_______________________________________________
ENGROSSED SUBSTITUTE HOUSE BILL 2552
_______________________________________________
State of Washington 52nd Legislature 1992 Regular Session
By House Committee on Capital Facilities & Financing (originally sponsored by Representatives H. Sommers, Schmidt, Rasmussen, Neher, Dellwo and Jacobsen; by request of Governor Gardner)
Read first time 01/20/92.
AN ACT Relating to the capital budget; amending 1991 sp.s. c 14 ss 6, 7, 10, 13, 16, 18, 26, 28, 29, 30, 34, 35, 37, 44, 47, 54, and 59 (uncodified); adding new sections to chapter 14, Laws of 1991 sp.s.; creating new sections; making appropriations and authorizing expenditures for the capital improvements; and declaring an emergency.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
PART 1
GENERAL GOVERNMENT
NEW SECTION. Sec. 1. A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:
FOR THE OFFICE OF THE SECRETARY OF STATE
(1) Central Washington Archives: To design a regional archives facility at Central Washington University in Ellensburg (93-2-001)
The appropriation in this subsection is subject to the following conditions and limitations: No moneys may be spent until preplanning documents have been reviewed and approved by the office of financial management under section 35 of this act.
Appropriation:
St Bldg Constr Acct......................... $.......... 360,000
Prior Biennia (Expenditures)...................... $........... 17,500
Future Biennia (Projected Costs).................. $........ 3,909,500
-------------
TOTAL................................. $........ 4,287,000
Sec. 2. 1991 sp.s. c 14 s 6 (uncodified) is amended to read as follows:
FOR THE OFFICE OF FINANCIAL MANAGEMENT
(1) Local jail facilities (88‑2‑001)
Reappropriation:
St Bldg Constr Acct......................... $.......... 308,000
Prior Biennia (Expenditures)...................... $........ 2,692,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 3,000,000
(2) For environmental cleanup related to underground storage tanks (92-5-003)
The appropriation in this subsection is subject to the following conditions and limitations:
(a) The moneys provided in this subsection shall be allocated to the agencies and institutions of the state for removal, replacement, and environmental cleanup projects related to underground storage tanks.
(b) No moneys appropriated in this subsection or in any subsection specifically referencing this subsection may be expended unless the office of financial management, in consultation with the department of general administration, has reviewed and approved the cost estimates for the project. Projects to replace underground storage tanks shall conform with guidelines to minimize the risk of environmental contamination and reduce unnecessary duplication of tanks. The guidelines shall be adopted by the department of general administration and shall provide for consideration of environmental risks associated with tank installations, interagency agreements for sharing fueling facilities, and the feasibility of alternative fueling systems.
Appropriation:
St Bldg Constr
Acct......................... $.... ((3,729,000))
5,233,000
CEP & RI Acct............................... $.......... 390,000
For Dev Acct................................ $........... 37,000
Res Mgmt Cost Acct.......................... $.......... 118,000
-------------
Subtotal Appropriation................ $.... ((4,274,000))
5,778,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.... ((4,274,000))
5,778,000
(3) For asbestos removal or abatement projects
The appropriations in this subsection are subject to the following conditions and limitations:
(a) The moneys provided in this subsection shall be allocated to agencies and institutions of the state for asbestos removal or abatement projects.
(((c))) (b) Moneys may be
allocated for an asbestos removal or abatement project only to the extent that
the project is necessary to eliminate or reduce a hazard to human health and
the project is completed in compliance with asbestos project standards adopted
by the department of general administration. The department of general
administration shall adopt standards to restrict the amount of asbestos removal
to the minimum amount necessary.
(((d))) (c) Subsections (3)(b) ((and
(c))) of this section do not apply to moneys reappropriated in this act for
projects for which, before the effective date of this act, the design has been
completed, bids have been requested, or a contract has been entered into.
Reappropriation:
St Bldg Constr Acct......................... $........ 4,919,000
CEP & RI Acct............................... $........... 25,000
-------------
Subtotal Reappropriation.............. $........ 4,944,000
Appropriation:
St Bldg Constr Acct......................... $........ 9,588,000
CEP & RI Acct............................... $.......... 540,000
-------------
Subtotal Appropriation................ $....... 10,128,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 14,448,000
(4) Higher education: Branch campuses site acquisition and development (90‑5‑002)
The appropriations in this subsection are subject to the following conditions and limitations:
(a) The appropriations in this subsection are provided solely for the acquisition of land and/or construction of facilities for branch campuses recommended by the higher education coordinating board, and shall be allocated to appropriate public institutions of higher education upon approval of the board.
(b) Allocations from the appropriation in this subsection for land acquisition in the Spokane area shall be subject to the provisions of chapter 205, Laws of 1991 (House Bill No. 2198) and approval by the higher education coordinating board.
(c) No facility may be constructed on the Spokane riverfront property, other than the Spokane Intercollegiate Research and Technology Institute (SIRTI) building, until a master plan for facilities that incorporates the SIRTI building and provides for maximum joint use of facilities, is completed by the joint center board and approved by the higher education coordinating board.
(((e))) (d) Any allocations made
from the appropriation in this subsection for construction projects costing
more than $4,000,000 shall not be expended on design documents or construction
until project preplanning documents have been reviewed and approved by the office
of financial management under section 59 ((of this act)), chapter 14,
Laws of 1991 sp.s.
Reappropriation:
St Bldg Constr Acct......................... $....... 31,301,667
Appropriation:
St Bldg Constr Acct......................... $....... 31,000,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $...... 109,000,000
-------------
TOTAL................................. $...... 171,301,667
(5) Capital plan improvements: To develop state-wide capital cost standards, planning guidelines and policies, and internal rent strategies
The appropriation in this subsection is subject to the following conditions and limitations: The office of financial management shall establish state-wide guidelines to minimize funding of state agency staffing and overhead costs from capital budget appropriations. The guidelines shall provide for uniform agency reporting of staffing and overhead costs charged to capital funds and accounts, including engineering and architectural services provided through the department of general administration. The office of financial management shall report to the fiscal committees of the legislature by January 1, 1993, on the guidelines established pursuant to this subsection.
Appropriation:
St Bldg Constr Acct......................... $.......... 282,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.......... 282,000
Sec. 3. 1991 sp.s. c 14 s 7 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
(1) Life and safety projects: To improve life and safety deficiencies and correct code violations on the capitol campus (88‑1‑006)
Reappropriation:
Cap Bldg Constr Acct........................ $........... 23,000
Prior Biennia (Expenditures)...................... $........... 90,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.......... 113,000
(2) Minor works: To complete minor works and other projects, including inadequate building systems (88‑2‑008), Northern State facility repairs (90‑1‑012), boiler plant structural repairs (90‑1‑016), building exterior repairs (90‑2‑006), mechanical system repairs (90‑2‑009), and building interior repairs (90‑2‑010)
Reappropriation:
St Bldg Constr Acct......................... $........ 2,621,000
Prior Biennia (Expenditures)...................... $........ 6,178,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 8,799,000
(3) Capitol Campus minor works: To complete minor works and other projects on the Capitol Campus, including boiler plant structural repairs (88‑1‑003), sidewalk and street repairs (90‑2‑005), building exterior repairs (90‑2‑006), and Capitol Lake shoreline repairs (90‑3‑013)
Reappropriation:
Cap Bldg Constr Acct........................ $........ 1,278,000
Prior Biennia (Expenditures)...................... $........ 1,587,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 2,865,000
(4) Burien criminal justice training center: To complete renovations to the Burien criminal justice training center (90‑3‑025)
Reappropriation:
St Bldg Constr Acct......................... $........ 5,000,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 5,000,000
(5) Natural Resources Building: To complete construction of the Natural Resources Building (90‑5‑003)
Reappropriation:
East Cap Constr Acct........................ $....... 45,400,000
Prior Biennia (Expenditures)...................... $....... 27,600,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 73,000,000
(6) Remodel of the John A. Cherberg Building (88‑2‑040)
The reappropriation in this subsection is subject to the following conditions and limitations: The project shall include review and development of program requirements for current and future facilities needs, including furnishings and equipment, for the Washington State Senate whose offices are currently located in the Institutions, Legislative, and John A. Cherberg Buildings. The project shall also include review and redesign, as necessary, of the proposed John A. Cherberg Building remodel, including construction and the acquisition of all furnishings and equipment required.
Reappropriation:
St Bldg Constr Acct......................... $........ 3,000,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 3,000,000
(7) Northern State Multi-Service Center: To complete the design for and to construct a sixteen-bed evaluation and treatment facility at the Northern State Multi-Service Center to provide care for the mentally ill consistent with chapter 71.24 RCW (90-5-027)
The reappropriation in this subsection is subject to the following conditions and limitations:
(a) No moneys from this reappropriation may be expended for construction until the department secures a lease with a county or a group of counties for use of the facility. The lease shall provide for payment to the department for all operations and management costs associated with the facility and a space rental charge. In establishing the space rental charge, the department shall consider fair market rent or lease rates charged for comparable facilities used by regional support networks.
(b) No moneys from this reappropriation may be expended for furnishings or equipment with a useful life expectancy of less than twenty years.
Reappropriation:
St Bldg Constr Acct......................... $........ 1,700,000
Prior Biennia (Expenditures)...................... $........... 50,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 1,750,000
(8) Olympia Archives Storage Building: To complete design and construction of the archives storage building at Olympia Airdustrial Park (90‑4‑024)
Reappropriation:
St Bldg Constr Acct......................... $........ 1,800,000
Appropriation:
St Bldg Constr Acct......................... $.......... 671,000
Prior Biennia (Expenditures)...................... $.......... 215,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 2,686,000
(9) Small and emergency repairs: For unexpected small and emergency repairs on the Capitol Campus, and at other general administration facilities throughout the state (92‑1‑001) (92‑2‑002)
Appropriation:
Cap Bldg Constr Acct........................ $.......... 645,000
St Bldg Constr Acct......................... $.......... 261,000
-------------
Subtotal Appropriation................ $.......... 906,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $........ 2,571,000
-------------
TOTAL................................. $........ 3,477,000
(10)Underground storage tanks: To remove and replace underground storage tanks on the Capitol Campus and at the Northern State multi-service center (92‑1‑005)
The appropriation
in this subsection may be expended only after compliance with section 6(2) ((of
this act)), chapter 14, Laws of 1991 sp.s.
Appropriation:
St Bldg Constr Acct......................... $.......... 140,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $........ 1,371,000
-------------
TOTAL................................. $........ 1,511,000
(11)Highway-Licenses Building: To complete the design for and to renovate the Highway-Licenses Building on the Capitol Campus (88‑5‑011) (92‑2‑003)
The new appropriation in this subsection is subject to the following conditions and limitations:
(a) No moneys may be spent for construction until the department of general administration develops a space rental charge to be assessed to agencies occupying the building being renovated with this appropriation. The space rental charge shall be sufficient to fully reimburse the annual debt service costs of the new appropriation in this subsection, and shall be assessed until the department has developed and implemented space rental charges for facilities owned by the department on a state-wide basis.
(b) No moneys may be spent until preplanning
documents have been reviewed and approved by the office of financial management
under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.
(c) $133,000 is provided solely to plan for and manage the temporary relocation and housing of tenants of the building renovated with this appropriation.
Reappropriation:
Cap Purch & Dev Acct........................ $.......... 150,000
Appropriation:
St Bldg Constr Acct......................... $....... 22,438,000
Prior Biennia (Expenditures)...................... $.......... 350,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 22,938,000
(12)General Administration Building: To preplan renovation of the General Administration Building (92‑2‑005)
The appropriation in this subsection shall not be expended for design documents until the project predesign documents have been reviewed and approved by the office of financial management under section 35 of this act.
Appropriation:
Cap Bldg Constr Acct........................ $........ 1,200,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $....... 22,101,000
-------------
TOTAL................................. $....... 23,301,000
(13)Minor works preplanning: To develop preplans and studies of minor works projects on the Capitol Campus (92‑2‑026)
Appropriation:
Cap Bldg Constr Acct........................ $.......... 750,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.......... 750,000
(14)Capitol Lake: To develop a dredging plan and dredge Capitol Lake, to repair lake dam gates, and to repair shoreline areas damaged by erosion (92‑2‑015) (92‑3‑019)
$200,000 of the appropriation in this subsection is provided solely to develop a management plan and to implement projects to reduce sedimentation and other pollution in the Deschutes river watershed. Eligible projects shall include, but are not limited to, stream corridor conservation, bank stabilization, agricultural soil conservation, silvicultural soil conservation, and sedimentation and pollution monitoring. When implementing this subsection, the department shall coordinate with the departments of natural resources, ecology, fisheries, wildlife, and transportation, and with affected local governments and Indian tribes.
Appropriation:
St Bldg Constr Acct......................... $........ 3,125,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 3,125,000
(15)Minor works: For minor works, repair, and improvement
projects on the Capitol Campus and at other facilities owned by the department,
including campus high voltage loop improvements, plaza garage elevator repairs,
Capitol Campus control system improvements, Governor's Mansion structural
repairs, utilities and grounds improvements, interior and exterior building
repairs, ((and)) building mechanical and electrical system improvements,
and employment security building elevator renovations (92‑2‑008)
(92‑2‑009) (92‑2‑013) (92‑2‑014) (92‑2‑016)
(92‑2‑017) (92‑2‑018) (92‑2‑020) (92‑2‑024)
(94-2-014)
Appropriation:
Cap Bldg
Constr Acct........................ $.... ((7,889,000))
4,467,000
St Bldg Constr
Acct......................... $.... ((2,595,000))
6,317,000
-------------
Subtotal Appropriation................ $... ((10,484,000))
10,784,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $....... 13,188,000
-------------
TOTAL................................. $... ((23,672,000))
23,972,000
(16)Northern State facility repairs: To repair the boiler and steam distribution system, trim trees, and repair roofing at the Northern State multi-service center (92‑2‑021)
Appropriation:
CEP & RI Acct............................... $.......... 280,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $........ 1,278,000
-------------
TOTAL................................. $........ 1,558,000
(17)State facilities planning: To develop designs and plans to accommodate agency housing needs in Thurston county (92‑5‑100) (92‑5‑101) (92‑5‑108) (92‑5‑102)
Of the appropriation in this subsection:
(a) $750,000 is provided ((solely)) to
develop master plans for satellite campuses to be located in the cities of
Lacey and Tumwater, and a facility plan, developed in consultation with the
city of Olympia, which includes mixed use in the downtown Olympia area. The
plans shall provide for the siting of consumer services within walking distance
of the major areas of concentration of state employees;
(b) $300,000 is provided ((solely)) to
develop a facility implementation strategy for Thurston county. The
implementation strategy shall include, but not be limited to, identification of
agency space requirements and opportunities for co-location with other
agencies, and an organizational process for developing specific project
proposals and establishing implementation timelines;
(c) $250,000 is provided ((solely)) to
develop a master plan for light industrial facility needs in Thurston county;
and
(d) $200,000 is provided ((solely)) for a
geotechnical and hydrological survey of the Capitol Campus.
The ((master)) plans and implementation
strategy developed under this subsection shall incorporate transportation
management and housing density principles designed to reduce commuter
congestion and reliance on single-occupancy automobiles.
Appropriation:
St Bldg Constr Acct......................... $........ 1,500,000
Prior Biennia (Expenditures)...................... $.......... 500,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 2,000,000
(18)Thurston county landbank: To purchase, option, or otherwise control real property adjacent to the department of ecology in the city of Lacey for future state facilities (92‑5‑000)
Appropriation:
St Bldg Constr Acct......................... $........ 8,000,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 8,000,000
(19)Heritage Park: To acquire property and begin planning for a park between the Capitol Campus and Budd Inlet (92‑5‑105)
The appropriation in this subsection may not be spent to acquire the property parcel located in Olympia south of Seventh Avenue and approximately two and seven-tenths acres in size if such property parcel is sold to a party other than the state after January 1, 1991, and the state's acquisition price is substantially greater than the acquisition price paid by the other party.
The department shall report to the fiscal committees of the house of representatives and the senate by December 15, 1991, on the status of property acquisitions and plans for the park. The report shall also describe the status of any projects being developed by local governments or other state agencies that affect the design or development of the park. Any expenditure made under this appropriation shall conform to the capital campus master plan.
Appropriation:
St Bldg Constr Acct......................... $........ 6,700,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $....... 13,800,000
-------------
TOTAL................................. $....... 20,500,000
(20)Condition assessment: To develop a prototype condition assessment methodology, assess the condition of facilities owned by the department of general administration, and prepare a facility maintenance strategy that emphasizes preventative maintenance (92‑2‑007)
The appropriations in this subsection may not be spent until a detailed scope of work consistent with the recommendations of the capital forum has been reviewed and approved by the office of financial management.
Appropriation:
Cap Bldg Constr Acct........................ $.......... 591,000
St Bldg Constr Acct......................... $.......... 500,000
-------------
Subtotal Appropriation................ $........ 1,091,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 1,091,000
(21)Ventilation system repair: John L. O'Brien Building
To replace existing heating, ventilation, and air conditioning system
Appropriation:
St Bldg Constr Acct......................... $.......... 650,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.......... 650,000
(22)Office Building #2 air handling system: To upgrade the air supply system by rebuilding the existing system, changing the emergency diesel exhaust system and investigating energy savings to reduce operating and maintenance costs (93‑2‑025)
Appropriation:
St Bldg Constr Acct......................... $........ 1,000,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 1,000,000
(23)Puyallup land acquisition: To reimburse the city of Puyallup for storm drainage improvements to land purchased by the state for a Pierce College extension (88‑3‑031)
Appropriation:
St Bldg Constr Acct......................... $.......... 208,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.......... 208,000
(24)Library for the Blind and Physically Handicapped: To acquire and begin renovating, or to acquire a purchase option on, space for the Washington library for the blind and physically handicapped (92-5-001)
The appropriation in this subsection is subject to the following conditions and limitations:
(a) The facility acquired with this appropriation shall be operated, managed, and maintained by the Seattle public library; and
(b) The department of general administration shall report to the legislature by January 1, 1993, with recommendations on future management and ownership of the library facility. The recommendations shall include an analysis of the benefits and costs associated with each management and ownership alternative, and shall be prepared in consultation with the office of financial management, the Washington state library, and the Seattle public library.
Appropriation:
St Bldg Constr Acct......................... $........ 1,900,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $........ 1,400,000
-------------
TOTAL................................. $........ 3,300,000
(25)Co-location and consolidation of state facilities: To identify the current locations of major concentrations of state facilities in the state and to determine where state facilities can be co-located and consolidated (92-5-004)
The appropriation in this subsection is subject to the following conditions and limitations:
(a) The department shall prepare policy recommendations and cost estimates for opportunities to co-locate and consolidate state facilities, including a comparison of the benefits and costs of purchasing or leasing such facilities and an analysis of private sector impacts; and
(b) The appropriation shall not be spent until a detailed scope of work has been reviewed and approved by the office of financial management.
