HOUSE BILL REPORT
ESHB 2097
As Passed Legislature
Title: An act relating to establishing a management program for Hood Canal rehabilitation.
Brief Description: Establishing a management program for Hood Canal rehabilitation.
Sponsors: By House Committee on Select Committee on Hood Canal (originally sponsored by Representatives Eickmeyer, Upthegrove, Hunt, B. Sullivan, Chase, Ericks, McCoy, Hunter, Pettigrew and Appleton).
Brief History:
Select Committee on Hood Canal: 2/22/05, 3/1/05 [DPS].
Floor Activity:
Passed House: 3/11/05, 58-36.
Senate Amended.
Passed Senate: 4/11/05, 35-13.
House Concurred.
Passed House: 4/20/05, 94-2.
Passed Legislature.
Brief Summary of Engrossed Substitute Bill |
|
|
|
|
|
HOUSE COMMITTEE ON SELECT COMMITTEE ON HOOD CANAL
Majority Report: The substitute bill be substituted therefor and the substitute bill do pass. Signed by 7 members: Representatives Eickmeyer, Chair; McCoy, Vice Chair; Pearson, Ranking Minority Member; Sump, Assistant Ranking Minority Member; Appleton, Chase and Walsh.
Staff: Caroleen Dineen (786-7156).
Background:
Hood Canal is a glacier-carved fjord approximately 60 miles in length with approximately
180 miles of shoreline. Portions of Hood Canal have had low dissolved oxygen
concentrations for many years. The University of Washington recorded low dissolved
oxygen concentrations in the 1950s. In recent years, low dissolved oxygen concentration
conditions and significant fish death events have been recorded on Hood Canal. The 2004
dissolved oxygen concentrations in southern Hood Canal were the lowest recorded
concentrations for the water body.
The Puget Sound Action Team (PSAT) is a state agency that develops and coordinates water
quality programs for Puget Sound. The Hood Canal Coordinating Council (HCCC) is a
group of county and tribal governments established to address water quality problems and
natural resource issues in the Hood Canal watershed. In May 2004, the PSAT and HCCC
prepared a report - the Preliminary Assessment and Corrective Action Plan (PACA) -
assessing sources of human-influenced nitrogen introduced into Hood Canal. The PACA
identifies six major categories of human-influenced nitrogen sources and specifies
recommendations for corrective actions for these categories.
Research and monitoring related to Hood Canal's low dissolved oxygen concentrations is
being conducted. The Department of Ecology's marine waters monitoring program and the
University of Washington's Puget Sound Regional Synthesis Model (PRISM) program
involve testing at numerous Hood Canal stations. In addition, Hood Canal monitoring and
research are being conducted by the United States Geological Survey and various local
agencies and organizations. Further, a group of 20 federal, state, local, and tribal agencies
and nonprofit organizations have established the Hood Canal Dissolved Oxygen Program
(HCDOP), a three-year effort to coordinate Hood Canal monitoring, analysis, and modeling
results.
Summary of Engrossed Substitute Bill:
Development of a Hood Canal rehabilitation program is authorized for Jefferson, Kitsap, and
Mason Counties. The program is authorized within the area designated as an aquatic
rehabilitation zone (ARZ) in legislation authorizing these zones [SHB 2081]. This area
includes watersheds that drain into Hood Canal south of a line projected from Tala Point in
Jefferson County to Foulweather Bluff in Kitsap County.
The Puget Sound Action Team (PSAT) is designated as the state lead agency for the Hood
Canal rehabilitation program. The Hood Canal Coordinating Council (HCCC) is designated
as the program's local management board. In addition to serving as the local management
board, the HCCC also must serve as the lead entity and regional recovery organization for
Hood Canal summer chum and assist in coordinating Hood Canal watershed planning
activities. The PSAT's and the HCCC's program activities are subject to the availability of
funds appropriated for this purpose.
