1165-S AMS BAUE S3009.2

 

 

 

SHB 1165 - S AMD TO S COMM AMD (S-2719.3/99) - 519

By Senators Bauer and Rossi

 

                                                   ADOPTED 4/25/99

 

    Beginning on page 1, line 29 of the amendment, strike all material down to and including line 30 on page 3.

 

    Renumber the remaining sections consecutively and correct internal references accordingly.

 

    On page 212, after line 11 of the amendment, insert the following:

 

    "NEW SECTION.  Sec. 923.  FOR THE OFFICE OF THE GOVERNOR

    Salmon Recovery Grants Program (00-2-001)

 

    The appropriations in this section are subject to the following conditions and limitations:

    (1) The entire $111,875,000 appropriation is provided solely to the salmon recovery funding board within the office of the governor to provide grants to local governments, state agencies, tribes, conservation districts, and nonprofit entities for salmon recovery activities pursuant to House Bill No. 2079 or Senate Bill No. 5595.  If neither House Bill No. 2079 nor Senate Bill No. 5595 are enacted by June 30, 1999, the amount provided in this section shall lapse.

    (2) Up to $14,000,000 of the general fund‑-federal appropriation is provided for grants to local governments for salmon recovery in accordance with a grant from the department of interior, United States fish and wildlife service received in December 1998.

    (3) The remaining appropriations in this section shall be distributed by the salmon recovery funding board within the following categories:

    (a) A minimum of thirty percent of the appropriation shall be provided for fish passage barrier correction projects;

    (b) A minimum of thirty percent of the appropriation shall be provided for habitat enhancement projects, which may include but are not limited to:  Purchase of riparian easements; stream restoration; stream flow augmentation; water quality improvement; water conservation; and storm water mitigation;

    (c) A minimum of twenty percent of the appropriation for planning activities related to salmon recovery, which may include, but is not limited to:  Regional salmon recovery planning; shoreline master program amendment; critical areas ordinance updates; lead entity administration and development of project lists; and project planning; and

    (d) The remaining twenty percent of the appropriation may be distributed among the categories for highest priority projects as determined by the salmon recovery funding board.

    (4) In developing project lists for funding, the salmon recovery funding board shall give priority consideration to:

    (a) Proposals that support the recovery of salmon or steelhead runs listed as threatened or endangered under the federal endangered species act (16 U.S.C. Sec. 1531 et seq.);

    (b) Projects supported by a limiting factors analysis conducted according to RCW 75.46.070(2);

    (c) Projects sponsored by a lead entity formed according to 75.46 RCW;

    (d) Projects supporting a watershed plan developed according to chapter 90.82 RCW;

    (e) Projects that create market wage jobs for displaced workers in rural natural resource impact areas, as defined under RCW 43.31.601(2);

    (f) Projects with a local funding match, which may include a match of volunteer labor;

    (g) Projects that include provisions for long-term maintenance and monitoring; and

    (h) Other priorities identified by the salmon recovery funding board.

    (5) For the 1999-2001 biennium, proposals shall be ranked by the interagency review team, for review, approval, and funding by the salmon recovery funding board.  A final list of projects funded with appropriation from this section shall be submitted to the office of financial management and the legislature by June 30th of each year.

    (6) The salmon recovery funding board shall develop a list of projects in each of the categories identified in subsection (3) of this section proposed for funding in the 2001-2003 biennium, for submittal to the office of financial management and the legislature by December 1, 2000.

 

Appropriation:

    General Fund‑-Federal...................... $       74,835,000

    State Building Construction Account‑-

           State............................... $        6,200,000

    Salmon Recovery Account.................... $       30,840,000

                                                     -------------

           Subtotal Appropriation.............. $      111,875,000

 

    Prior Biennia (Expenditures)............... $                0

    Future Biennia (Projected Costs)........... $                0

                                                     -------------

           TOTAL............................... $      111,875,000

 

    Sec. 924. 1999 c ... (SHB 1165) s 112 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Housing Assistance, Weatherization, and Affordable Housing (88-5-015) (00-2-003)

 

    The appropriations in this section are subject to the following conditions and limitations:

    (1) $5,000,000 of the new appropriation from the state building construction account is provided solely to promote development of safe and affordable housing units for persons eligible for services from the division of developmental disabilities within the department of social and health services.

