Z-0387.2  _______________________________________________

 

                          HOUSE BILL 1359

          _______________________________________________

 

State of Washington      57th Legislature     2001 Regular Session

 

By Representatives Alexander, Murray and McIntire; by request of Governor Locke

 

Read first time 01/24/2001.  Referred to Committee on Capital Budget.

Making appropriations and authorizing expenditures for capital improvements.


    AN ACT Relating to the capital budget; making appropriations and authorizing expenditures for capital improvements; creating new sections; and declaring an emergency.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

 

                              PART 1

                        GENERAL GOVERNMENT

 

    NEW SECTION.  Sec. 101.  FOR THE OFFICE OF THE SECRETARY OF STATE

    Deferred Maintenance Reduction Backlog Projects:  Regional Archive (02-1-002)

 

Appropriation:

    State Building Construction Account‑-State...... $     100,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     415,000

                                                     -------------

           TOTAL.................................... $     515,000

 

    NEW SECTION.  Sec. 102.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Rural Washington Loan Fund (RWLF)(88-2-002)

 

Reappropriation:

    State Building Construction Account‑-State...... $     558,716

    Rural Washington Loan Account‑-Federal.......... $   4,276,514

                                                     -------------

           Subtotal Reappropriation..................            $    4,835,230

 

Appropriation:

    Rural Washington Loan Account‑-Federal.......... $   5,650,367

 

    Prior Biennia (Expenditures).................... $   3,041,836

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  13,527,433

 

    NEW SECTION.  Sec. 103.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Grays Harbor Dredging (88-2-006)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,000,000

 

    Prior Biennia (Expenditures).. ................. $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,000,000

 

    NEW SECTION.  Sec. 104.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Seventh Street Theatre (90-2-008)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      51,110

 

    Prior Biennia (Expenditures).................... $      78,890

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     130,000

 

    NEW SECTION.  Sec. 105.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Drinking Water Assistance Program (98-2-008)

 

    The reappropriation in this section is subject to the following conditions and limitations:

    (1) Funding from the state public works trust fund program shall be matched with federal sources to improve the quality of drinking water in the state, and shall be used solely for projects that achieve the goals of the federal safe drinking water act.

    (2) The department shall report to the appropriate committees of the legislature by January 1, 2002, on the progress of the program, including administrative and technical assistance procedures, the application process and funding priorities.

 

Reappropriation:

    Drinking Water Assistance Account‑-State........ $  12,403,978

 

    Prior Biennia (Expenditures).................... $   4,586,022

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  16,990,000

 

    NEW SECTION.  Sec. 106.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, ECONOMIC DEVELOPMENT

    Mirabeau Point Community Complex (98-2-010)

 

    The reappropriation in this section is subject to the following conditions and limitations:

    (1) The amount is provided solely for a grant to Spokane county for design and development costs for Mirabeau Point community complex.

    (2) The amount represents the entire state contribution to the project and shall be matched by $8,500,000 in contributions toward the project from nonstate sources.

    (3) The reappropriation is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     535,336

 

    Prior Biennia (Expenditures).................... $     964,664

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,500,000

 

    NEW SECTION.  Sec. 107.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Sand Point Shoreline Restoration (00-1-002)

 

    The reappropriation in this section is provided to the city of Seattle for shoreline improvements and wetland restoration at Sand Point.  The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     500,000

 

    NEW SECTION.  Sec. 108.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Community Economic Revitalization (CERB)(00-2-001)

 

    The reappropriation in this section from the public facilities construction loan revolving account is subject to the following conditions and limitations:

    (1) The department shall ensure that all funds transferred from the public works assistance account into the public facility construction loan revolving account during the 1999‑2001 biennium are used only for loans to local governments.

    (2) The department shall ensure that all principal and interest payments from these loans are paid into the public works assistance account.

 

Reappropriation:

    Public Works Assistance Account‑-State.......... $     687,027

    Public Facility Construction Loan Revolving

           Account‑-State........................... $  10,300,000

                                                     -------------

           Subtotal Reappropriation..................            $    10,987,027

 

    Prior Biennia (Expenditures).................... $   8,611,730

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  19,598,757

 

    NEW SECTION.  Sec. 109.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Public Works Trust Fund (00-2-002)

 

Reappropriation:

    Public Works Assistance Account‑-State.......... $ 322,109,619

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $ 322,109,619

 

    NEW SECTION.  Sec. 110.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Housing Assistance, Weatherization, and Affordable Housing (00‑2‑003)

 

Reappropriation:

    State Building Construction Account‑-State...... $  26,800,000

 

    Prior Biennia (Expenditures).................... $  45,794,247

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  72,594,247

 

    NEW SECTION.  Sec. 111.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Building for the Arts (00-2-005)

 

    The reappropriation in this section shall support the projects as listed in section 113, chapter 379, Laws of 1999.

 

Reappropriation:

    State Building Construction Account‑-State...... $   2,000,000

 

    Prior Biennia (Expenditures).................... $  29,848,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  31,848,000

 

    NEW SECTION.  Sec. 112.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Community Services Facilities Program (00-02-006)

 

    The reappropriation in this section shall support the projects as listed in section 1007, chapter 1, Laws of 2000 2nd sp. sess.

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,703,000

 

    Prior Biennia (Expenditures).................... $   9,950,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  11,653,000

 

    NEW SECTION.  Sec. 113.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Housing for Homeless Families With Children Program (00-2-009)

 

    The reappropriation in this section is provided solely for the development of emergency shelters and transitional housing opportunities for homeless families with children.  The department shall minimize the amount of funds that are utilized for staff and administrative purposes.

 

Reappropriation:

    State Building Construction Account‑-State...... $     500,000

 

    Prior Biennia (Expenditures).................... $   4,500,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   5,000,000

 

    NEW SECTION.  Sec. 114.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    County Public Facility Construction (00-2-010)

 

    The reappropriations in this section shall be used solely for financial assistance to distressed counties that have experienced extraordinary costs due to the location of a major new business facility or the substantial expansion of an existing business facility in the county.  The entire reappropriation from the state building construction account shall be provided as a grant to support the Grays Harbor water system project and is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   3,500,000

    Distressed County Facilities Construction Loan

           Account‑-State........................... $   2,619,000

                                                     -------------

           Subtotal Reappropriation..................            $    6,119,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,119,000

 

    NEW SECTION.  Sec. 115.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Farmworker Housing Assistance (00-2-011)

 

    The reappropriation in this section is subject to the following conditions and limitations:

    (1) The reappropriation is provided solely for facilities housing low-income migrant, seasonal, and temporary farmworkers.

    (2) It is the intent of the legislature that operation of the facilities built under this section be in compliance with 8 U.S.C. Sec. 1342.

    (3) The department shall minimize the amount of these funds that are utilized for staff and administrative purposes or for other administrative purposes.

    (4) By December 15, 2001, the department shall submit a report to the governor and the appropriate committees of the legislature on the progress of the development of housing for farmworkers, including a list of projects funded under this section.

    (5) The department shall work with the farmworker housing advisory committee to prioritize funding of projects to the areas of highest need.

 

Reappropriation:

    State Building Construction Account‑-State...... $     500,000

 

    Prior Biennia (Expenditures).................... $   7,500,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   8,000,000

 

    NEW SECTION.  Sec. 116.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Burke Museum Governance and Siting Study (00-2-012)

 

    The reappropriation in this section is subject to the following conditions and limitations:

    (1) Funds are provided for a study of the governance of the Burke museum and for an examination of the potential expansion of the museum facility including siting issues.  The study shall be facilitated by the University of Washington, the department of community, trade, and economic development's tourism and economic development units, the executive director of the Washington state historical society, the city of Seattle, King county, and members of the community and businesses from various geographic regions of the state.  The department shall provide a report to the legislature by June 30, 2002, outlining funding strategies for an expanded state natural history museum that recognizes the limited state resources for capital facilities programmatic enhancements, and outlines alternative funding resources and partners.

    (2) The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    University of Washington Building

            Account‑-State.......................... $     350,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     350,000

 

    NEW SECTION.  Sec. 117.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Clark County Skills Center (00-4-100)

 

    The reappropriation in this section is subject to the following conditions and limitations:

    (1) The reappropriation in this section must be matched by at least $1,300,000 from other sources.

    (2) The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     350,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     350,000

 

    NEW SECTION.  Sec. 118.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Holly Park Education Center (00-4-101)

 

    The reappropriation in this section is subject to the following conditions and limitations:

    (1) The reappropriation in this section is provided solely for education space in the Holly Park housing development for South Seattle Community College.

    (2) The reappropriation in this section must be matched by an equal amount from other sources.

    (3) The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     500,000

 

    NEW SECTION.  Sec. 119.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Community Economic Revitalization (CERB) (02-4-003)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) The department shall ensure that the $5,000,000 transferred from the public works assistance account into the public facilities construction loan revolving account during the 2001-2003 biennium is used only for loans to local governments.  The department shall ensure that all principal and interest payments from these loans are paid into the public works assistance account.

    (2) $5,000,000 of the appropriation from the public facilities construction loan revolving account is subject to the approval of a transfer of funds from the multimodal transportation account into the public facilities construction loan revolving account.  Funds transferred from the multimodal transportation account into the public facilities construction loan revolving account are provided solely for transportation related investments that benefit rural economic development.  If a transfer of funds has not been made by June 30, 2002, then the appropriation in this subsection shall lapse.

    (3) Appropriations from the public facility construction loan revolving account shall be used solely to provide loans to eligible local governments and grants to the extent permissible by law.  The department shall ensure that all principal and interest payments from loans made on moneys from this account are paid into this account, except as otherwise required in subsection (1) of this section.

 

Appropriation:

    Public Facility Construction Loan Revolving

           Account‑-State........................... $  12,275,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  12,275,000

 

    NEW SECTION.  Sec. 120.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Drinking Water Assistance Program (02-4-008)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) Funding from the state public works trust fund program shall be matched with new federal sources to improve the quality of drinking water in the state, and shall be used solely for projects that achieve the goals of the federal safe drinking water act.

    (2) The department shall report to the appropriate committees of the legislature by January 1, 2002, on the progress of the program, including administrative and technical assistance procedures, the application process, and funding priorities.

 

Appropriation:

    Drinking Water Assistance Account‑-State........ $   7,700,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  30,800,000

                                                     -------------

           TOTAL.................................... $  38,500,000

 

    NEW SECTION.  Sec. 121.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Housing Assistance, Weatherization, and Affordable Housing (02‑4‑010)

 

    If a state taxable building construction account is created in the state treasury by section . . ., chapter . . . , (Senate/House Bill No. . . . .) Laws of 2001, the state taxable building construction account shall be used for the purposes of this section in lieu of the state building construction account created by RCW 43.83.020.

 

Appropriation:

    State Building Construction Account‑-State...... $  50,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 200,000,000

                                                     -------------

           TOTAL.................................... $ 250,000,000

 

    NEW SECTION.  Sec. 122.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Farmworker Housing Assistance (02-4-011)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) The appropriation is provided solely for facilities housing low-income migrant, seasonal, or temporary farmworkers.

    (2) It is the intent of the legislature that operation of the facilities built under this section be in compliance with 8 U.S.C. Sec. 1342.

    (3) The department shall minimize the amount of these funds that are utilized for staff and administrative purposes or other operational expenses.

    (4) By September 1, 2002, the department shall submit a report to the governor and the appropriate committees of the legislature on the progress of the development of housing for farmworkers, including a list of projects funded under this section.

    (5) The department shall work with the farmworker housing advisory committee to prioritize funding of projects to the areas of highest need.

    (6) Funding may also be provided, to the extent qualified projects are submitted, for health and safety projects.

 

Appropriation:

    State Building Construction Account‑-State...... $   8,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  32,000,000

                                                     -------------

           TOTAL.................................... $  40,000,000

 

    NEW SECTION.  Sec. 123.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Housing for Homeless Families with Children Program (02-4-012)

 

    The appropriation in this section is provided solely for the development of emergency shelters and transitional housing opportunities for homeless families with children.  The department shall minimize the amount of funds that are utilized for staff and administrative purposes.

 

Appropriation:

    State Building Construction Account‑-State...... $   5,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  20,000,000

                                                     -------------

           TOTAL.................................... $  25,000,000

 

    NEW SECTION.  Sec. 124.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Public Works Trust Fund (02-4-013)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) $10,000,000 of the appropriation in this section is provided solely for the preconstruction program as set forth in RCW 43.155.068.

    (2) $2,000,000 of the appropriation in this section is for the emergency loan program as set forth in RCW 43.155.065.

    (3) Not more than one percent of the appropriation may be used for planning loans.

 

Appropriation:

    Public Works Assistance Account‑-State..... $      225,300,000

 

    Prior Biennia (Expenditures)............... $                0

    Future Biennia (Projected Costs)........... $    1,215,700,000

                                                     -------------

           TOTAL............................... $    1,441,000,000

 

    NEW SECTION.  Sec. 125.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Consolidated Capital Programs Fund (02-4-001)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) The department shall establish a competitive process to prioritize applications for state assistance as follows:

    (a) The department shall conduct a statewide solicitation of major project applications from local governments, tribal governments, and other entities, as determined by the department.  The department shall evaluate and rank project applications from eligible entities in consultation with a citizen advisory committee, using objective criteria.   The advisory committee shall be appointed and chaired by the director, and shall include one member from each caucus of the legislature.  At a minimum, the evaluation and ranking process shall consider a project's feasibility and financial viability, local community support, site control, and an examination of existing assets that applicants may apply to projects.

    (b) The department may establish the amount of state grant assistance for individual project applications but the amount shall not exceed twenty percent of the estimated total capital cost or actual cost of a project, whichever is less, to a maximum state contribution of $1,000,000 per project.  Successful applicants to these appropriations may apply for grants from any future appropriations.  The remaining portions of the project capital cost shall be a match from nonstate sources that may include cash, the value of real property when acquired solely for the purpose of the project, and in‑kind contributions.  The department is authorized to set matching requirements for individual projects.  State assistance may be used to fund separate definable phases of a project if the project demonstrates adequate progress and has secured the necessary match funding.  The department shall not sign contracts or otherwise obligate funds under this section until the legislature has approved a specific list of projects.

    (c) In contracts for grants authorized under this section, the department shall include provisions requiring that capital improvements be held by the grantee for a specified period of time appropriate to the amount of the grant and that facilities be used for the express purpose of the grant.  If the grantee is found to be out of compliance with provisions of the contract, the grantee shall repay to the state general fund the principal amount of the grant plus interest calculated at the rate of interest on state of Washington general obligation bonds issued most closely to the date of authorization of the grant.

    (2) The department shall submit a list of recommended projects eligible for funding to the governor and the legislature in January 2002.  The list shall include projects that, due to their size, scope, or characteristics, are not fundable under existing capital programs.  The list, in priority order, shall include a description of each project, the amount of recommended state funding, and documentation of nonstate funds to be used for the project.

    (3) The department shall submit proposed legislation for continuation of this program beginning with the 2003‑2005 biennium and thereafter.

 

Appropriation:

    State Building Construction Account‑-State...... $   6,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,000,000

 

    NEW SECTION.  Sec. 126.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Community Services Facilities Program (02-4-007)

 

    The appropriation in this section is subject to the provisions of RCW 43.63A.125.  The following projects are eligible for funding:

 

Projects                                            Recommendation

 

YMCA of Grays Harbor, Aberdeen                                                                  $300,000

Community Youth Services, Olympia                         $300,000

Skagit County Community Action, Concrete                                                                 $300,000

Kindering Center, Bellevue                                $300,000

Bellevue Family YMCA, Bellevue                                                                  $300,000

Refugee Women's Alliance, Seattle                         $300,000

YWCA of Walla Walla, Walla Walla                          $300,000

Pierce County Alliance (facility), Tacoma                  $61,000

Compass Health, Everett                                   $300,000

Mid-City Concerns, Spokane                                 $28,000

Children's Home Society, Vaughn                            $70,000

Children's Home society, Spokane                          $238,000

Catholic Family/Child Services, Yakima                    $152,000

Korean Women's Association, Tacoma                        $218,000

Factory Small Biz Incubator, Tacoma                                                                  $300,000

Lao Highland Association of King County, Seattle               $119,000

First Place, Seattle                                      $300,000

NE Washington Rural Resources, Colville                    $114,000

 

Subtotal                                                $4,000,000

 

Alternate Projects

 

Northeast Washington Rural Resources, Colville                 $186,000

Nooksack Community Aid Society, Deming                    $165,000

Childhaven, Seattle                                       $149,000

 

Subtotal                                                  $500,000

 

Total                                                   $4,500,000

 

Appropriation:

    State Building Construction Account‑-State...... $   4,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,000,000

 

    NEW SECTION.  Sec. 127.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Building for the Arts (02-4-100)

 

    The appropriation in this section is subject to the provisions of RCW 43.63A.750.  The following projects are eligible for funding:

 

Projects                                            Recommendation

 

Orcas Theatre, Eastsound                                  $400,000

Empty Space Theatre, Fremont                               $29,000

Music Works Northwest, Bellevue                            $475,000

Hands on Children's Museum, Olympia                                                                  $130,000

Spokane Symphony, Spokane                                                                  $230,000

Mt. Baker Theatre, Bellingham                             $128,000

IKEA Performing Arts Center, Renton                                                                  $135,000

Seattle Art Museum, Seattle                             $1,000,000

Town Hall, Seattle                                        $175,000

Gladish Center, Pullman                                    $29,000

Broadway Center 1, Tacoma                                          $50,000

CREATE, Newport                                            $21,000

Spectrum Dance Theatre, Seattle                            $78,000

Gallery One, Ellensburg                                   $225,000

Admiral Theatre, Bremerton                                $450,000

Lake Chelan Bachfest, Chelan                               $38,000

Historic Seattle Preservation, Seattle                     $390,000

Kent Performing Arts Center 2, Kent                                $17,000

 

Subtotal                                                $4,000,000

 

Alternate Projects

 

Kent Performing Arts Center 3, Kent                                                                  $408,000

Historic Everett Theatre, Everett                          $92,000

 

Subtotal                                                  $500,000

 

Total                                                   $4,500,000

 

Appropriation:

    State Building Construction Account‑-State...... $   4,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,000,000

 

    NEW SECTION.  Sec. 128.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Seattle Chinese Gardens (02-4-014)

 

    The appropriation in this section is subject to the following conditions and limitations:  $200,000 of the appropriation in this section shall be matched by $200,000 in additional contributions toward the project from local government.

 

Appropriation:

    State Building Construction Account‑-State.. ... $     200,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     200,000

 

    NEW SECTION.  Sec. 129.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Filipino Community of Seattle (02-4-009)

 

    The appropriation in this section is subject to the following conditions and limitations:  $250,000 of the appropriation in this section shall be matched by $250,000 in additional contributions toward the project from local government.

 

Appropriation:

    State Building Construction Account‑-State...... $     250,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     250,000

 

    NEW SECTION.  Sec. 130.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

    Underground Storage Tank:  Pool (02-1-001)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) The money provided in this section shall be for projects that were not foreseen or could not have been contemplated at the time the current budget was prepared.  Funding is for allocation to agencies and institutions for removal, replacement, and environmental cleanup projects related to underground storage tanks.

    (2) No moneys appropriated in this section or in any section specifically referencing this section shall be expended unless the office of financial management has reviewed and approved the cost estimates for the project.

 

Appropriation:

    State Building Construction Account‑-State...... $   1,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   4,000,000

                                                     -------------

           TOTAL.................................... $   5,000,000

 

    NEW SECTION.  Sec. 131.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

    Hazardous Materials:  Pool (02-1-002)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) The money provided in this section shall be for projects that were not foreseen or could not have been contemplated at the time the current budget was prepared.  Funding is for allocation to agencies and institutions for removal and related environmental cleanup projects related to hazardous materials.

    (2) No moneys appropriated in this section or in any section specifically referencing this section shall be expended unless the office of financial management has reviewed building surveys conducted for hazardous materials and approved the cost estimates for the project.

 

Appropriation:

    State Building Construction Account‑-State...... $   1,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   4,000,000

                                                     -------------

           TOTAL.................................... $   5,000,000

 

    NEW SECTION.  Sec. 132.  FOR THE OFFICE OF FINANCIAL MANAGEMENT

    Budget System Improvements (02-1-004)

 

Appropriation:

    State Building Construction Account‑-State...... $     300,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)....... ........ $   1,200,000

                                                     -------------

           TOTAL.................................... $   1,500,000

 

    NEW SECTION.  Sec. 133.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    East Plaza Repairs (96-1-002)

 

    The appropriations in this section are subject to the following conditions and limitations:  $16,000,000 of the appropriation from the state vehicle parking account is subject to the approval of a reimbursable bond.

 

Reappropriation:

    Capitol Building Construction Account‑-State ... $     350,000

Appropriation:

    State Vehicle Parking Account‑-State.............            $    19,000,000

 

    Prior Biennia (Expenditures).................... $  22,217,200

    Future Biennia (Projected Costs)................ $  14,200,000

                                                     -------------

           TOTAL.................................... $  55,767,200

 

    NEW SECTION.  Sec. 134.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Legislative Buildings:  Safety and Infrastructure (98-1-005)

 

Reappropriation:

    Capitol Building Construction Account‑-State.... $     400,000

    Thurston County Capital Facilities

           Account‑-State........................... $     475,000

                                                     -------------

           Subtotal Reappropriation..................            $ 875,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     875,000

 

    NEW SECTION.  Sec. 135.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Office Building Two Rehabilitation (98-1-007)

 

Reappropriation:

    Thurston County Capital Facilities

           Account‑-State........................... $   1,000,000

Appropriation:

    Thurston County Capital Facilities

           Account‑-State....................... ... $   5,850,000

 

    Prior Biennia (Expenditures).................... $  10,470,000

    Future Biennia (Projected Costs)................ $   5,310,000

                                                     -------------

           TOTAL.................................... $  22,630,000

 

    NEW SECTION.  Sec. 136.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Transportation Building Preservation (98-1-008)

 

Reappropriation:

    Thurston County Capital Facilities

           Account‑-State........................... $     500,000

 

    Prior Biennia (Expenditures).................... $   1,466,740

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,966,740

 

    NEW SECTION.  Sec. 137.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Heritage Park (98-2-003)

 

Appropriation:

    Capitol Building Construction Account‑-State.... $   2,200,000

 

    Prior Biennia (Expenditures).................... $  12,559,774

    Future Biennia (Projected Costs)................ $   6,358,000

                                                     -------------

           TOTAL.................................... $  21,117,774

 

    NEW SECTION.  Sec. 138.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Capitol Campus Facilities:  Preservation (00-1-003)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    Capitol Building Construction Account‑-State.... $     500,000

    State Building Construction Account‑-State...... $      75,000

    Thurston County Capital Facilities

           Account‑-State........................... $     700,000

                                                     -------------

           Subtotal Reappropriation..................            $    1,275,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,275,000

 

    NEW SECTION.  Sec. 139.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    General Administration Building Renovation or Redevelopment (00‑1‑004)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     250,000

 

    Prior Biennia (Expenditures).................... $     750,000

    Future Biennia (Projected Costs)................ $   7,635,000

                                                     -------------

           TOTAL.................................... $   8,635,000

 

    NEW SECTION.  Sec. 140.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Capitol Lake:  Management Plan Implementation (00-1-007)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     700,000

 

    Prior Biennia (Expenditures).................... $   1,229,540

    Future Biennia (Projected Costs)................ $  15,250,000

                                                     -------------

           TOTAL.................................... $  17,179,540

 

    NEW SECTION.  Sec. 141.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    North Cascades Gateway Center:  Preservation (00-1-010)

 

Reappropriation:

    General Fund‑-Private/Local..................... $     210,000

 

    Prior Biennia (Expenditures).................... $      39,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     249,000

 

    NEW SECTION.  Sec. 142.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Legislative Building:  Rehabilitation and Capitol Addition (01‑1‑008)

 

    The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.

