6241-S AMH FLAN REDF 027
SSB 6241 - H AMD TO TR COMM AMD (H-5288.7/06) 1078
By Representative Flannigan
ADOPTED 3/2/2006
On page 53, line 4, after "engineering" strike all material through "south" on line 6
EFFECT: For the Tacoma Rail improvement project, removes the condition that construction shall not begin until Tacoma Rail transfers ownership to local jurisdictions of the tracks from the new interconnect in Thurston County south.