BILL REQ. #:  Z-0352.3 



_____________________________________________ 

SENATE BILL 5401
_____________________________________________
State of Washington58th Legislature2003 Regular Session

By Senators Zarelli, Poulsen, Rossi, Fairley and Winsley; by request of Governor Locke

Read first time 01/23/2003.   Referred to Committee on Ways & Means.



     AN ACT Relating to the capital budget; making appropriations and authorizing expenditures for capital improvements; amending 2001 2nd sp.s. c 8 s 158 (uncodified); amending 2002 c 238 ss 109 and 202 (uncodified); adding new sections to 2001 2nd sp.s. c 8 (uncodified); creating new sections; repealing 2002 c 238 s 204 (uncodified); and declaring an emergency.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

NEW SECTION.  Sec. 1   A capital budget is hereby adopted and, subject to the provisions set forth in this act, the several dollar amounts hereinafter specified, or so much thereof as shall be sufficient to accomplish the purposes designated, are hereby appropriated and authorized to be incurred for capital projects during the period ending June 30, 2005, out of the several funds specified in this act.

PART 1
GENERAL GOVERNMENT

NEW SECTION.  Sec. 101   FOR THE OFFICE OF THE SECRETARY OF STATE
     Deferred Maintenance Reduction Backlog Projects: Regional Archive (04-1-002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $100,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $400,000
          TOTAL . . . . . . . . . . . . $600,000

NEW SECTION.  Sec. 102   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Rural Washington Loan Fund (88-2-002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $558,000
     Rural Washington Loan Account--Federal . . . . . . . . . . . . $4,150,367
          Subtotal Reappropriation . . . . . . . . . . . . $4,708,367

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,942,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,650,367

NEW SECTION.  Sec. 103   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Building for the Arts (00-2-005)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation in this section shall support the projects as listed in section 109, chapter 8, Laws of 2001 2nd sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,550,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,850,000

NEW SECTION.  Sec. 104   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Community Economic Revitalization Board (CERB) (00-2-001)

     The reappropriation in this section from the public facilities construction loan revolving account is subject to the following conditions and limitations:
     (1) The department shall ensure that all funds transferred from the public works assistance account into the public facility construction loan revolving account during the 1999-2001 biennium are used only for loans to local governments.
     (2) The department shall ensure that all principal and interest payments from these loans are paid into the public works assistance account.

Reappropriation:
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $2,300,309

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,340,691
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,641,000

NEW SECTION.  Sec. 105   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     County Public Facility Construction (00-2-010)

Reappropriation:
     Distressed County Facilities Construction Loan
          Account--State . . . . . . . . . . . . $1,129,663

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,870,337
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 106   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Cancer Research Facility Grant (01-S-005)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations in this section are provided as a grant for equipment and facilities improvements for a prostate cancer research project at the University of Washington medical center. The reappropriations must be matched by an equal amount from nonstate sources.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 107   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Public Works Trust Fund (01-H-001)

Reappropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $93,593,068

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $93,593,068

NEW SECTION.  Sec. 108   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Fort Vancouver National Historic Reserve (01-S-002)

     The reappropriation in this section is subject to the following conditions and limitations: Funds not expended by June 30, 2005, shall lapse.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,987,248

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,752
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 109   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Chewelah Peak Environmental Learning Center (01-S-003)

     The reappropriation in this section is subject to the following conditions and limitations: Funds not expended by June 30, 2005, shall lapse.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,671,793

     Prior Biennia (Expenditures) . . . . . . . . . . . . $328,207
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 110   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Fox Theater Project (01-S-006)

     The reappropriation in this section is subject to the following conditions and limitations: Funds not expended by June 30, 2005, shall lapse.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $979,296

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,020,704
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 111   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Des Moines Beach Park - Structure Relocation (01-S-010)

     The reappropriation in this section is subject to the following conditions and limitations: Funds not expended by June 30, 2005, shall lapse.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $246,875

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,125
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $250,000

NEW SECTION.  Sec. 112   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Upper Kittitas County - Emergency Management Service Facility (01-S-16)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) Funds are provided as a matching grant for enhanced emergency services related to highway travel and incidental local needs. The funds shall be retained in allotment reserve until the office of financial management approves a plan submitted by the recipient organization for the generation of matching funds and the provision for emergency services needs on Interstate 90. The office of financial management shall identify the recipient entity or organization that is best suited to provide enhanced emergency services for the Cle Elum/I-90 region.
     (2) Funds not expended by June 30, 2005, shall lapse.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $908,500

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,500
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $920,000

NEW SECTION.  Sec. 113   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     West Central Community Center (01-S-016)

     The reappropriation in this section is subject to the following conditions and limitations: Funds not expended by June 30, 2005, shall lapse.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $25,431

     Prior Biennia (Expenditures) . . . . . . . . . . . . $74,569
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $100,000

NEW SECTION.  Sec. 114   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Milton Skate Park (01-H-016)

     The reappropriation in this section is subject to the following conditions and limitations: Funds not expended by June 30, 2005, shall lapse.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $115,537

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,463
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $117,000

NEW SECTION.  Sec. 115   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Pierce County Fairgrounds (01-H-017)

     The reappropriation in this section is subject to the following conditions and limitations: Funds not expended by June 30, 2005, shall lapse.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $95,125

     Prior Biennia (Expenditures) . . . . . . . . . . . . $54,875
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $150,000

NEW SECTION.  Sec. 116   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Coastal Erosion Grants (01-S-019)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) Funds are provided for coastal erosion grants in southwest Washington in partnership with other state and federal funds. Grays Harbor county is the lead agency in the administration of the grants.
     (2) Funds not expended by June 30, 2005, shall lapse.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $846,681

     Prior Biennia (Expenditures) . . . . . . . . . . . . $403,319
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,250,000

NEW SECTION.  Sec. 117   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     City of Grandview Infrastructure Development (02-S-006)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided for allocation by the department to the city of Grandview for infrastructure development, including but not limited to streets, water, sewer, and other utilities associated with the siting of a warehouse distribution center.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 118   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Community Economic Revitalization (CERB) (02-4-003)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriations from the public facility construction loan revolving account must be used solely to provide loans to eligible local governments and grants to the extent permissible by law. The department shall ensure that all principal and interest payments from loans made on moneys from this account are paid into this account.

Reappropriation:
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $4,431,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,931,000

NEW SECTION.  Sec. 119   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Local/Community Projects: Job Creation and Infrastructure Projects (02-S-005)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is subject to the provisions of RCW 43.63A.125. The reappropriation in this section shall support the projects as listed in section 202, chapter 238, Laws of 2002.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,213,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,213,000

NEW SECTION.  Sec. 120   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Community Services Facilities Program (02-4-007)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is subject to the provisions of RCW 43.63A.125. The reappropriation in this section shall support the projects as listed in section 111, chapter 8, Laws of 2001 2nd sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,814,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,911,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,725,000

NEW SECTION.  Sec. 121   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Drinking Water Assistance Program (02-4-008)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) Funding from the state public works trust fund program shall be matched with new federal sources to improve the quality of drinking water in the state, and shall be used solely for projects that achieve the goals of the federal safe drinking water act.
     (2) The department shall report to the appropriate committees of the legislature by January 1, 2004, on the progress of the program, including administrative and technical assistance procedures, the application process, and funding priorities.

Reappropriation:
     Drinking Water Assistance Account--State . . . . . . . . . . . . $7,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,700,000

NEW SECTION.  Sec. 122   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Farmworker Housing Assistance (02-4-011)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is provided solely for facilities housing low-income migrant, seasonal, or temporary farmworkers.
     (2) It is the intent of the legislature that operation of the facilities built under this section be in compliance with 8 U.S.C. Sec. 1342.
     (3) The department shall minimize the amount of these funds that are utilized for staff and administrative purposes or other operational expenses.
     (4) The department shall work with the farmworker housing advisory committee to prioritize funding of projects to the areas of highest need.
     (5) Funding may also be provided, to the extent qualified projects are submitted, for health and safety projects.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,000,000

NEW SECTION.  Sec. 123   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Housing Assistance, Weatherization, and Affordable Housing (02-4-010)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) At least $9,000,000 of the reappropriation from the state taxable building construction account is provided solely for weatherization administered through the energy matchmakers program.
     (2) $5,000,000 of the reappropriation from the state taxable building construction account is provided solely to promote development of safe and affordable housing units for persons eligible for services from the division of developmental disabilities within the department of social and health services.
     (3) $2,000,000 of the reappropriation from the state taxable building construction account is provided solely for grants to nonprofit organizations and public housing authorities for revolving loan, self-help housing programs for low and moderate income families.
     (4) $1,000,000 of the reappropriation from the state taxable building construction account is provided solely for shelters, transitional housing, or other housing facilities for victims of domestic violence.
     (5) The reappropriation in this section may not be included in the annual funds available for determining the administrative costs authorized under RCW 43.185.050.

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $22,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $35,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $57,500,000

NEW SECTION.  Sec. 124   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Housing for Homeless Families with Children (02-4-012)

     The reappropriation in this section is provided solely for the development of emergency shelters and transitional housing opportunities for homeless families with children. The department shall minimize the amount of funds that are utilized for staff and administrative purposes.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 125   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Public Works Trust Fund (02-4-013)

     The reappropriation in this section is subject to the following conditions and limitations: $20,000,000 of the general fund federal appropriation is provided solely for infrastructure projects that will improve water quality and benefit salmon. Projects should be designed to have immediate benefits to water quality and salmon as alternatives to habitat acquisition and improvements. The public works board is authorized and directed to seek funding through the Northwest power planning council, the conservation and reinvestment act, and other federal funding sources to supplement existing loan programs with grants or loans for water quality projects. The public works board shall utilize existing programs within chapter 43.155 RCW to distribute these additional grants or loans, with an emphasis on projects providing immediate benefits to water quality and salmon habitat. For the purposes of this section, the public works board may utilize federal funds as grants in conjunction with loans from chapter 43.155 RCW.

Reappropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $126,406,932

     Prior Biennia (Expenditures) . . . . . . . . . . . . $103,893,068
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $230,300,000

NEW SECTION.  Sec. 126   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Highline School District Aircraft Noise Mitigation (03-H-001)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The port of Seattle and the federal aviation administration shall provide their share of funding before the state reappropriation may be used.
     (2) The reappropriation does not commit the state to make future appropriations for this program.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $600,000
     Education Construction Account--State . . . . . . . . . . . . $4,400,000
          Subtotal Reappropriation . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 127   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Building for the Arts (04-4-007)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $8,000,000

NEW SECTION.  Sec. 128   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Community Economic Revitalization Board (CERB) (04-4-008)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely for loans to local governments.

Appropriation:
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $11,491,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $36,718,769
          TOTAL . . . . . . . . . . . . $48,209,769

NEW SECTION.  Sec. 129   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Community Services Facilities Program (04-4-006)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is subject to the provisions of RCW 43.63A.125.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $8,000,000

NEW SECTION.  Sec. 130   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Drinking Water Assistance Account (04-4-002)

Appropriation:
     Drinking Water Assistance Account--State . . . . . . . . . . . . $8,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $32,400,000
          TOTAL . . . . . . . . . . . . $40,900,000

NEW SECTION.  Sec. 131   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Drinking Water SRF - Authorization to Use Loan Repayments (04-4-010)

Appropriation:
     Drinking Water Assistance Account--State . . . . . . . . . . . . $11,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,200,000

NEW SECTION.  Sec. 132   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Farmworker Housing Assistance (04-4-004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $32,000,000
          TOTAL . . . . . . . . . . . . $40,000,000

NEW SECTION.  Sec. 133   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Housing Assistance, Weatherization, and Affordable Housing (04-4-003)

Appropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $50,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $200,000,000
          TOTAL . . . . . . . . . . . . $250,000,000

NEW SECTION.  Sec. 134   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Housing for Homeless with Children (04-4-005)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $25,000,000

NEW SECTION.  Sec. 135   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Local/Community Projects (04-4-011)

     The following projects are eligible for funding:

McCaw Hall Opera House (Seattle)       $4,500,000
Northwest Bioproducts Research Institute (Tri-Cities)
for design       $750,000
Greenbank Farm (Whidbey Island)       $1,500,000
Confluence Lewis and Clark Remembrance Art Project       $3,000,000
Washington Public Broadcasting Digital Television       $2,000,000

Appropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $11,750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,750,000

NEW SECTION.  Sec. 136   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Public Works Trust Fund (04-4-001)

Appropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $261,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,319,499,999
          TOTAL . . . . . . . . . . . . $1,580,699,999

NEW SECTION.  Sec. 137   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Rural Washington Loan Fund (RWLF) (04-4-009)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $1,900,000
     Rural Washington Loan Account--Federal . . . . . . . . . . . . $1,581,000
          Subtotal Appropriation . . . . . . . . . . . . $3,481,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $24,132,000
          TOTAL . . . . . . . . . . . . $27,613,000

NEW SECTION.  Sec. 138   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Merrill Hall Fire Repairs - Horticulture Building (01-H-020)

     The reappropriation in this section is subject to the following conditions and limitations: In addition to the funds provided in this section, the University of Washington may utilize appropriated funds for minor works to address emergent needs for Merrill hall.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 139   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Budget System Improvements (02-1-004)

     The reappropriation in this section is subject to the following conditions and limitations:
     Funds are provided solely for the following studies and activities:
     (1) Budget evaluation study team reviews of project proposals;
     (2) The compilation of benchmarking data and the development of standards for construction costs;
     (3) Contracts associated with a higher education facility financial responsibility study to be conducted in conjunction with the higher education coordinating board and the state board for community and technical colleges that provides guidelines for project cost sharing between state and federal funds, institutional funds, student fees and charges, and private donations; and
     (4) Other studies and system improvements planned in consultation with the house of representatives capital budget committee and the senate ways and means committee.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $141,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $59,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $200,000

NEW SECTION.  Sec. 140   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Budget System Improvements (04-2-002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,200,000
          TOTAL . . . . . . . . . . . . $1,400,000

NEW SECTION.  Sec. 141   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Capital Monitoring (04-2-028)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) $125,000 of this appropriation shall be used for continuation of the office of financial management's capital monitoring system and facilities inventory system databases.
     (2) $150,000 of this appropriation shall be used to conduct a study of the realignment of military forces and alternative uses of the land and facilities currently used by the Washington State military department readiness centers and armories for the Washington army national guard.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $275,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $768,700
          TOTAL . . . . . . . . . . . . $1,043,700

NEW SECTION.  Sec. 142   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     East Plaza Repairs (96-1-002)

Reappropriation:
     State Vehicle Parking Account--State . . . . . . . . . . . . $18,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $23,567,200
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,425,000
          TOTAL . . . . . . . . . . . . $53,992,200

NEW SECTION.  Sec. 143   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Office Building Two Rehabilitation (98-1-007)

Reappropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,000,000

NEW SECTION.  Sec. 144   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Transportation Building Preservation (98-1-008)

Reappropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,964,065
     Future Biennia (Projected Costs) . . . . . . . . . . . . $19,090,000
          TOTAL . . . . . . . . . . . . $21,954,065

NEW SECTION.  Sec. 145   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Heritage Park/Capitol Lake (00-1-007)

     The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,567,700
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,767,700

NEW SECTION.  Sec. 146   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Heritage Park (01-H-004)

Reappropriation:
     Capitol Building Construction Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,559,774
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,659,774

NEW SECTION.  Sec. 147   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Legislative Building: Rehabilitation and Capital Addition (01-1-008)

     The reappropriation in this section is subject to the conditions and limitations of section 109, chapter 238, Laws of 2002.

Reappropriation:
     Capital Historic District Construction
          Account--State . . . . . . . . . . . . $48,460,000
Appropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $2,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $40,021,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $90,781,000

NEW SECTION.  Sec. 148   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Capitol Campus: Infrastructure Preservation (02-1-003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $99,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $100,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $199,000

NEW SECTION.  Sec. 149   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Cherberg Building: Rehabilitation (02-1-005)

Appropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $695,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,200,000
          TOTAL . . . . . . . . . . . . $9,595,000

NEW SECTION.  Sec. 150   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     North Cascades Gateway Center Minor Works (02-1-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $217,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $35,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $252,000

NEW SECTION.  Sec. 151   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Pritchard Building: Rehabilitation (02-1-006)

Appropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $300,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $17,155,000
          TOTAL . . . . . . . . . . . . $18,455,000

NEW SECTION.  Sec. 152   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Thurston County Facilities: Preservation (02-1-002)

Reappropriation:
     Capitol Building Construction Account--State . . . . . . . . . . . . $100,000
     State Building Construction Account--State . . . . . . . . . . . . $250,000
          Subtotal Reappropriation . . . . . . . . . . . . $350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,559,774
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,909,774

NEW SECTION.  Sec. 153   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Job Creation and Infrastructure Projects (03-1-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $600,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $750,000

NEW SECTION.  Sec. 154   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Capitol Campus Infrastructure Preservation - Minor Works (04-1-003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,425,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,695,500
          TOTAL . . . . . . . . . . . . $6,120,500

NEW SECTION.  Sec. 155   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Emergency/Small Repairs and Improvements (04-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $1,100,000
          Subtotal Appropriation . . . . . . . . . . . . $1,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $6,800,000
          TOTAL . . . . . . . . . . . . $8,400,000

NEW SECTION.  Sec. 156   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Engineering and Architectural Services (04-2-014)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation in this section shall be used to provide project management services to state agencies as required by RCW 43.19.450 that are essential and mandated activities defined as core services and are included in the engineering and architectural services' responsibilities and task list for general public works projects of normal complexity. The general public works projects included are all those financed by the state capital budget, 2003 legislative session, with a total project value up to $20 million.
     (2) The department may negotiate agreements with agencies for additional fees to manage projects financed by financial contracts, other alternative financing, projects with a total value greater than $20 million, or for the nonstate funded portion of projects with mixed funding sources.

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $140,000
     State Building Construction Account--State . . . . . . . . . . . . $8,409,000
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $1,037,000
          Subtotal Appropriation . . . . . . . . . . . . $9,586,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $41,308,400
          TOTAL . . . . . . . . . . . . $50,894,400

NEW SECTION.  Sec. 157   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     General Administration Building Rehabilitation (04-1-013)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $55,400,000
          TOTAL . . . . . . . . . . . . $59,000,000

NEW SECTION.  Sec. 158   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Historic Buildings - Exteriors Preservation (04-1-012)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,975,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $11,600,000
          TOTAL . . . . . . . . . . . . $13,575,000

NEW SECTION.  Sec. 159   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Security Improvements (04-1-011)

Appropriation:
     State Vehicle Parking Account--State . . . . . . . . . . . . $12,500
     State Building Construction Account--State . . . . . . . . . . . . $1,805,650
          Subtotal Appropriation . . . . . . . . . . . . $1,818,150

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $5,818,150

NEW SECTION.  Sec. 160   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     State Capitol Master Plan Update (04-2-002)

Appropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $300,000

NEW SECTION.  Sec. 161   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Statewide Facilities Preservation - Minor Works (04-1-004)

Appropriation:
     State Vehicle Parking Account--State . . . . . . . . . . . . $220,000
     State Building Construction Account--State . . . . . . . . . . . . $1,415,000
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $5,300,000
     General Administration Service Account--State . . . . . . . . . . . . $3,270,000
          Subtotal Appropriation . . . . . . . . . . . . $10,205,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $46,849,000
          TOTAL . . . . . . . . . . . . $57,054,000

NEW SECTION.  Sec. 162   FOR THE MILITARY DEPARTMENT
     Bremerton Readiness Center (02-2-004)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) No money shall be committed or expended from the state building construction account until the general fund--federal construction funds are received and allotted.
     (2) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department will file quarterly project progress reports with the office of financial management. These reports will contain local, state, and federal funding reconciliation and balance sheets for this project and will detail any federal intentions on future readiness center projects.

