HOUSE BILL REPORT
ESHB 1010
As Amended by the Senate
Title: An act relating to energy efficiency and renewable energy.
Brief Description: Concerning energy efficiency and renewable energy standards.
Sponsors: By House Committee on Technology, Energy & Communications (originally sponsored by Representatives Morris, Hudgins, Morrell, Linville, B. Sullivan, McCoy and Chase).
Brief History:
Technology, Energy & Communications: 1/18/05, 1/20/05, 2/24/05 [DPS].
Floor Activity:
Passed House: 2/9/06, 96-1.
Senate Amended.
Passed Senate: 3/2/06, 47-0.
Brief Summary of Engrossed Substitute Bill |
|
|
HOUSE COMMITTEE ON TECHNOLOGY, ENERGY & COMMUNICATIONS
Majority Report: The substitute bill be substituted therefor and the substitute bill do pass. Signed by 8 members: Representatives Morris, Chair; Kilmer, Vice Chair; Crouse, Ranking Minority Member; Ericks, Hudgins, P. Sullivan, Takko and Wallace.
Minority Report: Without recommendation. Signed by 2 members: Representatives Haler, Assistant Ranking Minority Member; and Sump.
Staff: Scott Richards (786-7156).
Background:
In Washington, most of the electricity sold to retail customers is generated by hydroelectric
power. According to the state's 2004 fuel mix disclosure report using 2003 electricity
production data, hydroelectric power accounts for 66.6 percent of electricity sold; coal
represents 17.7 percent; nuclear power supplies 4.6 percent; and natural gas 9.8 percent.
Non-hydro renewable resources such as wind, landfill gas, or biomass represent 1.3 percent.
Traditionally, electric utilities have been guided in their efforts to acquire resources for
meeting their customers' demand for electricity by a least cost planning analysis. In
conducting least cost planning, utilities choose a mix of supply and demand side resources
that minimizes the cost of services to the customer. The mix may include electricity that is
generated by the utility itself, purchased on long-term contracts from other producers, or may
include some electricity purchased on the short-term or spot market. It may also include
conservation and energy efficiency.
The rules of the Washington Utilities and Transportation Commission (WUTC) require the
investor-owned electric utilities regulated by the WUTC to develop least cost plans in
consultation with the WUTC staff.
Summary of Engrossed Substitute Bill:
Utilities with more than 25,000 customers that are not full-requirements customers must
develop an Integrated Resource Plan (IRP). In developing the IRP, utilities in this category
must integrate into demand forecasts and resource evaluations descriptions of the mix of
resources and efficiency measures that will meet current and future needs at the lowest
reasonable cost to the utility and ratepayers. Lowest reasonable cost is defined as the lowest
cost mix of resources determined through a detailed and consistent analysis of a wide range
of commercially available sources. At a minimum, this analysis must consider resource cost,
market-volatility risks, demand-side resource uncertainties, resource dispatchability, resource
effect on system operation, the risks imposed on ratepayers, public policies regarding
resource preference adopted by Washington or the federal government and the cost of risks
associated with environmental effects including emissions of carbon dioxide.
All other utilities may elect to develop a full integrated resource plan, independently or
jointly with other consumer-owned utilities, or, at a minimum, a Resource Plan. These
utilities may use data submitted to federal power marketing agencies that is equivalent to the
data required in either an IRP or Resource Plan. Both IRPs and Resource Plans must be
updated at a minimum every three years.
Investor-owned utilities must submit their IRPs to the Utilities and Transportation
Commission and the consumer-owned utilities must submit their Resource Plan or IRPs to
the Department of Community, Trade and Economic Development (DCTED).
The DCTED will review all IRPs and Resource Plans and prepare an electronic report to the
Legislature that aggregates the data submitted by all utilities, summarizes at a statewide level
the resource choices and dates specified in the plans.
EFFECT OF SENATE AMENDMENT(S):
Legislative Intent
Removes intent language related to: encouraging the construction and development of
new energy resources; shortening the time it takes to bring new electricity generation to
market; recognizing that necessary infrastructure may not be in place for new generation; and
obtaining information from integrated resource plans will assist in identifying and developing
new energy generation and infrastructure.
Modifies intent language related to: ensuring there is an adequate supply of safe, clean
and reliable electricity at the lowest reasonable cost and risk to the utility and ratepayer;
developing comprehensive resource plans that explain the mix of generation and demand-side resources for the short and long-term; and maintaining Washington's commitment to a
vertically integrated utility structure; aggregating and analyzing plans at a statewide level.
Definitions
Modifies the definition of "consumer-owned utility" to include port districts and water-sewer districts.
Adds the definition for high efficiency cogeneration.
Modifies the definition of integrated resource plan to include an analysis of conservation
and efficiency resources.
Modifies the definition of lowest reasonable cost by adding the lowest cost mix of
generating resources and conservation and efficiency resources that will be determined
through an analysis of a wide range of commercially available resources, and adding the risks
to utilities in the analysis.