Appropriation:
St Bldg Constr Acct......................... $.......... 225,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.......... 225,000
NEW SECTION. Sec. 4. A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:
FOR THE DEPARTMENT OF INFORMATION SERVICES
(1) Data center and office building: To design and acquire land for a new Department of Information Services data center and office building (93-2-001)
The appropriation in this subsection shall not be expended for design documents until the project predesign documents have been reviewed and approved by the office of financial management under section 35 of this act. During the review and approval of predesign and design documents for this project, the office of financial management shall ensure that the sizing and design of the data center minimizes construction costs, provides for flexible facility use, and is consistent with the state's long-term requirements for centralized mainframe-based computing.
Appropriation:
Data Processing Bldg Constr Acct............ $........ 5,200,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $....... 58,400,000
-------------
TOTAL................................. $....... 63,600,000
(End of part)
PART 2
HUMAN RESOURCES
Sec. 5. 1991 sp.s. c 14 s 10 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
For the purposes of this
section, "capital cost" means land acquisition and project design and
construction. All projects funded in this section, except those under
subsection (5) of this section, shall comply with section 54 ((of this act)),
chapter 14, Laws of 1991 sp.s.
(1) Development loan fund (88‑2‑002)
The appropriation in this subsection shall be used for loans in timber-dependent communities as defined in Engrossed Substitute House Bill No. 1341.
Appropriation:
WA St Dev Loan Acct........................... $ 2,000,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 2,000,000
(2) Grays Harbor dredging (88‑3‑006)
The appropriation in this subsection is subject to the following conditions and limitations:
(a) The appropriation is provided solely for the state's share of costs for Grays Harbor dredging, dike construction, bridge relocation, and related expenses.
(b) Expenditure of moneys from this appropriation is contingent on the authorization of $40,000,000 and an initial appropriation of at least $13,000,000 from the United States army corps of engineers and the authorization of at least $10,000,000 from the local government for the project. Up to $3,500,000 of the local government contribution for the first year on the project may be composed of property, easements, rent adjustments, and other expenditures specifically for the purposes of this appropriation if approved by the army corps of engineers. State funds shall be disbursed at a rate not to exceed one dollar for every four dollars of federal funds expended by the army corps of engineers and one dollar from other nonstate sources.
(c) Expenditure of moneys from this appropriation is contingent on a cost-sharing arrangement and the execution of a local cooperation agreement between the Port of Grays Harbor and the army corps of engineers pursuant to Public Law 99-662, the federal water resources development act of 1986, whereby the corps of engineers will construct the project as authorized by that federal act.
(d) The Port of Grays Harbor shall make the best possible effort to acquire additional project funding from nonstate public grants and/or other governmental sources other than those in (b) of this subsection. Any money, up to $10,000,000 provided from such sources other than those in (b) of this subsection, shall be used to reimburse or replace state building construction account money. In the event the project cost is reduced, any resulting reduction or reimbursement of nonfederal costs realized by the Port of Grays Harbor shall be shared proportionally with the state.
Reappropriation:
St Bldg Constr Acct........................... $ 6,840,318
Prior Biennia (Expenditures)........................ $ 3,159,682
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 10,000,000
(3) Housing capital programs: To construct, acquire, and rehabilitate low-income housing (88‑5‑015)
The appropriation in this subsection is subject to the following conditions and limitations:
(a) $8,000,000 is provided solely for the affordable housing program. The department may not approve a request for assistance under this subsection for projects located in cities and counties that do not have an affordable housing needs assessment approved by the department. The department shall by rule establish the content of the affordable housing needs assessment and criteria for the approval of the affordable housing needs assessment.
(b) $8,000,000 is provided solely for the low-income weatherization program under chapter 70.164 RCW.
(c) $34,000,000 is provided solely for the housing assistance program. Effective July 1, 1992, the department may not approve loan or grant requests for projects under this subsection that are inconsistent with the city's or county's and state's comprehensive housing affordability strategy, as required under Title I, section 105, of the National Affordable Housing Act of 1990.
(d) The Washington housing trust fund appropriation is provided solely for the department to contract with the University of Washington college of architecture for: (i) A study of regulatory impediments to affordable housing; (ii) a study on various innovative design techniques that can be used to increase housing density; (iii) a recommendation to the legislature for a new building code and associated regulations that will substantially reduce the cost of housing. No indirect costs of the contracting agent may be paid from this appropriation.
Reappropriation:
St Bldg Constr Acct........................... $ 10,000,000
Appropriation:
St Bldg Constr Acct........................... $ 50,000,000
Washington Housing Trust Fund................. $ 150,000
-----------
Subtotal Appropriation.................. $ 50,149,500
Prior Biennia (Expenditures)........................ $ 8,000,000
Future Biennia (Projected Costs).................... $ 100,000,000
-----------
TOTAL................................... $ 168,149,500
(4) Columbia county courthouse (89‑4‑004)
The appropriations in this subsection are provided solely to repair and restore the Columbia county courthouse and shall be matched by at least $100,000 in private donations and local funds from Columbia county.
Reappropriation:
St Bldg Constr Acct........................... $ 600,000
Appropriation:
St Bldg Constr Acct........................... $ 60,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 660,000
(5) Public works trust fund (90‑2‑001)
$7,000,000 of the appropriation in this subsection is provided solely for the purposes of chapter 314, Laws of 1991, (Engrossed Substitute House Bill No. 1341, timber-dependent communities).
Reappropriation:
Public Works Assist........................... $ 85,734,000
Appropriation:
Public Works Assist........................... $ 88,491,000
Prior Biennia (Expenditures)........................ $ 54,534,447
Future Biennia (Projected Costs).................... $ 231,877,000
-----------
TOTAL................................... $ 460,636,447
(6) Seventh Street Hoquiam Theatre (90‑2‑008)
Reappropriation:
St Bldg Constr Acct........................... $ 250,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 250,000
(7) Tall ships tourist attraction: To design and construct a tall ship tourist attraction
The reappropriation in this subsection is subject to the following conditions and limitations:
(a) The reappropriation is provided solely to contract with the Grays Harbor Historical Seaport Authority to design and construct a tall ship tourist attraction.
(b) The reappropriation shall be matched by at least $513,105 from nonstate sources provided solely for capital costs of the project. The match may include cash and in-kind contributions, but may not include cash or in-kind contributions used to match other state moneys provided to the Grays Harbor Historical Seaport Authority.
(c) The department shall ensure that the state's interest is protected by requiring that if the tall ship tourist attraction is sold or its use is changed, the Grays Harbor Historical Seaport Authority shall return to the state of Washington an amount equal to the state's total contribution to the project.
Reappropriation:
St Bldg Constr Acct........................... $ 513,105
Prior Biennia (Expenditures)........................ $ 486,895
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 1,000,000
(8) Port of Klickitat dredge spoils: For site preparation and transport and deposit of Columbia river dredge spoils (90-2-013)
The reappropriation in this subsection is subject to the following conditions and limitations:
(a) The port of Klickitat shall sign an agreement to repay the reappropriation plus simple interest at three percent in eight annual installments beginning July 1, 1993; and
(b) Expenditure of money from this reappropriation is contingent on at least $300,000 from port district funds being provided for the project.
Reappropriation:
St Bldg Constr Acct........................... $ 250,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 250,000
(9) Historic community theaters (90‑5‑014)
The reappropriation in this subsection is provided solely for grants to preserve historic community theatres. No portion of the reappropriation in this subsection may be spent unless an equal amount from nonstate sources is provided for the same purposes. No more than $50,000 of the reappropriation shall be expended for renovation of the Admiral Theatre in west Seattle.
Reappropriation:
St Bldg Constr Acct........................... $ 250,000
Prior Biennia (Expenditures)........................ $ 250,000
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 500,000
(10)Emergency management building minor works (92‑2‑009)
Appropriation:
St Bldg Constr Acct........................... $ 180,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 180,000
(11)Columbia river dredging: For completing a study on the feasibility of deepening the navigation channel from Astoria to Vancouver (92‑5‑006)
Expenditure of this appropriation is contingent on $1,200,000 from the federal government and $600,000 from the state of Oregon being appropriated for the same purpose.
Appropriation:
St Bldg Constr Acct........................... $ 600,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 600,000
(12)Building for the arts: For grants to local performing arts and art museum organizations for facility improvements or additions (92‑5‑100)
The appropriation in this subsection is subject to the following conditions and limitations:
(a) Grants are limited to the following projects:
Estimated Total State State
Capital Cost Grant Portion
Seattle Children's Theatre $ 8,000,000 $ 1,200,000 15%
Admiral Theatre (Bremerton)$ 4,261,000 $ 639,000 15%
Spokane Symphony $ 1,500,000 $ 225,000 15%
Pacific Northwest Ballet $ 7,500,000 $ 1,125,000 15%
Seattle Symphony $ 54,000,000 $ 8,100,000 15%
Seattle Repertory Theatre $ 4,000,000 $ 600,000 15%
Intiman Theatre $ 800,000 $ 120,000 15%
Broadway Theatre District
(Tacoma) $ 8,400,000 $ 1,260,000 15%
Allied Arts of Yakima $ 500,000 $ 75,000 15%
Spokane Art School $ 454,000 $ 68,000 15%
Seattle Art Museum $ 4,862,500 $ 729,000 15%
Total $ 94,277,500 $ 14,141,000
(b) The state grant may provide no more than fifteen percent of the estimated total capital cost or actual total capital cost of the project, whichever is less. The remaining portions of project capital costs shall be a match from nonstate sources. The match may include cash and land value.
(c) State funding shall be distributed to projects in the order in which matching requirements have been met.
Appropriation:
St Bldg Constr Acct........................... $ 10,738,900
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 3,402,100
-----------
TOTAL................................... $ 14,141,000
(13)Columbia Gorge interpretive center: For construction of a facility in Stevenson with exhibits, classrooms, and a research library (92-5-101)
The appropriation in this subsection shall be matched by at least $5,000,000 from nonstate sources provided for capital costs of the project. The match may include cash, land value, and other in-kind contributions.
Appropriation:
St Bldg Constr Acct........................... $ 5,000,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 5,000,000
(14)Seattle Center redevelopment: For upgrading the Coliseum including engineering and other studies to determine renovation alternatives for the Coliseum, the International Fountain mall, Memorial Stadium, the Center House, the Pacific Arts Center, the Opera House, and central plant; converting the northwest rooms to a conference and exhibit facility; adding parking; renovating and developing open space areas; making improvements to mechanical, electrical, and other high-priority building systems; and making general improvements to the site, including but not limited to signs, fountains, portable stages, and fencing
The appropriation in this subsection shall be matched by moneys from nonstate sources sufficient to pay at least seventy-five percent of the total capital costs of these projects.
Appropriation:
St Bldg Constr Acct........................... $ 8,500,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 8,500,000
(15)Spokane Food Bank: For construction of a freezer/cooler
Appropriation:
St Bldg Constr Acct........................... $ 125,000
Prior Biennia (Expenditures)........................ $ 150,000
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 275,000
(16)Carolyn Downs Family Medical Center: To construct a new medical facility on the Odessa Brown Children's Clinic campus
The appropriation in this subsection shall be matched by at least $2,050,000 provided from nonstate sources for capital costs of this project.
Appropriation:
St Bldg Constr Acct........................... $ 500,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 500,000
(17)Nordic Heritage Museum: For building acquisition and improvements (90-2-007)
The reappropriation in this section is contingent on the expenditure for the same purpose of at least two dollars from nonstate sources for each dollar spent from this reappropriation.
Reappropriation:
St Bldg Constr Acct........................... $ 200,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 200,000
(18)Thorp Grist Mill: Restoration (90-5-010)
The reappropriation in this section is contingent on the expenditure for the same purpose of at least two dollars from nonstate sources for each dollar spent from this reappropriation.
Reappropriation:
St Bldg Constr Acct........................... $ 10,000
Prior Biennia (Expenditures)........................ $ 20,000
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 30,000
(19)Bremerton naval heritage redevelopment project
The reappropriation in this section is subject to the following conditions and limitations:
(a) This reappropriation is provided solely for capital improvements to the naval destroyer U.S.S. Turner Joy, in conjunction with the Bremerton naval heritage redevelopment project.
(b) No portion of this reappropriation may be expended unless an equal amount from nonstate and nonfederal sources is expended for the same purpose.
(c) Prior to the expenditure of this reappropriation, the recipient of the grant shall prepare and submit to the director of community development, for the director's approval, a financial plan that identifies the revenue sources for the completion of the project and for the long-term operation of the project.
Reappropriation:
St Bldg Constr Acct........................... $ 190,000
Prior Biennia (Expenditures)........................ $ 66,000
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 256,000
(20)Marine science center construction
The reappropriation in this section is subject to the following conditions and limitations:
(a) This reappropriation is provided solely for a grant to the city of Poulsbo for construction of a marine science center to be operated by educational service district no. 114.
(b) Expenditure of this reappropriation is contingent on site acquisition and at least $300,000 of construction costs contributed from nonstate sources.
Reappropriation:
St Bldg Constr Acct........................... $ 498,000
Prior Biennia (Expenditures)........................ $ 2,500
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 500,000
(21)A Contemporary Theater (90-1-006)
The reappropriation in this section is subject to the following conditions and limitations:
(a) This reappropriation is provided solely for the construction of a new theater in Seattle.
(b) No portion of this reappropriation may be expended unless at least $9,000,000 from nonstate sources, including the value of land, is provided for the same purpose.
Reappropriation:
St Bldg Constr Acct........................... $ 1,000,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 1,000,000
(22)Liberty Theater: To restore and rehabilitate Liberty Theater in Walla Walla
The reappropriation in this section is subject to the following conditions and limitations:
(a) Expenditure of moneys from this reappropriation is contingent on the expenditure for the same purpose of at least one dollar from nonstate sources, including in-kind contributions, for each four dollars spent from this reappropriation.
(b) The reappropriation is provided solely for a grant to a nonprofit corporation for rehabilitation and restoration of the historic Liberty Theater building in Walla Walla.
(c) The owner of the building shall grant to the state an historic preservation easement prior to the expenditure of any funds from this reappropriation.
(d) The nonprofit corporation shall submit to the director of community development, for the director's approval, a financial plan for the long-term operation of the building.
Reappropriation:
St Bldg Constr Acct........................... $ 200,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 200,000
(23)Yakima county: For construction and expansion of jail facilities in Yakima county
The reappropriation in this subsection may not exceed eighty percent of the total capital cost of the project. The remaining portion of project capital costs shall be a match from nonstate sources.
Reappropriation:
St Bldg Constr Acct........................... $ 2,400,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 2,400,000
(24)Resource Center for the Handicapped: For a grant to acquire the building in which the center currently operates
The appropriation in this subsection is subject to the following conditions and limitations:
(a) The appropriation may be used only to purchase the facility declared surplus by the Shoreline school district in which the center operates a program as of the effective date of this section; and
(b) No expenditure shall be made until an equal amount of private, nongovernmental moneys dedicated to the purchase and improvements of the facility have been raised through cash, in-kind contributions, or past lease-purchase expenditures for the facility.
Appropriation:
St Bldg Constr Acct........................... $ ((1,500,000))
900,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ ((1,500,000))
900,000
(25)Columbia river waterfront: Planning and coordinating existing and future land use, park, transportation, historical, and utility improvements along the shoreline of the Columbia river between the flushing channel and the Interstate 205 bridge
The appropriation in this subsection shall be matched by at least $100,000 from nonstate sources provided for the same purpose.
Appropriation:
St Bldg Constr Acct........................... $ 100,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 100,000
(26)Asian Resource Center: To construct an Asian Resource Center in Seattle
This appropriation shall be matched by at least $600,000 in cash provided from nonstate sources.
Appropriation:
St Bldg Constr Acct........................... $ 150,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 150,000
(27)Pike Place Market: For a grant to the city of Seattle (the "city") for the Pike Place Market preservation and development authority (the "authority") to acquire the interests of what is known as the urban group partnerships (the "partnerships") in eleven properties located in the Pike Place Market historical district (the "district")
(a) No portion of the
appropriation in this subsection may be expended until the ((city)) authority
certifies to the department that:
(i) The settlement proposal agreement dated June 6, 1991, concerning the properties in the district is confirmed, including but not limited to provisions that:
(A) The partnerships will receive not more than a total of $2,250,000 under the agreement;
(B) All rights, clear title, and interest in the market property will be relinquished by the partnerships and conveyed to the authority; and
(C) All pending litigation and related disputes will be dismissed with prejudice or otherwise finally resolved;
(ii) ((The city has
amended the authority's charter to preclude any future sales of interests in
authority properties in the district that could result in loss of authority
management responsibilities;
(iii))) The authority has executed and
recorded a conservation easement, which has been approved by the department,
providing protection for the character-defining features of the district. The
term of the easement shall extend until the year 2012 or until the bonds sold
to provide for this appropriation are retired, whichever is later. The
easement shall inure to the benefit of the state.
(b) No portion of the appropriation in this subsection may be expended until (i) the authority has executed an agreement with the department on behalf of the state to preclude any future sales of interest in the authority properties in the district that could result in loss of authority management responsibilities, except for reasonable encumbrances necessary for market-related purposes consistent with generally accepted management principles. Such agreement shall expire upon the termination of the conservation easement as provided in (a)(ii) of this subsection or the amendment of the authority's charter as provided in (b)(ii) of this subsection, whichever is earlier; or (ii) the city amends the authority's charter to preclude any future sales of the interests in authority properties in the district that could result in loss of authority management responsibilities, except for reasonable encumbrances necessary for market-related purposes. However, should the authority's council or its constituency fail to recommend such amendments to the mayor by June 1, 1992, the mayor shall, in his sole discretion, promulgate such amendments to the charter.
(d) The appropriation in this subsection shall be matched by at least $750,000 provided from nonstate sources for the same purpose as this appropriation.
Appropriation:
St Bldg Constr Acct........................... $ 1,500,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 1,500,000
(28)Keyport Naval Undersea Museum: To complete an auditorium in the museum
Appropriation:
St Bldg Constr Acct........................... $ 300,000
Prior Biennia (Expenditures)........................ $ 500,000
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 800,000
(29)Marcus Whitman Statue: To provide a duplicate casting of the official statue of Marcus Whitman and to erect this statue in Walla Walla county
Appropriation:
St Bldg Constr Acct........................... $ 53,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 53,000
(30)Mystic Lake flood assistance: For mitigation of development-induced flooding of the lake
Appropriation:
St Bldg Constr Acct........................... $ 53,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 53,000
(31)Maritime Museum: For exhibit, architecture, and facility planning for a maritime museum on the Seattle waterfront
Appropriation:
St Bldg Constr Acct........................... $ 200,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 200,000
(32)Tacoma educational enrichment center
The appropriation in this subsection shall be matched by a contribution of at least $2,200,000 provided from the Tacoma school district or other local government entity for capital costs of this project. The appropriation in this subsection is provided to the Tacoma school district for a facility to be operated under contract by the metropolitan park district of Tacoma. No funds may be expended until a facility plan has been jointly approved by the Tacoma school district and the metropolitan park district.