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $3,630,000
     State Building Construction Account--State . . . . . . . . . . . . $4,251,000
          Subtotal Reappropriation . . . . . . . . . . . . $7,881,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,942,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,823,000

NEW SECTION.  Sec. 163   FOR THE MILITARY DEPARTMENT
     Combined Support Maintenance Shop (02-2-011)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,281,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $26,544,000
          TOTAL . . . . . . . . . . . . $28,825,000

NEW SECTION.  Sec. 164   FOR THE MILITARY DEPARTMENT
     Minor Works to Support Federal Construction Projects (02-1-001)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $3,415,000
     State Building Construction Account--State . . . . . . . . . . . . $765,000
          Subtotal Reappropriation . . . . . . . . . . . . $4,180,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,345,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,525,000

NEW SECTION.  Sec. 165   FOR THE MILITARY DEPARTMENT
     Preservation Projects - Statewide (02-1-006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $485,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $485,000

NEW SECTION.  Sec. 166   FOR THE MILITARY DEPARTMENT
     Job Creation and Infrastructure Projects (03-1-001)

     The reappropriation in this section shall support the projects as listed in section 207, chapter 238, Laws of 2002 2nd sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 167   FOR THE MILITARY DEPARTMENT
     Communication Security - Emergency Management Division-Building No. 20 (04-1-002)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 168   FOR THE MILITARY DEPARTMENT
     Infrastructure Preservation - Statewide (04-1-004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,554,000
          TOTAL . . . . . . . . . . . . $4,054,000

NEW SECTION.  Sec. 169   FOR THE MILITARY DEPARTMENT
     Minor Works to Support Federal Construction Projects (04-1-003)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $11,150,000
     State Building Construction Account--State . . . . . . . . . . . . $2,798,000
          Subtotal Appropriation . . . . . . . . . . . . $13,948,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,345,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $54,462,000
          TOTAL . . . . . . . . . . . . $76,755,000

NEW SECTION.  Sec. 170   FOR THE MILITARY DEPARTMENT
     Preservation Projects - Statewide (04-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,654,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $7,487,000
          TOTAL . . . . . . . . . . . . $9,141,000

NEW SECTION.  Sec. 171   FOR THE MILITARY DEPARTMENT
     Spokane Readiness Center (04-2-003)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department shall file quarterly project progress reports with the office of financial management. These reports will contain local, state, and federal funding reconciliation and balance sheets for this project and will detail any federal intentions on future readiness center projects.
     (2) Appropriations shall be held in allotment reserve until the department completes a unit alignment and closure study that shows consolidation of units and disposal of surplus capital facilities.

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $8,800,000
     State Building Construction Account--State . . . . . . . . . . . . $4,768,000
          Subtotal Appropriation . . . . . . . . . . . . $13,568,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $13,568,000

NEW SECTION.  Sec. 172   FOR THE STATE CONVENTION AND TRADE CENTER
     Washington State Convention and Trade Center Omnibus Minor Works (04-1-002)

Appropriation:
     State Convention and Trade Center Account--State . . . . . . . . . . . . $2,045,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,900,000
          TOTAL . . . . . . . . . . . . $4,945,000

(End of part)


PART 2
HUMAN SERVICES

NEW SECTION.  Sec. 201   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Echo Glen Children's Center - Site: Infrastructure Improvements (96-2-229)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,149,856
Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $925,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,719,751
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,794,607

NEW SECTION.  Sec. 202   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Green Hill School Redevelopment: 416 Bed Institution (96-2-230)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,478,882

     Prior Biennia (Expenditures) . . . . . . . . . . . . $48,998,839
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $50,477,721

NEW SECTION.  Sec. 203   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Echo Glen Children's Center - Vocational Education: Construction (98-2-211)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,520,468

     Prior Biennia (Expenditures) . . . . . . . . . . . . $866,199
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,386,667

NEW SECTION.  Sec. 204   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Western State Hospital: Legal Offender Unit (98-2-052)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,598,060
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $44,696,281
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $51,294,341

NEW SECTION.  Sec. 205   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Child Study and Treatment Center - Cottages: Modifications, Phase 3 (00-1-015)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $816,824
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,024,776
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,641,600

NEW SECTION.  Sec. 206   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Eastern State Hospital: Campus Renovation, Phase 5 (00-2-002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,862,514

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,237,486
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,100,000

NEW SECTION.  Sec. 207   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Echo Glen Children's Center - Eleven Cottages: Renovation (00-1-041)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $607,421
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,490,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $167,579
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,609,000
          TOTAL . . . . . . . . . . . . $15,874,000

NEW SECTION.  Sec. 208   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Maple Lane School - Multi-Services Building: Renovation (00-1-003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $227,695
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $772,305
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,000,000

NEW SECTION.  Sec. 209   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Special Commitment Center - Secure Facility: Construction, Phase 3 (00-2-001)

     The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

     To the extent that the department projects savings and efficiencies through design or scope changes, funds appropriated in this section may be transferred to the statewide omnibus preservation project (02-1-069) for expenditure for minor works projects.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $46,529,975
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $11,158,212

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,135,025
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $58,823,212

NEW SECTION.  Sec. 210   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Child Care Facilities for Students and State Employees (01-5-003)

     Funds are provided to recapitalize child care facilities grant programs. These funds may be used by state agencies and higher education institutions to provide child care facilities for employees and students. Grants to state agencies will be provided and administered per chapter 41.04 RCW. The department shall develop guidelines for grant application for student child care facilities at institutions of higher education in conjunction with the office of financial management, the higher education coordinating board, and the state board for community and technical colleges. Grants for higher education child care facilities will be transferred into accounts administered through chapter 28B.135 RCW.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,999,891

     Prior Biennia (Expenditures) . . . . . . . . . . . . $109
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 211   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Green Hill School - Intensive Management Unit: Renovation (02-1-054)

     The reappropriation in this section is subject to the following conditions and limitations: The scope of work for the reappropriation shall support the scope of work for the new project in section 225 of this act.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,200,000

NEW SECTION.  Sec. 212   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Eastern State Hospital - Activity Therapy Building: Renovation (02-1-060)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,450,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,600,000

NEW SECTION.  Sec. 213   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Green Hill School - Entry/Security/Visitation: Addition (02-2-064)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $381,156

     Prior Biennia (Expenditures) . . . . . . . . . . . . $18,844
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $400,000

NEW SECTION.  Sec. 214   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Special Commitment Center - Less Restrictive Alternative: New Building (02-2-075)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,275,120

     Prior Biennia (Expenditures) . . . . . . . . . . . . $931,880
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,207,000

NEW SECTION.  Sec. 215   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Statewide: Omnibus Preservation Projects (02-1-069)

Reappropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $2,213,802
     State Building Construction Account--State . . . . . . . . . . . . $2,450,742
          Subtotal Reappropriation . . . . . . . . . . . . $4,664,544

     Prior Biennia (Expenditures) . . . . . . . . . . . . $835,456
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,500,000

NEW SECTION.  Sec. 216   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Statewide: Omnibus Programmatic Projects (02-2-070)

Reappropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $416,705
     State Building Construction Account--State . . . . . . . . . . . . $493,355
          Subtotal Reappropriation . . . . . . . . . . . . $910,060

     Prior Biennia (Expenditures) . . . . . . . . . . . . $89,940
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 217   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Western State Hospital - Power Plant: Revisions/Smokestack Removal (03-1-012)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,078,335

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,665
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,080,000

NEW SECTION.  Sec. 218   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Department of Social and Health Services: Capital Project Management (04-1-110)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $2,122,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,000,000
          TOTAL . . . . . . . . . . . . $7,122,000

NEW SECTION.  Sec. 219   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Eastern State Hospital - Interlake School: Demolition (04-1-304)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $1,850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,850,000

NEW SECTION.  Sec. 220   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Fircrest School - Y Buildings: Renovation (04-1-450)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,600,000
          TOTAL . . . . . . . . . . . . $3,200,000

NEW SECTION.  Sec. 221   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Fircrest School - 500 Building: Remodel (04-2-036)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,950,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,950,000

NEW SECTION.  Sec. 222   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Fircrest School - Cottage Renovation (04-1-058)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,074,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,490,000
          TOTAL . . . . . . . . . . . . $6,564,000

NEW SECTION.  Sec. 223   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Fircrest School - Site: Electrical Upgrade, Phase 2 (04-1-035)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,900,000
          TOTAL . . . . . . . . . . . . $4,400,000

NEW SECTION.  Sec. 224   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Green Hill School - Health Center/Administration: New Construction (04-2-202)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,756,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,756,000

NEW SECTION.  Sec. 225   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Green Hill School - IMU: New Construction (04-2-204)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,700,000

NEW SECTION.  Sec. 226   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Juvenile Rehabilitation - Acute Mental Health Unit: New Facility (04-2-203)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $7,502,000
          TOTAL . . . . . . . . . . . . $8,402,000

NEW SECTION.  Sec. 227   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Lakeland Village - Cottages: Renovation, Phases 3 and 4 (04-1-402)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,500,000
          TOTAL . . . . . . . . . . . . $6,500,000

NEW SECTION.  Sec. 228   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Maple Lane School - Recreation Building: Renovation (04-1-057)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,200,000

NEW SECTION.  Sec. 229   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Maple Lane School - Steam Plant and Tunnels: Upgrade (04-1-207)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,650,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,650,000

NEW SECTION.  Sec. 230   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Mental Health: Omnibus Programmatic Projects (04-2-365)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $29,000,000
          TOTAL . . . . . . . . . . . . $30,000,000

NEW SECTION.  Sec. 231   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Omnibus Preservation: Facility Preservation (04-1-112)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $26,000,000
          TOTAL . . . . . . . . . . . . $32,000,000

NEW SECTION.  Sec. 232   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Omnibus Preservation: Health, Safety, and Code Requirements (04-1-111)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $15,000,000
          TOTAL . . . . . . . . . . . . $17,000,000

NEW SECTION.  Sec. 233   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Omnibus Preservation: Infrastructure Preservation (04-1-113)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $11,000,000
          TOTAL . . . . . . . . . . . . $13,000,000

NEW SECTION.  Sec. 234   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Special Commitment Center - Regional SCTF: New 12 Bed Facility (04-2-502)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,300,000

NEW SECTION.  Sec. 235   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Statewide: Emergency and Unanticipated Repair Projects (04-1-116)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $750,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,000,000
          TOTAL . . . . . . . . . . . . $4,500,000

NEW SECTION.  Sec. 236   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Statewide: Facilities Condition Assessment and Preservation Plan (04-1-120)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $100,000

NEW SECTION.  Sec. 237   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Statewide: Hazards Abatement and Demolition (04-1-119)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) No more than $50,000 of this appropriation shall be used for hazardous materials surveys.
     (2) The remainder of the appropriation shall be used to demolish abandoned structures at Fircrest school, Rainier school and other campus structures to be identified by the department and approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 238   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Western State Hospital - Central Campus: Redevelopment (04-2-326)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $50,700,000
          TOTAL . . . . . . . . . . . . $51,700,000

NEW SECTION.  Sec. 239   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Western State Hospital - Laundry: New Construction (04-2-325)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,100,000

NEW SECTION.  Sec. 240   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Green Hill School - Intensive Management Unit: Renovation (02-1-054)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,200,000

NEW SECTION.  Sec. 241   FOR THE DEPARTMENT OF HEALTH
     Drinking Water Assistance Program (02-4-004)

     The reappropriation in this section is provided solely for an interagency agreement with the department of community, trade, and economic development to make, in cooperation with the public works board, loans to local governments and public water systems for projects and activities to protect and improve the state's drinking water facilities and resources.

Reappropriation:
     Drinking Water Assistance Account--Federal . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $19,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $24,000,000

NEW SECTION.  Sec. 242   FOR THE DEPARTMENT OF HEALTH
     Public Health Laboratory: Biosafety Level 3 Facility (02-2-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,231,485

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,231,485

NEW SECTION.  Sec. 243   FOR THE DEPARTMENT OF HEALTH
     Public Health Laboratory: C Wing Remodel (02-2-002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $295,900

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $295,900

NEW SECTION.  Sec. 244   FOR THE DEPARTMENT OF HEALTH
     Public Health Laboratory: Chiller Plant Upgrade (02-1-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,355,142

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,355,142

NEW SECTION.  Sec. 245   FOR THE DEPARTMENT OF HEALTH
     Public Health Laboratory: E Wing Remodel (02-2-003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $295,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $295,000

NEW SECTION.  Sec. 246   FOR THE DEPARTMENT OF HEALTH
     Drinking Water Assistance Program (04-4-003)

     The appropriation in this section is subject to the following conditions and limitations: This appropriation is provided solely for an interagency agreement with the department of community, trade, and economic development to make, in cooperation with the public works board, loans to local governments and public water systems for projects and activities to protect and improve the state's drinking water facilities and resources.

Appropriation:
     Drinking Water Assistance Account--Federal . . . . . . . . . . . . $28,122,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $112,488,000
          TOTAL . . . . . . . . . . . . $140,610,000

NEW SECTION.  Sec. 247   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Retsil Veterans' Home: Minor Works Mechanical/Electrical/HVAC (02-1-001)

Reappropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $520,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $520,000

NEW SECTION.  Sec. 248   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Retsil: 240 Bed Nursing Facility (02-2-008)

     The appropriations in this section are subject to the following conditions and limitations: The charitable, educational, penal, and reformatory account appropriation is provided solely for an historical district study as required by national funding guidelines associated with the federal appropriation.

Reappropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $500,000
Appropriation:
     General Fund--Federal . . . . . . . . . . . . $30,730,700
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $250,000
     State Building Construction Account--State . . . . . . . . . . . . $12,000,000
          Subtotal Appropriation . . . . . . . . . . . . $42,980,700

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $45,980,700

NEW SECTION.  Sec. 249   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Emergency Funds (04-1-002)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $300,000

NEW SECTION.  Sec. 250   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Orting Soldiers' Home: Minor Works Building (04-1-004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $140,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,290,000

NEW SECTION.  Sec. 251   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Spokane Veterans Home Kitchen (04-2-004)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $1,441,590

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,441,590

NEW SECTION.  Sec. 252   FOR THE DEPARTMENT OF CORRECTIONS
     Correctional Industries Space (98-2-005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,600,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,800,000

NEW SECTION.  Sec. 253   FOR THE DEPARTMENT OF CORRECTIONS
     Coyote Ridge Corrections Center: Expansion (98-2-011)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,054,117

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,607,834
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,661,951

NEW SECTION.  Sec. 254   FOR THE DEPARTMENT OF CORRECTIONS
     Stafford Creek Corrections Center: Construction (98-2-001)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $23,596
     State Building Construction Account--State . . . . . . . . . . . . $8,247,996
          Subtotal Reappropriation . . . . . . . . . . . . $8,271,592

     Prior Biennia (Expenditures) . . . . . . . . . . . . $189,316,793
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $197,588,385

NEW SECTION.  Sec. 255   FOR THE DEPARTMENT OF CORRECTIONS
     Local Criminal Justice Facilities (99-2-003)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation from the state building construction account--state appropriation is provided solely for grants to local jurisdictions for jail capacity expansion projects. Grants provided in this section shall be limited to up to $500,000 per jurisdiction.
     (2) $500,000 of the state building construction account--state reappropriation increase in this section is provided solely for grants to local jurisdictions for the construction of jail beds.

