Z-1173.6  _______________________________________________

 

                          HOUSE BILL 2452

          _______________________________________________

 

State of Washington      57th Legislature     2002 Regular Session

 

By Representatives Fisher and Chase; by request of Governor Locke

 

Read first time 01/17/2002.  Referred to Committee on Transportation.

Making transportation improvements.


    AN ACT Relating to transportation funding and appropriations; creating new sections; making appropriations; authorizing expenditures for capital improvements; and declaring an emergency.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

 

    NEW SECTION.  Sec. 1.  (1)     The legislature recognizes that a good transportation system is critical in keeping Washington state's economy strong and its businesses competitive.  The legislature further recognizes that badly needed investments in our state's transportation infrastructure will create jobs and help to ensure Washington's long-term economic success.

    (2) The transportation investment act of 2002 is hereby adopted and, subject to the provisions hereinafter set forth, the several amounts hereinafter specified, or as much thereof as may be necessary to accomplish the purposes designated, are hereby appropriated from the several accounts and funds hereinafter named to the designated state agencies and offices for employee compensation and other expenses, for capital projects, and for other specified purposes, including the payment of any final judgments arising out of such activities, for the period ending June 30, 2003.

    (3) Unless the context clearly requires otherwise, the definitions in this subsection apply throughout the act.

    (a) "Fiscal year 2002" or "FY 2002" means the fiscal year ending June 30, 2002.

    (b) "Fiscal year 2003" or "FY 2003" means the fiscal year ending June 30, 2003.

    (c) "FTE" means full-time equivalent.

    (d) "Lapse" or "revert" means the amount shall return to an unappropriated status.

    (e) "Provided solely" means the specified amount may be spent only for the specified purpose.

 

                              PART 1

              GENERAL GOVERNMENT AGENCIES‑-OPERATING

 

    NEW SECTION.  Sec. 101.  FOR THE DEPARTMENT OF REVENUE

Multimodal Transportation Account‑-State

    Appropriation.............................. $          115,000

 

 

                              PART 2

                OPERATING‑-TRANSPORTATION AGENCIES

 

    NEW SECTION.  Sec. 201.  FOR THE DEPARTMENT OF TRANSPORTATION‑-PUBLIC TRANSPORTATION‑-PROGRAM V

Multimodal Transportation Account‑-State

    Appropriation.............................. $       44,785,000

 

    The appropriation in this section is subject to the following conditions and limitations and specified amounts are provided solely for that activity:  $40,000,000 of the multimodal transportation account‑-state appropriation is provided solely for grants for transit, special needs transportation, and rural mobility.  The department shall work cooperatively with the agency council on coordinated transportation and the Washington state transit association to establish grant application procedures and selection criteria.

 

                              PART 3

        CAPITAL‑-TRANSPORTATION AGENCIES CAPITAL FACILITIES

 

    NEW SECTION.  Sec. 301.  FOR THE DEPARTMENT OF TRANSPORTATION‑-CAPITAL FACILITIES‑-PROGRAM D

    Thurston County Light Industrial

 

    The appropriation in this section is provided for the department of transportation's share of site acquisition costs for the Thurston County light industrial complex.  It is the intent of the legislature that the department's share of future project costs be supported by the sale of the department's existing facilities that are being replaced.

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   3,100,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  41,582,000

           TOTAL.................................... $  44,682,000

 

                              PART 4

          CAPITAL‑-HIGHWAY IMPROVEMENTS AND PRESERVATION

 

    The motor vehicle account‑-state appropriations of $384,606,000 in sections 401 through 540 of this act include $383,000,000 in proceeds from the sale of bonds authorized by RCW 47.10.843.  The transportation commission may authorize the use of current revenues available to the department of transportation in lieu of bond proceeds for any part of the state appropriation.

 

    NEW SECTION.  Sec. 401.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    US 2 - SR 522 Monroe Bypass - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,261,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  47,159,000

           TOTAL.................................... $  48,420,000

 

    NEW SECTION.  Sec. 402.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    US 2 - SR 206 Grade Separation - Design

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   2,922,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $      78,000

           TOTAL.................................... $   3,000,000

 

    NEW SECTION.  Sec. 403.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 3 - Allyn to SR 106 Vicinity Safety - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     978,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   3,313,000

           TOTAL.................................... $   4,291,000

 

    NEW SECTION.  Sec. 404.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 3 - SR 303 Interchange (Waaga Way) New Ramp - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     620,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   4,465,000

           TOTAL.................................... $   5,085,000

 

    NEW SECTION.  Sec. 405.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 3 - Deer Creek Loop Road to Agate Road - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $      87,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     484,000

           TOTAL.................................... $     571,000

 

    NEW SECTION.  Sec. 406.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 4 - Svensen's Curve Realignment - Right of Way and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,435,000

 

    Prior Biennia (Expenditures).................... $     145,518

    Future Biennia (Projected Costs)................ $   3,011,000

           TOTAL.................................... $   4,591,518

 

    NEW SECTION.  Sec. 407.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - Interstate Bridge Replacement - Design

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,550,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  27,750,000

           TOTAL.................................... $  29,300,000

 

    NEW SECTION.  Sec. 408.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - Airdustrial NB On Ramp Safety - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     276,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     453,000

           TOTAL.................................... $     729,000

 

    NEW SECTION.  Sec. 409.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - Martin Way Overcrossing Bike Lanes - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     363,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     199,000

           TOTAL.................................... $     562,000

 

    NEW SECTION.  Sec. 410.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - SR 16 Interchange/38th Street Interchange - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   6,324,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 250,241,000

           TOTAL.................................... $ 256,565,000

 

    NEW SECTION.  Sec. 411.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - South 48th to South M Street Core HOV - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $  13,065,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  20,496,000

           TOTAL.................................... $  33,561,000

 

    NEW SECTION.  Sec. 412.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - I-705 to Port of Tacoma Interchange Core HOV - Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     728,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   8,483,000

           TOTAL.................................... $   9,211,000

 

    NEW SECTION.  Sec. 413.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - East "L" Street to Puyallup Bridge Core HOV - Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     852,000

 

    Prior Biennia (Expenditures).................... $   5,519,556

    Future Biennia (Projected Costs)................ $  37,994,000

           TOTAL................................ ... $  44,365,556

 

    NEW SECTION.  Sec. 414.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - Port of Tacoma Interchange Core HOV - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  17,910,000

           TOTAL.................................... $  17,910,000

 

    NEW SECTION.  Sec. 415.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - Port of Tacoma Road to King County Line Core HOV - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  18,648,000

           TOTAL.................................... $  18,648,000

 

    NEW SECTION.  Sec. 416.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - Pierce County Line to Tukwila I/C, Core HOV - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   6,450,000

 

    Prior Biennia (Expenditures).................... $     223,637

    Future Biennia (Projected Costs)................ $ 132,723,000

           TOTAL.................................... $ 139,396,637

 

    NEW SECTION.  Sec. 417.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - South 320th Street to South 210th Street Stage 1 and 2, Auxiliary Lanes - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   4,746,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 107,218,000

           TOTAL.................................... $ 111,964,000

 

