HB 1597-S - DIGEST
(AS OF HOUSE 2ND READING 2/13/96)
Provides for the reduction of flood damage through the use of structural and nonstructural projects, such as streambank stabilization, river channel maintenance, land use restrictions, land buy-outs, flood easements, and emergency notification.
Requires land use regulations to be consistent with a flood management plan.
Revises rules for gravel removal.
Revises the criteria for approval or rejection of a hydraulic project permit by the department of fish and wildlife.
Revises provisions relating to the creation and operation of flood control zone districts.
Requires a county with two or more presidentially declared flood disasters within the most recent ten-year period to complete a comprehensive flood control plan by December 31, 1998.
Exempts designated projects from the requirement for a substantial development permit.
Repeals RCW 79.90.325.