Changes the term renewable energy to renewable resources and makes changes to the
definition which includes adding gas from sewage treatment facilities, byproducts of pulping
or wood manufacturing processes, and geothermal; and, eliminating fuel cells, fuel gases that
are used in a combined heat and power plant designed to produce both heat and electricity
from a single heat source, advanced biomass power conversation technologies, and types of
hydroelectric power and incremental gains in hydroelectric generating facilities.
Integrated Resource Plans and Resource Plans
Changes the reporting date for integrated resource plans and resource plans from July 31,
2007 to September 1, 2008.
Requires utilities with more than 25,000 customers that are not full requirements
customers to develop every four years an integrated resource plan and at a minimum produce
progress reports every two years that reflect changing conditions and progress of the
integrated resource plans.
Requires a utility with less than 25,000 customers to update its resource plan every two
years rather than every three years.
Requires each electric utility to publish a final integrated resource plan either as part of an
annual report or as a separate document available to the public.
Specifies that the integrated resource plan forecast period is at least ten years.
Makes other changes to the section related to integrated resource plans and resource
plans.
Submission of Resource Plans
Modifies provisions related to customer-owned utilities development of a work plan.
Allows consumer-owned utilities to use determinations required under the Energy Policy
Act in producing resource plans.
Reporting by the Department of Community, Trade and Economic Development
Eliminates the initial reporting date of June 30, 2008 for integrated resource plan and
resource plan summaries and requires these summaries be included in the biennial state
energy report.
Eliminates provision requiring individual utility plans being provided to the legislature.
Title
Changes the title from an act relating to energy efficiency and renewable energy to an act
relating to electric utility planning.
Appropriation: None.
Fiscal Note: Requested on January 14, 2005.
Effective Date: The bill takes effect 90 days after adjournment of session in which bill is passed.
Testimony For: Planning will help the state make sure that it has enough generation at a
cost that will help the economy. This issue is an important one for the Legislature to
consider.
Renewable projects are growing in the Northwest. The Western Governor's Association has
passed a clean energy resolution that will bring development to the Northwest. There is still
more for the state to do.
Recent integrated resource plans done by utilities show that integrated resource planning is
good for ratepayers in terms of rate stability and a diverse portfolio. It is good to have risk
assessment included, related to fuel price, volatility, and future environmental regulation.
These elements are often overlooked, but emphasize the point that it is not all about the
bottom-line for the ratepayer.
Integrated resource planning is being done. In some of these processes, if the plans assess
fuel volatility and potential risk of environmental regulation, the plans result in commitment
to renewable energy.
The Northwest has always done integrated resource plans. For investor-owned utilities, the
commission has typically required it. For public utilities, Bonneville Power Administration
(BPA) was charged with meeting all load growth. The BPA is leaving that role, and a bill
requiring utilities to do integrated resource plans, it strengthens the long-term claim on the
federal hydro-system. Plans take effort and are not a precise science. Rarely will the plan
give one answer. But all utilities should do that.
(With concerns) A state mandated one-size fits all approach would not work for the small
utilities. There are alternatives for small utilities, allowing small utilities to maintain local
control and decision making, while working with the key players.
In the intent section, it could be more clearly stated about electricity supply lagging behind
demand. That may be true prospectively, but is probably not true today and the intent
statement should make that clear.
There should be language providing that integrated resource plans are not the basis for a
cause of action against a utility.
Testimony Against: This bill discriminates between large utilities and the small and
medium utilities. Practically, it seems that large utilities would not be affected by this bill.
The WUTC would tell investor-owned utilities how often to update integrated resource plans
(IRP), but public utilities would have to do it every two years. The bill is very prescriptive in
its elements of what should be looked at in an IRP.
The assessment of risk related to fuel price is problematic. Does the language mean looking
at the risks related to renewable energy, like the wind blowing or the sun shining? It is
unclear what this assessment of risk is intended to refer to and it could mean many different
things.
The definition of an integrated resource plan only looks at improvements in efficient use of
electricity. Other elements should be included, such as improvements in generation and
transmission.
Persons Testifying: (In support) Ann Granuall, Renewable Northwest Project; David
Kirkpatrick, General Electric Wind Energy; Jim Harding, Seattle City Light; Sean
McCliment, Washington Rural Electric Cooperative Association; Jeremy Smithson, Solar
Washington; Bill LaBorde, Northwest Energy Coalition; Robert Pregulman, Washington
Public Interest Research Group; Toni Potter, League of Women Voters; and Collins Sprague,
Avista Corporation.
(With concerns) Jim White; Tim Boyd, Industrial Customers of Northwest Utilities; Dave
Arbaugh, Chelan County Public Utility District, City of Richland, Kitsap County Public
Utility District and Snohomish County Public Utility District; and Collins Sprague, Avista
Corporation.
(Opposed) Dave Warren, Washington Public Utility Districts Association.