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $3,285,472
     State Building Construction Account--State . . . . . . . . . . . . $3,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,785,472

NEW SECTION.  Sec. 256   FOR THE DEPARTMENT OF CORRECTIONS
     Violent Offender/Truth in Sentencing Grant Administration (99-2-004)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $672,287
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $94,194
          Subtotal Reappropriation . . . . . . . . . . . . $766,481

     Prior Biennia (Expenditures) . . . . . . . . . . . . $271,521
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,038,002

NEW SECTION.  Sec. 257   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: 100 Bed Management and Segregation Unit (00-2-008)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $11,200,000
     State Building Construction Account--State . . . . . . . . . . . . $8,538,759
          Subtotal Reappropriation . . . . . . . . . . . . $19,738,759

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $18,674,031

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,025,242
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $39,438,032

NEW SECTION.  Sec. 258   FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: Intensive Management Unit Improvements (00-1-025)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,100,964
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,600,964

NEW SECTION.  Sec. 259   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: Regional Training Center (02-2-016)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,775,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,975,000

NEW SECTION.  Sec. 260   FOR THE DEPARTMENT OF CORRECTIONS
     Minor Works: Omnibus Preservation (02-1-015)

     The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,793,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $826,247
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,619,247

NEW SECTION.  Sec. 261   FOR THE DEPARTMENT OF CORRECTIONS
     Minor Works: Program (02-2-030)

     The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,291,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $234,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,525,000

NEW SECTION.  Sec. 262   FOR THE DEPARTMENT OF CORRECTIONS
     Olympic Corrections Center: Replace Telecomm System (02-1-041)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $406,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,406,000

NEW SECTION.  Sec. 263   FOR THE DEPARTMENT OF CORRECTIONS
     Pine Lodge: Replace Telecommunication System (02-1-009)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $539,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,139,000

NEW SECTION.  Sec. 264   FOR THE DEPARTMENT OF CORRECTIONS
     Statewide Intensive Management Unit Repairs (02-1-040)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,360,080

     Prior Biennia (Expenditures) . . . . . . . . . . . . $251,920
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,612,000

NEW SECTION.  Sec. 265   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Building Water Pipe Replacement Phase 2 (02-1-008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $594,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,694,000

NEW SECTION.  Sec. 266   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Domestic Water System Improvements (02-1-007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $231,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,531,000

NEW SECTION.  Sec. 267   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Replace Steam/Condensate Piping (02-1-006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,170,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,170,000

NEW SECTION.  Sec. 268   FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: Replace Electrical Supply System (02-1-024)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,561,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,242,715

     Prior Biennia (Expenditures) . . . . . . . . . . . . $500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,016,473
          TOTAL . . . . . . . . . . . . $12,320,188

NEW SECTION.  Sec. 269   FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: Replace Sanitary/Domestic Water Lines (02-1-026)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $870,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,312,167

     Prior Biennia (Expenditures) . . . . . . . . . . . . $200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,187,520
          TOTAL . . . . . . . . . . . . $3,569,687

NEW SECTION.  Sec. 270   FOR THE DEPARTMENT OF CORRECTIONS
     Coyote Ridge Corrections Center: Expand Minimum Security Facility by 210 Beds (03-2-002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $394,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,394,000

NEW SECTION.  Sec. 271   FOR THE DEPARTMENT OF CORRECTIONS
     McNeil Island Corrections Center: Water Tank Replacement (03-1-022)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $194,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,394,000

NEW SECTION.  Sec. 272   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: Hospital (04-2-012)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,948,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $30,429,190
          TOTAL . . . . . . . . . . . . $34,377,190

NEW SECTION.  Sec. 273   FOR THE DEPARTMENT OF CORRECTIONS
     McNeil Island Corrections Center: Replace Submarine Electric Power Cable (04-1-006)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,882,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,882,000

NEW SECTION.  Sec. 274   FOR THE DEPARTMENT OF CORRECTIONS
     Mission Creek: Add 60 Minimum Security Beds (04-2-035)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $457,197

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,853,803
          TOTAL . . . . . . . . . . . . $4,311,000

NEW SECTION.  Sec. 275   FOR THE DEPARTMENT OF CORRECTIONS
     Omnibus Preservation: Facility Preservation (Minor Works) (04-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $24,000,000

NEW SECTION.  Sec. 276   FOR THE DEPARTMENT OF CORRECTIONS
     Omnibus Preservation: Health, Safety, and Code (04-1-021)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $19,000,000
          TOTAL . . . . . . . . . . . . $23,000,000

NEW SECTION.  Sec. 277   FOR THE DEPARTMENT OF CORRECTIONS
     Omnibus Preservation: Infrastructure Preservation (Minor Works) (04-1-003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $25,000,000

NEW SECTION.  Sec. 278   FOR THE DEPARTMENT OF CORRECTIONS
     Statewide Emergency Projects (04-1-036)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 279   FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: Centralize Emergency Generators (04-1-015)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,378,410

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,378,410

NEW SECTION.  Sec. 280   FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: Convert BAR Units from Medium to Close Custody (04-2-004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $17,809,202

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,809,202

NEW SECTION.  Sec. 281   FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: North Close Security Compound (04-2-005)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $139,740,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $139,740,000

(End of part)


PART 3
NATURAL RESOURCES

NEW SECTION.  Sec. 301   FOR THE DEPARTMENT OF ECOLOGY
     Referendum 38 Water Supply Facilities (74-2-006)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is provided solely for projects under contracts on or before June 30, 2001. Reappropriated funds not associated with contracted projects lapse June 30, 2001.
     (2) The office of financial management may grant waivers from this lapse requirement for specific projects upon findings of exceptional circumstances after notification of the chairs of the house of representatives capital budget committee and senate ways and means committee.
     (3) The department shall submit a report to the office of financial management and house of representatives capital budget committee and senate ways and means committee by December 1, 2003, listing all projects funded from this section.
     (4) $614,000 of the reappropriation from the state drought preparedness account is provided solely to purchase or lease water pursuant to section 305 of this act.

Reappropriation:
     State Drought Preparedness--State . . . . . . . . . . . . $614,000
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $3,387,517
          Subtotal Reappropriation . . . . . . . . . . . . $4,001,517

     Prior Biennia (Expenditures) . . . . . . . . . . . . $13,596,500
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,598,071

NEW SECTION.  Sec. 302   FOR THE DEPARTMENT OF ECOLOGY
     Local Toxics Grants to Locals for Cleanup and Prevention (88-2-008)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation in this section is provided solely for projects under contract on or before June 30, 2003. Reappropriated funds not associated with contracted projects lapse June 30, 2003. The office of financial management may grant waivers from this lapse requirement for specific projects upon findings of exceptional circumstances after notification of the chairs of the house of representatives capital budget committee and senate ways and means committee.
     (2) The department shall submit a report to the office of financial management and house of representatives capital budget committee and senate ways and means committee by December 1, 2003, listing all projects funded from this section.

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $45,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $88,830,922
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $133,830,922

NEW SECTION.  Sec. 303   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Account (90-2-002)

Reappropriation:
     Water Pollution Control Revolving Account--Federal . . . . . . . . . . . . $10,410,780

     Prior Biennia (Expenditures) . . . . . . . . . . . . $73,083,222
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $83,494,002

NEW SECTION.  Sec. 304   FOR THE DEPARTMENT OF ECOLOGY
     Low-Level Nuclear Waste Disposal Trench Closure (97-2-012)

Reappropriation:
     Site Closure Account--State . . . . . . . . . . . . $5,130,616

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,153,450
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,284,066

NEW SECTION.  Sec. 305   FOR THE DEPARTMENT OF ECOLOGY
     Water Rights Purchase/Lease (99-1-005)

     The reappropriation in this section is provided for the purchase or lease of water rights under the trust water rights program under chapters 90.42 and 90.38 RCW, for the purpose of improving stream and river flows in fish critical basins.

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $1,343,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,145,551
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,488,551

NEW SECTION.  Sec. 306   FOR THE DEPARTMENT OF ECOLOGY
     Water Irrigation Efficiencies (01-H-010)

     The reappropriations in this section are subject to the following conditions and limitations:
     (1) The reappropriations are provided solely to provide grants to conservation districts to assist the agricultural community to implement water conservation measures and irrigation efficiencies in the 16 critical basins. A conservation district receiving funds shall manage each grant to ensure that a portion of the water saved by the water conservation measure or irrigation efficiency will be placed as a purchase or a lease in the trust water rights program to enhance instream flows. The proportion of saved water placed in the trust water rights program must be equal to the percentage of the public investment in the conservation measure or irrigation efficiency. The percentage of the public investment may not exceed 85 percent of the total cost of the conservation measure or irrigation efficiency. In awarding grants, a conservation district shall give first priority to family farms.
     (2) By February 1, 2003, the state conservation commission shall submit a progress report to the appropriate standing committees of the legislature on: (a) The amount of public funds expended from this section; and (b) the location and amount of water placed in the trust water rights program pursuant to this section.

Reappropriation:
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $2,650,000
     Water Quality Account--State . . . . . . . . . . . . $3,117,000
          Subtotal Reappropriation . . . . . . . . . . . . $5,767,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,700,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,467,000

NEW SECTION.  Sec. 307   FOR THE DEPARTMENT OF ECOLOGY
     Water Measuring Devices (01-H-009)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely for water measuring devices and gauges. The department shall prioritize the distribution of water measuring devices and gauges to locations participating in the department of fish and wildlife's fish screens and cooperative compliance programs.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $700,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,400,000

NEW SECTION.  Sec. 308   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Fund (02-4-007)

     The reappropriation in this section is subject to the conditions and limitations of section 315, chapter 8, Laws of 2001 2nd sp. sess.

Reappropriation:
     Water Quality Account--State . . . . . . . . . . . . $18,083,411

     Prior Biennia (Expenditures) . . . . . . . . . . . . $115,983,563
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $134,066,974

NEW SECTION.  Sec. 309   FOR THE DEPARTMENT OF ECOLOGY
     Padilla Bay Expansion (02-2-006)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $945,000
     State Building Construction Account--State . . . . . . . . . . . . $405,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,350,000

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $2,417,196
     State Building Construction Account--State . . . . . . . . . . . . $568,804
          Subtotal Appropriation . . . . . . . . . . . . $2,986,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,344,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,680,000

NEW SECTION.  Sec. 310   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Account (02-4-002)

Reappropriation:
     Water Pollution Control Revolving Account--State . . . . . . . . . . . . $148,743,195
     Water Pollution Control Revolving Account--Federal . . . . . . . . . . . . $45,277,010
          Subtotal Reappropriation . . . . . . . . . . . . $194,020,205

     Prior Biennia (Expenditures) . . . . . . . . . . . . $160,582,591
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $354,602,796

NEW SECTION.  Sec. 311   FOR THE DEPARTMENT OF ECOLOGY
     Referendum 38 Water Supply Facilities (02-4-006)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) $250,000 of the reappropriation is provided solely to study the development of the Lake Wenatchee water storage project.
     (2) The department shall submit a report to the office of financial management, the house of representatives capital budget committee, and the senate ways and means committee by December 1, 2003, listing all projects funded from this section.

Reappropriation:
     State and Local Improvements Revolving
          Account (Water Supply Facilities)--State . . . . . . . . . . . . $4,879,163

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,120,837
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $18,000,000

NEW SECTION.  Sec. 312   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Program (04-4-007)

     The appropriation in this section is subject to the following conditions and limitations:
     (1)(a) The state building construction account appropriation in this section is provided solely for grants to finance water infrastructure and conveyance projects in the sixteen salmon critical basins identified in the statewide strategy to recover salmon. The purpose of this funding is to develop projects for enhanced water supply that resolves conflicts among water needs for municipal water supply, agricultural water supply, and fish restoration.
     (b) Priority for the use of these funds must be given to projects that have been identified for early action through watershed plans, comprehensive irrigation district management plans, or similar plan; or to projects that are part of an approved habitat conservation plan, or other intergovernmental agreement. Projects may precede completion of comprehensive watershed plans if resolution of the conflicts is necessary and the actions are compatible with the long-term planning effort. The department shall develop and administer this grants program in conjunction with the departments of agriculture and fish and wildlife. Decisions regarding which projects are funded must be by unanimous agreement of all three departments. The department shall seek local and federal funds to augment the funding provided by this appropriation.
     (2) Up to $7,547,044 of the water quality account appropriation is provided for the extended grant payment to Metro/King county.
     (3) Up to $10,000,000 of the water quality account appropriation is provided for the extended grant payment to Spokane for the Spokane-Rathdrum Prairie aquifer.
     (4) $2,000,000 of the water quality account -- state appropriation is provided for water quality facility grants for communities with a population of less than 5,000. The department shall give priority consideration to: (a) Communities subject to a regulatory order from the department of ecology for noncompliance with water quality regulations; (b) projects for which design work has been completed; and (c) projects with a local match from reasonable water quality rates and charges.
     (5) The remaining appropriation in this section is provided for statewide water quality implementation and planning grants and loans. The department shall give priority consideration to projects located in basins with critical or depressed salmonid stocks.
     (6) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department shall file quarterly project progress reports with the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,000,000
     Water Quality Account--State . . . . . . . . . . . . $40,000,000
          Subtotal Appropriation . . . . . . . . . . . . $48,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $200,000,000
          TOTAL . . . . . . . . . . . . $248,000,000

NEW SECTION.  Sec. 313   FOR THE DEPARTMENT OF ECOLOGY
     Local Toxics Grants to Locals for Cleanup and Prevention (04-4-008)

Appropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $45,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $180,000,000
          TOTAL . . . . . . . . . . . . $225,000,000

NEW SECTION.  Sec. 314   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Program (04-4-002)

     The appropriation in this section is subject to the following conditions and limitations:
     (1)(a) The state building construction account appropriation is provided solely to provide assistance to counties, cities, and special purpose districts to identify, acquire, and rehabilitate public water systems that have water quality problems or have been allowed to deteriorate to a point where public health is an issue. Eligibility is confined to applicants that already own at least one group A public water system and that demonstrate a track record of sound drinking water utility management. Funds may be used for: Planning, design, and other preconstruction activities; system acquisition; and capital construction costs.
     (b) This appropriation must be jointly administered by the department of health, the public works board, and the department of community, trade, and economic development using the drinking water state revolving fund loan program as an administrative model. In order to expedite the use of these funds and minimize administration costs, this appropriation must be administered by guidance, rather than rule. Projects must generally be prioritized using the drinking water state revolving fund loan program criteria. All financing provided through this program must be in the form of grants that must partially cover project costs. The maximum grant to any eligible entity may not exceed twenty-five percent of the funds allocated to this appropriation.
     (2) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department shall file quarterly project progress reports with the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000
     Water Pollution Control Revolving Account--State . . . . . . . . . . . . $66,663,333
     Water Pollution Control Revolving
          Account--Federal . . . . . . . . . . . . $44,466,666
          Subtotal Appropriation . . . . . . . . . . . . $115,129,999

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $462,000,000
          TOTAL . . . . . . . . . . . . $577,129,999

NEW SECTION.  Sec. 315   FOR THE DEPARTMENT OF ECOLOGY
     Water Rights Purchase/Lease (04-1-005)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided for the purchase or lease of water rights under section 305 of this act.

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $1,500,000
     State Drought Preparedness--State . . . . . . . . . . . . $1,500,000
          Subtotal Appropriation . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 316   FOR THE DEPARTMENT OF ECOLOGY
     Water Supply Facilities Program (04-4-006)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The state building construction account appropriation is provided solely for grants for the development of plans, engineering and financing reports, acquiring land and facilities, and other preconstruction activities associated with the development of water storage and groundwater storage and recovery projects. Proposed projects must be consistent with the recommendations of the water storage task force and the governor's water strategy. Priority for the use of these funds must be given to: Projects that have been identified for early action through watershed plans, comprehensive irrigation district management plans, or similar plans; to projects that are part of an approved habitat conservation plan or other intergovernmental agreement; or to joint projects with federal entities such as the bureau of reclamation. The department shall develop and administer this grants program in conjunction with the departments of agriculture and fish and wildlife. Decisions regarding which projects are funded must be by unanimous agreement of all three departments. The department shall seek local and federal funds to augment the funding provided by this appropriation.
     (2) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department shall file quarterly project progress reports with the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $7,000,000
          Subtotal Appropriation . . . . . . . . . . . . $11,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 317   FOR THE DEPARTMENT OF ECOLOGY
     Low-level Nuclear Waste Disposal Trench Site Investigation (04-4-010)

Appropriation:
     Site Closure Account--State . . . . . . . . . . . . $1,141,415

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,141,415

NEW SECTION.  Sec. 318   FOR THE STATE PARKS AND RECREATION COMMISSION
     Coastal Facility Relocation (00-1-005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,179,385

     Prior Biennia (Expenditures) . . . . . . . . . . . . $820,615
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 319   FOR THE STATE PARKS AND RECREATION COMMISSION
     Historical Structure and Land Use Program (00-1-007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $991,539

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,508,461
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,500,000

NEW SECTION.  Sec. 320   FOR THE STATE PARKS AND RECREATION COMMISSION
     Lewis and Clark Trail Bicentennial (00-1-010)

     The reappropriation in this section is provided solely to renovate facilities and enhance exhibits at Lewis and Clark trail interpretive centers located at Sacajawea state park and Fort Canby state park.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,074,732
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,337,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $425,268
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,837,000

NEW SECTION.  Sec. 321   FOR THE STATE PARKS AND RECREATION COMMISSION
     Facility Improvement (01-S-005)

     The reappropriation in this section is subject to the following conditions and limitations: $200,000 of the reappropriation is provided solely for funding of the twin tunnels bridge on the Iron Goat trail.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,182,938

     Prior Biennia (Expenditures) . . . . . . . . . . . . $317,062
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,500,000

NEW SECTION.  Sec. 322   FOR THE STATE PARKS AND RECREATION COMMISSION
     Beacon Rock Pierce Trust (02-3-018)

Reappropriation:
     Parks Renewal and Stewardship Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $200,000

NEW SECTION.  Sec. 323   FOR THE STATE PARKS AND RECREATION COMMISSION
     Coastal Facility Relocation (02-1-017)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The commission shall ensure that all funds transferred from the public works assistance account to the parks renewal and stewardship account during the 2001-2003 biennium are used only for this project.
     (2) Funds expended on this project for off-site utility infrastructure that may include the provision of electricity, water service, or sewer service must be for the benefit of the state. Entities that subsequently connect to or use this off-site utility infrastructure shall reimburse the state at a rate proportional to their use. The commission, in consultation with the public works board, shall develop policies and procedures to ensure this reimbursement occurs.
     (3) The commission shall ensure that all reimbursement recovered as specified in subsection (2) of this section is paid into the public works assistance account.
     (4) Ownership of the off-site sewer and water utility infrastructure constructed in this section shall transfer to the city of Ilwaco.

Reappropriation:
     Parks Renewal and Stewardship Account--State . . . . . . . . . . . . $3,783,774

     Prior Biennia (Expenditures) . . . . . . . . . . . . $300,726
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,084,500

NEW SECTION.  Sec. 324   FOR THE STATE PARKS AND RECREATION COMMISSION
     Environmental Learning Centers (02-1-010)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for the Seahurst environmental learning center.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $249,912

     Prior Biennia (Expenditures) . . . . . . . . . . . . $88
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $250,000

NEW SECTION.  Sec. 325   FOR THE STATE PARKS AND RECREATION COMMISSION
     Facility Preservation (02-1-001)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely to continue minor works projects that reduce the deferred maintenance backlog.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,968,773

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,031,227
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,000,000

NEW SECTION.  Sec. 326   FOR THE STATE PARKS AND RECREATION COMMISSION
     Fort Worden (02-1-003)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely for park preservation and for development of the multipurpose dining and meeting facility.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,996,015

     Prior Biennia (Expenditures) . . . . . . . . . . . . $73,350
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,069,365

NEW SECTION.  Sec. 327   FOR THE STATE PARKS AND RECREATION COMMISSION
     Major Park Renovation - Cama Beach (02-1-022)

     The reappropriation in this section is provided to complete electrical power, water, and sewer utilities, and for other park development and renovation.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,852,484
Appropriation:
     Parks Renewal and Stewardship Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $147,517
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,200,001

NEW SECTION.  Sec. 328   FOR THE STATE PARKS AND RECREATION COMMISSION
     Natural/Historic Stewardship (02-1-006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $929,184

     Prior Biennia (Expenditures) . . . . . . . . . . . . $70,816
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 329   FOR THE STATE PARKS AND RECREATION COMMISSION
     Park Housing (02-2-008)

     The appropriations in this section are subject to the following conditions and limitations: The appropriations in this section are provided solely to replace existing substandard housing or construct new housing at park locations that presently do not have a full-time, on-site ranger.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $484,138
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,862
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $5,500,000

NEW SECTION.  Sec. 330   FOR THE STATE PARKS AND RECREATION COMMISSION
     Parkland Acquisition Account (02-2-016)

Reappropriation:
     Parkland Acquisition Account--State . . . . . . . . . . . . $1,951,417

     Prior Biennia (Expenditures) . . . . . . . . . . . . $48,583
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 331   FOR THE STATE PARKS AND RECREATION COMMISSION
     Recreation Development-Grayland Beach (02-2-007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $468,064

     Prior Biennia (Expenditures) . . . . . . . . . . . . $31,936
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 332   FOR THE STATE PARKS AND RECREATION COMMISSION
     Statewide Boat Pumpout - Federal Clean Vessel Act (02-2-020)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $797,528

     Prior Biennia (Expenditures) . . . . . . . . . . . . $202,472
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 333   FOR THE STATE PARKS AND RECREATION COMMISSION
     Job Creation and Infrastructure (03-1-001)

     The reappropriation in this section shall support the projects as listed in section 211, chapter 238, Laws of 2002.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,400,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,500,000

NEW SECTION.  Sec. 334   FOR THE STATE PARKS AND RECREATION COMMISSION
     Beacon Rock Pierce Trust (04-2-018)

Appropriation:
     Parks Renewal and Stewardship Account--State . . . . . . . . . . . . $50,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $50,000

NEW SECTION.  Sec. 335   FOR THE STATE PARKS AND RECREATION COMMISSION
     Coastal Erosion (04-1-006)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $960,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $960,000

NEW SECTION.  Sec. 336   FOR THE STATE PARKS AND RECREATION COMMISSION
     Deception Pass State Park Renovation (04-1-019)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the commission shall file quarterly project progress reports with the office of financial management.
     (2) This appropriation shall be held in allotment reserve until the commission completes a predesign and scoping document that describes the park renovation plan in total, including those projects funded through other fund sources.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 337   FOR THE STATE PARKS AND RECREATION COMMISSION
     Emergency and Unforeseen Needs (04-1-012)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,200,000
          TOTAL . . . . . . . . . . . . $3,700,000

NEW SECTION.  Sec. 338   FOR THE STATE PARKS AND RECREATION COMMISSION
     Facility Assessment (04-2-011)

Appropriation:
     Parks Renewal and Stewardship Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $150,000

NEW SECTION.  Sec. 339   FOR THE STATE PARKS AND RECREATION COMMISSION
     Facility Preservation (04-1-001)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
     (2) The appropriation in this section is provided solely to continue minor works projects that reduce the deferred maintenance backlog.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 340   FOR THE STATE PARKS AND RECREATION COMMISSION
     Fort Worden (04-1-004)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the commission shall file quarterly project progress reports with the office of financial management.
     (2) The appropriation shall be held in allotment reserve until the commission produces business and marketing plans for Fort Worden conference center and state park that clearly identifies revenue and associated financing plan for operational and capital renewal costs.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 341   FOR THE STATE PARKS AND RECREATION COMMISSION
     Historic Stewardship (04-1-010)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
          TOTAL . . . . . . . . . . . . $9,000,000

NEW SECTION.  Sec. 342   FOR THE STATE PARKS AND RECREATION COMMISSION
     Iron Horse Trail (04-2-016)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the commission shall file quarterly project progress reports with the office of financial management.
     (2) The commission shall submit a study of potential user fees that could support maintenance, operation, and capital renewal costs of the agency's three cross-state trails. This study must be submitted to the office of financial management by September 15, 2003.

