SENATE BILL REPORT
HB 2874



As Reported By Senate Committee On:
Transportation, February 27, 2006

Title: An act relating to design-build construction for transportation projects.

Brief Description: Modifying transportation project design-build provisions.

Sponsors: Representatives Murray, Ericksen, Jarrett, Wallace and Woods; by request of Department of Transportation.

Brief History: Passed House: 2/10/06, 98-0.

Committee Activity: Transportation: 2/20/06, 2/27/06 [DP, DNP].


SENATE COMMITTEE ON TRANSPORTATION

Majority Report: Do pass.Signed by Senators Haugen, Chair; Jacobsen, Vice Chair; Poulsen, Vice Chair; Benson, Ranking Minority Member; Berkey, Eide, Esser, Finkbeiner, Kastama, Mulliken, Oke, Sheldon, Spanel, Swecker and Weinstein.

Minority Report: Do not pass.Signed by Senator Benton.

Staff: Hayley Gamble (786-7452)

Background: Design-build construction is a contracting technique that allows the owner of a project to contract with a single entity for the design and construction of a project. Some construction work can often begin before final design is complete, providing opportunity for cost savings and expedited project delivery. Traditional design-bid-build contracts require design to be completed before the construction portion of the project is awarded.

Current law allows the Department of Transportation (DOT) to use design-build construction if construction activities are highly specialized, efficiency opportunities through the use of a single entity for design and construction are greater, or significant savings in project delivery time would be realized. A design-build project must also be over ten million dollars. This law expires on April 30, 2008.

DOT is currently using design-build on three large projects and plans to use this process on other upcoming projects.

Summary of Bill: The design-build construction expiration date of April 30, 2008, is removed, allowing DOT to continue using this provision.

DOT may also use the design-build process on up to five pilot projects costing between two and ten million dollars. DOT must evaluate these projects to determine if benefits are gained from using design-build on projects of this size.

Appropriation: None.

Fiscal Note: Available.

Committee/Commission/Task Force Created: No.

Effective Date: Ninety days after adjournment of session in which bill is passed.

Testimony For: This is a good bill. WSDOT needs all the mechanisms available to them to help deliver the current program.

Testimony Against: None.

Who Testified: PRO: Rick Smith, WSDOT; Duke Schawb, AGC.