Z-0414.2 _______________________________________________
SENATE BILL 5347
_______________________________________________
State of Washington 57th Legislature 2001 Regular Session
By Senators Fairley and Zarelli; by request of Governor Locke
Read first time 01/19/2001. Referred to Committee on Ways & Means.
AN ACT Relating to the capital budget; making appropriations and authorizing expenditures for capital improvements; creating new sections; and declaring an emergency.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
PART 1
GENERAL GOVERNMENT
NEW SECTION. Sec. 101. FOR THE OFFICE OF THE SECRETARY OF STATE
Deferred Maintenance Reduction Backlog Projects: Regional Archive (02-1-002)
Appropriation:
State Building Construction Account‑-State...... $ 100,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 415,000
-------------
TOTAL.................................... $ 515,000
NEW SECTION. Sec. 102. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Rural Washington Loan Fund (RWLF)(88-2-002)
Reappropriation:
State Building Construction Account‑-State...... $ 558,716
Rural Washington Loan Account‑-Federal.......... $ 4,276,514
-------------
Subtotal Reappropriation.................. $ 4,835,230
Appropriation:
Rural Washington Loan Account‑-Federal.......... $ 5,650,367
Prior Biennia (Expenditures).................... $ 3,041,836
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 13,527,433
NEW SECTION. Sec. 103. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Grays Harbor Dredging (88-2-006)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 1,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,000,000
NEW SECTION. Sec. 104. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Seventh Street Theatre (90-2-008)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 51,110
Prior Biennia (Expenditures).................... $ 78,890
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 130,000
NEW SECTION. Sec. 105. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Drinking Water Assistance Program (98-2-008)
The reappropriation in this section is subject to the following conditions and limitations:
(1) Funding from the state public works trust fund program shall be matched with federal sources to improve the quality of drinking water in the state, and shall be used solely for projects that achieve the goals of the federal safe drinking water act.
(2) The department shall report to the appropriate committees of the legislature by January 1, 2002, on the progress of the program, including administrative and technical assistance procedures, the application process and funding priorities.
Reappropriation:
Drinking Water Assistance Account‑-State........ $ 12,403,978
Prior Biennia (Expenditures).................... $ 4,586,022
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 16,990,000
NEW SECTION. Sec. 106. FOR THE DEPARTMENT OF COMMUNITY, TRADE, ECONOMIC DEVELOPMENT
Mirabeau Point Community Complex (98-2-010)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The amount is provided solely for a grant to Spokane county for design and development costs for Mirabeau Point community complex.
(2) The amount represents the entire state contribution to the project and shall be matched by $8,500,000 in contributions toward the project from nonstate sources.
(3) The reappropriation is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 535,336
Prior Biennia (Expenditures).................... $ 964,664
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,500,000
NEW SECTION. Sec. 107. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Sand Point Shoreline Restoration (00-1-002)
The reappropriation in this section is provided to the city of Seattle for shoreline improvements and wetland restoration at Sand Point. The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 500,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)....... ........ $ 0
-------------
TOTAL.................................... $ 500,000
NEW SECTION. Sec. 108. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Community Economic Revitalization (CERB)(00-2-001)
The reappropriation in this section from the public facilities construction loan revolving account is subject to the following conditions and limitations:
(1) The department shall ensure that all funds transferred from the public works assistance account into the public facility construction loan revolving account during the 1999‑2001 biennium are used only for loans to local governments.
(2) The department shall ensure that all principal and interest payments from these loans are paid into the public works assistance account.
Reappropriation:
Public Works Assistance Account‑-State.......... $ 687,027
Public Facility Construction Loan Revolving
Account‑-State........................... $ 10,300,000
-------------
Subtotal Reappropriation.................. $ 10,987,027
Prior Biennia (Expenditures).................... $ 8,611,730
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 19,598,757
NEW SECTION. Sec. 109. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Public Works Trust Fund (00-2-002)
Reappropriation:
Public Works Assistance Account‑-State.......... $ 322,109,619
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 322,109,619
NEW SECTION. Sec. 110. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Housing Assistance, Weatherization, and Affordable Housing (00‑2‑003)
Reappropriation:
State Building Construction Account‑-State...... $ 26,800,000
Prior Biennia (Expenditures).................... $ 45,794,247
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 72,594,247
NEW SECTION. Sec. 111. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Building for the Arts (00-2-005)
The reappropriation in this section shall support the projects as listed in section 113, chapter 379, Laws of 1999.
Reappropriation:
State Building Construction Account‑-State...... $ 2,000,000
Prior Biennia (Expenditures).................... $ 29,848,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 31,848,000
NEW SECTION. Sec. 112. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Community Services Facilities Program (00-02-006)
The reappropriation in this section shall support the projects as listed in section 1007, chapter 1, Laws of 2000 2nd sp. sess.
Reappropriation:
State Building Construction Account‑-State...... $ 1,703,000
Prior Biennia (Expenditures).................... $ 9,950,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 11,653,000
NEW SECTION. Sec. 113. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Housing for Homeless Families With Children Program (00-2-009)
The reappropriation in this section is provided solely for the development of emergency shelters and transitional housing opportunities for homeless families with children. The department shall minimize the amount of funds that are utilized for staff and administrative purposes.
Reappropriation:
State Building Construction Account‑-State...... $ 500,000
Prior Biennia (Expenditures).................... $ 4,500,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 5,000,000
NEW SECTION. Sec. 114. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
County Public Facility Construction (00-2-010)
The reappropriations in this section shall be used solely for financial assistance to distressed counties that have experienced extraordinary costs due to the location of a major new business facility or the substantial expansion of an existing business facility in the county. The entire reappropriation from the state building construction account shall be provided as a grant to support the Grays Harbor water system project and is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 3,500,000
Distressed County Facilities Construction Loan
Account‑-State........................... $ 2,619,000
-------------
Subtotal Reappropriation.................. $ 6,119,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,119,000
NEW SECTION. Sec. 115. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Farmworker Housing Assistance (00-2-011)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The reappropriation is provided solely for facilities housing low-income migrant, seasonal, and temporary farmworkers.
(2) It is the intent of the legislature that operation of the facilities built under this section be in compliance with 8 U.S.C. Sec. 1342.
(3) The department shall minimize the amount of these funds that are utilized for staff and administrative purposes or for other administrative purposes.
(4) By December 15, 2001, the department shall submit a report to the governor and the appropriate committees of the legislature on the progress of the development of housing for farmworkers, including a list of projects funded under this section.
(5) The department shall work with the farmworker housing advisory committee to prioritize funding of projects to the areas of highest need.
Reappropriation:
State Building Construction Account‑-State...... $ 500,000
Prior Biennia (Expenditures).................... $ 7,500,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 8,000,000
NEW SECTION. Sec. 116. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Burke Museum Governance and Siting Study (00-2-012)
The reappropriation in this section is subject to the following conditions and limitations:
(1) Funds are provided for a study of the governance of the Burke museum and for an examination of the potential expansion of the museum facility including siting issues. The study shall be facilitated by the University of Washington, the department of community, trade, and economic development's tourism and economic development units, the executive director of the Washington state historical society, the city of Seattle, King county, and members of the community and businesses from various geographic regions of the state. The department shall provide a report to the legislature by June 30, 2002, outlining funding strategies for an expanded state natural history museum that recognizes the limited state resources for capital facilities programmatic enhancements, and outlines alternative funding resources and partners.
(2) The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
University of Washington Building
Account‑-State............. ............ $ 350,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 350,000
NEW SECTION. Sec. 117. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Clark County Skills Center (00-4-100)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The reappropriation in this section must be matched by at least $1,300,000 from other sources.
(2) The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 350,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 350,000
NEW SECTION. Sec. 118. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Holly Park Education Center (00-4-101)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The reappropriation in this section is provided solely for education space in the Holly Park housing development for South Seattle Community College.
(2) The reappropriation in this section must be matched by an equal amount from other sources.
(3) The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 500,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 500,000
NEW SECTION. Sec. 119. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Community Economic Revitalization (CERB) (02-4-003)
The appropriation in this section is subject to the following conditions and limitations:
(1) The department shall ensure that the $5,000,000 transferred from the public works assistance account into the public facilities construction loan revolving account during the 2001-2003 biennium is used only for loans to local governments. The department shall ensure that all principal and interest payments from these loans are paid into the public works assistance account.
(2) $5,000,000 of the appropriation from the public facilities construction loan revolving account is subject to the approval of a transfer of funds from the multimodal transportation account into the public facilities construction loan revolving account. Funds transferred from the multimodal transportation account into the public facilities construction loan revolving account are provided solely for transportation related investments that benefit rural economic development. If a transfer of funds has not been made by June 30, 2002, then the appropriation in this subsection shall lapse.
(3) Appropriations from the public facility construction loan revolving account shall be used solely to provide loans to eligible local governments and grants to the extent permissible by law. The department shall ensure that all principal and interest payments from loans made on moneys from this account are paid into this account, except as otherwise required in subsection (1) of this section.
Appropriation:
Public Facility Construction Loan Revolving
Account‑-State........................... $ 12,275,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................. ................. $ 12,275,000
NEW SECTION. Sec. 120. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Drinking Water Assistance Program (02-4-008)
The appropriation in this section is subject to the following conditions and limitations:
(1) Funding from the state public works trust fund program shall be matched with new federal sources to improve the quality of drinking water in the state, and shall be used solely for projects that achieve the goals of the federal safe drinking water act.
(2) The department shall report to the appropriate committees of the legislature by January 1, 2002, on the progress of the program, including administrative and technical assistance procedures, the application process, and funding priorities.
Appropriation:
Drinking Water Assistance Account‑-State........ $ 7,700,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 30,800,000
-------------
TOTAL.................................... $ 38,500,000
NEW SECTION. Sec. 121. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Housing Assistance, Weatherization, and Affordable Housing (02‑4‑010)
If a state taxable building construction account is created in the state treasury by section . . ., chapter . . . , (Senate/House Bill No. . . . .) Laws of 2001, the state taxable building construction account shall be used for the purposes of this section in lieu of the state building construction account created by RCW 43.83.020.
Appropriation:
State Building Construction Account‑-State...... $ 50,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 200,000,000
-------------
TOTAL.................................... $ 250,000,000
NEW SECTION. Sec. 122. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Farmworker Housing Assistance (02-4-011)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation is provided solely for facilities housing low-income migrant, seasonal, or temporary farmworkers.
(2) It is the intent of the legislature that operation of the facilities built under this section be in compliance with 8 U.S.C. Sec. 1342.
(3) The department shall minimize the amount of these funds that are utilized for staff and administrative purposes or other operational expenses.
(4) By September 1, 2002, the department shall submit a report to the governor and the appropriate committees of the legislature on the progress of the development of housing for farmworkers, including a list of projects funded under this section.
(5) The department shall work with the farmworker housing advisory committee to prioritize funding of projects to the areas of highest need.
(6) Funding may also be provided, to the extent qualified projects are submitted, for health and safety projects.
Appropriation:
State Building Construction Account‑-State...... $ 8,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 32,000,000
-------------
TOTAL.................................... $ 40,000,000
NEW SECTION. Sec. 123. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Housing for Homeless Families with Children Program (02-4-012)
The appropriation in this section is provided solely for the development of emergency shelters and transitional housing opportunities for homeless families with children. The department shall minimize the amount of funds that are utilized for staff and administrative purposes.
Appropriation:
State Building Construction Account‑-State...... $ 5,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 20,000,000
-------------
TOTAL.................................... $ 25,000,000
NEW SECTION. Sec. 124. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Public Works Trust Fund (02-4-013)
The appropriation in this section is subject to the following conditions and limitations:
(1) $10,000,000 of the appropriation in this section is provided solely for the preconstruction program as set forth in RCW 43.155.068.
(2) $2,000,000 of the appropriation in this section is for the emergency loan program as set forth in RCW 43.155.065.
(3) Not more than one percent of the appropriation may be used for planning loans.
Appropriation:
Public Works Assistance Account‑-State..... $ 225,300,000
Prior Biennia (Expenditures)............... $ 0
Future Biennia (Projected Costs)........... $ 1,215,700,000
-------------
TOTAL............. ................. $ 1,441,000,000
NEW SECTION. Sec. 125. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Consolidated Capital Programs Fund (02-4-001)
The appropriation in this section is subject to the following conditions and limitations:
(1) The department shall establish a competitive process to prioritize applications for state assistance as follows:
(a) The department shall conduct a statewide solicitation of major project applications from local governments, tribal governments, and other entities, as determined by the department. The department shall evaluate and rank project applications from eligible entities in consultation with a citizen advisory committee, using objective criteria. The advisory committee shall be appointed and chaired by the director, and shall include one member from each caucus of the legislature. At a minimum, the evaluation and ranking process shall consider a project's feasibility and financial viability, local community support, site control, and an examination of existing assets that applicants may apply to projects.
(b) The department may establish the amount of state grant assistance for individual project applications but the amount shall not exceed twenty percent of the estimated total capital cost or actual cost of a project, whichever is less, to a maximum state contribution of $1,000,000 per project. Successful applicants to these appropriations may apply for grants from any future appropriations. The remaining portions of the project capital cost shall be a match from nonstate sources that may include cash, the value of real property when acquired solely for the purpose of the project, and in‑kind contributions. The department is authorized to set matching requirements for individual projects. State assistance may be used to fund separate definable phases of a project if the project demonstrates adequate progress and has secured the necessary match funding. The department shall not sign contracts or otherwise obligate funds under this section until the legislature has approved a specific list of projects.
(c) In contracts for grants authorized under this section, the department shall include provisions requiring that capital improvements be held by the grantee for a specified period of time appropriate to the amount of the grant and that facilities be used for the express purpose of the grant. If the grantee is found to be out of compliance with provisions of the contract, the grantee shall repay to the state general fund the principal amount of the grant plus interest calculated at the rate of interest on state of Washington general obligation bonds issued most closely to the date of authorization of the grant.
(2) The department shall submit a list of recommended projects eligible for funding to the governor and the legislature in January 2002. The list shall include projects that, due to their size, scope, or characteristics, are not fundable under existing capital programs. The list, in priority order, shall include a description of each project, the amount of recommended state funding, and documentation of nonstate funds to be used for the project.
(3) The department shall submit proposed legislation for continuation of this program beginning with the 2003‑2005 biennium and thereafter.
Appropriation:
State Building Construction Account‑-State...... $ 6,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,000,000
NEW SECTION. Sec. 126. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Community Services Facilities Program (02-4-007)
The appropriation in this section is subject to the provisions of RCW 43.63A.125. The following projects are eligible for funding:
Projects Recommendation
YMCA of Grays Harbor, Aberdeen $300,000
Community Youth Services, Olympia $300,000
Skagit County Community Action, Concrete $300,000
Kindering Center, Bellevue $300,000
Bellevue Family YMCA, Bellevue $300,000
Refugee Women's Alliance, Seattle $300,000
YWCA of Walla Walla, Walla Walla $300,000
Pierce County Alliance (facility), Tacoma $61,000
Compass Health, Everett $300,000
Mid-City Concerns, Spokane $28,000
Children's Home Society, Vaughn $70,000
Children's Home society, Spokane $238,000
Catholic Family/Child Services, Yakima $152,000
Korean Women's Association, Tacoma $218,000
Factory Small Biz Incubator, Tacoma $300,000
Lao Highland Association of King County, Seattle $119,000
First Place, Seattle $300,000
NE Washington Rural Resources, Colville $114,000
Subtotal $4,000,000
Alternate Projects
Northeast Washington Rural Resources, Colville $186,000
Nooksack Community Aid Society, Deming $165,000
Childhaven, Seattle $149,000
Subtotal $500,000
Total $4,500,000
Appropriation:
State Building Construction Account‑-State...... $ 4,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,000,000
NEW SECTION. Sec. 127. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Building for the Arts (02-4-100)
The appropriation in this section is subject to the provisions of RCW 43.63A.750. The following projects are eligible for funding:
Projects Recommendation
Orcas Theatre, Eastsound $400,000
Empty Space Theatre, Fremont $29,000
Music Works Northwest, Bellevue $475,000
Hands on Children's Museum, Olympia $130,000
Spokane Symphony, Spokane $230,000
Mt. Baker Theatre, Bellingham $128,000
IKEA Performing Arts Center, Renton $135,000
Seattle Art Museum, Seattle $1,000,000
Town Hall, Seattle $175,000
Gladish Center, Pullman $29,000
Broadway Center 1, Tacoma $50,000
CREATE, Newport $21,000
Spectrum Dance Theatre, Seattle $78,000
Gallery One, Ellensburg $225,000
Admiral Theatre, Bremerton $450,000
Lake Chelan Bachfest, Chelan $38,000
Historic Seattle Preservation, Seattle $390,000
Kent Performing Arts Center 2, Kent $17,000
Subtotal $4,000,000
Alternate Projects
Kent Performing Arts Center 3, Kent $408,000
Historic Everett Theatre, Everett $92,000
Subtotal $500,000
Total $4,500,000
Appropriation:
State Building Construction Account‑-State...... $ 4,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,000,000
NEW SECTION. Sec. 128. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Seattle Chinese Gardens (02-4-014)
The appropriation in this section is subject to the following conditions and limitations: $200,000 of the appropriation in this section shall be matched by $200,000 in additional contributions toward the project from local government.
Appropriation:
State Building Construction Account‑-State...... $ 200,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 200,000
NEW SECTION. Sec. 129. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Filipino Community of Seattle (02-4-009)
The appropriation in this section is subject to the following conditions and limitations: $250,000 of the appropriation in this section shall be matched by $250,000 in additional contributions toward the project from local government.
Appropriation:
State Building Construction Account‑-State...... $ 250,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 250,000
NEW SECTION. Sec. 130. FOR THE OFFICE OF FINANCIAL MANAGEMENT
Underground Storage Tank: Pool (02-1-001)
The appropriation in this section is subject to the following conditions and limitations:
(1) The money provided in this section shall be for projects that were not foreseen or could not have been contemplated at the time the current budget was prepared. Funding is for allocation to agencies and institutions for removal, replacement, and environmental cleanup projects related to underground storage tanks.
(2) No moneys appropriated in this section or in any section specifically referencing this section shall be expended unless the office of financial management has reviewed and approved the cost estimates for the project.
Appropriation:
State Building Construction Account‑-State...... $ 1,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 4,000,000
-------------
TOTAL.................................... $ 5,000,000
NEW SECTION. Sec. 131. FOR THE OFFICE OF FINANCIAL MANAGEMENT
Hazardous Materials: Pool (02-1-002)
The appropriation in this section is subject to the following conditions and limitations:
(1) The money provided in this section shall be for projects that were not foreseen or could not have been contemplated at the time the current budget was prepared. Funding is for allocation to agencies and institutions for removal and related environmental cleanup projects related to hazardous materials.
(2) No moneys appropriated in this section or in any section specifically referencing this section shall be expended unless the office of financial management has reviewed building surveys conducted for hazardous materials and approved the cost estimates for the project.
Appropriation:
State Building Construction Account‑-State...... $ 1,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 4,000,000
-------------
TOTAL.................................... $ 5,000,000
NEW SECTION. Sec. 132. FOR THE OFFICE OF FINANCIAL MANAGEMENT
Budget System Improvements (02-1-004)
Appropriation:
State Building Construction Account‑-State...... $ 300,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)....... ........ $ 1,200,000
-------------
TOTAL.................................... $ 1,500,000
NEW SECTION. Sec. 133. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
East Plaza Repairs (96-1-002)
The appropriations in this section are subject to the following conditions and limitations: $16,000,000 of the appropriation from the state vehicle parking account is subject to the approval of a reimbursable bond.
Reappropriation:
Capitol Building Construction Account‑-State.... $ 350,000
Appropriation:
State Vehicle Parking Account‑-State............. $ 19,000,000
Prior Biennia (Expenditures).................... $ 22,217,200
Future Biennia (Projected Costs)................ $ 14,200,000
-------------
TOTAL.................................... $ 55,767,200
NEW SECTION. Sec. 134. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Legislative Buildings: Safety and Infrastructure (98-1-005)
Reappropriation:
Capitol Building Construction Account‑-State.... $ 400,000
Thurston County Capital Facilities
Account‑-State........................... $ 475,000
-------------
Subtotal Reappropriation.................. $ 875,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 875,000
NEW SECTION. Sec. 135. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Office Building Two Rehabilitation (98-1-007)
Reappropriation:
Thurston County Capital Facilities
Account‑-State........................... $ 1,000,000
Appropriation:
Thurston County Capital Facilities
Account‑-State........................... $ 5,850,000
Prior Biennia (Expenditures).................... $ 10,470,000
Future Biennia (Projected Costs)................ $ 5,310,000
-------------
TOTAL.................................... $ 22,630,000
NEW SECTION. Sec. 136. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Transportation Building Preservation (98-1-008)
Reappropriation:
Thurston County Capital Facilities
Account‑-State........................... $ 500,000
Prior Biennia (Expenditures).................... $ 1,466,740
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,966,740
NEW SECTION. Sec. 137. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Heritage Park (98-2-003)
Appropriation:
Capitol Building Construction Account‑-State.... $ 2,200,000
Prior Biennia (Expenditures).................... $ 12,559,774
Future Biennia (Projected Costs)................ $ 6,358,000
-------------
TOTAL.................................... $ 21,117,774
NEW SECTION. Sec. 138. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Capitol Campus Facilities: Preservation (00-1-003)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
Capitol Building Construction Account‑-State.... $ 500,000
State Building Construction Account‑-State...... $ 75,000
Thurston County Capital Facilities
Account‑-State........................... $ 700,000
-------------
Subtotal Reappropriation.................. $ 1,275,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,275,000
NEW SECTION. Sec. 139. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
General Administration Building Renovation or Redevelopment (00‑1‑004)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 250,000
Prior Biennia (Expenditures).................... $ 750,000
Future Biennia (Projected Costs)................ $ 7,635,000
-------------
TOTAL.................................... $ 8,635,000
NEW SECTION. Sec. 140. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Capitol Lake: Management Plan Implementation (00-1-007)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 700,000
Prior Biennia (Expenditures).................... $ 1,229,540
Future Biennia (Projected Costs)................ $ 15,250,000
-------------
TOTAL.................................... $ 17,179,540
NEW SECTION. Sec. 141. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
North Cascades Gateway Center: Preservation (00-1-010)
Reappropriation:
General Fund‑-Private/Local..................... $ 210,000
Prior Biennia (Expenditures).................... $ 39,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 249,000
NEW SECTION. Sec. 142. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Legislative Building: Rehabilitation and Capitol Addition (01‑1‑008)
The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.