    (2) (($1,800,000)) $800,000 of the reappropriation from the state building construction account is provided solely to promote development of safe and affordable housing units for persons eligible for services from the division of developmental disabilities within the department of social and health services.

    (3) $1,000,000 of the new appropriation from the state building construction account is provided solely for shelters, transitional housing, or other housing facilities for victims of domestic violence.

 

Reappropriation:

    State Building Construction Account‑-State...... $  22,000,000

Appropriation:

    State Building Construction Account‑-State...... $  57,500,000

    Washington Housing Trust Account‑-State......... $   4,300,000

                                                     -------------

           Subtotal Appropriation................... $  61,800,000

 

    Prior Biennia (Expenditures).................... $  43,790,503

    Future Biennia (Projected Costs)................ $ 200,000,000

                                                     -------------

           TOTAL.................................... $ 327,590,503

 

    Sec. 925. 1999 c ... (SHB 1165) s 139 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    General Administration Building:  Preservation (00-1-004)

 

Appropriation:

    State Building Construction Account‑-State...... $ ((2,275,000))

                                                         1,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   5,900,000

                                                     -------------

           TOTAL.................................... $ ((8,175,000))

                                                         6,900,000

 

    Sec. 926. 1999 c ... (SHB 1165) s 144 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Americans with Disabilities Act:  Pool (00-1-011)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) The money provided in this section shall be solely allocated to agencies and institutions((, except for the state community and technical colleges,)) for improvements to state-owned facilities for program access enhancements.

    (2) No moneys appropriated in this section or in any section specifically referencing this section shall be expended unless the department of general administration has reviewed and approved the cost estimates for the project.  The department of general administration shall implement an agency request and evaluation procedure similar to the one adopted in the 1997-99 biennium for distribution of funds.

    (3) No moneys appropriated in this section shall be available to institutions of higher education to modify dormitories.

 

Appropriation:

    State Building Construction Account‑-State...... $   3,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  14,000,000

                                                     -------------

           TOTAL.................................... $  17,000,000

 

    Sec. 927. 1999 c ... (SHB 1165) s 148 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Legislative Buildings:  Safety and infrastructure (98-1-005)

 

    (1) The appropriations shall support the detailed list of projects maintained by the office of financial management.

    (2) $270,000 of the new appropriation is provided to complete heating, ventilation, and air conditioning repair and improvements in the Newhouse building.

 

Reappropriation:

    State Building Construction Account‑-State...... $     179,454

    Thurston County Capital Facilities Account‑-

           State.................................... $     475,000

                                                     -------------

           Subtotal Reappropriation..................            $ 654,454

 

Appropriation:

    Capitol Building Construction Account‑-State.... $   4,250,000

    Thurston County Capital Facilities Account‑-

           State.................................... $     585,000

    State Building Construction Account‑-State...... $ ((270,000))

                                                           495,000

                                                     -------------

           Subtotal Appropriation................... $ ((5,105,000))

                                                         5,330,000

 

    Prior Biennia (Expenditures).................... $   1,415,546

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $ ((7,175,000))

                                                         7,400,000

 

    Sec. 928. 1999 c ... (SHB 1165) s 162 (uncodified) is amended to read as follows:

FOR THE MILITARY DEPARTMENT

    Yakima National Guard Armory and Readiness Center:  Design and utilities (98-2-001)

 

    The reappropriation in this section is subject to the following conditions and limitations:

    Funds expended on this project for off-site utility infrastructure, and facility construction and design, which may include the provision of electricity, natural gas service, water service, ((or)) sewer service, or facility construction and design shall be for the benefit of the state.  Entities that subsequently connect or use this off-site utility infrastructure shall reimburse the state at a rate proportional to their use.  The military department shall develop policies and procedures to ensure that this reimbursement occurs.

