattle) (86‑3‑026)

 

           Reappropriation:

               St Bldg Constr Acct................. $      17,901

 

           Prior Biennia (Expenditures)............. $   4,429,099

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   4,447,000

 

(4) Minor works (RMI) (88‑2‑001)

 

           Reappropriation:

               St Bldg Constr Acct................. $     114,174

 

           Prior Biennia (Expenditures)............. $   3,385,826

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   3,500,000

 

(5) Repairs, exterior walls (88‑3‑003)

 

           Reappropriation:

               St Bldg Constr Acct................. $     218,614

 

           Prior Biennia (Expenditures)............. $   4,045,386

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   4,264,000

 

(6) Repairs, mechanical, heating, ventilation, and air conditioning (88‑3‑004)

 

           Reappropriation:

               St Bldg Constr Acct................. $     500,121

 

           Prior Biennia (Expenditures)............. $   3,574,879

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   4,075,000

 

(7) Minor improvements (88‑3‑005)

 

           Reappropriation:

               St Bldg Constr Acct................. $     781,756

 

           Prior Biennia (Expenditures)............. $  12,982,244

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $  13,764,000

 

(8) Repairs, electrical (88‑3‑006)

 

           Reappropriation:

               St Bldg Constr Acct................. $     114,986

 

           Prior Biennia (Expenditures)............. $   1,277,014

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   1,392,000

 

(9) Sites and interiors (88‑3‑007)

 

           Reappropriation:

               St Bldg Constr Acct................. $     168,312

 

           Prior Biennia (Expenditures)............. $   1,757,688

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   1,926,000

 

(10)Agri Tech building (Walla Walla) (88‑3‑008)

 

           Reappropriation:

               St Bldg Constr Acct................. $   1,000,539

 

           Prior Biennia (Expenditures)............. $   2,114,461

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   3,115,000

 

(11)Plan, and construct library-student center (86‑2‑031)

 

           Reappropriation:

               St Bldg Constr Acct................. $     328,911

 

           Prior Biennia (Expenditures)............. $   7,662,089

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   7,991,000

 

(12)Vocational shop (Wenatchee) (88‑3‑010)

 

           Reappropriation:

               St Bldg Constr Acct................. $     613,953

 

           Prior Biennia (Expenditures)............. $     341,047

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     955,000

 

(13)Computer facility (Edmonds) (88‑3‑011)

 

           Reappropriation:

               St Bldg Constr Acct................. $      14,934

 

           Prior Biennia (Expenditures)............. $   3,820,066

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   3,835,000

 

(14)Learning resource center (Clark) (88‑3‑012)

 

           Reappropriation:

               St Bldg Constr Acct................. $     620,017

 

           Prior Biennia (Expenditures)............. $   5,759,983

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   6,380,000

 

(15)Extension center (Yakima Valley) (88‑3‑013)

 

           Reappropriation:

               St Bldg Constr Acct................. $     102,068

 

           Prior Biennia (Expenditures)............. $   1,588,932

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   1,691,000

 

(16)Math and science building (Spokane Falls) (88‑3‑015)

 

           Reappropriation:

               St Bldg Constr Acct................. $     779,618

 

           Prior Biennia (Expenditures)............. $   4,970,382

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   5,750,000

 

(17)Learning resource center (Spokane) (88‑3‑016)

 

           Reappropriation:

               St Bldg Constr Acct................. $     588,025

 

           Prior Biennia (Expenditures)............. $   4,946,975

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   5,535,000

 

(18)Preplanning for 1989‑93 major projects (88‑4‑014)

 

           Reappropriation:

               St Bldg Constr Acct................. $      48,852

 

           Prior Biennia (Expenditures)............. $     448,148

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     497,000

 

(19)Construct:  Whidbey learning resource center:  To house library and media services, computer science and office occupations programs, classrooms, and offices at Skagit Valley's Whidbey branch (Skagit Valley) (88‑5‑020)

 

           Reappropriation

               St Bldg Constr Acct................. $      66,117

           Appropriation:

               St Bldg Constr Acct................. $   2,123,000

 

           Prior Biennia (Expenditures)............. $      41,883

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   2,231,000

 

