ESHB 1010 -
By Committee on Water, Energy & Environment
ADOPTED 03/02/2006
Strike everything after the enacting clause and insert the following:
"NEW SECTION. Sec. 1 It is the intent of the legislature to
ensure an adequate supply of safe, clean, and reliable electricity at
the lowest reasonable cost and risk to the utility and its ratepayers.
To achieve this end, the legislature finds it essential that electric
utilities in Washington develop comprehensive resource plans that
explain the mix of generation and demand-side resources they plan to
use to meet their customers' electricity needs in both the short term
and the long term. The legislature also finds that resource planning
is an important way of maintaining Washington state's commitment to a
vertically integrated utility structure. The legislature further finds
that many utilities in Washington have had a long and successful
history of resource planning and are able to share their expertise with
other utilities. The legislature also finds it essential that the
utility plans be made publicly available and be aggregated and analyzed
at a statewide level so the citizens of the state and their public
officials have confidence that Washington's electricity supply is
adequate.
NEW SECTION. Sec. 2 The definitions in this section apply
throughout this chapter unless the context clearly requires otherwise.
(1) "Commission" means the utilities and transportation commission.
(2) "Conservation and efficiency resources" means any reduction in
electric power consumption that results from increases in the
efficiency of energy use, production, transmission, or distribution.
(3) "Consumer-owned utility" includes a municipal electric utility
formed under Title 35 RCW, a public utility district formed under Title
54 RCW, an irrigation district formed under chapter 87.03 RCW, a
cooperative formed under chapter 23.86 RCW, a mutual corporation or
association formed under chapter 24.06 RCW, a port district formed
under Title 53 RCW, or a water-sewer district formed under Title 57
RCW, that is engaged in the business of distributing electricity to one
or more retail electric customers in the state.
(4) "Department" means the department of community, trade, and
economic development.
(5) "Electric utility" means a consumer-owned or investor-owned
utility.
(6) "Full requirements customer" means an electric utility that
relies on the Bonneville power administration for all power needed to
supply its total load requirement other than that served by
nondispatchable generating resources totaling no more than six
megawatts or renewable resources.
(7) "Governing body" means the elected board of directors, city
council, commissioners, or board of any consumer-owned utility.
(8) "High efficiency cogeneration" means the sequential production
of electricity and useful thermal energy from a common fuel source,
where, under normal operating conditions, the facility has a useful
thermal energy output of no less than thirty-three percent of the total
energy output.
(9) "Integrated resource plan" means an analysis describing the mix
of generating resources and conservation and efficiency resources that
will meet current and projected needs at the lowest reasonable cost to
the utility and its ratepayers and that complies with the requirements
specified in section 3(1) of this act.
(10) "Investor-owned utility" means a corporation owned by
investors that meets the definition in RCW 80.04.010 and is engaged in
distributing electricity to more than one retail electric customer in
the state.
(11) "Lowest reasonable cost" means the lowest cost mix of
generating resources and conservation and efficiency resources
determined through a detailed and consistent analysis of a wide range
of commercially available resources. At a minimum, this analysis must
consider resource cost, market-volatility risks, demand-side resource
uncertainties, resource dispatchability, resource effect on system
operation, the risks imposed on the utility and its ratepayers, public
policies regarding resource preference adopted by Washington state or
the federal government, and the cost of risks associated with
environmental effects including emissions of carbon dioxide.
(12) "Plan" means either an "integrated resource plan" or a
"resource plan."
(13) "Renewable resources" means electricity generation facilities
fueled by: (a) Water; (b) wind; (c) solar energy; (d) geothermal
energy; (e) landfill gas; (f) biomass energy utilizing animal waste,
solid organic fuels from wood, forest, or field residues or dedicated
energy crops that do not include wood pieces that have been treated
with chemical preservatives such as creosote, pentachlorophenol, or
copper-chrome-arsenic; (g) byproducts of pulping or wood manufacturing
processes, including but not limited to bark, wood chips, sawdust, and
lignin in spent pulping liquors; (h) ocean thermal, wave, or tidal
power; or (i) gas from sewage treatment facilities.
(14) "Resource plan" means an assessment that estimates electricity
loads and resources over a defined period of time and complies with the
requirements in section 3(2) of this act.
NEW SECTION. Sec. 3 Each electric utility must develop a plan
consistent with this section.
(1) Utilities with more than twenty-five thousand customers that
are not full requirements customers shall develop or update an
integrated resource plan by September 1, 2008. At a minimum, progress
reports reflecting changing conditions and the progress of the
integrated resource plan must be produced every two years thereafter.
