CERTIFICATION OF ENROLLMENT

SUBSTITUTE HOUSE BILL 1854



58th Legislature
2003 Regular Session

Passed by the House April 21, 2003
  Yeas 97   Nays 0


________________________________________    
Speaker of the House of Representatives


Passed by the Senate April 10, 2003
  Yeas 48   Nays 0



________________________________________    
President of the Senate
CERTIFICATE

I, Cynthia Zehnder, Chief Clerk of the House of Representatives of the State of Washington, do hereby certify that the attached is SUBSTITUTE HOUSE BILL 1854 as passed by the House of Representatives and the Senate on the dates hereon set forth.



________________________________________    
Chief Clerk
Approved 









________________________________________    
Governor of the State of Washington
FILED







Secretary of State
State of Washington


_____________________________________________ 

SUBSTITUTE HOUSE BILL 1854
_____________________________________________

AS AMENDED BY THE SENATE

Passed Legislature - 2003 Regular Session
State of Washington58th Legislature2003 Regular Session

By House Committee on Technology, Telecommunications & Energy (originally sponsored by Representatives Crouse, Sullivan, Delvin, Blake, Bush and Grant)

READ FIRST TIME 03/05/03.   



     AN ACT Relating to joint operating agencies; adding a new section to chapter 43.52 RCW; adding a new section to chapter 54.16 RCW; adding a new section to chapter 35.92 RCW; adding a new section to chapter 35.22 RCW; adding a new section to chapter 35.23 RCW; adding a new section to chapter 35.27 RCW; and adding a new section to chapter 35A.80 RCW.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

NEW SECTION.  Sec. 1   A new section is added to chapter 43.52 RCW to read as follows:
     A city or district may contract to purchase from an operating agency electric power and energy required for its present or future requirements. For projects the output of which is limited to qualified alternative energy resources as defined by RCW 19.29A.090(3), the contract may include the purchase of capability of the projects to produce electricity in addition to the actual output of the projects. The contract may provide that the city or district must make the payments required by the contract whether or not a project is completed, operable, or operating and notwithstanding the suspension, interruption, interference, reduction, or curtailment of the output of a project or the power and energy contracted for. The contract may also provide that payments under the contract are not subject to reduction, whether by offset or otherwise, and shall not be conditioned upon the performance or nonperformance of the operating agency or a city or district under the contract or other instrument.

NEW SECTION.  Sec. 2   A new section is added to chapter 54.16 RCW to read as follows:
     A district may contract to purchase from a joint operating agency electric power and energy required for its present or future requirements. For projects the output of which is limited to qualified alternative energy resources as defined by RCW 19.29A.090(3), the contract may include the purchase of capability of the projects to produce electricity in addition to the actual output of the projects. The contract may provide that the district must make the payments required by the contract whether or not a project is completed, operable, or operating and notwithstanding the suspension, interruption, interference, reduction, or curtailment of the output of a project or the power and energy contracted for. The contract may also provide that payments under the contract are not subject to reduction, whether by offset or otherwise, and shall not be conditioned upon the performance or nonperformance of the joint operating agency or a city, town, or district under the contract or other instrument.

NEW SECTION.  Sec. 3   A new section is added to chapter 35.92 RCW to read as follows:
     A city or town may contract to purchase from a joint operating agency electric power and energy required for its present or future requirements. For projects the output of which is limited to qualified alternative energy resources as defined by RCW 19.29A.090(3), the contract may include the purchase of capability of the projects to produce electricity in addition to the actual output of the projects. The contract may provide that the city or town must make the payments required by the contract whether or not a project is completed, operable, or operating and notwithstanding the suspension, interruption, interference, reduction, or curtailment of the output of a project or the power and energy contracted for. The contract may also provide that payments under the contract are not subject to reduction, whether by offset or otherwise, and shall not be conditioned upon the performance or nonperformance of the joint operating agency or a city, town, or public utility district under the contract or other instrument.

NEW SECTION.  Sec. 4   A new section is added to chapter 35.22 RCW to read as follows:
     A city of the first class may contract to purchase from a joint operating agency electric power and energy required for its present or future requirements. For projects the output of which is limited to qualified alternative energy resources as defined by RCW 19.29A.090(3), the contract may include the purchase of capability of the projects to produce electricity in addition to the actual output of the projects. The contract may provide that the city must make the payments required by the contract whether or not a project is completed, operable, or operating and notwithstanding the suspension, interruption, interference, reduction, or curtailment of the output of a project or the power and energy contracted for. The contract may also provide that payments under the contract are not subject to reduction, whether by offset or otherwise, and shall not be conditioned upon the performance or nonperformance of the joint operating agency or a city, town, or public utility district under the contract or other instrument.

NEW SECTION.  Sec. 5   A new section is added to chapter 35.23 RCW to read as follows:
     A city of the second class may contract to purchase from a joint operating agency electric power and energy required for its present or future requirements. For projects the output of which is limited to qualified alternative energy resources as defined by RCW 19.29A.090(3), the contract may include the purchase of capability of the projects to produce electricity in addition to the actual output of the projects. The contract may provide that the city must make the payments required by the contract whether or not a project is completed, operable, or operating and notwithstanding the suspension, interruption, interference, reduction, or curtailment of the output of a project or the power and energy contracted for. The contract may also provide that payments under the contract are not subject to reduction, whether by offset or otherwise, and shall not be conditioned upon the performance or nonperformance of the joint operating agency or a city, town, or public utility district under the contract or other instrument.

NEW SECTION.  Sec. 6   A new section is added to chapter 35.27 RCW to read as follows:
     A town may contract to purchase from a joint operating agency electric power and energy required for its present or future requirements. For projects the output of which is limited to qualified alternative energy resources as defined by RCW 19.29A.090(3), the contract may include the purchase of capability of the projects to produce electricity in addition to the actual output of the projects. The contract may provide that the town must make the payments required by the contract whether or not a project is completed, operable, or operating and notwithstanding the suspension, interruption, interference, reduction, or curtailment of the output of a project or the power and energy contracted for. The contract may also provide that payments under the contract are not subject to reduction, whether by offset or otherwise, and shall not be conditioned upon the performance or nonperformance of the joint operating agency or a city, town, or public utility district under the contract or other instrument.

NEW SECTION.  Sec. 7   A new section is added to chapter 35A.80 RCW to read as follows:
     A code city may contract to purchase from a joint operating agency electric power and energy required for its present or future requirements. For projects the output of which is limited to qualified alternative energy resources as defined by RCW 19.29A.090(3), the contract may include the purchase of capability of the projects to produce electricity in addition to the actual output of the projects. The contract may provide that the code city must make the payments required by the contract whether or not a project is completed, operable, or operating and notwithstanding the suspension, interruption, interference, reduction, or curtailment of the output of a project or the power and energy contracted for. The contract may also provide that payments under the contract are not subject to reduction, whether by offset or otherwise, and shall not be conditioned upon the performance or nonperformance of the joint operating agency or a city, town, or public utility district under the contract or other instrument.

--- END ---