 

Reappropriation:

    Capitol Building Construction Account‑-State.... $   1,525,000

Appropriation:

    Capitol Building Construction Account‑-State ... $  96,400,000

    Thurston County Capital Facilities

           Account‑-State........................... $   1,300,000

                                                     -------------

           Subtotal Appropriation................... $  97,700,000

 

    Prior Biennia (Expenditures).................... $   1,475,000

    Future Biennia (Projected Costs)................ $   4,800,000

                                                     -------------

           TOTAL.................................... $ 105,500,000

 

    NEW SECTION.  Sec. 143.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Emergency/Small Repairs and Improvements (02-1-001)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Capitol Building Construction Account‑-State.... $     100,000

    State Building Construction Account‑-State...... $     400,000

    Thurston County Capital Facilities

           Account‑-State........................... $     900,000

                                                     -------------

           Subtotal Appropriation................... $   1,400,000

 

    Prior Biennia (Expenditures).................... $   2,195,000

    Future Biennia (Projected Costs)................ $   6,500,000

                                                     -------------

           TOTAL.................................... $  10,095,000

 

    NEW SECTION.  Sec. 144.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Thurston County Facilities:  Preservation (02-1-002)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Capitol Building Construction Account‑-State.... $   1,110,000

    State Building Construction Account‑-State...... $   2,060,000

    Thurston County Capital Facilities

           Account‑-State........................... $   3,861,000

                                                     -------------

           Subtotal Appropriation................... $   7,031,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  35,636,000

                                                     -------------

           TOTAL.................................... $  42,667,000

 

    NEW SECTION.  Sec. 145.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Capitol Campus Infrastructure Preservation (02-1-003)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Capitol Building Construction Account‑-State.... $      75,000

    State Building Construction Account‑-State...... $   2,250,000

                                                     -------------

           Subtotal Appropriation................... $   2,325,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  24,050,000

                                                     -------------

           TOTAL.................................... $  26,375,000

 

    NEW SECTION.  Sec. 146.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    North Cascades Gateway Center Minor Works (02-1-004)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    General Fund/Private/Local.......................            $ 500,000

    State Building Construction Account‑-State...... $   1,000,000

                                                     -------------

           Subtotal Appropriation................... $   1,500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   6,685,000

                                                     -------------

           TOTAL.................................... $   8,185,000

 

    NEW SECTION.  Sec. 147.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Cherberg Building:  Rehabilitation (02-1-005)

 

Appropriation:

    Thurston County Capital Facilities

           Account‑-State........................... $     695,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   7,000,000

                                                     -------------

           TOTAL.................................... $   7,695,000

 

    NEW SECTION.  Sec. 148.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Pritchard Library:  Rehabilitation (02-1-006)

 

Appropriation:

    Thurston County Capital Facilities

           Account‑-State........................... $     300,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,000,000

                                                     -------------

           TOTAL.................................... $   1,300,000

 

    NEW SECTION.  Sec. 149.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Transportation Building Preservation (02-1-008)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Thurston County Capital Facilities

           Account‑-State........................... $   2,001,250

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  18,098,000

                                                     -------------

           TOTAL.................................... $  20,099,250

 

    NEW SECTION.  Sec. 150.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Infrastructure Project:  Savings (02-1-999)

 

    Projects that are completed in accordance with section 915 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

 

Appropriation:

    State Building Construction Account‑-State...... $           1

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $           1

 

    NEW SECTION.  Sec. 151.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Capitol Campus Chiller Plant and Loop (02-2-006)

 

Appropriation:

    Capitol Building Construction Account‑-State.... $      50,000

    State Building Construction Account‑-State...... $     550,000

                                                     -------------

           Subtotal Appropriation................... $     600,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  21,220,000

                                                     -------------

           TOTAL.................................... $  21,820,000

 

    NEW SECTION.  Sec. 152.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Engineering and Architectural Services (02-2-012)

 

    The appropriation in this section shall be used to provide those services to state agencies required by RCW 43.19.450 that are essential and mandated activities defined as core services and are included in the engineering and architectural services responsibilities and task list for general public works projects of normal complexity.  The department may negotiate agreements with agencies for additional fees to manage exceptional projects including projects financed with alternative financing or for services above core services as described as optional and extra services in the task list.

 

Appropriation:

    Capitol Building Construction Account‑-State.... $     230,164

    Charitable, Educational, Penal, and Reformatory

           Institutions Account‑-State.............. $     867,240

    State Building Construction Account‑-State...... $   8,589,506

    Thurston County Capital Facilities

           Account‑-State........................... $     413,090

                                                     -------------

           Subtotal Appropriation................... $  10,100,000

 

    Prior Biennia (Expenditures).................... $  17,062,652

    Future Biennia (Projected Costs)................ $  43,522,000

                                                     -------------

           TOTAL.................................... $  70,684,652

 

    NEW SECTION.  Sec. 153.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Thurston County Facilities Planning (02-2-013)

 

    The appropriation in this section is subject to the following conditions and limitations:  The appropriation in this section is provided to conduct an analysis of future state office space needs in Thurston county, by agency, for the next ten years.  The department shall consult with state agencies, private developers, and building owners to determine the inventory of space available and planned over the next ten years in government and nongovernment buildings.  Planning for state office expansion shall consider the impact on current office space.

 

Appropriation:

    State Building Construction Account‑-State...... $     235,000

 

    Prior Biennia (Expenditures).................... $     100,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     335,000

 

    NEW SECTION.  Sec. 154.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Isabella Bush Records Center:  Expansion (02-3-001)

 

Appropriation:

    Thurston County Capital Facilities Account‑-State $     344,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     344,000

 

    NEW SECTION.  Sec. 155.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Small Agency, Board, and Commission Colocation Office:  Feasibility Study (02-3-007)

 

Appropriation:

    State Building Construction Account‑-State...... $     190,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     190,000

 

    NEW SECTION.  Sec. 156.  FOR THE DEPARTMENT OF GENERAL ADMINISTRATION

    Americans with Disabilities Act:  Pool (02-4-010)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) The money provided in this section shall be solely allocated to agencies and institutions for improvements to state‑owned facilities for program access enhancements.

    (2) No moneys appropriated in this section or in any section specifically referencing this section shall be expended unless the department of general administration has reviewed and approved the cost estimates for the project.  The department of general administration shall implement an agency request and evaluation procedure similar to the one adopted in the 1999-2001 biennium for distribution of funds.

    (3) No moneys appropriated in this section shall be available to institutions of higher education to modify dormitories.

    (4) The department shall minimize the expenditure of these funds for staff and administrative purposes or for other operational expenses.

 

Appropriation:

    State Building Construction Account‑-State...... $   2,000,000

 

    Prior Biennia (Expenditures).................... $   3,000,000

    Future Biennia (Projected Costs)................ $   2,000,000

                                                     -------------

           TOTAL.................................... $   7,000,000

 

    NEW SECTION.  Sec. 157.  FOR THE MILITARY DEPARTMENT

    Minor Works to Support Federal Construction Projects (98-1-001)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    General Fund‑-Federal........................... $   1,857,000

    State Building Construction Account‑-State...... $     312,000

                                                     -------------

           Subtotal Reappropriation..................            $    2,169,000

 

    Prior Biennia (Expenditures).................... $   8,352,100

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  10,521,000

 

    NEW SECTION.  Sec. 158.  FOR THE MILITARY DEPARTMENT

    Yakima Readiness Center:  Construction (98-2-001)

 

    The appropriations in this section are subject to the following conditions and limitations:

    (1) Funds expended on this project for off‑site utility infrastructure that may include the provision of electricity, natural gas service, water service, or sewer service shall be for the benefit of the state.  Entities that subsequently connect or use this off‑site utility infrastructure shall reimburse the state at a rate proportional to their use.  The department shall develop policies and procedures to ensure that this reimbursement occurs.

    (2) The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.

    (3) No money shall be committed or expended from the state building construction account until the general fund‑‑federal construction funds are received and allotted in accordance with section 903 of this act.

    (4) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department will file quarterly project progress reports with the office of financial management.  These reports will contain local, state, and federal funding reconciliations and balance sheets for this project and will detail any federal intentions on future readiness center projects.

 

Reappropriation:

    General Fund‑-Federal........................... $     230,614

    State Building Construction Account‑-State...... $   1,590,769

                                                     -------------

           Subtotal Reappropriation..................            $    1,821,383

 

Appropriation:

    General Fund‑-Federal........................... $   6,522,000

    State Building Construction Account‑-State...... $     653,000

                                                     -------------

           Subtotal Appropriation................... $   7,175,000

 

    Prior Biennia (Expenditures).................... $   5,159,459

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  14,155,842

 

    NEW SECTION.  Sec. 159.  FOR THE MILITARY DEPARTMENT

    Centralia Readiness Center:  Preservation (00-1-030)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     350,000

 

    Prior Biennia (Expenditures).................... $     350,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     700,000

 

    NEW SECTION.  Sec. 160.  FOR THE MILITARY DEPARTMENT

    Minor Works to Support Federal Construction Projects (02-1-001)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    General Fund‑-Federal........................... $  10,248,000

    State Building Construction Account‑-State...... $   2,277,000

                                                     -------------

           Subtotal Appropriation................... $  12,525,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  62,340,000

                                                     -------------

           TOTAL.................................... $  74,865,000

 

    NEW SECTION.  Sec. 161.  FOR THE MILITARY DEPARTMENT

    Preservation Projects-Statewide (02-1-006)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   1,478,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   7,116,000

                                                     -------------

           TOTAL.................................... $   8,594,000

 

    NEW SECTION.  Sec. 162.  FOR THE MILITARY DEPARTMENT

    Infrastructure Projects-Savings (02-1-009)

 

    Projects that are completed in accordance with section 915 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

 

Appropriation:

    State Building Construction Account‑-State...... $           1

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $           1

 

    NEW SECTION.  Sec. 163.  FOR THE MILITARY DEPARTMENT

    Spokane Combined Public Safety Training Center (02-2-003)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

    (2) No money shall be committed or expended from the state building construction account until the general fund‑‑federal construction funds are received and allotted in accordance with section 903 of this act.

    (3) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department will file quarterly project progress reports with the office of financial management.  These reports will contain local, state, and federal funding reconciliations and balance sheets for this project and will detail any federal intentions on future readiness center projects.

 

Appropriation:

    General Fund‑-Federal........................... $   9,996,000

    State Building Construction Account‑-State...... $   5,920,000

                                                     -------------

           Subtotal Appropriation................... $  15,916,000

 

    Prior Biennia (Expenditures).................... $   7,899,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  23,815,000

 

    NEW SECTION.  Sec. 164.  FOR THE MILITARY DEPARTMENT

    Bremerton Readiness Center (02-2-004)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

    (2) No money shall be committed or expended from the state building construction account until the general fund‑‑federal construction funds are received and allotted in accordance with section 903 of this act.

    (3) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department will file quarterly project progress reports with the office of financial management.  These reports will contain local, state, and federal funding reconciliations and balance sheets for this project and will detail any federal intentions on future readiness center projects.

 

Appropriation:

    General Fund‑-Federal........................... $   5,446,000

    State Building Construction Account‑‑State...... $   5,535,000

                                                     -------------

           Subtotal Appropriation................... $  10,981,000

 

    Prior Biennia (Expenditures).................... $   1,000,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  11,981,000

 

    NEW SECTION.  Sec. 165.  FOR THE MILITARY DEPARTMENT

    Fort Lewis Readiness Center (02-2-010)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    General Fund‑-Federal........................... $  19,941,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)....... ........ $           0

                                                     -------------

           TOTAL.................................... $  19,941,000

 

    NEW SECTION.  Sec. 166.  FOR THE MILITARY DEPARTMENT

    Combined Support Maintenance Shop (02-2-011)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    General Fund‑-Federal........................... $  17,032,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)....... ........ $           0

                                                     -------------

           TOTAL.................................... $  17,032,000

 

    NEW SECTION.  Sec. 167.  FOR THE MILITARY DEPARTMENT

    Combined Regional Training Institute (02-2-012)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    General Fund‑-Federal........................... $  14,712,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)....... ........ $           0

                                                     -------------

           TOTAL.................................... $  14,712,000

 

    NEW SECTION.  Sec. 168.  FOR THE MILITARY DEPARTMENT

    Phase 2 Yakima Maneuver and Training Equipment Site (02-2-013)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    General Fund‑-Federal........................... $  11,304,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)....... ........ $           0

                                                     -------------

           TOTAL.................................... $  11,304,000

 

    NEW SECTION.  Sec. 169.  FOR THE STATE CONVENTION AND TRADE CENTER

    Seattle Convention Center:  Replacement Housing (00-2-002)

 

Reappropriation:

    State Convention and Trade Center

           Account‑-State........................... $   1,745,000

 

    Prior Biennia (Expenditures).................... $   3,255,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   5,000,000

 

                              PART 2

                          HUMAN SERVICES

 

    NEW SECTIONSec. 201.  FOR THE CRIMINAL JUSTICE TRAINING COMMISSION

    Site Improvements - Minor Works (02-1-005)

 

Appropriation:

    State Building Construction Account‑‑State...... $     200,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     600,000

                                                     -------------

           TOTAL.................................... $     800,000

 

    NEW SECTIONSec. 202.  FOR THE CRIMINAL JUSTICE TRAINING COMMISSION

    Building Omnibus Minor Works (02-1-007)

 

Appropriation:

    State Building Construction Account‑‑State...... $     150,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     600,000

                                                     -------------

           TOTAL.................................... $     750,000

 

    NEW SECTIONSec. 203.  FOR THE DEPARTMENT OF LABOR AND INDUSTRIES

    Facilities Preservation and Improvement (02-1-001)

 

Appropriation:

    Accident Account‑‑State......................... $     825,000

    Medical Aid Account‑‑State.......................            $ 825,000

                                                     -------------

           Subtotal Appropriation................... $   1,650,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   2,700,000

                                                     -------------

           TOTAL.................................... $   4,350,000

 

    NEW SECTIONSec. 204.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Maple Lane School:  Wastewater Treatment Plant (94‑1‑201)

 

Reappropriation:

    State Building Construction Account‑‑State...... $     340,108

 

    Prior Biennia (Expenditures).................... $   3,766,946

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,107,054

 

    NEW SECTIONSec. 205.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Crisis Residential Centers (previously 96‑1‑900) (96‑2‑900)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $   1,685,257

 

    Prior Biennia (Expenditures).................... $   1,114,743

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,800,000

 

    NEW SECTIONSec. 206.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Echo Glen Children's Center ‑ Site:  Infrastructure Improvements (96‑2‑229)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $   1,467,119

 

    Prior Biennia (Expenditures).................... $   1,060,633

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,527,752

 

    NEW SECTIONSec. 207.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Green Hill School Redevelopment:  416 Bed Institution (96‑2‑230)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $   2,727,545

 

    Prior Biennia (Expenditures).................... $  14,121,602

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  16,849,147

 

    NEW SECTIONSec. 208.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Medical Lake Wastewater Treatment Facility (96‑1‑301)

 

Reappropriation:

    State Building Construction Account‑‑State...... $   2,052,878

 

    Prior Biennia (Expenditures).................... $   7,328,269

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   9,381,147

 

    NEW SECTIONSec. 209.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Eastern State Hospital:  Legal Offender Unit (98‑2‑002)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $   5,075,416

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   5,075,416

 

    NEW SECTIONSec. 210.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Echo Glen Children's Center ‑ Vocational Education:  Construction (98‑2‑211)

 

Reappropriation:

    State Building Construction Account‑‑State...... $     358,703

Appropriation:

    State Building Construction Account‑‑State...... $   3,500,000

 

    Prior Biennia (Expenditures).................... $     111,297

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   3,970,000

 

    NEW SECTIONSec. 211.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Western State Hospital:  Legal Offender Unit (98‑2‑052)

 

Reappropriation:

    State Building Construction Account‑‑State...... $  34,546,538

Appropriation:

    State Building Construction Account‑‑State...... $   2,059,000

 

    Prior Biennia (Expenditures).................... $  13,688,803

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  50,294,341

 

    NEW SECTIONSec. 212.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Western State Hospital:  Security Improvements (99‑1‑001)

 

Reappropriation:

    State Building Construction Account‑‑State...... $     538,815

 

    Prior Biennia (Expenditures).................... $     115,185

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     654,000

 

    NEW SECTIONSec. 213.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Americans with Disabilities Act (00-1-011)

 

Reappropriation:

    State Building Construction Account‑‑State...... $     118,200

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     118,200

 

    NEW SECTIONSec. 214.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Child Study and Treatment Center - Cottages:  Modifications (00‑1‑015)

 

Reappropriation:

    State Building Construction Account‑‑State...... $   1,376,682

Appropriation:

    State Building Construction Account‑‑State...... $   1,200,000

 

    Prior Biennia (Expenditures).................... $      23,318

    Future Biennia (Projected Costs)................ $   2,678,262

                                                     -------------

           TOTAL.................................... $   5,278,262

 

    NEW SECTIONSec. 215.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Eastern State Hospital:  Campus Renovation, Phase 5 (00-1-002)

 

    The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $     880,183

Appropriation:

    State Building Construction Account‑‑State...... $   9,154,750

 

    Prior Biennia (Expenditures).. ................. $      65,067

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  10,100,000

 

    NEW SECTIONSec. 216.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Echo Glen Children's Center ‑ Eleven Cottages:  Renovation (00‑1‑041)

 

Reappropriation:

    State Building Construction Account‑‑State...... $       7,526

Appropriation:

    State Building Construction Account‑‑State...... $     700,000

 

    Prior Biennia (Expenditures).................... $      67,474

    Future Biennia (Projected Costs)................ $  16,131,000

                                                     -------------

           TOTAL.................................... $  16,906,000

 

    NEW SECTIONSec. 217.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Emergency and Small Repairs (00-1-006)

 

Reappropriation:

    State Building Construction Account‑‑State...... $     394,061

 

    Prior Biennia (Expenditures).................... $     355,939

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     750,000

 

    NEW SECTIONSec. 218.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Infrastructure Project:  Savings (00‑1‑053)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $   1,000,001

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,000,001

 

    NEW SECTIONSec. 219.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Lakeland Village:  Cottage Renovation (00-1-004)

 

Reappropriation:

    State Building Construction Account‑‑State...... $     450,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     450,000

 

    NEW SECTIONSec. 220.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Maple Lane School - Multi-Services Building:  Renovation (00-1-003)

 

Reappropriation:

    State Building Construction Account‑‑State...... $     700,000

Appropriation:

    State Building Construction Account‑‑State...... $     300,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   5,550,000

                                                     -------------

           TOTAL.................................... $   6,550,000

 

    NEW SECTIONSec. 221.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Minor Works:  Preservation (00-1-018)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    Charitable, Educational, Penal, and Reformatory

           Institutions Account‑‑State.............. $   3,644,707

    State Building Construction Account‑‑State...... $   2,319,992

                                                     -------------

           Subtotal Reappropriation..................            $    5,964,699

 

    Prior Biennia (Expenditures).................... $   2,035,301

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   8,000,000

 

    NEW SECTIONSec. 222.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Minor Works:  Program (00‑2‑019)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $     993,963

 

    Prior Biennia (Expenditures).................... $       6,037

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,000,000

 

    NEW SECTIONSec. 223.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Mission Creek Youth Camp - Main Building:  Renovation Phase 2 (00‑1‑010)

 

Reappropriation:

    State Building Construction Account‑‑State...... $   1,642,973

 

    Prior Biennia (Expenditures).................... $     357,027

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,000,000

 

    NEW SECTIONSec. 224.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Rainier School - Laundry:  Equipment (00-1-001)

 

Reappropriation:

    State Building Construction Account‑‑State...... $     435,602

 

    Prior Biennia (Expenditures).................... $      14,398

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     450,000

 

    NEW SECTIONSec. 225.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Special Commitment Center ‑ Secure Facility:  Construction (00‑2‑001)

 

    The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $   8,000,000

Appropriation:

    State Building Construction Account‑‑State...... $  53,670,167

 

    Prior Biennia (Expenditures).................... $   8,500,000

    Future Biennia (Projected Costs)................ $  20,729,000

                                                     -------------

           TOTAL.................................... $  90,899,167

 

    NEW SECTIONSec. 226.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Special Commitment Center ‑ Less Restrictive Alternative (02‑2‑075)

 

Appropriation:

    State Building Construction Account‑‑State...... $   1,500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,500,000

 

    NEW SECTIONSec. 227.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Eastern State Hospital ‑ Administration and AT Building:  Renovation (02‑1‑060)

 

    The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $     500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   5,415,000

                                                     -------------

           TOTAL.................................... $   5,915,000

 

    NEW SECTIONSec. 228.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Fircrest School ‑ 500 Building:  Renovation, Phase 3 (02‑2‑036)

 

Appropriation:

    State Building Construction Account‑‑State...... $   4,300,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,300,000

 

    NEW SECTIONSec. 229.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Green Hill School ‑ Entry/Security/Visitation:  Addition (02‑2‑064)

 

Appropriation:

    State Building Construction Account‑‑State...... $     400,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   3,000,000

                                                     -------------

           TOTAL.................................... $   3,400,000

 

    NEW SECTIONSec. 230.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Green Hill School ‑ Health Center Building:  Renovation (02‑1‑061)

 

Appropriation:

    State Building Construction Account‑‑State...... $     400,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   4,000,000

                                                     -------------

           TOTAL.................................... $   4,400,000

 

    NEW SECTIONSec. 231.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Green Hill School ‑ Intensive Management Unit:  Renovation (02‑1‑054)

 

Appropriation:

    State Building Construction Account‑‑State...... $   3,200,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   3,200,000

 

    NEW SECTIONSec. 232.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Infrastructure Project:  Savings (02‑1‑053)

 

    Projects that are completed in accordance with section 915 of this act, may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

 

Appropriation:

    State Building Construction Account‑‑State...... $           1

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $           1

 

    NEW SECTIONSec. 233.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Capital Project Management (02-1-041)

 

Appropriation:

    State Building Construction Account‑‑State...... $   2,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   9,625,800

                                                     -------------

           TOTAL.................................... $  11,625,800

 

    NEW SECTIONSec. 234.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Statewide ‑ Laundry Facilities:  Upgrades and New Equipment (02‑1‑076)

 

Appropriation:

    State Building Construction Account‑‑State...... $   1,200,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,000,000

                                                     -------------

           TOTAL.................................... $   2,200,000

 

    NEW SECTIONSec. 235.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Statewide:  Emergency and Small Repair Projects (02‑1‑042)

 

Appropriation:

    State Building Construction Account‑‑State...... $     750,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   3,609,000

                                                     -------------

           TOTAL.................................... $   4,359,000

 

    NEW SECTIONSec. 236.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Statewide:  Facilities Condition Assessment and Preservation Plan (02‑1‑047)

 

Appropriation:

    State Building Construction Account‑‑State...... $     185,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     800,000

                                                     -------------

           TOTAL.................................... $     985,000

 

    NEW SECTIONSec. 237.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Statewide:  Hazardous Materials Abatement (02‑1‑043)

 

Appropriation:

    State Building Construction Account‑‑State...... $     300,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,430,000

                                                     -------------

           TOTAL.................................... $   1,730,000

 

    NEW SECTIONSec. 238.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Statewide:  Omnibus Preservation Projects (02‑1‑069)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Charitable, Educational, Penal, and Reformatory

           Institutions Account‑‑State.............. $   4,000,000

    State Building Construction Account‑‑State...... $   4,531,124

                                                     -------------

           Subtotal Appropriation................... $   8,531,124

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  42,253,000

                                                     -------------

           TOTAL.................................... $  50,784,124

 

    NEW SECTIONSec. 239.  FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES

    Statewide:  Omnibus Programmatic Projects (02‑2‑070)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Charitable, Educational, Penal, and Reformatory

           Institutions Account‑‑State.............. $     500,000

    State Building Construction Account‑‑State...... $     500,000

                                                     -------------

           Subtotal Appropriation................... $   1,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   4,812,000

                                                     -------------

           TOTAL.................................... $   5,812,000

 

    NEW SECTIONSec. 240.  FOR THE DEPARTMENT OF HEALTH

    Referendum 38 (86‑2‑099)

 

Reappropriation:

    State and Local Improvements Revolving Account

           (Water Supply Facilities)‑‑State......... $     158,000

 

    Prior Biennia (Expenditures).................... $     541,483

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     699,483

 

    NEW SECTIONSec. 241.  FOR THE DEPARTMENT OF HEALTH

    Public Health Laboratory:  Repairs and Improvements (96‑1‑001)

 

Reappropriation:

    State Building Construction Account‑‑State...... $   1,348,068

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,348,068

 

    NEW SECTIONSec. 242.  FOR THE DEPARTMENT OF HEALTH

    Public Health Laboratories:  Consolidation of Facilities (96‑2‑001)

 

Reappropriation:

    State Building Construction Account‑‑State...... $   3,652,971

 

    Prior Biennia (Expenditures).................... $   2,020,080

    Future Biennia (Projected Costs)............ ... $           0

                                                     -------------

           TOTAL.................................... $   5,673,051

 

    NEW SECTIONSec. 243.  FOR THE DEPARTMENT OF HEALTH

    Drinking Water Assistance Program (97‑2‑001)

 

    The reappropriation in this section is provided solely for an interagency agreement with the department of community, trade, and economic development to make, in cooperation with the public works board, loans to local governments and public water systems for projects and activities to protect and improve the state's drinking water facilities and resources.