Reappropriation:
Capitol Building Construction Account‑-State.... $ 1,525,000
Appropriation:
Capitol Building Construction Account‑-State.... $ 96,400,000
Thurston County Capital Facilities
Account‑-State........................... $ 1,300,000
-------------
Subtotal Appropriation................... $ 97,700,000
Prior Biennia (Expenditures).................... $ 1,475,000
Future Biennia (Projected Costs)................ $ 4,800,000
-------------
TOTAL.................................... $ 105,500,000
NEW SECTION. Sec. 143. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Emergency/Small Repairs and Improvements (02-1-001)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Capitol Building Construction Account‑-State.... $ 100,000
State Building Construction Account‑-State...... $ 400,000
Thurston County Capital Facilities
Account‑-State........................... $ 900,000
-------------
Subtotal Appropriation................... $ 1,400,000
Prior Biennia (Expenditures).................... $ 2,195,000
Future Biennia (Projected Costs)................ $ 6,500,000
-------------
TOTAL.................................... $ 10,095,000
NEW SECTION. Sec. 144. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Thurston County Facilities: Preservation (02-1-002)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Capitol Building Construction Account‑-State.... $ 1,110,000
State Building Construction Account‑-State...... $ 2,060,000
Thurston County Capital Facilities
Account‑-State........................... $ 3,861,000
-------------
Subtotal Appropriation................... $ 7,031,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 35,636,000
-------------
TOTAL.................................... $ 42,667,000
NEW SECTION. Sec. 145. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Capitol Campus Infrastructure Preservation (02-1-003)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Capitol Building Construction Account‑-State.... $ 75,000
State Building Construction Account‑-State...... $ 2,250,000
-------------
Subtotal Appropriation................... $ 2,325,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 24,050,000
-------------
TOTAL.................................... $ 26,375,000
NEW SECTION. Sec. 146. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
North Cascades Gateway Center Minor Works (02-1-004)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
General Fund/Private/Local....................... $ 500,000
State Building Construction Account‑-State...... $ 1,000,000
-------------
Subtotal Appropriation................... $ 1,500,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 6,685,000
-------------
TOTAL.................................... $ 8,185,000
NEW SECTION. Sec. 147. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Cherberg Building: Rehabilitation (02-1-005)
Appropriation:
Thurston County Capital Facilities
Account‑-State........................... $ 695,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 7,000,000
-------------
TOTAL.................................... $ 7,695,000
NEW SECTION. Sec. 148. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Pritchard Library: Rehabilitation (02-1-006)
Appropriation:
Thurston County Capital Facilities
Account‑-State........................... $ 300,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 1,000,000
-------------
TOTAL.................................... $ 1,300,000
NEW SECTION. Sec. 149. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Transportation Building Preservation (02-1-008)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Thurston County Capital Facilities
Account‑-State........................... $ 2,001,250
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 18,098,000
-------------
TOTAL.................................... $ 20,099,250
NEW SECTION. Sec. 150. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Infrastructure Project: Savings (02-1-999)
Projects that are completed in accordance with section 915 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account‑-State...... $ 1
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1
NEW SECTION. Sec. 151. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Capitol Campus Chiller Plant and Loop (02-2-006)
Appropriation:
Capitol Building Construction Account‑-State.... $ 50,000
State Building Construction Account‑-State...... $ 550,000
-------------
Subtotal Appropriation................... $ 600,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 21,220,000
-------------
TOTAL.................................... $ 21,820,000
NEW SECTION. Sec. 152. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Engineering and Architectural Services (02-2-012)
The appropriation in this section shall be used to provide those services to state agencies required by RCW 43.19.450 that are essential and mandated activities defined as core services and are included in the engineering and architectural services responsibilities and task list for general public works projects of normal complexity. The department may negotiate agreements with agencies for additional fees to manage exceptional projects including projects financed with alternative financing or for services above core services as described as optional and extra services in the task list.
Appropriation:
Capitol Building Construction Account‑-State.... $ 230,164
Charitable, Educational, Penal, and Reformatory
Institutions Account‑-State.............. $ 867,240
State Building Construction Account‑-State...... $ 8,589,506
Thurston County Capital Facilities
Account‑-State........................... $ 413,090
-------------
Subtotal Appropriation................... $ 10,100,000
Prior Biennia (Expenditures).................... $ 17,062,652
Future Biennia (Projected Costs)................ $ 43,522,000
-------------
TOTAL.................................... $ 70,684,652
NEW SECTION. Sec. 153. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Thurston County Facilities Planning (02-2-013)
The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided to conduct an analysis of future state office space needs in Thurston county, by agency, for the next ten years. The department shall consult with state agencies, private developers, and building owners to determine the inventory of space available and planned over the next ten years in government and nongovernment buildings. Planning for state office expansion shall consider the impact on current office space.
Appropriation:
State Building Construction Account‑-State...... $ 235,000
Prior Biennia (Expenditures).................... $ 100,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 335,000
NEW SECTION. Sec. 154. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Isabella Bush Records Center: Expansion (02-3-001)
Appropriation:
Thurston County Capital Facilities Account‑-State $ 344,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 344,000
NEW SECTION. Sec. 155. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Small Agency, Board, and Commission Colocation Office: Feasibility Study (02-3-007)
Appropriation:
State Building Construction Account‑-State...... $ 190,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 190,000
NEW SECTION. Sec. 156. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Americans with Disabilities Act: Pool (02-4-010)
The appropriation in this section is subject to the following conditions and limitations:
(1) The money provided in this section shall be solely allocated to agencies and institutions for improvements to state‑owned facilities for program access enhancements.
(2) No moneys appropriated in this section or in any section specifically referencing this section shall be expended unless the department of general administration has reviewed and approved the cost estimates for the project. The department of general administration shall implement an agency request and evaluation procedure similar to the one adopted in the 1999-2001 biennium for distribution of funds.
(3) No moneys appropriated in this section shall be available to institutions of higher education to modify dormitories.
(4) The department shall minimize the expenditure of these funds for staff and administrative purposes or for other operational expenses.
Appropriation:
State Building Construction Account‑-State...... $ 2,000,000
Prior Biennia (Expenditures).................... $ 3,000,000
Future Biennia (Projected Costs)................ $ 2,000,000
-------------
TOTAL.................................... $ 7,000,000
NEW SECTION. Sec. 157. FOR THE MILITARY DEPARTMENT
Minor Works to Support Federal Construction Projects (98-1-001)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
General Fund‑-Federal........................... $ 1,857,000
State Building Construction Account‑-State...... $ 312,000
-------------
Subtotal Reappropriation.................. $ 2,169,000
Prior Biennia (Expenditures).................... $ 8,352,100
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 10,521,000
NEW SECTION. Sec. 158. FOR THE MILITARY DEPARTMENT
Yakima Readiness Center: Construction (98-2-001)
The appropriations in this section are subject to the following conditions and limitations:
(1) Funds expended on this project for off‑site utility infrastructure that may include the provision of electricity, natural gas service, water service, or sewer service shall be for the benefit of the state. Entities that subsequently connect or use this off‑site utility infrastructure shall reimburse the state at a rate proportional to their use. The department shall develop policies and procedures to ensure that this reimbursement occurs.
(2) The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.
(3) No money shall be committed or expended from the state building construction account until the general fund‑‑federal construction funds are received and allotted in accordance with section 903 of this act.
(4) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department will file quarterly project progress reports with the office of financial management. These reports will contain local, state, and federal funding reconciliations and balance sheets for this project and will detail any federal intentions on future readiness center projects.
Reappropriation:
General Fund‑-Federal........................... $ 230,614
State Building Construction Account‑-State...... $ 1,590,769
-------------
Subtotal Reappropriation.................. $ 1,821,383
Appropriation:
General Fund‑-Federal........................... $ 6,522,000
State Building Construction Account‑-State...... $ 653,000
-------------
Subtotal Appropriation................... $ 7,175,000
Prior Biennia (Expenditures).................... $ 5,159,459
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 14,155,842
NEW SECTION. Sec. 159. FOR THE MILITARY DEPARTMENT
Centralia Readiness Center: Preservation (00-1-030)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 350,000
Prior Biennia (Expenditures).................... $ 350,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 700,000
NEW SECTION. Sec. 160. FOR THE MILITARY DEPARTMENT
Minor Works to Support Federal Construction Projects (02-1-001)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
General Fund‑-Federal........................... $ 10,248,000
State Building Construction Account‑-State...... $ 2,277,000
-------------
Subtotal Appropriation................... $ 12,525,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 62,340,000
-------------
TOTAL.................................... $ 74,865,000
NEW SECTION. Sec. 161. FOR THE MILITARY DEPARTMENT
Preservation Projects-Statewide (02-1-006)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 1,478,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 7,116,000
-------------
TOTAL.................................... $ 8,594,000
NEW SECTION. Sec. 162. FOR THE MILITARY DEPARTMENT
Infrastructure Projects-Savings (02-1-009)
Projects that are completed in accordance with section 915 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account‑-State...... $ 1
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1
NEW SECTION. Sec. 163. FOR THE MILITARY DEPARTMENT
Spokane Combined Public Safety Training Center (02-2-003)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.
(2) No money shall be committed or expended from the state building construction account until the general fund‑‑federal construction funds are received and allotted in accordance with section 903 of this act.
(3) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department will file quarterly project progress reports with the office of financial management. These reports will contain local, state, and federal funding reconciliations and balance sheets for this project and will detail any federal intentions on future readiness center projects.
Appropriation:
General Fund‑-Federal........................... $ 9,996,000
State Building Construction Account‑-State...... $ 5,920,000
-------------
Subtotal Appropriation................... $ 15,916,000
Prior Biennia (Expenditures).................... $ 7,899,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 23,815,000
NEW SECTION. Sec. 164. FOR THE MILITARY DEPARTMENT
Bremerton Readiness Center (02-2-004)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.
(2) No money shall be committed or expended from the state building construction account until the general fund‑‑federal construction funds are received and allotted in accordance with section 903 of this act.
(3) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department will file quarterly project progress reports with the office of financial management. These reports will contain local, state, and federal funding reconciliations and balance sheets for this project and will detail any federal intentions on future readiness center projects.
Appropriation:
General Fund‑-Federal........................... $ 5,446,000
State Building Construction Account‑‑State...... $ 5,535,000
-------------
Subtotal Appropriation................... $ 10,981,000
Prior Biennia (Expenditures).................... $ 1,000,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 11,981,000
NEW SECTION. Sec. 165. FOR THE MILITARY DEPARTMENT
Fort Lewis Readiness Center (02-2-010)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
General Fund‑-Federal........................... $ 19,941,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)....... ........ $ 0
-------------
TOTAL.................................... $ 19,941,000
NEW SECTION. Sec. 166. FOR THE MILITARY DEPARTMENT
Combined Support Maintenance Shop (02-2-011)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
General Fund‑-Federal........................... $ 17,032,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)....... ........ $ 0
-------------
TOTAL.................................... $ 17,032,000
NEW SECTION. Sec. 167. FOR THE MILITARY DEPARTMENT
Combined Regional Training Institute (02-2-012)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
General Fund‑-Federal........................... $ 14,712,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)....... ........ $ 0
-------------
TOTAL.................................... $ 14,712,000
NEW SECTION. Sec. 168. FOR THE MILITARY DEPARTMENT
Phase 2 Yakima Maneuver and Training Equipment Site (02-2-013)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
General Fund‑-Federal........................... $ 11,304,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)....... ........ $ 0
-------------
TOTAL.................................... $ 11,304,000
NEW SECTION. Sec. 169. FOR THE STATE CONVENTION AND TRADE CENTER
Seattle Convention Center: Replacement Housing (00-2-002)
Reappropriation:
State Convention and Trade Center
Account‑-State........................... $ 1,745,000
Prior Biennia (Expenditures).................... $ 3,255,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 5,000,000
PART 2
HUMAN SERVICES
NEW SECTION. Sec. 201. FOR THE CRIMINAL JUSTICE TRAINING COMMISSION
Site Improvements - Minor Works (02-1-005)
Appropriation:
State Building Construction Account‑‑State...... $ 200,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 600,000
-------------
TOTAL.................................... $ 800,000
NEW SECTION. Sec. 202. FOR THE CRIMINAL JUSTICE TRAINING COMMISSION
Building Omnibus Minor Works (02-1-007)
Appropriation:
State Building Construction Account‑‑State...... $ 150,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 600,000
-------------
TOTAL.................................... $ 750,000
NEW SECTION. Sec. 203. FOR THE DEPARTMENT OF LABOR AND INDUSTRIES
Facilities Preservation and Improvement (02-1-001)
Appropriation:
Accident Account‑‑State......................... $ 825,000
Medical Aid Account‑‑State....................... $ 825,000
-------------
Subtotal Appropriation................... $ 1,650,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 2,700,000
-------------
TOTAL.................................... $ 4,350,000
NEW SECTION. Sec. 204. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Maple Lane School: Wastewater Treatment Plant (94‑1‑201)
Reappropriation:
State Building Construction Account‑‑State...... $ 340,108
Prior Biennia (Expenditures).................... $ 3,766,946
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,107,054
NEW SECTION. Sec. 205. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Crisis Residential Centers (previously 96‑1‑900) (96‑2‑900)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 1,685,257
Prior Biennia (Expenditures).................... $ 1,114,743
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,800,000
NEW SECTION. Sec. 206. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Echo Glen Children's Center ‑ Site: Infrastructure Improvements (96‑2‑229)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 1,467,119
Prior Biennia (Expenditures).................... $ 1,060,633
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,527,752
NEW SECTION. Sec. 207. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Green Hill School Redevelopment: 416 Bed Institution (96‑2‑230)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 2,727,545
Prior Biennia (Expenditures).................... $ 14,121,602
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 16,849,147
NEW SECTION. Sec. 208. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Medical Lake Wastewater Treatment Facility (96‑1‑301)
Reappropriation:
State Building Construction Account‑‑State...... $ 2,052,878
Prior Biennia (Expenditures).................... $ 7,328,269
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 9,381,147
NEW SECTION. Sec. 209. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Eastern State Hospital: Legal Offender Unit (98‑2‑002)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 5,075,416
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 5,075,416
NEW SECTION. Sec. 210. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Echo Glen Children's Center ‑ Vocational Education: Construction (98‑2‑211)
Reappropriation:
State Building Construction Account‑‑State...... $ 358,703
Appropriation:
State Building Construction Account‑‑State...... $ 3,500,000
Prior Biennia (Expenditures).................... $ 111,297
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 3,970,000
NEW SECTION. Sec. 211. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Western State Hospital: Legal Offender Unit (98‑2‑052)
Reappropriation:
State Building Construction Account‑‑State...... $ 34,546,538
Appropriation:
State Building Construction Account‑‑State...... $ 2,059,000
Prior Biennia (Expenditures).................... $ 13,688,803
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 50,294,341
NEW SECTION. Sec. 212. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Western State Hospital: Security Improvements (99‑1‑001)
Reappropriation:
State Building Construction Account‑‑State...... $ 538,815
Prior Biennia (Expenditures).................... $ 115,185
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 654,000
NEW SECTION. Sec. 213. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Americans with Disabilities Act (00-1-011)
Reappropriation:
State Building Construction Account‑‑State...... $ 118,200
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 118,200
NEW SECTION. Sec. 214. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Child Study and Treatment Center - Cottages: Modifications (00‑1‑015)
Reappropriation:
State Building Construction Account‑‑State...... $ 1,376,682
Appropriation:
State Building Construction Account‑‑State...... $ 1,200,000
Prior Biennia (Expenditures).................... $ 23,318
Future Biennia (Projected Costs)................ $ 2,678,262
-------------
TOTAL.................................... $ 5,278,262
NEW SECTION. Sec. 215. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Eastern State Hospital: Campus Renovation, Phase 5 (00-1-002)
The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 880,183
Appropriation:
State Building Construction Account‑‑State...... $ 9,154,750
Prior Biennia (Expenditures).................... $ 65,067
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 10,100,000
NEW SECTION. Sec. 216. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Echo Glen Children's Center ‑ Eleven Cottages: Renovation (00‑1‑041)
Reappropriation:
State Building Construction Account‑‑State...... $ 7,526
Appropriation:
State Building Construction Account‑‑State...... $ 700,000
Prior Biennia (Expenditures).................... $ 67,474
Future Biennia (Projected Costs)................ $ 16,131,000
-------------
TOTAL.................................... $ 16,906,000
NEW SECTION. Sec. 217. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Emergency and Small Repairs (00-1-006)
Reappropriation:
State Building Construction Account‑‑State...... $ 394,061
Prior Biennia (Expenditures).................... $ 355,939
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 750,000
NEW SECTION. Sec. 218. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Infrastructure Project: Savings (00‑1‑053)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 1,000,001
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,000,001
NEW SECTION. Sec. 219. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Lakeland Village: Cottage Renovation (00-1-004)
Reappropriation:
State Building Construction Account‑‑State...... $ 450,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 450,000
NEW SECTION. Sec. 220. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Maple Lane School - Multi-Services Building: Renovation (00-1-003)
Reappropriation:
State Building Construction Account‑‑State...... $ 700,000
Appropriation:
State Building Construction Account‑‑State...... $ 300,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 5,550,000
-------------
TOTAL.................................... $ 6,550,000
NEW SECTION. Sec. 221. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor Works: Preservation (00-1-018)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account‑‑State.............. $ 3,644,707
State Building Construction Account‑‑State...... $ 2,319,992
-------------
Subtotal Reappropriation.................. $ 5,964,699
Prior Biennia (Expenditures).................... $ 2,035,301
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 8,000,000
NEW SECTION. Sec. 222. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor Works: Program (00‑2‑019)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 993,963
Prior Biennia (Expenditures).. ................. $ 6,037
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,000,000
NEW SECTION. Sec. 223. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Mission Creek Youth Camp - Main Building: Renovation Phase 2 (00‑1‑010)
Reappropriation:
State Building Construction Account‑‑State...... $ 1,642,973
Prior Biennia (Expenditures).................... $ 357,027
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,000,000
NEW SECTION. Sec. 224. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Rainier School - Laundry: Equipment (00-1-001)
Reappropriation:
State Building Construction Account‑‑State...... $ 435,602
Prior Biennia (Expenditures).................... $ 14,398
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 450,000
NEW SECTION. Sec. 225. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Special Commitment Center ‑ Secure Facility: Construction (00‑2‑001)
The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 8,000,000
Appropriation:
State Building Construction Account‑‑State...... $ 53,670,167
Prior Biennia (Expenditures).................... $ 8,500,000
Future Biennia (Projected Costs)................ $ 20,729,000
-------------
TOTAL.................................... $ 90,899,167
NEW SECTION. Sec. 226. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Special Commitment Center ‑ Less Restrictive Alternative (02‑2‑075)
Appropriation:
State Building Construction Account‑‑State...... $ 1,500,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,500,000
NEW SECTION. Sec. 227. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Eastern State Hospital ‑ Administration and AT Building: Renovation (02‑1‑060)
The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 500,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 5,415,000
-------------
TOTAL.................................... $ 5,915,000
NEW SECTION. Sec. 228. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Fircrest School ‑ 500 Building: Renovation, Phase 3 (02‑2‑036)
Appropriation:
State Building Construction Account‑‑State...... $ 4,300,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,300,000
NEW SECTION. Sec. 229. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Green Hill School ‑ Entry/Security/Visitation: Addition (02‑2‑064)
Appropriation:
State Building Construction Account‑‑State...... $ 400,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 3,000,000
-------------
TOTAL.................................... $ 3,400,000
NEW SECTION. Sec. 230. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Green Hill School ‑ Health Center Building: Renovation (02‑1‑061)
Appropriation:
State Building Construction Account‑‑State...... $ 400,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 4,000,000
-------------
TOTAL.................................... $ 4,400,000
NEW SECTION. Sec. 231. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Green Hill School ‑ Intensive Management Unit: Renovation (02‑1‑054)
Appropriation:
State Building Construction Account‑‑State...... $ 3,200,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 3,200,000
NEW SECTION. Sec. 232. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Infrastructure Project: Savings (02‑1‑053)
Projects that are completed in accordance with section 915 of this act, may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account‑‑State...... $ 1
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1
NEW SECTION. Sec. 233. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Capital Project Management (02-1-041)
Appropriation:
State Building Construction Account‑‑State...... $ 2,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 9,625,800
-------------
TOTAL.................................... $ 11,625,800
NEW SECTION. Sec. 234. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Statewide ‑ Laundry Facilities: Upgrades and New Equipment (02‑1‑076)
Appropriation:
State Building Construction Account‑‑State...... $ 1,200,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 1,000,000
-------------
TOTAL.................................... $ 2,200,000
NEW SECTION. Sec. 235. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Statewide: Emergency and Small Repair Projects (02‑1‑042)
Appropriation:
State Building Construction Account‑‑State...... $ 750,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 3,609,000
-------------
TOTAL.................................... $ 4,359,000
NEW SECTION. Sec. 236. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Statewide: Facilities Condition Assessment and Preservation Plan (02‑1‑047)
Appropriation:
State Building Construction Account‑‑State...... $ 185,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 800,000
-------------
TOTAL.................................... $ 985,000
NEW SECTION. Sec. 237. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Statewide: Hazardous Materials Abatement (02‑1‑043)
Appropriation:
State Building Construction Account‑‑State...... $ 300,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 1,430,000
-------------
TOTAL.................................... $ 1,730,000
NEW SECTION. Sec. 238. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Statewide: Omnibus Preservation Projects (02‑1‑069)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account‑‑State.............. $ 4,000,000
State Building Construction Account‑‑State...... $ 4,531,124
-------------
Subtotal Appropriation................... $ 8,531,124
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 42,253,000
-------------
TOTAL.................................... $ 50,784,124
NEW SECTION. Sec. 239. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Statewide: Omnibus Programmatic Projects (02‑2‑070)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account‑‑State.............. $ 500,000
State Building Construction Account‑‑State...... $ 500,000
-------------
Subtotal Appropriation................... $ 1,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 4,812,000
-------------
TOTAL.................................... $ 5,812,000
NEW SECTION. Sec. 240. FOR THE DEPARTMENT OF HEALTH
Referendum 38 (86‑2‑099)
Reappropriation:
State and Local Improvements Revolving Account
(Water Supply Facilities)‑‑State......... $ 158,000
Prior Biennia (Expenditures).................... $ 541,483
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 699,483
NEW SECTION. Sec. 241. FOR THE DEPARTMENT OF HEALTH
Public Health Laboratory: Repairs and Improvements (96‑1‑001)
Reappropriation:
State Building Construction Account‑‑State...... $ 1,348,068
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,348,068
NEW SECTION. Sec. 242. FOR THE DEPARTMENT OF HEALTH
Public Health Laboratories: Consolidation of Facilities (96‑2‑001)
Reappropriation:
State Building Construction Account‑‑State...... $ 3,652,971
Prior Biennia (Expenditures).................... $ 2,020,080
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 5,673,051
NEW SECTION. Sec. 243. FOR THE DEPARTMENT OF HEALTH
Drinking Water Assistance Program (97‑2‑001)
The reappropriation in this section is provided solely for an interagency agreement with the department of community, trade, and economic development to make, in cooperation with the public works board, loans to local governments and public water systems for projects and activities to protect and improve the state's drinking water facilities and resources.