Appropriation:
     Parks Renewal and Stewardship Account--State . . . . . . . . . . . . $262,500

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $262,500

NEW SECTION.  Sec. 343   FOR THE STATE PARKS AND RECREATION COMMISSION
     Parkland Acquisition (04-2-013)

Appropriation:
     Parkland Acquisition Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
          TOTAL . . . . . . . . . . . . $9,000,000

NEW SECTION.  Sec. 344   FOR THE STATE PARKS AND RECREATION COMMISSION
     Recreation Development (04-2-002)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) $100,000 of the state building construction account appropriation shall be used to retain a consultant to conduct a predesign study for a headquarters building located in Thurston county. The predesign shall compare a new leased facility against options to build and evaluate appropriate funding strategies.
     (2) $900,000 of the state building construction account appropriation shall be used to install fee collection stations at selected parks statewide.
     (3) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the commission shall file quarterly project progress reports with the office of financial management.
     (4) $2,000,000 of the state building construction account shall be held in allotment reserve until the commission produces a business and marketing plan for each proposed development project that clearly identifies the expected revenue and associated financing plan for operational and capital renewal costs.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
          TOTAL . . . . . . . . . . . . $11,000,000

NEW SECTION.  Sec. 345   FOR THE STATE PARKS AND RECREATION COMMISSION
     Roadways (04-1-003)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the commission shall file quarterly project progress reports with the office of financial management.
     (2) The commission shall submit a study of financial options that clearly identifies alternative funding options for long-term financing of park roadway preservation costs. This study must be submitted to the office of financial management by September 15, 2003.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 346   FOR THE STATE PARKS AND RECREATION COMMISSION
     Statewide Boat Pumpout - Federal Clean Vessel Act (04-4-014)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 347   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Boating Facilities Projects (98-2-001)

Reappropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $10,802,352

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,771,659
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $19,574,011

NEW SECTION.  Sec. 348   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Firearms Range Program (98-2-004)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . $187,393

     Prior Biennia (Expenditures) . . . . . . . . . . . . $386,276
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $573,669

NEW SECTION.  Sec. 349   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     National Recreation Trails (NRTP) (98-2-006)

Reappropriation:
     Recreation Resources Account--Federal . . . . . . . . . . . . $384,820

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,682,794
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,067,614

NEW SECTION.  Sec. 350   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Nonhighway Off-Road Vehicle Program (NOVA) (98-2-002)

Reappropriation:
     Nonhighway and Off-Road Vehicle Activities
          Program Account--State . . . . . . . . . . . . $4,419,897

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,676,026
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,095,923

NEW SECTION.  Sec. 351   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Wildlife and Recreation Program (WWRP) (98-2-003)

     The reappropriation in this section is subject to the following conditions and limitations: Reappropriated funds that are not obligated to a specific project may be used to fund projects from the list of alternate projects in biennia succeeding the biennium in which the funds were originally appropriated.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $18,622,854
     Habitat Conservation Account--State . . . . . . . . . . . . $18,531,278
          Subtotal Reappropriation . . . . . . . . . . . . $37,154,132

     Prior Biennia (Expenditures) . . . . . . . . . . . . $57,881,867
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $95,035,999

NEW SECTION.  Sec. 352   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Salmon Recovery (00-2-001)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $39,103,958
     Salmon Recovery Account--State . . . . . . . . . . . . $13,371,000
          Subtotal Reappropriation . . . . . . . . . . . . $52,474,958

     Prior Biennia (Expenditures) . . . . . . . . . . . . $49,094,431
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $101,569,389

NEW SECTION.  Sec. 353   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Boating Facilities Program (02-4-001)

Reappropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $6,588,503

     Prior Biennia (Expenditures) . . . . . . . . . . . . $345,510
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,934,013

NEW SECTION.  Sec. 354   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Boating Infrastructure Grant (BIG) (02-4-010)

Reappropriation:
     Recreation Resources Account--Federal . . . . . . . . . . . . $1,984,185

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,815
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 355   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Firearms and Archery Range Program (FARR) (02-0-001)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $400,000

NEW SECTION.  Sec. 356   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Hatchery Management Program (02-4-009)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $10,881,116

     Prior Biennia (Expenditures) . . . . . . . . . . . . $318,884
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,200,000

NEW SECTION.  Sec. 357   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Land and Water Conservation (LWCF) (02-4-005)

     The reappropriation in this section is subject to the following conditions and limitations: $1,500,000 of the recreation resources account--federal is reappropriated for projects chosen by the interagency committee for outdoor recreation.

Reappropriation:
     Recreation Resources Account--Federal . . . . . . . . . . . . $7,274,772

     Prior Biennia (Expenditures) . . . . . . . . . . . . $225,228
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,500,000

NEW SECTION.  Sec. 358   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     National Recreation Trails Program (NRTP) (02-4-006)

Reappropriation:
     Recreation Resources Account--Federal . . . . . . . . . . . . $1,879,698

     Prior Biennia (Expenditures) . . . . . . . . . . . . $253,238
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,132,936

NEW SECTION.  Sec. 359   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Nonhighway Off-Road Vehicle (NOVA) (02-4-002)

     (1) The reappropriation in this section for the nonhighway and off-road vehicle program under RCW 46.09.170(1)(d)(i) is subject to the following conditions and limitations: A portion of the reappropriation may be used for grants to projects to research, develop, publish, and distribute informational guides and maps of nonhighway and off-road vehicle trails and associated facilities meeting the requirements, guidelines, spirit, and intent of the federal Americans with disabilities act.
     (2) The reappropriation in this section for the nonhighway and off-road vehicle program under RCW 46.09.170(1)(d)(ii) is subject to the following conditions and limitations: The portion of the reappropriation that applies to grants for capital facilities may be used for grants to projects that meet the requirements, guidelines, spirit, and intent of the federal Americans with disabilities act and do not compromise or impair sensitive natural resources. The portion of the reappropriation that applies to grants for management, maintenance, and operation of existing off-road vehicle recreation facilities may be used to bring the facilities into compliance with the requirements, guidelines, spirit, and intent of the federal Americans with disabilities act.
     (3) The reappropriation in this section for the nonhighway and off-road vehicle program under RCW 46.09.170(1)(d)(iii) is subject to the following conditions and limitations: Funds may be expended for nonhighway road recreation facilities which may include recreational trails that are accessed by nonhighway roads and are intended solely for nonmotorized recreational uses.

Reappropriation:
     Nonhighway Off-Road Vehicle Activities Program
          Account--State . . . . . . . . . . . . $5,114,826

     Prior Biennia (Expenditures) . . . . . . . . . . . . $412,725
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,527,551

NEW SECTION.  Sec. 360   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Salmon Recovery (02-4-007)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) Activities funded through grants provided in this section shall be consistent with the salmon recovery funding board's goals, mission, and responsibilities.
     (2) Jobs for the environment projects submitted by lead entities are eligible to receive funding, including wages for jobs for the environment participants.

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $45,874,180
     State Building Construction Account--State . . . . . . . . . . . . $22,761,107
          Subtotal Reappropriation . . . . . . . . . . . . $68,635,287

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,357,713
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $74,993,000

NEW SECTION.  Sec. 361   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Wildlife and Recreation Program (WWRP) (02-4-003)

     The reappropriations in this section for the wildlife and recreation program under chapter 43.99A RCW and RCW 43.99A.040 are subject to the following conditions and limitations:
     (1) The reappropriation is provided for the approved list of projects included in LEAP capital document No. 2001-24, as developed on June 7, 2001, and LEAP capital document No. 2002-21, as developed on March 12, 2002.
     (2) The department of natural resources shall manage lands acquired through project No. 00-1427 "North Bay NAP" as a natural resources conservation area under chapter 79.71 RCW.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $19,365,923
     Habitat Conservation Account--State . . . . . . . . . . . . $19,756,942
          Subtotal Reappropriation . . . . . . . . . . . . $39,122,865

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,877,135
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $45,000,000

NEW SECTION.  Sec. 362   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Boating Facilities Program (BFP) (04-4-003)

Appropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $6,982,959

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $30,393,333
          TOTAL . . . . . . . . . . . . $37,376,292

NEW SECTION.  Sec. 363   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Boating Infrastructure Grant Program (BIG) (04-4-009)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
          TOTAL . . . . . . . . . . . . $10,000,000

NEW SECTION.  Sec. 364   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Family Forest Fish Blockages Program (04-4-011)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) This appropriation is provided solely for the salmon recovery funding board in consultation with the small forest landowner office of the department of natural resources and the department of fish and wildlife to provide grants to correct fish passage blockages on nonindustrial forest lands. Selection of projects must be coordinated with the other salmon recovery grant programs provided in section 370 of this act.
     (2) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the committee shall file quarterly project progress reports with the office of financial management.
     (3) The committee may not expend more than $100,000 of the appropriation for administrative or staff costs.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 365   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Firearms and Archery Range Recreation Program (FARR) (04-4-006)

Appropriation:
     Firearms Range Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,260,000
          TOTAL . . . . . . . . . . . . $1,410,000

NEW SECTION.  Sec. 366   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Hatchery Management Program (04-4-010)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,000,000
          TOTAL . . . . . . . . . . . . $50,000,000

NEW SECTION.  Sec. 367   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Land and Water Conservation Fund (LWCF) (04-4-007)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $5,735,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $22,940,000
          TOTAL . . . . . . . . . . . . $28,675,000

NEW SECTION.  Sec. 368   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     National Recreation Trails Program (NRTP) (04-4-008)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $2,260,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,040,000
          TOTAL . . . . . . . . . . . . $11,300,000

NEW SECTION.  Sec. 369   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Nonhighway and Off-Road Vehicle Activities Program (NOVA) (04-4-004)

Appropriation:
     Nonhighway and Off-Road Vehicle Activities Program
          Account--State . . . . . . . . . . . . $5,932,310

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $25,504,994
          TOTAL . . . . . . . . . . . . $31,437,304

NEW SECTION.  Sec. 370   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Salmon Recovery Fund Board Programs (SRFB) (04-4-001)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $36,000,000
     State Building Construction Account--State . . . . . . . . . . . . $18,000,000
          Subtotal Appropriation . . . . . . . . . . . . $54,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $184,000,000
          TOTAL . . . . . . . . . . . . $238,000,000

NEW SECTION.  Sec. 371   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Washington Wildlife and Recreation Program (WWRP) (04-4-002)

     The appropriation in this section is subject to the following conditions and limitations: In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the committee shall file quarterly project progress reports with the office of financial management.

Appropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $15,000,000
     Habitat Conservation Account--State . . . . . . . . . . . . $15,000,000
          Subtotal Appropriation . . . . . . . . . . . . $30,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $120,000,000
          TOTAL . . . . . . . . . . . . $150,000,000

NEW SECTION.  Sec. 372   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Aquatic Lands Enhancement Grants (02-4-018)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided for a list of projects in LEAP capital document No. 2001-44, as developed on June 7, 2001.

Reappropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $2,820,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,745,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $22,000,000
          TOTAL . . . . . . . . . . . . $27,565,000

NEW SECTION.  Sec. 373   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Aquatic Lands Enhancement Grants (04-4-018)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation in this section is provided for a list of projects in LEAP capital document No. XXXX-XX, as developed on . . . . . ., 2003.
     (2) The committee shall submit a list of recommended projects to be funded from the aquatic lands enhancement account in the 2005-2007 capital budget. The list shall result from a competitive grants program developed by the committee based upon, at a minimum: (a) A uniform criteria for selecting projects and awarding grants for up to fifty percent of the total project cost; (b) local community support for the project; and (c) environmental benefits to be derived from projects. This process must be coordinated with the salmon recovery funding board selection process. The list of projects must be submitted to the office of financial management by September 15, 2004.

Appropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $5,356,400

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,622,319
     Future Biennia (Projected Costs) . . . . . . . . . . . . $22,000,000
          TOTAL . . . . . . . . . . . . $39,978,719

NEW SECTION.  Sec. 374   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Deep Water Slough Restoration (98-2-021)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation lapses June 30, 2004.

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $155,800
     State Building Construction Account--State . . . . . . . . . . . . $150,000
          Subtotal Reappropriation . . . . . . . . . . . . $305,800

     Prior Biennia (Expenditures) . . . . . . . . . . . . $257,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $562,800

NEW SECTION.  Sec. 375   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Dole Property Acquisition (01-S-002)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations shall be used solely to acquire property and the associated water rights adjacent to the Chelan fish hatchery.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $756,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $30,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $786,000

NEW SECTION.  Sec. 376   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Fish Screens (01-H-011)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely for the inventory, design, construction, and installation of fish screens and fishways. To the extent practicable and cost effective, the department shall contract for the design, construction, and installation of fish screens and fishways. Funds provided by this appropriation may be used to match federal funds appropriated under HR 1444, the fisheries restoration and irrigation mitigation act of 2000.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $400,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 377   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Code Compliance and Protection (02-1-005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,350,000

NEW SECTION.  Sec. 378   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Commercial and Recreational Customer Satisfaction Improvements (02-2-006)

Reappropriation:
     Warm Water Game Fish Account--State . . . . . . . . . . . . $370,000
     Wildlife Account--State . . . . . . . . . . . . $200,000
          Subtotal Reappropriation . . . . . . . . . . . . $570,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $490,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,060,000

NEW SECTION.  Sec. 379   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Diverse Fish and Wildlife Population Health and Protection (02-2-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $50,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $250,000

NEW SECTION.  Sec. 380   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     ESA Compliance on Agency Lands (02-2-002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $650,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $350,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 381   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Facility and Infrastructure Standards and Renovations (02-1-009)

     The reappropriation in this section is subject to the following conditions and limitations: The department shall expend the reappropriated funds as detailed in section 390, chapter 8, Laws of 2001 2nd sp. sess.

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $328,700
     General Fund--Private/Local . . . . . . . . . . . . $60,000
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $100,000
     State Building Construction Account--State . . . . . . . . . . . . $1,925,000
     Wildlife Account--State . . . . . . . . . . . . $60,000
          Subtotal Reappropriation . . . . . . . . . . . . $2,473,700

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,507,300
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,981,000

NEW SECTION.  Sec. 382   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Forest and Fish Road Upgrade and Abandonment on Agency Lands (02-1-003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $180,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $320,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 383   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Partnership Improvements with Internal and External Customers (02-2-008)

     The reappropriation in this section is subject to the following conditions and limitations: Expenditures of the reappropriation in this section for fencing must comply with chapter 16.60 RCW.

Reappropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $10,000
     State Building Construction Account--State . . . . . . . . . . . . $45,000
          Subtotal Reappropriation . . . . . . . . . . . . $55,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $395,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $450,000

NEW SECTION.  Sec. 384   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Culvert Replacement for Fish Passage (03-S-001)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely to the department of fish and wildlife to replace culverts on state lands that impair fish passage. The department shall prioritize projects that affect fish species listed as threatened or endangered under the federal endangered species act.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $400,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 385   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Job Creation and Infrastructure Projects (03-1-001)

     The reappropriation in this section shall support the projects as listed in section 212, chapter 238, Laws of 2002.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,040,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,040,000

NEW SECTION.  Sec. 386   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Facility, Infrastructure, Lands, and Access Condition Improvement (04-1-003)

     The appropriation in this section is subject to the following conditions and limitations: $200,000 of the state building construction account appropriation shall be used for the design of the eastern region headquarters office complex. The department is encouraged to colocate with the department of transportation.