Appropriation:
St Bldg Constr Acct........................... $ 2,200,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 2,200,000
(33)Meeker Mansion: For acquisition of property adjacent to the Ezra Meeker mansion in Puyallup
The appropriation in this subsection is subject to the following conditions and limitations:
(a) The appropriation
shall be matched by at least $((200,000)) 100,000 provided from
the Ezra Meeker Historical Society for land acquisition and development.
(b) ((None of the
appropriation may be spent until the Ezra Meeker Historical Society
demonstrates to the satisfaction of the department that it will be able to
raise $200,000 through pledges and contributions.
(c))) The department shall consult
with the Washington State Historical Society before expending any portion of
this appropriation.
Appropriation:
St Bldg Constr Acct........................... $ 200,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 200,000
(34)Almira and Coulee-Hartline school districts: To make improvements to the Coulee-Hartline facility needed for a cooperative high school program with the Almira school district
The appropriation in this subsection is subject to the following conditions and limitations:
(a) No moneys may be expended until the boards of directors of the two school districts have provided to the department written confirmation that the moneys will be used solely to upgrade the Hartline facility for the purpose of implementing a cooperative high school district under chapter 28A.340 RCW;
(b) The appropriation shall be matched by at least $100,000 provided by the Almira and Coulee-Hartline school districts for capital costs of the project.
Appropriation:
St Bldg Constr Acct........................... $ 240,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 240,000
(35)Yakima criminal justice facility: For a grant to the city of Yakima for the construction of a new criminal justice facility
The appropriation in this subsection is subject to the following conditions and limitations:
(a) Before receiving the grant, the city shall demonstrate to the satisfaction of the department an ability to complete the construction of the facility and fund its operation.
(b) The grant may not exceed sixty-six percent of the total project capital costs as determined by the department. The remaining portion of project capital costs shall be a match provided from nonstate sources.
Appropriation:
St Bldg Constr Acct........................... $ 3,000,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 3,000,000
(36)Bonney Lake Park: For a grant to the city of Bonney Lake for the acquisition and development of such facilities as it deems necessary for a park at Bonney Lake
The appropriation in this subsection shall be matched by at least $35,000 from nonstate sources provided for the same purpose.
Appropriation:
St Bldg Constr Acct........................... $ 35,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 35,000
(37)Snohomish county drainage district number 6: To purchase drainage district number 6 and construct a cross-levee on it, in order to decrease damaging flooding of adjacent lands and to reestablish wetlands
The appropriation in this subsection shall be matched by at least $585,000 provided from nonstate sources for capital costs of this project.
Appropriation:
St Bldg Constr Acct........................... $ 350,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 350,000
(38)Tears of Joy Theatre: For construction of an international puppetry center in Vancouver
The appropriation in this subsection shall be matched by at least $1,950,000 from nonstate sources provided for capital costs of the project. The match may include cash, land value, and other in-kind contributions.
Appropriation:
St Bldg Constr Acct........................... $ 1,950,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 1,950,000
(39)Flood control structures: Repair of damage from November 1990 floods
The appropriation in this subsection is provided solely for the local share of matching funds required for federal assistance to repair flood control structures damaged in the November 1990 floods. Local government jurisdictions in the following counties may receive up to 36.5% of the required local match, or the amount listed below, whichever is less:
Chelan county $ ................................ 48,707
Clallam county ................................ 7,954
Grays Harbor county 2,755
Island county 656
Jefferson county 4,647
King county 209,337
Kitsap county 9,737
Kittitas county 30,914
Lewis county 14,802
Mason county 1,732
Pacific county 3,528
Pierce county 65,671
San Juan county 492
Skagit county 416,903
Snohomish county 188,005
Whatcom county 229,160
TOTAL 1,235,000
Appropriation:
St Bldg Constr Acct........................... $ 1,235,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 1,235,000
(40) Fire Training Center: For emergency repairs (93-2-001)
Appropriation:
St Bldg Constr Acct........................... $ 50,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 50,000
(41)Whatcom Museum: For building and exhibit acquisition, repair, and renovation
Expenditures from the appropriation in this subsection shall not exceed fifteen percent of the total estimated capital costs of the project. The remaining portions of the project costs shall be a match from nonstate sources. The match may include cash and land value received after January 1, 1990.
Appropriation:
St Bldg Constr Acct........................... $ 300,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 300,000
(42)Columbia River Renaissance: For a grant to the city of Vancouver to provide public access, park, and trails along the Columbia river
The appropriation in this subsection shall be matched by an equal amount of money from nonstate sources for the same purpose.
Appropriation:
St Bldg Constr Acct........................... $ 2,000,000
Prior Biennia (Expenditures)........................ $ 100,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 2,100,000
(43)Pacific Science Center: For building renovation and repairs and for acquisition and renovation of exhibits
Each dollar expended from the appropriation in this subsection shall be matched by at least three dollars from nonstate sources expended for the same purpose.
Appropriation:
St Bldg Constr Acct........................... $ 1,061,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,061,000
(44)Martin Luther King Jr. Memorial: For development of a public park around the memorial in Seattle. Development includes but is not limited to street curbs, sidewalks, lighting, a parking lot, and landscaping
Each dollar expended from the appropriation in this subsection shall be matched by at least one dollar from other sources expended for the same purpose.
Appropriation:
St Bldg Constr Acct........................... $ 100,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 100,000
NEW SECTION. Sec. 6. A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:
FOR THE DEPARTMENT OF LABOR AND INDUSTRIES
(1) Child care center: Design and construct a child care facility for state employees (93-5-005)
The appropriation in this subsection is subject to the following conditions and limitations: The operations of the child care facility shall be managed by an organization of state employees using the facility.
Appropriation:
Accident Fund................................. $ 450,000
Medical Aid Fund.............................. $ 450,000
-------------
Subtotal Appropriation.................. $ 900,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 900,000
Sec. 7. 1991 sp.s. c 14 s 13 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
(1) Rainier: Renovate Evergreen Center (79‑1‑017)
Reappropriation:
St Bldg Constr Acct........................... $ 200,000
DSHS Constr Acct.............................. $ 119,477
-------------
Subtotal Reappropriation................ $ 319,477
Prior Biennia (Expenditures)........................ $ 4,230,523
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 4,550,000
(2) Referendum 37: For handicapped facilities construction pursuant to chapter 43.99C RCW (79‑3‑001)
$9,529 of the appropriation may be used by Yakima county for improvements at the Community Center for the Deaf to permit increased service level to handicapped clients. This amount may be expended only if the final application for the project is submitted to the department by December 31, 1991, and approved by March 31, 1992.
Reappropriation:
((Hndcp Fac
Constr Acct....................... $ 253,531))
St Bldg Constr Acct........................... $ 88,556
Prior Biennia (Expenditures)........................ $ 33,371
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ ((286,902))
121,927
(3) Child study center: Construct high school on the grounds of Western State Hospital (88‑1‑318)
Reappropriation:
St Bldg Constr Acct........................... $ 130,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 130,000
(4) Western State Hospital: Sanitary sewer (88‑2‑400)
Reappropriation:
St Bldg Constr Acct........................... $ 200,000
Prior Biennia (Expenditures)........................ $ 2,109,238
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 2,309,238
(5) Echo Glen: Renovate eleven living units at Echo Glen Children's Center (90‑1‑210)
Reappropriation:
St Bldg Constr Acct........................... $ 2,600,000
Prior Biennia (Expenditures)........................ $ 364,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 2,964,000
(6) Emergency capital repairs (90‑1‑007)
Reappropriation:
CEP & RI Acct................................. $ 25,000
Prior Biennia (Expenditures)........................ $ 444,578
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 469,578
(7) Western State Hospital: Ward renovations, phase 4 (90‑1‑312)
Reappropriation:
St Bldg Constr Acct........................... $ 6,000,000
Prior Biennia (Expenditures)........................ $ 192,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 6,192,000
(8) Eastern State Hospital: Ward renovations, phase 2 (90‑1‑339)
Reappropriation:
St Bldg Constr
Acct........................... $ ((2,000,000))
467,784
Prior Biennia (Expenditures)........................ $ 2,510,400
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ ((4,510,400))
2,978,184
(9) Minor capital renewal: Utilities and facilities (90‑2‑001), roads and grounds (90‑2‑002), roofs (90‑2‑003), fire and safety (90‑1‑004), and hazardous substances (90‑1‑005)
Reappropriation:
CEP & RI Acct................................. $ 850,000
St Bldg Constr Acct........................... $ 450,000
-------------
Subtotal Reappropriation................ $ 1,300,000
Prior Biennia (Expenditures)........................ $ 2,633,393
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 4,733,725
(10)Small repairs and improvements (90‑2‑008)
Reappropriation:
CEP & RI Acct................................. $ 50,000
Prior Biennia (Expenditures)........................ $ 140,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 190,000
(11)Minor projects: Bureau of alcohol (90‑2‑010)
Reappropriation:
CEP & RI Acct................................. $ 350,000
Prior Biennia (Expenditures)........................ $ 92,400
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 442,400
(12)Minor projects: Juvenile rehabilitation division (90‑2‑020)
Reappropriation:
CEP & RI Acct................................. $ 200,000
St Bldg Constr Acct........................... $ 25,000
-------------
Subtotal Reappropriation................ $ 225,000
Prior Biennia (Expenditures)........................ $ 285,781
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 510,781
(13)Minor projects: Mental health division (90‑2‑030) and (90‑2‑032)
Reappropriation:
St Bldg Constr Acct........................... $ 200,000
CEP & RI Acct................................. $ 65,000
-------------
Subtotal Appropriation.................. $ 265,000
Prior Biennia (Expenditures)........................ $ 460,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 725,000
(14)Snohomish county: Mental health evaluation and treatment facility (90‑2‑033)
The reappropriation in this subsection is subject to the following conditions and limitations:
(a) The reappropriation is provided solely for a mental health evaluation and treatment facility in Snohomish county.
(b) No moneys from the reappropriation may be expended until the department enters into an agreement with Snohomish county or a group of counties for the facility. The payments under the agreement shall be either at least equal to the facility component of the state average rate‑per‑patient day paid by the department to community mental health providers for comparable services, or at least equal to the amount of this reappropriation amortized over fifteen years.
(c) No moneys from the reappropriation may be expended before adoption of a plan to provide mental health services through a regional support network as required by chapter 205, Laws of 1989.
(d) Other counties or regions that adopt plans for mental health services as required by chapter 205, Laws of 1989, shall be eligible for application to the state for future evaluation and treatment facility moneys under the same conditions as are provided in subsections (a) and (b) of this subsection, as long as no applicant receives appropriated moneys from state sources exceeding one million dollars.
Reappropriation:
St Bldg Constr Acct........................... $ 800,000
Prior Biennia (Expenditures)........................ $ 200,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,000,000
(15)Minor projects: Developmental disabilities division (90‑2‑040)
Reappropriation:
St Bldg Constr Acct........................... $ 250,000
Prior Biennia (Expenditures)........................ $ 484,222
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 734,222
(16)Minor capital renewal, mental health (90‑2‑060)
Reappropriation:
St Bldg Constr Acct........................... $ 500,000
Prior Biennia (Expenditures)........................ $ 500,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,000,000
(17)Child care facilities (90‑2‑300)
Reappropriation:
St Bldg Constr Acct........................... $ 350,000
Prior Biennia (Expenditures)........................ $ 250,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 600,000
(18)Eastern State: Electrical distribution system (90‑2‑345)
Reappropriation:
St Bldg Constr Acct........................... $ 600,000
Prior Biennia (Expenditures)........................ $ 771,600
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,371,600
(19)Lakeland Village: Steam plant replacement (90‑2‑425)
Reappropriation:
St Bldg Constr Acct........................... $ 3,000,000
Prior Biennia (Expenditures)........................ $ 1,063,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 4,063,000
(20)Preplanning (90‑4‑009)
The new appropriation in this subsection is provided solely for preplanning activities for the Administration Building at Lakeland Village, the security housing and treatment unit at Green Hill, and the vocational educational and administration buildings at Maple Lane.
Reappropriation:
CEP & RI Acct................................. $ 50,000
Appropriation:
CEP & RI Acct................................. $ 273,300
Prior Biennia (Expenditures)........................ $ 141,400
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 464,700
(21)Maple Lane: To add twenty-four new level 2 security beds (90‑5‑001)
Reappropriation:
St Bldg Constr Acct........................... $ 1,100,000
Prior Biennia (Expenditures)........................ $ 156,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,256,000
(22)Echo Glen: ((Perimeter fence)) Security
improvements (90‑5‑002)
Reappropriation:
St Bldg Constr
Acct........................... $ ((850,000))
500,000
Prior Biennia (Expenditures)........................ $ 106,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ ((956,000))
606,000
(23)Fircrest: Food bank facility (90‑5‑011)
Reappropriation:
St Bldg Constr Acct........................... $ 700,000
Prior Biennia (Expenditures)........................ $ 88,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 788,000
(24)Minor capital renewal fire safety (92‑1‑004), utilities and facilities (92‑2‑001), roads and grounds (92‑2‑002), and roofs (92‑2‑003)
Appropriation:
CEP & RI Acct................................. $ 3,284,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 7,136,000
-------------
TOTAL................................... $ 10,420,000
(25)Environmental: For minor works projects, including asbestos abatement, PCBs and other hazardous substances, and for planning functions pertaining to environmental/capital proposals (92‑1‑005)
Appropriation:
CEP & RI Acct................................. $ 359,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 664,000
-------------
TOTAL................................... $ 1,023,000
(26)Emergency and unanticipated projects: For emergency and unanticipated repairs to equipment, facilities, and infrastructures at state institutions (92‑1‑007)
Appropriation:
CEP & RI Acct................................. $ 250,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 538,100
-------------
TOTAL................................... $ 788,100
(27)Underground storage tanks: To test, replace, and/or remove underground storage tanks state-wide (92‑1‑060)
Appropriation:
CEP & RI Acct................................. $ 145,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 618,000
-------------
TOTAL................................... $ 673,000
(28)Western State Hospital: To complete phase 5 of 7 phases, including ward renovations, hospital administration and support spaces, and patient treatment areas (92‑1‑314)
The appropriation
in this subsection shall not be expended until project preplanning documents
have been reviewed and approved by the office of financial management under
section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.
Appropriation:
St Bldg Constr Acct........................... $ 13,669,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 13,669,000
(29)Eastern State Hospital: To complete phase 3 of 5 phases, including ward treatment areas, hospital support space, and necessary utilities (92‑1‑340)
The appropriation
in this subsection shall not be expended until project preplanning documents
have been reviewed and approved by the office of financial management under
section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.
Appropriation:
St Bldg Constr Acct........................... $ 7,578,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 7,578,000
(30)Small works: For miscellaneous projects under $25,000 each at the various institutions (92‑2‑008)
Appropriation:
CEP & RI Acct................................. $ 192,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 430,500
-------------
TOTAL................................... $ 622,500
(31)Minor projects, alcohol and substance abuse division: For miscellaneous minor repairs, safety, and electrical repairs at Northern State Hospital (92‑2‑010)
Appropriation:
CEP & RI Acct................................. $ 300,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 300,000
(32)Minor projects, juvenile rehabilitation division: For the upgrade of the water supply, sewer treatment, and security (92‑2‑020)
Appropriation:
CEP & RI Acct................................. $ 957,500
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 1,849,731
-------------
TOTAL................................... $ 2,807,231
(33)Minor projects, mental health division: For minor projects including storm sewer, electrical system, air conditioning, food distribution system, loading dock cover, and new parking lots at Western State Hospital; administration renovation, window security screens, outdoor recreation restrooms at Eastern State Hospital; cemetery fence and kitchen improvements at the Portal facility (92‑2‑030)
Appropriation:
CEP & RI Acct................................. $ 1,317,200
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 2,656,600
-------------
TOTAL................................... $ 3,973,800
(34)Minor projects, developmental disabilities division: For minor projects, including the "Y" Building renovation at Fircrest; replacement of living unit floors at Lakeland Village, a state-wide facilities and land use plan; renovation of bathroom and kitchen floors at Rainier School; and added support space and playground expansion at Yakima Valley School (92‑2‑040)
Appropriation:
CEP & RI Acct................................. $ 912,400
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 1,472,000
-------------
TOTAL................................... $ 2,384,400
(35)Maple Lane: To add sixty-four new level 1 security beds (92‑2‑225)
The appropriation
in this subsection shall not be expended until project preplanning documents
have been reviewed and approved by the office of financial management under
section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.
Appropriation:
St Bldg Constr Acct........................... $ 6,715,800
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 6,715,800
(36)Maple Lane: To add forty-seven new level 2 security beds (92‑2‑230)
The appropriation
in this subsection shall not be expended until project preplanning documents
have been reviewed and approved by the office of financial management under
section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.
Appropriation:
St Bldg Constr Acct........................... $ 3,107,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 3,107,000
(37)Child study: For construction of a new education ((center
(high school))) facility (primary and secondary) at the child study
and treatment center (92‑2‑319)
Appropriation:
St Bldg Constr
Acct........................... $ ((2,642,300))
4,442,300
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ ((2,642,300))
4,442,300
(38)Maintenance management: For completion of the maintenance management system at Medical Lake and Olympia (92‑3‑050)
Appropriation:
CEP & RI Acct................................. $ 292,800
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 473,500
-------------
TOTAL................................... $ 766,300
(39)Resource conservation: For energy and water conservation projects (92‑4‑006)
Appropriation:
CEP & RI Acct................................. $ 561,100
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 442,600
-------------
TOTAL................................... $ 1,003,700
(40)Child care facilities for state employees, including higher education employees (92‑4‑050)
The appropriation in this subsection is subject to the following conditions and limitations: The department shall report to the appropriate committees of the legislature by January 1, 1993, on grant guidelines which encourage proposals that provide for management of a child care facility by an organization of state employees.
Appropriation:
St Bldg Constr Acct........................... $ 2,500,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 2,500,000
(41)Washington Institute for Mental Illness Research at Western State Hospital
Appropriation:
CEP & RI Acct................................. $ 700,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 700,000
NEW SECTION. Sec. 8. A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:
FOR THE DEPARTMENT OF VETERANS' AFFAIRS
(1)Alzheimer unit: Design and remodel one wing of the Washington soldier's home for proper care and supervision of Alzheimer patients (93-2-001)
Appropriation:
St Bldg Constr Acct........................... $ 126,445
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 126,445
(2)Korean War memorial: To build and erect a Korean War memorial on the capitol campus
Expenditure of the appropriation in this subsection is contingent on a match of at least $200,000 from nonstate sources for the same purpose.
Appropriation:
St Bldg Constr Acct........................... $ 50,000
Prior Biennia (Expenditures)........................ $ 25,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 75,000
Sec. 9. 1991 sp.s. c 14 s 16 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
The appropriations in this section are subject to the following condition and limitation: The department shall, to the extent possible, employ inmate labor in the construction of projects where such employment use will save money.
(1) Washington State Reformatory: Continuation of cellblock renovations, and expansion of the industries and production areas and the gym (83‑3‑048)
The new
appropriation in this subsection shall not be expended until project
preplanning documents have been reviewed and approved by the office of
financial management under section 59 ((of this act)), chapter 14,
Laws of 1991 sp.s.
