H-4425.1 _______________________________________________
SUBSTITUTE HOUSE BILL 2302
_______________________________________________
State of Washington 52nd Legislature 1992 Regular Session
By House Committee on Capital Facilities & Financing (originally sponsored by Representatives H. Sommers, Miller, Rasmussen, Jones, Orr and P. Johnson; by request of Department of Community Development)
Read first time 02/03/92.
AN ACT Relating to appropriations for projects recommended by the public works board; creating a new section; and declaring an emergency.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
NEW SECTION. Sec. 1. Pursuant to chapter 43.155 RCW, the following project loans recommended by the public works board are authorized to be made with funds previously appropriated from the public works assistance account:
(1) City of Almira--water project--install 185 new remote readout meters in curbside meter boxes $93,969
(2) Asotin County PUD No. 1--water project--replace telemetry system and 9,500 lineal feet of steel water lines $1,027,838
(3) Bryn Mawr-Lakeridge Water & Sewer District--sanitary sewer
project--replace 1/2 mile of sewer pipe................................... $450,000
(4) Bryn Mawr-Lakeridge Water & Sewer District--water project--replace 3,600 lineal feet of 8 inch ductile iron pipe ................................. $360,000
(5) City of Buckley--CIP project--develop a capital improvement plan which covers roads, sanitary sewer, and storm sewer systems
..................................................................... $30,000
(6) Cape San Juan Water District--water project--develop a new metered well and laying 1,200 feet of water pipe $41,294
(7) City of Chehalis--sanitary sewer project--replace 21,218 lineal feet of sewer line, 74 manholes, and 426 side sewers..................................... $845,213
(8) City of Cheney--sanitary sewer project--replace treatment plant components and sludge composting equipment ............................... $2,175,000
(9) Clark County--sanitary sewer project--provide additional capacity at the Salmon Creek Wastewater Treatment Plant........................................ $2,550,000
(10) City of Cle Elum--sanitary sewer project--replace 5,250 lineal feet of collector and 2,400 lineal feet of interceptor.................................. $563,000
(11) City of Cosmopolis--CIP project--develop a capital improvement plan which covers roads, water, sanitary sewer, and storm sewer systems................................... $15,000
(12) City of Deer Park--CIP project--develop a capital improvement plan which covers sanitary sewer system........ $30,000
(13) City of Ephrata--sanitary sewer project--replace lift station, 10,600 lineal feet of pipe, and 25 manholes $765,000
(14) City of Everson--water project--drill two wells, build a 300,000 gallon reservoir, and install 7,000 lineal feet of pipes
.................................................................. $1,256,400
(15) City of Grand Coulee--water project--reconstruct water treatment plant, pipe, and, a 500,000 gallon reservoir $430,000
(16) City of Kennewick--road project--realign and reconstruct Ely Street and link Zintel Canyon bridge span $3,500,000
(17) King County Water District No. 107--sanitary sewer project--replace lift station, vault, and telemetry systems $210,994
(18) Kitsap County Sewer District No. 5--sanitary sewer project--install l4,000 lineal feet of lined concrete pipe $585,000
(19) City of Lacey--sanitary sewer project--install 4,300 lineal feet of PVC pipe, manholes, and street patching $424,274
(20) Lake Chelan Reclamation District--CIP project--develop a capital improvement plan which covers sanitary sewer and water systems
..................................................................... $11,250
(21) City of Mercer Island--sanitary sewer project--install pump motor controllers and lift station telemetry controls $409,583
(22) City of Morton--water project--modify intake structure, reroute pipeline, and construct a water filtration plant $1,666,143
(23) City of Moses Lake--water project--install a deep well vertical turbine pump, a pump house, and connections $434,700
(24) Northeast Lake Washington Sewer & Water District--water
project--replace 55,330 lineal feet of water mains..................... $2,205,000
(25) Town of Oakesdale--CIP project--develop a capital improvement plan which covers bridges, roads, water, sanitary sewer, and storm sewer systems............................ $7,500
(26) Olympic View Water & Sewer District--water project--replace 5,670 lineal feet of water mains...................... $252,315
(27) Pierce County--road project--replace a county ferry
.................................................................. $3,500,000
(28) City of Port Angeles--road project--reconstruct 3,500 lineal feet of Marine Drive ............... $702,000
(29) City of Port Angeles--road project--realign 275 feet of culverts and install headwalls to maintain hydraulic capacity $86,400
(30) City of Renton--sanitary sewer project--install 5,500 lineal feet of sewer mains and associated street restoration $987,180
(31) Rose Hill Water District--water project--replace 4,660 lineal feet of asbestos concrete mains, replace 3,115 lineal feet of pipe, and construct two pressure reducing stations $635,850
(32) City of Seattle--road project--reconstruct .68 miles of South Graham Street. $2,150,000
(33) City of Seattle--road project--improve traffic control systems on Martin Luther King Jr. Way South.................. $1,350,000
(34) City of Shelton--sanitary sewer project--install 36,000 lineal feet of pipe, 65 manholes, and street restoration $3,465,000
(35) Snohomish County PUD No. 1--water project--construct a 2 million gallon reservoir and install 38,700 lineal feet of mains
.................................................................. $3,500,000
(36) City of Spokane--bridge project--replace the existing damaged T.J. Meenach Drive Bridge ....................... $708,000
(37) Stevens County PUD No. 1--water project--replace 8,000 lineal feet of mains and reservoir in Willow-Beaver Park area $194,445
(38) Stevens County PUD No. 1--water project--replace 8,000 lineal feet of mains and water supply systems in Larson Beach-Cedar Beau Bay area............................... $179,760
(39) City of Tumwater--water project--investigate Palermo well field and construct a new well ............... $140,400
(40) City of Vancouver--road project--widen 700 feet of Andersen Road and improve 15,900 lineal feet of road surface $1,000,000
(41) City of Wapato--CIP project--develop a capital improvement plan which covers roads, water, sanitary sewer, and storm sewer
systems .................................................................. $30,000
(42) City of Waterville--water project--redevelop water supply systems including wells, pumps, lines, and reservoir $1,049,000
(43) City of West Richland--CIP project--develop a capital improvement plan which covers roads, water, sanitary sewer, and storm sewer systems............................ $30,000
(44) Whatcom County Water District No. 10--sanitary sewer project--replace 20,993 lineal feet of pipes and systems upgrade
.................................................................. $1,489,500
(45) City of Winthrop--CIP project--develop a capital improvement plan which covers roads, water, sanitary sewer, and storm sewer
systems................................................................... $30,000
(46) City of Yakima--sanitary sewer project--replace 17,324 lineal feet of pipe.. $1,120,000
(47) Emergency public works loans--as authorized by RCW
43.155.065............................................................. $1,000,000
Total approved list................................................... $43,678,008