(20)Construct:  A combination science, physical education, and instruction building (South Puget Sound) (88‑5‑021)

 

           Appropriation:

               St Bldg Constr Acct................. $   5,998,000

 

           Prior Biennia (Expenditures)............. $     256,000

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   6,254,000

 

(21)Construct:  Early childhood education facility of eight thousand square feet (Shoreline) (88‑5‑022)

 

           Reappropriation:

               St Bldg Constr Acct................. $      20,747

           Appropriation:

               St Bldg Constr Acct................. $   1,307,000

 

           Prior Biennia (Expenditures)............. $      57,253

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   1,385,000

 

(22)Construct:  Library addition and remodel to reconfigure the library building and add ten thousand four hundred seventy-five square feet (Columbia Basin) (88‑5‑023)

 

           Reappropriation:

               St Bldg Constr Acct................. $      77,194

           Appropriation:

               St Bldg Constr Acct................. $   1,972,000

 

           Prior Biennia (Expenditures)............. $      35,806

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   2,085,000

 

(23)Construct:  Vocational shops for diesel, automotive, and woodworking classes (Centralia) (88‑5‑024)

 

           Reappropriation:

               St Bldg Constr Acct................. $      49,234

           Appropriation:

               St Bldg Constr Acct................. $   2,025,000

 

           Prior Biennia (Expenditures)............. $      45,766

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   2,120,000

 

(24)Construct:  Learning research center addition and remodel to add seven thousand two hundred square feet for information technology, media production, offices, and work areas (Tacoma) (88‑5‑025)

 

           Reappropriation:

               St Bldg Constr Acct................. $      76,722

           Appropriation:

               St Bldg Constr Acct................. $   1,746,000

 

           Prior Biennia (Expenditures)............. $      13,278

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   1,836,000

 

(25)Construct:  Vocational food addition to add twelve thousand two hundred fifty square feet to the student center for expansion of the food service program areas (Lower Columbia) (88‑5‑026)

 

           Reappropriation:

               St Bldg Constr Acct................. $     138,067

           Appropriation:

               St Bldg Constr Acct................. $   2,902,000

 

           Prior Biennia (Expenditures)............. $       1,933

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   3,042,000

 

(26)Construct:  Business Education Building to house office technology labs, computer labs, and related support activities (Spokane) (88‑5‑027)

 

           Reappropriation:

               St Bldg Constr Acct................. $      33,714

           Appropriation:

               St Bldg Constr Acct................. $   6,311,000

 

           Prior Biennia (Expenditures)............. $     211,286

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   6,556,000

 

(27)Construct:  Student activity and physical education facility (Seattle Central) (88‑5‑028)

 

           Reappropriation:

               St Bldg Constr Acct................. $     148,348

           Appropriation:

               St Bldg Constr Acct................. $  11,080,000

 

           Prior Biennia (Expenditures)............. $     251,652

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $  11,480,000

 

(28)Washington State University education center (Clark) (89‑5‑019)

 

           Reappropriation:

               St Bldg Constr Acct................. $      12,793

 

           Prior Biennia (Expenditures)............. $   1,787,207

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   1,800,000

 

(29)Multipurpose child care center (Everett) (89‑5‑020)

 

           Reappropriation:

               St Bldg Constr Acct................. $      20,055

 

           Prior Biennia (Expenditures)............. $     465,533

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     485,588

 

(30)Fire and security repairs (90‑1‑004)

 

           Reappropriation:

               St Bldg Constr Acct................. $     499,132

 

           Prior Biennia (Expenditures)............. $     448,478

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     947,610

 

(31)Roof and structural repairs (90‑2‑002)

 

           Reappropriation:

               St Bldg Constr Acct................. $   1,336,671

 

           Prior Biennia (Expenditures)............. $   2,321,329

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   3,658,000

 

(32)Heating, ventilation, and air conditioning mechanical repairs (90‑2‑003)

 

           Reappropriation:

               St Bldg Constr Acct................. $   1,412,452

 

           Prior Biennia (Expenditures)............. $   1,560,378

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   2,972,830

 

(33)Electrical repairs (90‑2‑005)

 

           Reappropriation:

               St Bldg Constr Acct................. $     126,639

 