Reappropriation:
Drinking Water Assistance Account‑‑Federal...... $ 5,000,000
Prior Biennia (Expenditures).................... $ 30,086,024
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 35,086,024
NEW SECTION. Sec. 244. FOR THE DEPARTMENT OF HEALTH
Public Health Laboratory: Wastewater Treatment Systems (00-1-008)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 208,802
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 208,802
NEW SECTION. Sec. 245. FOR THE DEPARTMENT OF HEALTH
Public Health Laboratory: Chiller Plant Upgrade (02‑1‑004)
Appropriation:
State Building Construction Account‑‑State...... $ 2,355,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,355,000
NEW SECTION. Sec. 246. FOR THE DEPARTMENT OF HEALTH
Public Health Laboratory: Repairs and Improvements (02‑1‑005)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 172,400
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 2,944,200
-------------
TOTAL.................................... $ 3,116,600
NEW SECTION. Sec. 247. FOR THE DEPARTMENT OF HEALTH
Public Health Laboratory: Biosafety Level 3 Facility (02‑2‑001)
The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 2,231,485
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,231,485
NEW SECTION. Sec. 248. FOR THE DEPARTMENT OF HEALTH
Public Health Laboratory: C‑Wing Remodel (02‑2‑002)
Appropriation:
State Building Construction Account‑‑State...... $ 295,900
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 295,900
NEW SECTION. Sec. 249. FOR THE DEPARTMENT OF HEALTH
Public Health Laboratory: E‑Wing Remodel (02‑2‑003)
Appropriation:
State Building Construction Account‑‑State...... $ 295,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 295,000
NEW SECTION. Sec. 250. FOR THE DEPARTMENT OF HEALTH
Drinking Water Assistance Program (02‑4‑004)
The appropriation in this section is provided solely for an interagency agreement with the department of community, trade, and economic development to make, in cooperation with the public works board, loans to local governments and public water systems for projects and activities to protect and improve the state's drinking water facilities and resources.
Appropriation:
Drinking Water Assistance Account‑‑Federal...... $ 24,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 77,000,000
-------------
TOTAL.................................... $ 101,000,000
NEW SECTION. Sec. 251. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Retsil Veterans' Home: Minor Works Mechanical/Electrical/HVAC (02‑1‑001)
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account‑‑State......... ... $ 1,070,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 777,750
-------------
TOTAL.................................... $ 1,847,750
NEW SECTION. Sec. 252. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Orting Soldiers' Home: Minor Works Mechanical/Electrical/HVAC (02‑1‑002)
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account‑‑State............. $ 127,736
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)... ............ $ 1,060,835
-------------
TOTAL.................................... $ 1,188,571
NEW SECTION. Sec. 253. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Orting Soldiers' Home: Minor Works Buildings (02‑1‑004)
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account‑‑State............. $ 140,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 1,813,590
-------------
TOTAL.................................... $ 1,953,590
NEW SECTION. Sec. 254. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Emergency Funds (02‑1‑007)
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account‑‑State............. $ 500,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 500,000
NEW SECTION. Sec. 255. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Retsil Veterans' Home: Steam Plant Seismic Upgrade (02‑1‑010)
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account‑‑State............. $ 1,391,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,391,000
NEW SECTION. Sec. 256. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
240 Bed Nursing Facility (02‑2‑008)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation in this section, combined with the authorities granted in section 907(4) of this act, for a total of $16.5 million, are authorized to apply for a matching grant from the federal department of veterans' affairs.
(2) The department shall not commit or expend funds from these authorities until the federal construction grant has been certified and is available to Washington state for the purpose of constructing replacement nursing care beds.
Appropriation:
State Building Construction Account‑‑State...... $ 4,500,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 30,477,200
-------------
TOTAL.................................... $ 34,977,200
NEW SECTION. Sec. 257. FOR THE DEPARTMENT OF CORRECTIONS
Expand Coyote Ridge Corrections Center (98‑2‑011)
Reappropriation:
State Building Construction Account‑‑State...... $ 500,000
Appropriation:
State Building Construction Account‑‑State...... $ 1,676,000
Prior Biennia (Expenditures)........... ........ $ 748,453
Future Biennia (Projected Costs)................ $ 227,237,000
-------------
TOTAL.................................... $ 230,161,453
NEW SECTION. Sec. 258. FOR THE DEPARTMENT OF CORRECTIONS
Clallam Bay Corrections Center ‑ Youth Offender Facility Improvement (97‑2‑005)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 2,097,204
Prior Biennia (Expenditures).................... $ 2,402,796
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,500,000
NEW SECTION. Sec. 259. FOR THE DEPARTMENT OF CORRECTIONS
Stafford Creek Corrections Center Construction (98‑2‑001)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
General Fund‑‑Federal........................... $ 10,000,000
State Building Construction Account‑‑State...... $ 18,870,000
-------------
Subtotal Reappropriation.................. $ 28,870,000
Prior Biennia (Expenditures).................... $ 167,156,217
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 196,026,217
NEW SECTION. Sec. 260. FOR THE DEPARTMENT OF CORRECTIONS
Monroe Corrections Center ‑ Expand Special Offender Unit (98‑2‑010)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 7,400,000
Prior Biennia (Expenditures).................... $ 35,235,279
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 42,635,279
NEW SECTION. Sec. 261. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center for Women ‑ Special Needs and Reception Unit (96‑2‑006)
Reappropriation:
State Building Construction Account‑‑State...... $ 18,586,000
Prior Biennia (Expenditures).................... $ 3,214,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 21,800,000
NEW SECTION. Sec. 262. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center: Infrastructure Evaluation (98‑2‑004)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 324,000
Prior Biennia (Expenditures).................... $ 26,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 350,000
NEW SECTION. Sec. 263. FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island Corrections Center ‑ Still Harbor Dock (99‑2‑001)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 57,975
Prior Biennia (Expenditures).................... $ 1,742,219
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,800,194
NEW SECTION. Sec. 264. FOR THE DEPARTMENT OF CORRECTIONS
Violent Offender/Truth in Sentencing Grant Administration (99‑4‑003)
Reappropriation:
General Fund‑‑Federal........................... $ 382,577
Charitable, Educational, Penal, and Reformatory
Institutions Account‑‑State.............. $ 60,851
-------------
Subtotal Reappropriation.................. $ 443,428
Appropriation:
General Fund‑‑Federal........................... $ 386,536
Charitable, Educational, Penal, and Reformatory
Institutions Account‑‑State.............. $ 42,592
-------------
Subtotal Appropriation................... $ 429,128
Prior Biennia (Expenditures).................... $ 165,186
Future Biennia (Projected Costs)................ $ 214,743
-------------
TOTAL.................................... $ 1,252,485
NEW SECTION. Sec. 265. FOR THE DEPARTMENT OF CORRECTIONS
Americans with Disabilities Act (00‑1‑011)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 66,500
Prior Biennia (Expenditures).................... $ 20,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 86,500
NEW SECTION. Sec. 266. FOR THE DEPARTMENT OF CORRECTIONS
Local Criminal Justice Facilities (00‑4‑003)
Reappropriation:
General Fund‑‑Federal........................... $ 3,935,361
Appropriation:
General Fund‑‑Federal........................... $ 1,098,691
Prior Biennia (Expenditures).................... $ 210,000
Future Biennia (Projected Costs)................ $ 966,338
-------------
TOTAL.................................... $ 6,210,390
NEW SECTION. Sec. 267. FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island ‑ Special Commitment Center (00‑2‑005)
Reappropriation:
State Building Construction Account‑‑State...... $ 1,325,314
Prior Biennia (Expenditures).................... $ 1,174,686
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,500,000
NEW SECTION. Sec. 268. FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island Underground Storage Tank (00‑1‑001)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 377,896
Prior Biennia (Expenditures).................... $ 414,415
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 792,311
NEW SECTION. Sec. 269. FOR THE DEPARTMENT OF CORRECTIONS
Minor Works: Preservation (00‑1‑020)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 14,000,000
Prior Biennia (Expenditures).................... $ 6,000,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 20,000,000
NEW SECTION. Sec. 270. FOR THE DEPARTMENT OF CORRECTIONS
Minor Works: Program (00‑2‑010)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 4,000,000
Prior Biennia (Expenditures).................... $ 1,000,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 5,000,000
NEW SECTION. Sec. 271. FOR THE DEPARTMENT OF CORRECTIONS
Monroe Corrections Center: Kitchen Consolidations/Modifications (00‑2‑009)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 990,000
Prior Biennia (Expenditures).................... $ 110,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,100,000
NEW SECTION. Sec. 272. FOR THE DEPARTMENT OF CORRECTIONS
Monroe Corrections Center ‑ Hazardous Materials (00‑1‑002)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 52,950
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)............ ... $ 0
-------------
TOTAL.................................... $ 52,950
NEW SECTION. Sec. 273. FOR THE DEPARTMENT OF CORRECTIONS
Monroe Corrections Center - 100 Bed Intensive Management and Segregation Units (00‑2‑008)
The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 44,765
Appropriation:
General Fund‑‑Federal........................... $ 13,566,977
State Building Construction Account‑‑State...... $ 7,117,023
-------------
Subtotal Appropriation................... $ 20,684,000
Prior Biennia (Expenditures).................... $ 140,210
Future Biennia (Projected Costs)................ $ 17,727,000
-------------
TOTAL.................................... $ 38,595,975
NEW SECTION. Sec. 274. FOR THE DEPARTMENT OF CORRECTIONS
Statewide: Emergency Funds (00‑1‑021)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account‑‑State.............. $ 900,000
Prior Biennia (Expenditures).................... $ 14,158,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 15,058,000
NEW SECTION. Sec. 275. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary ‑ Intensive Management Unit Improvements (00‑1‑006)
Reappropriation:
State Building Construction Account‑‑State...... $ 3,290,000
Appropriation:
State Building Construction Account‑‑State...... $ 852,462
Prior Biennia (Expenditures).................... $ 210,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,352,462
NEW SECTION. Sec. 276. FOR THE DEPARTMENT OF CORRECTIONS
Correctional Industries Space Statewide (01‑2‑002)
Reappropriation:
State Building Construction Account‑‑State...... $ 327,206
Appropriation:
State Building Construction Account‑‑State...... $ 4,500,000
Prior Biennia (Expenditures).................... $ 2,972,794
Future Biennia (Projected Costs)................ $ 4,652,000
-------------
TOTAL.................................... $ 12,452,000
NEW SECTION. Sec. 277. FOR THE DEPARTMENT OF CORRECTIONS
Coyote Ridge Corrections Center ‑ Replace Telecommunications System (02‑1‑043)
The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 2,505,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,505,000
NEW SECTION. Sec. 278. FOR THE DEPARTMENT OF CORRECTIONS
Larch Corrections Center ‑ Pave Larch Access Road (02‑1‑037)
Appropriation:
State Building Construction Account‑‑State...... $ 2,057,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,057,000
NEW SECTION. Sec. 279. FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island: Replace Main Institution Water Storage Tank (02‑1‑022)
Appropriation:
State Building Construction Account‑‑State...... $ 1,644,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,644,000
NEW SECTION. Sec. 280. FOR THE DEPARTMENT OF CORRECTIONS
Minor Works: Omnibus Preservation 2002 (02‑1‑015)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 6,506,548
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 54,000,000
-------------
TOTAL.................................... $ 60,506,548
NEW SECTION. Sec. 281. FOR THE DEPARTMENT OF CORRECTIONS
Minor Works: Omnibus Program Request 2002 (02‑2‑030)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 1,525,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 8,000,000
-------------
TOTAL.................................... $ 9,525,000
NEW SECTION. Sec. 282. FOR THE DEPARTMENT OF CORRECTIONS
Monroe Corrections Center: Firing Range (02‑2‑017)
Appropriation:
State Building Construction Account‑‑State...... $ 3,355,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 3,355,000
NEW SECTION. Sec. 283. FOR THE DEPARTMENT OF CORRECTIONS
Monroe Corrections Center: Regional Training Center (02‑2‑016)
Appropriation:
State Building Construction Account‑‑State...... $ 2,955,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,955,000
NEW SECTION. Sec. 284. FOR THE DEPARTMENT OF CORRECTIONS
Olympic Corrections Center ‑ Replace Telecommunications Systems (02‑1‑041)
The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 2,406,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,406,000
NEW SECTION. Sec. 285. FOR THE DEPARTMENT OF CORRECTIONS
Pine Lodge ‑ Replace Telecommunications System (02‑1‑009)
The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 1,139,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,139,000
NEW SECTION. Sec. 286. FOR THE DEPARTMENT OF CORRECTIONS
Statewide: Department of Corrections Emergency Funds (02‑1‑028)
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account‑‑State............. $ 1,700,000
Prior Biennia (Expenditures).................... $ 901,000
Future Biennia (Projected Costs)................ $ 7,800,000
-------------
TOTAL.................................... $ 10,401,000
NEW SECTION. Sec. 287. FOR THE DEPARTMENT OF CORRECTIONS
Statewide: Intensive Management Unit Repairs (02‑1‑040)
Appropriation:
State Building Construction Account‑‑State...... $ 1,612,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,612,000
NEW SECTION. Sec. 288. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center ‑ Building Water Pipe Replacement Phase 2 (02‑1‑008)
Appropriation:
State Building Construction Account‑‑State...... $ 2,694,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,694,000
NEW SECTION. Sec. 289. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center ‑ Domestic Water Systems Improvements (02‑1‑007)
Appropriation:
State Building Construction Account‑‑State...... $ 3,531,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 3,531,000
NEW SECTION. Sec. 290. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center ‑ Replace Steam and Condensate Piping (02‑1‑006)
Appropriation:
State Building Construction Account‑‑State...... $ 6,170,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,170,000
NEW SECTION. Sec. 291. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center: Install Lethal Fence (02‑2‑029)
Appropriation:
State Building Construction Account‑‑State...... $ 1,318,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,318,000
NEW SECTION. Sec. 292. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary ‑ Replace Old Sanitary and Domestic Water Lines (02‑1‑026)
Appropriation:
State Building Construction Account‑‑State...... $ 1,070,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 2,640,000
-------------
TOTAL.................................... $ 3,710,000
NEW SECTION. Sec. 293. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary ‑ Replace Electrical Supply System (02‑1‑024)
Appropriation:
State Building Construction Account‑‑State...... $ 4,061,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 2,655,000
-------------
TOTAL.................................... $ 6,716,000
NEW SECTION. Sec. 294. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary: Medium Security Compound Lethal Fence (02‑2‑039)
Appropriation:
State Building Construction Account‑‑State...... $ 670,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 670,000
NEW SECTION. Sec. 295. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary: Intensive Management Unit Lethal Fence (02‑2‑038)
Appropriation:
State Building Construction Account‑‑State...... $ 301,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 301,000
PART 3
NATURAL RESOURCES
NEW SECTION. Sec. 301. FOR THE DEPARTMENT OF ECOLOGY
Referendum 26 Waste Disposal Facilities (74-2-004)
Reappropriation:
State and Local Improvements Revolving
Account (Waste Facilities)‑-State........ $ 398,083
Prior Biennia (Expenditures).................... $ 3,810,539
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,208,622
NEW SECTION. Sec. 302. FOR THE DEPARTMENT OF ECOLOGY
Referendum 38 Water Supply Facilities (74-2-006)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The reappropriation is provided solely for projects under contracts on or before June 30, 2001. Reappropriated funds not associated with contracted projects shall lapse on June 30, 2001.
(2) The office of financial management may grant waivers from this lapse requirement for specific projects upon findings of exceptional circumstances after notification of the chairs of the house of representatives capital budget committee and senate ways and means committee.
(3) The department shall submit a report to the office of financial management and house of representatives capital budget committee and senate ways and means committee by December 1, 2001, listing all projects funded from this section.
Reappropriation:
State Drought Preparedness‑-State............... $ 5,525,000
State and Local Improvements Revolving
Account (Water Supply Facilities)‑-State. $ 6,000,000
-------------
Subtotal Reappropriation.................. $ 11,525,000
Prior Biennia (Expenditures).................... $ 3,951,898
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 15,476,898
NEW SECTION. Sec. 303. FOR THE DEPARTMENT OF ECOLOGY
State Emergency Water Projects (76-2-003)
Reappropriation:
State Emergency Water Projects Revolving
Account‑-State........................... $ 577,833
Appropriation:
State Emergency Water Projects Revolving
Account‑-State........................... $ 214,167
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 792,000
NEW SECTION. Sec. 304. FOR THE DEPARTMENT OF ECOLOGY
Referendum 39 Waste Disposal Facilities (82-2-005)
Reappropriation:
State and Local Improvements Revolving
Account - Waste Facilities 1980‑-State... $ 500,000
Prior Biennia (Expenditures).................... $ 9,928,221
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 10,428,221
NEW SECTION. Sec. 305. FOR THE DEPARTMENT OF ECOLOGY
Centennial Clean Water Fund (86-2-007)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The reappropriation in this section is provided solely for projects under contract on or before June 30, 2001. Reappropriated funds not associated with contracted projects shall lapse on June 30, 2001.
(2) The office of financial management may grant waivers from this lapse requirement for specific projects upon findings of exceptional circumstances after notification of the chairs of the house of representatives capital budget committee and senate ways and means committee.
(3) The department shall submit a report to the office of financial management and house of representatives capital budget committee and senate ways and means committee by December 1, 2001, listing all projects funded from this section.
Reappropriation:
Public Works Assistance Account‑-State.......... $ 7,013,151
Water Quality Account‑-State.................... $ 27,318,809
-------------
Subtotal Reappropriation.................. $ 34,331,960
Prior Biennia (Expenditures).................... $ 132,232,544
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 166,564,504
NEW SECTION. Sec. 306. FOR THE DEPARTMENT OF ECOLOGY
Local Toxics Grants to Locals for Cleanup and Prevention (88-2-008)
The appropriations in this section are subject to the following conditions and limitations:
(1) The reappropriation in this section is provided solely for projects under contract on or before June 30, 2001. Reappropriated funds not associated with contracted projects shall lapse on June 30, 2001. The office of financial management may grant waivers from this lapse requirement for specific projects upon findings of exceptional circumstances after notification of the chairs of the house of representatives capital budget committee and senate ways and means committee.
(2) The department shall submit a report to the office of financial management and house of representatives capital budget committee and senate ways and means committee by December 1, 2001, listing all projects funded from this section.
Reappropriation:
Local Toxics Control Account‑-State............. $ 20,749,772
Appropriation:
Local Toxics Control Account‑-State............. $ 58,522,000
Prior Biennia (Expenditures).................... $ 76,009,089
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 155,280,861
NEW SECTION. Sec. 307. FOR THE DEPARTMENT OF ECOLOGY
Water Pollution Control Revolving Account (90-2-002)
Reappropriation:
Water Pollution Control Revolving Account‑-
State.................................... $ 38,403,302
Water Pollution Control Revolving Account‑-
Federal.................................. $ 44,795,830
-------------
Subtotal Reappropriation.................. $ 83,199,132
Prior Biennia (Expenditures).................... $ 169,901,509
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 253,100,641
NEW SECTION. Sec. 308. FOR THE DEPARTMENT OF ECOLOGY
Methow Basin Water Conservation (92-2-009)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely for projects under contract on or before June 30, 2001. Reappropriated funds not associated with contracted projects shall lapse on June 30, 2001.
Reappropriation:
State Building Construction Account‑-State...... $ 87,689
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 87,689
NEW SECTION. Sec. 309. FOR THE DEPARTMENT OF ECOLOGY
Low-Level Nuclear Waste Disposal Trench Closure (97-2-012)
Reappropriation:
Site Closure Account‑-State..................... $ 4,343,978
Prior Biennia (Expenditures).................... $ 1,993,482
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,337,460
NEW SECTION. Sec. 310. FOR THE DEPARTMENT OF ECOLOGY
Water Rights Purchase (99-1-005)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation is provided for the purchase of water rights under the trust water rights program under chapter 90.42 RCW, for the purpose of improving stream and river flows in fish critical basins. This appropriation shall only be used to acquire water rights in basins with current or proposed listings of salmon or steelhead under the federal endangered species act (16 U.S.C. Sec. 1531 et seq.) and where low flows have been identified as a limiting factor for salmon recovery. Priority for funding such purchases and leases shall take into consideration the following:
(a) Proposals providing the greatest benefit for restoring and protecting fish;
(b) Proposals providing benefits in addition to protecting fish critical streams and rivers;
(c) Proposals that include funds from other sources;
(d) Proposals showing a broad level of support among interested parties;
(e) Proposals requiring the lowest administrative costs to implement; and
(f) Proposals requiring the lowest overall cost within the context of the local marketplace.
(2) In making the selection of water rights to purchase, the department shall consult with the department of fish and wildlife.
Appropriation:
State Building Construction Account‑-State...... $ 1,000,000
Prior Biennia (Expenditures).................... $ 1,000,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,000,000
NEW SECTION. Sec. 311. FOR THE DEPARTMENT OF ECOLOGY
Minor Works (02-1-003)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 1,550,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 12,291,745
-------------
TOTAL.................................... $ 13,841,745
NEW SECTION. Sec. 312. FOR THE DEPARTMENT OF ECOLOGY
Padilla Bay (02-2-006)
Appropriation:
General Fund‑-Federal........................... $ 1,885,800
State Building Construction Account‑-State...... $ 808,200
-------------
Subtotal Appropriation................... $ 2,694,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,694,000
NEW SECTION. Sec. 313. FOR THE DEPARTMENT OF ECOLOGY
Local Hazardous Waste Liability (02-4-001)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation in this section is provided solely for grants to local governmental agencies named as potentially liable persons or potentially responsible parties when those agencies have conducted a moderate risk waste or similar program, and have become financially liable for clean-up and corrective action due to circumstances at a facility they used for hazardous waste treatment, storage, recycling, or disposal services.
(2) The department shall adopt rules for this financial assistance program. For the purposes of this grant program, the department may offer grants up to one hundred percent of total eligible costs. Eligible costs may include retroactive costs and legal fees associated with facility cleanup or corrective action.
Appropriation:
Local Toxics Control Account‑-State............. $ 2,000,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,000,000
NEW SECTION. Sec. 314. FOR THE DEPARTMENT OF ECOLOGY
Water Pollution Control Revolving Account (02-4-002)
Appropriation:
Water Pollution Control Revolving Account‑-
State.................................... $ 113,835,792
Water Pollution Control Revolving Account‑-
Federal.................................. $ 45,277,010
-------------
Subtotal Appropriation................... $ 159,112,802
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 467,108,040
-------------
TOTAL.................................... $ 626,220,842
NEW SECTION. Sec. 315. FOR THE DEPARTMENT OF ECOLOGY
Referendum 38 Water Supply Facilities (02-4-006)
The appropriation in this section is subject to the following conditions and limitations: The department shall submit a report to the office of financial management and house of representatives capital budget committee and senate ways and means committee by December 1, 2001, listing all projects funded from this section.
Appropriation:
State and Local Improvements Revolving
Account (Water Supply Facilities)‑-State. $ 10,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 12,000,000
-------------
TOTAL.................................... $ 22,000,000
NEW SECTION. Sec. 316. FOR THE DEPARTMENT OF ECOLOGY
Centennial Clean Water Fund (02-4-007)
The appropriation in this section is subject to the following conditions and limitations:
(1) Up to $15,097,000 of the water quality account appropriation is provided for extended grant payment to Metro/King county.
(2) Up to $10,000,000 of the water quality account appropriation is provided for the extended grant payment to Spokane for the Spokane-Rathdrum Prairie aquifer.
(3) The remaining appropriation in this section is provided for statewide water quality implementation and planning grants and loans. The department shall give priority consideration to projects located in basins with critical or depressed salmonid stocks.
