CERTIFICATION OF ENROLLMENT

 

              ENGROSSED SUBSTITUTE HOUSE BILL 2863

 

 

 

 

 

 

 

                        53rd Legislature

                      1994 Regular Session

Passed by the House March 5, 1994

  Yeas 89   Nays 4

 

 

 

 

Speaker of the

      House of Representatives

 

Passed by the Senate February 26, 1994

  Yeas 33   Nays 15

             CERTIFICATE

 

I, Marilyn Showalter, Chief Clerk of the House of Representatives of the State of Washington, do hereby certify that the attached is ENGROSSED SUBSTITUTE HOUSE BILL 2863 as passed by the House of Representatives and the Senate on the dates hereon set forth.

 

 

 

 

President of the Senate

 

                          Chief Clerk

 

 

Approved Place Style On Codes above, and Style Off Codes below.

                                FILED

          

 

 

Governor of the State of Washington

                   Secretary of State

                  State of Washington


          _______________________________________________

 

               ENGROSSED SUBSTITUTE HOUSE BILL 2863

          _______________________________________________

 

                     AS AMENDED BY THE SENATE

 

             Passed Legislature - 1994 Regular Session

 

State of Washington      53rd Legislature     1994 Regular Session

 

By House Committee on Transportation (originally sponsored by Representatives Zellinsky, R. Meyers and Schmidt)

 

Read first time 02/08/94.

 

Facilitating acquisition of a propulsion system for new jumbo ferries.



    AN ACT Relating to the jumbo ferry vessel propulsion system; adding a new section to chapter 47.60 RCW; creating new sections; and declaring an emergency.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

 

    NEW SECTION.  Sec. 1.  The legislature finds and declares that:

    A 1991 legislative study, conducted by Booz.Allen, Hamilton and M. Rosenblatt and Son, examining the Washington State Ferries' management of its vessel refurbishment and construction program, resulted in recommendations for improvements and changes in the vessel refurbishment and construction program.  These legislatively adopted recommendations encourage and support input by Washington State Ferries' engineers in the development of refurbishment and new construction project requirements.

    The recommendations of the Booz.Allen study have been applied to the construction of the Jumbo Class Mark II ferries through the appointment of a Jumbo Class Mark II Steering Committee comprised of current state ferry engineers responsible for the design, operation, and maintenance of state ferry vessels.

    The Steering Committee, in carrying out the recommendations of the Booz. Allen study, has determined that the procedure for the procurement of equipment, parts, and supplies for the Jumbo Class Mark II ferry vessels authorized by RCW 47.60.770 through 47.60.778, must take into consideration, in addition to life-cycle cost criteria, criteria that are essential to the operation of a public mass transportation system responsive to the needs of Washington State Ferries' users, and that assess the reliability, maintainability, and performance of equipment, parts, and supplies to be installed in the Jumbo Mark II ferries.

    The construction of the new Jumbo Class Mark II ferry vessels authorized by RCW 47.60.770 through 47.60.778 is critical to the welfare of the state and any delay in the immediate construction of the ferries will result in severe hardship and economic loss to the state and its citizens.  Recognizing these findings, it is the intent of the legislature that the vessel construction should not be delayed further because of the acquisition of a propulsion system, or any component of it, for the ferries, and to authorize the department of transportation to acquire all components of a complete propulsion system as soon as possible so that planned construction of the Jumbo Class Mark II ferry vessels can proceed immediately.

    The purpose of this chapter is to authorize the use, by the department, of supplemental, alternative contracting procedures for the procurement of a propulsion system, and the components thereof, for the Jumbo Class Mark II ferries; and to prescribe appropriate requirements and criteria to ensure that contracting procedures for such procurement serve the public interest.

 

    NEW SECTION.  Sec. 2.  A new section is added to chapter 47.60 RCW to read as follows:

    (1) The department may enter into a contract for the acquisition of the propulsion system, or any component of it, including diesel engines and spare parts, for installation into one or more of the three Jumbo Class Mark II ferry vessels authorized under this chapter.  This authorization does not limit the department from obtaining and installing the propulsion system, or any component of it, as incidental to the overall vessel construction contract authorized under RCW 47.60.770 through 47.60.778, nor from proceeding to complete an existing contract for acquisition of the propulsion system or any component of it.

    (2) Acquisition of a propulsion system, or any component of it, for the Jumbo Class Mark II ferries by the department under this section is exempt from chapter 43.19 RCW. 

    (3) Whenever the department decides to enter into an acquisition contract under this section it shall publish a notice of its intent to negotiate such a contract once a week for at least two consecutive weeks in one trade newspaper and one other newspaper, both of general circulation in the state.  The notice must contain, but is not limited to, the following information:

    (a) The identity of the propulsion system or components to be acquired and the proposed delivery dates for the propulsion system or components;

    (b) An address and telephone number that may be used to obtain the request for proposal.

