CERTIFICATION OF ENROLLMENT

 

              ENGROSSED SUBSTITUTE HOUSE BILL 1125

 

 

 

 

 

 

 

                        54th Legislature

                      1995 Regular Session

Passed by the House February 22, 1995

  Yeas 91   Nays 6

 

 

 

 

Speaker of the

       House of Representatives

 

Passed by the Senate April 4, 1995

  Yeas 45   Nays 0

               CERTIFICATE

 

I, Timothy A. Martin, Chief Clerk of the House of Representatives of the State of Washington, do hereby certify that the attached is ENGROSSED SUBSTITUTE HOUSE BILL 1125 as passed by the House of Representatives and the Senate on the dates hereon set forth.

 

 

 

 

President of the Senate

 

                               Chief Clerk

 

 

Approved Place Style On Codes above, and Style Off Codes below.

                                     FILED

          

 

 

Governor of the State of Washington

                        Secretary of State

                             of Washington


                  _______________________________________________

 

                       ENGROSSED SUBSTITUTE HOUSE BILL 1125

                  _______________________________________________

 

                     Passed Legislature - 1995 Regular Session

 

 

State of Washington              54th Legislature             1995 Regular Session

 

By House Committee on Energy & Utilities (originally sponsored by Representatives Kessler, Casada, Chandler, Kremen, Patterson, Mastin, Morris, Quall, Foreman, L. Thomas, Brumsickle, Buck, Huff and Schoesler)

 

Read first time 02/09/95.

 

Exempting federally licensed dams from state regulation.



     AN ACT Relating to dam safety inspections; amending RCW 43.21A.064, 86.16.025, and 90.03.350; reenacting and amending RCW 86.16.035; adding a new section to chapter 43.21A RCW; and creating a new section.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

 

     NEW SECTION.  Sec. 1.  The legislature finds and declares:

     (1) The federal energy regulatory commission, under the federal power act, licenses hydropower projects in navigable waters and regularly and extensively inspects facilities for safety; and

     (2) Nothing in this act alters or affects the department of ecology's authority to:  (a) Participate in the federal process of licensing hydropower projects; or (b) ensure that hydropower projects comply with federal statutes such as the coastal zone management act and the clean water act and, subject to section 2 of this act, all applicable state law.

 

     NEW SECTION.  Sec. 2.  A new section is added to chapter 43.21A RCW to read as follows:

     (1) With respect to the safety of any dam, canal, ditch, hydraulic power plant, reservoir, project, or other work, system, or plant that requires a license under the federal power act, no licensee shall be required to:

     (a) Submit proposals, plans, specifications, or other documents for approval by the department;

     (b) Seek a permit, license, or other form, permission, or authorization from the department;

     (c) Submit to inspection by the department; or

     (d) Change the design, construction, modification, maintenance, or operation of such facilities at the demand of the department.

     (2) For the purposes of this section, "licensee" means an owner or operator, or any employee thereof, of a dam, canal, ditch, hydraulic power plant, reservoir, project, or other work, system, or plant that requires a license under the federal power act.

 

     Sec. 3.  RCW 43.21A.064 and 1977 c 75 s 46 are each amended to read as follows:

     Subject to section 2 of this act, the director of the department of ecology shall have the following powers and duties:

     (1) The supervision of public waters within the state and their appropriation, diversion, and use, and of the various officers connected therewith;

     (2) Insofar as may be necessary to assure safety to life or property, he shall inspect the construction of all dams, canals, ditches, irrigation systems, hydraulic power plants, and all other works, systems, and plants pertaining to the use of water, and he may require such necessary changes in the construction or maintenance of said works, to be made from time to time, as will reasonably secure safety to life and property;

     (3) He shall regulate and control the diversion of water in accordance with the rights thereto;

     (4) He shall determine the discharge of streams and springs and other sources of water supply, and the capacities of lakes and of reservoirs whose waters are being or may be utilized for beneficial purposes;

     (5) He shall keep such records as may be necessary for the recording of the financial transactions and statistical data thereof, and shall procure all necessary documents, forms, and blanks.  He shall keep a seal of the office, and all certificates by him covering any of his acts or the acts of his office, or the records and files of his office, under such seal, shall be taken as evidence thereof in all courts;

     (6) He shall render when required by the governor, a full written report of the work of his office with such recommendations for legislation as he may deem advisable for the better control and development of the water resources of the state;

     (7) The director and duly authorized deputies may administer oaths;

     (8) He shall establish and promulgate rules governing the administration of chapter 90.03 RCW;

     (9) He shall perform such other duties as may be prescribed by law.

 

     Sec. 4.  RCW 86.16.025 and 1989 c 64 s 2 are each amended to read as follows:

     Subject to section 2 of this act, with respect to such features as may affect flood conditions, the department shall have authority to examine, approve or reject designs and plans for any structure or works, public or private, to be erected or built or to be reconstructed or modified upon the banks or in or over the channel or over and across the floodway of any stream or body of water in this state.

 

     Sec. 5.  RCW 86.16.035 and 1987 c 523 s 9 and 1987 c 109 s 53 are each reenacted and amended to read as follows:

     Subject to section 2 of this act, the department of ecology shall have supervision and control over all dams and obstructions in streams, and may make reasonable regulations with respect thereto concerning the flow of water which he deems necessary for the protection to life and property below such works from flood waters.

 

     Sec. 6.  RCW 90.03.350 and 1994 c 232 s 20 are each amended to read as follows:

     Except as provided in section 2 of this act, any person, corporation or association intending to construct or modify any dam or controlling works for the storage of ten acre feet or more of water, shall before beginning said construction or modification, submit plans and specifications of the same to the department for examination and approval as to its safety.  Such plans and specifications shall be submitted in duplicate, one copy of which shall be retained as a public record, by the department, and the other returned with its approval or rejection endorsed thereon.  No such dam or controlling works shall be constructed or modified until the same or any modification thereof shall have been approved as to its safety by the department.  Any such dam or controlling works constructed or modified in any manner other than in accordance with plans and specifications approved by the department or which shall not be maintained in accordance with the order of the department shall be presumed to be a public nuisance and may be abated in the manner provided by law, and it shall be the duty of the attorney general or prosecuting attorney of the county wherein such dam or controlling works, or the major portion thereof, is situated to institute abatement proceedings against the owner or owners of such dam or controlling works, whenever he or she is requested to do so by the department.

     A metals mining and milling operation regulated under chapter 232, Laws of 1994 is subject to additional dam safety inspection requirements due to the special hazards associated with failure of a tailings pond impoundment.  The department shall inspect these impoundments at least quarterly during the project's operation and at least annually thereafter for the postclosure monitoring period in order to ensure the safety of the dam or controlling works.  The department shall conduct additional inspections as needed during the construction phase of the mining operation in order to ensure the safe construction of the tailings impoundment.

 


                                    --- END ---