Appropriation:
Water Quality Account‑-State.................... $ 48,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 208,000,000
-------------
TOTAL.................................... $ 256,000,000
NEW SECTION. Sec. 317. FOR THE DEPARTMENT OF ECOLOGY
Yakima Basin Water Investments (02-4-008)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for water quality, water quantity, and fish habitat projects in the Yakima basin consistent with the Yakima water basin investment action agenda.
Appropriation:
State Building Construction Account‑-State...... $ 4,000,000
Water Quality Account‑-State.................... $ 4,000,000
-------------
Subtotal Appropriation................... $ 8,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 8,000,000
NEW SECTION. Sec. 318. FOR THE STATE PARKS AND RECREATION COMMISSION
Spokane Centennial Trail (89-5-112)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
General Fund‑-Federal........................... $ 206,534
Prior Biennia (Expenditures).................... $ 89,888
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 296,422
NEW SECTION. Sec. 319. FOR THE STATE PARKS AND RECREATION COMMISSION
Facilities Preservation: Statewide (98-1-003)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 3,732,558
Prior Biennia (Expenditures).................... $ 4,267,442
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 8,000,000
NEW SECTION. Sec. 320. FOR THE STATE PARKS AND RECREATION COMMISSION
Statewide Recreation Development Program (98-2-008)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
(2) $33,881 of the general fund‑-federal reappropriation is provided for the continuation of the United States national park service and the United States department of energy grants as described in section 325, chapter 379, Laws of 1999.
(3) $647,240 of the general fund‑-federal reappropriation is provided for the continuation of the United States forest service grant as described in section 325, chapter 379, Laws of 1999.
Reappropriation:
General Fund‑-Federal........................... $ 681,121
General Fund‑-Private/Local..................... $ 27,439
State Building Construction Account‑-State...... $ 1,452,376
-------------
Subtotal Reappropriation.................. $ 2,160,936
Prior Biennia (Expenditures).................... $ 1,155,651
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.... ................................ $ 3,316,587
NEW SECTION. Sec. 321. FOR THE STATE PARKS AND RECREATION COMMISSION
Statewide Facility Preservation and Deferred Maintenance (99-1-001)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 1,375,523
Prior Biennia (Expenditures).................... $ 2,624,477
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,000,000
NEW SECTION. Sec. 322. FOR THE STATE PARKS AND RECREATION COMMISSION
Cama Beach State Park Development (99-2-001)
Reappropriation:
Parks Renewal and Stewardship Account‑-State.... $ 150,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 150,000
NEW SECTION. Sec. 323. FOR THE STATE PARKS AND RECREATION COMMISSION
Coastal Facility Relocation (00-1-005)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 1,567,898
Prior Biennia (Expenditures).................... $ 432,102
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,000,000
NEW SECTION. Sec. 324. FOR THE STATE PARKS AND RECREATION COMMISSION
Historic Structure and Land Use Program (00-1-007)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 2,477,393
Prior Biennia (Expenditures).................... $ 4,022,607
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,500,000
NEW SECTION. Sec. 325. FOR THE STATE PARKS AND RECREATION COMMISSION
Lewis and Clark Trail Bicentennial (00-1-010)
Reappropriation:
State Building Construction Account‑-State...... $ 920,433
Appropriation:
State Building Construction Account‑-State...... $ 2,000,000
Prior Biennia (Expenditures).................... $ 579,567
Future Biennia (Projected Costs)................ $ 1,000,000
-------------
TOTAL.................................... $ 4,500,000
NEW SECTION. Sec. 326. FOR THE STATE PARKS AND RECREATION COMMISSION
Park Housing (00-1-014)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 84,312
Prior Biennia (Expenditures).................... $ 415,688
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 500,000
NEW SECTION. Sec. 327. FOR THE STATE PARKS AND RECREATION COMMISSION
Americans with Disabilities Act (00-9-036)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
(2) The department shall minimize the expenditure of these funds for staff and administrative purposes or for other operational expenses.
Reappropriation:
State Building Construction Account‑-State...... $ 100,000
Prior Biennia (Expenditures).................... $ 260,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 360,000
NEW SECTION. Sec. 328. FOR THE STATE PARKS AND RECREATION COMMISSION
Statewide Facility Preservation (02-1-001)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 10,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 42,000,000
-------------
TOTAL.................................... $ 52,000,000
NEW SECTION. Sec. 329. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden State Park (02-1-003)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 2,500,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 16,000,000
-------------
TOTAL.................................... $ 18,500,000
NEW SECTION. Sec. 330. FOR THE STATE PARKS AND RECREATION COMMISSION
Emergency and Unforeseen Needs (02-1-004)
Appropriation:
State Building Construction Account‑-State...... $ 500,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 3,200,000
-------------
TOTAL.................................... $ 3,700,000
NEW SECTION. Sec. 331. FOR THE STATE PARKS AND RECREATION COMMISSION
Natural/Historic Stewardship (02-1-006)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 2,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 15,000,000
-------------
TOTAL.................................... $ 17,000,000
NEW SECTION. Sec. 332. FOR THE STATE PARKS AND RECREATION COMMISSION
Environmental Learning Centers (02-1-010)
The appropriation in this section is subject to the following conditions and limitations: The appropriation funds predesign studies of environmental learning centers that have new revenue potential and provide significant new recreational opportunities.
Appropriation:
State Building Construction Account‑-State...... $ 500,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 15,000,000
-------------
TOTAL.................................... $ 15,500,000
NEW SECTION. Sec. 333. FOR THE STATE PARKS AND RECREATION COMMISSION
Coastal Facility Relocation (02-1-017)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.
(2) The department shall ensure that all funds transferred from the public works assistance account to the parks renewal and stewardship account during the 2001‑2003 biennium are used only for this project.
(3) Funds expended on this project for off‑site utility infrastructure that may include the provision of electricity, water service, or sewer service shall be for the benefit of the state. Entities that subsequently connect to or use this off‑site utility infrastructure shall reimburse the state at a rate proportional to their use. The department, in consultation with the public works board, shall develop policies and procedures to ensure this reimbursement occurs.
(4) The department shall ensure that all reimbursement recovered as specified in subsection (3) of this section shall be paid into the public works assistance account.
(5) Ownership of the off‑site sewer and water utility infrastructure constructed in this section shall transfer to the city of Ilwaco.
Appropriation:
Parks Renewal and Stewardship Account‑-State.... $ 5,700,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 5,700,000
NEW SECTION. Sec. 334. FOR THE STATE PARKS AND RECREATION COMMISSION
Facilities Assessment Program (02-2-005)
The appropriation in this section shall lapse on June 30, 2003.
Appropriation:
State Building Construction Account‑-State...... $ 400,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 400,000
NEW SECTION. Sec. 335. FOR THE STATE PARKS AND RECREATION COMMISSION
Recreation Development (02-2-007)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation funds predesign studies of major park developments that have new revenue potential and provide significant new recreational opportunities.
(2) $164,000 of this appropriation is provided as state match to federal funds for the Iron Horse depot.
Appropriation:
State Building Construction Account‑-State...... $ 664,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 16,000,000
-------------
TOTAL.................................... $ 16,664,000
NEW SECTION. Sec. 336. FOR THE STATE PARKS AND RECREATION COMMISSION
Park Housing (02-2-008)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 1,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 4,000,000
-------------
TOTAL.................................... $ 5,000,000
NEW SECTION. Sec. 337. FOR THE STATE PARKS AND RECREATION COMMISSION
Parkland Acquisition Account (02-2-016)
Appropriation:
Parkland Acquisition Account‑-State............. $ 2,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 8,000,000
-------------
TOTAL.................................... $ 10,000,000
NEW SECTION. Sec. 338. FOR THE STATE PARKS AND RECREATION COMMISSION
Statewide Boat Pumpouts Federal Clean Vessel Act (02-2-020)
Appropriation:
General Fund‑-Federal........................... $ 1,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 4,000,000
-------------
TOTAL.................................... $ 5,000,000
NEW SECTION. Sec. 339. FOR THE STATE PARKS AND RECREATION COMMISSION
Beacon Rock State Park: Pierce Trust Donation (02-3-018)
Appropriation:
Parks Renewal Stewardship Account‑-State........ $ 200,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 800,000
-------------
TOTAL.................................... $ 1,000,000
NEW SECTION. Sec. 340. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Boating Facilities Projects (98-2-001)
Reappropriation:
Recreation Resources Account‑-State............. $ 12,671,327
Prior Biennia (Expenditures).................... $ 11,422,293
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 24,093,620
NEW SECTION. Sec. 341. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Nonhighway Road and Off-Road Vehicle Activities (NOVA) (98-2-002)
Reappropriation:
NOVA Program Account‑-State..................... $ 7,731,493
Prior Biennia (Expenditures).................... $ 6,697,452
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 14,428,945
NEW SECTION. Sec. 342. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Washington Wildlife and Recreation Program (98-2-003)
Reappropriation:
State Building Construction Account‑-State...... $ 3,663,227
Outdoor Recreation Account‑-State............... $ 28,670,042
Habitat Conservation Account‑-State............. $ 38,434,915
-------------
Subtotal Reappropriation.................. $ 70,768,184
Prior Biennia (Expenditures).................... $ 58,287,719
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 129,055,903
NEW SECTION. Sec. 343. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Firearms Range Program (FARR) (98-2-004)
Reappropriation:
Firearms Range Account‑-State................... $ 801,244
Appropriation:
Firearms Range Account‑-State................... $ 50,000
Prior Biennia (Expenditures).................... $ 476,514
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,327,758
NEW SECTION. Sec. 344. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Land and Water Conservation Fund (LWCF) (98-2-005)
Reappropriation:
Outdoor Recreation Account‑-Federal............. $ 975,325
Prior Biennia (Expenditures).................... $ 849,761
Future Biennia (Projected Costs)................ $ 1
-------------
TOTAL.................................... $ 1,825,087
NEW SECTION. Sec. 345. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
National Recreation Trails (NRTP) (98-2-006)
Reappropriation:
Recreation Resources Account‑-Federal........... $ 1,667,819
Prior Biennia (Expenditures).................... $ 871,756
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,539,575
NEW SECTION. Sec. 346. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Salmon Recovery (00-2-001)
Reappropriation:
General Fund‑-Federal........................... $ 59,229,720
State Building Construction Account‑-State...... $ 3,743,220
Salmon Recovery Account‑-State.................. $ 24,417,957
-------------
Subtotal Reappropriation.................. $ 87,390,897
Prior Biennia (Expenditures).................... $ 13,639,576
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 101,030,473
NEW SECTION. Sec. 347. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Boating Facilities Projects (02-4-001)
Appropriation:
Recreation Resources Account‑-State............. $ 8,318,013
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 40,300,368
-------------
TOTAL.................................... $ 48,618,381
NEW SECTION. Sec. 348. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Nonhighway Road and Off-Road Vehicle Activities (NOVA) (02-4-002)
Appropriation:
NOVA Program Account‑-State..................... $ 5,527,551
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)............ ... $ 23,559,218
-------------
TOTAL.................................... $ 29,086,769
NEW SECTION. Sec. 349. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Washington Wildlife and Recreation Program (02-4-003)
The appropriation in this section for the wildlife and recreation program under chapter 43.99A RCW and RCW 43.99A.040 is subject to the following conditions and limitations: The new appropriation is provided for the approved list of projects included in LEAP capital document No. . . . . . ., as developed on . . . . . ., 2001, at . . . . . ..
Appropriation:
Outdoor Recreation Account‑-State............... $ 22,500,000
Habitat Conservation Account‑-State............. $ 22,500,000
-------------
Subtotal Appropriation................... $ 45,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 180,000,000
-------------
TOTAL.................................... $ 225,000,000
NEW SECTION. Sec. 350. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Land and Water Conservation Fund (LWCF) (02-4-005)
Appropriation:
Recreation Resources Account‑-Federal........... $ 2,500,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,500,000
NEW SECTION. Sec. 351. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
National Recreation Trails (NRTP) (02-4-006)
Appropriation:
Recreation Resources Account‑-Federal........... $ 2,132,936
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 977,000
-------------
TOTAL.................................... $ 3,109,936
NEW SECTION. Sec. 352. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Salmon Recovery (02-4-007)
Appropriation:
General Fund‑-Federal........................... $ 27,642,000
State Building Construction Account‑-State...... $ 28,000,000
-------------
Subtotal Appropriation................... $ 55,642,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 264,000,000
-------------
TOTAL.... ................................ $ 319,642,000
NEW SECTION. Sec. 353. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Hatchery Management (02-4-009)
Appropriation:
General Fund‑-Federal........................... $ 11,200,000
Prior Biennia (Expenditures).................... $ 440,627
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 11,640,627
NEW SECTION. Sec. 354. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Boating Infrastructure Grant (BIG) Program (02-4-010)
Appropriation:
Recreation Resources Account‑-Federal........... $ 2,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,000,000
NEW SECTION. Sec. 355. FOR THE STATE CONSERVATION COMMISSION
Water Quality Grants Program (98-2-001)
Reappropriation:
Water Quality Account‑-State.................... $ 1,616,400
Prior Biennia (Expenditures).................... $ 5,000,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,616,400
NEW SECTION. Sec. 356. FOR THE STATE CONSERVATION COMMISSION
Dairy Waste Management Grants Program (98-2-002)
Reappropriation:
Water Quality Account‑-State.................... $ 1,489,500
Prior Biennia (Expenditures).................... $ 5,500,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,989,500
NEW SECTION. Sec. 357. FOR THE STATE CONSERVATION COMMISSION
Conservation Reserve Enhancement Program (00-2-004)
Reappropriation:
State Building Construction Account‑-State...... $ 2,696,852
Appropriation:
State Building Construction Account‑-State...... $ 5,000,000
Prior Biennia (Expenditures).................... $ 5,000,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 12,696,852
NEW SECTION. Sec. 358. FOR THE STATE CONSERVATION COMMISSION
Water Quality Grants Program (02-4-001)
Appropriation:
Water Quality Account‑-State.................... $ 5,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 20,000,000
-------------
TOTAL.................................... $ 25,000,000
NEW SECTION. Sec. 359. FOR THE STATE CONSERVATION COMMISSION
Dairy Nutrient Management Grants Program (02-4-002)
Appropriation:
Water Quality Account‑-State.................... $ 5,500,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 22,000,000
-------------
TOTAL.................................... $ 27,500,000
NEW SECTION. Sec. 360. FOR THE STATE CONSERVATION COMMISSION
Puget Sound District Grants (02-4-003)
Appropriation:
Water Quality Account‑-State.................... $ 840,000
Prior Biennia (Expenditures).................... $ 1,660,000
Future Biennia (Projected Costs)................ $ 3,360,000
-------------
TOTAL.................................... $ 5,860,000
NEW SECTION. Sec. 361. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Tideland Acquisition (94-2-003)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
General Fund‑-Federal........................... $ 640,000
Prior Biennia (Expenditures).................... $ 4,360,000
Future Biennia (Projected Costs)............ ... $ 0
-------------
TOTAL.................................... $ 5,000,000
NEW SECTION. Sec. 362. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Nemah Hatchery Building and Incubation System Replacement (96‑1‑006)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 90,000
Prior Biennia (Expenditures).................... $ 1,610,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,700,000
NEW SECTION. Sec. 363. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Shellfish Laboratory and Hatchery Upgrades (96-1-009)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
Aquatic Lands Enhancement Account‑-State........ $ 120,000
State Building Construction Account‑-State...... $ 35,000
-------------
Subtotal Appropriation................... $ 155,000
Prior Biennia (Expenditures).................... $ 349,947
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 504,947
NEW SECTION. Sec. 364. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Minor Works Preservation (98-1-001)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 999,364
Prior Biennia (Expenditures).................... $ 3,029,208
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,028,572
NEW SECTION. Sec. 365. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Dam Inspection and Repair (98-1-004)
The appropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 30,000
Prior Biennia (Expenditures)....... ............ $ 1,120,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,150,000
NEW SECTION. Sec. 366. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Facilities Renovation (98-1-005)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑-
State.................................... $ 482,000
Prior Biennia (Expenditures).................... $ 1,769,201
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,251,201
NEW SECTION. Sec. 367. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Hatchery Renovation (98-1-006)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 1,055,000
Prior Biennia (Expenditures).................... $ 6,337,326
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 7,392,326
NEW SECTION. Sec. 368. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Recreational Access Redevelopment (98-1-007)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 70,000
Prior Biennia (Expenditures).................... $ 1,924,501
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,994,501
NEW SECTION. Sec. 369. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Coast and Puget Sound Wild Salmonid Habitat Restoration (98-1-009)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 200,000
Prior Biennia (Expenditures).................... $ 4,173,047
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,373,047
NEW SECTION. Sec. 370. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Coast and Puget Sound Wildstock Restoration: Hatcheries (98-1-010)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 120,000
Prior Biennia (Expenditures).................... $ 1,542,452
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,662,452
NEW SECTION. Sec. 371. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Statewide Fencing Renovation and Construction (98-1-012)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
(2) Expenditures of the reappropriation in this section for fencing shall comply with chapter 16.60 RCW.
Reappropriation:
State Building Construction Account‑-State...... $ 143,000
Prior Biennia (Expenditures).................... $ 768,118
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 911,118
NEW SECTION. Sec. 372. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Wildlife Renovation (98-1-013)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 90,000
Prior Biennia (Expenditures).................... $ 1,030,913
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,120,913
NEW SECTION. Sec. 373. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Issaquah Hatchery Improvements (98-1-015)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 2,210,000
Prior Biennia (Expenditures).................... $ 4,596,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,806,000
NEW SECTION. Sec. 374. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Warm Water Game Fish Access Facilities (98-2-006)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
Warm Water Game Fish Account‑-State............. $ 300,000
Prior Biennia (Expenditures).................... $ 889,815
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,189,815
NEW SECTION. Sec. 375. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Recreational Fish Enhancement (98-2-007)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
Recreational Fisheries Enhancement‑‑State........ $ 400,000
Prior Biennia (Expenditures).................... $ 678,313
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,078,313
NEW SECTION. Sec. 376. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Mitigation Projects and Dedicated Funds (98‑2‑008)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
Game Special Wildlife Account‑‑State............. $ 81,000
Game Special Wildlife Account‑‑Private/Local.... $ 1,000,000
-------------
Subtotal Reappropriation.................. $ 1,081,000
Prior Biennia (Expenditures).................... $ 6,880,041
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 7,961,041
NEW SECTION. Sec. 377. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Migratory Waterfowl Habitat Acquisition and Development (98‑2‑009)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
Wildlife Account‑‑State......................... $ 200,000
Prior Biennia (Expenditures).................... $ 669,849
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 869,849
NEW SECTION. Sec. 378. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Clam and Oyster Beach Enhancement (98‑2‑019)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
Aquatic Lands Enhancement Account‑‑State........ $ 35,000
Prior Biennia (Expenditures).................... $ 536,649
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 571,649
NEW SECTION. Sec. 379. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Deep Water Slough Restoration (98‑2‑021)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 170,000
Prior Biennia (Expenditures).................... $ 244,968
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 414,968
NEW SECTION. Sec. 380. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Salmon Restoration (99‑2‑001)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 250,000
Salmon Recovery Account‑‑State.................. $ 500,000
-------------
Subtotal Reappropriation.................. $ 750,000
Prior Biennia (Expenditures).................... $ 511,844
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,261,844
NEW SECTION. Sec. 381. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Upland Wildlife Habitat: Replacement (00-2-005)
Reappropriation:
Wildlife Account‑-State......................... $ 500,000
Prior Biennia (Expenditures).................... $ 100,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 600,000
NEW SECTION. Sec. 382. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Watchable Wildlife Program (00-2-007)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 75,000
Prior Biennia (Expenditures).................... $ 25,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 100,000
NEW SECTION. Sec. 383. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Goldsborough Creek Restoration (00-2-008)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 70,000
Prior Biennia (Expenditures).................... $ 1,030,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,100,000
NEW SECTION. Sec. 384. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Hatchery Reform Facility Retrofits (02-1-001)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
General Fund‑-Federal........................... $ 10,000,000
State Building Construction Account‑-State...... $ 5,000,000
-------------
Subtotal Appropriation................... $ 15,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 75,000,000
-------------
TOTAL.................................... $ 90,000,000
NEW SECTION. Sec. 385. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Forest and Fish Road Upgrade and Abandonment on Agency Lands (02‑1‑003)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
General Fund‑-Federal........................... $ 1,900,000
State Building Construction Account‑-State...... $ 500,000
-------------
Subtotal Appropriation................... $ 2,400,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 11,600,000
-------------
TOTAL.................................... $ 14,000,000
NEW SECTION. Sec. 386. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Code Compliance and Protection (02-1-005)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
General Fund‑-Federal........................... $ 550,000
General Fund‑-Private/Local..................... $ 1,250,000
State Building Construction Account‑-State...... $ 2,350,000
-------------
Subtotal Appropriation................... $ 4,150,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 28,500,000
-------------
TOTAL.................................... $ 32,650,000
NEW SECTION. Sec. 387. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Facility and Infrastructure Standards and Renovations (02-1-009)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
General Fund‑-Federal........................... $ 3,100,000
General Fund‑-Private/Local..................... $ 1,500,000
Aquatic Lands Enhancement Account‑-State........ $ 150,000
State Building Construction Account‑-State...... $ 6,700,000
-------------
Subtotal Appropriation................... $ 11,450,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 80,416,200
-------------
TOTAL.................................... $ 91,866,200
NEW SECTION. Sec. 388. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Infrastructure Savings (02-1-010)
Projects that are completed in accordance with section 915 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account‑-State...... $ 1
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1
NEW SECTION. Sec. 389. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Endangered Species Act Compliance on Agency Lands (02-2-002)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
General Fund‑-Federal........................... $ 8,800,000
State Building Construction Account‑-State...... $ 1,000,000
-------------
Subtotal Appropriation................... $ 9,800,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 43,200,000
-------------
TOTAL....................... ............ $ 53,000,000
NEW SECTION. Sec. 390. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Diverse Fish and Wildlife Population Health and Protection (02‑2‑004)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 250,000
Wildlife Account‑-State......................... $ 1,200,000
-------------
Subtotal Appropriation................... $ 1,450,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 12,500,000
-------------
TOTAL.................................... $ 13,950,000
NEW SECTION. Sec. 391. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Commercial and Recreational Customer Satisfaction Improvements (02‑2‑006)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Warm Water Game Fish Account‑-State............. $ 560,000
Wildlife Account‑-State......................... $ 500,000
-------------
Subtotal Appropriation................... $ 1,060,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 4,700,000
-------------
TOTAL.................................... $ 5,760,000
NEW SECTION. Sec. 392. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Watchable Fish and Wildlife and Recreation Sites (02-2-007)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Wildlife Account‑-State......................... $ 1,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 7,628,000
-------------
TOTAL.................................... $ 8,628,000
NEW SECTION. Sec. 393. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Partnership Improvements with Internal and External Customers (02‑2-008)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
(2) Expenditures of the appropriation in this section for fencing shall comply with chapter 16.60 RCW.