 

Reappropriation:

    Drinking Water Assistance Account‑‑Federal...... $   5,000,000

 

    Prior Biennia (Expenditures).................... $  30,086,024

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  35,086,024

 

    NEW SECTIONSec. 244.  FOR THE DEPARTMENT OF HEALTH

    Public Health Laboratory:  Wastewater Treatment Systems (00-1-008)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $     208,802

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     208,802

 

    NEW SECTIONSec. 245.  FOR THE DEPARTMENT OF HEALTH

    Public Health Laboratory:  Chiller Plant Upgrade (02‑1‑004)

 

Appropriation:

    State Building Construction Account‑‑State...... $   2,355,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,355,000

 

    NEW SECTIONSec. 246.  FOR THE DEPARTMENT OF HEALTH

    Public Health Laboratory:  Repairs and Improvements (02‑1‑005)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $     172,400

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   2,944,200

                                                     -------------

           TOTAL.................................... $   3,116,600

 

    NEW SECTIONSec. 247.  FOR THE DEPARTMENT OF HEALTH

    Public Health Laboratory:  Biosafety Level 3 Facility (02‑2‑001)

 

    The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $   2,231,485

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,231,485

 

    NEW SECTIONSec. 248.  FOR THE DEPARTMENT OF HEALTH

    Public Health Laboratory:  C‑Wing Remodel (02‑2‑002)

 

Appropriation:

    State Building Construction Account‑‑State...... $     295,900

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     295,900

 

    NEW SECTIONSec. 249.  FOR THE DEPARTMENT OF HEALTH

    Public Health Laboratory:  E‑Wing Remodel (02‑2‑003)

 

Appropriation:

    State Building Construction Account‑‑State...... $     295,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     295,000

 

    NEW SECTIONSec. 250.  FOR THE DEPARTMENT OF HEALTH

    Drinking Water Assistance Program (02‑4‑004)

 

    The appropriation in this section is provided solely for an interagency agreement with the department of community, trade, and economic development to make, in cooperation with the public works board, loans to local governments and public water systems for projects and activities to protect and improve the state's drinking water facilities and resources.

 

Appropriation:

    Drinking Water Assistance Account‑‑Federal...... $  24,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  77,000,000

                                                     -------------

           TOTAL.................................... $ 101,000,000

 

    NEW SECTIONSec. 251.  FOR THE DEPARTMENT OF VETERANS' AFFAIRS

    Retsil Veterans' Home:  Minor Works Mechanical/Electrical/HVAC (02‑1‑001)

 

Appropriation:

    Charitable, Educational, Penal, and Reformatory

            Institutions Account‑‑State............. $   1,070,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     777,750

                                                     -------------

           TOTAL.................................... $   1,847,750

 

    NEW SECTIONSec. 252.  FOR THE DEPARTMENT OF VETERANS' AFFAIRS

    Orting Soldiers' Home:  Minor Works Mechanical/Electrical/HVAC (02‑1‑002)

 

Appropriation:

    Charitable, Educational, Penal, and Reformatory

            Institutions Account‑‑State............. $     127,736

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,060,835

                                                     -------------

           TOTAL.................................... $   1,188,571

 

    NEW SECTIONSec. 253.  FOR THE DEPARTMENT OF VETERANS' AFFAIRS

    Orting Soldiers' Home:  Minor Works Buildings (02‑1‑004)

 

Appropriation:

    Charitable, Educational, Penal, and Reformatory

            Institutions Account‑‑State............. $     140,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,813,590

                                                     -------------

           TOTAL.................................... $   1,953,590

 

    NEW SECTIONSec. 254.  FOR THE DEPARTMENT OF VETERANS' AFFAIRS

    Emergency Funds (02‑1‑007)

 

Appropriation:

    Charitable, Educational, Penal, and Reformatory

            Institutions Account‑‑State............. $     500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     500,000

 

    NEW SECTIONSec. 255.  FOR THE DEPARTMENT OF VETERANS' AFFAIRS

    Retsil Veterans' Home:  Steam Plant Seismic Upgrade (02‑1‑010)

 

Appropriation:

    Charitable, Educational, Penal, and Reformatory

            Institutions Account‑‑State............. $   1,391,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,391,000

 

    NEW SECTIONSec. 256.  FOR THE DEPARTMENT OF VETERANS' AFFAIRS

    240 Bed Nursing Facility (02‑2‑008)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) The appropriation in this section, combined with the authorities granted in section 907(4) of this act, for a total of $16.5 million, are authorized to apply for a matching grant from the federal department of veterans' affairs.

    (2) The department shall not commit or expend funds from these authorities until the federal construction grant has been certified and is available to Washington state for the purpose of constructing replacement nursing care beds.

 

Appropriation:

    State Building Construction Account‑‑State...... $   4,500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  30,477,200

                                                     -------------

           TOTAL.................................... $  34,977,200

 

    NEW SECTIONSec. 257.  FOR THE DEPARTMENT OF CORRECTIONS

    Expand Coyote Ridge Corrections Center (98‑2‑011)

 

Reappropriation:

    State Building Construction Account‑‑State...... $     500,000

 

Appropriation:

    State Building Construction Account‑‑State...... $   1,676,000

 

    Prior Biennia (Expenditures)........... ........ $     748,453

    Future Biennia (Projected Costs)................ $ 227,237,000

                                                     -------------

           TOTAL.................................... $ 230,161,453

 

    NEW SECTIONSec. 258.  FOR THE DEPARTMENT OF CORRECTIONS

    Clallam Bay Corrections Center ‑ Youth Offender Facility Improvement (97‑2‑005)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $   2,097,204

 

    Prior Biennia (Expenditures).................... $   2,402,796

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,500,000

 

    NEW SECTIONSec. 259.  FOR THE DEPARTMENT OF CORRECTIONS

    Stafford Creek Corrections Center Construction (98‑2‑001)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    General Fund‑‑Federal........................... $  10,000,000

    State Building Construction Account‑‑State...... $  18,870,000

                                                     -------------

           Subtotal Reappropriation..................            $    28,870,000

 

    Prior Biennia (Expenditures).................... $ 167,156,217

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $ 196,026,217

 

    NEW SECTIONSec. 260.  FOR THE DEPARTMENT OF CORRECTIONS

    Monroe Corrections Center ‑ Expand Special Offender Unit (98‑2‑010)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $   7,400,000

 

    Prior Biennia (Expenditures).................... $  35,235,279

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  42,635,279

 

    NEW SECTIONSec. 261.  FOR THE DEPARTMENT OF CORRECTIONS

    Washington Corrections Center for Women ‑ Special Needs and Reception Unit (96‑2‑006)

 

Reappropriation:

    State Building Construction Account‑‑State...... $  18,586,000

 

    Prior Biennia (Expenditures).................... $   3,214,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  21,800,000

 

    NEW SECTIONSec. 262.  FOR THE DEPARTMENT OF CORRECTIONS

    Washington Corrections Center:  Infrastructure Evaluation (98‑2‑004)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $     324,000

 

    Prior Biennia (Expenditures).................... $      26,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     350,000

 

    NEW SECTIONSec. 263.  FOR THE DEPARTMENT OF CORRECTIONS

    McNeil Island Corrections Center ‑ Still Harbor Dock (99‑2‑001)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $      57,975

 

    Prior Biennia (Expenditures).................... $   1,742,219

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,800,194

 

    NEW SECTIONSec. 264.  FOR THE DEPARTMENT OF CORRECTIONS

    Violent Offender/Truth in Sentencing Grant Administration (99‑4‑003)

 

Reappropriation:

    General Fund‑‑Federal........................... $     382,577

    Charitable, Educational, Penal, and Reformatory

           Institutions Account‑‑State.............. $      60,851

                                                     -------------

           Subtotal Reappropriation..................            $ 443,428

Appropriation:

    General Fund‑‑Federal........................... $     386,536

    Charitable, Educational, Penal, and Reformatory

           Institutions Account‑‑State.............. $      42,592

                                                     -------------

           Subtotal Appropriation................... $     429,128

 

    Prior Biennia (Expenditures).................... $     165,186

    Future Biennia (Projected Costs)................ $     214,743

                                                     -------------

           TOTAL.................................... $   1,252,485

 

    NEW SECTIONSec. 265.  FOR THE DEPARTMENT OF CORRECTIONS

    Americans with Disabilities Act (00‑1‑011)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $      66,500

 

    Prior Biennia (Expenditures).................... $      20,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $      86,500

 

    NEW SECTIONSec. 266.  FOR THE DEPARTMENT OF CORRECTIONS

    Local Criminal Justice Facilities (00‑4‑003)

 

Reappropriation:

    General Fund‑‑Federal........................... $   3,935,361

Appropriation:

    General Fund‑‑Federal........................... $   1,098,691

 

    Prior Biennia (Expenditures).................... $     210,000

    Future Biennia (Projected Costs)................ $     966,338

                                                     -------------

           TOTAL.................................... $   6,210,390

 

    NEW SECTIONSec. 267.  FOR THE DEPARTMENT OF CORRECTIONS

    McNeil Island ‑ Special Commitment Center (00‑2‑005)

 

Reappropriation:

    State Building Construction Account‑‑State...... $   1,325,314

 

    Prior Biennia (Expenditures).................... $   1,174,686

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,500,000

 

    NEW SECTION.  Sec. 268.  FOR THE DEPARTMENT OF CORRECTIONS

    McNeil Island Underground Storage Tank (00‑1‑001)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $     377,896

 

    Prior Biennia (Expenditures).................... $     414,415

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     792,311

 

    NEW SECTIONSec. 269.  FOR THE DEPARTMENT OF CORRECTIONS

    Minor Works:  Preservation (00‑1‑020)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $  14,000,000

 

    Prior Biennia (Expenditures).................... $   6,000,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  20,000,000

 

    NEW SECTIONSec. 270.  FOR THE DEPARTMENT OF CORRECTIONS

    Minor Works:  Program (00‑2‑010)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $   4,000,000

 

    Prior Biennia (Expenditures).................... $   1,000,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   5,000,000

 

    NEW SECTIONSec. 271.  FOR THE DEPARTMENT OF CORRECTIONS

    Monroe Corrections Center:  Kitchen Consolidations/Modifications (00‑2‑009)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $     990,000

 

    Prior Biennia (Expenditures).................... $     110,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,100,000

 

    NEW SECTIONSec. 272.  FOR THE DEPARTMENT OF CORRECTIONS

    Monroe Corrections Center ‑ Hazardous Materials (00‑1‑002)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $      52,950

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)............ ... $           0

                                                     -------------

           TOTAL.................................... $      52,950

 

    NEW SECTIONSec. 273.  FOR THE DEPARTMENT OF CORRECTIONS

    Monroe Corrections Center - 100 Bed Intensive Management and Segregation Units (00‑2‑008)

 

    The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $      44,765

Appropriation:

    General Fund‑‑Federal........................... $  13,566,977

    State Building Construction Account‑‑State...... $   7,117,023

                                                     -------------

           Subtotal Appropriation................... $  20,684,000

 

    Prior Biennia (Expenditures).................... $     140,210

    Future Biennia (Projected Costs)................ $  17,727,000

                                                     -------------

           TOTAL.................................... $  38,595,975

 

    NEW SECTIONSec. 274.  FOR THE DEPARTMENT OF CORRECTIONS

    Statewide:  Emergency Funds (00‑1‑021)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    Charitable, Educational, Penal, and Reformatory

           Institutions Account‑‑State.............. $     900,000

 

    Prior Biennia (Expenditures).................... $  14,158,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  15,058,000

 

    NEW SECTION.  Sec. 275.  FOR THE DEPARTMENT OF CORRECTIONS

    Washington State Penitentiary ‑ Intensive Management Unit Improvements (00‑1‑006)

 

Reappropriation:

    State Building Construction Account‑‑State...... $   3,290,000

Appropriation:

    State Building Construction Account‑‑State...... $     852,462

 

    Prior Biennia (Expenditures).................... $     210,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,352,462

 

    NEW SECTIONSec. 276.  FOR THE DEPARTMENT OF CORRECTIONS

    Correctional Industries Space Statewide (01‑2‑002)

 

Reappropriation:

    State Building Construction Account‑‑State...... $     327,206

Appropriation:

    State Building Construction Account‑‑State...... $   4,500,000

 

    Prior Biennia (Expenditures).................... $   2,972,794

    Future Biennia (Projected Costs)................ $   4,652,000

                                                     -------------

           TOTAL.................................... $  12,452,000

 

    NEW SECTIONSec. 277.  FOR THE DEPARTMENT OF CORRECTIONS

    Coyote Ridge Corrections Center ‑ Replace Telecommunications System (02‑1‑043)

 

    The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $   2,505,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,505,000

 

    NEW SECTIONSec. 278.  FOR THE DEPARTMENT OF CORRECTIONS

    Larch Corrections Center ‑ Pave Larch Access Road (02‑1‑037)

 

Appropriation:

    State Building Construction Account‑‑State...... $   2,057,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,057,000

 

    NEW SECTIONSec. 279.  FOR THE DEPARTMENT OF CORRECTIONS

    McNeil Island:  Replace Main Institution Water Storage Tank (02‑1‑022)

 

Appropriation:

    State Building Construction Account‑‑State...... $   1,644,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)............ ... $           0

                                                     -------------

           TOTAL.................................... $   1,644,000

 

    NEW SECTIONSec. 280.  FOR THE DEPARTMENT OF CORRECTIONS

    Minor Works:  Omnibus Preservation 2002 (02‑1‑015)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $   6,506,548

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  54,000,000

                                                     -------------

           TOTAL.................................... $  60,506,548

 

    NEW SECTIONSec. 281.  FOR THE DEPARTMENT OF CORRECTIONS

    Minor Works:  Omnibus Program Request 2002 (02‑2‑030)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $   1,525,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   8,000,000

                                                     -------------

           TOTAL.................................... $   9,525,000

 

    NEW SECTIONSec. 282.  FOR THE DEPARTMENT OF CORRECTIONS

    Monroe Corrections Center:  Firing Range (02‑2‑017)

 

Appropriation:

    State Building Construction Account‑‑State...... $   3,355,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   3,355,000

 

    NEW SECTIONSec. 283.  FOR THE DEPARTMENT OF CORRECTIONS

    Monroe Corrections Center:  Regional Training Center (02‑2‑016)

 

Appropriation:

    State Building Construction Account‑‑State...... $   2,955,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,955,000

 

    NEW SECTIONSec. 284.  FOR THE DEPARTMENT OF CORRECTIONS

    Olympic Corrections Center ‑ Replace Telecommunications Systems (02‑1‑041)

 

    The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $   2,406,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,406,000

 

    NEW SECTIONSec. 285.  FOR THE DEPARTMENT OF CORRECTIONS

    Pine Lodge ‑ Replace Telecommunications System (02‑1‑009)

 

    The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $   1,139,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,139,000

 

    NEW SECTIONSec. 286.  FOR THE DEPARTMENT OF CORRECTIONS

    Statewide:  Department of Corrections Emergency Funds (02‑1‑028)

 

Appropriation:

    Charitable, Educational, Penal, and Reformatory

            Institutions Account‑‑State............. $   1,700,000

 

    Prior Biennia (Expenditures).................... $     901,000

    Future Biennia (Projected Costs)................ $   7,800,000

                                                     -------------

           TOTAL.................................... $  10,401,000

 

    NEW SECTIONSec. 287.  FOR THE DEPARTMENT OF CORRECTIONS

    Statewide:  Intensive Management Unit Repairs (02‑1‑040)

 

Appropriation:

    State Building Construction Account‑‑State...... $   1,612,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,612,000

 

    NEW SECTIONSec. 288.  FOR THE DEPARTMENT OF CORRECTIONS

    Washington Corrections Center ‑ Building Water Pipe Replacement Phase 2 (02‑1‑008)

 

Appropriation:

    State Building Construction Account‑‑State...... $   2,694,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,694,000

 

    NEW SECTIONSec. 289.  FOR THE DEPARTMENT OF CORRECTIONS

    Washington Corrections Center ‑ Domestic Water Systems Improvements (02‑1‑007)

 

Appropriation:

    State Building Construction Account‑‑State...... $   3,531,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   3,531,000

 

    NEW SECTIONSec. 290.  FOR THE DEPARTMENT OF CORRECTIONS

    Washington Corrections Center ‑ Replace Steam and Condensate Piping (02‑1‑006)

 

Appropriation:

    State Building Construction Account‑‑State...... $   6,170,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,170,000

 

    NEW SECTIONSec. 291.  FOR THE DEPARTMENT OF CORRECTIONS

    Washington Corrections Center:  Install Lethal Fence (02‑2‑029)

 

Appropriation:

    State Building Construction Account‑‑State...... $   1,318,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,318,000

 

    NEW SECTIONSec. 292.  FOR THE DEPARTMENT OF CORRECTIONS

    Washington State Penitentiary ‑ Replace Old Sanitary and Domestic Water Lines (02‑1‑026)

 

Appropriation:

    State Building Construction Account‑‑State...... $   1,070,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   2,640,000

                                                     -------------

           TOTAL.................................... $   3,710,000

 

    NEW SECTIONSec. 293.  FOR THE DEPARTMENT OF CORRECTIONS

    Washington State Penitentiary ‑ Replace Electrical Supply System (02‑1‑024)

 

Appropriation:

    State Building Construction Account‑‑State...... $   4,061,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   2,655,000

                                                     -------------

           TOTAL.................................... $   6,716,000

 

    NEW SECTIONSec. 294.  FOR THE DEPARTMENT OF CORRECTIONS

    Washington State Penitentiary:  Medium Security Compound Lethal Fence (02‑2‑039)

 

Appropriation:

    State Building Construction Account‑‑State...... $     670,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     670,000

 

    NEW SECTIONSec. 295.  FOR THE DEPARTMENT OF CORRECTIONS

    Washington State Penitentiary:  Intensive Management Unit Lethal Fence (02‑2‑038)

 

Appropriation:

    State Building Construction Account‑‑State...... $     301,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     301,000

 

                              PART 3

                         NATURAL RESOURCES

 

    NEW SECTION.  Sec. 301.  FOR THE DEPARTMENT OF ECOLOGY

    Referendum 26 Waste Disposal Facilities (74-2-004)

 

Reappropriation:

    State and Local Improvements Revolving

           Account (Waste Facilities)‑-State........ $     398,083

 

    Prior Biennia (Expenditures).................... $   3,810,539

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,208,622

 

    NEW SECTION.  Sec. 302.  FOR THE DEPARTMENT OF ECOLOGY

    Referendum 38 Water Supply Facilities (74-2-006)

 

    The reappropriation in this section is subject to the following conditions and limitations:

    (1) The reappropriation is provided solely for projects under contracts on or before June 30, 2001.  Reappropriated funds not associated with contracted projects shall lapse on June 30, 2001.

    (2) The office of financial management may grant waivers from this lapse requirement for specific projects upon findings of exceptional circumstances after notification of the chairs of the house of representatives capital budget committee and senate ways and means committee.

    (3) The department shall submit a report to the office of financial management and house of representatives capital budget committee and senate ways and means committee by December 1, 2001, listing all projects funded from this section.

 

Reappropriation:

    State Drought Preparedness‑-State............... $   5,525,000

    State and Local Improvements Revolving

           Account (Water Supply Facilities)‑-State. $   6,000,000

                                                     -------------

           Subtotal Reappropriation..................            $    11,525,000

 

    Prior Biennia (Expenditures).................... $   3,951,898

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  15,476,898

 

    NEW SECTION.  Sec. 303.  FOR THE DEPARTMENT OF ECOLOGY

    State Emergency Water Projects (76-2-003)

 

Reappropriation:

    State Emergency Water Projects Revolving

           Account‑-State........................... $     577,833

Appropriation:

    State Emergency Water Projects Revolving

           Account‑-State........................... $     214,167

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     792,000

 

    NEW SECTION.  Sec. 304.  FOR THE DEPARTMENT OF ECOLOGY

    Referendum 39 Waste Disposal Facilities (82-2-005)

 

Reappropriation:

    State and Local Improvements Revolving

           Account - Waste Facilities 1980‑-State... $     500,000

 

    Prior Biennia (Expenditures).................... $   9,928,221

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  10,428,221

 

    NEW SECTION.  Sec. 305.  FOR THE DEPARTMENT OF ECOLOGY

    Centennial Clean Water Fund (86-2-007)

 

    The reappropriation in this section is subject to the following conditions and limitations:

    (1) The reappropriation in this section is provided solely for projects under contract on or before June 30, 2001.  Reappropriated funds not associated with contracted projects shall lapse on June 30, 2001.

    (2) The office of financial management may grant waivers from this lapse requirement for specific projects upon findings of exceptional circumstances after notification of the chairs of the house of representatives capital budget committee and senate ways and means committee.

    (3) The department shall submit a report to the office of financial management and house of representatives capital budget committee and senate ways and means committee by December 1, 2001, listing all projects funded from this section.

 

Reappropriation:

    Public Works Assistance Account‑-State.......... $   7,013,151

    Water Quality Account‑-State.................... $  27,318,809

                                                     -------------

           Subtotal Reappropriation..................            $    34,331,960

 

    Prior Biennia (Expenditures).................... $ 132,232,544

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $ 166,564,504

 

    NEW SECTION.  Sec. 306.  FOR THE DEPARTMENT OF ECOLOGY

    Local Toxics Grants to Locals for Cleanup and Prevention (88-2-008)

 

    The appropriations in this section are subject to the following conditions and limitations:

    (1) The reappropriation in this section is provided solely for projects under contract on or before June 30, 2001.  Reappropriated funds not associated with contracted projects shall lapse on June 30, 2001.  The office of financial management may grant waivers from this lapse requirement for specific projects upon findings of exceptional circumstances after notification of the chairs of the house of representatives capital budget committee and senate ways and means committee.

    (2) The department shall submit a report to the office of financial management and house of representatives capital budget committee and senate ways and means committee by December 1, 2001, listing all projects funded from this section.

 

Reappropriation:

    Local Toxics Control Account‑-State............. $  20,749,772

Appropriation:

    Local Toxics Control Account‑-State............. $  58,522,000

 

    Prior Biennia (Expenditures).................... $  76,009,089

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $ 155,280,861

 

    NEW SECTION.  Sec. 307.  FOR THE DEPARTMENT OF ECOLOGY

    Water Pollution Control Revolving Account (90-2-002)

 

Reappropriation:

    Water Pollution Control Revolving Account‑-

           State.................................... $  38,403,302

    Water Pollution Control Revolving Account‑-

           Federal.................................. $  44,795,830

                                                     -------------

           Subtotal Reappropriation..................            $    83,199,132

 

    Prior Biennia (Expenditures).................... $ 169,901,509

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $ 253,100,641

 

    NEW SECTION.  Sec. 308.  FOR THE DEPARTMENT OF ECOLOGY

    Methow Basin Water Conservation (92-2-009)

 

    The reappropriation in this section is subject to the following conditions and limitations:  The reappropriation in this section is provided solely for projects under contract on or before June 30, 2001.  Reappropriated funds not associated with contracted projects shall lapse on June 30, 2001.

 

Reappropriation:

    State Building Construction Account‑-State...... $      87,689

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $      87,689

 

    NEW SECTION.  Sec. 309.  FOR THE DEPARTMENT OF ECOLOGY

    Low-Level Nuclear Waste Disposal Trench Closure (97-2-012)

 

Reappropriation:

    Site Closure Account‑-State..................... $   4,343,978

 

    Prior Biennia (Expenditures).................... $   1,993,482

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,337,460

 

    NEW SECTION.  Sec. 310.  FOR THE DEPARTMENT OF ECOLOGY

    Water Rights Purchase (99-1-005)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) The appropriation is provided for the purchase of water rights under the trust water rights program under chapter 90.42 RCW, for the purpose of improving stream and river flows in fish critical basins.  This appropriation shall only be used to acquire water rights in basins with current or proposed listings of salmon or steelhead under the federal endangered species act (16 U.S.C. Sec. 1531 et seq.) and where low flows have been identified as a limiting factor for salmon recovery.  Priority for funding such purchases and leases shall take into consideration the following:

    (a) Proposals providing the greatest benefit for restoring and protecting fish;

    (b) Proposals providing benefits in addition to protecting fish critical streams and rivers;

    (c) Proposals that include funds from other sources;

    (d) Proposals showing a broad level of support among interested parties;

    (e) Proposals requiring the lowest administrative costs to implement; and

    (f) Proposals requiring the lowest overall cost within the context of the local marketplace.

    (2) In making the selection of water rights to purchase, the department shall consult with the department of fish and wildlife.