    NEW SECTION.  Sec. 418.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - Junction SR 518 Direct HOV Ramp - Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,074,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  43,264,000

           TOTAL.................................... $  44,338,000

 

    NEW SECTION.  Sec. 419.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - Industrial Way Vicinity Transit Ramp - Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,289,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   8,016,000

           TOTAL.................................... $   9,305,000

 

    NEW SECTION.  Sec. 420.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - SR 520 Interchange Vicinity, Noise Walls - Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $      15,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   3,617,000

           TOTAL.................................... $   3,632,000

 

    NEW SECTION.  Sec. 421.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - NE 76th Street to NE 82nd Street, Noise Walls - Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $      69,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     709,000

           TOTAL.................................... $     778,000

 

    NEW SECTION.  Sec. 422.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - North 180th Street, Noise Walls - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     250,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     678,000

           TOTAL.................................... $     928,000

 

    NEW SECTION.  Sec. 423.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - NE 175th Street to NE 205th Street NB Lane - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,592,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   4,330,000

           TOTAL.................................... $   5,922,000

 

    NEW SECTION.  Sec. 424.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - 236th Street SW to 164th Street SW HOV - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $      38,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     939,000

           TOTAL.................................... $     977,000

 

    NEW SECTION.  Sec. 425.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - Interurban Trail Crossing of SR 524 - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     237,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   2,866,000

           TOTAL.................................... $   3,103,000

 

    NEW SECTION.  Sec. 426.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - 196th Street SW (SR 524) Interchange, Phase C - Right of Way and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,667,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  18,695,000

           TOTAL.................................... $  20,362,000

 

    NEW SECTION.  Sec. 427.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - SR 526 to US 2, Add HOV Lanes - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   3,988,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 154,285,000

           TOTAL.................................... $ 158,273,000

 

    NEW SECTION.  Sec. 428.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - North of SR 2 Interchange, Noise Walls - Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $      60,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     838,000

           TOTAL.................................... $     898,000

 

    NEW SECTION.  Sec. 429.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - Mt. Vernon, Bellingham, and Marysville, Traffic Systems - Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State....... ............ $      85,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     976,000

           TOTAL.................................... $   1,061,000

 

    NEW SECTION.  Sec. 430.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - 172nd Street NE (SR 531) Interchange - Right of Way and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,064,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   9,576,000

           TOTAL.................................... $  10,640,000

 

    NEW SECTION.  Sec. 431.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - South End of SR 536 Interchange, Noise Walls - Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $      57,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,023,000

           TOTAL.................................... $   1,080,000

 

    NEW SECTION.  Sec. 432.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - 2nd Street Bridge Replacement - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     467,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   7,872,000

           TOTAL.................................... $   8,339,000

 

    NEW SECTION.  Sec. 433.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - Bybee Creek Fish Barrier Removal - Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures)....... ............ $           0

    Future Biennia (Projected Costs)................ $   1,092,000

           TOTAL.................................... $   1,092,000

 

    NEW SECTION.  Sec. 434.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - Salmon Creek to I-205 Widening - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $  10,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  20,000,000

           TOTAL.................................... $  30,000,000

 

    NEW SECTION.  Sec. 435.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - Rush Road to Grand Mound Vicinity - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,372,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 104,449,000

           TOTAL.................................... $ 105,821,000

 

    NEW SECTION.  Sec. 436.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - Grand Mound to Maytown, Widening - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  33,530,000

           TOTAL.................................... $  33,530,000

 

    NEW SECTION.  Sec. 437.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 5 - State Route 502 Interchange - Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,733,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   8,431,000

           TOTAL.................................... $  10,164,000

 

    NEW SECTION.  Sec. 438.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 6 - Railroad Bridge to Rock Creek Bridge - Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,050,000

 

    Prior Biennia (Expenditures).................... $     483,514

    Future Biennia (Projected Costs)................ $     899,000

           TOTAL.................................... $   2,432,514

 

    NEW SECTION.  Sec. 439.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 7 - State Route 507 to State Route 512, Safety - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   9,664,000

           TOTAL.................................... $   9,664,000

 

    NEW SECTION.  Sec. 440.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 9 - 212th Street SE to 176th Street SE - Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     474,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   4,954,000

           TOTAL.................................... $   5,428,000

 

    NEW SECTION.  Sec. 441.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 9 - 56th Street SE and 42nd Street NE, Safety - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures)........... ........ $           0

    Future Biennia (Projected Costs)................ $   1,841,000

           TOTAL.................................... $   1,841,000

 

    NEW SECTION.  Sec. 442.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 9 - Prairie Road to Thunder Creek - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   3,332,000

           TOTAL.................................... $   3,332,000

 

    NEW SECTION.  Sec. 443.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 9 - Nooksack Road Vicinity to Cherry Street, All Weather Road - Right of Way and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     801,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  11,728,000

           TOTAL.................................... $  12,529,000

 

    NEW SECTION.  Sec. 444.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    US 12 - Old Naches Highway Interchange - Design

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     223,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     377,000

           TOTAL.................................... $     600,000

 

    NEW SECTION.  Sec. 445.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    US 12 - Attalia Vicinity, Add Lanes - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     133,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   8,253,000

           TOTAL.................................... $   8,386,000

 

    NEW SECTION.  Sec. 446.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    US 12 - Attalia Vicinity to SR 730, Add Lanes - Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     250,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,778,000

           TOTAL.................................... $   2,028,000

 

    NEW SECTION.  Sec. 447.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 14 - Maryhill Spur Vicinity to US 97, Add Truck Climbing Lane - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $      75,000

 

    Prior Biennia (Expenditures).................... $      88,201

    Future Biennia (Projected Costs)................ $   1,143,000

           TOTAL.................................... $   1,306,201

 

    NEW SECTION.  Sec. 448.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 14 - Camas/Washougal Vicinity, Widening - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,615,000

 

    Prior Biennia (Expenditures).................... $     933,559

    Future Biennia (Projected Costs)................ $  29,615,000

           TOTAL.................................... $  32,163,559

 

    NEW SECTION.  Sec. 449.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 16 - I-5 to Tacoma Narrows Bridge, Add HOV Lanes - Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   8,109,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  77,175,000

           TOTAL.................................... $  85,284,000

 

    NEW SECTION.  Sec. 450.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 16 - Olympic I/C to Purdy I/C, Add HOV Lanes - Design

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,300,000

           TOTAL.................................... $   1,300,000

 

    NEW SECTION.  Sec. 451.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 16 - Gig Harbor New Interchange - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   2,966,000

           TOTAL.................................... $   2,966,000

 

    NEW SECTION.  Sec. 452.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 16 - Burley/Olalla Intersection Safety - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     242,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     287,000

           TOTAL.................................... $     529,000

 

    NEW SECTION.  Sec. 453.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 16 - 36th Street to Olympic Drive NW, Add HOV Lanes - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,629,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   6,510,000

           TOTAL.................................... $   8,139,000

 

    NEW SECTION.  Sec. 454.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 17 - Pioneer Way to Stratford Road - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  14,744,000

           TOTAL.................................... $  14,744,000

 

    NEW SECTION.  Sec. 455.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 18 - Complete Corridor Expansion to Four Lane Freeway - Design, Right of Way, and Construction

 

    The appropriation in this section is provided for the design, right of way, and construction phases of the following projects along the SR 18 corridor:  Covington Way to Maple Valley; Maple Valley to Issaquah/Hobart Road; Issaquah/Hobart Road to Tigergate; Tigergate to I‑90.