Appropriation:
General Fund‑-Federal........................... $ 4,000,000
General Fund‑-Private/Local..................... $ 2,000,000
Aquatic Lands Enhancement Account‑-State........ $ 150,000
State Building Construction Account‑-State...... $ 400,000
Game Special Wildlife Account‑-State............. $ 50,000
Game Special Wildlife Account‑-Federal.......... $ 3,725,400
Game Special Wildlife Account‑-Private/Local.... $ 50,000
-------------
Subtotal Appropriation................... $ 10,375,400
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 46,824,700
-------------
TOTAL.................................... $ 57,200,100
NEW SECTION. Sec. 394. FOR THE DEPARTMENT OF NATURAL RESOURCES
Minor Works ‑ Programmatic (00‑2‑011)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
Forest Development Account‑‑State............... $ 121,590
Resources Management Cost Account‑‑State........ $ 303,975
State Building Construction Account‑‑State...... $ 216,160
Agricultural College Trust Management
Account‑‑State........................... $ 33,775
-------------
Subtotal Reappropriation.................. $ 675,500
Prior Biennia (Expenditures).................... $ 1,296,090
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,971,590
NEW SECTION. Sec. 395. FOR THE DEPARTMENT OF NATURAL RESOURCES
Aquatic Lands Enhancement Grants (00‑2‑014)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
Aquatic Lands Enhancement Account‑‑State........ $ 2,600,000
Prior Biennia (Expenditures).................... $ 10,179,070
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 12,779,070
NEW SECTION. Sec. 396. FOR THE DEPARTMENT OF NATURAL RESOURCES
Forest Legacy and Wetlands Conservation Grants (00‑2‑020)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
General Fund‑‑Federal........................... $ 2,270,000
Prior Biennia (Expenditures).................... $ 8,322,980
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 10,592,980
NEW SECTION. Sec. 397. FOR THE DEPARTMENT OF NATURAL RESOURCES
Small Timber Landowner Program (00‑5‑001)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 2,500,000
Prior Biennia (Expenditures).................... $ 2,500,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 5,000,000
NEW SECTION. Sec. 398. FOR THE DEPARTMENT OF NATURAL RESOURCES
Administrative Site Preservation (02‑1‑002)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Forest Development Account‑‑State............... $ 239,580
Resources Management Cost Account‑‑State........ $ 317,687
State Building Construction Account‑‑State...... $ 380,920
Agricultural College Trust Management
Account‑‑State........................... $ 66,550
-------------
Subtotal Appropriation................... $ 1,004,737
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)............ ... $ 7,365,000
-------------
TOTAL.................................... $ 8,369,737
NEW SECTION. Sec. 399. FOR THE DEPARTMENT OF NATURAL RESOURCES
Real Estate Repair, Maintenance, and Tenant Improvements (02‑1‑005)
Appropriation:
Resources Management Cost Account‑‑State........ $ 146,923
Prior Biennia (Expenditures).................... $ 911,220
Future Biennia (Projected Costs)................ $ 3,065,000
-------------
TOTAL.................................... $ 4,123,143
NEW SECTION. Sec. 400. FOR THE DEPARTMENT OF NATURAL RESOURCES
Hazardous Waste Removal (02‑1‑006)
Appropriation:
Forest Development Account‑‑State............... $ 25,000
Resources Management Cost Account‑‑State........ $ 25,000
-------------
Subtotal Appropriation................... $ 50,000
Prior Biennia (Expenditures).................... $ 107,110
Future Biennia (Projected Costs)................ $ 200,000
-------------
TOTAL.................................... $ 357,110
NEW SECTION. Sec. 401. FOR THE DEPARTMENT OF NATURAL RESOURCES
Recreation Facilities Preservation (02‑1‑011)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 340,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 6,200,000
-------------
TOTAL.................................... $ 6,540,000
NEW SECTION. Sec. 402. FOR THE DEPARTMENT OF NATURAL RESOURCES
Natural Area Facilities Preservation (02‑1‑016)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 508,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 6,775,000
-------------
TOTAL.................................... $ 7,283,000
NEW SECTION. Sec. 403. FOR THE DEPARTMENT OF NATURAL RESOURCES
Agricultural Asset Preservation (02‑1‑017)
Appropriation:
Resources Management Cost Account‑‑State........ $ 53,041
Prior Biennia (Expenditures).................... $ 154,000
Future Biennia (Projected Costs)................ $ 1,620,000
-------------
TOTAL.................................... $ 1,827,041
NEW SECTION. Sec. 404. FOR THE DEPARTMENT OF NATURAL RESOURCES
Communication Site Repairs (02‑1‑024)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Forest Development Account‑‑State............... $ 230,000
Resources Management Cost Account‑‑State........ $ 169,730
-------------
Subtotal Appropriation................... $ 399,730
Prior Biennia (Expenditures).................... $ 202,750
Future Biennia (Projected Costs)................ $ 1,220,000
-------------
TOTAL.................................... $ 1,822,480
NEW SECTION. Sec. 405. FOR THE DEPARTMENT OF NATURAL RESOURCES
Minor Works ‑ Programmatic (02‑2‑001)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Forest Development Account‑‑State............... $ 136,620
Resources Management Cost Account‑‑State........ $ 181,161
State Building Construction Account‑‑State...... $ 242,880
Agricultural College Trust Management
Account‑‑State........................... $ 37,950
-------------
Subtotal Appropriation................... $ 598,611
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 7,289,000
-------------
TOTAL.................................... $ 7,887,611
NEW SECTION. Sec. 406. FOR THE DEPARTMENT OF NATURAL RESOURCES
Small Timber Landowner Program (02‑2‑003)
Appropriation:
State Building Construction Account‑‑State...... $ 3,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 20,000,000
-------------
TOTAL.................................... $ 23,000,000
NEW SECTION. Sec. 407. FOR THE DEPARTMENT OF NATURAL RESOURCES
Right‑of‑Way Acquisition (02‑2‑007)
Appropriation:
Forest Development Account‑‑State............... $ 321,400
Resources Management Cost Account‑‑State........ $ 124,009
-------------
Subtotal Appropriation................... $ 445,409
Prior Biennia (Expenditures).................... $ 1,355,480
Future Biennia (Projected Costs)................ $ 5,248,000
-------------
TOTAL.................................... $ 7,048,889
NEW SECTION. Sec. 408. FOR THE DEPARTMENT OF NATURAL RESOURCES
Mineral Resource Testing (02‑2‑008)
Appropriation:
Forest Development Account‑‑State............... $ 11,900
Resources Management Cost Account‑‑State........ $ 6,100
-------------
Subtotal Appropriation................... $ 18,000
Prior Biennia (Expenditures).................... $ 18,000
Future Biennia (Projected Costs)................ $ 300,000
-------------
TOTAL.................................... $ 336,000
NEW SECTION. Sec. 409. FOR THE DEPARTMENT OF NATURAL RESOURCES
Commercial Development/Local Improvement Districts (02‑2‑009)
Appropriation:
Resources Management Cost Account‑‑State........ $ 90,000
Prior Biennia (Expenditures).................... $ 245,120
Future Biennia (Projected Costs)................ $ 450,000
-------------
TOTAL.................................... $ 785,120
NEW SECTION. Sec. 410. FOR THE DEPARTMENT OF NATURAL RESOURCES
Trust Land Transfer Program (02‑2‑010)
The state building construction account appropriation in this section is subject to the following conditions and limitations:
(1) The total appropriation is provided to the department solely to transfer from trust status or enter into thirty-year timber harvest restrictive easements for certain trust lands of state-wide significance deemed appropriate for state park, fish and wildlife habitat, natural area preserve, natural resources conservation area, open space, or recreation purposes.
(2) Property transferred under this section shall be appraised and transferred at fair market value. The value of the timber transferred shall be deposited by the department to the common school construction account in the same manner as timber revenues from other common school trust lands. No deduction shall be made for the resource management cost account under RCW 79.64.040. The value of the land transferred shall be deposited in the natural resources real property replacement account. These funds shall be expended by the department for the exclusive purpose of acquiring real property of equal value to be managed as common school trust land.
(3) Property subject to easement agreements under this section shall be appraised at fair market value both with and without the imposition of the easement. The entire difference in appraised value shall be deposited by the department to the common school construction fund in the same manner as lease revenues from other common school trust lands. No deduction shall be made for the resource management cost account under RCW 79.64.040.
(4) All reasonable costs incurred by the department to implement this section are authorized to be paid out of this appropriation. Authorized costs include the actual cost of appraisals, staff time, environmental reviews, surveys, and other similar costs.
(5) Intergrant exchanges between common school and other trust lands of equal value may occur if the exchange is in the interest of each trust, as determined by the board of natural resources.
(6) Prior to or concurrent with conveyance of these properties, the department, with full cooperation of the receiving agencies, shall execute and record a real property instrument that dedicates the transferred properties to the purposes identified in subsection (1) of this section for a minimum period of thirty years. The department of natural resources, in consultation with the receiving state agencies, shall develop policy to address requests to replace transferred properties subject to the recorded property instrument that are no longer deemed appropriate for the purposes identified in subsection (1) of this section.
(7) The department and receiving agencies shall work in good faith to carry out the intent of this section. However, the department or receiving agencies may remove a property from the transfer list based on new, substantive information, if it is determined that transfer of the property is not in the statewide interest of either the common school trust or the receiving agency.
(8) The department shall execute trust land transfers and easements such that 80 percent of the appropriation in this section is deposited in the common school construction fund. To achieve the 80:20 ratio, the department may offset transfers of property with low timber-to-land ratios with easements on other properties.
(9) On June 30, 2003, the state treasurer shall transfer all remaining uncommitted funds from this appropriation to the common school construction fund and the appropriation in this section shall be reduced by an equivalent amount.
Appropriation:
Natural Resources Real Property
Replacement‑‑State....................... $ 10,000,000
State Building Construction Account‑‑State...... $ 50,000,000
-------------
Subtotal Appropriation................... $ 60,000,000
Prior Biennia (Expenditures).................... $ 97,587,060
Future Biennia (Projected Costs)................ $ 280,000,000
-------------
TOTAL.................................... $ 437,587,060
NEW SECTION. Sec. 411. FOR THE DEPARTMENT OF NATURAL RESOURCES
Natural Resources Real Property Replacement (02‑2‑012)
Appropriation:
Natural Resources Real Property
Replacement‑‑State....................... $ 20,000,000
Prior Biennia (Expenditures).................... $ 15,139,050
Future Biennia (Projected Costs)................ $ 160,000,000
-------------
TOTAL.................................... $ 195,139,050
NEW SECTION. Sec. 412. FOR THE DEPARTMENT OF NATURAL RESOURCES
Land Bank (02‑2‑013)
Appropriation:
Resources Management Cost Account‑‑State........ $ 5,000,000
Prior Biennia (Expenditures).................... $ 2,000,000
Future Biennia (Projected Costs)................ $ 18,000,000
-------------
TOTAL.................................... $ 25,000,000
NEW SECTION. Sec. 413. FOR THE DEPARTMENT OF NATURAL RESOURCES
Community and Technical College Trust Land Acquisition (02‑2‑014)
Appropriation:
Community and Technical College Forest Reserve
Account‑‑State........................... $ 200,000
Prior Biennia (Expenditures).................... $ 168,870
Future Biennia (Projected Costs)................ $ 3,500,000
-------------
TOTAL.................................... $ 3,868,870
NEW SECTION. Sec. 414. FOR THE DEPARTMENT OF NATURAL RESOURCES
Forest Legacy and Wetlands Conservation Grants (02‑2‑015)
Appropriation:
General Fund‑‑Federal........................... $ 5,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 21,500,000
-------------
TOTAL.................................... $ 26,500,000
NEW SECTION. Sec. 415. FOR THE DEPARTMENT OF NATURAL RESOURCES
Marine Station Public Access (02‑2‑019)
Appropriation:
Resources Management Cost Account‑‑State........ $ 175,034
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 1,500,000
-------------
TOTAL.................................... $ 1,675,034
NEW SECTION. Sec. 416. FOR THE DEPARTMENT OF NATURAL RESOURCES
Commencement Bay Freshwater Channel (02‑2‑020)
Appropriation:
Aquatic Lands Enhancement Account‑‑State........ $ 2,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,000,000
NEW SECTION. Sec. 417. FOR THE DEPARTMENT OF NATURAL RESOURCES
Mobile Radio System Upgrade (02‑2‑022)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Forest Development Account‑‑State............... $ 239,900
Resources Management Cost Account‑‑State........ $ 398,400
State Building Construction Account‑‑State...... $ 500,000
-------------
Subtotal Appropriation................... $ 1,138,300
Prior Biennia (Expenditures).................... $ 783,500
Future Biennia (Projected Costs)................ $ 2,273,700
-------------
TOTAL.................................... $ 4,195,500
NEW SECTION. Sec. 418. FOR THE DEPARTMENT OF NATURAL RESOURCES
Riparian Open Space Program (02‑2‑023)
Appropriation:
State Building Construction Account‑‑State...... $ 1,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 4,000,000
-------------
TOTAL.................................... $ 5,000,000
NEW SECTION. Sec. 419. FOR THE DEPARTMENT OF NATURAL RESOURCES
Region Headquarters Modernization (02‑2‑025)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Forest Development Account‑‑State............... $ 72,000
State Building Construction Account‑‑State...... $ 128,000
Agricultural College Trust Management
Account‑‑State........................... $ 20,000
-------------
Subtotal Appropriation................... $ 220,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 8,800,000
-------------
TOTAL.................................... $ 9,020,000
NEW SECTION. Sec. 420. FOR THE DEPARTMENT OF NATURAL RESOURCES
Aquatic Lands Enhancement Grants (02‑4‑018)
The appropriation in this section is provided for a list of projects in LEAP capital document No. . . . ., as developed on . . . . ., 2001, at . . . . ..
The department shall submit a list of recommended projects to be funded from the aquatic lands enhancement account in the 2003‑2005 capital budget. The list shall result from a competitive grants program developed by the department based upon, at a minimum: A uniform criteria for the selection of projects and awarding of grants for up to fifty percent of the total project cost; local community support for the project; and a statewide geographic distribution of projects. The list of projects shall be submitted to the office of financial management by September 15, 2002.
Appropriation:
Aquatic Lands Enhancement Account‑‑State........ $ 4,685,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 22,000,000
-------------
TOTAL.................................... $ 26,685,000
PART 4
TRANSPORTATION
NEW SECTION. Sec. 501. FOR THE WASHINGTON STATE PATROL
Seattle Crime Laboratory - New Forensic Laboratory (00-2-008)
The reappropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 9,224,553
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 9,224,553
NEW SECTION. Sec. 502. FOR THE WASHINGTON STATE PATROL
Seattle Crime Laboratory - New Toxicology Laboratory (00-2-009)
The reappropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 2,455,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,455,000
NEW SECTION. Sec. 503. FOR THE WASHINGTON STATE PATROL
Boarding Home Fire Safety Program (00-4-010)
The reappropriation in this section is provided solely for grants for the installation or retrofit of fire sprinklers in licensed boarding homes. The reappropriation in this section is subject to the following conditions and limitations:
(1) The state fire marshal, in consultation with the department of social and health services, may develop rules to implement the grant program.
(2) The amount of the grant for an existing licensed boarding home shall not be greater than the difference between the cost of retrofitting and the cost of installing sprinklers during original construction of a comparable licensed boarding home with fire sprinklers.
(3) To be eligible for a grant under this section, the boarding home shall be licensed and accredited with the department of social and health services, at least fifteen percent of the boarding home's residents must be department of social and health services' clients, and the boarding home must maintain the department of social and health services' client ratio level for a period of no less than five years. If the department of social and health services' client ratio level is not maintained, then the boarding home shall reimburse the state for the amount of the grant plus appropriate interest.
(4) Any licensed boarding home receiving a grant shall complete the installation of the fire sprinklers by June 30, 2003.
Reappropriation:
State Building Construction Account‑-State...... $ 2,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,000,000
NEW SECTION. Sec. 504. FOR THE WASHINGTON STATE PATROL
Fire Training Academy - Preservation (02-1-006)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 200,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 1,000,000
-------------
TOTAL.................................... $ 1,200,000
NEW SECTION. Sec. 505. FOR THE WASHINGTON STATE PATROL
Vancouver Crime Laboratory - Acquire Land/Predesign (02-2-010)
Appropriation:
State Building Construction Account‑-State...... $ 500,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 7,400,000
-------------
TOTAL.................................... $ 7,900,000
NEW SECTION. Sec. 506. FOR THE WASHINGTON STATE PATROL
Spokane Crime Laboratory - Acquire Land for Crime Laboratory (02‑2‑013)
Appropriation:
State Building Construction Account‑-State...... $ 400,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 7,950,000
-------------
TOTAL............. ...................... $ 8,350,000
PART 5
EDUCATION
NEW SECTION. Sec. 601. FOR THE STATE BOARD OF EDUCATION
Public School Building Construction (00-2-001)
Reappropriation:
State Building Construction Account‑-State...... $ 100,000
Common School Construction Account‑-State........ $ 150,000,000
-------------
Subtotal Reappropriation.................. $ 150,100,000
Prior Biennia (Expenditures).................... $ 588,570,973
Future Biennia (Projected Costs)... ............ $ 0
-------------
TOTAL.................................... $ 738,670,973
NEW SECTION. Sec. 602. FOR THE STATE BOARD OF EDUCATION
State School Construction Assistance Grants (02-4-001)
The appropriation in this section is subject to the following conditions and limitations: (1) $200,000 from this appropriation is provided to fund up to two FTEs in the office of state fire marshal to exclusively review K‑12 construction documents for fire and life safety in accordance with the state building code. It is the intent of this appropriation to provide these services only to those districts that are located in counties without qualified review capabilities.
Appropriation:
Common School Construction Account‑-State... $ 386,996,729
Prior Biennia (Expenditures)............... $ 0
Future Biennia (Projected Costs)........... $ 1,831,522,031
-------------
TOTAL............................... $ 2,218,518,760
NEW SECTION. Sec. 603. FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
State School Construction Assistance Program Staff (02-4-001)
Appropriation:
Common School Construction Account‑-State... $ 1,930,989
Prior Biennia (Expenditures)............... $ 3,457,312
Future Biennia (Projected Costs)........... $ 9,554,976
-------------
TOTAL............................... $ 14,943,277
NEW SECTION. Sec. 604. FOR THE STATE SCHOOL FOR THE BLIND
Old Main and Alhsten Buildings, HVAC: Upgrade (00-1-002)
Reappropriation:
State Building Construction Account‑-State...... $ 500,000
Prior Biennia (Expenditures).................... $ 1,414,160
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,914,160
NEW SECTION. Sec. 605. FOR THE STATE SCHOOL FOR THE BLIND
Irwin, Old Main, Kennedy, and Dry Building Preservation (02-1-001)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 1,981,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,981,000
NEW SECTION. Sec. 606. FOR THE STATE SCHOOL FOR THE BLIND
School for the Blind: Campus Preservation (02-1-002)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 600,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 3,060,000
-------------
TOTAL.................................... $ 3,660,000
NEW SECTION. Sec. 607. FOR THE STATE SCHOOL FOR THE BLIND
Alsten Material Center and Braille Production (02-2-003)
The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 2,341,278
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,341,278
NEW SECTION. Sec. 608. FOR THE STATE SCHOOL FOR THE BLIND
Distance Learning Center (02-2-004)
The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 2,789,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,789,000
NEW SECTION. Sec. 609. FOR THE STATE SCHOOL FOR THE DEAF
Clark Hall/Lloyd: Upgrade (00-1-006)
Reappropriation:
State Building Construction Account‑-State...... $ 1,285,000
Prior Biennia (Expenditures).................... $ 115,000
Future Biennia (Projected Costs)................ $ 325,000
-------------
TOTAL.................................... $ 1,725,000
NEW SECTION. Sec. 610. FOR THE STATE SCHOOL FOR THE DEAF
Clark Hall/Lloyd: Seismic Stabilization (02-1-008)
Reappropriation:
State Building Construction Account‑-State...... $ 1,100,000
Prior Biennia (Expenditures).................... $ 300,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,400,000
NEW SECTION. Sec. 611. FOR THE STATE SCHOOL FOR THE DEAF
School for the Deaf: Campus Preservation (02-1-001)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 1,760,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 1,759,000
-------------
TOTAL.................................... $ 3,519,000
NEW SECTION. Sec. 612. FOR THE STATE SCHOOL FOR THE DEAF
School for the Deaf: Phase 2B (02-2-001)
The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 3,500,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 16,616,000
-------------
TOTAL.................................... $ 20,116,000
NEW SECTION. Sec. 613. FOR THE UNIVERSITY OF WASHINGTON
Classroom Improvements and Minor Works (00-1-001)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act. This reappropriation is a combination of section 616, chapter 379, Laws of 1999, and section 1036, chapter 1, Laws of 2000 2nd sp. sess.
Reappropriation:
State Building Construction Account‑-State...... $ 1,773,674
University of Washington Building
Account‑-State........................... $ 23,760,694
-------------
Subtotal Reappropriation.................. $ 25,534,368
Prior Biennia (Expenditures).................... $ 1,252,792
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 26,787,160
NEW SECTION. Sec. 614. FOR THE UNIVERSITY OF WASHINGTON
UW Bothell 2A/Cascadia Community College (00-2-015)
Reappropriation:
State Building Construction Account‑-State...... $ 36,860,685
Prior Biennia (Expenditures).................... $ 13,239,315
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 50,100,000
NEW SECTION. Sec. 615. FOR THE UNIVERSITY OF WASHINGTON
Tacoma Branch Campus Phase 2A (00-2-017)
The reappropriation in this section is subject to the conditions and limitations of sections 902, 903, 904, and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 35,364,085
Prior Biennia (Expenditures).................... $ 4,505,915
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 39,870,000
NEW SECTION. Sec. 616. FOR THE UNIVERSITY OF WASHINGTON
Tacoma Branch Campus Phase 3 (00-2-021)
Reappropriation:
State Building Construction Account‑-State...... $ 479,996
Prior Biennia (Expenditures).................... $ 20,004
Future Biennia (Projected Costs)................ $ 69,846,000
-------------
TOTAL.................................... $ 70,346,000
NEW SECTION. Sec. 617. FOR THE UNIVERSITY OF WASHINGTON
UW Tacoma Land Acquisition (01-2-029)
Appropriation:
Education Construction Account‑-State........... $ 4,000,000
Prior Biennia (Expenditures)........... ........ $ 2,500,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,500,000
NEW SECTION. Sec. 618. FOR THE UNIVERSITY OF WASHINGTON
UW Emergency Power Expansion - Phase I (02-1-009)
Appropriation:
State Building Construction Account‑-State...... $ 4,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 6,000,000
-------------
TOTAL.................................... $ 10,000,000
NEW SECTION. Sec. 619. FOR THE UNIVERSITY OF WASHINGTON
UW Wire Plant Upgrade (02-1-011)
Appropriation:
State Building Construction Account‑-State...... $ 5,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 20,000,000
-------------
TOTAL....................... ............ $ 25,000,000
NEW SECTION. Sec. 620. FOR THE UNIVERSITY OF WASHINGTON
Special Projects - Code Requirements (02-1-025)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Education Construction Account‑-State........... $ 2,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 4,000,000
-------------
TOTAL.................................... $ 6,000,000
NEW SECTION. Sec. 621. FOR THE UNIVERSITY OF WASHINGTON
Minor Repairs Programs (02-1-026)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 1,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 4,000,000
-------------
TOTAL.................................... $ 5,000,000
NEW SECTION. Sec. 622. FOR THE UNIVERSITY OF WASHINGTON
Deferred Renewal/Modernization/Current Access (02-1-031)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
University of Washington Building
Account‑-State........................... $ 6,000,000
Education Construction Account‑-State.... $ 1,000,000
-------------
Subtotal Appropriation................... $ 7,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 62,000,000
-------------
TOTAL.................................... $ 69,000,000
NEW SECTION. Sec. 623. FOR THE UNIVERSITY OF WASHINGTON
UW Tacoma - Technology Institute (02-1-150)
This appropriation is being made as part of an assumed $4,550,000 total equipment capitalization plan. The state share will be released once at least $3,000,000 in nonstate matching contributions have been raised.
