SENATE BILL REPORT
HB 2874
As Reported By Senate Committee On:
Transportation, February 27, 2006
Title: An act relating to design-build construction for transportation projects.
Brief Description: Modifying transportation project design-build provisions.
Sponsors: Representatives Murray, Ericksen, Jarrett, Wallace and Woods; by request of Department of Transportation.
Brief History: Passed House: 2/10/06, 98-0.
Committee Activity: Transportation: 2/20/06, 2/27/06 [DP, DNP].
SENATE COMMITTEE ON TRANSPORTATION
Majority Report: Do pass.Signed by Senators Haugen, Chair; Jacobsen, Vice Chair; Poulsen, Vice Chair; Benson, Ranking Minority Member; Berkey, Eide, Esser, Finkbeiner, Kastama, Mulliken, Oke, Sheldon, Spanel, Swecker and Weinstein.
Minority Report: Do not pass.Signed by Senator Benton.
Staff: Hayley Gamble (786-7452)
Background: Design-build construction is a contracting technique that allows the owner of a
project to contract with a single entity for the design and construction of a project. Some
construction work can often begin before final design is complete, providing opportunity for cost
savings and expedited project delivery. Traditional design-bid-build contracts require design to
be completed before the construction portion of the project is awarded.
Current law allows the Department of Transportation (DOT) to use design-build construction if
construction activities are highly specialized, efficiency opportunities through the use of a single
entity for design and construction are greater, or significant savings in project delivery time would
be realized. A design-build project must also be over ten million dollars. This law expires on
April 30, 2008.
DOT is currently using design-build on three large projects and plans to use this process on other
upcoming projects.
Summary of Bill: The design-build construction expiration date of April 30, 2008, is removed,
allowing DOT to continue using this provision.
DOT may also use the design-build process on up to five pilot projects costing between two and
ten million dollars. DOT must evaluate these projects to determine if benefits are gained from
using design-build on projects of this size.
Appropriation: None.
Fiscal Note: Available.
Committee/Commission/Task Force Created: No.
Effective Date: Ninety days after adjournment of session in which bill is passed.
Testimony For: This is a good bill. WSDOT needs all the mechanisms available to them to help deliver the current program.
Testimony Against: None.
Who Testified: PRO: Rick Smith, WSDOT; Duke Schawb, AGC.