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     513,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 140,037,000

           TOTAL.................................... $ 140,550,000

 

    NEW SECTION.  Sec. 456.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 20 - Mazama Area, Remove Fish Passage Barrier - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $      50,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     699,000

           TOTAL....................... ............ $     749,000

 

    NEW SECTION.  Sec. 457.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 20 - Deception and Canoe Pass Bridges - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   8,531,000

           TOTAL.................................... $   8,531,000

 

    NEW SECTION.  Sec. 458.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 20 - Fredonia to I-5 Widening - Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,775,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   2,725,000

           TOTAL.................................... $   4,500,000

 

    NEW SECTION.  Sec. 459.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 22 - I‑82 to McDonald Road, Safety - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     207,000

 

    Prior Biennia (Expenditures).................... $      15,852

    Future Biennia (Projected Costs)................ $   5,414,000

           TOTAL.................................... $   5,636,852

 

    NEW SECTION.  Sec. 460.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 24 - I‑82 to Keys Road - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  10,776,000

           TOTAL.................................... $  10,776,000

 

    NEW SECTION.  Sec. 461.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 28 - Junction US 2/97 to 9th Street - Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   4,195,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  10,150,000

           TOTAL.................................... $  14,345,000

 

    NEW SECTION.  Sec. 462.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 28 - Soap Lake Area, Safety Improvements - Right of Way and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $      83,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,734,000

           TOTAL.................................... $   1,817,000

 

    NEW SECTION.  Sec. 463.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 31 - Metaline Falls to International Border, Roadway Improvements - Right of Way and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   3,938,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   6,470,000

           TOTAL.................................... $  10,408,000

 

    NEW SECTION.  Sec. 464.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 82 - Thrall Road to Manatash Ridge - Design

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     600,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     500,000

           TOTAL.................................... $   1,100,000

 

    NEW SECTION.  Sec. 465.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 82 - Yakima Vicinity, Add Lanes - Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   2,973,000

           TOTAL.................................... $   3,473,000

 

    NEW SECTION.  Sec. 466.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 90 ‑ Ryegrass Summit to Vantage, Truck Climbing Lane ‑ Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $  10,526,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

           TOTAL.................................... $  10,526,000

 

    NEW SECTION.  Sec. 467.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 90 ‑ Moses Lake Area, Increase Vertical Bridge Clearance - Right of Way and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,511,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   2,603,000

           TOTAL.................................... $   4,114,000

 

    NEW SECTION.  Sec. 468.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 90 ‑ Highpoint to Preston, New Trail - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     300,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,350,000

           TOTAL.................................... $   1,650,000

 

    NEW SECTION.  Sec. 469.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 90 ‑ Harvard Road Interchange Improvements - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  12,925,000

           TOTAL.................................... $  12,925,000

 

    NEW SECTION.  Sec. 470.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 90 ‑ Argonne Road to Pines Road, Widening - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   5,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  11,553,000

           TOTAL.................................... $  16,553,000

 

    NEW SECTION.  Sec. 471.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 90 ‑ Pines Road to Sullivan Road, Widening - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   5,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  11,553,000

           TOTAL.................................... $  16,553,000

 

    NEW SECTION.  Sec. 472.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 90 ‑ Snoqualmie Pass East Improvements - Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $  12,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 263,453,000

           TOTAL.................................... $ 275,453,000

 

    NEW SECTION.  Sec. 473.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 90 ‑ Highline Canal to Elk Heights, Truck Climbing Lane ‑ Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   4,292,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

           TOTAL.................................... $   4,292,000

 

    NEW SECTION.  Sec. 474.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 96 - Seattle Hill Road to State Route 9, New Alignment - Right of Way and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     998,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   9,131,000

           TOTAL........ ........................... $  10,129,000

 

    NEW SECTION.  Sec. 475.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 99 - Aurora Avenue N. Corridor Project - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   2,727,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   2,273,000

           TOTAL.................................... $   5,000,000

 

    NEW SECTION.  Sec. 476.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    US 101 - Dawley Road Vicinity to Blyn Highway, Truck Climbing Lane ‑ Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,341,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

           TOTAL.................................... $   1,341,000

 

    NEW SECTION.  Sec. 477.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    US 101 - Blyn Vicinity Passing Lanes - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     834,000

 

    Prior Biennia (Expenditures)....... ............ $           0

    Future Biennia (Projected Costs)................ $     584,000

           TOTAL.................................... $   1,418,000

 

    NEW SECTION.  Sec. 478.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    US 101 - Gardiner Vicinity, Truck Climbing Lane - Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     323,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,328,000

           TOTAL.................................... $   1,651,000

 

    NEW SECTION.  Sec. 479.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 104 - SR 19 Westbound, Passing Lane - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,060,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     180,000

           TOTAL.................................... $   1,240,000

 

    NEW SECTION.  Sec. 480.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 106 ‑ Skobob Creek, Fish Passage Barrier Removal ‑ Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $      82,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,134,000

           TOTAL.................................... $   1,216,000

 

    NEW SECTION.  Sec. 481.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 112 ‑ Hoko-Ozette Road, Safety - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     969,000

           TOTAL.................................... $     969,000

 

    NEW SECTION.  Sec. 482.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 129 ‑ Clarkston Vicinity, Safety Improvements - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     789,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     345,000

           TOTAL.................................... $   1,134,000

 

    NEW SECTION.  Sec. 483.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 160 ‑ SR 16 to Longlake Road Vicinity, Safety Improvements - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     344,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,656,000

           TOTAL.................................... $   2,000,000

 

    NEW SECTION.  Sec. 484.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 161 ‑ 204th Street to 176th Street, Add Lanes - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   9,780,000

           TOTAL.................................... $   9,780,000

 

    NEW SECTION.  Sec. 485.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 161 ‑ 128th Street to 176th Street, Safety Improvements - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $      87,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   7,283,000

           TOTAL.................................... $   7,370,000

 

    NEW SECTION.  Sec. 486.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 161 ‑ SR 167 Eastbound Ramp, Safety Improvements - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     362,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,444,000

           TOTAL.................................... $   1,806,000

 

    NEW SECTION.  Sec. 487.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 161 ‑ 36th to Jovita, Widening - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,996,000

 

    Prior Biennia (Expenditures).................... $   2,115,325

    Future Biennia (Projected Costs)................ $  16,244,000

           TOTAL.................................... $  20,355,325

 

    NEW SECTION.  Sec. 488.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 161 ‑ Jovita Boulevard to S. 360th Street, Widening - Right of Way and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,113,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  15,264,000

           TOTAL.................................... $  16,377,000

 

    NEW SECTION.  Sec. 489.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 167 ‑ State Route 509 to Interstate 5, New Freeway - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $  28,770,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 307,674,000

           TOTAL.................................... $ 336,444,000

 