 

Reappropriation:

    State Building Construction Account‑-State...... $   2,725,000

    General Fund‑-Federal........................... $   8,275,000

                                                     -------------

           Subtotal Reappropriation..................            $    11,000,000

 

 

    Prior Biennia (Expenditures).................... $   2,573,000

    Future Biennia (Projected Costs)................ $   3,288,000

                                                     -------------

           TOTAL.................................... $  16,861,000

 

    Sec. 929. 1999 c ... (SHB 1165) s 267 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF CORRECTIONS

    McNeil Island Corrections Center ((- 200-bed)):  Department of social and health services-Special Commitment Center (00-2-005)

 

    The appropriation is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   2,500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  37,100,000

                                                     -------------

           TOTAL.................................... $  39,600,000

 

    Sec. 930. 1999 c ... (SHB 1165) s 331 (uncodified) is amended to read as follows:

FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION

    Washington Wildlife and Recreation Program (98-2-003)

 

    The appropriations in this section for the wildlife and recreation program under chapter 43.98A RCW and RCW 43.98A.040 are subject to the following condition and limitation:

    (1) The new appropriations in this section are provided for the approved list of projects included in LEAP capital document No. ((99-1)) 1999-W3, as developed on April ((8)) 23, 1999.

    (2) Any funding provided in this section for the Mt. Spokane - Quartz Mountain acquisition by the state parks and recreation commission shall not exceed fair market value as determined by an evaluation of three independent appraisals.

 

Reappropriation:

    State Building Construction Account‑-State...... $   6,475,416

    Outdoor Recreation Account‑-State............... $  23,733,311

    Habitat Conservation Account‑-State............. $  25,872,718

                                                     -------------

           Subtotal Reappropriation..................            $    56,081,445

 

Appropriation:

    Outdoor Recreation Account‑-State............... $  23,000,000

    Habitat Conservation Account‑-State............. $  25,000,000

                                                     -------------

           Subtotal Appropriation................... $  48,000,000

 

    Prior Biennia (Expenditures).................... $ 213,018,555

    Future Biennia (Projected Costs)................ $ 190,000,000

                                                     -------------

           TOTAL.................................... $ 507,100,000

 

    Sec. 931. 1999 c ... (SHB 1165) s 393 (uncodified) is amended to read as follows:

FOR THE DEPARTMENT OF NATURAL RESOURCES

    Aquatic Lands Enhancement Grants (00-2-014)

 

    The appropriation in this section is provided for a list of projects in LEAP capital document No. ((99-2)) 1999-A1, as developed on April ((8)) 23, 1999.

    The department shall submit a list of recommended projects to be funded from the aquatic lands enhancement account in the 2001-03 capital budget.  The list shall result from a competitive grants program developed by the department based upon, at a minimum:  A uniform criteria for the selection of projects and awarding of grants for up to fifty percent of the total project cost; local community support for the project; and a state-wide geographic distribution of projects.  The list of projects shall be submitted to the office of financial management by September 15, 2000.

 

Reappropriation:

    Aquatic Lands Enhancement Account‑-State........ $   2,340,000

Appropriation:

    Aquatic Lands Enhancement Account‑-State........ $ ((5,800,000))

                                                         5,550,000

 

    Prior Biennia (Expenditures).................... $   9,716,817

    Future Biennia (Projected Costs)................ $  24,000,000

                                                     -------------

           TOTAL.................................... $ ((41,856,817))

                                                        41,606,817

 

    Sec. 932. 1999 c ... (SHB 1165) s 503 (uncodified) is amended to read as follows:

FOR THE WASHINGTON STATE PATROL

    Boarding Home Fire Safety Program

 

    The appropriation in this section is provided solely for grants for the installation or retrofit of fire sprinklers in ((adult)) licensed boarding homes.  The appropriation in this section is subject to the following conditions and limitations:

    (1) The state fire marshal in consultation with the department of social and health services may develop rules to implement the grant program.

    (2) The amount of the grant for an existing ((adult)) licensed boarding home shall not be greater than the difference between the cost of retrofitting and the cost of installing sprinklers during original construction of a comparable ((adult)) licensed boarding home with fire sprinklers.

    (3) To be eligible for a grant under this section, the ((adult group)) boarding home shall be licensed and accredited with the department of social and health services.  To be eligible for a grant under this section, at least fifteen percent of the ((adult group)) boarding home's residents must be department of social and health services clients.  The ((adult group)) boarding home must maintain the department of social and health services client ratio level for a period of no less than five years.  If the department of social and health services client ratio level is not maintained, then the ((adult group)) boarding home shall reimburse the state for the amount of the grant plus appropriate interest.