           Prior Biennia (Expenditures)............. $     244,601

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     371,240

 

(34)Small repairs and improvements (90‑3‑001)

 

           Reappropriation:

               St Bldg Constr Acct................. $   1,338,574

 

           Prior Biennia (Expenditures)............. $   2,861,426

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   4,200,000

 

(35)Learning assistance resource center (Centralia) (90‑3‑006)

 

           Reappropriation:

               St Bldg Constr Acct................. $      66,076

 

           Prior Biennia (Expenditures)............. $   4,147,924

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   4,214,000

 

(36)Facility repairs (90‑3‑007)

 

     The reappropriation in this subsection is provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment or for other expenses that normally would be funded from the state operating budget.

 

           Reappropriation:

               St Bldg Constr Acct................. $     740,342

 

           Prior Biennia (Expenditures)............. $   3,107,838

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   3,848,180

 

(37)Technology laboratories (Highline) (90‑3‑023)

 

           Reappropriation:

               St Bldg Constr Acct................. $     554,817

 

           Prior Biennia (Expenditures)............. $   2,213,183

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   2,768,000

 

(38)Minor improvements (90‑5‑009)

 

     The reappropriation in this subsection is provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget, except that the sum of $465,000 may be expended for the purchase of Roosevelt Field at Olympic College.

 

           Reappropriation:

               St Bldg Constr Acct................. $   4,454,434

 

           Prior Biennia (Expenditures)............. $   8,838,506

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $  13,292,940

 

(39)Design:  Technology center (Whatcom) (90‑5‑010)

 

     The new appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Reappropriation:

               St Bldg Constr Acct................. $      34,750

           Appropriation:

               St Bldg Constr Acct................. $     249,000

 

           Prior Biennia (Expenditures)............. $      28,250

           Future Biennia (Projected Costs)......... $   6,378,000

                                                     -------------

                    TOTAL........................... $   6,690,000

 

(40)Design:  Physical education facility (North Seattle) (90‑5‑011)

 

     The appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St Bldg Constr Acct................. $     202,000

 

           Prior Biennia (Expenditures)............. $      45,000

           Future Biennia (Projected Costs)......... $   6,940,000

                                                     -------------

                    TOTAL........................... $   7,187,000

 

(41)Design:  Applied arts building (Spokane Falls) (90‑5‑012)

 

     The new appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Reappropriation:

               St Bldg Constr Acct................. $      33,157

           Appropriation:

               St Bldg Constr Acct................. $     280,000

 

           Prior Biennia (Expenditures)............. $      34,843

           Future Biennia (Projected Costs)......... $   5,213,000

                                                     -------------

                    TOTAL........................... $   5,561,000

 

(42)Design:  Industrial tech building (Spokane) (90‑5‑013)

 

     The new appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Reappropriation:

               St Bldg Constr Acct................. $       9,076

           Appropriation:

               St Bldg Constr Acct................. $     298,000

 

           Prior Biennia (Expenditures)............. $      54,924

           Future Biennia (Projected Costs)......... $   6,536,000

                                                     -------------

                    TOTAL........................... $   6,898,000

 

(43)Design:  Vocational art facility (Shoreline) (90‑5‑014)

 

 

           Reappropriation:

               St Bldg Constr Acct................. $      22,407

           Appropriation:

               St Bldg Constr Acct................. $     157,000

 

 

           Prior Biennia (Expenditures)............. $      28,593

           Future Biennia (Projected Costs)......... $   2,785,000

                                                     -------------

                    TOTAL........................... $   2,993,000

 

(44)Design:  Business education building (Clark) (90‑5‑015)

 

     The new appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Reappropriation:

               St Bldg Constr Acct................. $      33,280

           Appropriation:

               St Bldg Constr Acct................. $     305,000

 

           Prior Biennia (Expenditures)............. $      39,720

           Future Biennia (Projected Costs)......... $   5,725,000

                                                     -------------

                    TOTAL........................... $   6,103,000

 

(45)Design:  Student center (South Seattle) (90‑5‑016)

 

     The new appropriation in this subsection shall not be expended until project preplanning documents have been reviewed and approved by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Reappropriation:

               St Bldg Constr Acct................. $       5,117

           Appropriation:

               St Bldg Constr Acct................. $     258,000

 

           Prior Biennia (Expenditures)............. $      53,883

           Future Biennia (Projected Costs)......... $   4,276,000

                                                     -------------

                    TOTAL........................... $   4,593,000

 

(46)Design:  Library addition (Skagit Valley) (90‑5‑017)

 

           Appropriation:

               St Bldg Constr Acct................. $     116,000

 

           Prior Biennia (Expenditures)............. $      44,000

           Future Biennia (Projected Costs)......... $   1,896,000

                                                     -------------

                    TOTAL........................... $   2,056,000

 

(47)Acquisition:  Purchase land for staff and student parking (Olympic) (92‑1‑601)

 

           Appropriation:

               St Bldg Constr Acct................. $     105,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     105,000

 

(48)Acquisition:  Purchase a two thousand four hundred-square-foot child care facility (Centralia) (92‑1‑602)

 

           Appropriation:

               St Bldg Constr Acct................. $      78,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $      78,000

 

(49)Acquisition:  Purchase 1.76 acres and a five thousand seven hundred five-square-foot fire station for fire science training and additional college parking (Spokane) (92‑1‑603)

 

           Appropriation:

               St Bldg Constr Acct................. $     498,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     498,000

 

(50)Acquisition:  Purchase property for auto shop ((that is currently being leased)) program (Olympic) (92‑1‑604)

 

           Appropriation:

               St Bldg Constr Acct................. $     700,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     700,000

 

(51)Acquisition:  Purchase 1.4 acres and an eight thousand-square-foot graphic arts facility currently being leased for the Whidbey branch (Skagit Valley) (92‑1‑605)

 

           Appropriation:

               St Bldg Constr Acct................. $     280,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     280,000

 

(52)Acquisition:  Purchase a fourteen thousand six hundred three-square-foot vocational facility adjacent to the college that is currently being leased (Whatcom) (92‑1‑606)

 

           Appropriation:

               St Bldg Constr Acct................. $   1,893,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   1,893,000

 

(53)Underground tank repairs:  To remove sixty-five underground storage tanks and any contaminated soil (92‑2‑102)

 

     The appropriation in this subsection may be expended only after compliance with section 6(2) ((of this act)), chapter 14, Laws of 1991 sp.s..

 

           Appropriation:

               St Bldg Constr Acct................. $     650,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     650,000

 

(54)Life safety code repairs:  To pay local improvement district assessments and make improvements to meet handicap and safety regulations (92‑2‑103)

 

           Appropriation:

                St Bldg Constr Acct................. $   1,172,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   1,172,000

 

(55)Roof repairs:  To replace or repair roofs at seventeen campuses (92‑2‑104)

 

           Appropriation:

               St Bldg Constr Acct................. $   7,457,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   7,457,000

 

(56)Exterior and structural repairs:  To repair structural or exterior problems at seven campuses (92‑2‑105)

 

           Appropriation:

               St Bldg Constr Acct................. $     817,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     817,000

 

(57)Heating, ventilation, and air conditioning repairs:  To repair or replace HVAC systems on ten campuses (92‑2‑106)

 

           Appropriation:

               St Bldg Constr Acct................. $   3,074,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   3,074,000

 

(58)Electrical repairs:  To repair or replace electrical wiring and equipment on twelve campuses (92‑2‑107)

 

           Appropriation:

               St Bldg Constr Acct................. $   2,307,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   2,307,000

 

(59)Mechanical repairs:  To repair or replace mechanical system components on eleven campuses (92‑2‑108)

 

           Appropriation:

               St Bldg Constr Acct................. $   2,508,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   2,508,000

 

(60)Fire and security repairs:  To repair or improve fire and security systems on four campuses (92‑2‑109)

 

           Appropriation:

               St Bldg Constr Acct................. $     692,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                     TOTAL........................... $     692,000

 

(61)Interior repairs:  To repair or replace interior surfaces and equipment on twelve campuses (92‑2‑110)

 

           Appropriation:

               St Bldg Constr Acct................. $   1,440,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   1,440,000

 

(62)Site repairs:  To provide site improvements on eleven campuses (92‑2‑111)

 

           Appropriation:

               St Bldg Constr Acct................. $   1,329,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   1,329,000

 

(63)Small repairs and improvements:  To provide funds for each community college to make unforeseen repairs (92‑5‑001)

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) $45,000, or as much thereof as may be necessary, ((of the appropriation in this subsection)) is provided for an evaluation of the physical condition of the Seattle Vocational Institute formally the Washington Institute of Applied Technology (WIAT) facility.