    NEW SECTION.  Sec. 490.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 167 ‑ 15th Street SW to 15th Street NW, Add HOV Lanes - Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   3,139,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  34,507,000

           TOTAL.................................... $  37,646,000

 

    NEW SECTION.  Sec. 491.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 167 ‑ 15th Street NW to 84th Avenue S, Complete HOV Project - Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $      86,000

 

    Prior Biennia (Expenditures).................... $     907,378

    Future Biennia (Projected Costs)................ $     869,000

           TOTAL.................................... $   1,862,378

 

    NEW SECTION.  Sec. 492.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 167 ‑ Interstate 5 to State Route 161, New Freeway ‑ Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  78,609,000

           TOTAL.................................... $  78,609,000

 

    NEW SECTION.  Sec. 493.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 167 ‑ 84th Avenue S to S Grady Way, Complete HOV Project ‑ Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $      75,000

 

    Prior Biennia (Expenditures).................... $   1,013,353

    Future Biennia (Projected Costs)................ $   1,626,000

           TOTAL.................................... $   2,714,353

 

    NEW SECTION.  Sec. 494.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 167 ‑ Valley Avenue, New Interchange ‑ Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  19,641,000

           TOTAL.................................... $  19,641,000

 

    NEW SECTION.  Sec. 495.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 167 ‑ SR 512 Interchange to 15th Street SW, Add HOV Lanes ‑ Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   8,680,000

           TOTAL.................................... $   8,680,000

 

    NEW SECTION.  Sec. 496.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 169 ‑ 225th Avenue SE to SE Wax Road ‑ Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     116,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     609,000

           TOTAL.................................... $     725,000

 

    NEW SECTION.  Sec. 497.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 203 ‑ NE 124th/Novelty Road Vicinity ‑ Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     146,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,110,000

           TOTAL.................................... $   1,256,000

 

    NEW SECTION.  Sec. 498.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 205 ‑ SR 14 to 83rd Street Widening ‑ Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   2,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  18,000,000

           TOTAL.................................... $  20,000,000

 

    NEW SECTION.  Sec. 499.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 231 ‑ SR 292 to SR 395, All Weather Road ‑ Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $      20,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  12,183,000

           TOTAL.................................... $  12,203,000

 

    NEW SECTION.  Sec. 500.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 240 ‑ Interstate 182 to Richland Y, Add Lanes ‑ Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State........... ........ $   2,657,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  18,842,000

           TOTAL.................................... $  21,499,000

 

    NEW SECTION.  Sec. 501.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 240 ‑ Richland Y to Columbia Center Interchange, Improvements ‑ Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   3,438,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  18,608,000

           TOTAL.................................... $  22,046,000

 

    NEW SECTION.  Sec. 502.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 241 ‑ North Sunnyside Reconstruction, All Weather Road ‑ Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     972,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   6,302,000

           TOTAL.................................... $   7,274,000

 

    NEW SECTION.  Sec. 503.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 241 ‑ Rattlesnake Hills to Junction SR 24, All Weather Road ‑ Right of Way and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   2,385,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   2,632,000

           TOTAL.................................... $   5,017,000

 

    NEW SECTION.  Sec. 504.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 243 ‑ Wanapum North, All Weather Road ‑ Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     552,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   3,357,000

           TOTAL.................................... $   3,909,000

 

    NEW SECTION.  Sec. 505.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 270 ‑ Pullman to Idaho State Line, Widen to Four Lane Divided Highway ‑ Right of Way and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.. ................. $   1,461,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  19,475,000

           TOTAL.................................... $  20,936,000

 

    NEW SECTION.  Sec. 506.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 303 ‑ Bremerton to Silverdale, EIS ‑ Design

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     800,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

           TOTAL.................................... $     800,000

 

    NEW SECTION.  Sec. 507.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 304 ‑ SR 3 to Bremerton Ferry Terminal, Add HOV Lanes ‑ Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   5,645,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   5,155,000

           TOTAL.................................... $  10,800,000

 

    NEW SECTION.  Sec. 508.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 305 ‑ Poulsbo City Limits to Bond Road, Add Lanes ‑ Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,310,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  13,062,000

           TOTAL.................................... $  14,372,000

 

    NEW SECTION.  Sec. 509.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 307 ‑ State Route 305 to State Route 104, EIS ‑ Design

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     683,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   2,317,000

           TOTAL.................................... $   3,000,000

 

    NEW SECTION.  Sec. 510.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    US 395 ‑ 19th Avenue Kennewick, Add Noise Walls ‑ Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     993,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   2,756,000

           TOTAL.................................... $   3,749,000

 

    NEW SECTION.  Sec. 511.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    US 395 ‑ North Spokane Corridor, New Freeway ‑ Design, Right of Way, and Construction

 

    The appropriation in this section is provided for the design, right of way, and construction phases of the following projects along the US 395 North Spokane corridor:  North Spokane Corridor ‑ Right of Way; NSC Trent Avenue to Francis Avenue ‑ Preconstruction; NSC Spokane River to Francis Avenue ‑ Street Improvements; NSC Francis Avenue to Hawthorne Road ‑ Preconstruction; NSC Hawthorne Road to US 2 ‑ Four Lane Divided Highway; NSC US 2 to Wandermere Vicinity ‑ Four Lane Divided Highway.

 

Appropriation:

    Motor Vehicle Account‑-State.................... $  41,890,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 273,557,000

           TOTAL.................................... $ 315,447,000

 

    NEW SECTION.  Sec. 512.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 405 ‑ Tukwila to Lynnwood (Stage 1, Tukwila to Bellevue) ‑ Design, Right of Way, and Construction

 

    The appropriation in this section is provided for the design, right of way, and construction costs necessary to add two general‑purpose lanes in each direction of I-405 from I‑5 in Tukwila to I‑90 in Bellevue plus other capacity improvements as needed.  Funding is also provided to reconstruct the interchange at SR 167 and complete the design necessary to continue capacity improvements from I‑90 through Bellevue.

 

Appropriation:

    Motor Vehicle Account‑-State.................... $  50,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 2,143,919,000

           TOTAL.................................... $ 2,193,919,000

 

    NEW SECTION.  Sec. 513.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 405 ‑ Bothell to Swamp Creek Interchange, Complete HOV Project ‑ Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $      80,000

 

    Prior Biennia (Expenditures)................ ... $           0

    Future Biennia (Projected Costs)................ $     799,000

           TOTAL.................................... $     879,000

 

    NEW SECTION.  Sec. 514.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Interstate 405 ‑ NE 44th Interchange, Improvements ‑ Right of Way and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   5,999,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  60,410,000

           TOTAL.................................... $  66,409,000

 

    NEW SECTION.  Sec. 515.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 410 ‑ 234th to Hinkleman Extension Road, Add Lanes ‑ Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,620,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   5,748,000

           TOTAL.................................... $   7,368,000

 

    NEW SECTION.  Sec. 516.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 500 ‑ St. Johns Boulevard, New Interchange ‑ Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,650,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  20,413,000

           TOTAL.................................... $  22,063,000

 

    NEW SECTION.  Sec. 517.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 500 ‑ NE 112th Avenue, New Interchange ‑ Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $  11,536,000

 

