H-2505.1  _______________________________________________

 

                    SUBSTITUTE HOUSE BILL 2013

          _______________________________________________

 

State of Washington      55th Legislature     1997 Regular Session

 

By House Committee on Agriculture & Ecology (originally sponsored by Representatives Chandler, Regala, Schoesler, Linville, Johnson, Bush, McDonald, Mastin, Talcott, Delvin, Carrell, Smith, Koster, Sullivan, Kastama, Fisher, Conway, Cooper and Honeyford)

 

Read first time 03/05/97.

  Developing an existing ground water right.


    AN ACT Relating to the full and complete development of existing permits or certificates of ground water right; amending RCW 90.44.100; and creating a new section.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

 

    NEW SECTION.  Sec. 1.  (1) The purpose of this act is to ensure that public water systems within urban growth areas are permitted by the department of ecology to fully develop existing valid permits or certificates of ground water right to provide potable water service within the urban growth boundaries as defined in the various county growth management plans.

    (2) The legislature intends that the holder of a valid permit or certificate of ground water right be permitted by the department of ecology to amend a valid permit or certificate to allow full and complete development of the valid right by the construction of replacement or additional wells at the original location or new locations.

 

    Sec. 2.  RCW 90.44.100 and 1987 c 109 s 113 are each amended to read as follows:

    (1) After an application to, and upon the issuance by the department of an amendment to the appropriate permit or certificate of ground water right, the holder of a valid right to withdraw public ground waters may, without losing ((his)) the holder's priority of right, construct wells or other means of withdrawal at a new location in substitution for or in addition to those at the original location, or ((he)) the holder may change the manner or the place of use of the water((:  PROVIDED, HOWEVER, That such amendment)).

    (2) An amendment to construct replacement or new additional wells at a new location or to change the manner or place of use of the water shall be issued only after publication of notice of the application and findings as prescribed in the case of an original application.  Such amendment shall be issued by the department only on the conditions that:  (((1))) (a) The additional or ((substitute)) replacement well or wells shall tap the same body of public ground water as the original well or wells; (((2) use of the original well or wells shall be discontinued upon construction of the substitute well or wells; (3) the construction of an additional well or wells shall not enlarge the right conveyed by the original permit or certificate; and (4))) (b) where a replacement well or wells is approved, the use of the original well or wells shall be discontinued and the original well or wells shall be properly decommissioned; (c) where an additional well or wells is constructed, the original well or wells may continue to be used, but the combined total withdrawal from the original and additional well or wells shall not enlarge the right conveyed by the original permit or certificate; (d) in the case of replacement or additional well or wells at the location of the original well or wells other earlier priority  existing rights shall not be impaired.  The "location of the original well or wells" is defined as being within an area described as the point of withdrawal in the original public notice, as long as the replacement or additional well or wells will be no closer to another well with which the replacement or additional well or wells might interfere; or (e) in the case of replacement or additional well or wells outside the original well or wells location as defined in (d) of this subsection other existing rights shall not be impaired.  The department may specify an approved manner of construction and shall require a showing of compliance with the terms of the amendment, as provided in RCW 90.44.080 in the case of an original permit.

    (3) The construction of replacement or new additional well or wells at the original location as defined in subsection (2)(d) of this section shall be permitted without application to the department for an amendment.  However, the department shall require a showing of compliance with the conditions under subsection (2)(a) through (d) of this section.  The department may specify an approved manner of construction.

 


                            --- END ---