     (b) The state board for community and technology colleges shall include within the 1993-95 capital budget request for small repairs and improvements as identified in the governor's six year capital plan, an amount for a centralized reserve to be allocated by the board for facility emergency repairs that occur during the fiscal period.

     (c) The board shall ensure that all allocations from this appropriation are used for capital expenditures and not for expenditures normally funded from the state operating budget.

 

           Appropriation:

               St Bldg Constr Acct................. $   6,256,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $   6,256,000

 

(64)Minor improvements:  To complete fifty-seven minor improvement projects costing less than $500,000 each (92‑5‑200)

 

     The appropriation in this subsection is provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget.

 

           Appropriation:

               St Bldg Constr Acct................. $  16,930,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $  16,930,000

 

(65)Preplan:  Puyallup, phase 2 (Pierce) (92‑5‑501)

 

     Any preplanning documents developed using the appropriation in this subsection are subject to review by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St Bldg Constr Acct................. $      57,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $   9,653,000

                                                     -------------

                    TOTAL........................... $   9,710,000

 

(66)Preplan:  Vocational building (Skagit Valley) (92‑5‑502)

 

           Appropriation:

               St Bldg Constr Acct................. $      25,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $   2,116,000

                                                     -------------

                    TOTAL........................... $   2,141,000

 

(67)Preplan:  Learning resource center, arts, and student center (Whatcom) (92‑5‑503)

 

     Any preplanning documents developed using the appropriation in this subsection are subject to review by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St Bldg Constr Acct................. $      45,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $   6,942,000

                                                     -------------

                    TOTAL........................... $   6,987,000

 

(68)Preplan:  Office and instructional building (Edmonds) (92‑5‑504)

 

     Any preplanning documents developed using the appropriation in this subsection are subject to review by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St Bldg Constr Acct................. $      58,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $   8,485,000

                                                     -------------

                    TOTAL........................... $   8,543,000

 

(69)Preplan:  Technical skills facility (South Puget Sound) (92‑5‑505)

 

     Any preplanning documents developed using the appropriation in this subsection are subject to review by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St Bldg Constr Acct................. $      42,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $   5,849,000

                                                     -------------

                    TOTAL........................... $   5,891,000

 

(70)Preplan:  Learning resource center and technical facility (Green river) (92‑5‑506)

 

     Any preplanning documents developed using the appropriation in this subsection are subject to review by the office of financial management under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.

 

           Appropriation:

               St Bldg Constr Acct................. $      58,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $  10,462,000

                                                     -------------

                    TOTAL........................... $  10,520,000

 

(71)Preplan:  New Campus One (92‑5‑701)

 

           Appropriation:

               St Bldg Constr Acct................. $     300,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $  14,800,000

                                                     -------------

                    TOTAL........................... $  15,100,000

 

(72)Pool repairs (Pierce)

 

           Appropriation:

               St Bldg Constr Acct................. $     600,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     600,000

 

(73)Lake Washington Technical College:  For the administrative addition, classroom space, and aerospace laboratory (92-5-003)

 

     The appropriation in this subsection is in addition to the appropriation in chapter 2, Laws of 1992 (House Bill No. 2295) for Lake Washington Technical College and is provided solely for building construction, building equipment and furniture, street improvements, and required art works.