    Prior Biennia (Expenditures).. ................. $           0

    Future Biennia (Projected Costs)................ $  10,464,000

           TOTAL.................................... $  22,000,000

 

    NEW SECTION.  Sec. 518.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 500 ‑ 124th Avenue, Safety Improvements ‑ Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     821,000

           TOTAL.................................... $     821,000

 

    NEW SECTION.  Sec. 519.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 500 ‑ Ward Road to 162nd Avenue, Widening ‑ Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,271,000

           TOTAL.................................... $   1,271,000

 

    NEW SECTION.  Sec. 520.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 501 ‑ 19th Avenue Signal ‑ Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     975,000

           TOTAL.................................... $     975,000

 

    NEW SECTION.  Sec. 521.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 503 ‑ NE 144th to Brush Prairie, Stormwater Improvements ‑ Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     824,000

           TOTAL.................................... $     824,000

 

    NEW SECTION.  Sec. 522.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 503 ‑ Lewisville Park Climbing Lane ‑ Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     100,000

 

    Prior Biennia (Expenditures).................... $     247,733

    Future Biennia (Projected Costs)................ $     500,000

           TOTAL.................................... $     847,733

 

    NEW SECTION.  Sec. 523.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 509 ‑ I‑5 to Des Moines Way S and S 188th Street, New Extension ‑ Design, Right of Way, and Construction

    The appropriation in this section is provided for the design, right of way, and construction phases necessary to extend the freeway section on State Route 509 from its current terminus at S 188th Street near SeaTac Airport southeast to intersect Interstate 5 in the vicinity of S 210th.  The new extension will provide a divided roadway with two general-purpose lanes and one HOV lane in each direction.  The South Access Road will extend south from SeaTac Airport to intersect with SR 509 extension in the vicinity of S 206th.  Improvements to the local arterial system will be made to accommodate these new corridors and to improve traffic operations.

 

Appropriation:

    Motor Vehicle Account‑-State.................... $  29,810,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 465,188,000

           TOTAL.................................... $ 494,998,000

 

    NEW SECTION.  Sec. 524.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 519 - Intermodal Access Project - Right of Way and Construction

 

    The appropriation in this section is provided for the design, right of way, and construction phases necessary to construct intermodal improvements in south Seattle to reduce or eliminate the conflicts between existing intermodal facilities that serve south downtown Seattle, and improve State Route 519 through traffic from Interstate 5 and Interstate 90 to the Washington State Ferry and Port of Seattle facilities along the waterfront.

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     542,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  36,408,000

           TOTAL.................................... $  36,950,000

 

    NEW SECTION.  Sec. 525.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 520 - Seattle to Eastside Communities (Trans-Lake) - Design

 

    The appropriation in this section is provided for the design phase of the Seattle to Eastside Communities (Trans-Lake Washington) project.  The purpose of the Trans-Lake Washington project is to improve mobility for people and goods on SR 520 while minimizing negative impacts to neighborhoods and the environment.  An environmental impact statement will help the project's lead agencies and committees select a preferred alternative for implementation.  Remaining project costs are to be determined once a preferred alternative is selected.

 

Appropriation:

    Motor Vehicle Account‑-State.................... $  28,222,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

           TOTAL.................................... $  28,222,000

 

    NEW SECTION.  Sec. 526.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 520 - West Lake Sammamish Parkway to SR 202, Add Lanes - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,299,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  64,175,000

           TOTAL.................................... $  65,474,000

 

    NEW SECTION.  Sec. 527.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 522 - I-5 to SR 405 Multimodal Project - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   5,084,000

           TOTAL.................................... $   5,084,000

 

    NEW SECTION.  Sec. 528.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 522 - SR 9 to Paradise Lake Road, Widen to Four Lane Divided Highway - Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,287,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  21,162,000

           TOTAL.................................... $  22,449,000

 

    NEW SECTION.  Sec. 529.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 522 - Paradise Lake Road to Snohomish River, Widen to Four Lane Divided Highway - Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     448,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  14,050,000

           TOTAL.................................... $  14,498,000

 

    NEW SECTION.  Sec. 530.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 522 - Snohomish River Bridge to US 2, Widen to Four Lane Divided Highway - Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     897,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   4,562,000

           TOTAL.................................... $   5,459,000

 

    NEW SECTION.  Sec. 531.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 524 - 24th Avenue SW to SR 527, Add Lanes - Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $      61,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   4,377,000

           TOTAL.................................... $   4,438,000

 

    NEW SECTION.  Sec. 532.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 527 - 132nd Street SE to 112th Street SE, Add Lanes - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $      52,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  17,152,000

           TOTAL.................................... $  17,204,000

 

    NEW SECTION.  Sec. 533.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 530 - Jordan Road to 139th Avenue NE, Safety Improvements - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     806,000

           TOTAL.................................... $     806,000

 

    NEW SECTION.  Sec. 534.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 530 - Arlington Heights Road/Jordan Road, Safety Improvements - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,118,000

           TOTAL.................................... $   1,118,000

 

    NEW SECTION.  Sec. 535.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 530 - Lake Cavanaugh Road to Montague Creek, All Weather Road - Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,558,000

           TOTAL.................................... $   1,558,000

 

    NEW SECTION.  Sec. 536.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 531 - 43rd Avenue NE to 67th Avenue NE, Add Lanes - Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     791,000

 

    Prior Biennia (Expenditures).................... $     380,852

    Future Biennia (Projected Costs)................ $   6,119,000

           TOTAL................................ ... $   7,290,852

 

    NEW SECTION.  Sec. 537.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 539 - Tenmile Road to International Boundary, Add Lanes - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   3,869,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  12,539,000

           TOTAL.................................... $  16,408,000

 

    NEW SECTION.  Sec. 538.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 542 - Orleans to Britton Road, Add Lanes - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,674,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)....... ........ $  10,159,000

           TOTAL.................................... $  11,833,000

 

    NEW SECTION.  Sec. 539.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 543 - Boblett Street to International Boundary, Widen - Right of Way and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   2,263,000

 

    Prior Biennia (Expenditures).................... $     271,703

    Future Biennia (Projected Costs)................ $  20,045,000

           TOTAL.................................... $  22,579,703

 

    NEW SECTION.  Sec. 540.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    State Route 900 - SE 78th Street Vicinity to I-90 Vicinity, Add Lanes - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,407,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  11,159,000

           TOTAL.................................... $  12,566,000

 

    NEW SECTION.  Sec. 541.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Statewide Transportation Projects Totaling Less than $500,000

 

    The appropriation in this section is provided for the design, right of way, and construction phases of the following projects:

    Northwest region:  I-5/Ship Canal Bridge - noise mitigation; I-5/116th Street NE Vicinity - noise walls; I-90/West Lake Sammamish Parkway Vicinity - drainage; I-90/Raging River Vicinity - drainage; SR 169/140th Way SE to SR 900; SR 169/Fifth Avenue SE - noise walls.

    North Central region:  US 2/Dryden - signal; US 2/East Wenatchee Cascade Avenue - signal; US 97/Blewett Pass - truck lane; US 97A/Entiat Park Entrance - turn lanes.

