6528-S AMS .... S4255.2

 

 

 

SSB 6528 - S AMD 595

By Senator Keiser

 

                                                  ADOPTED 02/18/02

 

    On page 1, line 10, after "projects" insert "estimated to cost more than two hundred thousand dollars"

 

 

 

SSB 6528 - S AMD 595

By Senator Keiser

 

                                                  ADOPTED 02/18/02

 

    On page 2, beginning on line 2, after "(3)" strike all material through "specified;" on line 3, and insert "Whether the bidder has demonstrated the ability to perform within the time specified by previous contracts;"

 

    On page 2, line 17, after "nonresponsible" insert "and the bidder shall forfeit any bid deposit submitted to the contracting agency in support of the bid"

 


                            --- END ---