Reappropriation:
St Bldg Constr Acct........................... $ 1,800,000
Appropriation:
St Bldg Constr Acct........................... $ 9,687,000
Prior Biennia (Expenditures)........................ $ 19,513,213
Future Biennia (Projected Costs).................... $ 9,281,500
-------------
TOTAL................................... $ 40,281,713
(2) Washington State Penitentiary: For improving security facilities and utilities (83‑3‑052)
The new appropriation in this subsection is provided solely to renovate perimeter walls and towers.
Reappropriation:
St Bldg Constr Acct........................... $ 1,300,000
Appropriation:
St Bldg Constr Acct........................... $ 1,609,000
Prior Biennia (Expenditures)........................ $ 11,536,721
Future Biennia (Projected Costs).................... $ 4,274,000
-------------
TOTAL................................... $ 18,719,721
(3) McNeil Island Corrections Center: For replacement of water mains; installation of new telephone switch gear; purchase of an underwater power cable for emergency use; replacement of overhead power lines and poles; and projects related to regulation of the landfill (86‑1‑002)
Reappropriation:
St Bldg Constr Acct........................... $ 4,800,000
Appropriation:
St Bldg Constr Acct........................... $ 3,230,500
Prior Biennia (Expenditures)........................ $ 2,084,319
Future Biennia (Projected Costs).................... $ 4,780,000
-------------
TOTAL................................... $ 14,894,819
(4) McNeil Island Corrections Center: For repairs of roads and sea walls (86‑1‑004)
Reappropriation:
St Bldg Constr Acct........................... $ 700,000
Appropriation:
St Bldg Constr Acct........................... $ 1,922,500
Prior Biennia (Expenditures)........................ $ 5,400,879
Future Biennia (Projected Costs).................... $ 3,737,000
-------------
TOTAL................................... $ 11,760,379
(5) McNeil Island Corrections Center: For repair of island homes, replacement of the emergency generator, and fire and safety improvements to institutional buildings (86‑1‑008)
Reappropriation:
St Bldg Constr Acct........................... $ 2,100,000
Appropriation:
St Bldg Constr Acct........................... $ 2,040,000
Prior Biennia (Expenditures)........................ $ 6,084,008
Future Biennia (Projected Costs).................... $ 3,805,000
-------------
TOTAL................................... $ 14,029,008
(6) State-wide wastewater system improvements: For improvements to the laboratory at the wastewater facilities at the Monroe Reformatory; for upgrades of the sewage pumping system at Twin rivers Correctional Center; and for renovation of sewer lines at several facilities (88‑1‑017)
Reappropriation:
St Bldg Constr Acct........................... $ 450,000
Appropriation:
St Bldg Constr Acct........................... $ 2,298,000
Prior Biennia (Expenditures)........................ $ 863,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 3,611,000
(7) State-wide water system improvements: To construct a new 120,000-gallon reservoir at Twin rivers Correctional Center; to upgrade storage tanks at the Washington Correctional Center at Shelton and the Larch Correctional Center; to drill a new well at Clearwater/Olympic Correctional Center; to increase reservoir capacity at Cedar Creek Correctional Center; and to upgrade water treatment and storage at the Washington State Reformatory Honor Farm (88‑1‑018)
Reappropriation:
St Bldg Constr Acct........................... $ 900,000
Appropriation:
St Bldg Constr Acct........................... $ 1,731,000
Prior Biennia (Expenditures)........................ $ 461,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 3,092,000
(8) McNeil Island Corrections Center: Continue major renovation and expansion of the McNeil Island Correction Center (88‑2‑003)
The new
appropriation in this subsection shall be not expended until project
preplanning documents have been reviewed and approved by the office of
financial management under section 59 ((of this act)), chapter 14,
Laws of 1991 sp.s.
Reappropriation:
St Bldg Constr Acct........................... $ 27,000,000
Appropriation:
St Bldg Constr Acct........................... $ 37,126,000
Prior Biennia (Expenditures)........................ $ 5,012,222
Future Biennia (Projected Costs).................... $ 12,708,000
-------------
TOTAL................................... $ 81,846,222
(9) Work and training release relocation and expansion: To relocate and expand the work release facility currently located at Western State Hospital
No portion of this appropriation may be expended to purchase land until the department conducts a life-cycle cost analysis for the operating and capital costs of a facility to be located on the land and reports the results of the analysis to the fiscal committees of the legislature.
Reappropriation:
St Bldg Constr Acct........................... $ 4,000,000
Prior Biennia (Expenditures)........................ $ 415,400
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 4,415,400
(10)Washington Corrections Center for Women: For major renovation of existing facilities, including construction of thirty-bed special needs unit and addition of one hundred beds (88‑2‑006)
The new
appropriation in this subsection shall be not expended until project
preplanning documents have been reviewed and approved by the office of
financial management under section 59 ((of this act)), chapter 14,
Laws of 1991 sp.s.
Reappropriation:
St Bldg Constr Acct........................... $ 900,000
Appropriation:
St Bldg Constr
Acct........................... $ ((3,388,000))
11,097,000
Prior Biennia (Expenditures)........................ $ 715,000
Future Biennia (Projected Costs).................... $ ((7,709,000))
0
-------------
TOTAL................................... $ 12,712,000
(11)Hazardous materials management (90‑1‑004)
Reappropriation:
St Bldg Constr Acct........................... $ 200,000
Prior Biennia (Expenditures)........................ $ 79,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 279,000
(12)Washington Corrections Center/Washington Corrections Center for Women: Perimeter security upgrade (90‑1‑007)
Reappropriation:
St Bldg Constr Acct........................... $ 600,000
Prior Biennia (Expenditures)........................ $ 1,052,000
Future Biennia (Projected Costs).................... $ 1,183,000
-------------
TOTAL................................... $ 2,835,000
(13)State-wide minor projects (90‑1‑009)
Reappropriation:
CEP & RI Acct................................. $ 900,000
St Bldg Constr Acct........................... $ 2,700,000
-------------
Subtotal Reappropriation...................... $ 2,200,000
Prior Biennia (Expenditures)........................ $ 1,749,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 5,349,000
(14)State-wide small repairs and improvements (90‑1‑010)
Reappropriation:
St Bldg Constr Acct........................... $ 300,000
Prior Biennia (Expenditures)........................ $ 456,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 756,000
(15)State-wide emergency repair projects (90‑1‑013)
Reappropriation:
CEP & RI Acct................................. $ 150,000
Appropriation:
CEP & RI Acct................................. $ 750,000
Prior Biennia (Expenditures)........................ $ 600,000
Future Biennia (Projected Costs).................... $ 750,000
-------------
TOTAL................................... $ 2,250,000
(16)New facilities: To design and construct a new
1,024-bed medium-security prison, and ((four)) three
minimum-security correctional facilities, for a total of ((2,424)) 2,124
new beds (((90‑2‑001))) 92-5-900
The new
appropriation in this subsection shall not be expended until project preplanning
documents have been reviewed and approved by the office of financial management
under section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.
Reappropriation:
St Bldg Constr
Acct........................... $ ((51,550,000))
50,405,000
((Drug Enf
& Ed Acct.......................... $ 5,900,000
-------------
Subtotal Reappropriation................ $ 57,450,000))
Appropriation:
St Bldg Constr
Acct........................... $ ((96,036,000))
93,036,000
Prior Biennia (Expenditures)........................ $ 3,038,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ ((156,524,000))
146,479,000
(17)Washington State Penitentiary: For minimum security unit double bunking (90‑2‑003)
Reappropriation:
St Bldg Constr Acct........................... $ 1,050,000
Prior Biennia (Expenditures)........................ $ 160,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,210,000
(18)Twin rivers Corrections Center: Double bunking (90‑2‑004)
Reappropriation:
St Bldg Constr Acct........................... $ 2,500,000
Prior Biennia (Expenditures)........................ $ 481,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 2,981,000
(19)Washington State Penitentiary: Medium-security complex double bunking (90‑2‑005)
Reappropriation:
St Bldg Constr Acct........................... $ 1,000,000
Prior Biennia (Expenditures)........................ $ 128,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,128,000
(20)Clearwater/Olympic Corrections Center: 100‑bed expansion (90‑2‑006)
Reappropriation:
St Bldg Constr Acct........................... $ 1,200,000
Prior Biennia (Expenditures)........................ $ 538,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,738,000
(21)Cedar Creek Corrections Center: 100‑bed expansion (90‑2‑007)
Reappropriation:
St Bldg Constr Acct........................... $ 1,450,000
Prior Biennia (Expenditures)........................ $ 187,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,637,000
(22)Washington State Penitentiary: Expand medium-security complex industries building (90‑2‑016)
Reappropriation:
St Bldg Constr Acct........................... $ 1,100,000
Prior Biennia (Expenditures)........................ $ 113,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,213,000
(23)State-wide roof repair: For reroofing projects at the Corrections Center at Shelton, Cedar Creek Corrections Center, Indian Ridge Corrections Center, Clearwater/Olympic Corrections Center, Monroe Reformatory, and the Treatment Center for Women at Purdy facilities (90‑3‑011)
Reappropriation:
St Bldg Constr Acct........................... $ 150,000
Appropriation:
St Bldg Constr Acct........................... $ 2,631,000
Prior Biennia (Expenditures)........................ $ 1,350,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 4,131,000
(24)Clallam Bay Corrections Center: To expand program space and add three hundred forty-nine beds (90‑5‑026)
Reappropriation:
St Bldg Constr Acct........................... $ 23,000,000
Prior Biennia (Expenditures)........................ $ 2,301,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 25,301,000
(25)Camp labor pool funds (90‑5‑031)
Moneys from the reappropriation in this subsection shall made available to the department for expanded capacity projects in the event inmate labor cannot be employed.
Reappropriation:
St Bldg Constr Acct........................... $ 229,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 229,000
(26)Underground storage tanks: To test, replace, and/or remove underground storage tanks state-wide (92‑1‑002)
Appropriation:
St Bldg Constr Acct........................... $ 300,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 1,000,000
-------------
TOTAL................................... $ 1,300,000
(27)State-wide minor projects: For projects less than $500,000 pertaining to life safety/code compliance, property protection, or essential program support (92‑1‑012)
Appropriation:
St Bldg Constr Acct........................... $ 7,500,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 4,976,000
-------------
TOTAL................................... $ 12,476,000
(28)State-wide small repairs and improvements: For miscellaneous state-wide projects, each under $25,000 (92‑1‑013)
Appropriation:
St Bldg Constr Acct........................... $ 497,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 497,000
(29)Washington Corrections Center: To retrofit the boiler at Shelton (92‑1‑026)
In retrofitting the boiler, the department shall consider using wood pellets or natural gas, whichever is the more economically competitive, as the primary fuel source for the boiler.
Appropriation:
St Bldg Constr Acct........................... $ 2,164,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 2,164,000
(30)Washington State Penitentiary: To add space for recreation, legal libraries, medical/dental unit, property and a clothing room at medium-security facilities (92‑2‑021)
Appropriation:
St Bldg Constr Acct........................... $ 1,443,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,443,000
(31)Washington State Penitentiary: To add space to the current gym, and upgrade systems for heating, ventilation, and air conditioning, fire protection, lighting, and electricity (92‑2‑022)
Appropriation:
St Bldg Constr Acct........................... $ 888,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 888,000
(32)Washington Corrections Center: For installation of a new underground steam distribution/condensation return system (92‑2‑028)
Appropriation:
St Bldg Constr Acct........................... $ 729,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 729,000
(33)Washington State Reformatory: For initiation of a feasibility study for relocation of program and living space at the honor farm (92‑2‑029)
Appropriation:
St Bldg Constr Acct........................... $ 230,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 1,000,000
-------------
TOTAL................................... $ 1,230,000
(34)Washington State Reformatory: Restoration and repair of perimeter walls (92‑2‑031)
Appropriation:
St Bldg Constr Acct........................... $ 1,084,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,084,000
(35)Pilot preventive maintenance program: For computer hardware and software for a computer-based preventative maintenance system (92‑4‑033)
The appropriation in this subsection is subject to the following conditions and limitations: The department of corrections shall, every six months, submit a progress report on this project to the department of general administration, the office of financial management, the senate committee on ways and means, and the house of representatives committee on capital facilities and financing.
Appropriation:
St Bldg Constr Acct........................... $ 325,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 325,000
(36)Cedar Creek Corrections Center upgrade: Core facilities improvements and dormitory expansion (92‑2‑024)
Appropriation:
St Bldg Constr Acct........................... $ 1,426,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,426,000
(37)Mental health programming: To plan for the facility needs of the mentally ill offender population (93-2-035)
Appropriation:
St Bldg Constr Acct........................... $ 200,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 200,000
(38)Land acquisition: To acquire a purchase option on land adjacent to the Coyote Ridge Corrections Center for possible relocation of the department's dairy operations (93-2-036)
Appropriation:
St Bldg Constr Acct........................... $ 24,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 2,500,000
-------------
TOTAL................................... $ 2,524,000
(End of part)
PART 3
NATURAL RESOURCES
Sec. 10. 1991 sp.s. c 14 s 18 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
(1) Referendum 26: Waste disposal facilities (74‑5‑004)
Reappropriation:
LIRA, Waste Disp Fac........................ $....... 15,660,673
Prior Biennia (Expenditures)...................... $........ 8,093,028
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 23,753,701
(2) Referendum 38: Water supply facilities (74‑5‑006)
Reappropriation:
LIRA, Water Sup Fac......................... $....... 26,744,618
Prior Biennia (Expenditures)...................... $........ 2,466,576
Future Biennia (Projected Costs).................. $....... 29,763,000
-------------
TOTAL................................. $....... 58,974,194
(3) State emergency water project revolving account (76‑5‑003)
Reappropriation:
Emergency Water Proj........................ $........ 7,599,337
Appropriation:
Emergency Water Proj........................ $........ 1,343,929
Prior Biennia (Expenditures)...................... $....... 16,586,284
Future Biennia (Projected Costs).................. $.......... 224,761
-------------
TOTAL................................. $....... 25,754,311
(4) Referendum 39: Waste disposal facilities 1980 bond issue (82‑5‑005)
No expenditure from the reappropriation in this subsection shall be made for any grant valued over fifty million dollars to a city or county for solid waste disposal facilities unless the following conditions are met:
(a) The city or county agrees to comply with all the terms of the grant contract between the city or county and the department of ecology;
(b) The city or county agrees to implement curbside collection of recyclable materials as prescribed in the grant contract; and
(c) The city or county does not begin actual construction of the solid waste disposal facility until it has obtained a permit for prevention of significant deterioration as required by the federal clean air act.
Reappropriation:
LIRA, Waste
Disp Fac 1980................... $... ((61,598,000))
60,012,180
Prior Biennia (Expenditures)...................... $...... 401,402,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.. ((463,000,000))
461,414,180
(5) Water quality account (86‑5‑007)
The appropriations in this subsection are subject to the following conditions and limitations:
(a) In awarding grants, extending grant payments, or making loans from these appropriations for facilities that discharge directly into marine waters, the department shall:
(i) Give first priority to secondary wastewater treatment facilities that are mandated by both federal and state law;
(ii) Give second priority to projects that reduce combined sewer overflows; and
(iii) Encourage economies that are derived from any simultaneous projects that achieve the purposes of both (a) and (b) of this subsection.
(b) The following limitations shall apply to the department's total distribution of funds appropriated under this section:
(i) Not more than fifty percent for water pollution control facilities that discharge directly into marine waters;
(ii) Not more than twenty percent for water pollution control activities that prevent or mitigate pollution of underground waters and facilities that protect federally designated sole source aquifers with at least two-thirds for the Spokane-Rathdrum Prairie aquifer;
(iii) Not more than ten percent for water pollution control activities that protect freshwater lakes and rivers including but not limited to Lake Chelan and the Yakima and Columbia rivers;
(iv) Not more than ten percent for activities that control nonpoint source water pollution;
(v) Ten percent and such sums as may be remaining from the categories specified in (i) through (iv) of this subsection for water pollution control activities or facilities as determined by the department.
(c) In determining compliance schedules for the greatest reasonable reduction of combined sewer overflows, the department shall consider the amount of grant or loan moneys available to assist local governments in the planning, design, acquisition, construction, and improvement of combined sewer overflow facilities.
(d) $330,000 of the water quality account appropriation is provided solely for the department to evaluate water quality, solid and hazardous waste, and toxics cleanup needs of the state. The amount provided in this subsection represents the water quality account share of funding the evaluation. The department shall include in the evaluation information regarding existing needs and recommendations on how to address those needs within existing state financial assistance programs. The evaluation shall include options that rely solely on existing tax sources. The department shall also evaluate long-range financial options, including a greater reliance on loans, which take into account local financial resources. The evaluation shall be done in coordination with the state agency coordinating council established in Engrossed Substitute House Bill No. 1025 (Growth Management Strategies). If the bill is not enacted by July 31, 1991, the director of the department shall coordinate with the department of community development, the department of health, and the Puget Sound water quality authority as well as with other appropriate state and local agencies. By November 1, 1991, the department shall submit to the chairs of the house capital facilities and financing committee and the senate ways and means committee, a detailed work plan, budget, and schedule for completion of the evaluation.
Reappropriation:
Water Quality Acct.......................... $...... 134,422,504
Appropriation:
Water Quality Acct.......................... $....... 85,607,310
Prior Biennia (Expenditures)...................... $....... 53,036,533
Future Biennia (Projected Costs).................. $...... 157,835,000
-------------
TOTAL................................. $...... 430,901,347
(6) Nisqually River Interpretive Center
Appropriation:
St Bldg Constr Acct......................... $.......... 150,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.......... 150,000
(7) Local toxics control account (88‑5‑008)
$270,000 of the new appropriation in this subsection is provided solely for the evaluation required in subsection (5)(d) of this section.
$300,000 of the new appropriation in this subsection is provided solely for a pilot grant program to address remedial actions involving the contamination of drinking water supplies from hazardous substances. The pilot grant program is limited to remedial action where a responsible party has not been identified or held responsible. The department may establish an appropriate local match requirement for the pilot grant program. The department shall report to the appropriate committees of the legislature regarding the state-wide need for programs to clean up drinking water supplies contaminated by hazardous substances. This report shall be consolidated into the evaluation required in subsection (5)(d) of this section.
Reappropriation:
Local Toxics Control........................ $....... 27,653,297
Appropriation:
Local Toxics Control........................ $....... 59,183,607
Prior Biennia (Expenditures)...................... $....... 18,467,142
Future Biennia (Projected Costs).................. $...... 106,984,641
-------------
TOTAL................................. $...... 212,288,687
(8) Methow Basin water conservation
This appropriation in this subsection shall be used to fund water use efficiency improvements in this Methow Basin, including the installation of headworks, weirs, and fish screens on existing irrigation diversions, metering of miscellaneous water uses, and lining of irrigation canals and ditches in identified high priority irrigation systems.