    Olympic region:  SR 3/NB Off Ramp at Loxie Eagans Boulevard - signalization; SR 3/Spring Creek - fish passage; I-5/Woodland Creek - stormwater outfall; I-5/Indian Creek - fish passage; I-5/McAllister Creek - stormwater; SR 7/340th Intersection - safety; US 101/Corriea Road Vicinity to Zaccardo Road - safety; US 101/Chicken Coop Creek - fish passage; SR 104/Jct SR 19 Intersection Safety; SR 112/Unnamed Tributary to Pysht River - fish passage; SR 305/Bjorgen Creek - fish passage.

    Southwest region:  SR 503 Unnamed Creek Vicinity NE 319th Street - fish passage; SR 504/Vicinity Estes Road - fish passage; SR 505/Vicinity Nevil Road - fish passage; SR 505/Unnamed Creek Vicinity Jct SR 504 - fish passage.

    South Central region:  SCR Region Wide Bridge Rail Retrofit - safety; SR 124/East Junction SR 12 - reconstruction; SR 129/Asotin Vicinity - reconstruction; I-182/US 395 I/C - Roadside Safety; US 395/Kennewick Variable Message Sign - safety; US 395/North of Pasco - rumble strips.

    Eastern region:  US 395/Spokane to Stevens County Line - design; US 395/Spokane County Line to Chewelah - design.   

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   5,200,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   3,688,000

           TOTAL.................................... $   8,888,000

 

    NEW SECTION.  Sec. 542.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Olympic Region Environmental Mitigation

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,000,000

           TOTAL.................................... $   1,000,000

 

    NEW SECTION.  Sec. 543.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Transportation Project:  Savings

 

    Projects that are completed in accordance with section 1005 of this act may have their remaining funds transferred to this appropriation for other transportation improvement projects approved by the office of financial management.

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           1

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

           TOTAL.................................... $           1

 

    NEW SECTION.  Sec. 544.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Project Delivery System

 

    The appropriation in this section is provided for the acquisition of a project delivery system for the highway construction program.  At a minimum, the system shall provide specific project delivery information related to scope, budget, and schedule.

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   2,000,000

           TOTAL.................................... $   2,000,000

 

    NEW SECTION.  Sec. 545.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Global Positioning System Training

 

Appropriation:

    Motor Vehicle Account‑-State.................... $           0

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     186,000

           TOTAL.................................... $     186,000

 

    NEW SECTION.  Sec. 546.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Primary Control Monument Program

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     106,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $     709,000

           TOTAL.................................... $     815,000

 

    NEW SECTION.  Sec. 547.  FOR THE DEPARTMENT OF TRANSPORTATION‑-IMPROVEMENTS‑-PROGRAM I

    Restore Current Law Projects

 

    The appropriation in this section is provided for the design, right of way, and construction costs of 2001‑03 projects that were deferred due to a revenue shortfall in the current law budget.

 

Appropriation:

    Motor Vehicle Account‑-State.................... $  33,580,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

           TOTAL.................................... $  33,580,000

 

    NEW SECTION.  Sec. 548.  FOR THE DEPARTMENT OF TRANSPORTATION‑-PRESERVATION‑-PROGRAM P

    Restore Current Law Projects

 

    The appropriation in this section is provided for the design, right of way, and construction costs of 2001‑03 projects that were deferred due to a revenue shortfall in the current law budget.

 

Appropriation:

    Motor Vehicle Account‑-State.................... $  10,961,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

           TOTAL.................................... $  10,961,000

 

                              PART 6

          CAPITAL‑-WASHINGTON STATE FERRIES CONSTRUCTION

 

    The motor vehicle account‑-state appropriations of $27,421,000 in sections 601 through 607 of this act include $10,000,000 in proceeds from the sale of bonds authorized by RCW 47.10.843.  The transportation commission may authorize the use of current revenues available to the department of transportation in lieu of bond proceeds for any part of the state appropriation.

 

    NEW SECTION.  Sec. 601.  FOR THE DEPARTMENT OF TRANSPORTATION‑-WASHINGTON STATE FERRIES CONSTRUCTION‑-PROGRAM W

    Four Replacement Auto/Passenger Ferries - Design and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   4,128,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 317,761,000

           TOTAL.................................... $ 321,889,000

 

    NEW SECTION.  Sec. 602.  FOR THE DEPARTMENT OF TRANSPORTATION‑-WASHINGTON STATE FERRIES CONSTRUCTION‑-PROGRAM W

    Anacortes Multimodal Terminal - Design, Right of Way, and Construction

 

Appropriation:

    Motor Vehicle Account‑-State.................... $     518,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  53,842,000

           TOTAL.................................... $  54,360,000

 

    NEW SECTION.  Sec. 603.  FOR THE DEPARTMENT OF TRANSPORTATION‑-WASHINGTON STATE FERRIES CONSTRUCTION‑-PROGRAM W

    Mukilteo Multimodal Terminal - Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   1,810,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 105,943,000

           TOTAL.................................... $ 107,753,000

 

    NEW SECTION.  Sec. 604.  FOR THE DEPARTMENT OF TRANSPORTATION‑-WASHINGTON STATE FERRIES CONSTRUCTION‑-PROGRAM W

    Edmonds Multimodal Terminal - Design and Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   2,200,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

           TOTAL.................................... $   2,200,000

 

    NEW SECTION.  Sec. 605.  FOR THE DEPARTMENT OF TRANSPORTATION‑-WASHINGTON STATE FERRIES CONSTRUCTION‑-PROGRAM W

    Passenger-Only Vessel and Terminal Projects - Design and Construction

 

    The appropriation in this section is provided for the acquisition of passenger-only vessels and the costs associated with the design and construction of passenger-only terminal facilities necessary to begin passenger-only ferry service on the Seattle/Kingston route by September 2003 and the Seattle/Southworth route by September 2005.

 

Appropriation:

    Multimodal Transportation Account‑-State........ $   5,716,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  45,541,000

           TOTAL.................................... $  51,256,000

 

    NEW SECTION.  Sec. 606.  FOR THE DEPARTMENT OF TRANSPORTATION‑-WASHINGTON STATE FERRIES CONSTRUCTION‑-PROGRAM W

    Catch-up Preservation for Terminals and Vessels

 

    The appropriation in this section is provided for additional terminal and vessel preservation to reach level recommended by the legislature's joint task force on ferries.