Appropriation:
Education Construction Account‑-State........... $ 550,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 550,000
NEW SECTION. Sec. 624. FOR THE UNIVERSITY OF WASHINGTON
UW Bothell Phase 2B Offramp (02-2-014)
Appropriation:
State Building Construction Account‑-State...... $ 2,500,000
Prior Biennia (Expenditures)........... ........ $ 0
Future Biennia (Projected Costs)................ $ 9,650,000
-------------
TOTAL.................................... $ 12,150,000
NEW SECTION. Sec. 625. FOR THE UNIVERSITY OF WASHINGTON
UW Computer Science and Electrical Engineering Phase 3 (02-2-023)
The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 7,300,000
Appropriation:
State Building Construction Account‑-State...... $ 2,700,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 10,000,000
NEW SECTION. Sec. 626. FOR THE UNIVERSITY OF WASHINGTON
UW Tacoma Phase 2B (02-2-027)
The appropriation in this section is subject to the conditions and limitations of sections 902, 903, and 904 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 41,899,000
Prior Biennia (Expenditures).................... $ 3,450,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 45,349,000
NEW SECTION. Sec. 627. FOR THE UNIVERSITY OF WASHINGTON
UW Bio-Sciences Research (02-2-028)
The appropriation in this section is subject to the University of Washington providing sufficient evidence to the office of financial management of local revenue to support issuance of bonded debt and accompanying debt service associated with this project.
Appropriation:
Higher Education Construction Account‑-State.... $ 29,025,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 29,025,000
NEW SECTION. Sec. 628. FOR THE UNIVERSITY OF WASHINGTON
Suzzallo Library Renovation (94-1-015)
The appropriations in this section are subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 38,661,868
Appropriation:
State Building Construction Account‑-State...... $ 4,563,375
Prior Biennia (Expenditures).................... $ 3,700,007
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 46,925,250
NEW SECTION. Sec. 629. FOR THE UNIVERSITY OF WASHINGTON
New Law School Building (94-2-017)
Reappropriation:
Higher Education Construction Account‑-State.... $ 44,801,500
Higher Education Non-Proprietary Local Capital
Accounts‑-Private/Local.................. $ 24,186,000
-------------
Subtotal Reappropriation.................. $ 68,987,500
Prior Biennia (Expenditures).................... $ 1,274,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 70,261,500
NEW SECTION. Sec. 630. FOR THE UNIVERSITY OF WASHINGTON
Health Science Center BB Tower Elevators (96-1-007)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 6,259,910
University of Washington Building
Account‑-State........................... $ 93,100
-------------
Subtotal Reappropriation.................. $ 6,353,010
Prior Biennia (Expenditures).................... $ 156,982
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL............. ...................... $ 6,509,992
NEW SECTION. Sec. 631. FOR THE UNIVERSITY OF WASHINGTON
Bothell/Cascadia Community College Phase I (98-2-899)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 3,487,854
Prior Biennia (Expenditures).................... $ 42,484,284
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 45,972,138
NEW SECTION. Sec. 632. FOR THE UNIVERSITY OF WASHINGTON
Nuclear Reactor Decommissioning (99-1-009)
The appropriations in this section are subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 1,147,874
Appropriation:
State Building Construction Account‑-State...... $ 4,633,273
Prior Biennia (Expenditures).................... $ 303,885
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,085,032
NEW SECTION. Sec. 633. FOR THE UNIVERSITY OF WASHINGTON
UW Medical Center Improvements (99-2-010)
Reappropriation:
Higher Education Construction Account‑-State.... $ 43,977,711
Prior Biennia (Expenditures).................... $ 36,022,289
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 80,000,000
NEW SECTION. Sec. 634. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Minor Works: Safety and Environmental Projects (00‑1‑001)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 500,000
Prior Biennia (Expenditures).................... $ 1,500,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,000,000
NEW SECTION. Sec. 635. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Minor Works - Preservation: Reappropriation (00‑1‑004)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 900,000
Washington State University Building
Account‑-State........................... $ 1,500,000
-------------
Subtotal Reappropriation.................. $ 2,400,000
Prior Biennia (Expenditures).................... $ 3,600,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,000,000
NEW SECTION. Sec. 636. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Americans with Disabilities Act Projects: Reappropriation (00-1-011)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 65,000
Prior Biennia (Expenditures).................... $ 32,374
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 97,374
NEW SECTION. Sec. 637. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Child Care Facility: Renovation (00-1-039)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
Washington State University Building
Account‑-State........................... $ 1,500,000
Prior Biennia (Expenditures).................... $ 1,600,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 3,100,000
NEW SECTION. Sec. 638. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Scholars Hall/White Hall Renovation: Renovation (00‑1‑078)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 3,165,000
Institutions of Higher Education - Housing
and Food Account‑-Private/Local.......... $ 2,800,000
-------------
Subtotal Reappropriation.................. $ 5,965,000
Prior Biennia (Expenditures).................... $ 9,335,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 15,300,000
NEW SECTION. Sec. 639. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Power Plant Emergency Appropriation (00-1-502)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
Education Construction Account‑-State........... $ 250,000
Prior Biennia (Expenditures).................... $ 3,350,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 3,600,000
NEW SECTION. Sec. 640. FOR WASHINGTON STATE UNIVERSITY
WSU Branch Campuses - Minor Works: Branch Campuses (00-1-901)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
Washington State University Building
Account‑-State........................... $ 700,000
Prior Biennia (Expenditures).................... $ 300,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,000,000
NEW SECTION. Sec. 641. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Minor Works Program: Reappropriation (00‑2‑002)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
Washington State University Building
Account‑-State........................... $ 3,000,000
Prior Biennia (Expenditures).................... $ 2,000,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 5,000,000
NEW SECTION. Sec. 642. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Equipment Omnibus Acquisition: Reappropriation (00‑2‑003)
Reappropriation:
Washington State University Building
Account‑-State........................... $ 100,000
Prior Biennia (Expenditures).................... $ 3,400,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 3,500,000
NEW SECTION. Sec. 643. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Johnson Hall Addition-Plant BioScience Building: New (00-2-007)
The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.
Reappropriation:
Washington State University Building
Account‑-State........................... $ 97,142
Appropriation:
State Building Construction Account‑-State...... $ 3,500,000
Prior Biennia (Expenditures).................... $ 202,858
Future Biennia (Projected Costs)................ $ 45,200,000
-------------
TOTAL.................................... $ 49,000,000
NEW SECTION. Sec. 644. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Shock Physics Building: New Facility (00-2-080)
The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 1,100,000
Appropriation:
State Building Construction Account‑-State...... $ 3,540,000
Washington State University Building
Account‑-State........................... $ 7,100,000
-------------
Subtotal Appropriation................... $ 10,640,000
Prior Biennia (Expenditures).................... $ 660,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 12,400,000
NEW SECTION. Sec. 645. FOR WASHINGTON STATE UNIVERSITY
WSU Vancouver - Engineering and Life Sciences Building: New Facility (00-2-904)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 4,000,000
Prior Biennia (Expenditures).................... $ 25,470,650
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 29,470,650
NEW SECTION. Sec. 646. FOR WASHINGTON STATE UNIVERSITY
WSU Vancouver - Student Services Center: New Facility (00-2-905)
The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 25,000
Appropriation:
State Building Construction Account‑-State...... $ 1,500,000
Prior Biennia (Expenditures).................... $ 30,000
Future Biennia (Projected Costs)................ $ 14,001,000
-------------
TOTAL.................................... $ 15,556,000
NEW SECTION. Sec. 647. FOR WASHINGTON STATE UNIVERSITY
WSU Spokane Riverpoint - Academic Center Building: New Facility (00-2-906)
The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 33,723
Appropriation:
State Building Construction Account‑-State...... $ 2,271,000
Prior Biennia (Expenditures).................... $ 216,277
Future Biennia (Projected Costs)................ $ 42,729,000
-------------
TOTAL.................................... $ 45,250,000
NEW SECTION. Sec. 648. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Minor Capital Safety/Environmental (02-1-001)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Education Construction Account‑-State........... $ 1,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 4,000,000
-------------
TOTAL.................................... $ 5,000,000
NEW SECTION. Sec. 649. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Minor Capital Preservation/Renewal (02-1-004)
The appropriation in this section is subject to the conditions and limitations of section 905 of this act.
Appropriation:
Washington State University Building
Account‑-State........................... $ 3,775,000
Education Construction Account‑-State........... $ 3,000,000
-------------
Subtotal Appropriation................... $ 6,775,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 28,000,000
-------------
TOTAL.................................... $ 34,775,000
NEW SECTION. Sec. 650. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Campus Infrastructure: Preservation (02-1-073)
The appropriation in this section is subject to the conditions and limitations of section 905 of this act.
Appropriation:
Washington State University Building
Account‑-State........................... $ 1,019,300
State Building Construction Account‑-State...... $ 10,460,000
-------------
Subtotal Appropriation................... $ 11,479,300
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 24,000,000
-------------
TOTAL.................................... $ 35,479,300
NEW SECTION. Sec. 651. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Energy Plant - Heat: Renovation (02-1-501)
The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 23,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 23,000,000
NEW SECTION. Sec. 652. FOR WASHINGTON STATE UNIVERSITY
WSU Branch Campuses - Minor Capital Projects (02-1-901)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Washington State University Building
Account‑-State........................... $ 1,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 4,000,000
-------------
TOTAL.................................... $ 5,000,000
NEW SECTION. Sec. 653. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Minor Capital Improvements (02-2-002)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Washington State University Building
Account‑-State........................... $ 6,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 28,000,000
-------------
TOTAL.................................... $ 34,000,000
NEW SECTION. Sec. 654. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - WSUnet Infrastructure (02-2-074)
Appropriation:
Washington State University Building
Account‑-State........................... $ 4,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 18,000,000
-------------
TOTAL.................................... $ 22,000,000
NEW SECTION. Sec. 655. FOR WASHINGTON STATE UNIVERSITY
WSU Vancouver - Multimedia/Electronic Communication Classroom Building: (02-2-907)
The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 15,900,000
Prior Biennia (Expenditures).................... $ 600,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 16,500,000
NEW SECTION. Sec. 656. FOR WASHINGTON STATE UNIVERSITY
WSU Vancouver - Business and Education Building: New Facility (00‑2‑935)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 62,981
Prior Biennia (Expenditures).................... $ 132,019
Future Biennia (Projected Costs)................ $ 31,562,600
-------------
TOTAL.................................... $ 31,757,600
NEW SECTION. Sec. 657. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Compton Union Building Renovation: Renovation (02‑1‑066)
The appropriation in this section is subject to the conditions and limitations of section 906 of this act.
Appropriation:
Washington State University Building
Account‑-State........................... $ 346,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 44,654,000
-------------
TOTAL.................................... $ 45,000,000
NEW SECTION. Sec. 658. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Bohler Renovation: Renovation (94-1-010)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
Washington State University Building
Account‑-State........................... $ 200,000
Prior Biennia (Expenditures).................... $ 20,232,369
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 20,432,369
NEW SECTION. Sec. 659. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Kimbrough Hall Renovation/Addition: Renovation (94‑1‑019)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 100,000
Washington State University Building
Account‑-State........................... $ 121,875
-------------
Subtotal Reappropriation.................. $ 221,875
Prior Biennia (Expenditures).................... $ 11,511,125
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 11,733,000
NEW SECTION. Sec. 660. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Infrastructure: Savings (94-1-999)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 500,000
Prior Biennia (Expenditures).................... $ 211,465
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 711,465
NEW SECTION. Sec. 661. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Hazardous Waste Facilities - Statewide: New (94‑2‑006)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
Washington State University Building
Account‑-State........................... $ 2,450,000
Prior Biennia (Expenditures).................... $ 2,261,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,711,000
NEW SECTION. Sec. 662. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Education Addition (Cleveland): New Facility (97‑2‑001)
Reappropriation:
State Building Construction Account‑-State...... $ 600,000
Prior Biennia (Expenditures).................... $ 940,000
Future Biennia (Projected Costs)................ $ 10,210,000
-------------
TOTAL.................................... $ 11,750,000
NEW SECTION. Sec. 663. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Murrow Hall Addition: New Facility (97-2-008)
The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 1,000,000
Appropriation:
State Building Construction Account‑-State...... $ 10,910,000
Prior Biennia (Expenditures).................... $ 755,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 12,665,000
NEW SECTION. Sec. 664. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Campus Infrastructure: Preservation (98-1-073)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
Washington State University Building
Account‑-State........................... $ 3,000,000
Prior Biennia (Expenditures).................... $ 8,842,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 11,842,000
NEW SECTION. Sec. 665. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - South Campus Electrical Substation: New (98-2-044)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 200,000
Prior Biennia (Expenditures).................... $ 2,700,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,900,000
NEW SECTION. Sec. 666. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Teaching and Learning Center: New Facility (98‑2‑062)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 4,000,000
Prior Biennia (Expenditures).................... $ 27,574,500
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 31,574,500
NEW SECTION. Sec. 667. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Apparel, Merchandizing, Interior Design, and Landscape Architecture Building: New Facility (98-2-072)
Reappropriation:
State Building Construction Account‑-State...... $ 2,246,245
Prior Biennia (Expenditures).. ................. $ 631,755
Future Biennia (Projected Costs)................ $ 27,850,000
-------------
TOTAL.................................... $ 30,728,000
NEW SECTION. Sec. 668. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - WSUnet Infrastructure (98-2-074)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
Washington State University Building
Account‑-State........................... $ 100,000
Prior Biennia (Expenditures).................... $ 6,975,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 7,075,000
NEW SECTION. Sec. 669. FOR WASHINGTON STATE UNIVERSITY
WSU Spokane - Health Sciences Building: New Facility (98-2-903)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Higher Education Construction
Account‑-State........................... $ 14,400,000
Prior Biennia (Expenditures).................... $ 21,300,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 35,700,000
NEW SECTION. Sec. 670. FOR WASHINGTON STATE UNIVERSITY
WSU Vancouver - Phase 2 Construction (98-2-911)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 2,500,000
Prior Biennia (Expenditures).................... $ 10,565,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 13,065,000
NEW SECTION. Sec. 671. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Equipment Omnibus Appropriation (02-2-003)
For the purchase of equipment to improve, upgrade, or replace necessary instructional and research apparatus throughout the university.
Appropriation:
Washington State University Building
Account‑-State........................... $ 8,000,000
Prior Biennia (Expenditures).. ................. $ 0
Future Biennia (Projected Costs)................ $ 32,000,000
-------------
TOTAL.................................... $ 40,000,000
NEW SECTION. Sec. 672. FOR EASTERN WASHINGTON UNIVERSITY
EWU Senior Hall Design (00-1-003)
The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 43,000
Appropriation:
State Building Construction Account‑-State...... $ 1,211,000
Prior Biennia (Expenditures).................... $ 57,000
Future Biennia (Projected Costs)................ $ 13,999,000
-------------
TOTAL.................................... $ 15,310,000
NEW SECTION. Sec. 673. FOR EASTERN WASHINGTON UNIVERSITY
EWU Minor Works Programs (00-2-002)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
Eastern Washington University Capital Projects
Account‑-State........................... $ 1,210,000
Prior Biennia (Expenditures).................... $ 980,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,190,000
NEW SECTION. Sec. 674. FOR EASTERN WASHINGTON UNIVERSITY
EWU Childcare Center (00-2-003)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 47,000
Eastern Washington University Capital Projects
Account‑-State........................... $ 396,000
-------------
Subtotal Reappropriation.................. $ 443,000
Prior Biennia (Expenditures).................... $ 696,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,139,000
NEW SECTION. Sec. 675. FOR EASTERN WASHINGTON UNIVERSITY
EWU Cheney Hall - Design (00-2-009)
The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.
Reappropriation:
Eastern Washington University Capital Projects
Account‑-State........................... $ 225,000
Appropriation:
State Building Construction Account‑-State...... $ 3,600,000
Prior Biennia (Expenditures).................... $ 75,000
Future Biennia (Projected Costs)................ $ 19,000,000
-------------
TOTAL.................................... $ 22,900,000
NEW SECTION. Sec. 676. FOR EASTERN WASHINGTON UNIVERSITY
EWU Infrastructure Preservation (02-1-002)
The appropriation in this section is subject to the conditions and limitations of section 905 of this act.
Appropriation:
Education Construction Account‑-State........... $ 5,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 21,000,000
-------------
TOTAL.................................... $ 26,000,000
NEW SECTION. Sec. 677. FOR EASTERN WASHINGTON UNIVERSITY
EWU Minor Works Preservation (02-1-003)
The appropriations in this section are subject to the conditions and limitations of section 905 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 74,000
Eastern Washington University Capital Projects
Account‑-State........................... $ 1,375,000
-------------
Subtotal Reappropriation.................. $ 1,449,000
Appropriation:
State Building Construction Account‑-State...... $ 2,000,000
Eastern Washington University Capital Projects
Account‑-State........................... $ 4,000,000
-------------
Subtotal Appropriation................... $ 6,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 21,000,000
-------------
TOTAL.................................... $ 28,449,000
NEW SECTION. Sec. 678. FOR EASTERN WASHINGTON UNIVERSITY
EWU Roof Replacement 2001 (02-1-004)
Appropriation:
State Building Construction Account‑-State...... $ 2,619,000
Prior Biennia (Expenditures).................... $ 2,425,000
Future Biennia (Projected Costs)................ $ 6,000,000
-------------
TOTAL.................................... $ 11,044,000
NEW SECTION. Sec. 679. FOR EASTERN WASHINGTON UNIVERSITY
EWU HVAC Systems Upgrade (02-1-007)
Appropriation:
State Building Construction Account‑-State...... $ 3,000,000
Prior Biennia (Expenditures).................... $ 793,000
Future Biennia (Projected Costs)................ $ 5,500,000
-------------
TOTAL.................................... $ 9,293,000
NEW SECTION. Sec. 680. FOR EASTERN WASHINGTON UNIVERSITY
EWU Water System Preservation and Expansion (02-1-008)
Appropriation:
State Building Construction Account‑-State...... $ 2,236,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 7,500,000
-------------
TOTAL.................................... $ 9,736,000
NEW SECTION. Sec. 681. FOR EASTERN WASHINGTON UNIVERSITY
EWU Property Acquisition (02-2-001)
Appropriation:
Eastern Washington University Capital Projects
Account‑-State........................... $ 650,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 1,000,000
-------------
TOTAL.................................... $ 1,650,000
NEW SECTION. Sec. 682. FOR EASTERN WASHINGTON UNIVERSITY
EWU Campus Network Upgrade (02-2-004)
Appropriation:
State Building Construction Account‑-State...... $ 2,500,000
Prior Biennia (Expenditures).................... $ 1,000,000
Future Biennia (Projected Costs)................ $ 4,000,000
-------------
TOTAL.................................... $ 7,500,000
NEW SECTION. Sec. 683. FOR EASTERN WASHINGTON UNIVERSITY
EWU Tawanka Improvements (02-2-006)
The appropriation in this section is subject to the conditions and limitations of section 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 2,000,000
Eastern Washington University Capital Projects
Account‑-State........................... $ 1,196,000
-------------
Subtotal Appropriation................... $ 3,196,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 3,196,000
NEW SECTION. Sec. 684. FOR EASTERN WASHINGTON UNIVERSITY
EWU Classroom Renewal (02-2-007)
The appropriation in this section is subject to the conditions and limitations of section 905 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 1,566,000
Eastern Washington University Capital Projects
Account‑-State........................... $ 800,000
-------------
Subtotal Appropriation................... $ 2,366,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 13,400,000
-------------
TOTAL.................................... $ 15,766,000
NEW SECTION. Sec. 685. FOR EASTERN WASHINGTON UNIVERSITY
EWU Minor Works Programs (02-2-008)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 515,000
Eastern Washington University Capital Projects
Account‑-State........................... $ 1,985,000
-------------
Subtotal Appropriation................... $ 2,500,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 10,800,000
-------------
TOTAL.................................... $ 13,300,000
NEW SECTION. Sec. 686. FOR EASTERN WASHINGTON UNIVERSITY
EWU Monroe Hall Renovation (96-1-002)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 2,617,000
Eastern Washington University Capital Projects
Account‑-State........................... $ 125,000
-------------
Subtotal Reappropriation.................. $ 2,742,000
Prior Biennia (Expenditures).................... $ 5,514,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 8,256,000
NEW SECTION. Sec. 687. FOR EASTERN WASHINGTON UNIVERSITY
EWU Classroom Renewal (96-2-001)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
Eastern Washington University Capital Projects
Account‑-State........................... $ 150,000
Prior Biennia (Expenditures).................... $ 1,350,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,500,000
NEW SECTION. Sec. 688. FOR EASTERN WASHINGTON UNIVERSITY
EWU Water System Preservation and Expansion (98-1-002)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
Eastern Washington University Capital Projects
Account‑-State........................... $ 615,000
Prior Biennia (Expenditures).................... $ 265,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 880,000
NEW SECTION. Sec. 689. FOR EASTERN WASHINGTON UNIVERSITY
EWU Infrastructure Preservation (98-1-007)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 725,000
Prior Biennia (Expenditures).................... $ 275,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,000,000
NEW SECTION. Sec. 690. FOR EASTERN WASHINGTON UNIVERSITY
EWU Boiler Plant Expansion/Upgrade (98-1-011)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 4,695,000
Prior Biennia (Expenditures).................... $ 2,030,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,725,000
NEW SECTION. Sec. 691. FOR CENTRAL WASHINGTON UNIVERSITY
Minor Works Preservation (00-1-120)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
Central Washington University Capital Projects
Account‑-State........................... $ 750,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 750,000
NEW SECTION. Sec. 692. FOR CENTRAL WASHINGTON UNIVERSITY
Music Facility (00-2-001)
Reappropriation:
State Building Construction Account‑-State...... $ 2,000,000
Prior Biennia (Expenditures).................... $ 2,425,000
Future Biennia (Projected Costs)................ $ 25,000,000
-------------
TOTAL.................................... $ 29,425,000
NEW SECTION. Sec. 693. FOR CENTRAL WASHINGTON UNIVERSITY
Minor Works Program (00-2-110)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
Central Washington University Capital Projects
Account‑-State........................... $ 750,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 750,000
NEW SECTION. Sec. 694. FOR CENTRAL WASHINGTON UNIVERSITY
Fiber Optic Backbone Upgrade (00-2-130)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
Central Washington University Capital Projects
Account‑-State........................... $ 150,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 150,000
NEW SECTION. Sec. 695. FOR CENTRAL WASHINGTON UNIVERSITY
Omnibus Preservation (02-1-001)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Central Washington University Capital Projects
Account‑-State........................... $ 4,175,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 17,471,000
-------------
TOTAL.................................... $ 21,646,000
NEW SECTION. Sec. 696. FOR CENTRAL WASHINGTON UNIVERSITY
Infrastructure Savings (02-1-002)
Projects that are completed in accordance with section 915 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account‑-State...... $ 1
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1
NEW SECTION. Sec. 697. FOR CENTRAL WASHINGTON UNIVERSITY
Randall/Michaelsen Life Safety and Mechanical System Improvements (02-1-003)
The appropriation in this section is subject to the conditions and limitations of section 906 of this act.