 

           Appropriation:

               St Bldg Constr Acct................. $   2,291,200

 

           Prior Biennia (Expenditures)............. $  10,117,000

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $  12,408,200

 

(74)Bates Technical College:  For building furnishings and equipment to complete a facility (93-2-002)

 

           Appropriation:

               St Bldg Constr Acct................. $     108,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     108,000

 

(75)Clover Park Technical College:  Roof repairs (93-2-002)

 

           Appropriation:

               St Bldg Constr Acct................. $     189,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     189,000

 

(76)Wenatchee Valley College:  For remodeling to accommodate the WHETS telecommunication system

 

           Appropriation:

               St Bldg Constr Acct................. $     250,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     250,000

 

 

(77)Olympic College:  For electrical transformer repairs

 

           Appropriation:

               St Bldg Constr Acct................. $     100,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     100,000

 

 

(78)Columbia Basin College:  For heating system repairs and steam line replacement

 

           Appropriation:

               St Bldg Constr Acct................. $     281,600

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $     281,600

 

 

(79)Seattle Vocational Institute:  Facilities planning and emergency repairs

 

     The appropriation in this subsection is subject to the following conditions and limitations:

     (a) The Seattle Vocational Institute shall revise its mission statement to integrate with the goals, program, and facilities plans of the Seattle community college district;

     (b) $60,000, or as much thereof as may be necessary, is provided for unforeseen or emergency repairs to the facility;

     (c) The state board for community and technical colleges shall submit a report to the fiscal committees of the senate and house of representatives by January 15, 1993.  The report shall include:

     (i) The feasibility of alternative leased or new facilities that could replace the existing Seattle Vocational Institute building;

     (ii) A recommendation on the disposition or renovation of the existing Seattle Vocational Institute building; and

     (iii) Operating and capital cost estimates for the Seattle Vocational Institute for the next six years.

 

           Appropriation:

               St Bldg Constr Acct................. $     100,000

 

           Prior Biennia (Expenditures)............. $           0

           Future Biennia (Projected Costs)......... $           0

                                                     -------------

                    TOTAL........................... $    100,000"

 

 

 

                           (End of part)


 

 

                              "PART 5

                          MISCELLANEOUS"

 

    "NEW SECTION.  Sec. 30.  The estimated debt service costs impacting future general fund expenditures related solely to new supplemental capital appropriations within this act are $395,300 during the 1991-93 fiscal period; $23,794,000 during the 1993-95 fiscal period; and $28,381,300 during the 1995-97 fiscal period."

 

    "Sec. 31.  1991 sp.s. c 14 s 47 (uncodified) is amended to read as follows:

    The following agencies may enter into financial contracts for the purpose indicated and in not more than the principal amounts indicated plus financing expenses and required reserves pursuant to chapter 39.94 RCW:

    (1) Department of Social and Health Services to:

    (a) Lease a multi-service center in Benton or Franklin county for (($2,592,450)) $1,337,670 during the 1991-93 biennium; ((and))

    (b) Lease a Spokane North Community Service Office for $980,000 during the 1991-93 biennium; and

    (c) Lease a Children's and Family Services office in Toppenish for $135,000 during the 1991-93 biennium.

    (2) Department of Corrections to:

    (a) Lease-purchase a ((sixty-bed)) work-release facility in Benton or Franklin county for $((1,186,850)) 1,337,670 during the 1991-93 biennium;

    (b) Lease-purchase a forty-bed work-release facility in Longview for $1,337,670 during the 1991-93 biennium;

    (c) Lease-purchase ((twelve forty-bed)) three hundred sixty beds in work-release facilities in as-yet-undetermined locations state-wide ((for $1,337,670 each)), for a total of $((16,052,040)) 12,039,030 during the 1991-93 biennium;

    (d) Lease-purchase a correctional industries building at Shelton for $1,892,153 during the 1991-93 biennium; ((and))

    (e) Lease-purchase a four hundred-passenger ferry, used tugboat, and new vehicle barge at McNeil Island for $1,760,963 during the 1991-93 biennium; and

    (f) Lease-purchase property from the Department of Natural Resources on which the Cedar Creek, Indian Ridge, Larch, and Olympic Correctional Centers are now located for up to $1,000,000 during the 1991-93 biennium.

