HOUSE BILL REPORT
HB 1020
As Reported by House Committee On:
Technology, Energy & Communications
Title: An act relating to siting electrical transmission under the energy facility site evaluation council.
Brief Description: Regarding electrical transmission.
Sponsors: Representatives Morris and B. Sullivan.
Brief History:
Technology, Energy & Communications: 1/14/05, 1/27/05 [DPS].
Brief Summary of Substitute Bill |
|
|
HOUSE COMMITTEE ON TECHNOLOGY, ENERGY & COMMUNICATIONS
Majority Report: The substitute bill be substituted therefor and the substitute bill do pass. Signed by 11 members: Representatives Morris, Chair; Kilmer, Vice Chair; Crouse, Ranking Minority Member; Ericks, Haler, Hudgins, Nixon, P. Sullivan, Sump, Takko and Wallace.
Staff: Sarah Dylag (786-7109).
Background:
EFSEC Licensing
The Energy Facility Site Evaluation Council (EFSEC) was created in 1970 to provide
one-stop licensing for large energy projects. The EFSEC's membership includes mandatory
representation from five state agencies and discretionary representation from four additional
state agencies. The EFSEC's membership may include representatives from the particular
city, county, or port district where potential projects may be located.
The EFSEC's jurisdiction includes the siting of large intrastate natural gas and petroleum
pipelines, electric power plants above 350 megawatts, new oil refineries, large expansions of
existing facilities, and underground natural gas storage fields. For electric power plants, the
EFSEC's jurisdiction extends to those associated facilities that include new transmission lines
that operate in excess of 200 kilovolts and are necessary to connect the plant to the Northwest
power grid. Developers of energy facilities that exclusively use alternative energy resources,
regardless of the size of the facility's generation capacity, may choose to use the EFSEC
process to site the facility.
The EFSEC siting process generally involves six steps: (1) a potential site study followed by
an application; (2) State Environmental Policy Act review; (3) review for consistency with
applicable local land use laws and plans; (4) a formal adjudication on all issues related to the
project; (5) certain air and water pollution discharge permitting reviews as delegated by the
U.S. Environmental Protection Agency; and (6) a recommendation to the Governor who then
decides whether to accept, reject, or remand the application. A certification agreement
approved by the Governor preempts any other state or local regulation concerning the
location, construction, and operational conditions of an energy facility.
Under the EFSEC process, the applicant is required to pay the costs of the Council in
processing an application.
County and City Growth Management
Under the Growth Management Act, certain counties and cities must develop comprehensive
land use plans outlining the coordinated land use policy of the county or city. The
comprehensive land use planning process includes adopting development regulations, such as
zoning ordinances, critical areas ordinances, and binding site plan ordinances.
Summary of Substitute Bill:
A person or entity developing new transmission lines or expanding or reconstructing existing
transmission lines that operate in excess of 115 kilovolts may use the EFSEC process to
obtain siting approval for the transmission lines.
The EFSEC's jurisdiction over transmission is effective July 1, 2007 in counties and cities
that have not, prior to an applicant submitting an application to the EFSEC, identified
corridors for electrical transmission pursuant to statutory or local land use planning
requirements.
On or after July 1, 2007, the EFSEC must approve applications for siting of new transmission
facilities or for expanding or reconstructing existing transmission facilities in corridors
designated for this purpose by cities or counties pursuant to statutory or local land use
planning requirements.
Substitute Bill Compared to Original Bill:
The original bill provided that after July 1, 2007, the EFSEC must approve applications for
siting of transmission in corridors designated for these facilities by a county or city
comprehensive land use plan when the county or city has taken certain steps. The substitute
bill clarifies that the EFSEC's jurisdiction over transmission is effective July 1, 2007 and that
the EFSEC's jurisdiction applies in cities and counties that have not, prior to the submission
of an application for transmission, identified corridors for electrical transmission facilities in
accordance with applicable statutory or local land use planning requirements. The substitute
bill clarifies that after July 1, 2007, the EFSEC must approve applications to site electrical
transmission facilities in corridors identified for electrical transmission facilities in
accordance with applicable statutory or local land use planning requirements.
The substitute bill clarifies and corrects definitions and the authority of the EFSEC to
consider whether a proposed site is consistent and in compliance with city land use plans or
zoning ordinances.
Appropriation: None.
Fiscal Note: Not requested.
Effective Date of Substitute Bill: The bill takes effect 90 days after adjournment of session in which bill is passed.
Testimony For: (In support of original bill) The issue of availability of new transmission
and siting of that transmission is a growing issue. The availability of new transmission is a
problem in the Western United States and in Washington. The need for new transmission is
growing and transmission is integral to delivering generation where it is needed. In addition,
those that are building most of the transmission now have eminent domain authority. In the
future, there will be more merchant development of transmission that is privately financed
and will not have eminent domain authority. The bill will facilitate siting of merchant built
lines. Giving the EFSEC this jurisdiction is a tool for entities working to accommodate
growth in the state.
The intent of the bill is also to give local jurisdictions time and the option to site new
transmission corridors within their jurisdiction and, if the local jurisdictions do not do so by
July 1, 2007, then the EFSEC would have jurisdiction.
There is concern regarding clarifying when and where the EFSEC has jurisdiction and the
relationship of that jurisdiction to the requirements of the Growth Management Act.
Testimony Against: (With concerns to original bill) There are concerns about the impact this might have on local jurisdictions that might site transmission. First, the bill requires cities and counties to amend their comprehensive plans and not all cities and counties are required to do a comprehensive land use plan. In addition, there is cost associated with amendment comprehensive plans. There is also concern that it is an expensive and lengthy process for counties and cities to go through the siting process on their own. The bill would force cities and counties to either accept a developer's application or to go through the expensive and lengthy process on their own.
Persons Testifying: (In support of original bill) Representative Morris, prime sponsor.
(With concerns to original bill) Kathleen Collins, PacifiCorp; Scott Merriman, Association of
Counties; Victoria Lincoln, Association of Washington Cities; and Mike Tracey, Puget
Sound Energy.