    (4) The department shall send to any firm that requests it, a request for proposal outlining the design and construction requirements for the propulsion system, including any desired components.  The request for proposal must include, but is not limited to, the following information:

    (a) The proposed delivery date for each propulsion system or desired component and the location where delivery will be taken;

    (b) The form and formula for contract security;

    (c) A copy of the proposed contract;

    (d) The date by which proposals must be received by the department in order to be considered; and

    (e) A statement that any proposal submitted constitutes an offer and must remain open until ninety days after the deadline for submitting proposals, together with an explanation of the requirement that all proposals submitted must be accompanied by a deposit in the amount of five percent of the proposed cost.

    (5) The department shall evaluate all timely proposals received for:  (a) Compliance with the requirements specified in the request for proposal; and (b) suitability of each firm's proposal by applying appropriate criteria to be developed by the department:  (i) To assess the ability of the firm to expeditiously and satisfactorily perform and (ii) to accomplish an acquisition that is most advantageous to the department.  A portion of the technical requirements addressed in the request for proposal shall include, but is not limited to, user verifications of manufacturer's reliability claims; the quality of engine maintenance documentation; and engine compatibility with ship design.

    (6) The criteria to select the most advantageous diesel engine under subsection (5)(b)(ii) shall consist of life-cycle cost factors weighted at forty-five percent; and operational factors weighted as follows:  reliability at twenty percent, maintainability at twenty percent, and engine performance at fifteen percent.  For purposes of this subsection, the life-cycle cost factors shall consist of the costs for engine acquisition and warranty, spare parts acquisition and inventory, fuel efficiency and lubricating oil consumption, and commonality.  The fuel efficiency and lubricating oil consumption life-cycle cost factors shall receive not less than twenty percent of the total evaluation weighting and shall be evaluated under a format similar to that employed in the 1992 M.V. Tyee engine replacement contract.  The reliability factors shall consist of the length of service and reliability record in comparable uses, and mean time between overhauls.  The mean time between overhauls evaluation shall be based upon the manufacturer's required hours between change of wear components.  The maintainability factors shall consist of spare parts availability, the usual time anticipated to perform typical repair functions, and the quality of factory training programs for ferry system maintenance staff.  The performance factors shall consist of load change responsiveness, and air quality of exhaust and engine room emissions.

    (7) Upon concluding its evaluation, the department shall:

    (a) Select the firm presenting the proposal most advantageous to the department, taking into consideration compliance with the requirements stated in the request for proposal, and the criteria developed by the department, and rank the remaining firms in order of preference, judging them by the same standards; or

    (b) Reject all proposals as not in compliance with the requirements contained in the request for proposals.

    (8) The department shall immediately notify those firms that were not selected as the firm presenting the most advantageous proposal of the department's decision.  The department's decision is conclusive unless an aggrieved firm appeals the decision to the superior court of Thurston county within five days after receiving notice of the department's final decision.  The appeal shall be heard summarily within ten days after it is taken and on five days' notice to the department.  The court shall hear the appeal on the administrative record that was before the department.  The court may affirm the decision of the department, or it may reverse the decision if it determines the action of the department is arbitrary or capricious.

    (9) Upon selecting the firm that has presented the most advantageous proposal and ranking the remaining firms in order of preference, the department shall:

    (a) Negotiate a contract with the firm presenting the most advantageous proposal; or

    (b) If a final agreement satisfactory to the department cannot be negotiated with the firm presenting the most advantageous proposal, the department may then negotiate with the firm ranked next highest in order of preference.  If necessary, the department may repeat this procedure and negotiate with each firm in order of rank until the list of firms has been exhausted.

    (10) Proposals submitted by firms under this section constitute an offer and must remain open for ninety days.  When submitted, each proposal must be accompanied by a deposit in cash, certified check, cashier's check, or surety bond in the amount equal to five percent of the amount of the proposed contract price, and the department may not consider a proposal that has no deposit enclosed with it.  If the department awards a contract to a firm under the procedure set forth in this section and the firm fails to enter into the contract and furnish the required contract security within twenty days, exclusive of the day of the award, its deposit shall be forfeited to the state and deposited by the state treasurer to the credit of the Puget Sound capital construction account.  Upon the execution of a contract all proposal deposits shall be returned.

 

    NEW SECTION.  Sec. 3.  The department of transportation, the department of general administration, and the office of financial management, in consultation with the legislative transportation committee, shall conduct a systematic review of acquisition authorities established under chapters 43.19, 47.56, and 47.60 RCW, and the consequent impact on the operation of Washington state ferries as a public mass transportation system.  The results of this review, including any proposed legislation, shall be reported to the governor and the house of representatives and senate transportation committees on or before January 1, 1995.

 

    NEW SECTION.  Sec. 4.  This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and shall take effect immediately.

 


                            --- END ---