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $600,000
     State Building Construction Account--State . . . . . . . . . . . . $7,775,000
          Subtotal Appropriation . . . . . . . . . . . . $8,375,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,300,000
          TOTAL . . . . . . . . . . . . $48,675,000

NEW SECTION.  Sec. 387   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Fish and Wildlife Opportunity Improvements (04-2-006)

Appropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $300,000
     Warm Water Game Fish Account--State . . . . . . . . . . . . $550,000
     Wildlife Account--State . . . . . . . . . . . . $1,500,000
          Subtotal Appropriation . . . . . . . . . . . . $2,350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,500,000
          TOTAL . . . . . . . . . . . . $14,850,000

NEW SECTION.  Sec. 388   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Fish and Wildlife Population and Habitat Protection (04-1-002)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $355,000
     General Fund--Private/Local . . . . . . . . . . . . $1,025,000
     State Building Construction Account--State . . . . . . . . . . . . $7,300,000
     Wildlife Account--State . . . . . . . . . . . . $1,200,000
          Subtotal Appropriation . . . . . . . . . . . . $9,880,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $43,520,000
          TOTAL . . . . . . . . . . . . $53,400,000

NEW SECTION.  Sec. 389   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Hatchery Reform, Retrofits, and Condition Improvement (04-1-001)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $4,500,000
     General Fund--Private/Local . . . . . . . . . . . . $1,500,000
     State Building Construction Account--State . . . . . . . . . . . . $6,000,000
          Subtotal Appropriation . . . . . . . . . . . . $12,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $44,000,000
          TOTAL . . . . . . . . . . . . $56,000,000

NEW SECTION.  Sec. 390   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Internal and External Partnership Improvements (04-1-007)

     The appropriation in this section is subject to the following conditions and limitations: Expenditures of the appropriation in this section for fencing shall comply with chapter 16.60 RCW.

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $4,000,000
     General Fund--Private/Local . . . . . . . . . . . . $2,000,000
     Game Special Wildlife Account--State . . . . . . . . . . . . $50,000
     Game Special Wildlife Account--Federal . . . . . . . . . . . . $400,000
     Game Special Wildlife Account--Private/Local . . . . . . . . . . . . $50,000
          Subtotal Appropriation . . . . . . . . . . . . $6,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $26,000,000
          TOTAL . . . . . . . . . . . . $32,500,000

NEW SECTION.  Sec. 391   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Tokul Creek Hatchery (04-1-013)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,300,000

NEW SECTION.  Sec. 392   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Underground Storage Tank Replacement (04-1-015)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 393   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Washington Department of Fish and Wildlife Energy Savings (04-1-016)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 394   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Youth Sport Fishing Program (04-2-017)

Appropriation:
     Wildlife Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $250,000

NEW SECTION.  Sec. 395   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Forest Legacy (02-2-015)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $2,853,300

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,218,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,071,300

NEW SECTION.  Sec. 396   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Minor Works - Health and Safety (02-2-001)

Reappropriation:
     Forest Development Account--State . . . . . . . . . . . . $80,500
     Resources Management Cost Account--State . . . . . . . . . . . . $140,000
     State Building Construction Account--State . . . . . . . . . . . . $112,000
     Agricultural College Trust Management Account--State . . . . . . . . . . . . $17,500
          Subtotal Reappropriation . . . . . . . . . . . . $350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $782,911
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,132,911

NEW SECTION.  Sec. 397   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Administrative Site Preservation (04-1-002)

Appropriation:
     Forest Development Account--State . . . . . . . . . . . . $224,900
     Resources Management Cost Account--State . . . . . . . . . . . . $389,700
     State Building Construction Account--State . . . . . . . . . . . . $150,000
     Agricultural College Trust Management Account--State . . . . . . . . . . . . $49,200
          Subtotal Appropriation . . . . . . . . . . . . $813,800

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,117,037
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,709,000
          TOTAL . . . . . . . . . . . . $7,639,837

NEW SECTION.  Sec. 398   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Agricultural Asset Preservation (04-1-017)

Appropriation:
     Resource Management Cost Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $150,749
     Future Biennia (Projected Costs) . . . . . . . . . . . . $400,000
          TOTAL . . . . . . . . . . . . $650,749

NEW SECTION.  Sec. 399   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Commercial Development/Local Improvement Districts (04-2-009)

Appropriation:
     Resource Management Cost Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $168,027
     Future Biennia (Projected Costs) . . . . . . . . . . . . $400,000
          TOTAL . . . . . . . . . . . . $668,027

NEW SECTION.  Sec. 400   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Communication Site Repairs (04-1-024)

Appropriation:
     Forest Development Account--State . . . . . . . . . . . . $50,000
     Resource Management Cost Account--State . . . . . . . . . . . . $150,000
          Subtotal Appropriation . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $478,733
     Future Biennia (Projected Costs) . . . . . . . . . . . . $800,000
          TOTAL . . . . . . . . . . . . $1,478,733

NEW SECTION.  Sec. 401   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Community and Technical College Trust Land Acquisition (04-2-014)

Appropriation:
     Community and Technical College Forest Reserve
          Account--State . . . . . . . . . . . . $96,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $400,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,800,000
          TOTAL . . . . . . . . . . . . $2,296,000

NEW SECTION.  Sec. 402   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Forest Legacy (04-2-015)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $6,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $32,000,000
          TOTAL . . . . . . . . . . . . $38,000,000

NEW SECTION.  Sec. 403   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Hazardous Waste Removal (04-1-006)

Appropriation:
     Forest Development Account--State . . . . . . . . . . . . $25,000
     Resource Management Cost Account--State . . . . . . . . . . . . $25,000
          Subtotal Appropriation . . . . . . . . . . . . $50,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $65,500
     Future Biennia (Projected Costs) . . . . . . . . . . . . $200,000
          TOTAL . . . . . . . . . . . . $315,500

NEW SECTION.  Sec. 404   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Land Bank (04-2-013)

Appropriation:
     Resource Management Cost Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,898,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $45,000,000
          TOTAL . . . . . . . . . . . . $61,898,000

NEW SECTION.  Sec. 405   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Marine Station Public Access (04-2-019)

Appropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $175,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,500,000
          TOTAL . . . . . . . . . . . . $1,775,000

NEW SECTION.  Sec. 406   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Minor Works - Health and Safety (04-2-001)

Appropriation:
     Forest Development Account--State . . . . . . . . . . . . $133,400
     Resource Management Cost Account--State . . . . . . . . . . . . $232,000
     Agricultural College Trust Management Account--State . . . . . . . . . . . . $29,000
          Subtotal Appropriation . . . . . . . . . . . . $394,400

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,618,800
          TOTAL . . . . . . . . . . . . $6,013,200

NEW SECTION.  Sec. 407   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Mobile Radio System Upgrade (04-2-022)

     The appropriation in this section is subject to the following conditions and limitations: The department shall study and evaluate options for a comprehensive user fee system that equally distributes the cost to operate, maintain, and capitalize the radio system to all users on the network. The study must include an evaluation of a user fee system based on access to the network and not on radio inventory. The department shall report the study's findings and recommendations to the office of financial management by September 15, 2003.

Appropriation:
     Forest Development Account--State . . . . . . . . . . . . $227,400
     Resource Management Cost Account--State . . . . . . . . . . . . $386,500
     State Building Construction Account--State . . . . . . . . . . . . $1,659,800
          Subtotal Appropriation . . . . . . . . . . . . $2,273,700

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,546,500
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,820,200

NEW SECTION.  Sec. 408   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Natural Area Facilities Preservation (04-1-016)

     The appropriation in this section is subject to the following conditions and limitations: The department shall submit a study of funding source options that fully support the maintenance, operation, and capitalization of its natural area preserve facilities. This study must be submitted to the office of financial management by September 15, 2003.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $185,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,418,097
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,603,097

NEW SECTION.  Sec. 409   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Natural Resource Real Property Replacement (04-2-012)

Appropriation:
     Natural Resources Real Property Replacement
          Account--State . . . . . . . . . . . . $20,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $18,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $60,000,000
          TOTAL . . . . . . . . . . . . $98,000,000

NEW SECTION.  Sec. 410   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Real Estate Repair, Maintenance, and Tenant Improvements (04-1-005)

Appropriation:
     Resource Management Cost Account--State . . . . . . . . . . . . $1,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $539,335
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
          TOTAL . . . . . . . . . . . . $9,739,335

NEW SECTION.  Sec. 411   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Recreation Facilities Preservation (04-1-011)

     The appropriation in this section is subject to the following conditions and limitations: The department shall submit a study of funding source options that will fully support the maintenance, operation, and capitalization of its recreational facilities to the office of financial management by September 15, 2003.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $225,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $890,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,115,000

NEW SECTION.  Sec. 412   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Right of Way Acquisition (04-2-007)

Appropriation:
     Forest Development Account--State . . . . . . . . . . . . $100,000
     Resource Management Cost Account--State . . . . . . . . . . . . $400,000
          Subtotal Appropriation . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $704,320
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $5,204,320

NEW SECTION.  Sec. 413   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Riparian Open Space Program (04-2-023)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department shall file quarterly project progress reports with the office of financial management.
     (2) The department may not expend more than $100,000 of the appropriation for administrative or staff costs.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 414   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Statewide Estuarine Restoration Projects (04-2-021)

Appropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,800,000
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 415   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Wetland Grants (04-2-004)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 416   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Aquatic Lands Enhancement Grants (02-4-018)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided for a list of projects in LEAP capital document No. 2001-44, as developed on June 7, 2001.

Reappropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $2,820,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,745,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $22,000,000
          TOTAL . . . . . . . . . . . . $27,565,000

NEW SECTION.  Sec. 417   FOR THE DEPARTMENT OF AGRICULTURE
     Conservation Reserve Enhancement Program (00-2-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 418   FOR THE DEPARTMENT OF AGRICULTURE
     Dairy Nutrient Management Grants Program (02-4-002)

Reappropriation:
     Water Quality Account--State . . . . . . . . . . . . $350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $350,000

NEW SECTION.  Sec. 419   FOR THE DEPARTMENT OF AGRICULTURE
     Puget Sound District Grants (02-4-003)

Reappropriation:
     Water Quality Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $150,000

NEW SECTION.  Sec. 420   FOR THE DEPARTMENT OF AGRICULTURE
     Water Quality Grants Program (02-4-001)

Reappropriation:
     Water Quality Account--State . . . . . . . . . . . . $750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $750,000

NEW SECTION.  Sec. 421   FOR THE DEPARTMENT OF AGRICULTURE
     Conservation Reserve Enhancement Program (04-4-004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 422   FOR THE DEPARTMENT OF AGRICULTURE
     Puget Sound District Grants (04-4-005)

Appropriation:
     Water Quality Account--State . . . . . . . . . . . . $840,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,360,000
          TOTAL . . . . . . . . . . . . $4,200,000

NEW SECTION.  Sec. 423   FOR THE DEPARTMENT OF AGRICULTURE
     Water Quality Grants Program (04-4-001)

Appropriation:
     Water Quality Account--State . . . . . . . . . . . . $4,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $24,500,000

(End of part)


PART 4
TRANSPORTATION

NEW SECTION.  Sec. 501   FOR THE WASHINGTON STATE PATROL
     Seattle Toxicology Lab (00-2-009)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,455,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,059,864
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,514,864

NEW SECTION.  Sec. 502   FOR THE WASHINGTON STATE PATROL
     Spokane Crime Laboratory Construction (02-2-013)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $11,365,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $635,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,000,000

NEW SECTION.  Sec. 503   FOR THE WASHINGTON STATE PATROL
     Fire Training Academy - Sanitary Sewer System (04-2-011)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $440,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $440,000

NEW SECTION.  Sec. 504   FOR THE WASHINGTON STATE PATROL
     Fire Training Academy: Minor Works (04-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $250,000

NEW SECTION.  Sec. 505   FOR THE DEPARTMENT OF TRANSPORTATION
     Columbia River Dredging (03-H-001)

     The reappropriation in this section is provided solely to fund the second phase of a multiphase cooperative project with the state of Oregon to dredge the Columbia river. The department shall not expend the reappropriation in this section unless an agreement on ocean disposal sites has been reached that protects the state's commercial crab fishery. The amount in this section lapses unless the state of Oregon appropriates a dollar-for-dollar match to fund its share of the project.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $17,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,700,000

(End of part)


PART 5
EDUCATION

NEW SECTION.  Sec. 601   FOR THE STATE BOARD OF EDUCATION
     State School Construction Assistance Grants Reappropriation (02-4-001)

Reappropriation:
     Common School Construction Account--State . . . . . . . . . . . . $175,389,591

     Prior Biennia (Expenditures) . . . . . . . . . . . . $716,123,079
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $891,512,670

NEW SECTION.  Sec. 602   FOR THE STATE BOARD OF EDUCATION
     School Construction Assistance Grants (04-4-001)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) $200,000 from this appropriation is provided solely to fund up to two FTEs in the office of the state fire marshal to exclusively review K-12 construction documents, provide on-site construction inspections, and final acceptance inspections for fire and life safety in accordance with the state building code. These services shall only be provided to those districts that are located in counties without qualified review and inspection capabilities and who request such services.
     (2) $100,000 of this appropriation shall be held in reserve for a study on space and cost requirements in the K-12 school construction program. The office of financial management shall release the funds to the state board of education after the development and acceptance of a study outline that does not replicate previous studies. In the event that no study is conducted, the funds shall lapse.

Appropriation:
     Common School Construction Account--State . . . . . . . . . . . . $379,370,924

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,765,823,833
          TOTAL . . . . . . . . . . . . $2,145,194,757

NEW SECTION.  Sec. 603   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     State School Construction Assistance Program Staff (04-2-001)

Appropriation:
     Common School Construction Account--State . . . . . . . . . . . . $2,101,433

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,612,295
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,496,869
          TOTAL . . . . . . . . . . . . $15,210,597

NEW SECTION.  Sec. 604   FOR THE STATE SCHOOL FOR THE BLIND
     Ahlsten: Material Center and Braille Production (02-2-003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,041,278
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,341,278

NEW SECTION.  Sec. 605   FOR THE STATE SCHOOL FOR THE BLIND
     Campus Preservation (02-1-002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $200,000

NEW SECTION.  Sec. 606   FOR THE STATE SCHOOL FOR THE BLIND
     Distance Learning Center/Covered Play Area (02-2-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,039,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,789,000

NEW SECTION.  Sec. 607   FOR THE STATE SCHOOL FOR THE BLIND
     Irwin: Old Main, Kennedy, and Dry Building Preservation (02-1-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,681,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,981,000

NEW SECTION.  Sec. 608   FOR THE STATE SCHOOL FOR THE BLIND
     Boiler House Renovation/Electrical Vault Replacement (04-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $668,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $668,000

NEW SECTION.  Sec. 609   FOR THE STATE SCHOOL FOR THE BLIND
     Campus Preservation (04-1-004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $770,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,830,000
          TOTAL . . . . . . . . . . . . $3,600,000

NEW SECTION.  Sec. 610   FOR THE STATE SCHOOL FOR THE BLIND
     Kennedy, Dry, and Irwin Buildings Preservation (04-1-002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,279,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,279,000

NEW SECTION.  Sec. 611   FOR THE STATE SCHOOL FOR THE BLIND
     Old Main Annex - Commercial Kitchen (04-2-003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $425,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $425,000

NEW SECTION.  Sec. 612   FOR THE STATE SCHOOL FOR THE DEAF
     School Campus Redevelopment (01-2-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $19,837,344

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,540,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $7,319,000
          TOTAL . . . . . . . . . . . . $28,696,344

NEW SECTION.  Sec. 613   FOR THE UNIVERSITY OF WASHINGTON
     UW Law School Building (94-2-017)

Reappropriation:
     Higher Education Construction Account--State . . . . . . . . . . . . $20,810,780
     Higher Education Non-Proprietary Local Capital
          Accounts--Private/Local . . . . . . . . . . . . $19,409,915
          Subtotal Reappropriation . . . . . . . . . . . . $40,220,695

     Prior Biennia (Expenditures) . . . . . . . . . . . . $34,634,805
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $74,855,500

NEW SECTION.  Sec. 614   FOR THE UNIVERSITY OF WASHINGTON
     UW Tacoma Campus Phase 2A (00-2-017)

     No money from the reappropriation in this section may be expended that would be inconsistent with the recommendations of the higher education coordinating board and the project design, scope, and schedule approved by the office of financial management.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,914,974

     Prior Biennia (Expenditures) . . . . . . . . . . . . $34,720,959
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $37,635,933

NEW SECTION.  Sec. 615   FOR THE UNIVERSITY OF WASHINGTON
     UW Tacoma Land Acquisition (01-2-029)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $5,950,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,950,000

NEW SECTION.  Sec. 616   FOR THE UNIVERSITY OF WASHINGTON
     UW Emergency Power Expansion - Phase 1 (02-1-009)

Reappropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $11,225,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $475,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,700,000

NEW SECTION.  Sec. 617   FOR THE UNIVERSITY OF WASHINGTON
     UW Life Sciences II Building (02-2-028)

     The reappropriation in this section is subject to the University of Washington providing sufficient evidence to the office of financial management of local revenue to support issuance of bonded debt and accompanying debt service associated with this project.

Reappropriation:
     Higher Education Construction Account--State . . . . . . . . . . . . $29,025,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,000,000
          TOTAL . . . . . . . . . . . . $69,025,000

NEW SECTION.  Sec. 618   FOR THE UNIVERSITY OF WASHINGTON
     UW Minor Repairs Programs (02-1-026)

     The reappropriation in this section is subject to the following conditions and limitations: The University of Washington shall provide $19,000,000 in local nonappropriated funds for this project.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $652,949

     Prior Biennia (Expenditures) . . . . . . . . . . . . $347,051
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 619   FOR THE UNIVERSITY OF WASHINGTON
     UW Special Projects - Code Requirements (02-1-025)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,940,355

     Prior Biennia (Expenditures) . . . . . . . . . . . . $59,645
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 620   FOR THE UNIVERSITY OF WASHINGTON
     UW Tacoma Campus Phase 2B (02-2-027)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $40,899,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,450,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $44,349,000

NEW SECTION.  Sec. 621   FOR THE UNIVERSITY OF WASHINGTON
     UW Urgent Deferred Renewal/Modernization (02-1-031)

Reappropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $3,209,349
     Education Construction Account--State . . . . . . . . . . . . $6,500,000
          Subtotal Reappropriation . . . . . . . . . . . . $9,709,349

     Prior Biennia (Expenditures) . . . . . . . . . . . . $290,651
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,000,000

NEW SECTION.  Sec. 622   FOR THE UNIVERSITY OF WASHINGTON
     UW Campus Communications Infrastructure (04-1-011)

Appropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $15,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $70,000,000
          TOTAL . . . . . . . . . . . . $85,000,000

NEW SECTION.  Sec. 623   FOR THE UNIVERSITY OF WASHINGTON
     UW Facilities Adaptation (04-2-004)

     The appropriation in this section is subject to the following conditions and limitations: The University of Washington shall provide $10,000,000 in local nonappropriated funds for this project.

Appropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $42,000,000
          TOTAL . . . . . . . . . . . . $45,000,000

NEW SECTION.  Sec. 624   FOR THE UNIVERSITY OF WASHINGTON
     UW Johnson Hall Renovation (04-1-005)

Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $50,352,025

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $50,352,025

NEW SECTION.  Sec. 625   FOR THE UNIVERSITY OF WASHINGTON
     UW Urgent Deferred Renewal/Modernization (04-1-031)

     The appropriation in this section is subject to the following conditions and limitations: The University of Washington shall provide $10,000,000 in local nonappropriated funds for this project.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $60,000,000
          TOTAL . . . . . . . . . . . . $70,000,000

NEW SECTION.  Sec. 626   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Murrow Hall Addition: New Facility (98-2-008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,560,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,560,000

NEW SECTION.  Sec. 627   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Education Addition Cleveland Hall (98-2-032)

Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $11,160,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,540,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,700,000

NEW SECTION.  Sec. 628   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Johnson Hall Addition - Plant Bioscience Building (00-2-007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,200,000
Appropriation:
     Higher Education Non-Proprietary Local Capital
          Accounts--Federal . . . . . . . . . . . . $10,000,000
     Education Construction Account--State . . . . . . . . . . . . $35,200,000
          Subtotal Appropriation . . . . . . . . . . . . $45,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,600,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $49,000,000

NEW SECTION.  Sec. 629   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Shock Physics Building (00-2-080)

Reappropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,400,000

NEW SECTION.  Sec. 630   FOR WASHINGTON STATE UNIVERSITY
     WSU Vancouver - Engineering and Life Sciences Building (00-2-904)

     No money from the reappropriation may be expended that would be inconsistent with the recommendations of the higher education coordinating board and the project design, scope, and schedule approved by the office of financial management.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $24,870,650
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $29,470,650

NEW SECTION.  Sec. 631   FOR WASHINGTON STATE UNIVERSITY
     WSU Vancouver - Student Services Center (00-2-905)

     No money from the reappropriation may be expended that would be inconsistent with the recommendations of the higher education coordinating board and the project design, scope, and schedule approved by the office of financial management.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $950,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $605,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,555,000

NEW SECTION.  Sec. 632   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Campus Infrastructure: Preservation (02-1-073)


Reappropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $1,748,459
     State Building Construction Account--State . . . . . . . . . . . . $1,600,000
          Subtotal Reappropriation . . . . . . . . . . . . $3,348,459

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,130,841
     Future Biennia (Projected Costs) . . . . . . . . . . . . $24,000,000
          TOTAL . . . . . . . . . . . . $35,479,300

NEW SECTION.  Sec. 633   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Energy Plant (02-1-501)

     The reappropriation in this section is subject to the following conditions and limitations: Any agreement or contract for the modernization or replacement of the existing steam generation plant currently located on the Pullman campus must comply with chapter 39.35C RCW. Prior to entering into an agreement or contract obligating itself on this project, the university shall have the project reviewed by the appropriate staff of the energy division of the department of community, trade, and economic development and the department of general administration, and shall consider any comments and suggestions made by these departments. If the project involves a private energy development firm, the following issues shall be considered in the development and implementation of the project:
     (1) Regional and local utility needs for power;
     (2) Cost and certainty of fuel supplies;
     (3) Value of electricity produced and options for sale of surplus electricity;
     (4) The capability of the university to own and operate the facility should the private party terminate its involvement;
     (5) Costs associated with interconnection with the local electric utility's transmission system;
     (6) Capability of the local electric utility to wheel electricity generated by the facility and the costs associated with wheeling;
     (7) Potential financial risks to the state or the university and measures to mitigate any risks; and
     (8) Benefits to the state and the university from the project including design configuration, ownership arrangement, operations, and financial arrangements for the project based on the selection of project participants.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $15,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,750,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $23,000,000

NEW SECTION.  Sec. 634   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Minor Capital Improvements (MCI) (02-2-002)

Reappropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $1,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,700,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,000,000

NEW SECTION.  Sec. 635   FOR WASHINGTON STATE UNIVERSITY
     WSU Vancouver - Multimedia/Electronic Communication Classroom Building (02-2-907)

     No money from the reappropriation may be expended that would be inconsistent with the recommendations of the higher education coordinating board and the project design, scope, and schedule approved by the office of financial management.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,400,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,900,000

NEW SECTION.  Sec. 636   FOR WASHINGTON STATE UNIVERSITY
     WSU Campuses - Minor Capital Projects - Statewide (04-1-901)

Appropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,105,100
          TOTAL . . . . . . . . . . . . $6,105,100

NEW SECTION.  Sec. 637   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Biomedical Sciences Facility (04-2-009)

Appropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $32,715,000
          TOTAL . . . . . . . . . . . . $32,965,000

NEW SECTION.  Sec. 638   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Biotechnology/Life Sciences 1 (04-2-085)

Appropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,500,000
          TOTAL . . . . . . . . . . . . $6,500,000

NEW SECTION.  Sec. 639   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Campus Infrastructure (04-1-073)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 640   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Equipment Omnibus Appropriation (04-2-003)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for the purchase of equipment to improve, upgrade, or replace necessary instructional and research apparatus throughout the university.

Appropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,840,800
          TOTAL . . . . . . . . . . . . $48,840,800

NEW SECTION.  Sec. 641   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Hospital Renovation (04-2-058)

Appropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $300,000

NEW SECTION.  Sec. 642   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Minor Capital Improvements (MCI) (04-2-002)

Appropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $7,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $38,288,250
          TOTAL . . . . . . . . . . . . $45,788,250

NEW SECTION.  Sec. 643   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Minor Capital Preservation/Renewal (MCR) (04-1-004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000
     Washington State University Building Account--State . . . . . . . . . . . . $4,225,000
          Subtotal Appropriation . . . . . . . . . . . . $7,225,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $25,040,800
          TOTAL . . . . . . . . . . . . $32,265,800

NEW SECTION.  Sec. 644   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Minor Capital Safety/Security/Environment (04-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 645   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - WSUnet Infrastructure (04-2-074)

Appropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,420,400
          TOTAL . . . . . . . . . . . . $24,420,400

NEW SECTION.  Sec. 646   FOR WASHINGTON STATE UNIVERSITY
     WSU TriCities - Bioproducts and Sciences Building (04-2-940)

Appropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $35,849,000
          TOTAL . . . . . . . . . . . . $35,999,000

NEW SECTION.  Sec. 647   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Campus Infrastructure: Preservation (02-1-073)

Reappropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $1,748,459
     State Building Construction Account--State . . . . . . . . . . . . $2,167,807
          Subtotal Reappropriation . . . . . . . . . . . . $3,916,266

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,563,034
     Future Biennia (Projected Costs) . . . . . . . . . . . . $24,000,000
          TOTAL . . . . . . . . . . . . $35,479,300

NEW SECTION.  Sec. 648   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Murrow Hall Addition: New Facility (98-2-008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,560,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,560,000

NEW SECTION.  Sec. 649   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Computing and Engineering Sciences Building (Cheney Hall) (00-2-009)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,675,000
Appropriation:
     General Fund--Private/Local . . . . . . . . . . . . $5,000,000
     Education Construction Account--State . . . . . . . . . . . . $19,000,482
          Subtotal Appropriation . . . . . . . . . . . . $24,000,482

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,225,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $27,900,482

NEW SECTION.  Sec. 650   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Senior Hall Renovation (00-1-003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $730,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $730,000

NEW SECTION.  Sec. 651   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Campus Network Upgrade (02-2-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 652   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Classroom Renewal (02-2-007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $775,000
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $75,000
          Subtotal Reappropriation . . . . . . . . . . . . $850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $850,000

NEW SECTION.  Sec. 653   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Infrastructure Preservation (02-1-002)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $1,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,600,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $21,000,000
          TOTAL . . . . . . . . . . . . $26,000,000

NEW SECTION.  Sec. 654   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Roof Replacement (02-1-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,794,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $6,000,000
          TOTAL . . . . . . . . . . . . $11,044,000

NEW SECTION.  Sec. 655   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Water System Preservation and Expansion (02-1-008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $986,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $7,500,000
          TOTAL . . . . . . . . . . . . $9,736,000

NEW SECTION.  Sec. 656   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Minor Works - Preservation (02-1-003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $600,000
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $1,250,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,850,000

NEW SECTION.  Sec. 657   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Minor Works - Program (02-2-008)

Reappropriation:
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $600,000

NEW SECTION.  Sec. 658   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Classroom Renewal (04-2-013)

Appropriation:
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $691,325

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,016,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,200,000
          TOTAL . . . . . . . . . . . . $12,907,325

NEW SECTION.  Sec. 659   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Infrastructure Preservation (04-1-006)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,900,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $19,000,000
          TOTAL . . . . . . . . . . . . $28,100,000

NEW SECTION.  Sec. 660   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Minor Works - Preservation (04-1-012)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $4,000,000
          Subtotal Appropriation . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,150,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $25,000,000
          TOTAL . . . . . . . . . . . . $39,150,000

NEW SECTION.  Sec. 661   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Minor Works - Program (04-2-017)

Appropriation:
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $650,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,189,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,750,000
          TOTAL . . . . . . . . . . . . $13,589,000

NEW SECTION.  Sec. 662   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Roof Replacements (04-1-024)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,844,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,750,000
          TOTAL . . . . . . . . . . . . $7,344,000

NEW SECTION.  Sec. 663   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Senior Hall Renovation (04-1-001)

Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $14,480,315

     Prior Biennia (Expenditures) . . . . . . . . . . . . $581,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,061,315

NEW SECTION.  Sec. 664   FOR EASTERN WASHINGTON UNIVERSITY
     EWU University Visitor Center and Formal Entry (04-2-010)

Appropriation:
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $975,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $975,000

NEW SECTION.  Sec. 665   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Infrastructure Preservation (02-1-002)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $1,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,600,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $21,000,000
          TOTAL . . . . . . . . . . . . $26,000,000

NEW SECTION.  Sec. 666   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Roof Replacement (02-1-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,794,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $6,000,000
          TOTAL . . . . . . . . . . . . $11,044,000

NEW SECTION.  Sec. 667   FOR EASTERN WASHINGTON UNIVERSITY
     EWU Water System Preservation and Expansion (02-1-008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $986,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $7,500,000
          TOTAL . . . . . . . . . . . . $9,736,000

NEW SECTION.  Sec. 668   FOR CENTRAL WASHINGTON UNIVERSITY
     Music Education Facility (00-2-001)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $14,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,000,000

NEW SECTION.  Sec. 669   FOR CENTRAL WASHINGTON UNIVERSITY
     CWU/Highline Higher Education Center (02-2-101)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000
Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $75,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,575,000

NEW SECTION.  Sec. 670   FOR CENTRAL WASHINGTON UNIVERSITY
     McConnell Stage Remodel (02-1-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,800,000

NEW SECTION.  Sec. 671   FOR CENTRAL WASHINGTON UNIVERSITY
     Omnibus - Preservation (02-1-001)

Reappropriation:
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $325,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $325,000

NEW SECTION.  Sec. 672   FOR CENTRAL WASHINGTON UNIVERSITY
     Omnibus - Program (02-2-002)

     (1) The reappropriation in this section is subject to the conditions and limitations of sections 905 and 906 of this act.
     (2) $350,000 of this reappropriation is provided for interior classroom improvements within the Olympic south building of Pierce College at Fort Steilacoom.

Reappropriation:
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $2,376,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,376,000

NEW SECTION.  Sec. 673   FOR CENTRAL WASHINGTON UNIVERSITY
     Randall/Michaelsen Life Safety (02-1-003)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $3,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,250,000

NEW SECTION.  Sec. 674   FOR CENTRAL WASHINGTON UNIVERSITY
     Dean Hall: Science Facility Renovation (04-1-003)

Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $4,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,100,000
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 675   FOR CENTRAL WASHINGTON UNIVERSITY
     Dean Hall: Walnut Mall Utility Upgrade (04-1-002)

Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $9,580,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $32,508,000
          TOTAL . . . . . . . . . . . . $42,088,000

NEW SECTION.  Sec. 676   FOR CENTRAL WASHINGTON UNIVERSITY
     Minor Works: Program (04-2-028)

Appropriation:
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $3,914,400

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $15,000,000
          TOTAL . . . . . . . . . . . . $18,914,400

NEW SECTION.  Sec. 677   FOR CENTRAL WASHINGTON UNIVERSITY
     Preservation - Facility (04-1-026)

Appropriation:
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $1,163,500

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $6,400,000
          TOTAL . . . . . . . . . . . . $7,563,500

NEW SECTION.  Sec. 678   FOR CENTRAL WASHINGTON UNIVERSITY
     Preservation - Health, Safety, and Code Requirements (04-1-025)

Appropriation:
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $950,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $4,950,000

NEW SECTION.  Sec. 679   FOR CENTRAL WASHINGTON UNIVERSITY
     Preservation - Infrastructure (04-1-027)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,561,200

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,500,000
          TOTAL . . . . . . . . . . . . $10,061,200

NEW SECTION.  Sec. 680   FOR CENTRAL WASHINGTON UNIVERSITY
     Seismic Life/Safety (04-1-014)

Appropriation:
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 681   FOR THE EVERGREEN STATE COLLEGE
     Life Safety/Code Compliance Reappropriation (02-1-013)

Reappropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 682   FOR THE EVERGREEN STATE COLLEGE
     Minor Works Preservation Reappropriation (02-1-014)

Reappropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,900,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,200,000

NEW SECTION.  Sec. 683   FOR THE EVERGREEN STATE COLLEGE
     Seminar Building Phase II - Construction (02-2-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $36,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $40,750,000

NEW SECTION.  Sec. 684   FOR THE EVERGREEN STATE COLLEGE
     Daniel J. Evans Building - Modernization (04-2-006)

Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $21,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $22,250,000
          TOTAL . . . . . . . . . . . . $43,750,000

NEW SECTION.  Sec. 685   FOR THE EVERGREEN STATE COLLEGE
     Emergency Repairs (04-1-002)

Appropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,600,000
          TOTAL . . . . . . . . . . . . $3,200,000

NEW SECTION.  Sec. 686   FOR THE EVERGREEN STATE COLLEGE
     Infrastructure Preservation (04-1-001)

Appropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $1,550,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,000,000
          TOTAL . . . . . . . . . . . . $2,550,000

NEW SECTION.  Sec. 687   FOR THE EVERGREEN STATE COLLEGE
     Lab II 3rd Floor - Chemistry Labs Remodel (04-2-007)

Appropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 688   FOR THE EVERGREEN STATE COLLEGE
     Life Safety Code Compliance (04-1-004)

Appropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $11,400,000
          TOTAL . . . . . . . . . . . . $13,900,000

NEW SECTION.  Sec. 689   FOR THE EVERGREEN STATE COLLEGE
     Minor Works Preservation (04-1-005)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $18,400,000
          TOTAL . . . . . . . . . . . . $22,750,000

NEW SECTION.  Sec. 690   FOR THE EVERGREEN STATE COLLEGE
     Minor Works Program (04-2-003)

Appropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,195,000
          TOTAL . . . . . . . . . . . . $4,045,000

NEW SECTION.  Sec. 691   FOR WESTERN WASHINGTON UNIVERSITY
     Communications Facility (98-2-053)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $22,500,000
Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $13,973,400
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $40,473,400

NEW SECTION.  Sec. 692   FOR WESTERN WASHINGTON UNIVERSITY
     Minor Works - Infrastructure Preservation (02-1-070)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,450,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,550,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 693   FOR WESTERN WASHINGTON UNIVERSITY
     Minor Works - Program (02-2-072)

Reappropriation:
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $1,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,031,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,831,000

NEW SECTION.  Sec. 694   FOR WESTERN WASHINGTON UNIVERSITY
     Minor Works - Facility Preservation (04-1-076)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $25,000,000

NEW SECTION.  Sec. 695   FOR WESTERN WASHINGTON UNIVERSITY
     Minor Works - Infrastructure Preservation (04-1-075)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,905,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,000,000
          TOTAL . . . . . . . . . . . . $11,905,000

NEW SECTION.  Sec. 696   FOR WESTERN WASHINGTON UNIVERSITY
     Minor Works - Program (04-2-077)

Appropriation:
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $8,050,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,000,000
          TOTAL . . . . . . . . . . . . $48,050,000

NEW SECTION.  Sec. 697   FOR WESTERN WASHINGTON UNIVERSITY
     Minor Works - Safety Preservation (04-1-074)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,965,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,000,000
          TOTAL . . . . . . . . . . . . $11,965,000

NEW SECTION.  Sec. 698   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Lewis and Clark Trail Interpretive Infrastructure Grant Program (02-4-001)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided for development of station camp 1805 as a national historic park in conjunction with the projected relocation of highway 101 in Pacific county.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 699   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Lewis and Clark Station Camp Park Project (02-S-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,552,226

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,552,226

NEW SECTION.  Sec. 700   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Olympia-State Capital Museum Preservation Projects (02-1-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $50,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $655,397
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $705,397

NEW SECTION.  Sec. 701   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Tacoma - Stadium Way Research Center Preservation Projects (02-1-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $40,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $299,847
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $339,847

NEW SECTION.  Sec. 702   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Washington Heritage Project (02-4-004)

     The reappropriation in this section shall support the projects as listed in section 734, chapter 8, Laws of 2001 2nd sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,375,136

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,319,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,694,136

NEW SECTION.  Sec. 703   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Stadium Way Research Center - Code Violation Correction (04-1-003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $461,200

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $461,200

NEW SECTION.  Sec. 704   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Washington Heritage Project (04-4-004)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is subject to the provisions of RCW 27.34.330.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $8,000,000

NEW SECTION.  Sec. 705   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clover Park: Transportation Trade - Construction (96-2-662)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,697,112

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,348,288
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $18,045,400

NEW SECTION.  Sec. 706   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Olympic College Poulsbo Center: Construction (96-2-654)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,450,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,596,675
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $13,046,675

NEW SECTION.  Sec. 707   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellingham Technical College: Health/Business Building (98-2-672)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,737,347

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,199,252
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,936,599

NEW SECTION.  Sec. 708   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lake Washington Technical College: Phase 3 - New Facility (98-2-673)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,447,549

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,557,451
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,005,000

NEW SECTION.  Sec. 709   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Renton Technical College: Technology Resource Center (98-2-674)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,151,873

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,619,127
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,771,000

NEW SECTION.  Sec. 710   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Skagit Valley Community College: Whidbey Higher Education Center (98-2-675)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $641,516

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,278,097
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,919,613

NEW SECTION.  Sec. 711   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Centralia College: Instructional Building Replacement (99-2-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $172,934

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,227,066
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,400,000

NEW SECTION.  Sec. 712   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clark College: Clark Center at Washington State University Vancouver (00-2-680)

     No money from the appropriations in this section may be expended that would be inconsistent with the recommendations of the higher education coordinating board and the project design, scope, and schedule approved by the office of financial management.