Appropriation:
St Bldg Constr Acct......................... $.......... 400,000
LIRA, Water Sup Fac......................... $.......... 800,000
-------------
Subtotal Appropriation................ $........ 1,200,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 1,200,000
(9)Water pollution control facility loans
Appropriation:
Water Pollution Cont Rev Fund............... $....... 83,000,000
Prior Biennia (Expenditures)...................... $........ 7,400,000
Future Biennia (Projected Costs).................. $....... 71,000,000
-------------
TOTAL................................. $...... 161,400,000
NEW SECTION. Sec. 11. A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
(1) Sewer facilities: For sewer improvements at the following state parks: Ike Kinswa, Millersylvania, Lewis and Clark Trail, Bayview, Sequim Bay, Penrose Point, Tolmie, Fort Casey, Fort Ebey, and Maryhill.
Appropriation:
LIRA, Waste Fac 1980........................ $........ 1,585,820
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 1,585,820
(2) Deception Pass: Repair failed water system
Appropriation:
St Bldg Constr Acct......................... $.......... 283,180
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.......... 283,180
NEW SECTION. Sec. 12. A new section is added to chapter 14, Laws of 1991 sp.s to read as follows:
The state parks and recreation commission may sell to a city or county for one dollar existing park lands or interpretive centers that are closed because of budgetary constraints. The purchasing city or county must agree to keep the park land or interpretive center open for public access and use. The conveyance agreement shall contain a reversionary interest held by the commission that takes effect if the property is ever used for any purpose other than a public park or interpretive center.
NEW SECTION. Sec. 13. A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:
FOR THE WASHINGTON STATE DAIRY PRODUCTS COMMISSION
(1) Acquire permanent facility: To acquire a permanent facility to house the offices and operations of the commission (92-5-001)
The appropriation in this subsection is subject to the following conditions and limitations: At least one dollar from the commission's operating funds shall be spent for each three dollars spent from this appropriation.
Appropriation:
WA St Dairy Prod Comm Fac Acct.............. $.......... 900,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.......... 900,000
NEW SECTION. Sec. 14. A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:
FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
(1) Clear creek dam: To rebuild the dam according to plans approved by the United States bureau of reclamation (93-2-002)
The appropriation in this subsection is contingent on at least $3,250,000 being provided from federal and local sources. The state shall not be obligated for project costs that exceed this appropriation.
Appropriation:
St Bldg Constr Acct......................... $........ 1,550,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 1,550,000
NEW SECTION. Sec. 15. A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:
FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
The legislature hereby approves, without exception, the list of local projects dated October 1, 1991, submitted by the interagency committee for outdoor recreation to the office of financial management.
NEW SECTION. Sec. 16. A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:
FOR THE DEPARTMENT OF TRADE AND ECONOMIC DEVELOPMENT
(1) Washington Technology Center (92-5-001)
The appropriation in this subsection is provided solely for the design and outfitting of the first and second floor laboratory spaces in Fluke Hall. It is the intention of the legislature that the appropriation in this subsection completes the state's funding commitment regarding the construction and outfitting of Fluke Hall.
Appropriation:
St Bldg Constr Acct......................... $........ 1,000,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 1,000,000
NEW SECTION. Sec. 17. A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:
FOR THE DEPARTMENT OF FISHERIES
(1) Coast and Puget Sound salmon enhancement (92‑5‑001)
Appropriation:
St Bldg Constr Acct......................... $.......... 513,311
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.......... 513,311
(2) Habitat management (92-2-001)
Appropriation:
General Fund‑Federal........................ $.......... 800,000
General Fund‑Priv/Loc....................... $.......... 800,000
-------------
Subtotal Appropriation................ $........ 1,600,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 1,600,000
NEW SECTION. Sec. 18. A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:
FOR THE DEPARTMENT OF WILDLIFE
Repair of flood damage on Luhrs Landing
Appropriation:
St Bldg Constr Acct......................... $........... 40,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........... 40,000
Sec. 19. 1991 sp.s. c 14 s 26 (uncodified) is amended to read as follows:
FOR THE PARKS AND RECREATION COMMISSION: TIMBERLAND PURCHASES AND COMMON SCHOOL PURCHASES
The appropriation in this section is subject to the following conditions and limitations:
(1) This appropriation is provided to the state parks and recreation commission ("commission") solely to acquire trust lands that have been identified by the department of natural resources ("department") as appropriate for state park use and development. Except as specifically otherwise provided in this section, the commission shall acquire the following parcels:
(a) Lord Hill, in Snohomish county, west of Monroe;
(b) Beacon Rock, in Skamania county, adjacent to Beacon Rock State Park;
(c) Larrabee Addition, (1 and 2) in Whatcom county, northeast of Larrabee State Park and Chuckanut Mountain;
(d) South Whidbey, in Island county, adjacent to South Whidbey State Park;
(e) Wallace Falls Addition, in Snohomish county, adjacent to Wallace Falls State Park;
(f) Soleduck corridor, in Clallam county, on the Soleduck river at Sappho;
(g) Dugualia Bay property, in Island county, on the northeast shore of Whidbey Island;
(h) Rasar property, in Skagit county, west of Birdsview, near the Skagit river;
(i) Wallace Falls Addition (Northwest) property, in Snohomish county, adjacent to the northwestern side of the designated park property;
(j) Wallace Falls Addition (Southwest) property, in Snohomish county, adjacent to the southwestern side of Wallace Falls State Park;
(k) Hoypus Hill in Island county south of Hoypus Point Natural Forest Area at Deception Pass State Park;
(l) Lake Easton in Easton in Kittitas county west of Lake Easton State park near the town of Easton;
(m) Diamond Point, in Clallam county, on the Strait of Juan de Fuca; and
(n) Skykomish river property, along Highway 2, near Index.
(2) The commission may expend moneys from this appropriation for acquisition of the Skykomish river property under subsection (1)(n) of this section only to the extent that moneys remain available after the commission has made all reasonable efforts to acquire the other properties identified in this subsection.
(3) To achieve the purposes of this section, intergrant exchanges between common school trust lands and parcels of noncommon school trust lands shall occur on an equal-value basis.
(4) Proceeds from the transfer of the timber shall be deposited by the department in the same manner as timber revenues from other common school trust lands. No deduction may be made for the resource management cost account under RCW 79.64.040. The proceeds from the transfer of the land shall be used by the department to acquire timber land of equal value to be managed as common school trust land and to maintain a sustainable yield.
(5) The department shall
attempt to maintain an aggregate ratio of ((approximately)) 85:15
timber-to-land value in these transactions. If the aggregate value of
timber-to-land varies by more than plus or minus five percent of that ratio,
individual land acquisitions ((may)) shall be dropped in order to
maintain ((the approximate)) a ratio in this range.
(6) It is the intent of
the legislature that, insofar as feasible, the full parcels identified in
subsection (1) of this section be acquired for park purposes. However, to the
extent authorized by the commission and House Bill No. 2990, the
boundaries of the Diamond Point property under subsection (1)(m) of this
section may vary from the property boundaries as described in the joint study
conducted by the commission and the department under section 4, chapter 163,
Laws of 1985.
(7) Any amounts
remaining after compliance with subsections (1) through (6) of this section
shall lapse.
Appropriation:
St Bldg Constr
Acct......................... $....... 50,000,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-----------
TOTAL................................. $....... 50,000,000
NEW SECTION. Sec. 20. A new
section is added to chapter 14, Laws of 1991 sp.s. to read as follows:
FOR
THE DEPARTMENT OF NATURAL RESOURCES
(1) Land transfers: For
acquisition of replacement lands as authorized by House Bill No. 2533
Appropriation:
Natural
Resources Property Replacement
Acct.................................. $....... 30,000,000
Prior Biennia
(Expenditures)...................... $................ 0
Future Biennia
(Projected Costs).................. $....... 20,000,000
-------------
TOTAL................................. $....... 50,000,000
NEW SECTION. Sec. 21. The
department of natural resources, in cooperation with the parks and recreation
commission and the interagency committee for outdoor recreation, shall report
to the appropriate committees of the legislature by September 1, 1992, on
alternatives for acquiring lands abutting Larrabee State Park. The report
shall incorporate the following principles:
(1)
Maximum use of local and private funds and resources;
(2)
Consistency with existing state acquisition programs; and
(3)
Consideration of land acquisition and development that have already occurred or
are proposed for the area.
NEW SECTION. Sec. 22. A new
section is added to chapter 14, Laws of 1991 sp.s. to read as follows:
FOR
THE STATE CONVENTION AND TRADE CENTER
(1) Minor works: For minor works
improvement projects, including security improvements, lighting enhancements,
and space expansions (93-2-001)
The
appropriation in this subsection is subject to the following conditions and
limitations: Before expending the appropriation in this subsection, the
Washington State Convention and Trade Center shall report to the office of
financial management and to the fiscal committees of the legislature a status
report on the convention and trade center account and the convention and trade
center operations account. The status report shall include, but not be limited
to: Amounts borrowed under RCW 67.40.045 and 67.40.055 and corresponding
repayment schedules, projections of future revenues and expenditures, transfers
between accounts, and compliance with provisions of RCW 67.40.040.
Appropriation:
State
Convention and Trade Center
Acct.................................. $........ 1,050,000
Prior Biennia
(Expenditures)...................... $................ 0
Future Biennia
(Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 1,050,000
(End of part)
PART 4
TRANSPORTATION
Sec. 23. 1991
sp.s. c 14 s 28 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF
TRANSPORTATION
(1) Acquisition of dredge spoils
sites (83‑1‑001)
Reappropriation:
St Bldg Constr Acct......................... $.......... 200,000
Prior Biennia (Expenditures)...................... $........ 3,277,162
Future Biennia (Projected Costs).................. $................ 0
-----------
TOTAL................................. $........ 3,477,162
(2) Toutle river retention dam
(87‑1‑001)
Reappropriation:
St Bldg Constr Acct......................... $.......... 500,000
Prior Biennia (Expenditures)...................... $....... 10,722,118
Future Biennia (Projected Costs).................. $................ 0
-----------
TOTAL................................. $....... 11,222,118
(3) Essential rail assistance
(90‑1‑001)
The reappropriation in
this subsection is provided solely for distribution to county rail districts
and port districts for capital expenditures for the purposes of acquiring,
maintaining, or improving branch lines as authorized by chapter 47.76 RCW. The
reappropriation in this subsection shall not be used for operating expenses of
rail systems, programs, or services.
Reappropriation:
ESS Rail Assis Acct......................... $........ 1,000,000
Prior Biennia (Expenditures)...................... $.......... 200,000
Future Biennia (Projected Costs).................. $........ 2,000,000
-----------
TOTAL................................. $........ 3,200,000
(4)
Essential rail banking (90‑1‑002)
(a) The reappropriation
in this subsection is provided solely for the purchase of unused rail rights of
way as authorized by chapter 47.76 RCW and shall not be used for operating
expenses of rail systems, programs, or services.
(b) Expenditures shall
not be made until the department consults with the chairs and ranking minority
members of the house of representatives and senate transportation committees,
house of representatives capital facilities committee, and senate ways and
means committee, concerning specific railroad rights of way that the department
proposes to acquire or assist local governments in acquiring, and as required
by chapter 43, Laws of 1990.
(((c) The appropriation
in this subsection is provided solely to acquire the Stampede Pass rail line
and right of way and is subject to the following conditions and limitations:
(i) The department of
transportation is directed to negotiate an agreement with the city of Tacoma
for the purchase by one or both parties of the rail line and right of way in
anticipation of the carrier filing for abandonment. The department shall
reimburse the state building construction account with moneys received under
the agreement from the city of Tacoma and the reimbursed moneys shall lapse.
The amount to be paid by the city of Tacoma under the agreement shall represent
the value of that portion of the rail line and right of way lying within the
city's Green river watershed, as determined by appraisal by the department.
(ii) The department
shall not expend this appropriation unless the carrier has filed for
abandonment or the department and the carrier have agreed on a purchase price
prior to an abandonment filing.
(iii) If the filing of
an abandonment application by the carrier precedes the execution of an agreement
between the department and the city of Tacoma, the department is directed to
purchase the rail line on behalf of the state's and city of Tacoma's interest.
(iv) It is the intent
of the legislature that, when Interstate Commerce Commission regulations allow,
the department shall sell an interest or fee title to the city of Tacoma for
that portion of the rail line and right of way lying with the city's Green
river watershed. The first $2,100,000 of the proceeds from the sale shall be
deposited in the state building construction account and any additional amount
shall be deposited one-third in the essential rail banking account and
two-thirds in the state motor vehicle fund. The agreement shall ensure that
joint corridor use requirements of the state and the city are met including the
protection of the Green river watershed.
(v) This appropriation
is contingent upon an appropriation of an additional $2,000,000 being provided
in the omnibus transportation appropriations act, Reengrossed Substitute House
Bill No. 1231 for the department of transportation to acquire the Stampede Pass
rail line and/or right of way.
(vi) This appropriation
shall not be used for operating expenses of rail systems, programs, or
services.))
Reappropriation:
ESS Rail Bank Acct.......................... $........ 1,100,000
((Appropriation:
St
Bldg Constr Acct......................... $...... 2,100,000))
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-----------
TOTAL................................. $.... ((3,200,000))
1,100,000
Sec. 24. 1991 sp.s. c 14 s 29 (uncodified) is amended to read as follows:
FOR THE WASHINGTON STATE PATROL
(1) Crime laboratory, Tacoma: To design and construct a new eight thousand-square foot crime lab facility in Tacoma, to be co-located with the Washington State Patrol/Department of Licensing District headquarters (92‑1‑008)
The appropriation in this section shall not be expended for consolidation of laboratory services currently being performed in the Kelso and Kennewick crime laboratories.
Appropriation:
St Bldg Constr Acct......................... $........ 2,017,000
Prior Biennia (Expenditures)...................... $........... 20,000
Future Biennia (Projected Costs).................. $................ 0
-----------
TOTAL................................. $........ 2,037,000
(2) Spokane crime laboratory: For safety enhancements (92-1-008)
Appropriation:
St Bldg Constr Acct......................... $.......... 192,000
Prior Biennia (Expenditures)...................... $............ 4,500
Future Biennia (Projected Costs).................. $................ 0
-----------
TOTAL................................. $.......... 196,500
(3) Headquarters: Design a new headquarters facility in Olympia (90-2-040)
The appropriation in this subsection is subject to the following conditions and limitations:
(a) The appropriation in this subsection shall not be expended for design documents until project preplanning documents have been reviewed and approved by the office of financial management under section 35 of this act.
(b) The legislature finds that the 1992 capitol campus master plan adopted by the state capitol committee provides a strategic direction for development of state facilities in Thurston county. The legislature also finds that the Washington state patrol is in need of a headquarters building to consolidate its Thurston county operations, and that such headquarters building, envisioned and planned before the 1992 capitol campus master plan was completed, is most appropriately located at a site other than the proposed location immediately east of the transportation building on the capitol campus. $2,400,000 of the appropriation in this subsection is provided solely for land acquisition and design of a new headquarters building to be located at an alternative Thurston county site in conformance with the capitol campus master plan.
Appropriation:
WSP Highway Acct............................ $........ 3,400,000
Prior Biennia (Expenditures)...................... $.......... 250,000
Future Biennia (Projected Costs).................. $....... 45,323,000
-----------
TOTAL................................. $....... 48,973,000
(4) Everett district headquarters--Crime laboratory (90-2-018)
Reappropriation:
St Bldg Constr Acct......................... $.......... 455,000
Prior Biennia (Expenditures)...................... $........... 15,000
Future Biennia (Projected Costs).................. $................ 0
-----------
TOTAL................................. $.......... 470,000
(End of part)
PART 5
EDUCATION
Sec. 25. 1991 sp.s. c 14 s 30 (uncodified) is amended to read as follows:
FOR THE STATE BOARD OF EDUCATION
The appropriations in subsections (1) through (9) of this section are subject to the following condition and limitation: Total cash disbursed from the common school construction fund may not exceed the available cash balance.
(1) Public school building construction (79‑3‑002)
Reappropriation:
Common School Constr Fund................... $.............. 500
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.............. 500
(2) Public school building construction (83‑3‑001)
Reappropriation:
Common School Constr Fund................... $.......... 110,000
Prior Biennia (Expenditures)...................... $.......... 490,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.......... 600,000
(3) Public school building construction (86‑4‑001)
Reappropriation:
Common School Constr Fund................... $........ 1,100,000
Prior Biennia (Expenditures)...................... $........ 1,400,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 2,500,000
(4) Public school building construction (86‑4‑008)
Reappropriation:
Common School Constr Fund................... $........... 70,000
Prior Biennia (Expenditures)...................... $........... 75,298
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.......... 145,298
(5) Public school building construction (88‑2‑001)
Reappropriation:
Common School Constr Fund................... $........ 4,000,000
Prior Biennia (Expenditures)...................... $....... 61,328,022
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 65,328,022
(6) Public school building construction (89‑2‑004)
Reappropriation:
Common School Constr Fund................... $........... 80,000
Prior Biennia (Expenditures)...................... $........ 2,920,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 3,000,000
(7) Public school building construction (90‑2‑001)
Reappropriation:
Common School Constr Fund................... $...... 156,000,000
Prior Biennia (Expenditures)...................... $...... 252,527,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $...... 408,527,000
(8) Public school building construction (91‑2‑001)
The appropriations in this subsection are subject to the following conditions and limitations:
(a) A maximum of $1,200,000 may be spent for state administration of school construction funding.
(b) A maximum of $225,000 may be expended for two full-time equivalent field staff with construction/architectural experience to assist in evaluating project requests and reviewing information reported by school districts.
(c) A maximum of $100,000 may be expended for development of a new priority system pursuant to (f) of this subsection.
(d) Funding ((for
common school construction and modernization)) is provided first for
projects approved for state assistance by the state board as of January 26,
1991, and ready to receive a commitment of state funds on July 1, 1992. The
remaining funding is provided for projects approved for state assistance by the
state board after January 26, 1991, subject to (e) of this subsection. ((Of
the funds available for obligation by the state board after state
administration costs and after the costs incurred under (b) and (c) of this
subsection, fifty-eight percent is provided solely for approved new
construction projects to serve unhoused students, four percent is provided
solely for approved condemnation projects, and thirty-four percent is provided
solely for approved modernization projects. The remaining funds shall be
allocated at the discretion of the state board.))
(e) Projects approved for
state assistance by the state board after January 26, 1991, pursuant to WAC
180-25-040((,)) shall be placed on a new priority system developed by
the state board pursuant to (f) of this subsection. In approving projects
for construction of new school facilities to meet enrollment growth, after July
1, 1992, the board shall give priority to districts that have implemented a
modified school calendar or schedule that is designed to increase the pupil
capacity of the district's school buildings. The state board may allocate
funds for financial assistance to school districts for planning and
implementing a modified school calendar as authorized in Substitute House Bill
No. 2631.
(f)(i) The state board shall develop a new priority system for allocating state assistance for school construction and modernization projects. The priority system shall include evaluation of projects according to objective criteria established by the state board and a process for review of data submitted by school districts. In developing the system and the criteria, the state board shall consider the following factors: Type of space requested; current space availability, age, and condition; cost benefit considerations of new construction as compared to modernization; impacts of maintenance on the condition of facilities; impacts of delay of receipt of state assistance; and short and long-range demographic projections.