 

Appropriation:

    State Building Construction Account‑-State...... $   1,000,000

 

    Prior Biennia (Expenditures).................... $   1,000,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,000,000

 

    NEW SECTION.  Sec. 311.  FOR THE DEPARTMENT OF ECOLOGY

    Minor Works (02-1-003)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   1,550,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  12,291,745

                                                     -------------

           TOTAL.................................... $  13,841,745

 

    NEW SECTION.  Sec. 312.  FOR THE DEPARTMENT OF ECOLOGY

    Padilla Bay (02-2-006)

 

Appropriation:

    General Fund‑-Federal........................... $   1,885,800

    State Building Construction Account‑-State...... $     808,200

                                                     -------------

           Subtotal Appropriation................... $   2,694,000

 

    Prior Biennia (Expenditures)................ ... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,694,000

 

    NEW SECTION.  Sec. 313.  FOR THE DEPARTMENT OF ECOLOGY

    Local Hazardous Waste Liability (02-4-001)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) The appropriation in this section is provided solely for grants to local governmental agencies named as potentially liable persons or potentially responsible parties when those agencies have conducted a moderate risk waste or similar program, and have become financially liable for clean-up and corrective action due to circumstances at a facility they used for hazardous waste treatment, storage, recycling, or disposal services.

    (2) The department shall adopt rules for this financial assistance program.  For the purposes of this grant program, the department may offer grants up to one hundred percent of total eligible costs.  Eligible costs may include retroactive costs and legal fees associated with facility cleanup or corrective action.

 

Appropriation:

    Local Toxics Control Account‑-State............. $   2,000,000

 

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,000,000

 

    NEW SECTION.  Sec. 314.  FOR THE DEPARTMENT OF ECOLOGY

    Water Pollution Control Revolving Account (02-4-002)

 

Appropriation:

    Water Pollution Control Revolving Account‑-

           State.................................... $ 113,835,792

    Water Pollution Control Revolving Account‑-

           Federal.................................. $  45,277,010

                                                     -------------

           Subtotal Appropriation................... $ 159,112,802

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 467,108,040

                                                     -------------

           TOTAL.................................... $ 626,220,842

 

    NEW SECTION.  Sec. 315.  FOR THE DEPARTMENT OF ECOLOGY

    Referendum 38 Water Supply Facilities (02-4-006)

 

    The appropriation in this section is subject to the following conditions and limitations:  The department shall submit a report to the office of financial management and house of representatives capital budget committee and senate ways and means committee by December 1, 2001, listing all projects funded from this section.

 

Appropriation:

    State and Local Improvements Revolving

           Account (Water Supply Facilities)‑-State. $  10,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  12,000,000

                                                     -------------

           TOTAL.................................... $  22,000,000

 

    NEW SECTION.  Sec. 316.  FOR THE DEPARTMENT OF ECOLOGY

    Centennial Clean Water Fund (02-4-007)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) Up to $15,097,000 of the water quality account appropriation is provided for extended grant payment to Metro/King county.

    (2) Up to $10,000,000 of the water quality account appropriation is provided for the extended grant payment to Spokane for the Spokane-Rathdrum Prairie aquifer.

    (3) The remaining appropriation in this section is provided for statewide water quality implementation and planning grants and loans.  The department shall give priority consideration to projects located in basins with critical or depressed salmonid stocks.

 

Appropriation:

    Water Quality Account‑-State.................... $  48,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 208,000,000

                                                     -------------

           TOTAL.................................... $ 256,000,000

 

    NEW SECTION.  Sec. 317.  FOR THE DEPARTMENT OF ECOLOGY

    Yakima Basin Water Investments (02-4-008)

 

    The appropriation in this section is subject to the following conditions and limitations:  The appropriation is provided solely for water quality, water quantity, and fish habitat projects in the Yakima basin consistent with the Yakima water basin investment action agenda.

 

Appropriation:

    State Building Construction Account‑-State...... $   4,000,000

    Water Quality Account‑-State.................... $   4,000,000

                                                     -------------

           Subtotal Appropriation................... $   8,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   8,000,000

 

    NEW SECTION.  Sec. 318.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Spokane Centennial Trail (89-5-112)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    General Fund‑-Federal........................... $     206,534

 

    Prior Biennia (Expenditures).................... $      89,888

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     296,422

 

    NEW SECTION.  Sec. 319.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Facilities Preservation:  Statewide (98-1-003)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   3,732,558

 

    Prior Biennia (Expenditures).................... $   4,267,442

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   8,000,000

 

    NEW SECTION.  Sec. 320.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Statewide Recreation Development Program (98-2-008)

 

    The reappropriation in this section is subject to the following conditions and limitations:

    (1) The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

    (2) $33,881 of the general fund‑-federal reappropriation is provided for the continuation of the United States national park service and the United States department of energy grants as described in section 325, chapter 379, Laws of 1999.

    (3) $647,240 of the general fund‑-federal reappropriation is provided for the continuation of the United States forest service grant as described in section 325, chapter 379, Laws of 1999.

 

Reappropriation:

    General Fund‑-Federal........................... $     681,121

    General Fund‑-Private/Local..................... $      27,439

    State Building Construction Account‑-State...... $   1,452,376

                                                     -------------

           Subtotal Reappropriation..................            $    2,160,936

 

    Prior Biennia (Expenditures).................... $   1,155,651

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.... ................................ $   3,316,587

 

    NEW SECTION.  Sec. 321.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Statewide Facility Preservation and Deferred Maintenance (99-1-001)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,375,523

 

    Prior Biennia (Expenditures).................... $   2,624,477

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL................................ ... $   4,000,000

 

    NEW SECTION.  Sec. 322.  FOR THE STATE PARKS AND RECREATION COMMISSION 

    Cama Beach State Park Development (99-2-001)

 

Reappropriation:

    Parks Renewal and Stewardship Account‑-State.... $     150,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     150,000

 

    NEW SECTION.  Sec. 323.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Coastal Facility Relocation (00-1-005)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,567,898

 

    Prior Biennia (Expenditures).................... $     432,102

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,000,000

 

    NEW SECTION.  Sec. 324.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Historic Structure and Land Use Program (00-1-007)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   2,477,393

 

    Prior Biennia (Expenditures).................... $   4,022,607

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,500,000

 

    NEW SECTION.  Sec. 325.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Lewis and Clark Trail Bicentennial (00-1-010)

 

Reappropriation:

    State Building Construction Account‑-State...... $     920,433

Appropriation:

    State Building Construction Account‑-State...... $   2,000,000

 

    Prior Biennia (Expenditures).................... $     579,567

    Future Biennia (Projected Costs)................ $   1,000,000

                                                     -------------

           TOTAL.................................... $   4,500,000

 

    NEW SECTION.  Sec. 326.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Park Housing (00-1-014)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      84,312

 

    Prior Biennia (Expenditures).................... $     415,688

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     500,000

 

    NEW SECTION.  Sec. 327.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Americans with Disabilities Act (00-9-036)

 

    The reappropriation in this section is subject to the following conditions and limitations:

    (1) The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

    (2) The department shall minimize the expenditure of these funds for staff and administrative purposes or for other operational expenses.

 

Reappropriation:

    State Building Construction Account‑-State...... $     100,000

 

    Prior Biennia (Expenditures).................... $     260,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     360,000

 

    NEW SECTION.  Sec. 328.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Statewide Facility Preservation (02-1-001)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $  10,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  42,000,000

                                                     -------------

           TOTAL.................................... $  52,000,000

 

    NEW SECTION.  Sec. 329.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Fort Worden State Park (02-1-003)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   2,500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  16,000,000

                                                     -------------

           TOTAL.................................... $  18,500,000

 

    NEW SECTION.  Sec. 330.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Emergency and Unforeseen Needs (02-1-004)

 

Appropriation:

    State Building Construction Account‑-State...... $     500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   3,200,000

                                                     -------------

           TOTAL.................................... $   3,700,000

 

    NEW SECTION.  Sec. 331.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Natural/Historic Stewardship (02-1-006)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   2,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  15,000,000

                                                     -------------

           TOTAL.................................... $  17,000,000

 

    NEW SECTION.  Sec. 332.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Environmental Learning Centers (02-1-010)

 

    The appropriation in this section is subject to the following conditions and limitations:  The appropriation funds predesign studies of environmental learning centers that have new revenue potential and provide significant new recreational opportunities.

 

Appropriation:

    State Building Construction Account‑-State...... $     500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  15,000,000

                                                     -------------

           TOTAL.................................... $  15,500,000

 

    NEW SECTION.  Sec. 333.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Coastal Facility Relocation (02-1-017)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

    (2) The department shall ensure that all funds transferred from the public works assistance account to the parks renewal and stewardship account during the 2001‑2003 biennium are used only for this project.

    (3) Funds expended on this project for off‑site utility infrastructure that may include the provision of electricity, water service, or sewer service shall be for the benefit of the state.  Entities that subsequently connect to or use this off‑site utility infrastructure shall reimburse the state at a rate proportional to their use.  The department, in consultation with the public works board, shall develop policies and procedures to ensure this reimbursement occurs.

    (4) The department shall ensure that all reimbursement recovered as specified in subsection (3) of this section shall be paid into the public works assistance account.

    (5) Ownership of the off‑site sewer and water utility infrastructure constructed in this section shall transfer to the city of Ilwaco.

 

Appropriation:

    Parks Renewal and Stewardship Account‑-State.... $   5,700,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   5,700,000

 

    NEW SECTION.  Sec. 334.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Facilities Assessment Program (02-2-005)

 

    The appropriation in this section shall lapse on June 30, 2003.

 

Appropriation:

    State Building Construction Account‑-State...... $     400,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     400,000

 

    NEW SECTION.  Sec. 335.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Recreation Development (02-2-007)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) The appropriation funds predesign studies of major park developments that have new revenue potential and provide significant new recreational opportunities.

    (2) $164,000 of this appropriation is provided as state match to federal funds for the Iron Horse depot.

 

Appropriation:

    State Building Construction Account‑-State...... $     664,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  16,000,000

                                                     -------------

           TOTAL.................................... $  16,664,000

 

    NEW SECTION.  Sec. 336.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Park Housing (02-2-008)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   1,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   4,000,000

                                                     -------------

           TOTAL.................................... $   5,000,000

 

    NEW SECTION.  Sec. 337.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Parkland Acquisition Account (02-2-016)

 

Appropriation:

    Parkland Acquisition Account‑-State............. $   2,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   8,000,000

                                                     -------------

           TOTAL.................................... $  10,000,000

 

    NEW SECTION.  Sec. 338.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Statewide Boat Pumpouts Federal Clean Vessel Act (02-2-020)

 

Appropriation:

    General Fund‑-Federal........................... $   1,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   4,000,000

                                                     -------------

           TOTAL.................................... $   5,000,000

 

    NEW SECTION.  Sec. 339.  FOR THE STATE PARKS AND RECREATION COMMISSION

    Beacon Rock State Park:  Pierce Trust Donation (02-3-018)

 

Appropriation:

    Parks Renewal Stewardship Account‑-State........ $     200,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     800,000

                                                     -------------

           TOTAL.................................... $   1,000,000

 

    NEW SECTION.  Sec. 340.  FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION

    Boating Facilities Projects (98-2-001)

 

Reappropriation:

    Recreation Resources Account‑-State............. $  12,671,327

 

    Prior Biennia (Expenditures).................... $  11,422,293

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  24,093,620

 

    NEW SECTION.  Sec. 341.  FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION

    Nonhighway Road and Off-Road Vehicle Activities (NOVA) (98-2-002)

 

Reappropriation:

    NOVA Program Account‑-State..................... $   7,731,493

 

    Prior Biennia (Expenditures).................... $   6,697,452

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  14,428,945

 

    NEW SECTION.  Sec. 342.  FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION 

    Washington Wildlife and Recreation Program (98-2-003)

 

Reappropriation:

    State Building Construction Account‑-State...... $   3,663,227

    Outdoor Recreation Account‑-State............... $  28,670,042

    Habitat Conservation Account‑-State............. $  38,434,915

                                                     -------------

           Subtotal Reappropriation..................            $    70,768,184

 

    Prior Biennia (Expenditures).................... $  58,287,719

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $ 129,055,903

 

    NEW SECTION.  Sec. 343.  FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION

    Firearms Range Program (FARR) (98-2-004)

 

Reappropriation:

    Firearms Range Account‑-State................... $     801,244

Appropriation:

    Firearms Range Account‑-State................... $      50,000

 

    Prior Biennia (Expenditures).................... $     476,514

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,327,758

 

    NEW SECTION.  Sec. 344.  FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION

    Land and Water Conservation Fund (LWCF) (98-2-005)

 

Reappropriation:

    Outdoor Recreation Account‑-Federal............. $     975,325

 

    Prior Biennia (Expenditures).................... $     849,761

    Future Biennia (Projected Costs)................ $           1

                                                     -------------

           TOTAL.................................... $   1,825,087

 

    NEW SECTION.  Sec. 345.  FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION

    National Recreation Trails (NRTP) (98-2-006)

 

Reappropriation:

    Recreation Resources Account‑-Federal....... ... $   1,667,819

 

    Prior Biennia (Expenditures).................... $     871,756

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,539,575

 

    NEW SECTION.  Sec. 346.  FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION

    Salmon Recovery (00-2-001)

 

Reappropriation:

    General Fund‑-Federal........................... $  59,229,720

    State Building Construction Account‑-State...... $   3,743,220

    Salmon Recovery Account‑-State.................. $  24,417,957

                                                     -------------

           Subtotal Reappropriation..................            $    87,390,897

 

    Prior Biennia (Expenditures).................... $  13,639,576

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $ 101,030,473

 

    NEW SECTION.  Sec. 347.  FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION

    Boating Facilities Projects (02-4-001)

 

Appropriation:

    Recreation Resources Account‑-State............. $   8,318,013

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  40,300,368

                                                     -------------

           TOTAL.................................... $  48,618,381

 

    NEW SECTION.  Sec. 348.  FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION

    Nonhighway Road and Off-Road Vehicle Activities (NOVA) (02-4-002)

 

Appropriation:

    NOVA Program Account‑-State..................... $   5,527,551

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  23,559,218

                                                     -------------

           TOTAL.................................... $  29,086,769

 

    NEW SECTION.  Sec. 349.  FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION 

    Washington Wildlife and Recreation Program (02-4-003)

 

    The appropriation in this section for the wildlife and recreation program under chapter 43.99A RCW and RCW 43.99A.040 is subject to the following conditions and limitations:  The new appropriation is provided for the approved list of projects included in LEAP capital document No. . . . . . ., as developed on . . . . . ., 2001, at . . . . . ..

 

Appropriation:

    Outdoor Recreation Account‑-State............... $  22,500,000

    Habitat Conservation Account‑-State............. $  22,500,000

                                                     -------------

           Subtotal Appropriation................... $  45,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 180,000,000

                                                     -------------

           TOTAL.................................... $ 225,000,000

 

    NEW SECTION.  Sec. 350.  FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION

    Land and Water Conservation Fund (LWCF) (02-4-005)

 

Appropriation:

    Recreation Resources Account‑-Federal........... $   2,500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,500,000

 

    NEW SECTION.  Sec. 351.  FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION

    National Recreation Trails (NRTP) (02-4-006)

 

Appropriation:

    Recreation Resources Account‑-Federal........... $   2,132,936

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     977,000

                                                     -------------

           TOTAL.................................... $   3,109,936

 

    NEW SECTION.  Sec. 352.  FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION 

    Salmon Recovery (02-4-007)

 

Appropriation:

    General Fund‑-Federal........................... $  27,642,000

    State Building Construction Account‑-State...... $  28,000,000

                                                     -------------

           Subtotal Appropriation................... $  55,642,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 264,000,000

                                                     -------------

           TOTAL.................................... $ 319,642,000

 

    NEW SECTION.  Sec. 353.  FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION

    Hatchery Management (02-4-009)

 

Appropriation:

    General Fund‑-Federal........................... $  11,200,000

 

    Prior Biennia (Expenditures).................... $     440,627

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  11,640,627

 

    NEW SECTION.  Sec. 354.  FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION

    Boating Infrastructure Grant (BIG) Program (02-4-010)

 

Appropriation:

    Recreation Resources Account‑-Federal........... $   2,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,000,000

 

    NEW SECTION.  Sec. 355.  FOR THE STATE CONSERVATION COMMISSION

    Water Quality Grants Program (98-2-001)

 

Reappropriation:

    Water Quality Account‑-State.................... $   1,616,400

 

    Prior Biennia (Expenditures).................... $   5,000,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,616,400

 

    NEW SECTION.  Sec. 356.  FOR THE STATE CONSERVATION COMMISSION

    Dairy Waste Management Grants Program (98-2-002)

 

Reappropriation:

    Water Quality Account‑-State.................... $   1,489,500

 

    Prior Biennia (Expenditures).................... $   5,500,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,989,500

 

    NEW SECTION.  Sec. 357.  FOR THE STATE CONSERVATION COMMISSION

    Conservation Reserve Enhancement Program (00-2-004)

 

Reappropriation:

    State Building Construction Account‑-State...... $   2,696,852

Appropriation:

    State Building Construction Account‑-State...... $   5,000,000

 

    Prior Biennia (Expenditures).................... $   5,000,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  12,696,852

 

    NEW SECTION.  Sec. 358.  FOR THE STATE CONSERVATION COMMISSION

    Water Quality Grants Program (02-4-001)

 

Appropriation:

    Water Quality Account‑-State.................... $   5,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  20,000,000

                                                     -------------

           TOTAL.................................... $  25,000,000

 

    NEW SECTION.  Sec. 359.  FOR THE STATE CONSERVATION COMMISSION

    Dairy Nutrient Management Grants Program (02-4-002)

 

Appropriation:

    Water Quality Account‑-State.................... $   5,500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  22,000,000

                                                     -------------

           TOTAL.................................... $  27,500,000

 

    NEW SECTION.  Sec. 360.  FOR THE STATE CONSERVATION COMMISSION

    Puget Sound District Grants (02-4-003)

 

Appropriation:

    Water Quality Account‑-State.................... $     840,000

 

    Prior Biennia (Expenditures).................... $   1,660,000

    Future Biennia (Projected Costs)................ $   3,360,000

                                                     -------------

           TOTAL.................................... $   5,860,000

 

    NEW SECTION.  Sec. 361.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Tideland Acquisition (94-2-003)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

 

Reappropriation:

    General Fund‑-Federal........................... $     640,000

 

    Prior Biennia (Expenditures).................... $   4,360,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   5,000,000

 

    NEW SECTION.  Sec. 362.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Nemah Hatchery Building and Incubation System Replacement (96‑1‑006)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      90,000

 

    Prior Biennia (Expenditures).................... $   1,610,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,700,000

 

    NEW SECTION.  Sec. 363.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Shellfish Laboratory and Hatchery Upgrades (96-1-009)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    Aquatic Lands Enhancement Account‑-State........ $     120,000

    State Building Construction Account‑-State...... $      35,000

                                                     -------------

           Subtotal Appropriation................... $     155,000

 

    Prior Biennia (Expenditures).................... $     349,947

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     504,947

 

    NEW SECTION.  Sec. 364.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Minor Works Preservation (98-1-001)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     999,364

 

    Prior Biennia (Expenditures).................... $   3,029,208

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,028,572

 

    NEW SECTION.  Sec. 365.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Dam Inspection and Repair (98-1-004)

 

    The appropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      30,000

 

    Prior Biennia (Expenditures).................... $   1,120,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,150,000

 

    NEW SECTION.  Sec. 366.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Facilities Renovation (98-1-005)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑-

           State.................................... $     482,000

 

    Prior Biennia (Expenditures).................... $   1,769,201

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,251,201

 

    NEW SECTION.  Sec. 367.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Hatchery Renovation (98-1-006)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,055,000

 

    Prior Biennia (Expenditures).................... $   6,337,326

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   7,392,326

 

    NEW SECTION.  Sec. 368.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Recreational Access Redevelopment (98-1-007)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      70,000

 

    Prior Biennia (Expenditures).................... $   1,924,501

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,994,501

 

    NEW SECTION.  Sec. 369.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Coast and Puget Sound Wild Salmonid Habitat Restoration (98-1-009)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     200,000

 

    Prior Biennia (Expenditures).................... $   4,173,047

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,373,047

 

    NEW SECTION.  Sec. 370.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Coast and Puget Sound Wildstock Restoration:  Hatcheries (98-1-010)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     120,000

 

    Prior Biennia (Expenditures).................... $   1,542,452

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,662,452

 

    NEW SECTION.  Sec. 371.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Statewide Fencing Renovation and Construction (98-1-012)

 

    The reappropriation in this section is subject to the following conditions and limitations:

    (1) The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

    (2) Expenditures of the reappropriation in this section for fencing shall comply with chapter 16.60 RCW.

 

Reappropriation:

    State Building Construction Account‑-State...... $     143,000

 

    Prior Biennia (Expenditures).................... $     768,118

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     911,118

 

    NEW SECTION.  Sec. 372.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Wildlife Renovation (98-1-013)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      90,000

 

    Prior Biennia (Expenditures).................... $   1,030,913

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,120,913

 

    NEW SECTION.  Sec. 373.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Issaquah Hatchery Improvements (98-1-015)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   2,210,000

 

    Prior Biennia (Expenditures).................... $   4,596,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,806,000

 

    NEW SECTION.  Sec. 374.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Warm Water Game Fish Access Facilities (98-2-006)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    Warm Water Game Fish Account‑-State............. $     300,000

 

    Prior Biennia (Expenditures).................... $     889,815

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,189,815

 

    NEW SECTION.  Sec. 375.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Recreational Fish Enhancement (98-2-007)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    Recreational Fisheries Enhancement‑‑State........            $ 400,000

 

    Prior Biennia (Expenditures).................... $     678,313

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,078,313

 

    NEW SECTION.  Sec. 376.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Mitigation Projects and Dedicated Funds (98‑2‑008)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    Game Special Wildlife Account‑‑State.............            $ 81,000

    Game Special Wildlife Account‑‑Private/Local.... $   1,000,000

                                                     -------------

           Subtotal Reappropriation..................            $    1,081,000

 

    Prior Biennia (Expenditures).................... $   6,880,041

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   7,961,041

 

    NEW SECTION.  Sec. 377.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Migratory Waterfowl Habitat Acquisition and Development (98‑2‑009)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    Wildlife Account‑‑State......................... $     200,000

 

    Prior Biennia (Expenditures).................... $     669,849

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     869,849

 

    NEW SECTION.  Sec. 378.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Clam and Oyster Beach Enhancement (98‑2‑019)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    Aquatic Lands Enhancement Account‑‑State........ $      35,000

 

    Prior Biennia (Expenditures).................... $     536,649

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     571,649

 

    NEW SECTION.  Sec. 379.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Deep Water Slough Restoration (98‑2‑021)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $     170,000

 

    Prior Biennia (Expenditures).................... $     244,968

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     414,968

 

    NEW SECTION.  Sec. 380.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Salmon Restoration (99‑2‑001)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $     250,000

    Salmon Recovery Account‑‑State.................. $     500,000

                                                     -------------

           Subtotal Reappropriation..................            $ 750,000

 

    Prior Biennia (Expenditures).................... $     511,844

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,261,844

 

    NEW SECTION.  Sec. 381.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Upland Wildlife Habitat:  Replacement (00-2-005)

 

Reappropriation:

    Wildlife Account‑-State......................... $     500,000

 

    Prior Biennia (Expenditures).................... $     100,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     600,000

 

    NEW SECTION.  Sec. 382.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Watchable Wildlife Program (00-2-007)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      75,000

 

    Prior Biennia (Expenditures).................... $      25,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     100,000

 

    NEW SECTION.  Sec. 383.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Goldsborough Creek Restoration (00-2-008)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      70,000

 

    Prior Biennia (Expenditures).................... $   1,030,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,100,000

 

    NEW SECTION.  Sec. 384.  FOR THE DEPARTMENT OF FISH AND WILDLIFE 

    Hatchery Reform Facility Retrofits (02-1-001)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    General Fund‑-Federal........................... $  10,000,000

    State Building Construction Account‑-State...... $   5,000,000

                                                     -------------

           Subtotal Appropriation................... $  15,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  75,000,000

                                                     -------------

           TOTAL.................................... $  90,000,000

 

    NEW SECTION.  Sec. 385.  FOR THE DEPARTMENT OF FISH AND WILDLIFE 

    Forest and Fish Road Upgrade and Abandonment on Agency Lands (02‑1‑003)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    General Fund‑-Federal........................... $   1,900,000

    State Building Construction Account‑-State...... $     500,000

                                                     -------------

           Subtotal Appropriation................... $   2,400,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  11,600,000

                                                     -------------

           TOTAL.................................... $  14,000,000

 

    NEW SECTION.  Sec. 386.  FOR THE DEPARTMENT OF FISH AND WILDLIFE 

    Code Compliance and Protection (02-1-005)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    General Fund‑-Federal........................... $     550,000

    General Fund‑-Private/Local..................... $   1,250,000

    State Building Construction Account‑-State...... $   2,350,000

                                                     -------------

           Subtotal Appropriation................... $   4,150,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  28,500,000

                                                     -------------

           TOTAL.................................... $  32,650,000

 

    NEW SECTION.  Sec. 387.  FOR THE DEPARTMENT OF FISH AND WILDLIFE 

    Facility and Infrastructure Standards and Renovations (02-1-009)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    General Fund‑-Federal........................... $   3,100,000

    General Fund‑-Private/Local..................... $   1,500,000

    Aquatic Lands Enhancement Account‑-State........ $     150,000

    State Building Construction Account‑-State...... $   6,700,000

                                                     -------------

           Subtotal Appropriation................... $  11,450,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  80,416,200

                                                     -------------

           TOTAL.................................... $  91,866,200

 

    NEW SECTION.  Sec. 388.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Infrastructure Savings (02-1-010)

 

    Projects that are completed in accordance with section 915 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

 

Appropriation:

    State Building Construction Account‑-State...... $           1

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $           1

 

    NEW SECTION.  Sec. 389.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Endangered Species Act Compliance on Agency Lands (02-2-002)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    General Fund‑-Federal........................... $   8,800,000

    State Building Construction Account‑-State...... $   1,000,000

                                                     -------------

           Subtotal Appropriation................... $   9,800,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  43,200,000

                                                     -------------

           TOTAL....................... ............ $  53,000,000

 

    NEW SECTION.  Sec. 390.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Diverse Fish and Wildlife Population Health and Protection (02‑2‑004)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $     250,000

    Wildlife Account‑-State......................... $   1,200,000

                                                     -------------

           Subtotal Appropriation................... $   1,450,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  12,500,000

                                                     -------------

           TOTAL.................................... $  13,950,000

 

    NEW SECTION.  Sec. 391.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Commercial and Recreational Customer Satisfaction Improvements (02‑2‑006)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Warm Water Game Fish Account‑-State............. $     560,000

    Wildlife Account‑-State......................... $     500,000

                                                     -------------

           Subtotal Appropriation................... $   1,060,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   4,700,000

                                                     -------------

           TOTAL.................................... $   5,760,000

 

    NEW SECTION.  Sec. 392.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Watchable Fish and Wildlife and Recreation Sites (02-2-007)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Wildlife Account‑-State......................... $   1,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   7,628,000

                                                     -------------

           TOTAL.................................... $   8,628,000

 

    NEW SECTION.  Sec. 393.  FOR THE DEPARTMENT OF FISH AND WILDLIFE

    Partnership Improvements with Internal and External Customers (02‑2-008)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

    (2) Expenditures of the appropriation in this section for fencing shall comply with chapter 16.60 RCW.

