Brief Description: Requiring a feasibility study of the viability of a solar electric generating facility.
Sponsors: Senate Committee on Water, Energy & Environment (originally sponsored by Senators Poulsen, Rockefeller, Rasmussen and Fraser).
Brief Summary of Substitute Bill |
|
Hearing Date: 2/16/06.
Staff: Scott Richards (786-7156).
Background:
A solar energy system is any device that relies upon direct sunlight as an energy source for use in
the generation of electricity.
The largest solar electric facility in the world is located in Muhlhausen, Germany, according to
pvresources.com. Dedicated in 2005, the Bavaria Solarpark is comprised of a total of 57,600
photovoltaic panels and has 10 megawatt (MW) of total generating capacity. In early February,
the companies Powered by Renewables and SunEdison announced that they will develop a 18
MW solar photovoltaic project in Nevada, making it the world's largest solar photovoltaic
project.
Thin Film Solar Cells
Thin film solar cells are a layer of semiconductor material a few microns or less in thickness,
used to make solar photovoltaic cells. Most thin film technologies are based principally on
copper, indium and selenium (CIS). Although thin film solar cells typically produce a lower total
energy output than silicon-based crystalline solar cells, they are cheaper to manufacture and do
not rely on silicon, which is experiencing a worldwide shortage. While less efficient than
silicon-based crystalline solar cells, thin film efficiencies are increasing. In 2005, one
manufacturer announced its CIS thin film technology had achieved 13.5 percent efficiency, a new
world record for thin-film.
Northwest Solar Center
The Northwest Solar Center (Center) is a project of Washington State University that manages
solar energy activities such as the joint Washington State and Department of Energy Million
Solar Roofs Project and the state off-grid, plug and play solar rebate program. Also, the Center
helped develop the White Bluffs Solar Project (38 kilowatts DC/29.5 kilowatts AC) at Hanford,
the largest public solar project in the Northwest. The White Bluffs Solar Project is owned and
operated by Energy Northwest, Washington's sole joint operating agency and began generating
electricity in 2002.
Summary of Bill:
Northwest Solar Center
The Center shall conduct a feasibility assessment of the economic and technical viability of
building a large scale, public demonstration, solar electric generating facility.
Feasibility Assessment
The assessment should include the facility's economic viability, costs and benefits to
Washington, including job creation and environmental impacts, and its impact on the region's
energy.
In conducting this assessment, the Center shall make the following assumptions about the
facility:
Stakeholder Involvement
In conducting this assessment, the Center must assemble and work with a team representing state
and federal energy agencies and laboratories, public utility districts, rural electric cooperatives,
the Northwest Power and Conservation Council, the solar industry, local manufacturers and other
stakeholders as determined essential by the Center.
Reporting Requirements
The assessment must be completed and a report summarizing the findings prepared and delivered
to the energy and fiscal committees of the Legislature by December 15, 2006.
Appropriation: None.
Fiscal Note: Available for original bill.
Effective Date: The bill takes effect 90 days after adjournment of session in which bill is passed. However, the bill is null and void unless funded in the budget.