(ii) The state board shall present a progress report and implementation plan to the governor and the appropriate fiscal committees of the legislature by February 15, 1992.
(g) The common school reimbursable construction account appropriation in this section serves as compensation to the common school construction fund for any obligation owed the fund as a result of vocational technical institutes being transferred from the authority of a local school district and the superintendent of public instruction to the state board for community and technical colleges as directed by chapter 238, Laws of 1991 (Engrossed Substitute Senate Bill No. 5184, workforce training and education).
Appropriation:
Common School
Constr Fund................... $.. ((135,500,000))
156,300,000
Common School
Reimb Constr Acct............. $.. ((120,000,000))
255,500,000
-------------
Subtotal Appropriation................ $.. ((255,500,000))
411,800,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $...... 350,000,000
-------------
TOTAL................................. $.. ((605,500,000))
761,800,000
(((9) Public school building
construction (91‑2‑001)
The
appropriation in this subsection is subject to the following conditions and
limitations:
(a) This
appropriation is subject to all conditions and limitations contained in
subsection (8) of this section.
Appropriation:
Common School
Constr Fund................... $....... 21,000,000
Prior Biennia
(Expenditures)...................... $................ 0
Future Biennia
(Projected Costs).................. $................ 0
-------------
TOTAL................................. $..... 21,000,000))
NEW SECTION. Sec. 26. A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:
FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
(1) Before-and-after-school child care facility grants: To establish or expand before-and-after-school child care programs housed within public elementary schools (93-5-001)
The appropriation in this subsection is subject to the following conditions and limitations: Grants shall be awarded to public school districts on a competitive basis, and shall be used to support the capital costs of establishing or expanding a before-and-after-school child care program. Eligible capital costs shall include facility improvements and acquisition of equipment with a long-term useful life. The superintendent of public instruction shall, in consultation with the child care coordinating committee under RCW 74.13.090, establish criteria for the awarding of grants. Such criteria shall include, but not be limited to, the percentage of nonstate funding to be contributed to the project, the number of children to be served, the cost per child care slot, and the projected lifespan of the before-and-after-school child care program.
Appropriation:
St Bldg Constr Acct......................... $.......... 375,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.......... 375,000
Sec. 27. 1991 sp.s. c 14 s 34 (uncodified) is amended to read as follows:
FOR THE UNIVERSITY OF WASHINGTON
(1) Safety: Fire code, PCB, and life safety (86‑1‑001)
Reappropriation:
UW Bldg Acct................................ $........ 6,890,000
Prior Biennia (Expenditures)...................... $........ 2,298,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 9,188,000
(2) Safety: Asbestos removal (86‑1‑002)
Reappropriation:
UW Bldg Acct................................ $........ 4,900,000
Prior Biennia (Expenditures)...................... $.......... 600,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 5,500,000
(3) Minor works: Building renewal (86‑1‑004)
Reappropriation:
UW Bldg Acct................................ $........ 6,200,000
Prior Biennia (Expenditures)...................... $........ 5,983,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 12,183,000
(4) Health Science Center G Court, H Wing, and I Court addition (86‑2‑021) and H Wing renovation (88‑2‑015)
Reappropriation:
St Bldg Constr Acct......................... $....... 43,508,000
UW Bldg Acct................................ $........ 3,500,000
-------------
Subtotal Reappropriation.............. $....... 47,008,000
Prior Biennia (Expenditures)...................... $........ 7,856,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 54,864,000
(5) Minor works: Program renewal (86‑3‑005)
The reappropriations in this subsection are provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget.
Reappropriation:
UW Bldg Acct................................ $........ 3,800,000
Prior Biennia (Expenditures)...................... $........ 9,540,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 13,340,000
(6) Power plant boiler: To replace boiler number four with a gas and oil fixed boiler, including upgrades in the central heating plant (88‑2‑022)
The appropriation
in this subsection shall not be expended until project preplanning documents
have been reviewed and approved by the office of financial management under
section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.
Reappropriation:
St Bldg Constr Acct......................... $.......... 360,000
UW Bldg Acct................................ $.......... 240,000
-------------
Subtotal Reappropriation.............. $.......... 600,000
Appropriation:
St Bldg Constr Acct......................... $....... 19,872,000
Prior Biennia (Expenditures)...................... $.......... 468,495
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 20,340,495
(7) K Wing addition (90‑1‑001)
The reappropriation in this subsection is provided from the proceeds of state general obligation bonds reimbursed from university indirect cost revenues from federal research grants and contracts pursuant to RCW 43.99H.020(18).
Reappropriation:
H Ed Constr Acct............................ $....... 45,000,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 45,000,000
(8) Emergency power generation (90‑2‑001)
Reappropriation:
St Bldg Constr Acct......................... $....... 10,500,000
Prior Biennia (Expenditures)...................... $.......... 610,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 11,110,000
(9) Physics: To construct and equip a new building for the physics and astronomy departments (90‑2‑009)
The project
funded by the appropriations in this subsection shall be constructed on
campus. The new appropriation in this subsection shall not be expended until
project preplanning documents have been reviewed and approved by the office of
financial management under section 59 ((of this act)), chapter 14,
Laws of 1991 sp.s.
Reappropriation:
St Bldg Constr Acct......................... $........ 4,000,000
Appropriation:
((H Ed
Reimb Constr Acct)).................. $....... 64,786,000
St Bldg Constr Acct
Prior Biennia (Expenditures)...................... $........ 3,778,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 72,564,000
(10)Chemistry I: Design and construction (90‑2‑011)
The reappropriation in this subsection is subject to the following conditions and limitations:
(a) The reappropriation shall not be expended for construction until the project predesign and design documents have been reviewed and approved by the office of financial management under section 35 of this act.
(b) The project funded by the reappropriation in this subsection shall be constructed on campus.
Reappropriation:
St Bldg Constr Acct......................... $....... 37,200,000
Prior Biennia (Expenditures)...................... $........ 1,952,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 39,152,000
(11)Electrical engineering and computer science building: To complete the design of a replacement building for the departments of electrical engineering and computer science and engineering (90‑2‑013) (92‑2‑024)
The project
funded by the appropriations in this subsection shall be constructed on
campus. Other than for preplanning, the reappropriation shall not be expended
until project preplanning documents have been reviewed and approved by the
office of financial management under section 59 ((of this act)),
chapter 14, Laws of 1991 sp.s.
Reappropriation:
St Bldg Constr Acct......................... $........ 3,450,000
Appropriation
St Bldg Constr Acct......................... $........ 1,147,000
-------------
Subtotal Appropriation................ $........ 5,597,000
Prior Biennia (Expenditures)...................... $.......... 661,000
Future Biennia (Projected Costs).................. $....... 93,500,000
-------------
TOTAL................................. $....... 98,758,000
(12)Electrical distribution system (88‑1‑011), power plant chiller (88‑1‑012), power plant stack replacement (88‑1‑023)
Reappropriation:
St Bldg Constr Acct......................... $.......... 830,000
UW Bldg Acct................................ $.......... 770,000
-------------
Subtotal Reappropriation.............. $........ 1,600,000
Prior Biennia (Expenditures)...................... $........ 7,539,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 9,139,000
(13)Safety: Fire code, PCB, and life safety projects including: Cleanup of asbestos, compliance with federal regulations for PCB removal and contaminated soil, and life safety and fire code regulations (92‑1‑004)
Appropriation:
St Bldg Constr Acct......................... $....... 10,640,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $....... 33,333,000
-------------
TOTAL................................. $....... 43,973,000
(14)Minor capital renewal: To complete minor projects costing under $500,000 that renew or bring campus facilities into code compliance (92‑1‑005)
The appropriations in this subsection are provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget.
Appropriation:
St Bldg Constr Acct......................... $........ 3,525,000
UW Bldg Acct................................ $........ 5,000,000
-------------
Subtotal Appropriation................ $........ 8,525,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $....... 40,200,000
-------------
TOTAL................................. $....... 48,725,000
(15)Communications Building Renovation (88‑2‑014)
Reappropriation:
St Bldg Constr Acct......................... $........ 2,015,000
UW Bldg Acct................................ $........ 1,167,000
-------------
Subtotal Reappropriation.............. $........ 3,182,000
Prior Biennia (Expenditures)...................... $........ 3,555,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 6,737,000
(16)Nuclear reactor decommission: To design the removal and decontamination of the nuclear reactor on campus (92‑1‑022)
Appropriation:
St Bldg Constr Acct......................... $.......... 235,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $........ 2,488,000
-------------
TOTAL................................. $........ 2,723,000
(17)Kincaid basement: To build twenty-two thousand-square feet of basement space between the Kincaid Building and the new Physics Building (92‑2‑002)
Appropriation:
St Bldg Constr Acct......................... $........ 3,314,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 3,314,000
(18)Physics Hall renovation, program: To complete the design for renovation of the existing Physics Hall (92‑2‑008)
The appropriation
in this subsection shall not be expended on design documents until project
preplanning documents have been reviewed and approved by the office of
financial management under section 59 ((of this act)), chapter 14,
Laws of 1991 sp.s.
Appropriation:
St Bldg Constr Acct......................... $........ 2,543,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $....... 37,800,000
-------------
TOTAL................................. $....... 40,343,000
(19)Chiller addition: To add one central power plant chiller unit (92‑2‑009)
Appropriation:
St Bldg Constr Acct......................... $........ 2,459,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 2,459,000
(20)Data communications: To complete several data communications projects involving infrastructure, wiring, and building modifications (92‑2‑010)
Appropriation:
St Bldg Constr Acct......................... $........ 2,700,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 2,700,000
(21)Electrical distribution: To upgrade the campus electrical distribution (92‑2‑012)
Appropriation:
St Bldg Constr Acct......................... $........ 1,300,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 1,300,000
(22)Other utility projects: To remove and decontaminate underground storage tanks and other repair projects (92‑2‑013)
The appropriation
in this subsection may be expended only after compliance with section 6(2) ((of
this act)), chapter 14, Laws of 1991 sp.s.
Appropriation:
St Bldg Constr Acct......................... $.......... 460,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $....... 20,000,000
-------------
TOTAL................................. $....... 20,460,000
(23)Comparative medicine facility: To construct an animal laboratory facility (92‑2‑017)
Appropriation:
St Bldg Constr Acct......................... $.......... 700,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.......... 700,000
(24)Minor capital improvements: To complete minor remodeling projects costing under $500,000 that improve space usage and make repairs for specific campus programs or buildings (92‑3‑006)
The appropriations in this subsection are provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget.
Appropriation:
St Bldg Constr Acct......................... $........ 5,703,000
UW Bldg Acct................................ $........ 5,000,000
-------------
Subtotal Appropriation................ $....... 10,703,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $....... 40,250,000
-------------
TOTAL................................. $....... 50,953,000
(25)Parrington Hall exterior: To repair the exterior of Parrington Hall (92‑3‑018)
Appropriation:
UW Bldg Acct................................ $........ 1,759,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 1,759,000
(26)Meany Hall exterior renovation: To replace the leaking exterior of Meany Hall (92‑3‑019)
The appropriation
in this subsection shall not be expended for design documents until project
preplanning documents have been reviewed and approved by the office of
financial management under section 59 ((of this act)), chapter 14,
Laws of 1991 sp.s.
Appropriation:
UW Bldg Acct................................ $........ 7,238,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 7,238,000
(27)Denny Hall exterior repair: To repair and seismically improve the exterior of Denny Hall (92‑3‑020)
Reappropriation:
St Bldg Constr Acct......................... $.......... 215,000
Appropriation:
UW Bldg Acct................................ $........ 1,670,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 1,885,000
(28)Fisheries II/utilities: To prepare plans for extending the utilities infrastructure to the west campus, constructing a new fisheries building, and replacing the facility for police and custodial units (92‑2‑027)
The appropriation
in this subsection shall not be expended on design documents until project
preplanning documents have been reviewed and approved by the office of
financial management under section 59 ((of this act)), chapter 14,
Laws of 1991 sp.s.
Appropriation:
St((ate))
Bldg Constr Acct.................. $........ 1,850,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $....... 91,528,000
-------------
TOTAL................................. $....... 93,378,000
(29)Olympic Natural Resources Center
The appropriation
in this subsection shall not be expended for design documents until project
preplanning documents have been reviewed and approved by the office of
financial management under section 59 ((of this act)), chapter 14,
Laws of 1991 sp.s.
Appropriation:
St Bldg Constr Acct......................... $........ 5,675,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 5,675,000
(30)Employee day care facility‑-Preplanning
The appropriation in this subsection is provided solely for the purpose of acquiring, preparing a site for meeting the needs identified in the November 1987 child-care study conducted for the higher education coordinating board. In acquiring a site, the University shall make every effort to locate the child-care facility within a two-mile radius of the main Seattle campus and shall give a high priority to the use of buildings owned, but not used by, the Seattle school district.
Appropriation:
St Bldg Constr Acct......................... $.......... 150,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.......... 150,000
(31)School of Business expansion: Predesign and design (93-4-001)
The appropriation in this subsection is subject to the following conditions and limitations:
(a) The appropriation shall not be expended for design documents until the project predesign documents have been reviewed and approved by the office of financial management under section 35 of this act.
(b) The appropriation in this subsection shall be matched by and spent concurrently with at least $650,000 in cash provided from nonstate sources.
Appropriation:
St Bldg Constr Acct......................... $.......... 650,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $........ 5,350,000
-------------
TOTAL................................. $........ 6,000,000
(32)Burke Memorial Washington State Museum: For building renovations and new exhibits
The appropriation in this subsection shall be matched by at least $733,000 from other sources for the same purpose.
Appropriation:
St Bldg Constr Acct......................... $........ 2,200,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 2,200,000
Sec. 28. 1991 sp.s. c 14 s 35 (uncodified) is amended to read as follows:
FOR WASHINGTON STATE UNIVERSITY
(1) Science Hall renewal, phase 2 (86‑1‑006)
Reappropriation:
H Ed Constr Acct............................ $.......... 400,000
Prior Biennia (Expenditures)...................... $....... 10,804,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 11,204,000
(2) Minor capital improvements (90‑1‑001)
The reappropriation in this subsection is provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget.
Reappropriation:
WSU Bldg Acct............................... $........ 1,788,000
Prior Biennia (Expenditures)...................... $........ 3,212,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 5,000,000
(3) Minor capital renewal (90‑1‑002)
The reappropriation in this subsection is provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget.
Reappropriation:
St Bldg Constr Acct......................... $........ 1,950,000
Prior Biennia (Expenditures)...................... $........ 3,050,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 5,000,000
(4) Washington higher education telecommunications system: To convert one of two analog channels to digital (90‑2‑021)
Any expenditure under this reappropriation shall be consistent with the plan being developed by the department of information services for the 1991 legislative session for the cost-effective, incremental implementation of a coordinated state-wide video telecommunications system.
Reappropriation:
WSU Bldg Acct............................... $........ 2,700,000
Prior Biennia (Expenditures)...................... $........... 55,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 2,755,000
(5) Land acquisition (Branch Campus) (90‑5‑002)
Reappropriation:
St Bldg Constr Acct......................... $.......... 250,000
Prior Biennia (Expenditures)...................... $........ 1,095,333
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 1,345,333
(6) Tri-Cities University Center (90‑5‑901)
Reappropriation:
St Bldg Constr Acct......................... $........ 2,850,000
Prior Biennia (Expenditures)...................... $........ 9,548,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 12,398,000
(7) Minor capital improvements: To complete minor remodeling projects costing under $500,000 that improve space usage and make repairs for specific campus programs or buildings (92‑1‑001)
The appropriation in this subsection is provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget.
Appropriation:
WSU Bldg Acct............................... $........ 6,500,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $....... 21,300,000
-------------
TOTAL................................. $....... 27,800,000
(8) Expansion of east campus substation: To provide an additional 15,000 KVA electrical power capacity to the existing east campus substation (92‑1‑015)
Reappropriation:
WSU Bldg Acct............................... $.......... 525,100
Appropriation:
WSU Bldg Acct............................... $.......... 670,000
Prior Biennia (Expenditures)...................... $............ 7,900
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 1,203,000
(9) Smith Gym electrical system replacement: To replace the entire building-wide electrical system (92‑1‑017)
Reappropriation:
WSU Bldg Acct............................... $.......... 638,300
Appropriation:
WSU Bldg Acct............................... $.......... 542,000
Prior Biennia (Expenditures)...................... $............ 9,700
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 1,190,000
(10)Hazardous, pathological, and radioactive waste handling facilities: To provide centralized facilities to prepare, package, and ship biomedical, pathological, hazardous, low-level, and nonradioactive waste (92‑1‑019)
The appropriation
in this subsection shall not be expended until project preplanning documents
have been reviewed and approved by the office of financial management under
section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.
Reappropriation:
WSU Bldg Acct............................... $........... 21,700
Appropriation:
St Bldg Constr Acct......................... $........ 1,343,000
Prior Biennia (Expenditures)...................... $.......... 130,300
Future Biennia (Projected Costs).................. $........ 5,570,000
-------------
TOTAL................................. $........ 7,065,000
(11)Asbestos removal: To remove asbestos contaminated fireproofing from the roof beams and support structures of the Coliseum (92‑1‑020)
The appropriation
in this subsection may be expended only after compliance with section 6(3) ((of
this act)), chapter 14, Laws of 1991 sp.s.
Appropriation:
WSU Bldg Acct............................... $........ 1,513,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 1,513,000
(12)Fulmer Hall: To design renovations of Fulmer Hall Annex to meet fire, safety, and handicap access code requirements and to make changes in functional use of space (92‑1‑023)
The appropriation
in this subsection shall not be expended until project preplanning documents
have been reviewed and approved by the office of financial management under
section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.
Appropriation:
St Bldg Constr Acct......................... $.......... 957,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $........ 7,943,000
-------------
TOTAL................................. $........ 8,900,000
(13)Nuclear radiation center study (92‑1‑025)
Reappropriation:
WSU Bldg Acct............................... $........... 13,400
Prior Biennia (Expenditures)...................... $........... 39,600
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........... 53,000
(14)Minor capital renewal: To complete minor projects costing under $500,000 that renew or bring campus facilities into code compliance (92‑2‑002)
The appropriation in this subsection is provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget.
Appropriation:
St Bldg Constr Acct......................... $........ 5,500,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 5,500,000
(15)Preplanning: To complete preplanning documents for the following projects: Engineering teaching-research building, animal sciences laboratory building, Thompson Hall renewal, Heald Hall renewal, Holland Library renewal, Bohler Gym addition/renewal, Kimbrough Hall addition, and classroom auditorium building (92‑2‑003)
The preplanning document shall include but not be limited to projected workload, site conditions, user requirements, current space available, and an overall budget and cost estimate breakdown in a form prescribed by the office of financial management.