    (3) State Board for Community College Education to:

    (a) Lease-purchase a warehouse-type facility to house the electrician apprentice training program in Skagit county for an estimated cost of $200,000 during the 1991-93 biennium;

    (b) Lease-purchase a facility to house the cosmetology training program at Everett for $60,000;

    (c) Lease a facility to house the Bellevue Community College business office in Bellevue for $120,000 during the 1991-93 biennium;

    (d) Lease a facility for the Green River Community College education and training center in Kent for $120,000 in the 1991-93 biennium;

    (e) Lease-purchase office space for Edmonds Community College in Edmonds for $280,000 during the 1991-93 biennium;

    (f) Lease-purchase space to house Spokane Falls Community College's adult education programs in Spokane for $300,000 during the 1991-93 biennium;

    (g) Lease-purchase space to house plant services for Wenatchee Valley Community College in Wenatchee for $96,000 during the 1991-93 biennium;

    (h) Lease-purchase land in Bellingham for Whatcom Community College for $450,000;

    (i) Purchase a central storage facility for Spokane Community College for $75,000;

    (j) Purchase a hangar at Felts Field to house the aircraft mechanics' vocational training program for Spokane Community College for $161,000; ((and))

    (k) Lease-purchase an auto technology training facility at Shoreline Community College for $2,600,000.  The college or its trustee may secure the financing contract with a lease of the land directly under the facility being financed by the contract;

    (l) Purchase 6.32 acres adjacent to Centralia College for $1,500,000 during the 1991-93 biennium;

    (m) Purchase 2.33 acres and house adjacent to Green River Community College for $250,000 during the 1991-93 biennium;

    (n) Purchase 1.66 acres contiguous to Lake Washington Technical College for $500,000 during the 1991-93 biennium;

    (o) Purchase 0.37 acres contiguous to Lower Columbia College for $55,000 during the 1991-93 biennium;

    (p) Purchase 8.8 acres contiguous to the South Puget Sound Community College for $500,000 during the 1991-93 biennium;

    (q) Purchase 6 acres contiguous to Wenatchee Valley College for $265,000 during the 1991-93 biennium;

    (r) Purchase 4.29 acres contiguous to Whatcom Community College for $560,000 during the 1991-93 biennium;

    (s) Purchase 10.5 acres adjacent to Whatcom Community College for $1,400,000 during the 1991-93 biennium;

    (t) Purchase the Masonic Temple property adjacent to Seattle Central Community College for $1,600,000 during the 1991-93 biennium;

    (u) Lease an industrial training center in Colville for Community Colleges of Spokane for $600,000 during the 1991-93 biennium;

    (v) Lease-purchase Colville Building #2 for expansion of the Colville Center for the Community Colleges of Spokane for $300,000 during the 1991-93 biennium;

    (w) Purchase a 6,000 square foot building and site on San Juan Island for instructional, office, and meeting space for Skagit Valley Community College for $600,000 during the 1991-93 biennium;

    (x) Purchase 20,000 square foot building on a five-acre site in Gig Harbor for an off-site education center for Tacoma Community College for $1,750,000 during the 1991-93 biennium;

    (y) Purchase space for a Kent education and training center by Green River Community College for up to $201,000 per year; and

    (z) Lease or lease-purchase a computing and telecommunications center for the community and technical college system for up to $5,000,000.

    (4) The Department of Ecology, to acquire, design, and construct a Thurston county headquarters for $53,000,000.

    (5) The Evergreen State College, to expand the college activities building for $800,000.  The college or its trustee may secure the financing contract with a lease of the land directly under the facility being financed by the contract.  The financing contract shall be repaid through student activities fees.

    (6) The Department of General Administration, to purchase or lease purchase office space to house the state board for community college education staff for $1,400,000."

 

    "Sec. 32.  1991 sp.s. c 14 s 54 (uncodified) is amended to read as follows:

    Unless otherwise stated, for all appropriations under this act that require a match of nonstate money or in-kind contributions, the following requirement, consistent with RCW 43.88.150, shall apply:  Expenditure of state money shall be timed so that the state share of project expenditures never exceeds the intended state share of total project costs.  This section shall not apply to section 10(5), chapter 14, Laws of 1991 sp.s. as amended by section ((12(5))) 5(5) of this act."