    (4) Any licensed boarding home receiving a grant shall complete the installation of the fire sprinklers by June 30, 2001.

 

Appropriation:

    State Building Construction Account‑-State...... $   2,500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,500,000

 

    Sec. 933. 1999 c ... (SHB 1165) s 639 (uncodified) is amended to read as follows:

FOR THE UNIVERSITY OF WASHINGTON

    UW Bothell and Cascadia Community College Phase I (98-2-899)

 

    The reappropriation in this section is subject to the following conditions and limitations:

    (1) No money from this reappropriation may be expended that would be inconsistent with the recommendations of the higher education coordinating board and the project design, scope, and schedule approved by the office of financial management.

    (2) The reappropriation in this section is subject to the review and allotment procedures under sections 902 through 904 of this act.

    (3) The reappropriation in this section is to be combined with the appropriations shown in sections 617, ((639, 768, and 821)) 640, 769, and 823 of this act and shall be managed by the department of general administration to construct a campus to serve at least 2,000 student full-time equivalents with approximately 1,200 for the University of Washington and 800 for Cascadia Community College.

 

Reappropriation:

    State Building Construction Account‑-State...... $  40,000,000

 

    Prior Biennia (Expenditures).................... $   7,970,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  47,970,000

 

    Sec. 934. 1999 c ... (SHB 1165) s 640 (uncodified) is amended to read as follows:

FOR THE UNIVERSITY OF WASHINGTON

    UW Bothell and Cascadia Community College Future Phases (98-2-999)

 

    The reappropriation in this section is subject to the following conditions and limitations:

    (1) No money from this reappropriation may be expended that would be inconsistent with the recommendations of the higher education coordinating board and the project design, scope, and schedule approved by the office of financial management.

    (2) The reappropriation in this section is subject to the review and allotment procedures under sections 902 through 904 of this act.

    (3) The reappropriation in this section is to be combined with the appropriations shown in sections 617, ((638, 768, and 821)) 639, 769, and 823 of this act and shall be managed by the department of general administration.

    (4) The predesign for phase II to serve at least 2,000 additional  University of Washington and community college student full-time equivalents included in this reappropriation shall be conducted in accordance with the predesign manual published by the office of financial management.

    (5) Design of phase IIA to serve at least 1,000 total University of Washington and Cascadia Community College student full-time equivalents shall not proceed until the completed predesign requirements in subsection (4) of this section have been reviewed and approved by the office of financial management.

 

Reappropriation:

    State Building Construction Account‑-State...... $   2,069,063

 

    Prior Biennia (Expenditures).................... $     930,937

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   3,000,000

 

    Sec. 935. 1999 c ... (SHB 1165) s 769 (uncodified) is amended to read as follows:

FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Cascadia Community College:  Development (00-2-501)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) No money from this appropriation may be expended that would be inconsistent with the recommendations of the higher education coordinating board and the project design, scope, and schedule approved by the office of financial management.

    (2) $7,500,000 of this appropriation is provided solely for equipment and completion of phase I of the colocated campus.

    (3) The appropriation in this section is subject to the review and allotment procedures under sections 902 through 904 of this act.

    (4) The appropriation in this section is to be combined with the appropriations shown in sections 617, ((638,)) 639, 640, and ((821)) 823 of this act and shall be managed by the department of general administration.

    (5) $42,600,000 of this appropriation is provided solely for the completion of construction of phase IIA of the campus.  The appropriation represents the total state contribution for all costs including design, construction, and equipping of phase IIA of the campus.

    (6) Phase IIA shall accommodate 1,000 additional full-time equivalent students when completed.