Appropriation:
Education Construction Account‑-State........... $ 3,800,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 3,800,000
NEW SECTION. Sec. 698. FOR CENTRAL WASHINGTON UNIVERSITY
McConnell Stage and Classroom Remodel (02-1-004)
The appropriation in this section is subject to the conditions and limitations of section 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 2,100,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,100,000
NEW SECTION. Sec. 699. FOR CENTRAL WASHINGTON UNIVERSITY
Omnibus - Program (02-2-002)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Central Washington University Capital Projects
Account‑-State........................... $ 4,200,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 12,559,000
-------------
TOTAL.................................... $ 16,759,000
NEW SECTION. Sec. 700. FOR CENTRAL WASHINGTON UNIVERSITY
CWU/Highline Higher Education Center (02-2-101)
The appropriation in this section is contingent on an approved plan to increase enrollment at Central Washington University. The appropriation in this section is also subject to the conditions and limitations of sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 2,500,000
Prior Biennia (Expenditures).................... $ 75,000
Future Biennia (Projected Costs)................ $ 10,000,000
-------------
TOTAL.................................... $ 12,575,000
NEW SECTION. Sec. 701. FOR CENTRAL WASHINGTON UNIVERSITY
Steam/Electric/Chilled Water/Fiber Optic (98-1-120)
The appropriations in this section are subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 1,000,000
Appropriation:
State Building Construction Account‑-State...... $ 6,000,000
Education Construction Account‑-State........... $ 2,000,000
-------------
Subtotal Appropriation................... $ 8,000,000
Prior Biennia (Expenditures).................... $ 7,517,812
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 16,517,812
NEW SECTION. Sec. 702. FOR CENTRAL WASHINGTON UNIVERSITY
Lynnwood Higher Education Center (98-2-080)
The reappropriation in this section is subject to the conditions and limitations of sections 902, 903, and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 4,000,000
Central Washington University Capital Projects
Account‑-State........................... $ 1,000,000
-------------
Subtotal Reappropriation.................. $ 5,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 5,000,000
NEW SECTION. Sec. 703. FOR THE EVERGREEN STATE COLLEGE
Minor Works Preservation Reappropriation (00-1-002)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
The Evergreen State College Capital Projects
Account‑-State...................... $ 250,000
Prior Biennia (Expenditures)............... $ 0
Future Biennia (Projected Costs)........... $ 0
-------------
TOTAL............................... $ 250,000
NEW SECTION. Sec. 704. FOR THE EVERGREEN STATE COLLEGE
Emergency Repairs (02-1-003)
Appropriation:
The Evergreen State College Capital Projects
Account‑-State...................... $ 560,000
Prior Biennia (Expenditures)............... $ 0
Future Biennia (Projected Costs)........... $ 2,700,000
-------------
TOTAL............................... $ 3,260,000
NEW SECTION. Sec. 705. FOR THE EVERGREEN STATE COLLEGE
Life Safety/Code Compliance (02-1-013)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
The Evergreen State College Capital Projects
Account‑-State...................... $ 2,500,000
Prior Biennia (Expenditures)............... $ 0
Future Biennia (Projected Costs)........... $ 13,000,000
-------------
TOTAL............................... $ 15,500,000
NEW SECTION. Sec. 706. FOR THE EVERGREEN STATE COLLEGE
Minor Works Preservation (02-1-014)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Education Construction Account‑-State...... $ 3,000,000
Prior Biennia (Expenditures)............... $ 0
Future Biennia (Projected Costs)........... $ 21,800,000
-------------
TOTAL............................... $ 24,800,000
NEW SECTION. Sec. 707. FOR THE EVERGREEN STATE COLLEGE
Minor Works Program (02-2-002)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
The Evergreen State College Capital Projects
Account‑-State...................... $ 1,815,000
Prior Biennia (Expenditures)............... $ 0
Future Biennia (Projected Costs)........... $ 1,850,000
-------------
TOTAL............................... $ 3,665,000
NEW SECTION. Sec. 708. FOR THE EVERGREEN STATE COLLEGE
Seminar Building Phase 2 - Construction (02-2-004)
The appropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 41,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 41,000,000
NEW SECTION. Sec. 709. FOR THE EVERGREEN STATE COLLEGE
COM Building Renovation and Expansion (04-2-011)
Appropriation:
The Evergreen State College Capital Projects
Account‑-State...................... $ 200,000
Prior Biennia (Expenditures)............... $ 0
Future Biennia (Projected Costs)........... $ 15,750,000
-------------
TOTAL............................... $ 15,950,000
NEW SECTION. Sec. 710. FOR WESTERN WASHINGTON UNIVERSITY
Minor Works: Preservation (R) (00-1-068)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account--State...... $ 1,850,000
Prior Biennia (Expenditures).................... $ 2,650,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,500,000
NEW SECTION. Sec. 711. FOR WESTERN WASHINGTON UNIVERSITY
Minor Works: Program (00-2-069)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
Western Washington University Capital
Projects Account‑-State............. $ 2,700,000
Prior Biennia (Expenditures)............... $ 4,030,000
Future Biennia (Projected Costs)........... $ 0
-------------
TOTAL............................... $ 6,730,000
NEW SECTION. Sec. 712. FOR WESTERN WASHINGTON UNIVERSITY
Minor Works: Preservation - Infrastructure (02-1-070)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Education Construction Account--State........... $ 3,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 20,000,000
-------------
TOTAL.................................... $ 23,000,000
NEW SECTION. Sec. 713. FOR WESTERN WASHINGTON UNIVERSITY
Minor Works: Preservation - Safety (02-1-071)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Education Construction Account‑-State...... $ 3,000,000
Prior Biennia (Expenditures)............... $ 0
Future Biennia (Projected Costs)... ........ $ 20,000,000
-------------
TOTAL............................... $ 23,000,000
NEW SECTION. Sec. 714. FOR WESTERN WASHINGTON UNIVERSITY
Infrastructure Savings (02-1-999)
Projects that are completed in accordance with section 915 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account‑-State...... $ 1
Prior Biennia (Expenditures).................... $ 970,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 970,001
NEW SECTION. Sec. 715. FOR WESTERN WASHINGTON UNIVERSITY
Minor Works: Program (02-2-072)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Western Washington University Capital Projects
Account‑-State...................... $ 6,831,000
Prior Biennia (Expenditures)............... $ 0
Future Biennia (Projected Costs)........... $ 40,000,000
-------------
TOTAL............................... $ 46,831,000
NEW SECTION. Sec. 716. FOR WESTERN WASHINGTON UNIVERSITY
Campus Services Facility (96-2-025)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 8,000,000
Prior Biennia (Expenditures).................... $ 3,391,800
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 11,391,800
NEW SECTION. Sec. 717. FOR WESTERN WASHINGTON UNIVERSITY
Integrated Signal Distribution (96-2-056)
The reappropriation in this section is subject to the conditions and limitations of section 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 1,200,000
Prior Biennia (Expenditures).................... $ 12,277,900
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 13,477,900
NEW SECTION. Sec. 718. FOR WESTERN WASHINGTON UNIVERSITY
Campus Infrastructure Development (98-2-024)
The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 1,300,000
Appropriation:
State Building Construction Account‑-State...... $ 11,000,000
Western Washington University Capital Projects
Account‑-State........................... $ 669,000
-------------
Subtotal Appropriation................... $ 11,669,000
Prior Biennia (Expenditures).................... $ 1,150,000
Future Biennia (Projected Costs)................ $ 8,780,000
-------------
TOTAL.................................... $ 22,899,000
NEW SECTION. Sec. 719. FOR WESTERN WASHINGTON UNIVERSITY
Communications Facility (98-2-053)
The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 2,500,000
Appropriation:
State Building Construction Account‑-State...... $ 32,519,000
Prior Biennia (Expenditures).................... $ 1,454,400
Future Biennia (Projected Costs)................ $ 4,000,000
-------------
TOTAL.................................... $ 40,473,400
NEW SECTION. Sec. 720. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Washington Heritage Projects (98-2-004)
The reappropriation in this section shall support the projects as listed in section 748, chapter 379, Laws of 1999.
Reappropriation:
State Building Construction Account‑-State...... $ 916,000
Prior Biennia (Expenditures).................... $ 9,480,000
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 10,396,000
NEW SECTION. Sec. 721. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Olympia - State Capital Museum Preservation (02-1-001)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 238,679
Prior Biennia (Expenditures).................... $ 466,718
Future Biennia (Projected Costs)................ $ 129,423
-------------
TOTAL.................................... $ 834,820
NEW SECTION. Sec. 722. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Tacoma - State History Museum Preservation Projects (02-1-002)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 373,016
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 1,738,605
-------------
TOTAL.................................... $ 2,111,621
NEW SECTION. Sec. 723. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Tacoma - Stadium Way Research Center Preservation Projects (02‑1‑004)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 339,847
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 527,721
-------------
TOTAL.................................... $ 867,568
NEW SECTION. Sec. 724. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Lewis and Clark Trail Interpretive Infrastructure Grant Program (02-4-001)
Appropriation:
State Building Construction Account‑-State...... $ 1,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 1,000,000
-------------
TOTAL.................................... $ 2,000,000
NEW SECTION. Sec. 725. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Washington Heritage Projects (02-4-004)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation is subject to the provisions of RCW 27.34.330.
(2) The appropriation is provided for the following list of projects:
Total
Amount Project
Organization Recommended Cost
Jefferson County Historical Society - Bell Tower $ 100,000 386,083
Spokane Parks and Recreation - Corbin and Moore-
Turner Heritage Gardens 54,437 266,831
Clallam County Historical Society - Lincoln School 83,500 250,000
Orcas Island Historical Society - Museum 54,136 167,604
Gig Harbor Peninsula Historical Society - Heritage
and Arts Center 400,000 7,301,518
Vashon-Maury Island Historical Society - Heritage
Museum 175,000 526,879
Loon Lake Historical Society - Old Schoolhouse 8,292 29,896
Northwest School of Wooden Boatbuilding - Port Hadlock 97,500 463,832
Drayton Harbor Maritime Group - Dock Restoration
and Replacement 216,790 650,372
Volunteers for Outdoor Washington - Twin Tunnels
Bridge 200,000 1,360,000
Historic Seattle PDA - Dearborn House 200,000 2,131,227
Vancouver National Historic Reserve - American
Red Cross House 400,000 2,195,000
Maritime Heritage Foundation - Historic Ship Wharf 400,000 2,031,000
Cowlitz County Museum - Museum Expansion and Remodel 350,000 1,059,152
Mansfield Museum and Historical Society - Museum
Renovation 10,916 35,750
Fox Island Chapel - Chapel on Echo Bay 49,665 149,000
Kirkman House Museum - Museum Repair and Stabilization 20,000 64,080
City of Mount Vernon - Lincoln Theatre 250,000 1,535,082
Squaxin Island Tribe - Tu Ha'Buts Cultural Center -
Phase 2 225,000 1,734,000
Western Forest Industries Museum - Train Shed and
Baldwin Locomotive 150,000 450,000
Steamer Virginia V Foundation - Restoration of
Virginia V 100,000 4,077,663
Ferry County Fair Association - Carousel Restoration 60,000 190,500
White River Valley Museum - Olson Farm 200,000 1,647,750
Alderwood Manor Heritage Association - Superintendent's
Cottage 24,000 150,000
Kitsap County Historical Society Museum - Storage
Systems for Artifacts 70,000 516,422
Kalakala Foundation - Dry-dock and Renovation Phase 100,764 2,321,550
----------------------------
$4,000,000 31,691,191
Alternate Organizations
Kalakala Foundation - remaining balance recommended 174,236
Museum of Flight 50,000 5,009,667
Friends of Skamokawa 9,900 30,199
City of Raymond 239,000 719,000
City of Morton 100,000 301,230
----------------------------
$ 573,136 6,060,096
Appropriation:
State Building Construction Account‑-State...... $ 4,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 15,000,000
-------------
TOTAL.................................... $ 19,000,000
NEW SECTION. Sec. 726. FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
Cheney Cowles Museum: Preservation (02-1-002)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 250,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 1,125,000
-------------
TOTAL.................................... $ 1,375,000
NEW SECTION. Sec. 727. FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
Cheney Cowles Museum: Addition and Remodel (98-2-001)
The reappropriation in this section is subject to the conditions and limitations of sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 12,000,000
Prior Biennia (Expenditures).................... $ 6,891,600
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 18,891,600
NEW SECTION. Sec. 728. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Yakima Valley College - Replace Pedestrian Crossing (96-1-400)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 270,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 270,000
NEW SECTION. Sec. 729. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Project Artwork Consolidation Account (96-2-400)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 92,634
Prior Biennia (Expenditures).................... $ 71,788
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 164,422
NEW SECTION. Sec. 730. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
North Seattle Community College - Vocational/Child Care Building: Construction (96-2-651)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 991,101
Prior Biennia (Expenditures).................... $ 6,902,202
Future Biennia (Projected Costs)................ $ 905,906
-------------
TOTAL.................................... $ 8,799,209
NEW SECTION. Sec. 731. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Everett Community College - Instructional Technical Center: Construction (96-2-652)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 1,389,644
Prior Biennia (Expenditures).................... $ 483,057
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,872,701
NEW SECTION. Sec. 732. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
South Seattle Community College - Integrated Learning Assistance Resource Center: Construction (96-2-653)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 975,508
Prior Biennia (Expenditures).................... $ 3,473,110
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,448,618
NEW SECTION. Sec. 733. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Olympic College - Poulsbo Center: Construction (96-2-654)
The reappropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 12,961,456
Prior Biennia (Expenditures).................... $ 85,219
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 13,046,675
NEW SECTION. Sec. 734. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Clover Park - Transportation Trade: Construction (96-2-662)
The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account--State...... $ 1,240,000
Appropriation:
State Building Construction Account--State...... $ 16,784,000
Prior Biennia (Expenditures).................... $ 21,400
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 18,045,400
NEW SECTION. Sec. 735. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Clover Park Technical College - Aviation Trades Complex: Construction (96-2-998)
Reappropriation:
State Building Construction Account‑-State...... $ 3,629,657
Community and Technical College Capital Projects
Account--State........................... $ 1,599,612
-------------
Subtotal Reappropriation.................. $ 5,229,269
Prior Biennia (Expenditures).................... $ 4,628,383
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 9,857,652
NEW SECTION. Sec. 736. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Underground Storage Tanks (98-1-003)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 135,848
Prior Biennia (Expenditures).................... $ 74,157
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 210,005
NEW SECTION. Sec. 737. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Bates Technical College: Renovation (98-1-190)
Reappropriation:
State Building Construction Account‑-State...... $ 2,034,538
Prior Biennia (Expenditures).................... $ 4,859,879
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,894,417
NEW SECTION. Sec. 738. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Olympic College - Library: Replacement (98-2-500)
Reappropriation:
State Building Construction Account‑-State...... $ 363,057
Prior Biennia (Expenditures).................... $ 612,943
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 976,000
NEW SECTION. Sec. 739. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Highline Community College - Classroom/Laboratory Building: Construction (98-2-660)
The reappropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 5,113,782
Prior Biennia (Expenditures).................... $ 786,218
Future Biennia (Projected Costs)....... ........ $ 0
-------------
TOTAL.................................... $ 5,900,000
NEW SECTION. Sec. 740. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Spokane Community College - Allied Health Building: Addition (98‑2‑661)
The reappropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 8,904,736
Prior Biennia (Expenditures).................... $ 1,795,264
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 10,700,000
NEW SECTION. Sec. 741. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Bellingham Technical College - Health/Business Building: New Facility (98-2-672)
The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 709,921
Appropriation:
State Building Construction Account--State...... $ 8,086,600
Prior Biennia (Expenditures).................... $ 140,078
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 8,936,599
NEW SECTION. Sec. 742. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Lake Washington - Phase 3: New Facility (98-2-673)
The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 766,817
Appropriation:
State Building Construction Account--State...... $ 15,840,000
Prior Biennia (Expenditures).................... $ 398,183
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 17,005,000
NEW SECTION. Sec. 743. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Renton Technical College - Technology Resource Center (98-2-674)
The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 863,309
Appropriation:
State Building Construction Account--State...... $ 10,591,000
Prior Biennia (Expenditures).................... $ 316,691
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 11,771,000
NEW SECTION. Sec. 744. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Skagit Valley College - Whidbey Higher Education Center (98-2-675)
The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 519,731
Appropriation:
State Building Construction Account--State...... $ 9,175,300
Prior Biennia (Expenditures).................... $ 215,269
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 9,910,300
NEW SECTION. Sec. 745. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Cascadia Community College/University of Washington Bothell: Construction (98-2-999)
The reappropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 3,670,870
Prior Biennia (Expenditures).................... $ 26,378,539
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 30,049,409
NEW SECTION. Sec. 746. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Centralia College - Instructional Building: Replacement (99-2-001)
The reappropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 12,985,518
Prior Biennia (Expenditures).................... $ 1,414,482
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 14,400,000
NEW SECTION. Sec. 747. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Columbia Basin College - Electrical Substation (00-0-099)
Reappropriation:
State Building Construction Account‑-State...... $ 974,367
Prior Biennia (Expenditures).................... $ 25,633
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,000,000
NEW SECTION. Sec. 748. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Statewide Minor Works: Preservation (00-1-001)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
Community and Technical College Capital Projects
Account‑-State........................... $ 5,653,024
Prior Biennia (Expenditures).................... $ 6,046,976
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 11,700,000
NEW SECTION. Sec. 749. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Statewide Roof Repairs: Infrastructure Improvements (00-1-010)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
Community and Technical College Capital Projects
Account‑-State........................... $ 2,622,278
Prior Biennia (Expenditures).................... $ 1,974,722
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,597,000
NEW SECTION. Sec. 750. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Statewide Facility Repairs (00-1-050)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 19,457,556
Community and Technical College Capital Projects
Account‑-State........................... $ 2,348,852
-------------
Subtotal Reappropriation.................. $ 21,806,408
Prior Biennia (Expenditures).................... $ 5,593,592
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 27,400,000
NEW SECTION. Sec. 751. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Statewide Site Repairs (00-1-090)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 3,153,892
Prior Biennia (Expenditures).................... $ 688,108
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 3,842,000
NEW SECTION. Sec. 752. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Statewide Minor Works: Program (00-1-130)
The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 9,989,777
Community and Technical College Capital Projects
Account‑-State.... ...................... $ 1,108,813
-------------
Subtotal Reappropriation.................. $ 11,098,590
Prior Biennia (Expenditures).................... $ 5,751,410
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 16,850,000
NEW SECTION. Sec. 753. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Pierce College - Portable Buildings: Replacement (00-1-223)
Reappropriation:
Community and Technical College Capital Projects
Account‑-State........................... $ 5,435,538
Prior Biennia (Expenditures).................... $ 204,462
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 5,640,000
NEW SECTION. Sec. 754. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Edmonds Community College - Relocatable Buildings: Replacement (00‑1‑236)
Reappropriation:
Community and Technical College Capital Projects
Account‑-State........................... $ 5,379,064
Prior Biennia (Expenditures).................... $ 1,020,936
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL....................... ............ $ 6,400,000
NEW SECTION. Sec. 755. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
South Puget Sound Community College - Portable Buildings Replacement (00-1-237)
Reappropriation:
Community and Technical College Capital Projects
Account‑-State........................... $ 4,382,808
Prior Biennia (Expenditures).................... $ 229,592
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,612,400
NEW SECTION. Sec. 756. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
South Puget Sound Community College - General Education Complex (00‑2‑679)
The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 54,119
Appropriation:
State Building Construction Account‑-State...... $ 1,781,000
Prior Biennia (Expenditures).................... $ 69,881
Future Biennia (Projected Costs)................ $ 16,937,000
-------------
TOTAL.................................... $ 18,842,000
NEW SECTION. Sec. 757. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Olympic College - Physical Plant Building: Replacement (00-2-002)
Reappropriation:
State Building Construction Account‑-State...... $ 19,055
Appropriation:
State Building Construction Account‑-State...... $ 5,086,600
Prior Biennia (Expenditures).................... $ 1,009,945
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,115,600
NEW SECTION. Sec. 758. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Bellevue Community College - Robinswood School: Replacement (00‑2‑005)
Reappropriation:
State Building Construction Account‑-State...... $ 13,847,731
Prior Biennia (Expenditures).................... $ 1,958,869
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 15,806,600
NEW SECTION. Sec. 759. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Shoreline Community College - Library/Technical Center: New Facility (00-2-319)
Reappropriation:
State Building Construction Account‑-State...... $ 6,868,308
Prior Biennia (Expenditures).................... $ 381,692
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 7,250,000
NEW SECTION. Sec. 760. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Green River Community College - Drama/Music Class/Laboratories: Renovation (00-2-322)
Reappropriation:
State Building Construction Account‑-State...... $ 3,373,693
Prior Biennia (Expenditures).................... $ 56,307
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 3,430,000
NEW SECTION. Sec. 761. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Clark Community College - Applied Arts 4 Building Renovation (00‑2‑326)
Reappropriation:
State Building Construction Account‑-State...... $ 2,416,873
Prior Biennia (Expenditures).................... $ 123,127
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,540,000
NEW SECTION. Sec. 762. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Clark College/WSU Vancouver - Classroom/Laboratories: Design (00‑2‑680)
The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 63,690
Appropriation:
State Building Construction Account‑-State...... $ 1,644,000
Prior Biennia (Expenditures).................... $ 56,310
Future Biennia (Projected Costs)................ $ 17,712,900
-------------
TOTAL.................................... $ 19,476,900
NEW SECTION. Sec. 763. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Wenatchee Valley College - Sexton Hall Computer Laboratories: Renovation (00‑2‑327)
Reappropriation:
State Building Construction Account‑-State...... $ 107,300
Prior Biennia (Expenditures).................... $ 592,700
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 700,000
NEW SECTION. Sec. 764. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Wenatchee Valley College - Omak Science Laboratory: New Facility (00‑2‑952)
The reappropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 446,653
Prior Biennia (Expenditures).................... $ 453,347
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 900,000
NEW SECTION. Sec. 765. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Yakima Valley Community College - Mechanics Complex: Renovation (00‑2‑328)
Reappropriation:
State Building Construction Account‑-State...... $ 1,676,797
Prior Biennia (Expenditures).................... $ 38,203
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,715,000
NEW SECTION. Sec. 766. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Yakima Valley College - Higher Education Center (00-2-954)
The reappropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 1,068,836
Prior Biennia (Expenditures).................... $ 2,931,164
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,000,000
NEW SECTION. Sec. 767. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Tacoma Community College - Building 5: Renovation (00‑2‑335)
Reappropriation:
State Building Construction Account‑-State...... $ 1,493,026
Prior Biennia (Expenditures).................... $ 6,974
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,500,000
NEW SECTION. Sec. 768. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Bellingham Technical College - Building B: Renovation (00‑2‑338)
Reappropriation:
State Building Construction Account‑-State...... $ 1,844,811
Prior Biennia (Expenditures).................... $ 81,989
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,926,800
NEW SECTION. Sec. 769. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Cascadia Community College: Development (00-2-501)
The reappropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 36,963,520
Prior Biennia (Expenditures).................... $ 13,136,480
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 50,100,000
NEW SECTION. Sec. 770. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Columbia Basin College - Emergency Roof: Replacement (00-2-600)
Reappropriation:
Education Construction Account‑-State........... $ 1,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,000,000
NEW SECTION. Sec. 771. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Pierce College Puyallup - Phase 3 Expansion: Design (00-2-676)
The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 25,918
Appropriation:
State Building Construction Account‑-State...... $ 1,743,000
Prior Biennia (Expenditures).................... $ 191,282
Future Biennia (Projected Costs)................ $ 19,917,000
-------------
TOTAL.................................... $ 21,877,200
NEW SECTION. Sec. 772. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Whatcom Community College - Design Classroom/Laboratory Building: New Facility (00-2-677)
The appropriations in this section are subject to the review and allotment procedures under sections 902 and 903 of this act.