 

Appropriation:

    Motor Vehicle Account‑-State.................... $  11,690,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  88,310,000

           TOTAL.................................... $ 100,000,000

 

    NEW SECTION.  Sec. 607.  FOR THE DEPARTMENT OF TRANSPORTATION‑-WASHINGTON STATE FERRIES CONSTRUCTION‑-PROGRAM W

    Seattle Pier 48 Acquisition/Relocation - Right of Way

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   7,075,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,860,000

           TOTAL.................................... $   8,935,000

 

                              PART 7

                    CAPITAL--RAIL CONSTRUCTION

 

    NEW SECTION.  Sec. 701.  FOR THE DEPARTMENT OF TRANSPORTATION‑-RAIL‑-PROGRAM Y‑-CAPITAL

    Passenger Rail Capital Improvements - Design, Right of Way, and Construction

 

    The appropriation in this section is provided for the design, right of way, and construction costs associated with the following list of passenger rail capital projects:

 

                                                          2001-03 Total         Future Biennia

County              Project                             Amount Recommended   (Projected Costs)

 

Clark               Vancouver Rail Project - incl. 39th St. Bridge 31,803,000   29,172,000

Cowlitz             Kelso-Martin Bluff - 3rd mainline     10,460,000          135,286,000

Pierce              Point Defiance (Lakeview) Bypass      26,160,000          105,840,000

King                Kent-Auburn Valley Improvements       18,013,000           51,987,000

Lewis               Napavine Third Mainline                        0           32,000,000

Lewis               Vadar to Winlock                               0           30,000,000

Lewis               North Chehalis to Wabash - 3rd mainline        0           45,000,000

Cowlitz             Castle Rock - 3rd mainline                     0           12,911,000

Snohomish           PA Junction to Delta Junction - speed increase 4,000,000             0

Whatcom             Bellingham Siding Extension                    0           30,000,000

King, Snohomish     Capacity Improvements                          0           46,000,000

King, Snohomish,

Whatcom             High-Speed Upgrades                            0           22,171,000

King, Snohomish,

Whatcom             Second Round Trip Projects                     0            6,793,000

King, Pierce, Lewis,

Cowlitz, Clark      Grade Crossing Upgrades                  120,000                    0

Pierce, Thurston,

Lewis, Cowlitz,

Clark               High Speed Crossovers                 13,605,000                    0

King, Pierce,

Thurston, Lewis,

Cowlitz, Clark      High Speed Upgrades                   10,399,000           12,000,000

                    High-Speed Locomotives                12,000,000           72,000,000

                    New High-Speed Train Sets             18,037,000          125,963,000

Total          134,137,000   757,123,000

 

Appropriation:

    Multimodal Transportation Account‑-State........ $  22,400,000

    Multimodal Transportation Account‑-Federal...... $ 111,737,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 757,123,000

           TOTAL............. ...................... $ 891,260,000

 

    NEW SECTION.  Sec. 702.  FOR THE DEPARTMENT OF TRANSPORTATION‑-RAIL‑-PROGRAM Y‑-CAPITAL

    Freight Rail Assistance Program - Design, Right of Way, and Construction

 

    The appropriation in this section is provided for the design, right of way, and construction costs associated with the following list of freight rail capital projects:

 

                                                          2001-03 Total         Future Biennia

County              Project                             Amount Recommended   (Projected Costs)

 

Yakima              Yakima County Improvements               300,000                    0

Grays Harbor        Puget Sound & Pacific Swing Bridge Repairs 1,000,000                 0

Skagit              Mount Vernon Terminal Log Transload            0              200,000

Lincoln             Columbia Basin RR Connell to Warden Upgrade    0            1,000,000

Walla Walla         Blue Mtn. RR Wallula to Walla Walla Upgrade    0            1,200,000

Columbia            Port of Columbia County - Dayton Upgrades      0              300,000

Grays Harbor        Grays Harbor County Saw Mill Spur              0           15,000,000

Benton              Port of Benton Industrial Spur Track to Rock Quarry                 0       500,000

Grant, Lincoln      Palouse R. & Coulee City RR Bridge Repairs     0              500,000

Pierce, Lewis       Various 286-Pound Upgrade Projects             0           39,800,000

Pierce, Lewis       Tacoma Rail Mtn. Div. Chehalis to Frederickson Upgrade              0       10,200,000

Pierce, Lewis       Tacoma Rail Mtn. Div. Morton Line Repairs 700,000            2,300,000

Total          2,000,000     71,000,000

 

Appropriation:

    Multimodal Transportation Account‑-State........ $   2,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  71,000,000

           TOTAL.................................... $  73,000,000

 

    NEW SECTION.  Sec. 703.  FOR THE DEPARTMENT OF TRANSPORTATION‑-RAIL‑-PROGRAM Y‑-CAPITAL

    Short Haul Intermodal Study - Design

 

Appropriation:

    Multimodal Transportation Account‑-State........ $     500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $           0

           TOTAL.................................... $     500,000

 

    NEW SECTION.  Sec. 704.  FOR THE DEPARTMENT OF TRANSPORTATION‑-RAIL‑-PROGRAM Y‑-CAPITAL

    Washington Fruit Express - Design, Right of Way, and Construction

 

    The appropriation in this section is provided for the design, right of way, and construction of transload facilities in Wenatchee and Pasco.

 

Appropriation:

    Multimodal Transportation Account‑-State........ $   1,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   1,000,000

           TOTAL.................................... $   2,000,000

 

                              PART 8

                      CAPITAL‑-LOCAL PROGRAMS

 

    NEW SECTION.  Sec. 801.  FOR THE DEPARTMENT OF TRANSPORTATION‑-LOCAL PROGRAMS‑-PROGRAM Z‑-CAPITAL

    Columbia River Dredging, Washington State Share - Design and Construction

 

Appropriation:

    Multimodal Transportation Account‑-State........ $           0

 

    Prior Biennia (Expenditures).. ................. $           0

    Future Biennia (Projected Costs)................ $  17,700,000

           TOTAL.................................... $  17,700,000

 

    NEW SECTION.  Sec. 802.  FOR THE DEPARTMENT OF TRANSPORTATION‑-LOCAL PROGRAMS‑-PROGRAM Z‑-CAPITAL

    School Safety Enhancements

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   5,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $   5,000,000

           TOTAL.................................... $  10,000,000

 

    NEW SECTION.  Sec. 803.  FOR THE DEPARTMENT OF TRANSPORTATION‑-LOCAL PROGRAMS‑-PROGRAM Z‑-CAPITAL

    Main Street Pavement Program

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   4,500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  40,500,000

           TOTAL.................................... $  45,000,000

 

    NEW SECTION.  Sec. 804.  FOR THE DEPARTMENT OF TRANSPORTATION‑-LOCAL PROGRAMS‑-PROGRAM Z‑-CAPITAL

    County Corridor Congestion Relief

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   4,500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  40,500,000

           TOTAL.................................... $  45,000,000

 

    NEW SECTION.  Sec. 805.  FOR THE DEPARTMENT OF TRANSPORTATION‑-LOCAL PROGRAMS‑-PROGRAM Z‑-CAPITAL

    City Corridor Congestion Relief

 

Appropriation:

    Motor Vehicle Account‑-State.................... $   4,500,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  40,500,000

           TOTAL.................................... $  45,000,000

 

    NEW SECTION.  Sec. 806.  FOR THE DEPARTMENT OF TRANSPORTATION‑-LOCAL PROGRAMS‑-PROGRAM Z‑-CAPITAL

    Freight mobility projects as identified by the freight mobility strategic investment board

 

Appropriation:

    Motor Vehicle Account‑-State.................... $  23,800,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $ 214,200,000

           TOTAL.................................... $ 238,000,000

 

    The appropriations in this section are subject to the following conditions and limitations:  The motor vehicle account‑-state appropriation of $23,800,000 in this section includes $20,000,000 in proceeds from the sale of bonds authorized by RCW 47.10.843.  The transportation commission may authorize the use of current revenues available to the department of transportation in lieu of bond proceeds for any part of the state appropriation.

