CERTIFICATION OF ENROLLMENT
ENGROSSED SECOND SUBSTITUTE SENATE BILL 5724
52nd Legislature
1992 Regular Session
Passed by the Senate March 12, 1992 Yeas 41 Nays 6
President of the Senate
Passed by the House March 12, 1992 Yeas 96 Nays 1 |
CERTIFICATE
I, Gordon Golob, Secretary of the Senate of the State of Washington, do hereby certify that the attached is ENGROSSED SECOND SUBSTITUTE SENATE BILL 5724 as passed by the Senate and the House of Representatives on the dates hereon set forth. |
Speaker of the House of Representatives |
Secretary
|
Approved Place Style On Codes above, and Style Off Codes below. |
FILED |
|
|
Governor of the State of Washington |
Secretary of State State of Washington |
_______________________________________________
ENGROSSED SECOND SUBSTITUTE SENATE BILL 5724
_______________________________________________
AS RECOMMENDED BY THE CONFERENCE COMMITTEE
Passed Legislature - 1992 Regular Session
State of Washington 52nd Legislature 1991 Regular Session
By Senate Committee on Ways & Means (originally sponsored by Senators Sutherland, Hayner and Owen).
Read first time March 11, 1991.
AN ACT Relating to water pollution control of chlorinated organic compound emissions; and adding a new section to chapter 90.48 RCW.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
NEW SECTION. Sec. 1. A new section is added to chapter 90.48 RCW to read as follows:
(1) The department may require each pulp mill and paper mill discharging chlorinated organics to conduct and submit an engineering report on the cost of installing technology designed to reduce the amount of chlorinated organic compounds discharged into the waters of the state. The department shall allow at least twenty-four months from the effective date of this act for each pulp mill and each paper mill to submit an engineering report.
(2) The department may not issue a permit establishing limits to the discharge of chlorinated organic compounds by a pulp mill or a paper mill under RCW 90.48.160 or 90.48.260 until at least nine months after receiving an engineering report from a kraft mill and at least fifteen months after receiving an engineering report from a sulfite mill.
(3) Nothing in this section shall apply to dioxin compounds.