 

Appropriation:

    General Fund‑-Federal........................... $   4,000,000

    General Fund‑-Private/Local..................... $   2,000,000

    Aquatic Lands Enhancement Account‑-State........ $     150,000

    State Building Construction Account‑-State...... $     400,000

    Game Special Wildlife Account‑-State.............            $ 50,000

    Game Special Wildlife Account‑-Federal.......... $   3,725,400

    Game Special Wildlife Account‑-Private/Local.... $      50,000

                                                     -------------

           Subtotal Appropriation................... $  10,375,400

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  46,824,700

                                                     -------------

           TOTAL.................................... $  57,200,100

 

    NEW SECTION.  Sec. 394.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Minor Works ‑ Programmatic (00‑2‑011)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    Forest Development Account‑‑State............... $     121,590

    Resources Management Cost Account‑‑State........ $     303,975

    State Building Construction Account‑‑State...... $     216,160

    Agricultural College Trust Management

           Account‑‑State........................... $      33,775

                                                     -------------

           Subtotal Reappropriation..................            $ 675,500

 

    Prior Biennia (Expenditures).................... $   1,296,090

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,971,590

 

    NEW SECTION.  Sec. 395.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Aquatic Lands Enhancement Grants (00‑2‑014)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    Aquatic Lands Enhancement Account‑‑State........ $   2,600,000

 

    Prior Biennia (Expenditures).................... $  10,179,070

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  12,779,070

 

    NEW SECTION.  Sec. 396.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Forest Legacy and Wetlands Conservation Grants (00‑2‑020)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    General Fund‑‑Federal........................... $   2,270,000

 

    Prior Biennia (Expenditures).................... $   8,322,980

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  10,592,980

 

    NEW SECTION.  Sec. 397.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Small Timber Landowner Program (00‑5‑001)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $   2,500,000

 

    Prior Biennia (Expenditures).................... $   2,500,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   5,000,000

 

    NEW SECTION.  Sec. 398.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Administrative Site Preservation (02‑1‑002)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Forest Development Account‑‑State............... $     239,580

    Resources Management Cost Account‑‑State........ $     317,687

    State Building Construction Account‑‑State...... $     380,920

    Agricultural College Trust Management

           Account‑‑State........................... $      66,550

                                                     -------------

           Subtotal Appropriation................... $   1,004,737

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)............ ... $   7,365,000

                                                     -------------

           TOTAL.................................... $   8,369,737

 

    NEW SECTION.  Sec. 399.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Real Estate Repair, Maintenance, and Tenant Improvements (02‑1‑005)

 

Appropriation:

    Resources Management Cost Account‑‑State........ $     146,923

 

    Prior Biennia (Expenditures).................... $     911,220

    Future Biennia (Projected Costs)................ $   3,065,000

                                                     -------------

           TOTAL.................................... $   4,123,143

 

    NEW SECTION.  Sec. 400.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Hazardous Waste Removal (02‑1‑006)

 

Appropriation:

    Forest Development Account‑‑State............... $      25,000

    Resources Management Cost Account‑‑State........ $      25,000

                                                     -------------

           Subtotal Appropriation................... $      50,000

 

    Prior Biennia (Expenditures).................... $     107,110

    Future Biennia (Projected Costs)................ $     200,000

                                                     -------------

           TOTAL.................................... $     357,110

 

 

    NEW SECTION.  Sec. 401.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Recreation Facilities Preservation (02‑1‑011)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $     340,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   6,200,000

                                                     -------------

           TOTAL.................................... $   6,540,000

 

    NEW SECTION.  Sec. 402.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Natural Area Facilities Preservation (02‑1‑016)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $     508,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   6,775,000

                                                     -------------

           TOTAL.................................... $   7,283,000

 

    NEW SECTION.  Sec. 403.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Agricultural Asset Preservation (02‑1‑017)

 

Appropriation:

    Resources Management Cost Account‑‑State........ $      53,041

 

    Prior Biennia (Expenditures).................... $     154,000

    Future Biennia (Projected Costs)................ $   1,620,000

                                                     -------------

           TOTAL.................................... $   1,827,041

 

    NEW SECTION.  Sec. 404.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Communication Site Repairs (02‑1‑024)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Forest Development Account‑‑State............... $     230,000

    Resources Management Cost Account‑‑State........ $     169,730

                                                     -------------

           Subtotal Appropriation................... $     399,730

 

    Prior Biennia (Expenditures).................... $     202,750

    Future Biennia (Projected Costs)................ $   1,220,000

                                                     -------------

           TOTAL.................................... $   1,822,480

 

    NEW SECTION.  Sec. 405.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Minor Works ‑ Programmatic (02‑2‑001)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Forest Development Account‑‑State............... $     136,620

    Resources Management Cost Account‑‑State........ $     181,161

    State Building Construction Account‑‑State...... $     242,880

    Agricultural College Trust Management

           Account‑‑State........................... $      37,950

                                                     -------------

           Subtotal Appropriation................... $     598,611

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   7,289,000

                                                     -------------

           TOTAL.................................... $   7,887,611

 

    NEW SECTION.  Sec. 406.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Small Timber Landowner Program (02‑2‑003)

 

Appropriation:

    State Building Construction Account‑‑State...... $   3,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  20,000,000

                                                     -------------

           TOTAL.................................... $  23,000,000

 

    NEW SECTION.  Sec. 407.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Right‑of‑Way Acquisition (02‑2‑007)

 

Appropriation:

    Forest Development Account‑‑State............... $     321,400

    Resources Management Cost Account‑‑State........ $     124,009

                                                     -------------

           Subtotal Appropriation................... $     445,409

 

    Prior Biennia (Expenditures).................... $   1,355,480

    Future Biennia (Projected Costs)................ $   5,248,000

                                                     -------------

           TOTAL.................................... $   7,048,889

 

    NEW SECTION.  Sec. 408.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Mineral Resource Testing (02‑2‑008)

 

Appropriation:

    Forest Development Account‑‑State............... $      11,900

    Resources Management Cost Account‑‑State........ $       6,100

                                                     -------------

           Subtotal Appropriation................... $      18,000

 

    Prior Biennia (Expenditures).................... $      18,000

    Future Biennia (Projected Costs)................ $     300,000

                                                     -------------

           TOTAL.................................... $     336,000

 

    NEW SECTION.  Sec. 409.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Commercial Development/Local Improvement Districts (02‑2‑009)

 

Appropriation:

    Resources Management Cost Account‑‑State........ $      90,000

 

    Prior Biennia (Expenditures).................... $     245,120

    Future Biennia (Projected Costs)................ $     450,000

                                                     -------------

           TOTAL.................................... $     785,120

 

    NEW SECTION.  Sec. 410.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Trust Land Transfer Program (02‑2‑010)

 

    The state building construction account appropriation in this section is subject to the following conditions and limitations:

    (1) The total appropriation is provided to the department solely to transfer from trust status or enter into thirty-year timber harvest restrictive easements for certain trust lands of state-wide significance deemed appropriate for state park, fish and wildlife habitat, natural area preserve, natural resources conservation area, open space, or recreation purposes.

    (2) Property transferred under this section shall be appraised and transferred at fair market value.  The value of the timber transferred shall be deposited by the department to the common school construction account in the same manner as timber revenues from other common school trust lands.  No deduction shall be made for the resource management cost account under RCW 79.64.040.  The value of the land transferred shall be deposited in the natural resources real property replacement account.  These funds shall be expended by the department for the exclusive purpose of acquiring real property of equal value to be managed as common school trust land.

    (3) Property subject to easement agreements under this section shall be appraised at fair market value both with and without the imposition of the easement.  The entire difference in appraised value shall be deposited by the department to the common school construction fund in the same manner as lease revenues from other common school trust lands.  No deduction shall be made for the resource management cost account under RCW 79.64.040.

    (4) All reasonable costs incurred by the department to implement this section are authorized to be paid out of this appropriation.  Authorized costs include the actual cost of appraisals, staff time, environmental reviews, surveys, and other similar costs.

    (5) Intergrant exchanges between common school and other trust lands of equal value may occur if the exchange is in the interest of each trust, as determined by the board of natural resources.

    (6) Prior to or concurrent with conveyance of these properties, the department, with full cooperation of the receiving agencies, shall execute and record a real property instrument that dedicates the transferred properties to the purposes identified in subsection (1) of this section for a minimum period of thirty years.  The department of natural resources, in consultation with the receiving state agencies, shall develop policy to address requests to replace transferred properties subject to the recorded property instrument that are no longer deemed appropriate for the purposes identified in subsection (1) of this section.

    (7) The department and receiving agencies shall work in good faith to carry out the intent of this section.  However, the department or receiving agencies may remove a property from the transfer list based on new, substantive information, if it is determined that transfer of the property is not in the statewide interest of either the common school trust or the receiving agency.

    (8) The department shall execute trust land transfers and easements such that 80 percent of the appropriation in this section is deposited in the common school construction fund.  To achieve the 80:20 ratio, the department may offset transfers of property with low timber-to-land ratios with easements on other properties.

    (9) On June 30, 2003, the state treasurer shall transfer all remaining uncommitted funds from this appropriation to the common school construction fund and the appropriation in this section shall be reduced by an equivalent amount.

 

Appropriation:

    Natural Resources Real Property

           Replacement‑‑State....................... $  10,000,000

    State Building Construction Account‑‑State...... $  50,000,000

                                                     -------------

           Subtotal Appropriation................... $  60,000,000

 

    Prior Biennia (Expenditures).................... $  97,587,060

    Future Biennia (Projected Costs)................ $ 280,000,000

                                                     -------------

           TOTAL.................................... $ 437,587,060

 

    NEW SECTION.  Sec. 411.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Natural Resources Real Property Replacement (02‑2‑012)

 

Appropriation:

    Natural Resources Real Property

           Replacement‑‑State....................... $  20,000,000

 

    Prior Biennia (Expenditures).................... $  15,139,050

    Future Biennia (Projected Costs)................ $ 160,000,000

                                                     -------------

           TOTAL.................................... $ 195,139,050

 

    NEW SECTION.  Sec. 412.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Land Bank (02‑2‑013)

 

Appropriation:

    Resources Management Cost Account‑‑State........ $   5,000,000

 

    Prior Biennia (Expenditures).................... $   2,000,000

    Future Biennia (Projected Costs)................ $  18,000,000

                                                     -------------

           TOTAL.................................... $  25,000,000

 

    NEW SECTION.  Sec. 413.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Community and Technical College Trust Land Acquisition (02‑2‑014)

 

Appropriation:

    Community and Technical College Forest Reserve

           Account‑‑State........................... $     200,000

 

    Prior Biennia (Expenditures).................... $     168,870

    Future Biennia (Projected Costs)................ $   3,500,000

                                                     -------------

           TOTAL.................................... $   3,868,870

 

    NEW SECTION.  Sec. 414.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Forest Legacy and Wetlands Conservation Grants (02‑2‑015)

 

Appropriation:

    General Fund‑‑Federal........................... $   5,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  21,500,000

                                                     -------------

           TOTAL.................................... $  26,500,000

 

    NEW SECTION.  Sec. 415.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Marine Station Public Access (02‑2‑019)

 

Appropriation:

    Resources Management Cost Account‑‑State........ $     175,034

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,500,000

                                                     -------------

           TOTAL.................................... $   1,675,034

 

    NEW SECTION.  Sec. 416.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Commencement Bay Freshwater Channel (02‑2‑020)

 

Appropriation:

    Aquatic Lands Enhancement Account‑‑State........ $   2,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,000,000

 

    NEW SECTION.  Sec. 417.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Mobile Radio System Upgrade (02‑2‑022)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Forest Development Account‑‑State............... $     239,900

    Resources Management Cost Account‑‑State........ $     398,400

    State Building Construction Account‑‑State...... $     500,000

                                                     -------------

           Subtotal Appropriation................... $   1,138,300

 

    Prior Biennia (Expenditures).................... $     783,500

    Future Biennia (Projected Costs)................ $   2,273,700

                                                     -------------

           TOTAL.................................... $   4,195,500

 

    NEW SECTION.  Sec. 418.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Riparian Open Space Program (02‑2‑023)

 

Appropriation:

    State Building Construction Account‑‑State...... $   1,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   4,000,000

                                                     -------------

           TOTAL.................................... $   5,000,000

 

    NEW SECTION.  Sec. 419.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Region Headquarters Modernization (02‑2‑025)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Forest Development Account‑‑State............... $      72,000

    State Building Construction Account‑‑State...... $     128,000

    Agricultural College Trust Management

           Account‑‑State........................... $      20,000

                                                     -------------

           Subtotal Appropriation................... $     220,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   8,800,000

                                                     -------------

           TOTAL.................................... $   9,020,000

 

    NEW SECTION.  Sec. 420.  FOR THE DEPARTMENT OF NATURAL RESOURCES

    Aquatic Lands Enhancement Grants (02‑4‑018)

 

    The appropriation in this section is provided for a list of projects in LEAP capital document No. . . . ., as developed on . . . . ., 2001, at . . . . ..

    The department shall submit a list of recommended projects to be funded from the aquatic lands enhancement account in the 2003‑2005 capital budget.  The list shall result from a competitive grants program developed by the department based upon, at a minimum:  A uniform criteria for the selection of projects and awarding of grants for up to fifty percent of the total project cost; local community support for the project; and a statewide geographic distribution of projects.  The list of projects shall be submitted to the office of financial management by September 15, 2002.

 

Appropriation:

    Aquatic Lands Enhancement Account‑‑State........ $   4,685,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  22,000,000

                                                     -------------

           TOTAL.................................... $  26,685,000

 

                              PART 4

                          TRANSPORTATION

 

    NEW SECTION.  Sec. 501.  FOR THE WASHINGTON STATE PATROL

    Seattle Crime Laboratory - New Forensic Laboratory (00-2-008)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   9,224,553

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   9,224,553

 

    NEW SECTION.  Sec. 502.  FOR THE WASHINGTON STATE PATROL

    Seattle Crime Laboratory - New Toxicology Laboratory (00-2-009)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   2,455,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,455,000

 

    NEW SECTION.  Sec. 503.  FOR THE WASHINGTON STATE PATROL

    Boarding Home Fire Safety Program (00-4-010)

 

    The reappropriation in this section is provided solely for grants for the installation or retrofit of fire sprinklers in licensed boarding homes.  The reappropriation in this section is subject to the following conditions and limitations:

    (1) The state fire marshal, in consultation with the department of social and health services, may develop rules to implement the grant program.

    (2) The amount of the grant for an existing licensed boarding home shall not be greater than the difference between the cost of retrofitting and the cost of installing sprinklers during original construction of a comparable licensed boarding home with fire sprinklers.

    (3) To be eligible for a grant under this section, the boarding home shall be licensed and accredited with the department of social and health services, at least fifteen percent of the boarding home's residents must be department of social and health services' clients, and the boarding home must maintain the department of social and health services' client ratio level for a period of no less than five years.  If the department of social and health services' client ratio level is not maintained, then the boarding home shall reimburse the state for the amount of the grant plus appropriate interest.

    (4) Any licensed boarding home receiving a grant shall complete the installation of the fire sprinklers by June 30, 2003.

 

Reappropriation:

    State Building Construction Account‑-State...... $   2,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,000,000

 

    NEW SECTION.  Sec. 504.  FOR THE WASHINGTON STATE PATROL

    Fire Training Academy - Preservation (02-1-006)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $     200,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,000,000

                                                     -------------

           TOTAL.................................... $   1,200,000

 

    NEW SECTION.  Sec. 505.  FOR THE WASHINGTON STATE PATROL

    Vancouver Crime Laboratory - Acquire Land/Predesign (02-2-010)

 

Appropriation:

    State Building Construction Account‑-State...... $     500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   7,400,000

                                                     -------------

           TOTAL.................................... $   7,900,000

 

    NEW SECTION.  Sec. 506.  FOR THE WASHINGTON STATE PATROL

    Spokane Crime Laboratory - Acquire Land for Crime Laboratory (02‑2‑013)

 

Appropriation:

    State Building Construction Account‑-State...... $     400,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   7,950,000

                                                     -------------

           TOTAL............. ...................... $   8,350,000

 

                              PART 5

                             EDUCATION

 

    NEW SECTION.  Sec. 601.  FOR THE STATE BOARD OF EDUCATION

    Public School Building Construction (00-2-001)

 

Reappropriation:

    State Building Construction Account‑-State...... $     100,000

    Common School Construction Account‑-State........            $    150,000,000

                                                     -------------

           Subtotal Reappropriation..................            $    150,100,000

 

    Prior Biennia (Expenditures).................... $ 588,570,973

    Future Biennia (Projected Costs)... ............ $           0

                                                     -------------

           TOTAL.................................... $ 738,670,973

 

    NEW SECTION.  Sec. 602.  FOR THE STATE BOARD OF EDUCATION

    State School Construction Assistance Grants (02-4-001)

 

    The appropriation in this section is subject to the following conditions and limitations:  (1) $200,000 from this appropriation is provided to fund up to two FTEs in the office of state fire marshal to exclusively review K‑12 construction documents for fire and life safety in accordance with the state building code.  It is the intent of this appropriation to provide these services only to those districts that are located in counties without qualified review capabilities.

 

Appropriation:

    Common School Construction Account‑-State...                 $    386,996,729

 

    Prior Biennia (Expenditures)............... $                0

    Future Biennia (Projected Costs)........... $    1,831,522,031

                                                     -------------

           TOTAL............................... $    2,218,518,760

 

    NEW SECTION.  Sec. 603.  FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION

    State School Construction Assistance Program Staff (02-4-001)

 

Appropriation:

    Common School Construction Account‑-State...                 $    1,930,989

 

    Prior Biennia (Expenditures)............... $        3,457,312

    Future Biennia (Projected Costs)........... $        9,554,976

                                                     -------------

           TOTAL............................... $       14,943,277

 

    NEW SECTION.  Sec. 604.  FOR THE STATE SCHOOL FOR THE BLIND

    Old Main and Alhsten Buildings, HVAC:  Upgrade (00-1-002)

 

Reappropriation:

    State Building Construction Account‑-State...... $     500,000

 

    Prior Biennia (Expenditures).................... $   1,414,160

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,914,160

 

    NEW SECTION.  Sec. 605.  FOR THE STATE SCHOOL FOR THE BLIND

    Irwin, Old Main, Kennedy, and Dry Building Preservation (02-1-001)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   1,981,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,981,000

 

    NEW SECTION.  Sec. 606.  FOR THE STATE SCHOOL FOR THE BLIND

    School for the Blind:  Campus Preservation (02-1-002)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $     600,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   3,060,000

                                                     -------------

           TOTAL.................................... $   3,660,000

 

    NEW SECTION.  Sec. 607.  FOR THE STATE SCHOOL FOR THE BLIND

    Alsten Material Center and Braille Production (02-2-003)

 

    The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   2,341,278

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,341,278

 

    NEW SECTION.  Sec. 608.  FOR THE STATE SCHOOL FOR THE BLIND

    Distance Learning Center (02-2-004)

 

    The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   2,789,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,789,000

 

    NEW SECTION.  Sec. 609.  FOR THE STATE SCHOOL FOR THE DEAF

    Clark Hall/Lloyd:  Upgrade (00-1-006)

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,285,000

 

    Prior Biennia (Expenditures).................... $     115,000

    Future Biennia (Projected Costs)................ $     325,000

                                                     -------------

           TOTAL.................................... $   1,725,000

 

    NEW SECTION.  Sec. 610.  FOR THE STATE SCHOOL FOR THE DEAF

    Clark Hall/Lloyd:  Seismic Stabilization (02-1-008)

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,100,000

 

    Prior Biennia (Expenditures).................... $     300,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,400,000

 

    NEW SECTION.  Sec. 611.  FOR THE STATE SCHOOL FOR THE DEAF

    School for the Deaf:  Campus Preservation (02-1-001)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   1,760,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,759,000

                                                     -------------

           TOTAL.................................... $   3,519,000

 

    NEW SECTION.  Sec. 612.  FOR THE STATE SCHOOL FOR THE DEAF

    School for the Deaf:  Phase 2B (02-2-001)

 

    The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   3,500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  16,616,000

                                                     -------------

           TOTAL.................................... $  20,116,000

 

    NEW SECTION.  Sec. 613.  FOR THE UNIVERSITY OF WASHINGTON

    Classroom Improvements and Minor Works (00-1-001)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.  This reappropriation is a combination of section 616, chapter 379, Laws of 1999, and section 1036, chapter 1, Laws of 2000 2nd sp. sess.