 

    NEW SECTION.  Sec. 807.  FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT

    Community Economic Revitalization (CERB) - Rural Economic Vitality

 

    The appropriation in this section is provided solely for grants for transportation-related capital investments that benefit rural economic development.  The community economic revitalization board and the highways and local programs service center at the department of transportation shall work cooperatively to establish grant application procedures and project selection criteria.

 

Appropriation:

    Multimodal Transportation Account‑-State........ $   5,000,000

 

    Prior Biennia (Expenditures).................... $           0

    Future Biennia (Projected Costs)................ $  45,000,000

           TOTAL.................................... $  50,000,000

 

                              PART 9

                    TRANSFERS AND DISTRIBUTIONS

 

    NEW SECTION.  Sec. 901.  FOR THE STATE TREASURER‑-BOND RETIREMENT AND INTEREST AND ONGOING BOND REGISTRATION AND TRANSFER CHARGES:  FOR BOND SALES DISCOUNTS AND DEBT TO BE PAID BY MOTOR VEHICLE FUND AND TRANSPORTATION FUND REVENUE

Highway Bond Retirement Account Appropriation........            $........................................... 7,109,000

Motor Vehicle Account‑-State Appropriation.......... $   4,130,000

           TOTAL.................................... $  11,239,000

 

 

    NEW SECTION.  Sec. 902.  FOR THE STATE TREASURER‑-BOND RETIREMENT AND INTEREST, AND ONGOING BOND REGISTRATION AND TRANSFER CHARGES:  FOR BOND SALE EXPENSES AND FISCAL AGENT CHARGES

Motor Vehicle Account‑-State Appropriation.......... $     340,000

 

    NEW SECTION.  Sec. 903.  FOR THE STATE TREASURER‑-STATE REVENUES FOR DISTRIBUTION

Motor Vehicle Account‑-State Appropriation

    for revenue distribution to the cities.......... $   7,250,000

Motor Vehicle Account‑-State Appropriation

    for distribution to the counties... ............ $   7,250,000

           TOTAL.................................... $  14,500,000

 

 

    The distributions in this section are subject to the following conditions and limitations and specified amounts are provided solely for that activity:

    (1) The motor vehicle account‑-state appropriation to cities is to be distributed in one distribution in June 2003 consistent with RCW 46.68.110 (4) and (5).  Deductions shall not be made for supervision, studies, or the city hardship assistance program.

    (2) The distribution to counties shall be distributed in a manner consistent with RCW 46.68.122.  Deductions shall not be made for supervision, studies, or the city hardship assistance program.

    (3) The amounts provided in this section may not be used to supplant any existing local government funding for transportation projects or programs.  Any local government in violation of this requirement shall immediately forfeit its eligibility for future distributions provided under this section.

 

                              PART 10

         PROVISIONS NECESSARY TO IMPLEMENT APPROPRIATIONS

 

    NEW SECTION.  Sec. 1001.  (1) Agencies shall expedite the expenditure of appropriations in order to:  (a) Rehabilitate transportation infrastructure resources; (b) accelerate transportation related environmental rehabilitation and restoration projects for the improvement of the state's natural environment; (c) reduce additional costs associated with acquisition and construction inflationary pressures; and (d) provide additional employment opportunities associated with transportation capital expenditures.

    (2) In order to meet the goals of this section, the following conditions apply to the appropriations of this act:  To the extent feasible, agencies are directed to accelerate expenditures and may use contracted design and construction services wherever necessary to meet the goals of this section.

 

    NEW SECTION.  Sec. 1002.  The amounts shown under the headings "Prior Biennia," "Future Biennia," and "Total" in this act are for informational purposes only and do not constitute legislative approval of these amounts.

 

    NEW SECTION.  Sec. 1003.  (1) Unless otherwise stated, for all appropriations under this act that require a match of nonstate money or in-kind contributions, the following requirement, consistent with RCW 43.88.150, shall apply:  Expenditures of state money shall be timed so that the state share of project expenditures never exceeds the intended state share of total project costs.

    (2) Provision of the full amount of required matching funds is not required to permit the expenditures of capital budget appropriations for phased projects if a proportional amount of the required matching funds is provided for each distinct, identifiable phase of the project.

 

    NEW SECTION.  Sec. 1004.  Any capital improvements or capital projects involving construction or major expansion of a state office facility, including, but not limited to, district headquarters and detachment offices, shall be reviewed by the department of general administration for possible consolidation, colocation, and compliance with state office standards before allotment of funds.  The intent of the requirement imposed by this section is to eliminate duplication and reduce total office space requirements where feasible, while ensuring proper service to the public.

 

    NEW SECTION.  Sec. 1005.  The governor, through the office of financial management, may authorize a transfer of appropriation authority provided for a capital project that is in excess of the amount required for the completion of such project to another capital project for which the appropriation is insufficient.  No such transfer may be used to expand the capacity of any facility beyond that intended by the legislature in making the appropriation.  Such transfers may be effected only between capital appropriations to a specific department or agency and only between capital projects that are funded from the same fund or account.  No transfers may occur between projects to local government agencies except where the grants are provided within a single omnibus appropriation and where such transfers are specifically authorized by the implementing statutes which govern the grants.

    For purposes of this section, the governor may find that an amount is in excess of the amount required for the completion of a project only if:  (1) The project defined in the notes to the budget document is substantially complete and there are funds remaining; or (2) bids have been let on a project and it appears to a substantial certainty that the project as defined in the notes to the budget document can be completed within the biennium for less than the amount appropriated in this act.

    For the purposes of this section, the legislature intends that each project be defined as proposed to the legislature in the governor's budget document, unless it clearly appears from the legislative history that the legislature intended to define the scope of a project in a different way.

    A report of any transfer effected under this section, except emergency projects or any transfer under $250,000, shall be filed with the legislative transportation committees of the senate and the house of representatives by the office of financial management at least thirty days before the date the transfer is effected.  The office of financial management shall report all emergency or smaller transfers within thirty days from the date of transfer.

 

    NEW SECTION.  Sec. 1006.  If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected.

 

    NEW SECTION.  Sec. 1007.  This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately.

 

                               INDEX                         PAGE #

 

DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT....... 53

DEPARTMENT OF REVENUE........................................... 2

DEPARTMENT OF TRANSPORTATION..................... 2, 3, 46, 48, 51

CAPITAL FACILITIES--PROGRAM D................................... 3

IMPROVEMENTS--PROGRAM I......................................... 3

LOCAL PROGRAMS--PROGRAM Z--CAPITAL............................. 51

PRESERVATION--PROGRAM P........................................ 46

PUBLIC TRANSPORTATION--PROGRAM V................................ 2

RAIL--PROGRAM Y--CAPITAL....................................... 48

WASHINGTON STATE FERRIES CONSTRUCTION--PROGRAM W............... 46

STATE TREASURER................................................ 53

BOND RETIREMENT AND INTEREST................................... 53

STATE REVENUES FOR DISTRIBUTION................................ 53

 

 


                            --- END ---