H-4741.2  _______________________________________________

 

                    SUBSTITUTE HOUSE BILL 2773

          _______________________________________________

 

State of Washington      55th Legislature     1998 Regular Session

 

By House Committee on Energy & Utilities (originally sponsored by Representatives Poulsen, Crouse, Morris, Cooper and Constantine)

 

Read first time 02/03/98.  Referred to Committee on .

Requiring electric utilities to provide net metering systems to their customer-generators.


    AN ACT Relating to net metering for certain renewable energy systems; and adding a new chapter to Title 80 RCW.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

 

    NEW SECTION.  Sec. 1.  The legislature finds that it is in the public interest to:

    (1) Encourage private investment in renewable energy resources;

    (2) Stimulate the economic growth of this state; and

    (3) Enhance the continued diversification of the energy resources used in this state.

 

    NEW SECTION.  Sec. 2.  The definitions in this section apply throughout this chapter unless the context clearly indicates otherwise.

    (1) "Commission" means the utilities and transportation commission.

    (2) "Customer-generator" means a user of a net metering system.

    (3) "Electrical company" means a company owned by investors that meets the definition of RCW 80.04.010.

    (4) "Electric cooperative" means a cooperative or association organized under chapter 23.86 or 24.06 RCW.

    (5) "Electric utility" means any electrical company, public utility district, irrigation district, port district, electric cooperative, or municipal electric utility that is engaged in the business of distributing electricity to retail electric customers in the state.

    (6) "Irrigation district" means an irrigation district under chapter 87.03 RCW.

    (7) "Municipal electric utility" means a city or town that owns or operates an electric utility authorized by chapter 35.92 RCW.

    (8) "Net metering" means measuring the difference between the electricity supplied by an electric utility and the electricity generated by a customer-generator that is fed back to the electric utility over the applicable billing period.

    (9) "Net metering system" means a facility for the production of electrical energy that:

    (a) Uses as its fuel either solar, wind, or hydropower;

    (b) Has a generating capacity of not more than twenty-five kilowatts;

    (c) Is located on the customer-generator's premises;

    (d) Operates in parallel with the electric utility's transmission and distribution facilities; and

    (e) Is intended primarily to offset part or all of the customer-generator's requirements for electricity.

    (10) "Port district" means a port district within which an industrial development district has been established as authorized by Title 53 RCW.

    (11) "Public utility district" means a district authorized by chapter 54.04 RCW.

 

    NEW SECTION.  Sec. 3.  An electric utility:

    (1) Shall offer to make net metering available to eligible customers-generators on a first-come, first-served basis until the cumulative generating capacity of net metering systems equals 0.1 percent of the utility's peak demand during 1996;

    (2) Shall allow net metering systems to be interconnected using a standard kilowatt-hour meter capable of registering the flow of electricity in two directions, unless the commission, in the case of an electrical company, or the appropriate governing body, in the case of other electric utilities, determines, after appropriate notice and opportunity for comment:

    (a) That the use of additional metering equipment to monitor the flow of electricity in each direction is necessary and appropriate for the interconnection of net metering systems, after taking into account the benefits and costs of purchasing and installing additional metering equipment; and

    (b) How the cost of purchasing and installing an additional meter is to be allocated between the customer-generator and the utility;

    (3) Shall charge the customer-generator a minimum monthly fee that is the same as other customers of the electric utility in the same rate class, but shall not charge the customer-generator any additional standby, capacity, interconnection, or other fee or charge unless the commission, in the case of an electrical company, or the appropriate governing body, in the case of other electric utilities, determines, after appropriate notice and opportunity for comment that:

    (a) The electric utility will incur direct costs associated with interconnecting or administering net metering systems that exceed any offsetting benefits associated with these systems; and

    (b) Public policy is best served by imposing these costs on the customer-generator rather than allocating these costs among the utility's entire customer base.

 

    NEW SECTION.  Sec. 4.  Consistent with the other provisions of this chapter, the net energy measurement must be calculated in the following manner:

    (1) The electric utility shall measure the net electricity produced or consumed during the billing period, in accordance with normal metering practices.

    (2) If the electricity supplied by the electric utility exceeds the electricity generated by the customer-generator and fed back to the electric utility during the billing period, the customer-generator shall be billed for the net electricity supplied by the electric utility, in accordance with normal metering practices.

    (3) If electricity generated by the customer-generator exceeds the electricity supplied by the electric utility, the customer-generator:

    (a) Shall be billed for the appropriate customer charges for that billing period, in accordance with section 3 of this act; and

    (b) Shall be credited for the excess kilowatt-hours generated during the billing period, with this kilowatt-hour credit appearing on the bill for the following billing period.

    At the beginning of each calendar year, any remaining unused kilowatt-hour credit accumulated during the previous year shall be granted to the electric utility, without any compensation to the customer-generator.

 

    NEW SECTION.  Sec. 5.  (1) A net metering system used by a customer-generator shall include, at the customer-generator's own expense, all equipment necessary to meet applicable safety, power quality, and interconnection requirements established by the national electrical code, the institute of electrical and electronics engineers, and underwriters laboratories.

    (2) The commission, in the case of an electrical company, or the appropriate governing body, in the case of other electric utilities, after appropriate notice and opportunity for comment, may adopt by regulation additional safety, power quality, and interconnection requirements for customer-generators that the commission determines are necessary to protect public safety and system reliability.

 

    NEW SECTION.  Sec. 6.  Sections 1 through 5 of this act constitute a new chapter in Title 80 RCW.

 


                            --- END ---