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,773,674

    University of Washington Building

           Account‑-State........................... $  23,760,694

                                                     -------------

           Subtotal Reappropriation..................            $    25,534,368

 

    Prior Biennia (Expenditures).................... $   1,252,792

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  26,787,160

 

    NEW SECTION.  Sec. 614.  FOR THE UNIVERSITY OF WASHINGTON

    UW Bothell 2A/Cascadia Community College (00-2-015)

 

Reappropriation:

    State Building Construction Account‑-State...... $  36,860,685

 

    Prior Biennia (Expenditures).................... $  13,239,315

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  50,100,000

 

    NEW SECTION.  Sec. 615.  FOR THE UNIVERSITY OF WASHINGTON

    Tacoma Branch Campus Phase 2A (00-2-017)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 902, 903, 904, and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $  35,364,085

 

    Prior Biennia (Expenditures).................... $   4,505,915

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  39,870,000

 

    NEW SECTION.  Sec. 616.  FOR THE UNIVERSITY OF WASHINGTON

    Tacoma Branch Campus Phase 3 (00-2-021)

 

Reappropriation:

    State Building Construction Account‑-State...... $     479,996

 

    Prior Biennia (Expenditures).................... $      20,004

    Future Biennia (Projected Costs)................ $  69,846,000

                                                     -------------

           TOTAL.................................... $  70,346,000

 

    NEW SECTION.  Sec. 617.  FOR THE UNIVERSITY OF WASHINGTON

    UW Tacoma Land Acquisition (01-2-029)

 

Appropriation:

    Education Construction Account‑-State........... $   4,000,000

 

    Prior Biennia (Expenditures)........... ........ $   2,500,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,500,000

 

    NEW SECTION.  Sec. 618.  FOR THE UNIVERSITY OF WASHINGTON

    UW Emergency Power Expansion - Phase I (02-1-009)

 

Appropriation:

    State Building Construction Account‑-State...... $   4,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   6,000,000

                                                     -------------

           TOTAL.................................... $  10,000,000

 

    NEW SECTION.  Sec. 619.  FOR THE UNIVERSITY OF WASHINGTON

    UW Wire Plant Upgrade (02-1-011)

 

Appropriation:

    State Building Construction Account‑-State...... $   5,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  20,000,000

                                                     -------------

           TOTAL....................... ............ $  25,000,000

 

    NEW SECTION.  Sec. 620.  FOR THE UNIVERSITY OF WASHINGTON

    Special Projects - Code Requirements (02-1-025)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Education Construction Account‑-State........... $   2,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   4,000,000

                                                     -------------

           TOTAL.................................... $   6,000,000

 

    NEW SECTION.  Sec. 621.  FOR THE UNIVERSITY OF WASHINGTON

    Minor Repairs Programs (02-1-026)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   1,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   4,000,000

                                                     -------------

           TOTAL.................................... $   5,000,000

 

    NEW SECTION.  Sec. 622.  FOR THE UNIVERSITY OF WASHINGTON

    Deferred Renewal/Modernization/Current Access (02-1-031)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    University of Washington Building

           Account‑-State........................... $   6,000,000

           Education Construction Account‑-State.... $   1,000,000

                                                     -------------

           Subtotal Appropriation................... $   7,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  62,000,000

                                                     -------------

           TOTAL.................................... $  69,000,000

 

    NEW SECTION.  Sec. 623.  FOR THE UNIVERSITY OF WASHINGTON

    UW Tacoma - Technology Institute (02-1-150)

 

    This appropriation is being made as part of an assumed $4,550,000 total equipment capitalization plan.  The state share will be released once at least $3,000,000 in nonstate matching contributions have been raised.

 

Appropriation:

    Education Construction Account‑-State........... $     550,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     550,000

 

    NEW SECTION.  Sec. 624.  FOR THE UNIVERSITY OF WASHINGTON

    UW Bothell Phase 2B Offramp (02-2-014)

 

Appropriation:

    State Building Construction Account‑-State...... $   2,500,000

 

    Prior Biennia (Expenditures)........... ........ $           0

    Future Biennia (Projected Costs)................ $   9,650,000

                                                     -------------

           TOTAL.................................... $  12,150,000

 

    NEW SECTION.  Sec. 625.  FOR THE UNIVERSITY OF WASHINGTON

    UW Computer Science and Electrical Engineering Phase 3 (02-2-023)

 

    The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   7,300,000

Appropriation:

    State Building Construction Account‑-State...... $   2,700,000

 

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  10,000,000

 

    NEW SECTION.  Sec. 626.  FOR THE UNIVERSITY OF WASHINGTON

    UW Tacoma Phase 2B (02-2-027)

 

    The appropriation in this section is subject to the conditions and limitations of sections 902, 903, and 904 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $  41,899,000

 

    Prior Biennia (Expenditures).................... $   3,450,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  45,349,000

 

    NEW SECTION.  Sec. 627.  FOR THE UNIVERSITY OF WASHINGTON

    UW Bio-Sciences Research (02-2-028)

 

    The appropriation in this section is subject to the University of Washington providing sufficient evidence to the office of financial management of local revenue to support issuance of bonded debt and accompanying debt service associated with this project.

 

Appropriation:

    Higher Education Construction Account‑-State.... $  29,025,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  29,025,000

 

    NEW SECTION.  Sec. 628.  FOR THE UNIVERSITY OF WASHINGTON

    Suzzallo Library Renovation (94-1-015)

 

    The appropriations in this section are subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $  38,661,868

Appropriation:

    State Building Construction Account‑-State...... $   4,563,375

 

    Prior Biennia (Expenditures).................... $   3,700,007

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  46,925,250

 

    NEW SECTION.  Sec. 629.  FOR THE UNIVERSITY OF WASHINGTON

    New Law School Building (94-2-017)

 

Reappropriation:

    Higher Education Construction Account‑-State.... $  44,801,500

    Higher Education Non-Proprietary Local Capital

           Accounts‑-Private/Local.................. $  24,186,000

                                                     -------------

           Subtotal Reappropriation..................            $    68,987,500

 

    Prior Biennia (Expenditures).................... $   1,274,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  70,261,500

 

    NEW SECTION.  Sec. 630.  FOR THE UNIVERSITY OF WASHINGTON

    Health Science Center BB Tower Elevators (96-1-007)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   6,259,910

    University of Washington Building

           Account‑-State........................... $      93,100

                                                     -------------

           Subtotal Reappropriation..................            $    6,353,010

 

    Prior Biennia (Expenditures).................... $     156,982

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL............. ...................... $   6,509,992

 

    NEW SECTION.  Sec. 631.  FOR THE UNIVERSITY OF WASHINGTON

    Bothell/Cascadia Community College Phase I (98-2-899)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   3,487,854

 

    Prior Biennia (Expenditures).................... $  42,484,284

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  45,972,138

 

    NEW SECTION.  Sec. 632.  FOR THE UNIVERSITY OF WASHINGTON

    Nuclear Reactor Decommissioning (99-1-009)

 

    The appropriations in this section are subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,147,874

Appropriation:

    State Building Construction Account‑-State...... $   4,633,273

 

    Prior Biennia (Expenditures).................... $     303,885

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,085,032

 

    NEW SECTION.  Sec. 633.  FOR THE UNIVERSITY OF WASHINGTON

    UW Medical Center Improvements (99-2-010)

 

Reappropriation:

    Higher Education Construction Account‑-State.... $  43,977,711

 

    Prior Biennia (Expenditures).................... $  36,022,289

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  80,000,000

 

    NEW SECTION.  Sec. 634.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Minor Works:  Safety and Environmental Projects (00‑1‑001)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     500,000

 

    Prior Biennia (Expenditures).................... $   1,500,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,000,000

 

    NEW SECTION.  Sec. 635.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Minor Works - Preservation:  Reappropriation (00‑1‑004)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     900,000

    Washington State University Building

           Account‑-State........................... $   1,500,000

                                                     -------------

           Subtotal Reappropriation..................            $    2,400,000

 

    Prior Biennia (Expenditures).................... $   3,600,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,000,000

 

    NEW SECTION.  Sec. 636.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Americans with Disabilities Act Projects:  Reappropriation (00-1-011)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      65,000

 

    Prior Biennia (Expenditures).................... $      32,374

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $      97,374

 

    NEW SECTION.  Sec. 637.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Child Care Facility:  Renovation (00-1-039)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    Washington State University Building

           Account‑-State........................... $   1,500,000

 

    Prior Biennia (Expenditures).................... $   1,600,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   3,100,000

 

    NEW SECTION.  Sec. 638.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Scholars Hall/White Hall Renovation:  Renovation (00‑1‑078)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   3,165,000

    Institutions of Higher Education - Housing

           and Food Account‑-Private/Local.......... $   2,800,000

                                                     -------------

           Subtotal Reappropriation..................            $    5,965,000

 

    Prior Biennia (Expenditures).................... $   9,335,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  15,300,000

 

    NEW SECTION.  Sec. 639.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Power Plant Emergency Appropriation (00-1-502)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    Education Construction Account‑-State........... $     250,000

 

    Prior Biennia (Expenditures).................... $   3,350,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   3,600,000

 

    NEW SECTION.  Sec. 640.  FOR WASHINGTON STATE UNIVERSITY

    WSU Branch Campuses - Minor Works:  Branch Campuses (00-1-901)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    Washington State University Building

           Account‑-State........................... $     700,000

 

    Prior Biennia (Expenditures).................... $     300,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,000,000

 

    NEW SECTION.  Sec. 641.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Minor Works Program:  Reappropriation (00‑2‑002)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    Washington State University Building

           Account‑-State........................... $   3,000,000

 

    Prior Biennia (Expenditures).................... $   2,000,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   5,000,000

 

    NEW SECTION.  Sec. 642.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Equipment Omnibus Acquisition:  Reappropriation (00‑2‑003)

 

Reappropriation:

    Washington State University Building

           Account‑-State........................... $     100,000

 

    Prior Biennia (Expenditures).................... $   3,400,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   3,500,000

 

    NEW SECTION.  Sec. 643.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Johnson Hall Addition-Plant BioScience Building:  New (00-2-007)

 

    The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.

 

Reappropriation:

    Washington State University Building

           Account‑-State........................... $      97,142

Appropriation:

    State Building Construction Account‑-State...... $   3,500,000

 

    Prior Biennia (Expenditures).................... $     202,858

    Future Biennia (Projected Costs)................ $  45,200,000

                                                     -------------

           TOTAL.................................... $  49,000,000

 

    NEW SECTION.  Sec. 644.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Shock Physics Building:  New Facility (00-2-080)

 

    The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,100,000

Appropriation:

    State Building Construction Account‑-State...... $   3,540,000

    Washington State University Building

           Account‑-State........................... $   7,100,000

                                                     -------------

           Subtotal Appropriation................... $  10,640,000

 

    Prior Biennia (Expenditures).................... $     660,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  12,400,000

 

    NEW SECTION.  Sec. 645.  FOR WASHINGTON STATE UNIVERSITY

    WSU Vancouver - Engineering and Life Sciences Building:  New Facility (00-2-904)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   4,000,000

 

    Prior Biennia (Expenditures).................... $  25,470,650

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  29,470,650

 

    NEW SECTION.  Sec. 646.  FOR WASHINGTON STATE UNIVERSITY

    WSU Vancouver - Student Services Center:  New Facility (00-2-905)

 

    The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      25,000

Appropriation:

    State Building Construction Account‑-State...... $   1,500,000

 

    Prior Biennia (Expenditures).................... $      30,000

    Future Biennia (Projected Costs)................ $  14,001,000

                                                     -------------

           TOTAL.................................... $  15,556,000

 

    NEW SECTION.  Sec. 647.  FOR WASHINGTON STATE UNIVERSITY

    WSU Spokane Riverpoint - Academic Center Building:  New Facility (00-2-906)

 

    The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      33,723

Appropriation:

    State Building Construction Account‑-State...... $   2,271,000

 

    Prior Biennia (Expenditures).................... $     216,277

    Future Biennia (Projected Costs)................ $  42,729,000

                                                     -------------

           TOTAL.................................... $  45,250,000

 

    NEW SECTION.  Sec. 648.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Minor Capital Safety/Environmental (02-1-001)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Education Construction Account‑-State........... $   1,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   4,000,000

                                                     -------------

           TOTAL.................................... $   5,000,000

 

    NEW SECTION.  Sec. 649.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Minor Capital Preservation/Renewal (02-1-004)

 

    The appropriation in this section is subject to the conditions and limitations of section 905 of this act.

 

Appropriation:

    Washington State University Building

           Account‑-State........................... $   3,775,000

    Education Construction Account‑-State........... $   3,000,000

                                                     -------------

           Subtotal Appropriation................... $   6,775,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  28,000,000

                                                     -------------

           TOTAL.................................... $  34,775,000

 

    NEW SECTION.  Sec. 650.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Campus Infrastructure:  Preservation (02-1-073)

 

    The appropriation in this section is subject to the conditions and limitations of section 905 of this act.

 

Appropriation:

    Washington State University Building

           Account‑-State........................... $   1,019,300

    State Building Construction Account‑-State...... $  10,460,000

                                                     -------------

           Subtotal Appropriation................... $  11,479,300

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  24,000,000

                                                     -------------

           TOTAL.................................... $  35,479,300

 

    NEW SECTION.  Sec. 651.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Energy Plant - Heat:  Renovation (02-1-501)

 

    The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $  23,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  23,000,000

 

    NEW SECTION.  Sec. 652.  FOR WASHINGTON STATE UNIVERSITY

    WSU Branch Campuses - Minor Capital Projects (02-1-901)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Washington State University Building

           Account‑-State........................... $   1,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   4,000,000

                                                     -------------

           TOTAL.................................... $   5,000,000

 

    NEW SECTION.  Sec. 653.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Minor Capital Improvements (02-2-002)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Washington State University Building

           Account‑-State........................... $   6,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  28,000,000

                                                     -------------

           TOTAL.................................... $  34,000,000

 

    NEW SECTION.  Sec. 654.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - WSUnet Infrastructure (02-2-074)

 

Appropriation:

    Washington State University Building

           Account‑-State........................... $   4,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  18,000,000

                                                     -------------

           TOTAL.................................... $  22,000,000

 

    NEW SECTION.  Sec. 655.  FOR WASHINGTON STATE UNIVERSITY

    WSU Vancouver - Multimedia/Electronic Communication Classroom Building:  (02-2-907)

 

    The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $  15,900,000

 

    Prior Biennia (Expenditures).................... $     600,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  16,500,000

 

    NEW SECTION.  Sec. 656.  FOR WASHINGTON STATE UNIVERSITY

    WSU Vancouver - Business and Education Building:  New Facility (00‑2‑935)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      62,981

 

    Prior Biennia (Expenditures).................... $     132,019

    Future Biennia (Projected Costs)................ $  31,562,600

                                                     -------------

           TOTAL.................................... $  31,757,600

 

    NEW SECTION.  Sec. 657.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Compton Union Building Renovation:  Renovation (02‑1‑066)

 

    The appropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Appropriation:

    Washington State University Building

           Account‑-State................... ........ $     346,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  44,654,000

                                                     -------------

           TOTAL.................................... $  45,000,000

 

    NEW SECTION.  Sec. 658.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Bohler Renovation:  Renovation (94-1-010)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    Washington State University Building

           Account‑-State........................... $     200,000

 

    Prior Biennia (Expenditures).................... $  20,232,369

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  20,432,369

 

    NEW SECTION.  Sec. 659.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Kimbrough Hall Renovation/Addition:  Renovation (94‑1‑019)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     100,000

    Washington State University Building

           Account‑-State........................... $     121,875

                                                     -------------

           Subtotal Reappropriation..................            $ 221,875

 

    Prior Biennia (Expenditures).................... $  11,511,125

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  11,733,000

 

    NEW SECTION.  Sec. 660.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Infrastructure:  Savings (94-1-999)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     500,000

 

    Prior Biennia (Expenditures).................... $     211,465

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     711,465

 

    NEW SECTION.  Sec. 661.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Hazardous Waste Facilities - Statewide:  New (94‑2‑006)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    Washington State University Building

           Account‑-State........................... $   2,450,000

 

    Prior Biennia (Expenditures).................... $   2,261,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,711,000

 

    NEW SECTION.  Sec. 662.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Education Addition (Cleveland):  New Facility (97‑2‑001)

 

Reappropriation:

    State Building Construction Account‑-State...... $     600,000

 

    Prior Biennia (Expenditures).................... $     940,000

    Future Biennia (Projected Costs)... ............ $  10,210,000

                                                     -------------

           TOTAL.................................... $  11,750,000

 

    NEW SECTION.  Sec. 663.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Murrow Hall Addition:  New Facility (97-2-008)

 

    The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,000,000

Appropriation:

    State Building Construction Account‑-State...... $  10,910,000

 

    Prior Biennia (Expenditures).................... $     755,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  12,665,000

 

    NEW SECTION.  Sec. 664.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Campus Infrastructure:  Preservation (98-1-073)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    Washington State University Building

           Account‑-State.... ...................... $   3,000,000

 

    Prior Biennia (Expenditures).................... $   8,842,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  11,842,000

 

    NEW SECTION.  Sec. 665.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - South Campus Electrical Substation:  New (98-2-044)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     200,000

 

    Prior Biennia (Expenditures).................... $   2,700,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,900,000

 

    NEW SECTION.  Sec. 666.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Teaching and Learning Center:  New Facility (98‑2‑062)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   4,000,000

 

    Prior Biennia (Expenditures).................... $  27,574,500

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  31,574,500

 

    NEW SECTION.  Sec. 667.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Apparel, Merchandizing, Interior Design, and Landscape Architecture Building:  New Facility (98-2-072)

 

Reappropriation:

    State Building Construction Account‑-State...... $   2,246,245

 

    Prior Biennia (Expenditures).................... $     631,755

    Future Biennia (Projected Costs)................ $  27,850,000

                                                     -------------

           TOTAL.................................... $  30,728,000

 

    NEW SECTION.  Sec. 668.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - WSUnet Infrastructure (98-2-074)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    Washington State University Building

           Account‑-State........................... $     100,000

 

    Prior Biennia (Expenditures).................... $   6,975,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   7,075,000

 

    NEW SECTION.  Sec. 669.  FOR WASHINGTON STATE UNIVERSITY

    WSU Spokane - Health Sciences Building:  New Facility (98-2-903)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Higher Education Construction

           Account‑-State........................... $  14,400,000

 

    Prior Biennia (Expenditures).................... $  21,300,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  35,700,000

 

    NEW SECTION.  Sec. 670.  FOR WASHINGTON STATE UNIVERSITY

    WSU Vancouver - Phase 2 Construction (98-2-911)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   2,500,000

 

    Prior Biennia (Expenditures).................... $  10,565,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  13,065,000

 

    NEW SECTION.  Sec. 671.  FOR WASHINGTON STATE UNIVERSITY

    WSU Pullman - Equipment Omnibus Appropriation (02-2-003)

 

    For the purchase of equipment to improve, upgrade, or replace necessary instructional and research apparatus throughout the university.

 

Appropriation:

    Washington State University Building

           Account‑-State........................... $   8,000,000

 

    Prior Biennia (Expenditures).. ................. $           0

    Future Biennia (Projected Costs)................ $  32,000,000

                                                     -------------

           TOTAL.................................... $  40,000,000

 

    NEW SECTION.  Sec. 672.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Senior Hall Design (00-1-003)

 

    The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      43,000

Appropriation:

    State Building Construction Account‑-State.. ... $   1,211,000

 

 

    Prior Biennia (Expenditures).................... $      57,000

    Future Biennia (Projected Costs)................ $  13,999,000

                                                     -------------

           TOTAL.................................... $  15,310,000

 

    NEW SECTION.  Sec. 673.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Minor Works Programs (00-2-002)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    Eastern Washington University Capital Projects

           Account‑-State........................... $   1,210,000

 

    Prior Biennia (Expenditures).................... $     980,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,190,000

 

    NEW SECTION.  Sec. 674.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Childcare Center (00-2-003)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      47,000

    Eastern Washington University Capital Projects

           Account‑-State........................... $     396,000

                                                     -------------

           Subtotal Reappropriation..................            $ 443,000

 

    Prior Biennia (Expenditures).................... $     696,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,139,000

 

    NEW SECTION.  Sec. 675.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Cheney Hall - Design (00-2-009)

 

    The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.

 

Reappropriation:

    Eastern Washington University Capital Projects

           Account‑-State........................... $     225,000

Appropriation:

    State Building Construction Account‑-State...... $   3,600,000

 

    Prior Biennia (Expenditures).................... $      75,000

    Future Biennia (Projected Costs)................ $  19,000,000

                                                     -------------

           TOTAL.................................... $  22,900,000

 

    NEW SECTION.  Sec. 676.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Infrastructure Preservation (02-1-002)

 

    The appropriation in this section is subject to the conditions and limitations of section 905 of this act.

 

Appropriation:

    Education Construction Account‑-State........... $   5,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  21,000,000

                                                     -------------

           TOTAL.................................... $  26,000,000

 

    NEW SECTION.  Sec. 677.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Minor Works Preservation (02-1-003)

 

    The appropriations in this section are subject to the conditions and limitations of section 905 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      74,000

    Eastern Washington University Capital Projects

           Account‑-State........................... $   1,375,000

                                                     -------------

           Subtotal Reappropriation..................            $    1,449,000

 

Appropriation:

    State Building Construction Account‑-State...... $   2,000,000

    Eastern Washington University Capital Projects

           Account‑-State........................... $   4,000,000

                                                     -------------

           Subtotal Appropriation................... $   6,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  21,000,000

                                                     -------------

           TOTAL................................ ... $  28,449,000

 

    NEW SECTION.  Sec. 678.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Roof Replacement 2001 (02-1-004)

 

Appropriation:

    State Building Construction Account‑-State...... $   2,619,000

 

    Prior Biennia (Expenditures).................... $   2,425,000

    Future Biennia (Projected Costs)................ $   6,000,000

                                                     -------------

           TOTAL.................................... $  11,044,000

 

    NEW SECTION.  Sec. 679.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU HVAC Systems Upgrade (02-1-007)

 

Appropriation:

    State Building Construction Account‑-State...... $   3,000,000

 

    Prior Biennia (Expenditures).................... $     793,000

    Future Biennia (Projected Costs)................ $   5,500,000

                                                     -------------

           TOTAL.................................... $   9,293,000

 

    NEW SECTION.  Sec. 680.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Water System Preservation and Expansion (02-1-008)

 

Appropriation:

    State Building Construction Account‑-State...... $   2,236,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   7,500,000

                                                     -------------

           TOTAL.................................... $   9,736,000

 

    NEW SECTION.  Sec. 681.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Property Acquisition (02-2-001)

 

Appropriation:

    Eastern Washington University Capital Projects

           Account‑-State........................... $     650,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,000,000

                                                     -------------

           TOTAL.................................... $   1,650,000

 

    NEW SECTION.  Sec. 682.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Campus Network Upgrade (02-2-004)

 

Appropriation:

    State Building Construction Account‑-State...... $   2,500,000

 

    Prior Biennia (Expenditures).................... $   1,000,000

    Future Biennia (Projected Costs)................ $   4,000,000

                                                     -------------

           TOTAL.................................... $   7,500,000

 

    NEW SECTION.  Sec. 683.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Tawanka Improvements (02-2-006)

 

    The appropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   2,000,000

    Eastern Washington University Capital Projects

           Account‑-State........................... $   1,196,000

                                                     -------------

           Subtotal Appropriation................... $   3,196,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   3,196,000

 

    NEW SECTION.  Sec. 684.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Classroom Renewal (02-2-007)

 

    The appropriation in this section is subject to the conditions and limitations of section 905 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   1,566,000

    Eastern Washington University Capital Projects

           Account‑-State........................... $     800,000

                                                     -------------

           Subtotal Appropriation................... $   2,366,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  13,400,000

                                                     -------------

           TOTAL.................................... $  15,766,000

 

    NEW SECTION.  Sec. 685.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Minor Works Programs (02-2-008)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $     515,000

    Eastern Washington University Capital Projects

           Account‑-State........................... $   1,985,000

                                                     -------------

           Subtotal Appropriation................... $   2,500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  10,800,000

                                                     -------------

           TOTAL................................ ... $  13,300,000

 

    NEW SECTION.  Sec. 686.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Monroe Hall Renovation (96-1-002)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   2,617,000

    Eastern Washington University Capital Projects

           Account‑-State........................... $     125,000

                                                     -------------

           Subtotal Reappropriation..................            $    2,742,000

 

    Prior Biennia (Expenditures).................... $   5,514,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   8,256,000

 

    NEW SECTION.  Sec. 687.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Classroom Renewal (96-2-001)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    Eastern Washington University Capital Projects

           Account‑-State........................... $     150,000

 

    Prior Biennia (Expenditures).................... $   1,350,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,500,000

 

    NEW SECTION.  Sec. 688.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Water System Preservation and Expansion (98-1-002)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    Eastern Washington University Capital Projects

           Account‑-State........................... $     615,000

 

    Prior Biennia (Expenditures).................... $     265,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     880,000

 

    NEW SECTION.  Sec. 689.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Infrastructure Preservation (98-1-007)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     725,000

 

    Prior Biennia (Expenditures).................... $     275,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,000,000

 

    NEW SECTION.  Sec. 690.  FOR EASTERN WASHINGTON UNIVERSITY

    EWU Boiler Plant Expansion/Upgrade (98-1-011)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   4,695,000

 

    Prior Biennia (Expenditures).................... $   2,030,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,725,000

 

    NEW SECTION.  Sec. 691.  FOR CENTRAL WASHINGTON UNIVERSITY

    Minor Works Preservation (00-1-120)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    Central Washington University Capital Projects

           Account‑-State........................... $     750,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     750,000

 

    NEW SECTION.  Sec. 692.  FOR CENTRAL WASHINGTON UNIVERSITY

    Music Facility (00-2-001)

 

Reappropriation:

    State Building Construction Account‑-State...... $   2,000,000

 

    Prior Biennia (Expenditures).................... $   2,425,000

    Future Biennia (Projected Costs)................ $  25,000,000

                                                     -------------

           TOTAL.................................... $  29,425,000

 