 

Appropriation:

    State Building Construction Account‑-State...... $  50,100,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 105,000,000

                                                     -------------

           TOTAL.................................... $ 155,100,000

 

    Sec. 936. 1999 c ... (SHB 1165) s 798 (uncodified) is amended to read as follows:

FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Clover Park Technical College - Transportation Trades:  Design (96-2-662)

 

    The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-

           State............................... $           25,000

Appropriation:

    State Building Construction Account‑-

           State............................... $    ((1,200,000))

                                                         1,240,000

 

    Prior Biennia (Expenditures)............... $           25,000

    Future Biennia (Projected Costs)........... $       16,230,000

                                                     -------------

           TOTAL............................... $   ((17,480,000))

                                                        17,520,000

 

    Sec. 937. 1999 c ... (SHB 1165) s 817 (uncodified) is amended to read as follows:

FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Highline Community College - Classroom/Laboratory Building:  Construction (98-2-660)

 

    The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     310,000

Appropriation:

    State Building Construction Account‑-State...... $ ((5,700,000))

                                                         5,900,000

 

    Prior Biennia (Expenditures).................... $      79,717

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $ ((6,089,717))

                                                         6,289,717

 

    Sec. 938. 1999 c ... (SHB 1165) s 821 (uncodified) is amended to read as follows:

FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Renton Technical College - Technology Resource Center:  Design (98-2-674)

 

    The appropriations in this section are subject to the following conditions and limitations:

    (1) The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

    (2) The program scope and project budget for this project shall comply with the approved predesign document on file with the office of financial management.

 

Reappropriation:

    State Building Construction Account‑-

           State............................... $           67,064

Appropriation:

    State Building Construction Account‑-

           State............................... $    ((1,010,000))

                                                         1,045,000

 

    Prior Biennia (Expenditures)............... $           67,936

    Future Biennia (Projected Costs)........... $       10,760,000

                                                     -------------

           TOTAL............................... $   ((11,905,000))

                                                        11,940,000

 

    Sec. 939. 1999 c ... (SHB 1165) s 822 (uncodified) is amended to read as follows:

FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Skagit Valley College Higher Education Center (98-2-675)

 

    The appropriations in this section are subject to the following conditions and limitations:

    (1) The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

    (2) The program scope and project budget for this project shall comply with the approved predesign document on file with the office of financial management.

    (3) The project shall be coordinated with Western Washington University in order to incorporate a distance education classroom and additional classroom, lab, and office space for use by the university.

 

Reappropriation:

    State Building Construction Account‑-State...... $      17,942

Appropriation:

    State Building Construction Account‑-State...... $ ((660,000))

                                                           685,000

 

    Prior Biennia (Expenditures).................... $      32,058

    Future Biennia (Projected Costs)................ $   9,175,000

                                                     -------------

           TOTAL.................................... $ ((9,885,000))

                                                         9,910,000

 

    Sec. 940. 1999 c ... (SHB 1165) s 923 (uncodified) is amended to read as follows:

    ((The state treasurer shall transfer)) $2,500,000 is appropriated from the state ((convention and trade center account)) building construction account for fiscal year 2000.  The appropriation in this section shall be deposited to the Washington housing trust account.

 

    Sec. 941.  RCW 43.98A.050 and 1999 c ... (SHB 1165) s 920 are each amended to read as follows:

    (1) Moneys appropriated for this chapter to the outdoor recreation account shall be distributed in the following way:

    (a) Not less than twenty-five percent to the state parks and recreation commission for the acquisition and development of state parks, with at least seventy-five percent of this money for acquisition costs.  However, during the 1999-2001 biennium, distributions for acquisition and development of state parks shall not exceed four million two hundred fifty thousand dollars, and the proportion for acquisition costs shall be determined by the commission;

    (b) Not less than twenty-five percent for the acquisition, development, and renovation of local parks, with at least fifty percent of this money for acquisition costs;

    (c) Not less than fifteen percent for the acquisition and development of trails;

    (d) Not less than ten percent for the acquisition and development of water access sites, with at least seventy-five percent of this money for acquisition costs; and

    (e) The remaining amount shall be considered unallocated and shall be distributed by the committee to state and local agencies to fund high priority acquisition and development needs for parks, trails, and water access sites((, except that for the 1999-2001 biennium, unallocated funds may not be distributed to projects in the state parks category)).

    (2) In distributing these funds, the committee retains discretion to meet the most pressing needs for state and local parks, trails, and water access sites, and is not required to meet the percentages described in subsection (1) of this section in any one biennium.

    (3) Only local agencies may apply for acquisition, development, or renovation funds for local parks under subsection (1)(b) of this section.