Reappropriation:
State Building Construction Account‑-State...... $ 25,706
Appropriation:
State Building Construction Account‑-State...... $ 891,900
Prior Biennia (Expenditures).................... $ 54,294
Future Biennia (Projected Costs)................ $ 10,653,200
-------------
TOTAL.................................... $ 11,625,100
NEW SECTION. Sec. 773. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Highline Community College - Higher Education Center and Childcare (00-2-678)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 2,228,000
Prior Biennia (Expenditures).................... $ 117,000
Future Biennia (Projected Costs)................ $ 20,991,000
-------------
TOTAL.................................... $ 23,336,000
NEW SECTION. Sec. 774. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Statewide Hazardous Material Pool (00‑9‑031)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 269,610
Prior Biennia (Expenditures).................... $ 100,336
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 369,946
NEW SECTION. Sec. 775. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Statewide Americans with Disabilities Pool (00‑9‑036)
The reappropriation in this section is subject to the conditions and limitations of section 906(2)(b) of this act.
Reappropriation:
State Building Construction Account‑‑State...... $ 805,026
Prior Biennia (Expenditures).................... $ 132,345
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 937,371
NEW SECTION. Sec. 776. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Minor Works ‑ Preservation (Emergency Funds) (02‑1‑001)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 12,000,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 58,000,000
-------------
TOTAL.................................... $ 70,000,000
NEW SECTION. Sec. 777. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Roof Repairs "A" (02‑1‑010)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Education Construction Account‑‑State........... $ 7,473,077
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 20,000,000
-------------
TOTAL.................................... $ 27,473,077
NEW SECTION. Sec. 778. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Facility Repairs "A" (02‑1‑050)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Education Construction Account‑‑State........... $ 21,660,328
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 90,000,000
-------------
TOTAL.................................... $ 111,660,328
NEW SECTION. Sec. 779. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Site Repairs "A" ‑ Community and Technical College System (02‑1‑090)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Education Construction Account‑‑State........... $ 8,343,232
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 24,000,000
-------------
TOTAL.................................... $ 32,343,232
NEW SECTION. Sec. 780. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Minor Works ‑ Program ‑ Community and Technical College System (02‑1‑130)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 10,965,000
Education Construction Account‑‑State........... $ 5,535,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 80,000,000
-------------
TOTAL.................................... $ 96,500,000
NEW SECTION. Sec. 781. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Roof Repairs "B" - Community and Technical College System (02‑1‑710)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Education Construction Account‑-State........... $ 5,273,179
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 20,000,000
-------------
TOTAL.................................... $ 25,273,179
NEW SECTION. Sec. 782. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Facility Repairs "B" - Community and Technical College System (02‑1‑750)
The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
Appropriation:
Education Construction Account‑-State........... $ 7,643,579
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 100,000,000
-------------
TOTAL.................................... $ 107,643,579
NEW SECTION. Sec. 783. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Predesign Studies (02-2-001)
Appropriation:
State Building Construction Account‑-State...... $ 400,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL............................ ........ $ 400,000
NEW SECTION. Sec. 784. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Skagit Valley College ‑ Office Space: Replacement (02‑1‑213)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
Community and Technical College Capital Projects
Account‑‑State........................... $ 762,689
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 762,689
NEW SECTION. Sec. 785. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Seattle Central Community College ‑ Portables: Replacement (02‑1‑215)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 6,897,400
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,897,400
NEW SECTION. Sec. 786. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Seattle Central Community College ‑ Edison Hall: Renovation (02‑1‑315)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 5,809,200
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 5,809,200
NEW SECTION. Sec. 787. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
South Seattle Community College ‑ Building A: Replacement (02‑1‑217)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
Community and Technical College Capital Projects
Account‑‑State........................... $ 5,477,400
Prior Biennia (Expenditures).. ................. $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 5,477,400
NEW SECTION. Sec. 788. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Wenatchee Valley College ‑ Greenhouse: Replacement (02‑1‑220)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
Community and Technical College Capital Projects
Account‑‑State........................... $ 441,360
Prior Biennia (Expenditures).. ................. $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 441,360
NEW SECTION. Sec. 789. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Wenatchee Valley College ‑ Agriculture Program: Renovation (02‑1‑328)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 794,536
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 794,536
NEW SECTION. Sec. 790. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Green River Community College ‑ International Program: Replacement (02‑1‑222)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
Community and Technical College Capital Projects
Account‑‑State........................... $ 587,070
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 587,070
NEW SECTION. Sec. 791. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Pierce College Fort Steilacoom ‑ Portables: Replacement (02‑1‑223)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
Community and Technical College Capital Projects
Account‑‑State........................... $ 2,452,100
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,452,100
NEW SECTION. Sec. 792. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Lower Columbia College ‑ Physical Science Portables: Replacement (02‑1‑226)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
Education Construction Account‑‑State........... $ 1,959,800
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,959,800
NEW SECTION. Sec. 793. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Lower Columbia College ‑ Vocational Building: Renovation/Addition (02‑1‑326)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 1,090,700
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,090,700
NEW SECTION. Sec. 794. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Yakima Valley Community College ‑ Child Care: Replacement (02‑1‑229)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
Community and Technical College Capital Projects
Account‑‑State........................... $ 969,900
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 969,900
NEW SECTION. Sec. 795. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Yakima Valley Community College ‑ Sundquist Hall: Renovation (02‑1‑329)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 1,812,800
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 1,812,800
NEW SECTION. Sec. 796. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Yakima Valley Higher Education Center (02-2-100)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
(2) The appropriation in this section is subject to the conditions and limitations under section 911 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 18,500,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 18,500,000
NEW SECTION. Sec. 797. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Spokane Falls Community College ‑ Fine Arts Building: Replacement (02‑1‑231)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
Community and Technical College Capital Projects
Account‑‑State........................... $ 672,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 672,000
NEW SECTION. Sec. 798. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Spokane Falls Community College ‑ Library: Renovation (02‑1‑331)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 5,602,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 5,602,000
NEW SECTION. Sec. 799. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Bellingham Technical College ‑ Replacement: New Facility (02‑1‑239)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 4,357,900
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,357,900
NEW SECTION. Sec. 800. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Lake Washington Community College ‑ Replacement: New Facility (02‑1‑240)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 6,915,300
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,915,300
NEW SECTION. Sec. 801. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Peninsula College ‑ Buildings D and E: Renovation (02‑1‑310)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
Education Construction Account‑‑State........... $ 2,669,800
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 2,669,800
NEW SECTION. Sec. 802. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Grays Harbor Community College ‑ Library: Renovation (02‑1‑311)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
Community and Technical College Capital Projects
Account‑‑State........................... $ 4,579,500
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,579,500
NEW SECTION. Sec. 803. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Shoreline Community College ‑ Building 800: Renovation (02‑1‑319)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 6,021,100
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,021,100
NEW SECTION. Sec. 804. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Bellevue Community College ‑ "A" Building: Renovation (02‑1‑320)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 5,566,100
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 5,566,100
NEW SECTION. Sec. 805. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Columbia Basin Community College ‑ Building A: Renovation (02‑1‑333)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑‑State...... $ 6,434,100
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 6,434,100
NEW SECTION. Sec. 806. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Clover Park - Building 18 Machine Trades: New Facility (02-1-343)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 4,791,800
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 4,791,800
NEW SECTION. Sec. 807. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Spokane Community College - Multicultural Student Service Center (02-2-230)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
Community and Technical College Capital Projects
Account‑-State........................... $ 235,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 0
-------------
TOTAL.................................... $ 235,000
NEW SECTION. Sec. 808. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
University of Washington - Bothell/Cascadia Phase 2B: New Facilities (02-2-999)
The appropriation in this section is subject to the review and allotment procedures under sections 902 and 903 of this act.
Appropriation:
State Building Construction Account‑-State...... $ 2,500,000
Prior Biennia (Expenditures).................... $ 0
Future Biennia (Projected Costs)................ $ 17,476,750
-------------
TOTAL.................................... $ 19,976,750
PART 6
MISCELLANEOUS
NEW SECTION. Sec. 901. The estimated debt service costs impacting future general fund expenditures related solely to new capital appropriations within this act are $18,427,449 during the 2001-2003 fiscal period; $106,954,937 during the 2003-2005 fiscal period; $149,523,472 during the 2005-2007 fiscal period; $149,899,611 during the 2007-2009 fiscal period; and $149,899,611 during the 2009-2011 fiscal period.
NEW SECTION. Sec. 902. To ensure that major construction projects are carried out in accordance with legislative and executive intent, appropriations in this act referencing this section or in excess of $5,000,000 shall not be expended until the office of financial management has reviewed and approved the agency's predesign and other documents and approved an allotment for the project. The predesign document shall include but not be limited to program, site, and cost analysis in accordance with the predesign manual adopted by the office of financial management. To improve monitoring of major construction projects, progress reports shall be submitted by the agency administering the project to the office of financial management and to the fiscal committees of the house of representatives and senate. Reports will be submitted on July 1st and December 31st each year in a format to be developed by the office of financial management.
NEW SECTION. Sec. 903. Allotments for appropriations shall be provided in accordance with the capital project review requirements adopted by the office of financial management. The office of financial management shall notify the house of representatives capital budget committee and the senate ways and means committee of allotment releases based on review by the office of financial management. No expenditure may be incurred or obligation entered into for appropriations referring to this section until the office of financial management has approved the allotment of the funds to be expended. Projects that will be employing alternative public works construction procedures, under chapter 39.10 RCW, are subject to the allotment procedures defined in this section and RCW 43.88.110. Contracts shall not be executed that call for expenditures in excess of the approved allotment, and the total amount shown in such contracts for the cost of future work that has not been appropriated shall not exceed the amount identified for such work in the level of funding approved by the office of financial management at the completion of predesign.
NEW SECTION. Sec. 904. Appropriations for design and construction of facilities on higher education branch campuses shall be expended only after funds are allotted to institutions of higher education on the basis of: (1) Comparable unit cost standards, as determined by the office of financial management in consultation with the higher education coordinating board; (2) costs consistent with other higher education teaching facilities in the state; and (3) student full-time equivalent enrollment levels as established by the office of financial management in consultation with the higher education coordinating board.
NEW SECTION. Sec. 905. To ensure that minor works appropriations are carried out in accordance with legislative intent, funds shall not be allotted until project lists are on file at the office of financial management. No expenditure may be incurred or obligation entered into for appropriations referring to this section until the office of financial management has approved the allotment of the funds to be expended.
NEW SECTION. Sec. 906. (1) Agencies shall expedite the expenditure of reappropriations and appropriations in order to: (a) Rehabilitate infrastructure resources; (b) accelerate environmental rehabilitation and restoration projects for the improvement of the state's natural environment; (c) reduce additional costs associated with acquisition and construction inflationary pressures; and (d) provide additional employment opportunities associated with capital expenditures.
(2) In order to meet the goals of this section, the following conditions apply to appropriations that reference this section: (a) To the extent feasible, agencies are directed to accelerate expenditure rates at the current level of permanent employees and shall use contracted design and construction services wherever necessary to meet the goals of this section; and (b) reappropriations that reference this subsection (2)(b) shall lapse on June 30, 2003.
(3) The office of financial management shall report the following to the appropriate fiscal committees of the legislature by January 30, 2003: (a) A listing of reappropriations in the governor's 2003-2005 capital budget recommendation that have been reappropriated one or more times and have ten percent or more of the original appropriation unexpended; and (b) an explanation of why the appropriation remains unexpended.
NEW SECTION. Sec. 907. ACQUISITION OF PROPERTIES AND FACILITIES THROUGH FINANCIAL CONTRACTS. The following agencies may enter into financial contracts, paid from any funds of an agency, appropriated or nonappropriated, for the purposes indicated and in not more than the principal amounts indicated, plus financing expenses and required reserves pursuant to chapter 39.94 RCW. When securing properties under this section, agencies shall use the most economical financial contract option available, including long-term leases, lease-purchase agreements, lease-development with option to purchase agreements or financial contracts using certificates of participation. The director of general administration shall ensure that the clustering of state facilities and the collocation and consolidation of state agencies take place where such configurations are economical and consistent with agency space needs. Agencies shall assist the department of general administration with facility collocation and consolidation efforts.
State agencies may enter into agreements with the department of general administration and the state treasurer's office to develop requests to the legislature for acquisition of properties and facilities through financial contracts. The agreements may include charges for services rendered.
(1) Secretary of state:
(a) Enter into a financing contract in the amount of $13,582,200 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase or construct a regional archives building in eastern Washington.
(b) Enter into a financing contract in the amount of $653,800 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase technology equipment and software for an electronic data archive, provided that authority to expend funding for acquisition of technology equipment and software associated with the electronic data archive is conditioned on compliance with section 902 of the 2001-2003 operating budget bill (information services projects).
(2) Department of general administration:
(a) Enter into a financing contract in the amount of $3,956,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW, to expand the existing Isabella Bush records center in Tumwater for use by state agencies.
(b) Enter into a financing contract in the amount of $35,656,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW, to purchase two existing office buildings and associated land in Tacoma for use by the department of social and health services.
(3) Department of corrections:
(a) Enter into a financing contract in the amount of $4,588,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase or construct a correctional industries transportation services warehouse.
(b) Enter into a financing contract in the amount of $7,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase or construct work release beds.
(c) Enter into a financing contract in the amount of $4,970,403 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase or construct reynolds work release.
(d) Enter into a financing contract in the amount of $7,016,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct lethal fences at either the Washington state penitentiary, or the Washington correction center, or both.
(4) Department of veterans affairs: Enter into a financing contract in the amount of $12,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a skilled nursing home in Retsil.
(5) State parks and recreation: It is the intent of the legislature that the operating revenues of the department provide the primary source of funds necessary to meet financing contract obligations for the projects financed under this authority. In addition, state parks and recreation is authorized to pledge to make payments from appropriated funds pursuant to chapter 39.94 RCW in order to:
(a) Enter into financing contracts in the amount of $1,500,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase and install cabins and yurts statewide.
(b) Enter into financing contracts in the amount of $165,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to convert the lighthouse keeper's house into a rental unit at Fort Canby state park.
(c) Enter into financing contracts in the amount of $1,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct revenue generating facilities at Deception Pass state park.
(d) Enter into financing contracts in the amount of $1,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct concession facilities statewide.
(e) Enter into financing contracts in the amount of $1,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct revenue generating day-use amenities statewide.
(f) Enter into financing contracts in the amount of $1,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to upgrade three Puget Sound environmental learning centers to make them more useable during off-season times.
(g) Enter into financing contracts in the amount of $500,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to improve moorage and campsite electrification statewide.
(h) Enter into financing contracts in the amount of $7,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a replacement dining facility at Fort Worden state park.
(6) Community and technical colleges:
(a) Enter into a financing contract on behalf of Edmonds Community College in the amount of $4,106,300 plus financing expenses and reserves pursuant to chapter 39.94 RCW to renovate Lynnwood hall and Montlake Terrace hall.
(b) Enter into a financing contract on behalf of Edmonds Community College in the amount of $3,134,900 plus financing expenses and reserves pursuant to chapter 39.94 RCW to construct an addition to the student center building.
(c) Enter into a financing contract on behalf of Highline Community College in the amount of $15,066,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to replace the student union building.
NEW SECTION. Sec. 908. FOR THE ARTS COMMISSION‑-ART WORK ALLOWANCE POOLING. (1) One-half of one percent of moneys appropriated in this act for original construction of school plant facilities is provided solely for the purposes of RCW 28A.335.210. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the superintendent of public instruction and representatives of school district boards.
(2) One-half of one percent of moneys appropriated in this act for original construction or any major renovation or remodel work exceeding two hundred thousand dollars by colleges or universities is provided solely for the purposes of RCW 28B.10.027. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the board of regents or trustees.
(3) One-half of one percent of moneys appropriated in this act for original construction of any public building by a state agency as defined in RCW 43.17.020 is provided solely for the purposes of RCW 43.17.200. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the state agency.
(4) At least eighty-five percent of the moneys spent by the Washington state arts commission during the 1999-2001 biennium for the purposes of RCW 28A.335.210, 28B.10.027, and 43.17.200 shall be spent solely for direct acquisition of works of art.
NEW SECTION. Sec. 909. The amounts shown under the headings "Prior Biennia," "Future Biennia," and "Total" in this act are for informational purposes only and do not constitute legislative approval of these amounts.
NEW SECTION. Sec. 910. "Reappropriations" in this act are appropriations and, unless the context clearly provides otherwise, are subject to the relevant conditions and limitations applicable to appropriations. Reappropriations shall be limited to the unexpended balances remaining on June 30, 1999, from the 1997-1999 biennial appropriations for each project.
NEW SECTION. Sec. 911. To carry out the provisions of this act, the governor may assign responsibility for predesign, design, construction, and other related activities to any appropriate agency.
NEW SECTION. Sec. 912. If any federal moneys appropriated by this act for capital projects are not received by the state, the department or agency to which the moneys were appropriated may replace the federal moneys with funds available from private or local sources. No replacement may occur under this section without the prior approval of the director of financial management in consultation with the senate committee on ways and means and the house of representatives capital budget committee.
NEW SECTION. Sec. 913. (1) Unless otherwise stated, for all appropriations under this act that require a match of nonstate money or in-kind contributions, the following requirement, consistent with RCW 43.88.150, shall apply: Expenditures of state money shall be timed so that the state share of project expenditures never exceeds the intended state share of total project costs.
(2) Provision of the full amount of required matching funds is not required to permit the expenditure of capital budget appropriations for phased projects if a proportional amount of the required matching funds is provided for each distinct, identifiable phase of the project.
NEW SECTION. Sec. 914. Any capital improvements or capital projects involving construction or major expansion of a state office facility, including, but not limited to, district headquarters, detachment offices, and off-campus faculty offices, shall be reviewed by the department of general administration for possible consolidation, collocation, and compliance with state office standards before allotment of funds. The intent of the requirement imposed by this section is to eliminate duplication and reduce total office space requirements where feasible, while ensuring proper service to the public.
NEW SECTION. Sec. 915. The governor, through the office of financial management, may authorize a transfer of appropriation authority provided for a capital project that is in excess of the amount required for the completion of such project to another capital project for which the appropriation is insufficient. No such transfer may be used to expand the capacity of any facility beyond that intended by the legislature in making the appropriation. Such transfers may be effected only between capital appropriations to a specific department, commission, agency, or institution of higher education and only between capital projects that are funded from the same fund or account. No transfers may occur between projects to local government agencies except where the grants are provided within a single omnibus appropriation and where such transfers are specifically authorized by the implementing statutes which govern the grants.
For purposes of this section, the governor may find that an amount is in excess of the amount required for the completion of a project only if: (1) The project as defined in the notes to the budget document is substantially complete and there are funds remaining; or (2) bids have been let on a project and it appears to a substantial certainty that the project as defined in the notes to the budget document can be completed within the biennium for less than the amount appropriated in this act.
For the purposes of this section, the legislature intends that each project be defined as proposed to the legislature in the governor's budget document, unless it clearly appears from the legislative history that the legislature intended to define the scope of a project in a different way.
A report of any transfer effected under this section, except emergency projects or any transfer under $250,000, shall be filed with the legislative fiscal committees of the senate and house of representatives by the office of financial management at least thirty days before the date the transfer is effected. The office of financial management shall report all emergency or smaller transfers within thirty days from the date of transfer.
NEW SECTION. Sec. 916. If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected.
NEW SECTION. Sec. 917. This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately.
INDEX PAGE#
CENTRAL WASHINGTON UNIVERSITY................................. 145
COMMUNITY AND TECHNICAL COLLEGE SYSTEM........................ 159
CRIMINAL JUSTICE TRAINING COMMISSION........................... 35
DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT........ 2
DEPARTMENT OF CORRECTIONS...................................... 53
DEPARTMENT OF ECOLOGY.......................................... 66
DEPARTMENT OF FISH AND WILDLIFE................................ 89
DEPARTMENT OF GENERAL ADMINISTRATION........................... 19
DEPARTMENT OF HEALTH........................................... 48
DEPARTMENT OF LABOR AND INDUSTRIES............................. 35
DEPARTMENT OF NATURAL RESOURCES............................... 101
DEPARTMENT OF SOCIAL AND HEALTH SERVICES....................... 36
DEPARTMENT OF VETERANS' AFFAIRS................................ 51
EASTERN WASHINGTON STATE HISTORICAL SOCIETY................... 158
EASTERN WASHINGTON UNIVERSITY................................. 138
INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION................... 82
MILITARY DEPARTMENT............................................ 29
OFFICE OF FINANCIAL MANAGEMENT................................. 18
OFFICE OF THE SECRETARY OF STATE................................ 1
STATE BOARD OF EDUCATION...................................... 114
STATE CONSERVATION COMMISSION.................................. 87
STATE CONVENTION AND TRADE CENTER.............................. 34
STATE PARKS AND RECREATION COMMISSION.......................... 74
STATE SCHOOL FOR THE BLIND.................................... 115
STATE SCHOOL FOR THE DEAF..................................... 116
SUPERINTENDENT OF PUBLIC INSTRUCTION.......................... 115
THE EVERGREEN STATE COLLEGE................................... 149
UNIVERSITY OF WASHINGTON...................................... 117
WASHINGTON STATE HISTORICAL SOCIETY........................... 155
WASHINGTON STATE PATROL....................................... 111
WASHINGTON STATE UNIVERSITY................................... 124
WESTERN WASHINGTON UNIVERSITY................................. 151
--- END ---