    NEW SECTION.  Sec. 693.  FOR CENTRAL WASHINGTON UNIVERSITY

    Minor Works Program (00-2-110)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    Central Washington University Capital Projects

           Account‑-State........................... $     750,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     750,000

 

    NEW SECTION.  Sec. 694.  FOR CENTRAL WASHINGTON UNIVERSITY

    Fiber Optic Backbone Upgrade (00-2-130)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    Central Washington University Capital Projects

           Account‑-State........................... $     150,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     150,000

 

    NEW SECTION.  Sec. 695.  FOR CENTRAL WASHINGTON UNIVERSITY

    Omnibus Preservation (02-1-001)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Central Washington University Capital Projects

           Account‑-State........................... $   4,175,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  17,471,000

                                                     -------------

           TOTAL.................................... $  21,646,000

 

    NEW SECTION.  Sec. 696.  FOR CENTRAL WASHINGTON UNIVERSITY

    Infrastructure Savings (02-1-002)

 

    Projects that are completed in accordance with section 915 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

 

Appropriation:

    State Building Construction Account‑-State...... $           1

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $           1

 

    NEW SECTION.  Sec. 697.  FOR CENTRAL WASHINGTON UNIVERSITY

    Randall/Michaelsen Life Safety and Mechanical System Improvements (02-1-003)

 

    The appropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Appropriation:

    Education Construction Account‑-State........... $   3,800,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   3,800,000

 

    NEW SECTION.  Sec. 698.  FOR CENTRAL WASHINGTON UNIVERSITY

    McConnell Stage and Classroom Remodel (02-1-004)

 

    The appropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   2,100,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,100,000

 

    NEW SECTION.  Sec. 699.  FOR CENTRAL WASHINGTON UNIVERSITY

    Omnibus - Program (02-2-002)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Central Washington University Capital Projects

           Account‑-State........................... $   4,200,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  12,559,000

                                                     -------------

           TOTAL.................................... $  16,759,000

 

    NEW SECTION.  Sec. 700.  FOR CENTRAL WASHINGTON UNIVERSITY

    CWU/Highline Higher Education Center (02-2-101)

 

    The appropriation in this section is contingent on an approved plan to increase enrollment at Central Washington University.  The appropriation in this section is also subject to the conditions and limitations of sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   2,500,000

 

    Prior Biennia (Expenditures).................... $      75,000

    Future Biennia (Projected Costs)................ $  10,000,000

                                                     -------------

           TOTAL.................................... $  12,575,000

 

    NEW SECTION.  Sec. 701.  FOR CENTRAL WASHINGTON UNIVERSITY

    Steam/Electric/Chilled Water/Fiber Optic (98-1-120)

 

    The appropriations in this section are subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,000,000

Appropriation:

    State Building Construction Account‑-State...... $   6,000,000

    Education Construction Account‑-State........... $   2,000,000

                                                     -------------

           Subtotal Appropriation................... $   8,000,000

 

    Prior Biennia (Expenditures).................... $   7,517,812

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  16,517,812

 

    NEW SECTION.  Sec. 702.  FOR CENTRAL WASHINGTON UNIVERSITY

    Lynnwood Higher Education Center (98-2-080)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 902, 903, and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   4,000,000

    Central Washington University Capital Projects

           Account‑-State........................... $   1,000,000

                                                     -------------

           Subtotal Reappropriation..................            $    5,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   5,000,000

 

    NEW SECTION.  Sec. 703.  FOR THE EVERGREEN STATE COLLEGE

    Minor Works Preservation Reappropriation (00-1-002)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    The Evergreen State College Capital Projects

           Account‑-State...................... $          250,000

 

    Prior Biennia (Expenditures)............... $                0

    Future Biennia (Projected Costs)........... $                0

                                                     -------------

           TOTAL............................... $          250,000

 

    NEW SECTION.  Sec. 704.  FOR THE EVERGREEN STATE COLLEGE

    Emergency Repairs (02-1-003)

 

Appropriation:

    The Evergreen State College Capital Projects

           Account‑-State...................... $          560,000

 

    Prior Biennia (Expenditures)............... $                0

    Future Biennia (Projected Costs)........... $        2,700,000

                                                     -------------

           TOTAL............................... $        3,260,000

 

    NEW SECTION.  Sec. 705.  FOR THE EVERGREEN STATE COLLEGE

    Life Safety/Code Compliance (02-1-013)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    The Evergreen State College Capital Projects

           Account‑-State...................... $        2,500,000

 

    Prior Biennia (Expenditures)............... $                0

    Future Biennia (Projected Costs)........... $       13,000,000

                                                     -------------

           TOTAL............................... $       15,500,000

 

    NEW SECTION.  Sec. 706.  FOR THE EVERGREEN STATE COLLEGE

    Minor Works Preservation (02-1-014)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Education Construction Account‑-State...... $        3,000,000

 

    Prior Biennia (Expenditures)............... $                0

    Future Biennia (Projected Costs)... ........ $       21,800,000

                                                     -------------

           TOTAL............................... $       24,800,000

 

    NEW SECTION.  Sec. 707.  FOR THE EVERGREEN STATE COLLEGE

    Minor Works Program (02-2-002)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    The Evergreen State College Capital Projects

           Account‑-State...................... $        1,815,000

 

    Prior Biennia (Expenditures)............... $                0

    Future Biennia (Projected Costs)........... $        1,850,000

                                                     -------------

           TOTAL............. ................. $        3,665,000

 

    NEW SECTION.  Sec. 708.  FOR THE EVERGREEN STATE COLLEGE

    Seminar Building Phase 2 - Construction (02-2-004)

 

    The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $  41,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  41,000,000

 

    NEW SECTION.  Sec. 709.  FOR THE EVERGREEN STATE COLLEGE

    COM Building Renovation and Expansion (04-2-011)

 

Appropriation:

    The Evergreen State College Capital Projects

           Account‑-State...................... $          200,000

 

    Prior Biennia (Expenditures)............... $                0

    Future Biennia (Projected Costs)........... $       15,750,000

                                                     -------------

           TOTAL............................... $       15,950,000

 

    NEW SECTION.  Sec. 710.  FOR WESTERN WASHINGTON UNIVERSITY

    Minor Works:  Preservation (R) (00-1-068)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account--State...... $   1,850,000

 

    Prior Biennia (Expenditures).................... $   2,650,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,500,000

 

    NEW SECTION.  Sec. 711.  FOR WESTERN WASHINGTON UNIVERSITY

    Minor Works:  Program (00-2-069)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    Western Washington University Capital

           Projects Account‑-State............. $        2,700,000

 

    Prior Biennia (Expenditures)............... $        4,030,000

    Future Biennia (Projected Costs)........... $                0

                                                     -------------

           TOTAL............................... $        6,730,000

 

    NEW SECTION.  Sec. 712.  FOR WESTERN WASHINGTON UNIVERSITY

    Minor Works:  Preservation - Infrastructure (02-1-070)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Education Construction Account--State........... $   3,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  20,000,000

                                                     -------------

           TOTAL.................................... $  23,000,000

 

    NEW SECTION.  Sec. 713.  FOR WESTERN WASHINGTON UNIVERSITY

    Minor Works:  Preservation - Safety (02-1-071)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Education Construction Account‑-State...... $        3,000,000

 

    Prior Biennia (Expenditures)............... $                0

    Future Biennia (Projected Costs)... ........ $       20,000,000

                                                     -------------

           TOTAL............................... $       23,000,000

 

    NEW SECTION.  Sec. 714.  FOR WESTERN WASHINGTON UNIVERSITY

    Infrastructure Savings (02-1-999)

 

    Projects that are completed in accordance with section 915 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

 

Appropriation:

    State Building Construction Account‑-State...... $           1

 

    Prior Biennia (Expenditures).................... $     970,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     970,001

 

    NEW SECTION.  Sec. 715.  FOR WESTERN WASHINGTON UNIVERSITY

    Minor Works:  Program (02-2-072)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Western Washington University Capital Projects

           Account‑-State...................... $        6,831,000

 

    Prior Biennia (Expenditures)............... $                0

    Future Biennia (Projected Costs)........... $       40,000,000

                                                     -------------

           TOTAL............................... $       46,831,000

 

    NEW SECTION.  Sec. 716.  FOR WESTERN WASHINGTON UNIVERSITY

    Campus Services Facility (96-2-025)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   8,000,000

 

    Prior Biennia (Expenditures).................... $   3,391,800

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  11,391,800

 

    NEW SECTION.  Sec. 717.  FOR WESTERN WASHINGTON UNIVERSITY

    Integrated Signal Distribution (96-2-056)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,200,000

 

    Prior Biennia (Expenditures).................... $  12,277,900

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  13,477,900

 

    NEW SECTION.  Sec. 718.  FOR WESTERN WASHINGTON UNIVERSITY

    Campus Infrastructure Development (98-2-024)

 

    The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,300,000

Appropriation:

    State Building Construction Account‑-State...... $  11,000,000

    Western Washington University Capital Projects

           Account‑-State........................... $     669,000

                                                     -------------

           Subtotal Appropriation................... $  11,669,000

 

    Prior Biennia (Expenditures).................... $   1,150,000

    Future Biennia (Projected Costs)................ $   8,780,000

                                                     -------------

           TOTAL.................................... $  22,899,000

 

    NEW SECTION.  Sec. 719.  FOR WESTERN WASHINGTON UNIVERSITY

    Communications Facility (98-2-053)

 

    The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   2,500,000

Appropriation:

    State Building Construction Account‑-State...... $  32,519,000

 

    Prior Biennia (Expenditures).................... $   1,454,400

    Future Biennia (Projected Costs)................ $   4,000,000

                                                     -------------

           TOTAL.................................... $  40,473,400

 

    NEW SECTION.  Sec. 720.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

    Washington Heritage Projects (98-2-004)

 

    The reappropriation in this section shall support the projects as listed in section 748, chapter 379, Laws of 1999.

 

Reappropriation:

    State Building Construction Account‑-State...... $     916,000

 

    Prior Biennia (Expenditures).................... $   9,480,000

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  10,396,000

 

    NEW SECTION.  Sec. 721.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

    Olympia - State Capital Museum Preservation (02-1-001)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $     238,679

 

    Prior Biennia (Expenditures).................... $     466,718

    Future Biennia (Projected Costs)................ $     129,423

                                                     -------------

           TOTAL.................................... $     834,820

 

    NEW SECTION.  Sec. 722.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

    Tacoma - State History Museum Preservation Projects (02-1-002)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $     373,016

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,738,605

                                                     -------------

           TOTAL.................................... $   2,111,621

 

    NEW SECTION.  Sec. 723.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

    Tacoma - Stadium Way Research Center Preservation Projects (02‑1‑004)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $     339,847

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     527,721

                                                     -------------

           TOTAL.................................... $     867,568

 

    NEW SECTION.  Sec. 724.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

    Lewis and Clark Trail Interpretive Infrastructure Grant Program (02-4-001)

 

Appropriation:

    State Building Construction Account‑-State...... $   1,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,000,000

                                                     -------------

           TOTAL.................................... $   2,000,000

 

    NEW SECTION.  Sec. 725.  FOR THE WASHINGTON STATE HISTORICAL SOCIETY

    Washington Heritage Projects (02-4-004)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) The appropriation is subject to the provisions of RCW 27.34.330.

    (2) The appropriation is provided for the following list of projects:

                                                                             Total

                                                          Amount            Project

Organization                                            Recommended       Cost

Jefferson County Historical Society - Bell Tower      $  100,000            386,083

Spokane Parks and Recreation - Corbin and Moore-

  Turner Heritage Gardens                                 54,437            266,831

Clallam County Historical Society - Lincoln School        83,500            250,000

Orcas Island Historical Society - Museum                  54,136            167,604

Gig Harbor Peninsula Historical Society - Heritage

  and Arts Center                                        400,000          7,301,518

Vashon-Maury Island Historical Society - Heritage

  Museum                                                 175,000            526,879

Loon Lake Historical Society - Old Schoolhouse             8,292             29,896

Northwest School of Wooden Boatbuilding - Port Hadlock    97,500            463,832

Drayton Harbor Maritime Group - Dock Restoration

  and Replacement                                        216,790            650,372

Volunteers for Outdoor Washington - Twin Tunnels

  Bridge                                                 200,000          1,360,000

Historic Seattle PDA - Dearborn House                    200,000          2,131,227

Vancouver National Historic Reserve - American

  Red Cross House                                        400,000          2,195,000

Maritime Heritage Foundation - Historic Ship Wharf       400,000          2,031,000

Cowlitz County Museum - Museum Expansion and Remodel     350,000          1,059,152

Mansfield Museum and Historical Society - Museum

  Renovation                                              10,916             35,750

Fox Island Chapel - Chapel on Echo Bay                    49,665            149,000

Kirkman House Museum - Museum Repair and Stabilization    20,000             64,080

City of Mount Vernon - Lincoln Theatre                   250,000          1,535,082

Squaxin Island Tribe - Tu Ha'Buts Cultural Center -

  Phase 2                                                225,000          1,734,000

Western Forest Industries Museum - Train Shed and

  Baldwin Locomotive                                     150,000            450,000

Steamer Virginia V Foundation - Restoration of

  Virginia V                                             100,000          4,077,663

Ferry County Fair Association - Carousel Restoration      60,000            190,500

White River Valley Museum - Olson Farm                   200,000          1,647,750

Alderwood Manor Heritage Association - Superintendent's

  Cottage                                                 24,000            150,000

Kitsap County Historical Society Museum - Storage

  Systems for Artifacts                                   70,000            516,422

Kalakala Foundation - Dry-dock and Renovation Phase      100,764          2,321,550

                                                       ----------------------------

                                                      $4,000,000         31,691,191

 

Alternate Organizations

Kalakala Foundation - remaining balance recommended      174,236

Museum of Flight                                          50,000          5,009,667

Friends of Skamokawa                                       9,900             30,199

City of Raymond                                          239,000            719,000

City of Morton                                           100,000            301,230

                                                       ----------------------------

                                                      $  573,136          6,060,096

Appropriation:

    State Building Construction Account‑-State...... $   4,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  15,000,000

                                                     -------------

           TOTAL.................................... $  19,000,000

 

    NEW SECTION.  Sec. 726.  FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY

    Cheney Cowles Museum:  Preservation (02-1-002)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $     250,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,125,000

                                                     -------------

           TOTAL.................................... $   1,375,000

 

    NEW SECTION.  Sec. 727.  FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY

    Cheney Cowles Museum:  Addition and Remodel (98-2-001)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $  12,000,000

 

    Prior Biennia (Expenditures).................... $   6,891,600

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  18,891,600

 

    NEW SECTION.  Sec. 728.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Yakima Valley College - Replace Pedestrian Crossing (96-1-400)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     270,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     270,000

 

    NEW SECTION.  Sec. 729.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Project Artwork Consolidation Account (96-2-400)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      92,634

 

    Prior Biennia (Expenditures).................... $      71,788

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     164,422

 

    NEW SECTION.  Sec. 730.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    North Seattle Community College - Vocational/Child Care Building:  Construction (96-2-651)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     991,101

 

    Prior Biennia (Expenditures).................... $   6,902,202

    Future Biennia (Projected Costs)................ $     905,906

                                                     -------------

           TOTAL.................................... $   8,799,209

 

    NEW SECTION.  Sec. 731.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Everett Community College - Instructional Technical Center:  Construction (96-2-652)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,389,644

 

    Prior Biennia (Expenditures).................... $     483,057

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,872,701

 

    NEW SECTION.  Sec. 732.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    South Seattle Community College - Integrated Learning Assistance Resource Center:  Construction (96-2-653)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     975,508

 

    Prior Biennia (Expenditures).................... $   3,473,110

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,448,618

 

    NEW SECTION.  Sec. 733.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Olympic College - Poulsbo Center:  Construction (96-2-654)

 

    The reappropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $  12,961,456

 

    Prior Biennia (Expenditures).................... $      85,219

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  13,046,675

 

    NEW SECTION.  Sec. 734.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Clover Park - Transportation Trade:  Construction (96-2-662)

 

    The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account--State...... $   1,240,000

Appropriation:

    State Building Construction Account--State...... $  16,784,000

 

    Prior Biennia (Expenditures).................... $      21,400

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  18,045,400

 

    NEW SECTION.  Sec. 735.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Clover Park Technical College - Aviation Trades Complex:  Construction (96-2-998)

 

Reappropriation:

    State Building Construction Account‑-State...... $   3,629,657

    Community and Technical College Capital Projects

           Account--State........................... $   1,599,612

                                                     -------------

           Subtotal Reappropriation..................            $    5,229,269

 

    Prior Biennia (Expenditures).................... $   4,628,383

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   9,857,652

 

    NEW SECTION.  Sec. 736.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Underground Storage Tanks (98-1-003)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     135,848

 

    Prior Biennia (Expenditures).................... $      74,157

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     210,005

 

    NEW SECTION.  Sec. 737.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Bates Technical College:  Renovation (98-1-190)

 

Reappropriation:

    State Building Construction Account‑-State...... $   2,034,538

 

    Prior Biennia (Expenditures).................... $   4,859,879

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,894,417

 

    NEW SECTION.  Sec. 738.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Olympic College - Library:  Replacement (98-2-500)

 

Reappropriation:

    State Building Construction Account‑-State...... $     363,057

 

    Prior Biennia (Expenditures).................... $     612,943

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     976,000

 

    NEW SECTION.  Sec. 739.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Highline Community College - Classroom/Laboratory Building:  Construction (98-2-660)

 

    The reappropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   5,113,782

 

    Prior Biennia (Expenditures).................... $     786,218

    Future Biennia (Projected Costs)....... ........ $           0

                                                     -------------

           TOTAL.................................... $   5,900,000

 

    NEW SECTION.  Sec. 740.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Spokane Community College - Allied Health Building:  Addition (98‑2‑661)

 

    The reappropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   8,904,736

 

    Prior Biennia (Expenditures).................... $   1,795,264

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  10,700,000

 

    NEW SECTION.  Sec. 741.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Bellingham Technical College - Health/Business Building:  New Facility (98-2-672)

 

    The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     709,921

Appropriation:

    State Building Construction Account--State...... $   8,086,600

 

    Prior Biennia (Expenditures).................... $     140,078

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   8,936,599

 

    NEW SECTION.  Sec. 742.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Lake Washington - Phase 3:  New Facility (98-2-673)

 

    The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     766,817

Appropriation:

    State Building Construction Account--State...... $  15,840,000

 

    Prior Biennia (Expenditures).................... $     398,183

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  17,005,000

 

    NEW SECTION.  Sec. 743.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Renton Technical College - Technology Resource Center (98-2-674)

 

    The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     863,309

Appropriation:

    State Building Construction Account--State...... $  10,591,000

 

    Prior Biennia (Expenditures).................... $     316,691

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  11,771,000

 

    NEW SECTION.  Sec. 744.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Skagit Valley College - Whidbey Higher Education Center (98-2-675)

 

    The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     519,731

Appropriation:

    State Building Construction Account--State...... $   9,175,300

 

    Prior Biennia (Expenditures).................... $     215,269

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   9,910,300

 

    NEW SECTION.  Sec. 745.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Cascadia Community College/University of Washington Bothell:  Construction (98-2-999)

 

    The reappropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   3,670,870

 

    Prior Biennia (Expenditures).................... $  26,378,539

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  30,049,409

 

    NEW SECTION.  Sec. 746.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Centralia College - Instructional Building:  Replacement (99-2-001)

 

    The reappropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $  12,985,518

 

    Prior Biennia (Expenditures).................... $   1,414,482

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  14,400,000

 

    NEW SECTION.  Sec. 747.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Columbia Basin College - Electrical Substation (00-0-099)

 

Reappropriation:

    State Building Construction Account‑-State...... $     974,367

 

    Prior Biennia (Expenditures).................... $      25,633

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,000,000

 

    NEW SECTION.  Sec. 748.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Statewide Minor Works:  Preservation (00-1-001)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    Community and Technical College Capital Projects

           Account‑-State........................... $   5,653,024

 

    Prior Biennia (Expenditures).................... $   6,046,976

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  11,700,000

 

    NEW SECTION.  Sec. 749.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Statewide Roof Repairs:  Infrastructure Improvements (00-1-010)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    Community and Technical College Capital Projects

           Account‑-State........................... $   2,622,278

 

    Prior Biennia (Expenditures).................... $   1,974,722

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,597,000

 

    NEW SECTION.  Sec. 750.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Statewide Facility Repairs (00-1-050)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $  19,457,556

    Community and Technical College Capital Projects

           Account‑-State........................... $   2,348,852

                                                     -------------

           Subtotal Reappropriation..................            $    21,806,408

 

    Prior Biennia (Expenditures).................... $   5,593,592

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  27,400,000

 

    NEW SECTION.  Sec. 751.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Statewide Site Repairs (00-1-090)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   3,153,892

 

    Prior Biennia (Expenditures).................... $     688,108

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   3,842,000

 

    NEW SECTION.  Sec. 752.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Statewide Minor Works:  Program (00-1-130)

 

    The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $   9,989,777

    Community and Technical College Capital Projects

           Account‑-State.... ...................... $   1,108,813

                                                     -------------

           Subtotal Reappropriation..................            $    11,098,590

 

    Prior Biennia (Expenditures).................... $   5,751,410

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  16,850,000

 

    NEW SECTION.  Sec. 753.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Pierce College - Portable Buildings:  Replacement (00-1-223)

 

Reappropriation:

    Community and Technical College Capital Projects

           Account‑-State........................... $   5,435,538

 

    Prior Biennia (Expenditures).................... $     204,462

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   5,640,000

 

    NEW SECTION.  Sec. 754.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Edmonds Community College - Relocatable Buildings:  Replacement (00‑1‑236)

 

Reappropriation:

    Community and Technical College Capital Projects

           Account‑-State........................... $   5,379,064

 

    Prior Biennia (Expenditures).................... $   1,020,936

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL....................... ............ $   6,400,000

 

    NEW SECTION.  Sec. 755.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    South Puget Sound Community College - Portable Buildings Replacement (00-1-237)

 

Reappropriation:

    Community and Technical College Capital Projects

           Account‑-State........................... $   4,382,808

 

    Prior Biennia (Expenditures).................... $     229,592

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,612,400

 

    NEW SECTION.  Sec. 756.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    South Puget Sound Community College - General Education Complex (00‑2‑679)

 

    The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      54,119

Appropriation:

    State Building Construction Account‑-State...... $   1,781,000

 

    Prior Biennia (Expenditures).................... $      69,881

    Future Biennia (Projected Costs)................ $  16,937,000

                                                     -------------

           TOTAL.................................... $  18,842,000

 

    NEW SECTION.  Sec. 757.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Olympic College - Physical Plant Building:  Replacement (00-2-002)

 

Reappropriation:

    State Building Construction Account‑-State...... $      19,055

Appropriation:

    State Building Construction Account‑-State...... $   5,086,600

 

    Prior Biennia (Expenditures).................... $   1,009,945

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,115,600

 

    NEW SECTION.  Sec. 758.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Bellevue Community College - Robinswood School:  Replacement (00‑2‑005)

 

Reappropriation:

    State Building Construction Account‑-State...... $  13,847,731

 

    Prior Biennia (Expenditures).................... $   1,958,869

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  15,806,600

 

    NEW SECTION.  Sec. 759.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Shoreline Community College - Library/Technical Center:  New Facility (00-2-319)

 

Reappropriation:

    State Building Construction Account‑-State...... $   6,868,308

 

    Prior Biennia (Expenditures).................... $     381,692

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   7,250,000

 

    NEW SECTION.  Sec. 760.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Green River Community College - Drama/Music Class/Laboratories:  Renovation (00-2-322)

 

Reappropriation:

    State Building Construction Account‑-State...... $   3,373,693

 

    Prior Biennia (Expenditures).................... $      56,307

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   3,430,000

 

    NEW SECTION.  Sec. 761.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Clark Community College - Applied Arts 4 Building Renovation (00‑2‑326)

 

Reappropriation:

    State Building Construction Account‑-State...... $   2,416,873

 

    Prior Biennia (Expenditures).................... $     123,127

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,540,000

 

    NEW SECTION.  Sec. 762.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Clark College/WSU Vancouver - Classroom/Laboratories:  Design (00‑2‑680)

 

    The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      63,690

Appropriation:

    State Building Construction Account‑-State...... $   1,644,000

 

    Prior Biennia (Expenditures).................... $      56,310

    Future Biennia (Projected Costs)................ $  17,712,900

                                                     -------------

           TOTAL.................................... $  19,476,900

 

    NEW SECTION.  Sec. 763.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Wenatchee Valley College - Sexton Hall Computer Laboratories:  Renovation (00‑2‑327)

 

Reappropriation:

    State Building Construction Account‑-State...... $     107,300

 

    Prior Biennia (Expenditures).................... $     592,700

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     700,000

 

    NEW SECTION.  Sec. 764.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Wenatchee Valley College - Omak Science Laboratory:  New Facility (00‑2‑952)

 

    The reappropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $     446,653

 

    Prior Biennia (Expenditures).................... $     453,347

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     900,000

 

    NEW SECTION.  Sec. 765.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Yakima Valley Community College - Mechanics Complex:  Renovation (00‑2‑328)

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,676,797

 

    Prior Biennia (Expenditures).................... $      38,203

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,715,000

 

    NEW SECTION.  Sec. 766.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Yakima Valley College - Higher Education Center (00-2-954)

 

    The reappropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $   1,068,836

 

    Prior Biennia (Expenditures).................... $   2,931,164

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,000,000

 

    NEW SECTION.  Sec. 767.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Tacoma Community College - Building 5:  Renovation (00‑2‑335)

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,493,026

 

    Prior Biennia (Expenditures).................... $       6,974

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,500,000

 

    NEW SECTION.  Sec. 768.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Bellingham Technical College - Building B:  Renovation (00‑2‑338)

 

Reappropriation:

    State Building Construction Account‑-State...... $   1,844,811

 

    Prior Biennia (Expenditures).................... $      81,989

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,926,800

 

    NEW SECTION.  Sec. 769.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Cascadia Community College:  Development (00-2-501)

 

    The reappropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $  36,963,520

 

    Prior Biennia (Expenditures).................... $  13,136,480

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  50,100,000

 

    NEW SECTION.  Sec. 770.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Columbia Basin College - Emergency Roof:  Replacement (00-2-600)

 

Reappropriation:

    Education Construction Account‑-State........... $   1,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,000,000

 

    NEW SECTION.  Sec. 771.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Pierce College Puyallup - Phase 3 Expansion:  Design (00-2-676)

 

    The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      25,918

Appropriation:

    State Building Construction Account‑-State...... $   1,743,000

 

    Prior Biennia (Expenditures).................... $     191,282

    Future Biennia (Projected Costs)................ $  19,917,000

                                                     -------------

           TOTAL.................................... $  21,877,200

 

    NEW SECTION.  Sec. 772.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Whatcom Community College - Design Classroom/Laboratory Building:  New Facility (00-2-677)

 

    The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Reappropriation:

    State Building Construction Account‑-State...... $      25,706

Appropriation:

    State Building Construction Account‑-State...... $     891,900

 

    Prior Biennia (Expenditures).................... $      54,294

    Future Biennia (Projected Costs)................ $  10,653,200

                                                     -------------

           TOTAL.................................... $  11,625,100

 

    NEW SECTION.  Sec. 773.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Highline Community College - Higher Education Center and Childcare (00-2-678)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   2,228,000

 

    Prior Biennia (Expenditures).................... $     117,000

    Future Biennia (Projected Costs)................ $  20,991,000

                                                     -------------

           TOTAL.................................... $  23,336,000

 

    NEW SECTION.  Sec. 774.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Statewide Hazardous Material Pool (00‑9‑031)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $     269,610

 

    Prior Biennia (Expenditures).................... $     100,336

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     369,946

 

    NEW SECTION.  Sec. 775.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Statewide Americans with Disabilities Pool (00‑9‑036)

 

    The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.