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $1,096,000
Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $18,009,800

     Prior Biennia (Expenditures) . . . . . . . . . . . . $668,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $19,773,800

NEW SECTION.  Sec. 713   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Facilities Repairs "A" (00-1-050)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,670,115
     Community and Technical College Capital Projects
          Account--State . . . . . . . . . . . . $251,363
          Subtotal Reappropriation . . . . . . . . . . . . $2,921,478

     Prior Biennia (Expenditures) . . . . . . . . . . . . $24,478,522
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $27,400,000

NEW SECTION.  Sec. 714   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College: Drama/Music Class - Renovation (00-2-322)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,278,152

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,151,848
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,430,000

NEW SECTION.  Sec. 715   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Highline Community College: Higher Ed Center/Childcare (00-2-678)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,386,220
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $21,052,400

     Prior Biennia (Expenditures) . . . . . . . . . . . . $958,780
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $23,397,400

NEW SECTION.  Sec. 716   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Program (Minor Improvements) (00-1-130)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,629,385
     Community and Technical College Capital Projects
          Account--State . . . . . . . . . . . . $530,325
          Subtotal Reappropriation . . . . . . . . . . . . $2,159,710

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,690,290
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,850,000

NEW SECTION.  Sec. 717   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Olympic College: Physical Plant Building Replacement (00-2-002)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $693,895

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,421,705
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,115,600

NEW SECTION.  Sec. 718   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Pierce College Puyallup: Phase III Expansion (00-2-676)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $723,985
Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $23,374,774

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,236,215
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $25,334,974

NEW SECTION.  Sec. 719   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Shoreline Community College: Library/Technical Center (00-2-319)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $444,384

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,805,616
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,250,000

NEW SECTION.  Sec. 720   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Site Repairs "A" (00-1-090)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $916,036

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,925,964
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,842,000

NEW SECTION.  Sec. 721   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Puget Sound Community College: Humanities/General Education Complex (00-2-679)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $1,092,690
Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $17,350,248

     Prior Biennia (Expenditures) . . . . . . . . . . . . $812,310
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $19,255,248

NEW SECTION.  Sec. 722   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Whatcom Community College: Classroom/Lab Building (00-2-677)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $372,634
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,932,400

     Prior Biennia (Expenditures) . . . . . . . . . . . . $599,266
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,904,300

NEW SECTION.  Sec. 723   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Yakima Valley Community College: Higher Education Center (00-2-954)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,054,502

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,445,498
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,500,000

NEW SECTION.  Sec. 724   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College: Science Building (01-2-688)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,396,409

     Prior Biennia (Expenditures) . . . . . . . . . . . . $100,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $27,407,191
          TOTAL . . . . . . . . . . . . $29,903,600

NEW SECTION.  Sec. 725   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Tacoma Community College: Science Building (01-2-687)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,379,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $100,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $28,929,265
          TOTAL . . . . . . . . . . . . $31,408,265

NEW SECTION.  Sec. 726   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Technology Institute Partner College Computer Labs (01-2-689)

     The reappropriation in this section is provided to construct and equip three computer science and language labs, an approximate size being 1,200 square feet, one at each of the following college districts: Highline, Olympic, and South Puget Sound.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $345,722

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,154,278
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 727   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bates Technical College: LRC/Vocational (02-2-684)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,796,206

     Prior Biennia (Expenditures) . . . . . . . . . . . . $94,346
     Future Biennia (Projected Costs) . . . . . . . . . . . . $15,168,902
          TOTAL . . . . . . . . . . . . $17,059,454

NEW SECTION.  Sec. 728   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellevue Community College: "A" Building Renovation (02-1-320)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,416,787

     Prior Biennia (Expenditures) . . . . . . . . . . . . $149,313
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,566,100

NEW SECTION.  Sec. 729   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellingham Technical College: Replacement (02-1-239)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,887,851

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,470,049
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,357,900

NEW SECTION.  Sec. 730   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Big Bend Community College: Library Replacement (02-1-232)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $7,467,104

     Prior Biennia (Expenditures) . . . . . . . . . . . . $29,896
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,497,000

NEW SECTION.  Sec. 731   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clover Park Technical College: Building 18 Machine Trades (02-1-343)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,769,304

     Prior Biennia (Expenditures) . . . . . . . . . . . . $22,496
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,791,800

NEW SECTION.  Sec. 732   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Columbia Basin College: Building "A" Renovation (02-1-333)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,836,142

     Prior Biennia (Expenditures) . . . . . . . . . . . . $597,958
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,434,100

NEW SECTION.  Sec. 733   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Edmonds Community College: Instructional Lab Building (02-2-685)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,939,060

     Prior Biennia (Expenditures) . . . . . . . . . . . . $58,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,491,466
          TOTAL . . . . . . . . . . . . $17,488,526

NEW SECTION.  Sec. 734   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Facility Repairs "A" (02-1-050)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $14,420,290

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,240,038
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $21,660,328

NEW SECTION.  Sec. 735   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Grays Harbor College: Library Renovation (02-1-311)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,142,150

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,437,350
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,579,500

NEW SECTION.  Sec. 736   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College: International Program Replacement (02-1-222)

Reappropriation:
     Community and Technical College Capital Projects
          Account--State . . . . . . . . . . . . $550,243

     Prior Biennia (Expenditures) . . . . . . . . . . . . $36,827
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $587,070

NEW SECTION.  Sec. 737   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lake Washington Technical College: Replacement (02-1-240)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,544,305

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,370,995
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,915,300

NEW SECTION.  Sec. 738   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lower Columbia College: Physical Science Portables Replacement (02-1-226)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,656,630

     Prior Biennia (Expenditures) . . . . . . . . . . . . $303,170
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,959,800

NEW SECTION.  Sec. 739   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Preservation (Emergency Funds) (02-1-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,912,186

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,087,814
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,000,000

NEW SECTION.  Sec. 740   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Program (02-1-130)

     The reappropriation in this section is subject to the following conditions and limitations: Funding is provided from the education construction account as capital project matching funds to the following colleges: Olympic College-Shelton, $500,000; Skagit Valley, $500,000; Seattle Central, $500,000; South Seattle, $500,000; Yakima Valley, $500,000; Spokane Falls, $500,000; Whatcom, $267,500; Tacoma, $500,000; Clover Park, $500,000; and Edmonds, $500,000. Matching funds provided in this section do not imply commitments or guarantees that the legislature will provide future expenses of properties and facilities acquired, constructed, or improved. State funds must be matched by an equal or greater amount of nonstate moneys.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,806,471
     Education Construction Account--State . . . . . . . . . . . . $4,448,102
          Subtotal Reappropriation . . . . . . . . . . . . $13,254,573

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,012,927
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $21,267,500

NEW SECTION.  Sec. 741   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Peninsula College: Buildings D and E Renovation (02-1-310)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,656,850

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,950
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,669,800

NEW SECTION.  Sec. 742   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Pierce College Fort Steilacoom: Portables Replacement (02-1-223)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,450,234

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,866
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,452,100

NEW SECTION.  Sec. 743   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Roof Repairs "A" (02-1-010)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $5,342,227

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,130,850
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,473,077

NEW SECTION.  Sec. 744   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College: Edison Hall Renovation (02-1-315)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,759,212

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,049,988
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,809,200

NEW SECTION.  Sec. 745   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College: Portables Replacement (02-1-215)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,890,744

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,656
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,897,400

NEW SECTION.  Sec. 746   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Shoreline Community College: Building 800 Renovation (02-1-319)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,021,032

     Prior Biennia (Expenditures) . . . . . . . . . . . . $68
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,021,100

NEW SECTION.  Sec. 747   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Site Repairs "A" (02-1-090)

     The reappropriation in this section is subject to the following conditions and limitations: $200,000 of the reappropriation from the state building construction account--state is provided solely to South Seattle Community College for the Seattle Chinese gardens. The appropriation must be matched by $200,000 in additional contributions toward the project from local government.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000
     Education Construction Account--State . . . . . . . . . . . . $3,852,474
          Subtotal Reappropriation . . . . . . . . . . . . $4,052,474

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,490,758
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,543,232

NEW SECTION.  Sec. 748   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Skagit Valley College: Office Space Replacement (02-1-213)

Reappropriation:
     Community and Technical College Capital Projects
          Account--State . . . . . . . . . . . . $752,777

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,912
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $762,689

NEW SECTION.  Sec. 749   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Puget Sound Community College: Family Education/Child Center (02-1-238)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,707,130

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,424,870
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,132,000

NEW SECTION.  Sec. 750   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Seattle Community College: Building "A" Replacement (02-1-217)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,352,550

     Prior Biennia (Expenditures) . . . . . . . . . . . . $124,850
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,477,400

NEW SECTION.  Sec. 751   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls Community College: Fine Arts Building Replacement (02-1-231)

Reappropriation:
     Community and Technical College Capital Projects
          Account--State . . . . . . . . . . . . $672,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $672,000

NEW SECTION.  Sec. 752   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls Community College: Library Renovation (02-1-331)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,498,450

     Prior Biennia (Expenditures) . . . . . . . . . . . . $103,550
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,602,000

NEW SECTION.  Sec. 753   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Tacoma Community College: Information Technology Vocational Center (02-2-683)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $534,671
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $14,531,900

     Prior Biennia (Expenditures) . . . . . . . . . . . . $663,429
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,730,000

NEW SECTION.  Sec. 754   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Tacoma Community College: Portable Buildings Replacement (02-1-236)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $3,437,867

     Prior Biennia (Expenditures) . . . . . . . . . . . . $19,133
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,457,000

NEW SECTION.  Sec. 755   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Walla Walla Community College: Basic Skills/Computer Lab (02-2-686)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $573,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $36,300
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,431,700
          TOTAL . . . . . . . . . . . . $6,041,000

NEW SECTION.  Sec. 756   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Walla Walla Community College: Parent/Child Center Replacement (02-1-234)

Reappropriation:
     Community and Technical College Capital Projects
          Account--State . . . . . . . . . . . . $369,324

     Prior Biennia (Expenditures) . . . . . . . . . . . . $21,906
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $391,230

NEW SECTION.  Sec. 757   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Wenatchee Valley College: Greenhouse Replacement (02-1-220)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $441,360

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $441,360

NEW SECTION.  Sec. 758   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Job Creation and Infrastructure Projects (03-1-001)

     The reappropriation in this section shall support the projects as listed in section 224, chapter 238, Laws of 2002.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,135,168
     Education Construction Account--State . . . . . . . . . . . . $10,209,178
          Subtotal Reappropriation . . . . . . . . . . . . $12,344,346

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,255,829
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $26,600,175

NEW SECTION.  Sec. 759   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellevue Community College: "D" Building Renovation (04-1-308)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $13,418,700

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $13,418,700

NEW SECTION.  Sec. 760   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellevue Community College: NWCET Expansion (04-2-402)

Appropriation:
     General Fund--Private/Local . . . . . . . . . . . . $938,100

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $938,100

NEW SECTION.  Sec. 761   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clark College: Renovation - Applied Arts 5 (04-1-303)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,872,413

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,872,413

NEW SECTION.  Sec. 762   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clark College: Stout Hall (04-1-203)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,049,889

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,049,889

NEW SECTION.  Sec. 763   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Columbia Basin College: Renovation - "T" Building (04-1-307)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,058,500

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,058,500

NEW SECTION.  Sec. 764   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Edmonds Community College: Renovation - Mountlake Terrace Hall (04-1-311)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,827,030

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,827,030

NEW SECTION.  Sec. 765   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Everett Community College: Pilchuck/Glacier (04-1-205)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,311,700

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,633,300
          TOTAL . . . . . . . . . . . . $15,945,000

NEW SECTION.  Sec. 766   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Everett Community College: Renovation - Monte Cristo Hall (04-1-305)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,352,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,352,000

NEW SECTION.  Sec. 767   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Facility Repairs "A" (04-1-050)

Appropriation:
     Community and Technical College Capital Projects
          Account--State . . . . . . . . . . . . $22,428,699

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $80,000,000
          TOTAL . . . . . . . . . . . . $102,428,699

NEW SECTION.  Sec. 768   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Grays Harbor College: Replacement - Instructional Building (04-1-204)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,263,300

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,371,700
          TOTAL . . . . . . . . . . . . $17,635,000

NEW SECTION.  Sec. 769   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College: Computer Technology Center (04-2-682)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $356,193
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,984,800

     Prior Biennia (Expenditures) . . . . . . . . . . . . $658,507
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,999,500

NEW SECTION.  Sec. 770   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lake Washington Technical College: Renovation - East/West Buildings (04-1-312)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,420,800

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,420,800

NEW SECTION.  Sec. 771   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Program (Minor Improvements) (04-2-130)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $20,040,317

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $60,000,000
          TOTAL . . . . . . . . . . . . $80,040,317

NEW SECTION.  Sec. 772   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works Preservation (RMI) (04-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $13,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,000,000
          TOTAL . . . . . . . . . . . . $53,500,000

NEW SECTION.  Sec. 773   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     North Seattle Community College: Arts and Science Renovation (04-1-309)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,785,700

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,785,700

NEW SECTION.  Sec. 774   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Olympic College: Science and Technology Building Replacement (04-1-202)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $22,098,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $22,098,000

NEW SECTION.  Sec. 775   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Peninsula College: Community Resource Center (04-2-406)

Appropriation:
     General Fund--Private/Local . . . . . . . . . . . . $939,908

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $939,908

NEW SECTION.  Sec. 776   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Renton Technical College: Portable Replacement (04-1-215)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $419,300

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,630,300
          TOTAL . . . . . . . . . . . . $3,049,600

NEW SECTION.  Sec. 777   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Roof Repairs "A" (04-1-010)

Appropriation:
     Community and Technical College Capital Projects
          Account--State . . . . . . . . . . . . $7,265,677

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $27,265,677

NEW SECTION.  Sec. 778   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Roof Repairs "B" (04-1-710)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $9,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $29,000,000

NEW SECTION.  Sec. 779   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College: Renovation - Broadway Edison (04-1-310)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,995,800

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,995,800

NEW SECTION.  Sec. 780   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central: Replacement North Plaza Building (04-1-275)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,976,200

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,976,200

NEW SECTION.  Sec. 781   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Site Repairs "A" (04-1-090)

Appropriation:
     Community and Technical College Capital Projects
          Account--State . . . . . . . . . . . . $5,305,624

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $25,305,624

NEW SECTION.  Sec. 782   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Skagit Valley College: Science Building Replacement (04-1-209)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,256,600

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,256,600

NEW SECTION.  Sec. 783   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Seattle Community College: Instructional Technology Center (04-2-681)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $713,759
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $17,236,600

     Prior Biennia (Expenditures) . . . . . . . . . . . . $910,641
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $18,861,000

NEW SECTION.  Sec. 784   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Seattle Community College: Renovation - Pastry Vocational Program (04-1-314)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,613,100

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,613,100

NEW SECTION.  Sec. 785   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Seattle Community College: Replacement Portables (04-1-210)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,882,200

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,882,200

NEW SECTION.  Sec. 786   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Tacoma Community College: Renovation - Building 7 (04-1-313)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,988,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,988,000

NEW SECTION.  Sec. 787   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Tacoma Community College: Replacement - Portable Buildings (04-1-206)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,622,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,622,000

NEW SECTION.  Sec. 788   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Walla Walla Community College: Health Science Facility (04-1-211)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,261,400

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,261,400

NEW SECTION.  Sec. 789   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Wenatchee Valley College: Portable Replacement (04-1-201)

Appropriation:
     Community and Technical College Capital Projects
          Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 790   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Yakima Valley Community College: Renovation - Sundquist Annex (04-1-302)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,852,700

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,852,700

NEW SECTION.  Sec. 791   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Yakima Valley: Classroom Building Replacement (04-1-207)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,960,100

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,960,100

(End of part)


PART 6
MISCELLANEOUS

NEW SECTION.  Sec. 901   The estimated debt service costs impacting future general fund expenditures related solely to new capital appropriations within this act are $18,827,417 during the 2003-2005 fiscal period; $111,194,423 during the 2005-2007 fiscal period; $155,435,444 during the 2007-2009 fiscal period; $155,435,444 during the 2009-2011 fiscal period; and $155,435,444 during the 2011-2013 period.

NEW SECTION.  Sec. 902   To ensure that major construction projects are carried out in accordance with legislative and executive intent, appropriations in this act in excess of $5,000,000 shall not be expended or encumbered until the office of financial management has reviewed and approved the agency's predesign and other documents, and approved an allotment for the project granting specific authority to expend or encumber funds. The predesign document shall include but not be limited to program, site, and cost analysis in accordance with the predesign manual adopted by the office of financial management. To improve monitoring of major construction projects, progress reports shall be submitted by the agency administering the project to the office of financial management and to the fiscal committees of the house of representatives and senate. Reports will be submitted on July 1st and December 31st each year in a format to be developed by the office of financial management.

NEW SECTION.  Sec. 903   Allotments for appropriations shall be provided in accordance with the capital project review requirements adopted by the office of financial management. The office of financial management shall notify the house of representatives capital budget committee and the senate ways and means committee of allotment releases based on review by the office of financial management. No expenditure may be incurred or obligation entered into for appropriations in this act until the office of financial management has given final approval to the allotment of the funds to be expended or encumbered. Projects that will be employing alternative public works construction procedures under chapter 39.10 RCW are subject to the allotment procedures defined in this section and RCW 43.88.110. Contracts shall not be executed that call for expenditures in excess of the approved allotment, and the total amount shown in such contracts for the cost of future work that has not been appropriated shall not exceed the amount identified for such work in the level of funding approved by the office of financial management at the completion of predesign.

NEW SECTION.  Sec. 904   Appropriations for design and construction of facilities on higher education campuses shall be expended only after funds are allotted to institutions of higher education on the basis of: (1) Comparable unit cost standards, as determined by the office of financial management in consultation with the higher education coordinating board; (2) costs consistent with other higher education teaching facilities in the state; and (3) student full-time equivalent enrollment levels as established by the office of financial management in consultation with the higher education coordinating board.

NEW SECTION.  Sec. 905   To ensure that minor works appropriations are carried out in accordance with legislative intent, funds shall not be allotted until project lists are on file at the office of financial management. No expenditure may be incurred or obligation entered into for appropriations referring to this section until the office of financial management has approved the allotment of the funds to be expended. The office of financial management shall encourage state agencies to incorporate accessibility planning and improvements into the normal and customary capital program.

NEW SECTION.  Sec. 906   (1) Agencies shall expedite the expenditure of reappropriations and appropriations in order to: (a) Rehabilitate infrastructure resources; (b) accelerate environmental rehabilitation and restoration projects for the improvement of the state's natural environment; (c) reduce additional costs associated with acquisition and construction inflationary pressures; and (d) provide additional employment opportunities associated with capital expenditures.
     (2) In order to meet the goals of this section, the following conditions apply to appropriations in this act: (a) To the extent feasible, agencies are directed to accelerate expenditure rates at their current level of permanent employees and shall use contracted design and construction services wherever necessary to meet the goals of this section; and (b) reappropriations that reference this subsection (2)(b) shall lapse on June 30, 2005.
     (3) The office of financial management shall report the following to the appropriate fiscal committees of the legislature by January 30, 2005: (a) A listing of reappropriations in the governor's 2005-2007 capital budget recommendation that have been reappropriated one or more times and have ten percent or more of the original appropriation unexpended; and (b) an explanation of why the appropriation remains unexpended.