    (4) State and local agencies may apply for funds for trails under subsection (1)(c) of this section.

    (5) State and local agencies may apply for funds for water access sites under subsection (1)(d) of this section.

 

    NEW SECTION.  Sec. 942.  A new section is added to 1999 c ... (SHB 1165) to read as follows:

FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Thurston County Office Space Study

 

    The appropriation in this section is subject to the following condition and limitation:  The appropriation in this section is provided to conduct an analysis of future state office space needs in Thurston county, by agency, for the next ten years.  The department shall consult with state agencies, private developers, and building owners to determine the inventory of space available and planned over the next ten years in government and nongovernment buildings.  Planning for state office expansion shall consider the impact on current office space.

 

Appropriation:

    State Building Construction Account‑-

           State.... ................................ $     100,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     100,000

 

    NEW SECTION.  Sec. 943.  A new section is added to 1999 c ... (SHB 1165) to read as follows:

FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Sand Point Shoreline Restoration

 

    The appropriation in this section is provided to the city of Seattle for shoreline improvements and wetland restoration at Sand Point.

 

Appropriation:

    State Building Construction Account‑-

           State.................................... $     500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     500,000

 

    NEW SECTION.  Sec. 944.  A new section is added to 1999 c ... (SHB 1165) to read as follows:

    For the purposes of section 905 of this act, "operating revenues" shall include, but not be limited to, any funds of an agency, appropriated or nonappropriated.

 

    NEW SECTION.  Sec. 945.  A new section is added to 1999 c ... (SHB 1165) to read as follows:

FOR THE OFFICE OF FINANCIAL MANAGEMENT

    $6,400,000 of the State Building Construction Account‑-State is reappropriated for allocation to the University of Washington for the following projects:

 

Old Physics Hall:  (Mary Gates Hall) Design and Construction (92-2-008)

Minor Repairs:  Preservation (94-1-003)

Minor Works:  Utility Infrastructure (96-1-004)

Health Sciences Center D-Wing Dent Student Lab (96-1-016)

Fisheries Science - Oceanography Science Buildings (96-2-006)

Social Work Third Floor Addition (96-2-010)

Southwest Campus Utilities Phase I (96-2-027)

Minor Works:  Safety (98-1-001)

Minor Works:  Preservation (98-1-004)

Underground Storage Tanks, Motor Pool (98-1-999)

Nuclear Reactor:  Decommissioning (99-2-009)

 

    NEW SECTION.  Sec. 946.  A new section is added to 1999 c ... (SHB 1165) to read as follows:

FOR THE STATE CONVENTION AND TRADE CENTER

     Seattle - Convention Center:  Replacement housing (00-2-002)

 

    $5,000,000 of the appropriation in this section is provided solely for additional low-income and affordable housing associated with the expansion of the convention center.  The housing division of the department of community, trade, and economic development shall select the low-income and affordable housing projects, which shall be distributed throughout King county.

 

Appropriation:

    State Convention and Trade Center

           Account‑-State........................... $   5,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

               TOTAL............................... $   5,000,000

 

    NEW SECTION.  Sec. 947.  A new section is added to 1999 c ... (ESSB 5180) to read as follows:

FOR THE MILITARY DEPARTMENT

General Fund‑-State Appropriation (FY 2000)......... $   3,000,000

 

    The appropriation in this section is provided for emergency services readiness centers in Bremerton, Yakima, and Spokane."

 

    Renumber the remaining sections consecutively and correct internal references accordingly.

 

 

 

SHB 1165 - S AMD TO S COMM AMD (S-2719.3/99)

By Senator

 

                                                   ADOPTED 4/25/99

 

    On page 214, beginning on line 6 of the title amendment, after "43.98A.070," strike the remainder of the title amendment and insert "43.98A.050, and 43.98A.050; amending 1999 c ... (SHB 1165) ss 112, 139, 144, 148, 162, 267, 331, 393, 503, 639, 640, 769, 798, 817, 821, 822, and 923 (uncodified); adding a new section to chapter 43.83B RCW; adding new sections to 1999 c ... (SHB 1165); adding a new section to 1999 c ... (ESSB 5180); creating new sections; and declaring an emergency."

 


                            --- END ---