Appropriation:
WSU Bldg Acct............................... $.......... 869,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $.......... 869,000
(16)Holland Library addition: To furnish and equip the library addition (92‑2‑012)
Reappropriation:
St Bldg Constr Acct......................... $....... 29,500,000
WSU Bldg Acct............................... $........... 48,600
-------------
Subtotal Reappropriation.............. $....... 29,548,600
Appropriation:
St Bldg Constr Acct......................... $........ 2,580,000
Prior Biennia (Expenditures)...................... $........ 4,992,400
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 37,121,000
(17)Veterinary teaching hospital: To construct and furnish a new teaching hospital for the department of veterinary medicine and surgery (92‑2‑013)
The appropriation
in this subsection shall not be expended until project preplanning documents
have been reviewed and approved by the office of financial management under
section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.
Reappropriation:
St Bldg Constr Acct......................... $.......... 970,000
WSU Bldg Acct............................... $.......... 110,000
-------------
Subtotal Reappropriation.............. $........ 1,080,000
Appropriation:
((H Ed
Reimb Constr Acct)).................. $....... 26,835,000
St Bldg Constr Acct
Prior Biennia (Expenditures)...................... $.......... 747,000
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 28,662,000
(18)Child care facility: To design, construct, and furnish a child care facility by remodeling the vacated Rogers-Orton Dining Hall (92‑2‑014)
Appropriation:
St Bldg Constr Acct......................... $........ 2,171,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 2,171,000
(19)Carpenter Hall completion (renewal): To complete the renovation of Carpenter Hall (92‑2‑016)
Reappropriation:
H Ed Constr Acct............................ $.......... 500,000
Appropriation:
WSU Bldg Acct............................... $.......... 810,000
Prior Biennia (Expenditures)...................... $........ 6,289,715
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 7,599,715
(20)Communication infrastructure renewal: To design and construct university-wide communications facilities for telephone, computer, and audio-visual services (92‑2‑018)
The appropriation
in this subsection shall not be expended until project preplanning documents
have been reviewed and approved by the office of financial management under
section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.
Appropriation:
St Bldg Constr Acct......................... $....... 10,000,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 10,000,000
(21)Todd Hall renewal: To renovate the entire building, including upgrading electrical and other building-wide systems, modernizing and refurnishing of classrooms and offices (92‑2‑021)
The appropriation
in this subsection shall not be expended until project preplanning documents
have been reviewed and approved by the office of financial management under
section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.
Reappropriation:
WSU Bldg Acct............................... $........... 37,000
Appropriation:
St Bldg Constr Acct......................... $........ 1,143,000
Prior Biennia (Expenditures)...................... $.......... 145,000
Future Biennia (Projected Costs).................. $....... 14,795,000
-------------
TOTAL................................. $....... 16,120,000
(22)Student services addition: To design and construct a building for consolidated student service functions (92‑2‑027)
The appropriation
in this subsection shall not be expended until project preplanning documents
have been reviewed and approved by the office of financial management under
section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.
Appropriation:
St Bldg Constr Acct......................... $....... 15,000,000
WSU Bldg Acct............................... $.......... 967,000
-------------
Subtotal Appropriation................ $....... 15,967,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $....... 15,967,000
(23)Records, maintenance materials storage, and recycling, phase 1: To construct a storage structure for inactive records, physical plant storage, and recycling storage (92‑2‑028)
Appropriation:
WSU Bldg Acct............................... $........ 1,761,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 1,761,000
(24)WHETS expansion: To add a fourth channel to the
network that serves the Tri-Cities, Spokane, and Vancouver branch campuses, to
add two classrooms in Pullman, Tri-Cities, and Vancouver, to add one classroom
in Spokane, and to extend the network and add one classroom ((at the Tree
Fruit Research and Extension Center)) in Wenatchee (92‑2‑908)
Any extension of educational telecommunications to the Wenatchee area shall be planned to allow for the possible future participation of multiple higher education institutions, especially those having direct program responsibility for the Wenatchee area. Implementation plans shall be approved by the higher education coordinating board, in conjunction with the department of information services.
Appropriation:
WSU Bldg Acct............................... $........ 2,321,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 2,321,000
(25)Dairy and forage facility: To design and construct a facility that includes a new dairy center and milking parlor, a freestall building, and offices and classrooms (92‑3‑024)
Appropriation:
WSU Bldg Acct............................... $........ 2,714,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 2,714,000
(26)Chilled water storage facility: To design and construct a 2,820,000-gallon chilled water storage tank (92‑4‑022)
Appropriation:
St Bldg Constr Acct......................... $........ 2,850,000
Prior Biennia (Expenditures)...................... $................ 0
Future Biennia (Projected Costs).................. $................ 0
-------------
TOTAL................................. $........ 2,850,000
Sec. 29. 1991 sp.s. c 14 s 37 (uncodified) is amended to read as follows:
FOR CENTRAL WASHINGTON UNIVERSITY
(1) Handicap modifications (88‑1‑007)
Reappropriation:
CWU Cap Proj Acct............................. $ 150,000
Prior Biennia (Expenditures)........................ $ 565,000
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 715,000
(2) Psychology animal research facility (90‑1‑060)
Reappropriation:
St Bldg Constr Acct........................... $ 1,700,000
Prior Biennia (Expenditures)........................ $ 447,000
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 2,147,000
(3) Telecommunications system, phase 2 (90‑2‑003)
Reappropriation:
CWU Cap Proj Acct............................. $ 1,182,000
Prior Biennia (Expenditures)........................ $ 261,600
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 1,443,600
(4) Shaw/Smyser Hall remodel (90‑2‑005)
The appropriation in this
subsection shall not be expended until project preplanning documents have been
reviewed and approved by the office of financial management under section 59 ((of
this act)), chapter 14, Laws of 1991 sp.s.
Reappropriation:
St Bldg Constr Acct........................... $ 2,406,000
CWU Cap Proj Acct............................. $ 950,000
-----------
Subtotal Reappropriation................ $ 3,356,000
Appropriation:
((H Ed Reimb Constr Acct)).................... $ 7,027,000
St Bldg Constr Acct
Prior Biennia (Expenditures)........................ $ 349,900
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 10,732,900
NEW SECTION. Sec. 30. A new section is added to chapter 14, Laws of 1991 sp.s. to read as follows:
FOR EASTERN WASHINGTON UNIVERSITY
(1) To acquire property within the campus boundary from the Department of Natural Resources (92-5-001)
The appropriation in this subsection is in addition to the appropriation for same purpose in section 36, chapter 14, Laws of 1991 sp.s.
Appropriation:
EWU Cap Proj Acct............................. $ 175,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 175,000
(2) To remodel space in the Spokane Center to provide a student computer center (92-5-008)
Appropriation:
EWU Cap Proj Acct............................. $ 600,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-----------
TOTAL................................... $ 600,000
Sec. 31. 1991 sp.s. c 14 s 44 (uncodified) is amended to read as follows:
FOR THE COMMUNITY COLLEGE SYSTEM
(1) Extension facility (Puyallup) (86‑3‑021)
Reappropriation:
St Bldg Constr Acct........................... $ 99,211
Prior Biennia (Expenditures)........................ $ 5,276,789
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 5,376,000
(2) Tech building and remodeling (Skagit Valley) (86‑3‑022)
Reappropriation:
St Bldg Constr Acct........................... $ 30,085
Prior Biennia (Expenditures)........................ $ 3,369,915
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 3,400,000
(3) Heavy equipment building (South Seattle) (86‑3‑026)
Reappropriation:
St Bldg Constr Acct........................... $ 17,901
Prior Biennia (Expenditures)........................ $ 4,429,099
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 4,447,000
(4) Minor works (RMI) (88‑2‑001)
Reappropriation:
St Bldg Constr Acct........................... $ 114,174
Prior Biennia (Expenditures)........................ $ 3,385,826
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 3,500,000
(5) Repairs, exterior walls (88‑3‑003)
Reappropriation:
St Bldg Constr Acct........................... $ 218,614
Prior Biennia (Expenditures)........................ $ 4,045,386
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 4,264,000
(6) Repairs, mechanical, heating, ventilation, and air conditioning (88‑3‑004)
Reappropriation:
St Bldg Constr Acct........................... $ 500,121
Prior Biennia (Expenditures)........................ $ 3,574,879
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 4,075,000
(7) Minor improvements (88‑3‑005)
Reappropriation:
St Bldg Constr Acct........................... $ 781,756
Prior Biennia (Expenditures)........................ $ 12,982,244
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 13,764,000
(8) Repairs, electrical (88‑3‑006)
Reappropriation:
St Bldg Constr Acct........................... $ 114,986
Prior Biennia (Expenditures)........................ $ 1,277,014
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,392,000
(9) Sites and interiors (88‑3‑007)
Reappropriation:
St Bldg Constr Acct........................... $ 168,312
Prior Biennia (Expenditures)........................ $ 1,757,688
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,926,000
(10)Agri Tech building (Walla Walla) (88‑3‑008)
Reappropriation:
St Bldg Constr Acct........................... $ 1,000,539
Prior Biennia (Expenditures)........................ $ 2,114,461
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 3,115,000
(11)Plan, and construct library-student center (86‑2‑031)
Reappropriation:
St Bldg Constr Acct........................... $ 328,911
Prior Biennia (Expenditures)........................ $ 7,662,089
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 7,991,000
(12)Vocational shop (Wenatchee) (88‑3‑010)
Reappropriation:
St Bldg Constr Acct........................... $ 613,953
Prior Biennia (Expenditures)........................ $ 341,047
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 955,000
(13)Computer facility (Edmonds) (88‑3‑011)
Reappropriation:
St Bldg Constr Acct........................... $ 14,934
Prior Biennia (Expenditures)........................ $ 3,820,066
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 3,835,000
(14)Learning resource center (Clark) (88‑3‑012)
Reappropriation:
St Bldg Constr Acct........................... $ 620,017
Prior Biennia (Expenditures)........................ $ 5,759,983
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 6,380,000
(15)Extension center (Yakima Valley) (88‑3‑013)
Reappropriation:
St Bldg Constr Acct........................... $ 102,068
Prior Biennia (Expenditures)........................ $ 1,588,932
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,691,000
(16)Math and science building (Spokane Falls) (88‑3‑015)
Reappropriation:
St Bldg Constr Acct........................... $ 779,618
Prior Biennia (Expenditures)........................ $ 4,970,382
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 5,750,000
(17)Learning resource center (Spokane) (88‑3‑016)
Reappropriation:
St Bldg Constr Acct........................... $ 588,025
Prior Biennia (Expenditures)........................ $ 4,946,975
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 5,535,000
(18)Preplanning for 1989‑93 major projects (88‑4‑014)
Reappropriation:
St Bldg Constr Acct........................... $ 48,852
Prior Biennia (Expenditures)........................ $ 448,148
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 497,000
(19)Construct: Whidbey learning resource center: To house library and media services, computer science and office occupations programs, classrooms, and offices at Skagit Valley's Whidbey branch (Skagit Valley) (88‑5‑020)
Reappropriation
St Bldg Constr Acct........................... $ 66,117
Appropriation:
St Bldg Constr Acct........................... $ 2,123,000
Prior Biennia (Expenditures)........................ $ 41,883
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 2,231,000
(20)Construct: A combination science, physical education, and instruction building (South Puget Sound) (88‑5‑021)
Appropriation:
St Bldg Constr Acct........................... $ 5,998,000
Prior Biennia (Expenditures)........................ $ 256,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 6,254,000
(21)Construct: Early childhood education facility of eight thousand square feet (Shoreline) (88‑5‑022)
Reappropriation:
St Bldg Constr Acct........................... $ 20,747
Appropriation:
St Bldg Constr Acct........................... $ 1,307,000
Prior Biennia (Expenditures)........................ $ 57,253
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,385,000
(22)Construct: Library addition and remodel to reconfigure the library building and add ten thousand four hundred seventy-five square feet (Columbia Basin) (88‑5‑023)
Reappropriation:
St Bldg Constr Acct........................... $ 77,194
Appropriation:
St Bldg Constr Acct........................... $ 1,972,000
Prior Biennia (Expenditures)........................ $ 35,806
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 2,085,000
(23)Construct: Vocational shops for diesel, automotive, and woodworking classes (Centralia) (88‑5‑024)
Reappropriation:
St Bldg Constr Acct........................... $ 49,234
Appropriation:
St Bldg Constr Acct........................... $ 2,025,000
Prior Biennia (Expenditures)........................ $ 45,766
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 2,120,000
(24)Construct: Learning research center addition and remodel to add seven thousand two hundred square feet for information technology, media production, offices, and work areas (Tacoma) (88‑5‑025)
Reappropriation:
St Bldg Constr Acct........................... $ 76,722
Appropriation:
St Bldg Constr Acct........................... $ 1,746,000
Prior Biennia (Expenditures)........................ $ 13,278
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,836,000
(25)Construct: Vocational food addition to add twelve thousand two hundred fifty square feet to the student center for expansion of the food service program areas (Lower Columbia) (88‑5‑026)
Reappropriation:
St Bldg Constr Acct........................... $ 138,067
Appropriation:
St Bldg Constr Acct........................... $ 2,902,000
Prior Biennia (Expenditures)........................ $ 1,933
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 3,042,000
(26)Construct: Business Education Building to house office technology labs, computer labs, and related support activities (Spokane) (88‑5‑027)
Reappropriation:
St Bldg Constr Acct........................... $ 33,714
Appropriation:
St Bldg Constr Acct........................... $ 6,311,000
Prior Biennia (Expenditures)........................ $ 211,286
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 6,556,000
(27)Construct: Student activity and physical education facility (Seattle Central) (88‑5‑028)
Reappropriation:
St Bldg Constr Acct........................... $ 148,348
Appropriation:
St Bldg Constr Acct........................... $ 11,080,000
Prior Biennia (Expenditures)........................ $ 251,652
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 11,480,000
(28)Washington State University education center (Clark) (89‑5‑019)
Reappropriation:
St Bldg Constr Acct........................... $ 12,793
Prior Biennia (Expenditures)........................ $ 1,787,207
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,800,000
(29)Multipurpose child care center (Everett) (89‑5‑020)
Reappropriation:
St Bldg Constr Acct........................... $ 20,055
Prior Biennia (Expenditures)........................ $ 465,533
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 485,588
(30)Fire and security repairs (90‑1‑004)
Reappropriation:
St Bldg Constr Acct........................... $ 499,132
Prior Biennia (Expenditures)........................ $ 448,478
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 947,610
(31)Roof and structural repairs (90‑2‑002)
Reappropriation:
St Bldg Constr Acct........................... $ 1,336,671
Prior Biennia (Expenditures)........................ $ 2,321,329
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 3,658,000
(32)Heating, ventilation, and air conditioning mechanical repairs (90‑2‑003)
Reappropriation:
St Bldg Constr Acct........................... $ 1,412,452
Prior Biennia (Expenditures)........................ $ 1,560,378
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 2,972,830
(33)Electrical repairs (90‑2‑005)
Reappropriation:
St Bldg Constr Acct........................... $ 126,639
Prior Biennia (Expenditures)........................ $ 244,601
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 371,240
(34)Small repairs and improvements (90‑3‑001)
Reappropriation:
St Bldg Constr Acct........................... $ 1,338,574
Prior Biennia (Expenditures)........................ $ 2,861,426
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 4,200,000
(35)Learning assistance resource center (Centralia) (90‑3‑006)
Reappropriation:
St Bldg Constr Acct........................... $ 66,076
Prior Biennia (Expenditures)........................ $ 4,147,924
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 4,214,000
(36)Facility repairs (90‑3‑007)
The reappropriation in this subsection is provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment or for other expenses that normally would be funded from the state operating budget.
Reappropriation:
St Bldg Constr Acct........................... $ 740,342
Prior Biennia (Expenditures)........................ $ 3,107,838
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 3,848,180
(37)Technology laboratories (Highline) (90‑3‑023)
Reappropriation:
St Bldg Constr Acct........................... $ 554,817
Prior Biennia (Expenditures)........................ $ 2,213,183
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 2,768,000
(38)Minor improvements (90‑5‑009)
The reappropriation in this subsection is provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget, except that the sum of $465,000 may be expended for the purchase of Roosevelt Field at Olympic College.
Reappropriation:
St Bldg Constr Acct........................... $ 4,454,434
Prior Biennia (Expenditures)........................ $ 8,838,506
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 13,292,940
(39)Design: Technology center (Whatcom) (90‑5‑010)
The new
appropriation in this subsection shall not be expended until project
preplanning documents have been reviewed and approved by the office of
financial management under section 59 ((of this act)), chapter 14,
Laws of 1991 sp.s.
Reappropriation:
St Bldg Constr Acct........................... $ 34,750
Appropriation:
St Bldg Constr Acct........................... $ 249,000
Prior Biennia (Expenditures)........................ $ 28,250
Future Biennia (Projected Costs).................... $ 6,378,000
-------------
TOTAL................................... $ 6,690,000
(40)Design: Physical education facility (North Seattle) (90‑5‑011)
The appropriation
in this subsection shall not be expended until project preplanning documents
have been reviewed and approved by the office of financial management under
section 59 ((of this act)), chapter 14, Laws of 1991 sp.s.
Appropriation:
St Bldg Constr Acct........................... $ 202,000
Prior Biennia (Expenditures)........................ $ 45,000
Future Biennia (Projected Costs).................... $ 6,940,000
-------------
TOTAL................................... $ 7,187,000
(41)Design: Applied arts building (Spokane Falls) (90‑5‑012)
The new
appropriation in this subsection shall not be expended until project
preplanning documents have been reviewed and approved by the office of
financial management under section 59 ((of this act)), chapter 14,
Laws of 1991 sp.s.
Reappropriation:
St Bldg Constr Acct........................... $ 33,157
Appropriation:
St Bldg Constr Acct........................... $ 280,000
Prior Biennia (Expenditures)........................ $ 34,843
Future Biennia (Projected Costs).................... $ 5,213,000
-------------
TOTAL................................... $ 5,561,000
(42)Design: Industrial tech building (Spokane) (90‑5‑013)
The new
appropriation in this subsection shall not be expended until project
preplanning documents have been reviewed and approved by the office of
financial management under section 59 ((of this act)), chapter 14,
Laws of 1991 sp.s.
Reappropriation:
St Bldg Constr Acct........................... $ 9,076
Appropriation:
St Bldg Constr Acct........................... $ 298,000
Prior Biennia (Expenditures)........................ $ 54,924
Future Biennia (Projected Costs).................... $ 6,536,000
-------------
TOTAL................................... $ 6,898,000
(43)Design: Vocational art facility (Shoreline) (90‑5‑014)
Reappropriation:
St Bldg Constr Acct........................... $ 22,407
Appropriation:
St Bldg Constr Acct........................... $ 157,000
Prior Biennia (Expenditures)........................ $ 28,593
Future Biennia (Projected Costs).................... $ 2,785,000
-------------
TOTAL................................... $ 2,993,000
(44)Design: Business education building (Clark) (90‑5‑015)
The new
appropriation in this subsection shall not be expended until project
preplanning documents have been reviewed and approved by the office of
financial management under section 59 ((of this act)), chapter 14,
Laws of 1991 sp.s.