NEW SECTION.  Sec. 907   ACQUISITION OF PROPERTIES AND FACILITIES THROUGH FINANCIAL CONTRACTS. The following agencies may enter into financial contracts, paid from any funds of an agency, appropriated or nonappropriated, for the purposes indicated and in not more than the principal amounts indicated, plus financing expenses and required reserves pursuant to chapter 39.94 RCW. When securing properties under this section, agencies shall use the most economical financial contract option available, including long-term leases, lease-purchase agreements, lease-development with option to purchase agreements or financial contracts using certificates of participation. Expenditures made by an agency for one of the indicated purposes before the issue date of the authorized financial contract and any certificates of participation therein are intended to be reimbursed from proceeds of the financial contract and any certificates of participation therein to the extent provided in the agency's financing plan approved by the state finance committee.
     State agencies may enter into agreements with the department of general administration and the state treasurer's office to develop requests to the legislature for acquisition of properties and facilities through financial contracts. The agreements may include charges for services rendered.
     (1) Department of general administration: Enter into a financing contract for an amount approved by the office of financial management for costs and financing expenses and required reserves pursuant to chapter 39.94 RCW to lease develop or lease purchase a state office building of 150,000 to 200,000 square feet on state-owned property in Tumwater according to the terms of the agreement with the Port of Olympia when the property was acquired or within the preferred development/leasing areas in Thurston county. The building shall be constructed and financed so that agency occupancy costs will not exceed comparable private market rental rates. The comparable general office space rate shall be calculated based on the three latest Thurston county leases of new space of at least 100,000 rentable square feet adjusted for inflation as determined by the department of general administration. The department of general administration shall coordinate with potential state agency tenants whose current lease expire near the time of occupancy so that buyout of current leases do not add to state expense. The office of financial management shall certify to the state treasurer: (a) The project description and dollar amount; and (b) that all requirements of this subsection (1) have been met.
     (2) Department of corrections:
     (a) Enter into a financing contract in the amount of $400,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a waste transfer station and purchase a garbage truck at the McNeil Island corrections center.
     (b) Enter into a financing contract in the amount of $4,588,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a transportation services warehouse and offices for correctional industries.
     (c) Enter into a financing contract in the amount of $7,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to acquire work release sites or purchase existing work release facilities when opportunities become available.
     (3) Washington State University: Enter into a financing contract in the amount of $10,713,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a wastewater reclamation plant.
     (4) Western Washington University: Enter into a financing contract in the amount of $4,482,060 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct two regulation sized, multiseason playfields.
     (5) Community and technical colleges:
     (a) Enter into a financing contract on behalf of South Puget Sound Community College in the amount of $660,000 plus financing expenses and reserves pursuant to chapter 39.94 RCW to construct parking and stormwater mitigation facilities.
     (b) Enter into a financing contract on behalf of South Puget Sound Community College in the amount of $10,600,000 plus financing expenses and reserves pursuant to chapter 39.94 RCW to purchase land and construct a new classroom, office, and support facility for the Hawks Prairie extension.
     (c) Enter into a financing contract on behalf of Seattle Central Community College in the amount of $3,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct an above-ground parking garage.
     (d) Enter into a financing contract on behalf of Big Bend Community College in the amount of $6,500,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct an international conference and training center and dining services center building.
     (e) Enter into a financing contract on behalf of Spokane Community College in the amount of $725,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase land.
     (f) Enter into a financing contract on behalf of Bellevue Community College in the amount of $20,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase North Center.
     (g) Enter into a financing contract on behalf of Pierce Community College Fort Steilacoom in the amount of $4,928,800 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct an addition to the fitness center.
     (h) Enter into a financing contract on behalf of Pierce Community College Fort Steilacoom in the amount of $2,248,892 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a childcare center.
     (i) Enter into a financing contract on behalf of Clark Community College in the amount of $9,839,464 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a bookstore, meeting rooms, student lounge, and study space.
     (j) Enter into a financing contract on behalf of Green River Community College in the amount of $500,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase Lea Hill Park to replace facilities for athletic fitness and recreation.
     (k) Enter into a financing contract on behalf of Walla Walla Community College in the amount of $2,708,800 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase land and construct a building for professional-technical instruction.
     (l) Enter into a financing contract on behalf of Walla Walla Community College in the amount of $504,400 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase land and buildings at the Clarkston center.

NEW SECTION.  Sec. 908   FOR THE ARTS COMMISSION--ART WORK ALLOWANCE POOLING. (1) One-half of one percent of moneys appropriated in this act for original construction of school plant facilities is provided solely for the purposes of RCW 28A.335.210. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the superintendent of public instruction and representatives of school district boards.
     (2) One-half of one percent of moneys appropriated in this act for original construction or any major renovation or remodel work exceeding two hundred thousand dollars by colleges or universities is provided solely for the purposes of RCW 28B.10.027. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the board of regents or trustees.
     (3) One-half of one percent of moneys appropriated in this act for original construction of any public building by a state agency as defined in RCW 43.17.020 is provided solely for the purposes of RCW 43.17.200. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the state agency.
     (4) At least eighty-five percent of the moneys spent by the Washington state arts commission during the 2003-2005 biennium for the purposes of RCW 28A.335.210, 28B.10.027, and 43.17.200 must be expended solely for direct acquisition of works of art.
     (5) Funds established by subsection (4) of this section not expended by June 30, 2005, shall lapse.

NEW SECTION.  Sec. 909   The amounts shown under the headings "Prior Biennia," "Future Biennia," and "Total" in this act are for informational purposes only and do not constitute legislative approval of these amounts.

NEW SECTION.  Sec. 910   "Reappropriations" in this act are appropriations and, unless the context clearly provides otherwise, are subject to the relevant conditions and limitations applicable to appropriations. Reappropriations shall be limited to the unexpended balances remaining on June 30, 2003, from the 2001-2003 biennial appropriations for each project.

NEW SECTION.  Sec. 911   To carry out the provisions of this act, the governor may assign responsibility for predesign, design, construction, and other related activities to any appropriate agency.

NEW SECTION.  Sec. 912   If any federal moneys appropriated by this act for capital projects are not received by the state, the department or agency to which the moneys were appropriated may replace the federal moneys with funds available from private or local sources. No replacement may occur under this section without the prior approval of the director of financial management in consultation with the senate ways and means committee and the house of representatives capital budget committee.

NEW SECTION.  Sec. 913   (1) Unless otherwise stated, for all appropriations under this act that require a match of nonstate money or in-kind contributions, the following requirement, consistent with RCW 43.88.150, shall apply: Expenditures of state money shall be timed so that the state share of project expenditures never exceeds the intended state share of total project costs.
     (2) Provision of the full amount of required matching funds is not required to permit the expenditure of capital budget appropriations for phased projects if a proportional amount of the required matching funds is provided for each distinct, identifiable phase of the project.

NEW SECTION.  Sec. 914   Any capital improvements or capital projects involving construction or major expansion of a state office facility, including, but not limited to, district headquarters, detachment offices, and off-campus faculty offices, must be reviewed by the department of general administration for possible consolidation, collocation, and compliance with state office standards before allotment of funds. The intent of the requirement imposed by this section is to eliminate duplication and reduce total office space requirements where feasible, while ensuring proper service to the public.

NEW SECTION.  Sec. 915   The governor, through the office of financial management, may authorize a transfer of appropriation authority provided for a capital project that is in excess of the amount required for the completion of such project to another capital project for which the appropriation is insufficient. No such transfer may be used to expand the capacity of any facility beyond that intended by the legislature in making the appropriation. Such transfers may be effected only between capital appropriations to a specific department, commission, agency, or institution of higher education and only between capital projects that are funded from the same fund or account. No transfers may occur between projects to local government agencies except where the grants are provided within a single omnibus appropriation and where such transfers are specifically authorized by the implementing statutes that govern the grants.
     For purposes of this section, the governor may find that an amount is in excess of the amount required for the completion of a project only if: (1) The project as defined in the notes to the budget document is substantially complete and there are funds remaining; or (2) bids have been let on a project and it appears to a substantial certainty that the project as defined in the notes to the budget document can be completed within the biennium for less than the amount appropriated in this act.
     For the purposes of this section, the legislature intends that each project be defined as proposed to the legislature in the governor's budget document, unless it clearly appears from the legislative history that the legislature intended to define the scope of a project in a different way.
     A report of any transfer effected under this section, except emergency projects or any transfer under $250,000, shall be filed with the legislative fiscal committees of the senate and house of representatives by the office of financial management at least thirty days before the date the transfer is effected. The office of financial management shall report all emergency or smaller transfers within thirty days from the date of transfer.

NEW SECTION.  Sec. 916   NONTAXABLE AND TAXABLE BOND PROCEEDS.
Portions of the appropriation authority granted by this act from the state building construction account may be transferred to the state taxable building construction account as deemed necessary by the state finance committee to comply with the federal internal revenue service rules and regulations pertaining to the use of nontaxable bond proceeds. The state treasurer shall submit written notification to the director of financial management if it is determined that a shift of appropriation authority from the state building construction account to the state taxable building construction account is necessary.

NEW SECTION.  Sec. 917   The office of financial management, in consultation with the department of general administration, shall identify capital projects that may benefit from an energy analysis to determine whether there are alternate, more economical, and energy efficient means of completing the work. The office of financial management shall hold appropriations in allotment reserve on the following types of capital projects until this analysis can be completed: Heating, ventilation, and air conditioning modifications, chiller plants, steam plants, boilers, chilled water or steam lines, building control systems, lighting improvements, or other major energy using systems that may warrant additional analysis. Agencies receiving appropriations for such projects are encouraged to utilize energy performance contracts or alternative financing for equipment in lieu of state appropriated funds. The office of financial management may transfer funds remaining in allotment reserve to infrastructure savings projects within the agency that has realized savings from energy efficiency alternatives.

NEW SECTION.  Sec. 918   A new section is added to 2001 2nd sp.s. c 8 (uncodified) to read as follows:
FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Public Works Trust Fund 2001-2003 Supplemental (03-4-002)

Appropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $58,072,911

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $58,072,911

Sec. 919   2002 c 238 s 202 (uncodified) is amended to read as follows:
     FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Local/Community Projects (2002-S-005): Job Creation and Infrastructure Projects

     The following projects are eligible for funding:

Projects       Amount

Asia Pacific center . . . . . . . . . . . . $50,000
Benton county jail . . . . . . . . . . . . $2,000,000
Bremerton maritime park . . . . . . . . . . . . $500,000
Edmonds waterfront park . . . . . . . . . . . . $300,000
Grace Cole memorial park/Brookside creek . . . . . . . . . . . . $400,000
Kent station infrastructure improvements . . . . . . . . . . . . $900,000
Mill creek active use ball fields . . . . . . . . . . . . $1,000,000
Nathan Chapman trail . . . . . . . . . . . . $300,000
Penny creek/9th Avenue crossing . . . . . . . . . . . . $400,000
Port Angeles skills center/skills consortium . . . . . . . . . . . . $3,000,000
Puget Sound environmental learning center . . . . . . . . . . . . $2,000,000
Ridgefield wastewater treatment . . . . . . . . . . . . $585,000
Sammamish surface water treatment . . . . . . . . . . . . $1,500,000
Shoreline historical museum . . . . . . . . . . . . $28,000
Snohomish county children's museum . . . . . . . . . . . . $300,000
Soundview park/playground . . . . . . . . . . . . $200,000
Stewart heights pool project . . . . . . . . . . . . $500,000
Sundome seating expansion - Yakima . . . . . . . . . . . . $1,250,000
West central community center childcare project . . . . . . . . . . . . $500,000
William H. Factory small business incubator . . . . . . . . . . . . $250,000
((Yakima ballfields)) For the transfer of property,
     commonly known as Larson park field No. 4 and
     Dunbar field, of the city of Yakima to the
     Yakima Valley Community College and for the
     creation of new ball fields by and for the
     city of Yakima.
. . . . . . . . . . . . $1,250,000
          TOTAL . . . . . . . . . . . . $17,213,000

Appropriation:
     State Building Construction Account -- State . . . . . . . . . . . . $17,213,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,213,000

Sec. 920   2001 2nd sp.s. c 8 s 158 (uncodified) is amended to read as follows:
     FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Legislative Buildings - O'Brien and Newhouse Building Improvements (01-H-021)

Appropriation:
     ((Capitol Building Construction Account -- State . . . . . . . . . . . . $1,000,000))
     Thurston County Capital Facilities
          Account -- State . . . . . . . . . . . . (($1,000,000))
       $2,000,000

          ((Subtotal Appropriation . . . . . . . . . . . . $2,000,000))

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

Sec. 921   2002 c 238 s 109 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Legislative Building: Rehabilitation (01-1-008)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) The appropriations in this section are subject to the conditions and limitations of sections 902 and 903 of this act.
     (2) The department of general administration, in consultation with the legislature, the governor, and the state capitol committee, shall immediately begin planning and initiate an accelerated design/construction schedule for the renovation of the state legislative building as follows:
     (a) No new permanent buildings shall be constructed, and the department shall follow standards for historic preservation;
     (b) The goal shall be to reoccupy the building in time for the 2005 legislative session;
     (c) The department shall make temporary accommodations for the displacement of legislators and legislative staff in the John L. O'Brien building, the Pritchard building, the Cherberg building, and the Newhouse building, and may use modular space. Decisions on the use of space for the Pritchard building will be made by legislative leadership by July 1, 2001, to make it available for use by the legislature by April 1, 2002;
     (d) The department shall temporarily move the state library from the Pritchard building by October 1, 2001, and, if needed, the department shall lease storage facilities in Thurston county for books and other library assets;
     (e) The department shall make temporary accommodations for other tenants of the state legislative building as follows:
     (i) The office of the insurance commissioner shall be temporarily moved to leased space in Thurston county;
     (ii) The office of the governor shall be moved to the Insurance building;
     (iii) The primary office of the code reviser and the lieutenant governor shall be moved to a location on the west capitol campus; and
     (iv) The other tenants, including the office of the state treasurer, the office of the state auditor, and the office of the secretary of state shall be moved to leased space in Thurston county;
     (f) The state legislative building shall be completely vacated by the office of the governor, the office of the secretary of state, the office of treasurer, and the office of the state auditor by November 1, 2001, and by the legislature fourteen days after the end of the 2002 legislative session to make it available for renovation by the contractor; and
     (g) State contracts for the legislative building renovation, Nisqually earthquake repair, and future earthquake mitigation shall conform to all rules, regulations, and requirements of the federal emergency management agency.
     (3) The state capitol committee, in conjunction with a legislative building renovation oversight committee consisting of two members from both the house of representatives and senate, each appointed by legislative leadership, shall periodically advise the department regarding the rehabilitation, the receipt and use of private funds, and other issues that may arise.
     (4) The department shall report on the progress of accelerated planning, design, and relocations related to the renovation of the state legislative building to the legislature and the governor by July 15, 2001, and November 15, 2001, and shall consult with the legislature and governor on major decisions including placement of the cafeteria and exiting stairs in the legislative building by August 31, 2001.
     (5) In the event of any conflicts between the conditions and limitations in this section and section 3, chapter 123, Laws of 2001, the conditions and limitations of this section shall apply.
     (((6) $154,000 of the capitol historic district construction account appropriation is provided solely for the department of general administration to contract for fund-raising services for the solicitation of charitable gifts, grants, or donations specifically for the purpose of preservation and restoration of the state legislative building and related educational exhibits and programs. By June 30, 2004, the amount provided by this subsection shall be reinvested to the capitol historic district construction account from the proceeds of the gifts, grants, and donations.))

Reappropriation:
     Capitol Building Construction Account -- State . . . . . . . . . . . . $2,000,000
     Thurston County Capital Facilities
          Account -- State . . . . . . . . . . . . $2,500,000
          Subtotal Reappropriation . . . . . . . . . . . . $4,500,000

Appropriation:
     Capitol Historic District Construction
          Account -- State . . . . . . . . . . . . $81,681,000
     Thurston County Capital Facilities
          Account -- State . . . . . . . . . . . . $1,300,000
          Subtotal Appropriation . . . . . . . . . . . . $82,981,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,300,000
          TOTAL . . . . . . . . . . . . $90,781,000

NEW SECTION.  Sec. 922   A new section is added to 2001 2nd sp.s. c 8 (uncodified) to read as follows:
FOR WESTERN WASHINGTON UNIVERSITY
     Parks Hall Fire Damage (03-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 923   2002 c 238 s 204 (uncodified) is repealed.

NEW SECTION.  Sec. 924   If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected.

NEW SECTION.  Sec. 925   This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately.

(End of part)



     INDEX       PAGE #


CENTRAL WASHINGTON UNIVERSITY . . . . . . . . . . . . 116
COMMUNITY AND TECHNICAL COLLEGE SYSTEM . . . . . . . . . . . . 126
COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT . . . . . . . . . . . . 2
DEPARTMENT OF AGRICULTURE . . . . . . . . . . . . 94
DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT . . . . . . . . . . . . 160
DEPARTMENT OF CORRECTIONS . . . . . . . . . . . . 43
DEPARTMENT OF ECOLOGY . . . . . . . . . . . . 52
DEPARTMENT OF FISH AND WILDLIFE . . . . . . . . . . . . 81
DEPARTMENT OF GENERAL ADMINISTRATION . . . . . . . . . . . . 18
DEPARTMENT OF HEALTH . . . . . . . . . . . . 40
DEPARTMENT OF NATURAL RESOURCES . . . . . . . . . . . . 88
DEPARTMENT OF SOCIAL AND HEALTH SERVICES . . . . . . . . . . . . 28
DEPARTMENT OF TRANSPORTATION . . . . . . . . . . . . 97
DEPARTMENT OF VETERANS AFFAIRS . . . . . . . . . . . . 41
EASTERN WASHINGTON UNIVERSITY . . . . . . . . . . . . 111
INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION . . . . . . . . . . . . 71
MILITARY DEPARTMENT . . . . . . . . . . . . 24
OFFICE OF FINANCIAL MANAGEMENT . . . . . . . . . . . . 16
STATE BOARD OF EDUCATION . . . . . . . . . . . . 98
STATE CONVENTION AND TRADE CENTER . . . . . . . . . . . . 27
STATE PARKS AND RECREATION COMMISSION . . . . . . . . . . . . 61
STATE SCHOOL FOR THE BLIND . . . . . . . . . . . . 99
STATE SCHOOL FOR THE DEAF . . . . . . . . . . . . 101
SUPERINTENDENT OF PUBLIC INSTRUCTION . . . . . . . . . . . . 99
THE EVERGREEN STATE COLLEGE . . . . . . . . . . . . 119
UNIVERSITY OF WASHINGTON . . . . . . . . . . . . 101
WASHINGTON STATE HISTORICAL SOCIETY . . . . . . . . . . . . 123
WASHINGTON STATE PATROL . . . . . . . . . . . . 96
WASHINGTON STATE UNIVERSITY . . . . . . . . . . . . 104
WESTERN WASHINGTON UNIVERSITY . . . . . . . . . . . . 122