 

Reappropriation:

    State Building Construction Account‑‑State...... $     805,026

 

    Prior Biennia (Expenditures).................... $     132,345

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     937,371

 

    NEW SECTION.  Sec. 776.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Minor Works ‑ Preservation (Emergency Funds) (02‑1‑001)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $  12,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  58,000,000

                                                     -------------

           TOTAL.................................... $  70,000,000

 

    NEW SECTION.  Sec. 777.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Roof Repairs "A" (02‑1‑010)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Education Construction Account‑‑State........... $   7,473,077

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  20,000,000

                                                     -------------

           TOTAL.................................... $  27,473,077

 

    NEW SECTION.  Sec. 778.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Facility Repairs "A" (02‑1‑050)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Education Construction Account‑‑State........... $  21,660,328

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  90,000,000

                                                     -------------

           TOTAL.................................... $ 111,660,328

 

    NEW SECTION.  Sec. 779.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Site Repairs "A" ‑ Community and Technical College System (02‑1‑090)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Education Construction Account‑‑State........... $   8,343,232

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  24,000,000

                                                     -------------

           TOTAL.................................... $  32,343,232

 

    NEW SECTION.  Sec. 780.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Minor Works ‑ Program ‑ Community and Technical College System (02‑1‑130)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $  10,965,000

    Education Construction Account‑‑State........... $   5,535,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  80,000,000

                                                     -------------

           TOTAL.................................... $  96,500,000

 

    NEW SECTION.  Sec. 781.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Roof Repairs "B" - Community and Technical College System (02‑1‑710)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Education Construction Account‑-State........... $   5,273,179

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  20,000,000

                                                     -------------

           TOTAL.................................... $  25,273,179

 

    NEW SECTION.  Sec. 782.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Facility Repairs "B" - Community and Technical College System (02‑1‑750)

 

    The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

 

Appropriation:

    Education Construction Account‑-State........... $   7,643,579

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 100,000,000

                                                     -------------

           TOTAL.................................... $ 107,643,579

 

    NEW SECTION.  Sec. 783.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Predesign Studies (02-2-001)

 

Appropriation:

    State Building Construction Account‑-State...... $     400,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL............................ ........ $     400,000

 

    NEW SECTION.  Sec. 784.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Skagit Valley College ‑ Office Space:  Replacement (02‑1‑213)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    Community and Technical College Capital Projects

           Account‑‑State........................... $     762,689

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     762,689

 

    NEW SECTION.  Sec. 785.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Seattle Central Community College ‑ Portables:  Replacement (02‑1‑215)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $   6,897,400

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,897,400

 

    NEW SECTION.  Sec. 786.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Seattle Central Community College ‑ Edison Hall:  Renovation (02‑1‑315)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $   5,809,200

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   5,809,200

 

    NEW SECTION.  Sec. 787.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    South Seattle Community College ‑ Building A:  Replacement (02‑1‑217)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    Community and Technical College Capital Projects

           Account‑‑State........................... $   5,477,400

 

    Prior Biennia (Expenditures).. ................. $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   5,477,400

 

    NEW SECTION.  Sec. 788.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Wenatchee Valley College ‑ Greenhouse:  Replacement (02‑1‑220)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    Community and Technical College Capital Projects

           Account‑‑State........................... $     441,360

 

    Prior Biennia (Expenditures).. ................. $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     441,360

 

    NEW SECTION.  Sec. 789.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Wenatchee Valley College ‑ Agriculture Program:  Renovation (02‑1‑328)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $     794,536

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     794,536

 

    NEW SECTION.  Sec. 790.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Green River Community College ‑ International Program:  Replacement (02‑1‑222)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    Community and Technical College Capital Projects

           Account‑‑State........................... $     587,070

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     587,070

 

    NEW SECTION.  Sec. 791.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Pierce College Fort Steilacoom ‑ Portables:  Replacement (02‑1‑223)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    Community and Technical College Capital Projects

           Account‑‑State........................... $   2,452,100

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,452,100

 

    NEW SECTION.  Sec. 792.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Lower Columbia College ‑ Physical Science Portables:  Replacement (02‑1‑226)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    Education Construction Account‑‑State........... $   1,959,800

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,959,800

 

    NEW SECTION.  Sec. 793.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Lower Columbia College ‑ Vocational Building:  Renovation/Addition (02‑1‑326)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $   1,090,700

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,090,700

 

    NEW SECTION.  Sec. 794.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Yakima Valley Community College ‑ Child Care:  Replacement (02‑1‑229)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    Community and Technical College Capital Projects

           Account‑‑State........................... $     969,900

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     969,900

 

    NEW SECTION.  Sec. 795.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Yakima Valley Community College ‑ Sundquist Hall:  Renovation (02‑1‑329)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $   1,812,800

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   1,812,800

 

    NEW SECTION.  Sec. 796.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Yakima Valley Higher Education Center (02-2-100)

 

    The appropriation in this section is subject to the following conditions and limitations:

    (1) The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

    (2) The appropriation in this section is subject to the conditions and limitations under section 911 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $  18,500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $  18,500,000

 

    NEW SECTION.  Sec. 797.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Spokane Falls Community College ‑ Fine Arts Building:  Replacement (02‑1‑231)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    Community and Technical College Capital Projects

           Account‑‑State........................... $     672,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     672,000

 

    NEW SECTION.  Sec. 798.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Spokane Falls Community College ‑ Library:  Renovation (02‑1‑331)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $   5,602,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   5,602,000

 

    NEW SECTION.  Sec. 799.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Bellingham Technical College ‑ Replacement:  New Facility (02‑1‑239)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $   4,357,900

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,357,900

 

    NEW SECTION.  Sec. 800.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Lake Washington Community College ‑ Replacement:  New Facility (02‑1‑240)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $   6,915,300

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,915,300

 

    NEW SECTION.  Sec. 801.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Peninsula College ‑ Buildings D and E:  Renovation (02‑1‑310)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    Education Construction Account‑‑State........... $   2,669,800

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   2,669,800

 

    NEW SECTION.  Sec. 802.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Grays Harbor Community College ‑ Library:  Renovation (02‑1‑311)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    Community and Technical College Capital Projects

           Account‑‑State........................... $   4,579,500

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,579,500

 

    NEW SECTION.  Sec. 803.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Shoreline Community College ‑ Building 800:  Renovation (02‑1‑319)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $   6,021,100

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,021,100

 

    NEW SECTION.  Sec. 804.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Bellevue Community College ‑ "A" Building:  Renovation (02‑1‑320)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $   5,566,100

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   5,566,100

 

    NEW SECTION.  Sec. 805.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Columbia Basin Community College ‑ Building A:  Renovation (02‑1‑333)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑‑State...... $   6,434,100

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   6,434,100

 

    NEW SECTION.  Sec. 806.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Clover Park - Building 18 Machine Trades:  New Facility (02-1-343)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   4,791,800

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $   4,791,800

 

    NEW SECTION.  Sec. 807.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    Spokane Community College - Multicultural Student Service Center (02-2-230)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    Community and Technical College Capital Projects

           Account‑-State........................... $     235,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

                                                     -------------

           TOTAL.................................... $     235,000

 

    NEW SECTION.  Sec. 808.  FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

    University of Washington - Bothell/Cascadia Phase 2B:  New Facilities (02-2-999)

 

    The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.

 

Appropriation:

    State Building Construction Account‑-State...... $   2,500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  17,476,750

                                                     -------------

           TOTAL.................................... $  19,976,750

 

                              PART 6

                           MISCELLANEOUS

 

    NEW SECTION.  Sec. 901.  The estimated debt service costs impacting future general fund expenditures related solely to new capital appropriations within this act are $18,427,449 during the 2001-2003 fiscal period; $106,954,937 during the 2003-2005 fiscal period; $149,523,472 during the 2005-2007 fiscal period; $149,899,611 during the 2007-2009 fiscal period; and $149,899,611 during the 2009-2011 fiscal period.

 

    NEW SECTION.  Sec. 902.  To ensure that major construction projects are carried out in accordance with legislative and executive intent, appropriations in this act referencing this section or in excess of $5,000,000 shall not be expended until the office of financial management has reviewed and approved the agency's predesign and other documents and approved an allotment for the project.  The predesign document shall include but not be limited to program, site, and cost analysis in accordance with the predesign manual adopted by the office of financial management.  To improve monitoring of major construction projects, progress reports shall be submitted by the agency administering the project to the office of financial management and to the fiscal committees of the house of representatives and senate.  Reports will be submitted on July 1st and December 31st each year in a format to be developed by the office of financial management.

 

    NEW SECTION.  Sec. 903.  Allotments for appropriations shall be provided in accordance with the capital project review requirements adopted by the office of financial management.  The office of financial management shall notify the house of representatives capital budget committee and the senate ways and means committee of allotment releases based on review by the office of financial management.  No expenditure may be incurred or obligation entered into for appropriations referring to this section until the office of financial management has approved the allotment of the funds to be expended.  Projects that will be employing alternative public works construction procedures, under chapter 39.10 RCW, are subject to the allotment procedures defined in this section and RCW 43.88.110.  Contracts shall not be executed that call for expenditures in excess of the approved allotment, and the total amount shown in such contracts for the cost of future work that has not been appropriated shall not exceed the amount identified for such work in the level of funding approved by the office of financial management at the completion of predesign.

 

    NEW SECTION.  Sec. 904.  Appropriations for design and construction of facilities on higher education branch campuses shall be expended only after funds are allotted to institutions of higher education on the basis of:  (1) Comparable unit cost standards, as determined by the office of financial management in consultation with the higher education coordinating board; (2) costs consistent with other higher education teaching facilities in the state; and (3) student full-time equivalent enrollment levels as established by the office of financial management in consultation with the higher education coordinating board.

 

    NEW SECTION.  Sec. 905.  To ensure that minor works appropriations are carried out in accordance with legislative intent, funds shall not be allotted until project lists are on file at the office of financial management.  No expenditure may be incurred or obligation entered into for appropriations referring to this section until the office of financial management has approved the allotment of the funds to be expended.

 

    NEW SECTION.  Sec. 906.  (1) Agencies shall expedite the expenditure of reappropriations and appropriations in order to:  (a) Rehabilitate infrastructure resources; (b) accelerate environmental rehabilitation and restoration projects for the improvement of the state's natural environment; (c) reduce additional costs associated with acquisition and construction inflationary pressures; and (d) provide additional employment opportunities associated with capital expenditures.

    (2) In order to meet the goals of this section, the following conditions apply to appropriations that reference this section:  (a) To the extent feasible, agencies are directed to accelerate expenditure rates at the current level of permanent employees and shall use contracted design and construction services wherever necessary to meet the goals of this section; and (b) reappropriations that reference this subsection (2)(b) shall lapse on June 30, 2003.

    (3) The office of financial management shall report the following to the appropriate fiscal committees of the legislature by January 30, 2003:  (a) A listing of reappropriations in the governor's 2003-2005 capital budget recommendation that have been reappropriated one or more times and have ten percent or more of the original appropriation unexpended; and (b) an explanation of why the appropriation remains unexpended.

 

    NEW SECTION.  Sec. 907.  ACQUISITION OF PROPERTIES AND FACILITIES THROUGH FINANCIAL CONTRACTS.  The following agencies may enter into financial contracts, paid from any funds of an agency, appropriated or nonappropriated, for the purposes indicated and in not more than the principal amounts indicated, plus financing expenses and required reserves pursuant to chapter 39.94 RCW.  When securing properties under this section, agencies shall use the most economical financial contract option available, including long-term leases, lease-purchase agreements, lease-development with option to purchase agreements or financial contracts using certificates of participation.  The director of general administration shall ensure that the clustering of state facilities and the collocation and consolidation of state agencies take place where such configurations are economical and consistent with agency space needs.  Agencies shall assist the department of general administration with facility collocation and consolidation efforts.

    State agencies may enter into agreements with the department of general administration and the state treasurer's office to develop requests to the legislature for acquisition of properties and facilities through financial contracts.  The agreements may include charges for services rendered.

    (1) Secretary of state:

    (a) Enter into a financing contract in the amount of $13,582,200 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase or construct a regional archives building in eastern Washington.

    (b) Enter into a financing contract in the amount of $653,800 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase technology equipment and software for an electronic data archive, provided that authority to expend funding for acquisition of technology equipment and software associated with the electronic data archive is conditioned on compliance with section 902 of the 2001-2003 operating budget bill (information services projects).

    (2) Department of general administration:

    (a) Enter into a financing contract in the amount of $3,956,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW, to expand the existing Isabella Bush records center in Tumwater for use by state agencies.

    (b) Enter into a financing contract in the amount of $35,656,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW, to purchase two existing office buildings and associated land in Tacoma for use by the department of social and health services.

    (3) Department of corrections:

    (a) Enter into a financing contract in the amount of $4,588,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase or construct a correctional industries transportation services warehouse.

    (b) Enter into a financing contract in the amount of $7,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase or construct work release beds.

    (c) Enter into a financing contract in the amount of $4,970,403 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase or construct reynolds work release.

    (d) Enter into a financing contract in the amount of $7,016,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct lethal fences at either the Washington state penitentiary, or the Washington correction center, or both.

    (4) Department of veterans affairs:  Enter into a financing contract in the amount of $12,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a skilled nursing home in Retsil.

    (5) State parks and recreation:  It is the intent of the legislature that the operating revenues of the department provide the primary source of funds necessary to meet financing contract obligations for the projects financed under this authority.  In addition, state parks and recreation is authorized to pledge to make payments from appropriated funds pursuant to chapter 39.94 RCW in order to:

    (a) Enter into financing contracts in the amount of $1,500,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase and install cabins and yurts statewide.

    (b) Enter into financing contracts in the amount of $165,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to convert the lighthouse keeper's house into a rental unit at Fort Canby state park.

    (c) Enter into financing contracts in the amount of $1,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct revenue generating facilities at Deception Pass state park.

    (d) Enter into financing contracts in the amount of $1,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct concession facilities statewide.

    (e) Enter into financing contracts in the amount of $1,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct revenue generating day-use amenities statewide.

    (f) Enter into financing contracts in the amount of $1,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to upgrade three Puget Sound environmental learning centers to make them more useable during off-season times.

    (g) Enter into financing contracts in the amount of $500,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to improve moorage and campsite electrification statewide.

    (h) Enter into financing contracts in the amount of $7,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a replacement dining facility at Fort Worden state park.

    (6) Community and technical colleges:

    (a) Enter into a financing contract on behalf of Edmonds Community College in the amount of $4,106,300 plus financing expenses and reserves pursuant to chapter 39.94 RCW to renovate Lynnwood hall and Montlake Terrace hall.

    (b) Enter into a financing contract on behalf of Edmonds Community College in the amount of $3,134,900 plus financing expenses and reserves pursuant to chapter 39.94 RCW to construct an addition to the student center building.

    (c) Enter into a financing contract on behalf of Highline Community College in the amount of $15,066,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to replace the student union building.

 

    NEW SECTION.  Sec. 908.  FOR THE ARTS COMMISSION‑-ART WORK ALLOWANCE POOLING.  (1) One-half of one percent of moneys appropriated in this act for original construction of school plant facilities is provided solely for the purposes of RCW 28A.335.210.  The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the superintendent of public instruction and representatives of school district boards.

    (2) One-half of one percent of moneys appropriated in this act for original construction or any major renovation or remodel work exceeding two hundred thousand dollars by colleges or universities is provided solely for the purposes of RCW 28B.10.027.  The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the board of regents or trustees.

    (3) One-half of one percent of moneys appropriated in this act for original construction of any public building by a state agency as defined in RCW 43.17.020 is provided solely for the purposes of RCW 43.17.200.  The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the state agency.

    (4) At least eighty-five percent of the moneys spent by the Washington state arts commission during the 1999-2001 biennium for the purposes of RCW 28A.335.210, 28B.10.027, and 43.17.200 shall be spent solely for direct acquisition of works of art.

 

    NEW SECTION.  Sec. 909.  The amounts shown under the headings "Prior Biennia," "Future Biennia," and "Total" in this act are for informational purposes only and do not constitute legislative approval of these amounts.

 

    NEW SECTION.  Sec. 910.  "Reappropriations" in this act are appropriations and, unless the context clearly provides otherwise, are subject to the relevant conditions and limitations applicable to appropriations.  Reappropriations shall be limited to the unexpended balances remaining on June 30, 1999, from the 1997-1999 biennial appropriations for each project.

 

    NEW SECTION.  Sec. 911.  To carry out the provisions of this act, the governor may assign responsibility for predesign, design, construction, and other related activities to any appropriate agency.

 

    NEW SECTION.  Sec. 912.  If any federal moneys appropriated by this act for capital projects are not received by the state, the department or agency to which the moneys were appropriated may replace the federal moneys with funds available from private or local sources.  No replacement may occur under this section without the prior approval of the director of financial management in consultation with the senate committee on ways and means and the house of representatives capital budget committee.

 

    NEW SECTION.  Sec. 913.  (1) Unless otherwise stated, for all appropriations under this act that require a match of nonstate money or in-kind contributions, the following requirement, consistent with RCW 43.88.150, shall apply:  Expenditures of state money shall be timed so that the state share of project expenditures never exceeds the intended state share of total project costs.

    (2) Provision of the full amount of required matching funds is not required to permit the expenditure of capital budget appropriations for phased projects if a proportional amount of the required matching funds is provided for each distinct, identifiable phase of the project.

 

    NEW SECTION.  Sec. 914.  Any capital improvements or capital projects involving construction or major expansion of a state office facility, including, but not limited to, district headquarters, detachment offices, and off-campus faculty offices, shall be reviewed by the department of general administration for possible consolidation, collocation, and compliance with state office standards before allotment of funds.  The intent of the requirement imposed by this section is to eliminate duplication and reduce total office space requirements where feasible, while ensuring proper service to the public.

 

    NEW SECTION.  Sec. 915.  The governor, through the office of financial management, may authorize a transfer of appropriation authority provided for a capital project that is in excess of the amount required for the completion of such project to another capital project for which the appropriation is insufficient.  No such transfer may be used to expand the capacity of any facility beyond that intended by the legislature in making the appropriation.  Such transfers may be effected only between capital appropriations to a specific department, commission, agency, or institution of higher education and only between capital projects that are funded from the same fund or account.  No transfers may occur between projects to local government agencies except where the grants are provided within a single omnibus appropriation and where such transfers are specifically authorized by the implementing statutes which govern the grants.

    For purposes of this section, the governor may find that an amount is in excess of the amount required for the completion of a project only if:  (1) The project as defined in the notes to the budget document is substantially complete and there are funds remaining; or (2) bids have been let on a project and it appears to a substantial certainty that the project as defined in the notes to the budget document can be completed within the biennium for less than the amount appropriated in this act.

    For the purposes of this section, the legislature intends that each project be defined as proposed to the legislature in the governor's budget document, unless it clearly appears from the legislative history that the legislature intended to define the scope of a project in a different way.

    A report of any transfer effected under this section, except emergency projects or any transfer under $250,000, shall be filed with the legislative fiscal committees of the senate and house of representatives by the office of financial management at least thirty days before the date the transfer is effected.  The office of financial management shall report all emergency or smaller transfers within thirty days from the date of transfer.

 

    NEW SECTION.  Sec. 916.  If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected.

 

    NEW SECTION.  Sec. 917.  This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately.

 

                               INDEX                          PAGE#

 

CENTRAL WASHINGTON UNIVERSITY................................. 145

COMMUNITY AND TECHNICAL COLLEGE SYSTEM........................ 159

CRIMINAL JUSTICE TRAINING COMMISSION........................... 35

DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT........ 2

DEPARTMENT OF CORRECTIONS...................................... 53

DEPARTMENT OF ECOLOGY.......................................... 66

DEPARTMENT OF FISH AND WILDLIFE................................ 89

DEPARTMENT OF GENERAL ADMINISTRATION........................... 19

DEPARTMENT OF HEALTH........................................... 48

DEPARTMENT OF LABOR AND INDUSTRIES............................. 35

DEPARTMENT OF NATURAL RESOURCES............................... 101

DEPARTMENT OF SOCIAL AND HEALTH SERVICES....................... 36

DEPARTMENT OF VETERANS' AFFAIRS................................ 51

EASTERN WASHINGTON STATE HISTORICAL SOCIETY................... 158

EASTERN WASHINGTON UNIVERSITY................................. 138

INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION................... 82

MILITARY DEPARTMENT............................................ 29

OFFICE OF FINANCIAL MANAGEMENT................................. 18

OFFICE OF THE SECRETARY OF STATE................................ 1

STATE BOARD OF EDUCATION...................................... 114

STATE CONSERVATION COMMISSION.................................. 87

STATE CONVENTION AND TRADE CENTER.............................. 34

STATE PARKS AND RECREATION COMMISSION.......................... 74

STATE SCHOOL FOR THE BLIND.................................... 115

STATE SCHOOL FOR THE DEAF..................................... 116

SUPERINTENDENT OF PUBLIC INSTRUCTION.......................... 115

THE EVERGREEN STATE COLLEGE................................... 149

UNIVERSITY OF WASHINGTON...................................... 117

WASHINGTON STATE HISTORICAL SOCIETY........................... 155

WASHINGTON STATE PATROL....................................... 111

WASHINGTON STATE UNIVERSITY................................... 124

WESTERN WASHINGTON UNIVERSITY................................. 151

 

 


                            --- END ---