Reappropriation:
St Bldg Constr Acct........................... $ 33,280
Appropriation:
St Bldg Constr Acct........................... $ 305,000
Prior Biennia (Expenditures)........................ $ 39,720
Future Biennia (Projected Costs).................... $ 5,725,000
-------------
TOTAL................................... $ 6,103,000
(45)Design: Student center (South Seattle) (90‑5‑016)
The new
appropriation in this subsection shall not be expended until project
preplanning documents have been reviewed and approved by the office of
financial management under section 59 ((of this act)), chapter 14,
Laws of 1991 sp.s.
Reappropriation:
St Bldg Constr Acct........................... $ 5,117
Appropriation:
St Bldg Constr Acct........................... $ 258,000
Prior Biennia (Expenditures)........................ $ 53,883
Future Biennia (Projected Costs).................... $ 4,276,000
-------------
TOTAL................................... $ 4,593,000
(46)Design: Library addition (Skagit Valley) (90‑5‑017)
Appropriation:
St Bldg Constr Acct........................... $ 116,000
Prior Biennia (Expenditures)........................ $ 44,000
Future Biennia (Projected Costs).................... $ 1,896,000
-------------
TOTAL................................... $ 2,056,000
(47)Acquisition: Purchase land for staff and student parking (Olympic) (92‑1‑601)
Appropriation:
St Bldg Constr Acct........................... $ 105,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 105,000
(48)Acquisition: Purchase a two thousand four hundred-square-foot child care facility (Centralia) (92‑1‑602)
Appropriation:
St Bldg Constr Acct........................... $ 78,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 78,000
(49)Acquisition: Purchase 1.76 acres and a five thousand seven hundred five-square-foot fire station for fire science training and additional college parking (Spokane) (92‑1‑603)
Appropriation:
St Bldg Constr Acct........................... $ 498,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 498,000
(50)Acquisition: Purchase property for auto shop
((that is currently being leased)) program (Olympic) (92‑1‑604)
Appropriation:
St Bldg Constr Acct........................... $ 700,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 700,000
(51)Acquisition: Purchase 1.4 acres and an eight thousand-square-foot graphic arts facility currently being leased for the Whidbey branch (Skagit Valley) (92‑1‑605)
Appropriation:
St Bldg Constr Acct........................... $ 280,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 280,000
(52)Acquisition: Purchase a fourteen thousand six hundred three-square-foot vocational facility adjacent to the college that is currently being leased (Whatcom) (92‑1‑606)
Appropriation:
St Bldg Constr Acct........................... $ 1,893,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,893,000
(53)Underground tank repairs: To remove sixty-five underground storage tanks and any contaminated soil (92‑2‑102)
The appropriation
in this subsection may be expended only after compliance with section 6(2) ((of
this act)) chapter 14, Laws of 1991 sp.s..
Appropriation:
St Bldg Constr Acct........................... $ 650,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 650,000
(54)Life safety code repairs: To pay local improvement district assessments and make improvements to meet handicap and safety regulations (92‑2‑103)
Appropriation:
St Bldg Constr Acct........................... $ 1,172,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,172,000
(55)Roof repairs: To replace or repair roofs at seventeen campuses (92‑2‑104)
Appropriation:
St Bldg Constr Acct........................... $ 7,457,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 7,457,000
(56)Exterior and structural repairs: To repair structural or exterior problems at seven campuses (92‑2‑105)
Appropriation:
St Bldg Constr Acct........................... $ 817,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 817,000
(57)Heating, ventilation, and air conditioning repairs: To repair or replace HVAC systems on ten campuses (92‑2‑106)
Appropriation:
St Bldg Constr Acct........................... $ 3,074,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 3,074,000
(58)Electrical repairs: To repair or replace electrical wiring and equipment on twelve campuses (92‑2‑107)
Appropriation:
St Bldg Constr Acct........................... $ 2,307,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 2,307,000
(59)Mechanical repairs: To repair or replace mechanical system components on eleven campuses (92‑2‑108)
Appropriation:
St Bldg Constr Acct........................... $ 2,508,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 2,508,000
(60)Fire and security repairs: To repair or improve fire and security systems on four campuses (92‑2‑109)
Appropriation:
St Bldg Constr Acct........................... $ 692,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 692,000
(61)Interior repairs: To repair or replace interior surfaces and equipment on twelve campuses (92‑2‑110)
Appropriation:
St Bldg Constr Acct........................... $ 1,440,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,440,000
(62)Site repairs: To provide site improvements on eleven campuses (92‑2‑111)
Appropriation:
St Bldg Constr Acct........................... $ 1,329,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 1,329,000
(63)Small repairs and improvements: To provide funds for each community college to make unforeseen repairs (92‑5‑001)
Of the appropriation in this subsection:
(a)
$45,000, or as much thereof as may be necessary((, of the appropriation in
this subsection)) is provided for an evaluation of the physical condition
of the Seattle Vocational Institute formally the Washington Institute of
Applied Technology (WIAT) facility.
(b) $282,000, or as much as may be necessary, may be expended for heating system repairs at Columbia Basin College.
(c) $100,000, or as much as may be necessary, may be expended for electrical transformer repairs at Olympic College.
Appropriation:
St Bldg Constr Acct........................... $ 6,256,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 6,256,000
(64)Minor improvements: To complete fifty-seven minor improvement projects costing less than $500,000 each (92‑5‑200)
The appropriation in this subsection is provided solely for minor repairs, fixtures, and improvements to state buildings and facilities and shall not be used for computer equipment, land acquisition, or for other expenses that normally would be funded from the state operating budget.
Appropriation:
St Bldg Constr Acct........................... $ 16,930,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 16,930,000
(65)Preplan: Puyallup, phase 2 (Pierce) (92‑5‑501)
Any preplanning
documents developed using the appropriation in this subsection are subject to
review by the office of financial management under section 59 ((of this act)),
chapter 14, Laws of 1991 sp.s.
Appropriation:
St Bldg Constr Acct........................... $ 57,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 9,653,000
-------------
TOTAL................................... $ 9,710,000
(66)Preplan: Vocational building (Skagit Valley) (92‑5‑502)
Appropriation:
St Bldg Constr Acct........................... $ 25,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 2,116,000
-------------
TOTAL................................... $ 2,141,000
(67)Preplan: Learning resource center, arts, and student center (Whatcom) (92‑5‑503)
Any preplanning
documents developed using the appropriation in this subsection are subject to
review by the office of financial management under section 59 ((of this act)),
chapter 14, Laws of 1991 sp.s.
Appropriation:
St Bldg Constr Acct........................... $ 45,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 6,942,000
-------------
TOTAL................................... $ 6,987,000
(68)Preplan: Office and instructional building (Edmonds) (92‑5‑504)
Any preplanning
documents developed using the appropriation in this subsection are subject to
review by the office of financial management under section 59 ((of this act)),
chapter 14, Laws of 1991 sp.s.
Appropriation:
St Bldg Constr Acct........................... $ 58,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 8,485,000
-------------
TOTAL................................... $ 8,543,000
(69)Preplan: Technical skills facility (South Puget Sound) (92‑5‑505)
Any preplanning
documents developed using the appropriation in this subsection are subject to
review by the office of financial management under section 59 ((of this act)),
chapter 14, Laws of 1991 sp.s.
Appropriation:
St Bldg Constr Acct........................... $ 42,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 5,849,000
-------------
TOTAL................................... $ 5,891,000
(70)Preplan: Learning resource center and technical facility (Green river) (92‑5‑506)
Any preplanning
documents developed using the appropriation in this subsection are subject to
review by the office of financial management under section 59 ((of this act)),
chapter 14, Laws of 1991 sp.s.
Appropriation:
St Bldg Constr Acct........................... $ 58,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 10,462,000
-------------
TOTAL................................... $ 10,520,000
(71)Preplan: New Campus One (92‑5‑701)
Appropriation:
St Bldg Constr Acct........................... $ 300,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 14,800,000
-------------
TOTAL................................... $ 15,100,000
(72)Pool repairs (Pierce)
Appropriation:
St Bldg Constr Acct........................... $ 600,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 600,000
(73)Lake Washington Technical College: For the administrative addition, classroom space, and aerospace laboratory (92-5-003)
The appropriation in this subsection is in addition to the appropriation in House Bill No. 2295 for Lake Washington Technical College and is provided solely for building construction, building equipment and furniture, street improvements, and required art works.
Appropriation:
St Bldg Constr Acct........................... $ 2,291,000
Prior Biennia (Expenditures)........................ $ 10,117,000
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 12,408,000
(74)Bates Technical College: For building furnishings and equipment to complete a facility (93-2-002)
Appropriation:
St Bldg Constr Acct........................... $ 108,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 108,000
(75)Clover Park Technical College: Roof repairs (93-2-002)
Appropriation:
St Bldg Constr Acct........................... $ 189,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 189,000
(76)Seattle Vocational Institute: For minor building repairs: Waterproof the exterior of the building, handicapped access, and electrical repairs (93-2-003)
The state board for community and technical colleges shall submit a report on the future program and facility plans for the Seattle Vocational Institute. The report shall include operating and capital cost estimates for the next six years and shall be submitted to the fiscal committees of the house of representatives and senate by January 15, 1993.
Appropriation:
St Bldg Constr Acct........................... $ 628,000
Prior Biennia (Expenditures)........................ $ 0
Future Biennia (Projected Costs).................... $ 0
-------------
TOTAL................................... $ 628,000
(End of part)
PART 6
MISCELLANEOUS
NEW SECTION. Sec. 32. The estimated debt service costs impacting future general fund expenditures related solely to new supplemental capital appropriations within this act are $395,300 during the 1991-93 fiscal period; $23,794,000 during the 1993-95 fiscal period; and $28,381,300 during the 1995-97 fiscal period.
Sec. 33. 1991 sp.s. c 14 s 47 (uncodified) is amended to read as follows:
The following agencies may enter into financial contracts for the purpose indicated and in not more than the principal amounts indicated plus financing expenses and required reserves pursuant to chapter 39.94 RCW:
(1) Department of Social and Health Services to:
(a)
Lease a multi-service center in Benton or Franklin county for (($2,592,450))
$1,337,670 during the 1991-93 biennium; ((and))
(b) Lease a Spokane North Community Service Office for $980,000 during the 1991-93 biennium; and
(c) Lease a Children's and Family Services office in Toppenish for $135,000 during the 1991-93 biennium.
(2) Department of Corrections to:
(a)
Lease-purchase a ((sixty-bed)) work-release facility in Benton or
Franklin county for $((1,186,850)) 1,337,670 during the
1991-93 biennium;
(b) Lease-purchase a forty-bed work-release facility in Longview for $1,337,670 during the 1991-93 biennium;
(c)
Lease-purchase ((twelve forty-bed)) three hundred sixty beds in
work-release facilities in as-yet-undetermined locations state-wide ((for
$1,337,670 each)), for a total of $((16,052,040)) 12,039,030
during the 1991-93 biennium;
(d)
Lease-purchase a correctional industries building at Shelton for $1,892,153
during the 1991-93 biennium; ((and))
(e) Lease-purchase a four hundred-passenger ferry, used tugboat, and new vehicle barge at McNeil Island for $1,760,963 during the 1991-93 biennium; and
(f) Lease-purchase property from the Department of Natural Resources on which the Cedar Creek, Indian Ridge, Larch, and Olympic Correctional Centers are now located for up to $1,000,000 during the 1991-93 biennium.
(3) State Board for Community College Education to:
(a) Lease-purchase a warehouse-type facility to house the electrician apprentice training program in Skagit county for an estimated cost of $200,000 during the 1991-93 biennium;
(b) Lease-purchase a facility to house the cosmetology training program at Everett for $60,000;
(c) Lease a facility to house the Bellevue Community College business office in Bellevue for $120,000 during the 1991-93 biennium;
(d) Lease a facility for the Green River Community College education and training center in Kent for $120,000 in the 1991-93 biennium;
(e) Lease-purchase office space for Edmonds Community College in Edmonds for $280,000 during the 1991-93 biennium;
(f) Lease-purchase space to house Spokane Falls Community College's adult education programs in Spokane for $300,000 during the 1991-93 biennium;
(g) Lease-purchase space to house plant services for Wenatchee Valley Community College in Wenatchee for $96,000 during the 1991-93 biennium;
(h) Lease-purchase land in Bellingham for Whatcom Community College for $450,000;
(i) Purchase a central storage facility for Spokane Community College for $75,000;
(j)
Purchase a hangar at Felts Field to house the aircraft mechanics' vocational
training program for Spokane Community College for $161,000; ((and))
(k) Lease-purchase an auto technology training facility at Shoreline Community College for $2,600,000. The college or its trustee may secure the financing contract with a lease of the land directly under the facility being financed by the contract;
(l) Purchase 6.32 acres adjacent to Centralia College for $1,500,000 during the 1991-93 biennium;
(m) Purchase 2.33 acres and house adjacent to Green River Community College for $250,000 during the 1991-93 biennium;
(n) Purchase 1.66 acres contiguous to Lake Washington Technical College for $500,000 during the 1991-93 biennium;
(o) Purchase 0.37 acres contiguous to Lower Columbia College for $55,000 during the 1991-93 biennium;
(p) Purchase 8.8 acres contiguous to the South Puget Sound Community College for $500,000 during the 1991-93 biennium;
(q) Purchase 6 acres contiguous to Wenatchee Valley College for $265,000 during the 1991-93 biennium;
(r) Purchase 4.29 acres contiguous to Whatcom Community College for $560,000 during the 1991-93 biennium;
(s) Purchase 10.5 acres adjacent to Whatcom Community College for $1,400,000 during the 1991-93 biennium;
(t) Purchase the Masonic Temple property adjacent to Seattle Central Community College for $1,600,000 during the 1991-93 biennium;
(u) Lease an industrial training center in Colville for Community Colleges of Spokane for $600,000 during the 1991-93 biennium;
(v) Lease-purchase Colville Building #2 for expansion of the Colville Center for the Community Colleges of Spokane for $300,000 during the 1991-93 biennium;
(w) Purchase a 6,000 square foot building and site on San Juan Island for instructional, office, and meeting space for Skagit Valley Community College for $600,000 during the 1991-93 biennium;
(x) Purchase 20,000 square foot building on a five-acre site in Gig Harbor for an off-site education center for Tacoma Community College for $1,750,000 during the 1991-93 biennium;
(y) Purchase space for a Kent education and training center by Green River Community College for up to $201,000 per year; and
(z) Lease or lease-purchase a computing and telecommunications center for the community and technical college system for up to $5,000,000.
(4) The Department of Ecology, to acquire, design, and construct a Thurston county headquarters for $53,000,000.
(5) The Evergreen State College, to expand the college activities building for $800,000. The college or its trustee may secure the financing contract with a lease of the land directly under the facility being financed by the contract. The financing contract shall be repaid through student activities fees.
(6) The Department of General Administration, to purchase or lease purchase office space to house the state board for community college education staff for $1,400,000.
Sec. 34. 1991 sp.s. c 14 s 54 (uncodified) is amended to read as follows:
Unless otherwise stated, for all appropriations under this act that
require a match of nonstate money or in-kind contributions, the following
requirement, consistent with RCW 43.88.150, shall apply: Expenditure of state
money shall be timed so that the state share of project expenditures never
exceeds the intended state share of total project costs. This section shall
not apply to section 10(5), chapter 14, Laws of 1991 sp.s. and section
((12(5))) 5(5) of this act.
Sec. 35. 1991 sp.s. c 14 s 59 (uncodified) is amended to read as follows:
To ensure that major construction projects are carried out in accordance with legislative and executive intent, appropriations in this act referencing this section shall not be expended until the office of financial management has reviewed the agency's programmatic preplanning or predesign document and approved continuation of or made changes to the project. The program preplanning document shall include but not be limited to projected workload, site conditions, user requirements, current space available, and an overall budget and cost estimate breakdown in a form prescribed by the office of financial management. The predesign document shall be prepared in accordance with the predesign standards adopted by the office of financial management. The office of financial management shall report to the house of representatives capital facilities committee, the senate ways and means committee, and the legislative transportation committee a listing of the program documents the office has reviewed and approved, changes made to the documents resulting from the review, and the estimated cost changes resulting from the review.
NEW SECTION. Sec. 36. In recognition of the services provided to the beneficiaries of state trust lands by county public safety agencies, lease payments for public safety communication systems located on trust lands in any county with a population of less than five thousand shall be twenty-five percent of the fair market value as determined by the department of natural resources.
NEW SECTION. Sec. 37. A new section is added to chapter 14, Laws of 1991 sp.s. (uncodified) to read as follows:
As used in this act, the following phrases have the following meanings:
"Data Processing Bldg Constr Acct" means Data Processing Building Construction Account;
"WA St Dairy Prod Comm Fac Acct" means Washington State Dairy Products Commission Facility Account;
"Water Pollution Cont Rev Fund" means the Water Pollution Control Revolving Fund.
NEW SECTION. Sec. 38. This act is subject to the provisions, definitions, conditions, and limitations of chapter 14, Laws of 1991 sp. sess., as amended by this act.
(End of part)
PART 7
SEVERABILITY AND EFFECTIVE DATE
NEW SECTION. Sec. 39. If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected.
NEW SECTION. Sec. 40. This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and shall take effect immediately.
(End of part)
INDEX
Page #
CENTRAL WASHINGTON UNIVERSITY.................................................. 103
COMMUNITY COLLEGE SYSTEM
SYSTEM......................................................................... 105
DEPARTMENT OF COMMUNITY DEVELOPMENT............................................. 18
DEPARTMENT OF CORRECTIONS....................................................... 50
DEPARTMENT OF ECOLOGY........................................................... 63
DEPARTMENT OF FISHERIES......................................................... 70
DEPARTMENT OF GENERAL ADMINISTRATION............................................. 5
DEPARTMENT OF INFORMATION SERVICES.............................................. 17
DEPARTMENT OF LABOR AND INDUSTRIES.............................................. 37
DEPARTMENT OF NATURAL RESOURCES................................................. 73
DEPARTMENT OF SOCIAL AND HEALTH SERVICES........................................ 38
DEPARTMENT OF TRADE AND ECONOMIC DEVELOPMENT.................................... 69
DEPARTMENT OF TRANSPORTATION.................................................... 75
DEPARTMENT OF VETERANS' AFFAIRS................................................. 49
DEPARTMENT OF WILDLIFE.......................................................... 70
EASTERN WASHINGTON UNIVERSITY.................................................. 105
INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION................................ 68, 69
OFFICE OF FINANCIAL MANAGEMENT................................................... 2
OFFICE OF THE SECRETARY OF STATE................................................. 1
PARKS AND RECREATION COMMISSION
Timberland Purchases and Common School Purchases................................ 71
STATE BOARD OF EDUCATION........................................................ 80
STATE CONVENTION AND TRADE CENTER............................................... 73
STATE PARKS AND RECREATION COMMISSION........................................... 67
SUPERINTENDENT OF PUBLIC INSTRUCTION............................................ 83
UNIVERSITY OF WASHINGTON........................................................ 84
WASHINGTON STATE DAIRY PRODUCTS COMMISSION...................................... 68
WASHINGTON STATE PATROL......................................................... 77
WASHINGTON STATE UNIVERSITY..................................................... 95