S-1094.1 _______________________________________________
SENATE BILL 5550
_______________________________________________
State of Washington 57th Legislature 2001 Regular Session
By Senators Morton, Honeyford, Horn, Hale, Hochstatter, Swecker, Deccio, Long, Winsley, McDonald, Hewitt, Sheahan, Rossi and Roach
Read first time 01/26/2001. Referred to Committee on Environment, Energy & Water.
AN ACT Relating to clarifying the authority of the energy facility site evaluation council; amending RCW 80.50.020 and 80.50.060; adding a new section to chapter 80.50 RCW; and declaring an emergency.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
Sec. 1. RCW 80.50.020 and 1995 c 69 s 1 are each amended to read as follows:
(1) "Applicant" means any person who makes application for a site certification pursuant to the provisions of this chapter;
(2) "Application" means any request for approval of a particular site or sites filed in accordance with the procedures established pursuant to this chapter, unless the context otherwise requires;
(3) "Person" means an individual, partnership, joint venture, private or public corporation, association, firm, public service company, political subdivision, municipal corporation, government agency, public utility district, or any other entity, public or private, however organized;
(4) "Site" means any proposed or approved location of an energy facility;
(5) "Certification" means a binding agreement between an applicant and the state which shall embody compliance to the siting guidelines, in effect as of the date of certification, which have been adopted pursuant to RCW 80.50.040 as now or hereafter amended as conditions to be met prior to or concurrent with the construction or operation of any energy facility;
(6) "Associated facilities" means storage, transmission, handling, or other related and supporting facilities connecting an energy plant with the existing energy supply, processing, or distribution system, including, but not limited to, communications, controls, mobilizing or maintenance equipment, instrumentation, and other types of ancillary transmission equipment, off-line storage or venting required for efficient operation or safety of the transmission system and overhead, and surface or subsurface lines of physical access for the inspection, maintenance, and safe operations of the transmission facility and new transmission lines constructed to operate at nominal voltages in excess of 200,000 volts to connect a thermal power plant to the northwest power grid: PROVIDED, That common carrier railroads or motor vehicles shall not be included;
(7) "Transmission facility" means any of the following together with their associated facilities:
(a) Crude or refined petroleum or liquid petroleum product transmission pipeline of the following dimensions: A pipeline larger than six inches minimum inside diameter between valves for the transmission of these products with a total length of at least fifteen miles;
(b) Natural gas, synthetic fuel gas, or liquified petroleum gas transmission pipeline of the following dimensions: A pipeline larger than fourteen inches minimum inside diameter between valves, for the transmission of these products, with a total length of at least fifteen miles for the purpose of delivering gas to a distribution facility, except an interstate natural gas pipeline regulated by the United States federal power commission;
(8) "Independent consultants" means those persons who have no financial interest in the applicant's proposals and who are retained by the council to evaluate the applicant's proposals, supporting studies, or to conduct additional studies;
(9) "Thermal power plant" means, for the purpose of certification, any electrical generating facility using any fuel, including nuclear materials, for distribution of electricity by electric utilities;
(10) "Energy facility" means an energy plant or transmission facilities: PROVIDED, That the following are excluded from the provisions of this chapter:
(a) Facilities for the extraction, conversion, transmission or storage of water, other than water specifically consumed or discharged by energy production or conversion for energy purposes; and
(b) Facilities operated by and for the armed services for military purposes or by other federal authority for the national defense;
(11) "Council" means the energy facility site evaluation council created by RCW 80.50.030;
(12) "Counsel for the environment" means an assistant attorney general or a special assistant attorney general who shall represent the public in accordance with RCW 80.50.080;
(13) "Construction" means on-site improvements, excluding exploratory work, which cost in excess of two hundred fifty thousand dollars;
(14) "Energy plant" means the following facilities together with their associated facilities:
(a) Any stationary
thermal power plant with generating capacity of ((two)) six
hundred fifty thousand kilowatts or more, measured using maximum continuous
electric generating capacity, less minimum auxiliary load, at average ambient
temperature and pressure, and floating thermal power plants of fifty thousand
kilowatts or more, including associated facilities;
(b) Facilities which will have the capacity to receive liquified natural gas in the equivalent of more than one hundred million standard cubic feet of natural gas per day, which has been transported over marine waters;
(c) Facilities which will have the capacity to receive more than an average of fifty thousand barrels per day of crude or refined petroleum or liquified petroleum gas which has been or will be transported over marine waters, except that the provisions of this chapter shall not apply to storage facilities unless occasioned by such new facility construction;
(d) Any underground reservoir for receipt and storage of natural gas as defined in RCW 80.40.010 capable of delivering an average of more than one hundred million standard cubic feet of natural gas per day; and
(e) Facilities capable of processing more than twenty-five thousand barrels per day of petroleum into refined products;
(15) "Land use plan" means a comprehensive plan or land use element thereof adopted by a unit of local government pursuant to chapters 35.63, 35A.63, or 36.70 RCW;
(16) "Zoning ordinance" means an ordinance of a unit of local government regulating the use of land and adopted pursuant to chapters 35.63, 35A.63, or 36.70 RCW or Article XI of the state Constitution.
Sec. 2. RCW 80.50.060 and 1977 ex.s. c 371 s 5 are each amended to read as follows:
(1) The provisions of
this chapter shall apply to the construction of energy facilities which
includes the new construction of energy facilities and the reconstruction or
enlargement of existing energy facilities where the net increase in physical
capacity or dimensions resulting from such reconstruction or enlargement meets
or exceeds those capacities or dimensions set forth in RCW 80.50.020 (7) and (((17)))
(14), as now or hereafter amended. No construction of such energy
facilities may be undertaken, except as otherwise provided in this chapter,
after July 15, 1977, without first obtaining certification in the manner
provided in this chapter.
(2) The provisions of this chapter apply to the construction of any new energy facility or the reconstruction or enlargement of any existing energy facility if the person responsible for the project chooses to utilize the process established in this chapter, regardless of the generating capacity of the project.
(3) The
provisions of this chapter shall not apply to normal maintenance and repairs
which do not increase the capacity or dimensions beyond those set forth in RCW
80.50.020 (7) and (((17))) (14), as now or hereafter amended.
(((3))) (4)
Applications for certification of energy facilities made prior to July 15, 1977,
shall continue to be governed by the applicable provisions of law in effect on
the day immediately preceding July 15, 1977, with the exceptions of RCW
80.50.190 and 80.50.071 which shall apply to such prior applications and to
site certifications prospectively from July 15, 1977.
(((4))) (5)
Applications for certification shall be upon forms prescribed by the council
and shall be supported by such information and technical studies as the council
may require.
NEW SECTION. Sec. 3. A new section is added to chapter 80.50 RCW to read as follows:
The council may only develop rules, policies, procedures, guidelines, or operating protocols that are based directly on state statutory or administrative code authority. A site certification agreement may not require compliance with air quality, water quality, or health protection measures unless the compliance is based on standards required by state statute or the Washington Administrative Code.
NEW SECTION. Sec. 4. This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately.
--- END ---