An updated integrated resource plan must be developed at least every
four years subsequent to the 2008 integrated resource plan. The
integrated resource plan, at a minimum, must include:
(a) A range of forecasts, for at least the next ten years, of
projected customer demand which takes into account econometric data and
customer usage;
(b) An assessment of commercially available conservation and
efficiency resources. Such assessment may include, as appropriate,
high efficiency cogeneration, demand response and load management
programs, and currently employed and new policies and programs needed
to obtain the conservation and efficiency resources;
(c) An assessment of a commercially available, utility scale
renewable and nonrenewable generating technologies;
(d) A comparative evaluation of renewable and nonrenewable
generating resources, including transmission and distribution delivery
costs, and conservation and efficiency resources using "lowest
reasonable cost" as a criterion;
(e) The integration of the demand forecasts and resource
evaluations into a long-range assessment describing the mix of supply
side generating resources and conservation and efficiency resources
that will meet current and projected needs at the lowest reasonable
cost and risk to the utility and its ratepayers; and
(f) A short-term plan identifying the specific actions to be taken
by the utility consistent with the long-range integrated resource plan.
(2) All other utilities may elect to develop a full integrated
resource plan as set forth in subsection (1) of this section or, at a
minimum, shall develop a resource plan that:
(a) Estimates loads for the next five and ten years;
(b) Enumerates the resources that will be maintained and/or
acquired to serve those loads; and
(c) Explains why the resources in (b) of this subsection were
chosen and, if the resources chosen are not renewable resources or
conservation and efficiency resources, why such a decision was made.
(3) An electric utility that is required to develop a resource plan
under this section must complete its initial plan by September 1, 2008.
(4) Resource plans developed under this section must be updated on
a regular basis, at a minimum on intervals of two years.
(5) Plans shall not be a basis to bring legal action against
electric utilities.
(6) Each electric utility shall publish a final integrated resource
plan either as part of an annual report or as a separate document
available to the public.
NEW SECTION. Sec. 4 (1) Investor-owned utilities shall submit
integrated resource plans to the commission. The commission shall
establish by rule the requirements for preparation and submission of
integrated resource plans.
(2) The commission may adopt additional rules as necessary to
clarify the requirements of section 3 of this act as they apply to
investor-owned utilities.
NEW SECTION. Sec. 5 (1) The governing body of a consumer-owned
utility that develops a plan under this chapter shall encourage
participation of its consumers in development of the plans and progress
reports and approve the plans and progress reports after it has
provided public notice and hearing.
(2) Each consumer-owned utility shall transmit a copy of its plan
to the department by September 1, 2008, and transmit subsequent
progress reports or plans to the department at least every two years
thereafter. The department shall develop, in consultation with
utilities, a common cover sheet that summarizes the essential data in
their plans or progress reports.
(3) Consumer-owned utilities may develop plans of a similar type
jointly with other consumer-owned utilities. Data and assessments
included in joint reports must be identifiable to each individual
utility.
(4) To minimize duplication of effort and maximize efficient use of
utility resources, in developing their plans under section 3 of this
act, consumer-owned utilities are encouraged to use resource planning
concepts, techniques, and information provided to and by organizations
such as the United States department of energy, the Northwest planning
and conservation council, Pacific Northwest utility conference
committee, and other state, regional, national, and international
entities, and, for the 2008 plan, as appropriate, are encouraged to use
and be consistent with relevant determinations required under Title
XII - Electricity; Subtitle E, Sections 1251 - 1254 of the federal
energy policy act of 2005.
NEW SECTION. Sec. 6 The department shall review the plans of
consumer-owned utilities and investor-owned utilities, and data
available from other state, regional, and national sources, and prepare
a report to the legislature aggregating the data and assessing the
overall adequacy of Washington's electricity supply. The report shall
include a statewide summary of utility load forecasts, load/resource
balance, and utility plans for the development of thermal generation,
renewable resources, and conservation and efficiency resources. The
commission shall provide the department with data summarizing the plans
of investor-owned utilities for use in the department's statewide
summary. The department shall submit its report within the biennial
report required under RCW 43.21F.045.
NEW SECTION. Sec. 7 Sections 1 through 6 of this act constitute
a new chapter in Title
ESHB 1010 -
By Committee on Water, Energy & Environment
ADOPTED 03/02/2006
On page 1, line 1 of the title, after "Relating to" strike the remainder of the title and insert "electric utility planning; and adding a new chapter to Title 19 RCW."