SENATE BILL 6413
_____________________________________________
State of Washington58th Legislature2004 Regular Session

By Senators Mulliken, T. Sheldon, Swecker, Rasmussen, Esser, Hargrove, Murray and Stevens

Read first time 01/20/2004.   Referred to Committee on Land Use & Planning.



     AN ACT Relating to impact fees for residential construction; adding a new section to chapter 82.02 RCW; and adding a new section to chapter 43.21C RCW.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

NEW SECTION.  Sec. 1   A new section is added to chapter 82.02 RCW to read as follows:
     Impact fees for residential construction shall only be collected by the county, city, or town imposing the impact fee either:
     (1) At the time of title transfer to the occupant;
     (2) Twelve months after the building permit is issued;
     (3) At the time of final inspection of the residence; or
     (4) At the time the certificate of occupancy is issued.

NEW SECTION.  Sec. 2   A new section is added to chapter 43.21C RCW to read as follows:
     Impact fees under this chapter for residential construction shall only be collected by the county, city, or town imposing the impact fee either:
     (1) At the time of title transfer to the occupant;
     (2) Twelve months after the building permit is issued;
     (3) At the time of final inspection of the residence; or
     (4) At the time the certificate of occupancy is issued.

--- END ---