The PSAT and HCCC must participate in program development, and each must approve and
co-manage program projects. The PSAT and the HCCC each may receive and disburse funds
for projects, studies, and activities related to Hood Canal's low dissolved oxygen
concentrations. The PSAT and HCCC must jointly coordinate a process to prioritize
projects, studies, and activities for which the PSAT receives state funding specifically
allocated for Hood Canal corrective actions. The PSAT and HCCC must develop funding
criteria based on the likely value in addressing and resolving Hood Canal's low dissolved
oxygen concentrations. Final project approval requires the consent of both the PSAT and the
HCCC.
In developing the program and establishing the funding criteria, the PSAT and HCCC must
solicit participation by federal, tribal, state and local agencies as well as universities and
nonprofit organizations with expertise related to rehabilitation program activities. The local
management board may include state and federal agency representatives or additional persons
as nonvoting board members or may receive technical assistance and advice from them in
other venues. The local management board also may appoint technical advisory committees
as needed.
Reporting requirements are specified. The local management board must assess, with
participating local and tribal governments, concepts for a regional governance structure and
report the findings and recommendations to the appropriate legislative committees by
December 1, 2007. The local management board also must submit a quarterly progress report
to its participating counties, tribes, and state agencies. In addition, the local management
board must submit an annual report to the appropriate legislative committees.
To fulfill its responsibilities, the local management board may have staff; enter into contracts;
accept and disburse funds; make recommendations to local governments regarding potential
regulations, programs, and incentives; pay necessary expenses; and choose a fiduciary agent.
Regulatory restrictions are specified. The rehabilitation program provisions do not provide
the PSAT or the HCCC any regulatory authority. In addition, the HCCC (as the local
management board) may not exercise authority over land or water within individual counties
or otherwise preempt local government authority.
Authority of other entities is preserved. Any of the local management board's participating
counties and tribes, any federal, tribal, state, or local agencies, or any universities or nonprofit
organizations may continue individual Hood Canal rehabilitation efforts and activities. The
local management board provisions do not preclude any local governments from entering into
interlocal agreements. In addition, the rehabilitation program provisions do not prohibit any
federal, tribal, state, or local agencies, universities, or nonprofit organizations from receiving
funding for specific projects that may assist in Hood Canal rehabilitation.
The rehabilitation program provisions do not apply to forest practices regulated under the
state's Forest Practices Act.
Legislative findings identify the substantial environmental, cultural, economic, recreational,
and aesthetic importance of Hood Canal. Legislative findings also specify concerns
regarding Hood Canal's low dissolved oxygen concentrations and identify numerous research,
monitoring, and study efforts that are occurring with respect to this condition. Legislative
findings also recognize a need for the state to take additional action to address Hood Canal's
low dissolved oxygen concentrations. Legislative intent is specified to designate state and
local entities to develop and coordinate Hood Canal rehabilitation program and funding.
The Hood Canal rehabilitation program provisions are codified in the new statutory chapter
created in the ARZ legislation [SHB 2081].
Appropriation: None.
Fiscal Note: Available. New fiscal note requested on March 2, 2005.
Effective Date: The bill contains an emergency clause and takes effect immediately.
Testimony For: (Original bill) The bill looks to the HCCC – an existing entity – to serve as
the management board for the Hood Canal rehabilitation program. The HCCC already has an
executive director and includes representatives of all three counties and the tribes. The
HCCC can serve as the lead for this program.
(With concerns on original bill) The PSAT supports the findings of this bill. The Hood Canal
is at risk; rehabilitation is necessary. The PSAT has partnered with HCCC and many other
state and federal and local interests to identify problems, develop some early actions,
organize research, and coordinate application of state and federal resources to projects. If the
intent is to have the HCCC be the management board, the bill should specifically designate
the HCCC.
The HCDOP was created a year ago and has served as a coordinating mechanism through the
present. The HCDOP has functioned well and effectively represents various interests.
Concern exists that with the momentum in the HCDOP, creating a new entity and getting it
started may deplete some of the HCDOP energy.
Testimony Against: None.
Persons Testifying: (In support of original bill) Representative William Eickmeyer, prime
sponsor.
(With concerns on original bill) Terry Hull, Puget Sound Action Team.