HOUSE BILL 2403
_____________________________________________
State of Washington59th Legislature2006 Regular Session

By Representatives Morris, B. Sullivan and Miloscia

Prefiled 12/30/2005. Read first time 01/09/2006.   Referred to Committee on Technology, Energy & Communications.



     AN ACT Relating to promoting distributive generation; amending RCW 80.60.010, 80.60.020, and 80.60.030; and adding a new section to chapter 80.60 RCW.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

Sec. 1   RCW 80.60.010 and 2000 c 158 s 1 are each amended to read as follows:
     The definitions in this section apply throughout this chapter unless the context clearly indicates otherwise.
     (1) "Commission" means the utilities and transportation commission.
     (2) "Customer-generator" means a user of a net metering system.
     (3) "Distributive generation" means generation below five hundred kilowatts that is connected to the distribution transmission of an electric utility.
     (4)
"Electrical company" means a company owned by investors that meets the definition of RCW 80.04.010.
     (((4))) (5) "Electric cooperative" means a cooperative or association organized under chapter 23.86 or 24.06 RCW.
     (((5))) (6) "Electric utility" means any electrical company, public utility district, irrigation district, port district, electric cooperative, or municipal electric utility that is engaged in the business of distributing electricity to retail electric customers in the state.
     (((6))) (7) "Irrigation district" means an irrigation district under chapter 87.03 RCW.
     (((7))) (8) "Municipal electric utility" means a city or town that owns or operates an electric utility authorized by chapter 35.92 RCW.
     (((8))) (9) "Net metering" means measuring the difference between the electricity supplied by an electric utility and the electricity generated by a customer-generator that is fed back to the electric utility over the applicable billing period.
     (((9))) (10) "Net metering system" means a fuel cell or a facility for the production of electrical energy that:
     (a) Uses as its fuel either solar, wind, or hydropower;
     (b) Has a generating capacity of not more than ((twenty-five)) five hundred kilowatts;
     (c) Is located on the customer-generator's premises;
     (d) Operates in parallel with the electric utility's transmission and distribution facilities; and
     (e) Is intended primarily to offset part or all of the customer-generator's requirements for electricity.
     (((10))) (11) "Port district" means a port district within which an industrial development district has been established as authorized by Title 53 RCW.
     (((11))) (12) "Public utility district" means a district authorized by chapter 54.04 RCW.

Sec. 2   RCW 80.60.020 and 2000 c 158 s 2 are each amended to read as follows:
     An electric utility:
     (1) Shall offer to make net metering available to eligible customers-generators on a first-come, first-served basis until the cumulative generating capacity of net metering systems equals ((0.1)) one percent of the utility's peak demand during 1996, of which not less than ((0.05)) 0.5 percent shall be attributable to net metering systems that use as its fuel either solar, wind, or hydropower;
     (2) Shall allow net metering systems to be interconnected if:
     (a) By January 2, 2008, the generating capacity is less than one hundred kilowatts; or
     (b) By January 2, 2010, the generating capacity is less than three hundred kilowatts; or
     (c) After January 1, 2010, the generating capacity is less than three hundred kilowatts, unless the net metering system involves three phase power lines, in which case generating capacity shall be allowed up to five hundred kilowatts;
     (3)
Shall allow net metering systems to be interconnected using a standard kilowatt-hour meter capable of registering the flow of electricity in two directions, unless the commission, in the case of an electrical company, or the appropriate governing body, in the case of other electric utilities, determines, after appropriate notice and opportunity for comment:
     (a) That the use of additional metering equipment to monitor the flow of electricity in each direction is necessary and appropriate for the interconnection of net metering systems, after taking into account the benefits and costs of purchasing and installing additional metering equipment; and
     (b) How the cost of purchasing and installing an additional meter is to be allocated between the customer-generator and the utility;
     (((3))) (4) Shall charge the customer-generator a minimum monthly fee that is the same as other customers of the electric utility in the same rate class, but shall not charge the customer-generator any additional standby, capacity, interconnection, or other fee or charge unless the commission, in the case of an electrical company, or the appropriate governing body, in the case of other electric utilities, determines, after appropriate notice and opportunity for comment that:
     (a) The electric utility will incur direct costs associated with interconnecting or administering net metering systems that exceed any offsetting benefits associated with these systems; and
     (b) Public policy is best served by imposing these costs on the customer-generator rather than allocating these costs among the utility's entire customer base.

Sec. 3   RCW 80.60.030 and 1998 c 318 s 4 are each amended to read as follows:
     Consistent with the other provisions of this chapter, the net energy measurement must be calculated in the following manner:
     (1) The electric utility shall measure the net electricity produced or consumed during the billing period, in accordance with normal metering practices.
     (2) If the electricity supplied by the electric utility exceeds the electricity generated by the customer-generator and fed back to the electric utility during the billing period, the customer-generator shall be billed for the net electricity supplied by the electric utility, in accordance with normal metering practices.
     (3) If electricity generated by the customer-generator exceeds the electricity supplied by the electric utility, the customer-generator:
     (a) Shall be billed for the appropriate customer charges for that billing period, in accordance with RCW 80.60.020; and
     (b) Shall be credited for the excess kilowatt-hours generated during the billing period, with this kilowatt-hour credit appearing on the bill for the following billing period.
     ((At the beginning)) On April 30th of each calendar year, any remaining unused kilowatt-hour credit accumulated during the previous year shall be granted to the electric utility, without any compensation to the customer-generator.

NEW SECTION.  Sec. 4   A new section is added to chapter 80.60 RCW to read as follows:
     (1) A utility may solicit power purchase agreements to sell the qualifying facilities output to any other Washington utility. The local utility has the option to match the proposed price or must wheel the qualifying facility's output at a flat rate price not to exceed ten percent of the value of the power actually delivered under the contracted price. For purposes of this section, a qualifying facility is any generation facility having five hundred kilowatt capacity or less.
     (2) A utility is exempt from this section if one percent of its power originates from distributive generation.
     (3) If a utility is exempt under subsection (2) of this section, the utility must report their exemption to the relevant standing committees in the legislature.
     (4) If one or more utilities are found to be exempt under this section, the legislature may review the generation thresholds contained in this section for potential modification.

--- END ---