 

    "Sec. 33.  1991 sp.s. c 14 s 59 (uncodified) is amended to read as follows:

    To ensure that major construction projects are carried out in accordance with legislative and executive intent, appropriations in this act referencing this section shall not be expended until the office of financial management has reviewed the agency's programmatic preplanning or predesign document and approved continuation of or made changes to the project.  The program preplanning document shall include but not be limited to projected workload, site conditions, user requirements, current space available, and an overall budget and cost estimate breakdown in a form prescribed by the office of financial management.  The predesign document shall be prepared in accordance with the predesign standards adopted by the office of financial management.  The office of financial management shall report to the house of representatives capital facilities committee, the senate ways and means committee, and the legislative transportation committee a listing of the program documents the office has reviewed and approved, changes made to the documents resulting from the review, and the estimated cost changes resulting from the review."

 

    "NEW SECTION.  Sec. 34.  In recognition of the services provided to the beneficiaries of state trust lands by county public safety agencies, lease payments for public safety communication systems located on trust lands in any county with a population of less than five thousand shall be twenty-five percent of the fair market value as determined by the department of natural resources."

 

    "NEW SECTION.  Sec. 35.  A new section is added to chapter 14, Laws of 1991 sp.s. (uncodified) to read as follows:

    As used in this act, the following phrases have the following meanings:

    "WA St Dairy Prod Comm Fac Acct" means Washington State Dairy Products Commission Facility Account.

    "Data Processing Bldg Constr Acct" means Data Processing Building Construction Account;

    "Nat Res Prop Repl Acct" means Natural Resources Property Replacement Account.

    St Conv & Trade Ctr Acct" means State Convention and Trade Center Account.

    "Water Pollution Cont Rev Fund" means the Water Pollution Control Revolving Fund."

 

    "NEW SECTION.  Sec. 36.  This act is subject to the provisions, definitions, conditions, and limitations of chapter 14, Laws of 1991 sp. sess., as amended by this act."

 

 

 

                           (End of part)


 

 

                              "PART 6

                 SEVERABILITY AND EFFECTIVE DATE"

 

    "NEW SECTION.  Sec. 37.  If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected."

 

    "NEW SECTION.  Sec. 38.  This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and shall take effect immediately."

 

 

 

                           (End of part)


 

 

 


                               INDEX

                                                            Page #

COMMUNITY COLLEGE SYSTEM

SYSTEM........................................................ 109

DEPARTMENT OF COMMUNITY DEVELOPMENT............................ 18

DEPARTMENT OF CORRECTIONS...................................... 53

DEPARTMENT OF ECOLOGY.......................................... 66

DEPARTMENT OF FISHERIES........................................ 78

DEPARTMENT OF GENERAL ADMINISTRATION............................ 5

DEPARTMENT OF INFORMATION SERVICES............................. 17

DEPARTMENT OF NATURAL RESOURCES................................ 82

DEPARTMENT OF SOCIAL AND HEALTH SERVICES....................... 41

DEPARTMENT OF TRADE AND ECONOMIC DEVELOPMENT................... 78

DEPARTMENT OF VETERANS' AFFAIRS................................ 53

DEPARTMENT OF WILDLIFE......................................... 79

EASTERN WASHINGTON UNIVERSITY................................. 108

INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION................... 74

OFFICE OF FINANCIAL MANAGEMENT.................................. 2

OFFICE OF THE SECRETARY OF STATE................................ 1

PARKS AND RECREATION COMMISSION

Timberland Purchases and Common School Purchases............... 80

STATE BOARD OF EDUCATION....................................... 84

STATE CONVENTION AND TRADE CENTER.............................. 82

STATE PARKS AND RECREATION COMMISSION...................... 71, 73

SUPERINTENDENT OF PUBLIC INSTRUCTION........................... 87

UNIVERSITY OF WASHINGTON....................................... 88

WASHINGTON STATE DAIRY PRODUCTS COMMISSION..................... 74

WASHINGTON STATE UNIVERSITY.................................... 99

 

 

 

 

ESHB 2552 - CONF REPT

By Conference Committee

 

                                                   ADOPTED 3/12/92

 

    On page 1, line 1 of the title, after "budget;" strike the remainder of the title and insert "amending 1991 sp.s. c 14 ss 6, 7, 10, 13, 16, 18, 20, 26, 30, 34, 35, 44, 47, 54, and 59 (uncodified); adding new sections to chapter 14, Laws of 1991 sp.s.; creating new sections; making appropriations and authorizing expenditures for the capital improvements; and declaring an emergency."