BILL REQ. #: H-3925.1
State of Washington | 59th Legislature | 2006 Regular Session |
Read first time 01/23/2006. Referred to Committee on Local Government.
AN ACT Relating to the role of fire protection districts and water-sewer districts in growth management planning; and amending RCW 36.70A.030, 36.70A.110, 36.70A.150, 36.70A.210, and 36.70A.350.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
Sec. 1 RCW 36.70A.030 and 2005 c 423 s 2 are each amended to read
as follows:
Unless the context clearly requires otherwise, the definitions in
this section apply throughout this chapter.
(1) "Adopt a comprehensive land use plan" means to enact a new
comprehensive land use plan or to update an existing comprehensive land
use plan.
(2) "Agricultural land" means land primarily devoted to the
commercial production of horticultural, viticultural, floricultural,
dairy, apiary, vegetable, or animal products or of berries, grain, hay,
straw, turf, seed, Christmas trees not subject to the excise tax
imposed by RCW 84.33.100 through 84.33.140, finfish in upland
hatcheries, or livestock, and that has long-term commercial
significance for agricultural production.
(3) "City" means any city or town, including a code city.
(4) "Comprehensive land use plan," "comprehensive plan," or "plan"
means a generalized coordinated land use policy statement of the
governing body of a county or city that is adopted pursuant to this
chapter.
(5) "Critical areas" include the following areas and ecosystems:
(a) Wetlands; (b) areas with a critical recharging effect on aquifers
used for potable water; (c) fish and wildlife habitat conservation
areas; (d) frequently flooded areas; and (e) geologically hazardous
areas.
(6) "Department" means the department of community, trade, and
economic development.
(7) "Development regulations" or "regulation" means the controls
placed on development or land use activities by a county or city,
including, but not limited to, zoning ordinances, critical areas
ordinances, shoreline master programs, official controls, planned unit
development ordinances, subdivision ordinances, and binding site plan
ordinances together with any amendments thereto. A development
regulation does not include a decision to approve a project permit
application, as defined in RCW 36.70B.020, even though the decision may
be expressed in a resolution or ordinance of the legislative body of
the county or city.
(8) "Forest land" means land primarily devoted to growing trees for
long-term commercial timber production on land that can be economically
and practically managed for such production, including Christmas trees
subject to the excise tax imposed under RCW 84.33.100 through
84.33.140, and that has long-term commercial significance. In
determining whether forest land is primarily devoted to growing trees
for long-term commercial timber production on land that can be
economically and practically managed for such production, the following
factors shall be considered: (a) The proximity of the land to urban,
suburban, and rural settlements; (b) surrounding parcel size and the
compatibility and intensity of adjacent and nearby land uses; (c) long-term local economic conditions that affect the ability to manage for
timber production; and (d) the availability of public facilities and
services conducive to conversion of forest land to other uses.
(9) "Geologically hazardous areas" means areas that because of
their susceptibility to erosion, sliding, earthquake, or other
geological events, are not suited to the siting of commercial,
residential, or industrial development consistent with public health or
safety concerns.
(10) "Long-term commercial significance" includes the growing
capacity, productivity, and soil composition of the land for long-term
commercial production, in consideration with the land's proximity to
population areas, and the possibility of more intense uses of the land.
(11) "Minerals" include gravel, sand, and valuable metallic
substances.
(12) "Public facilities" include streets, roads, highways,
sidewalks, street and road lighting systems, traffic signals, domestic
water systems, storm and sanitary sewer systems, parks and recreational
facilities, and schools.
(13) "Public services" include fire protection and suppression,
water supply, sanitary sewer service, law enforcement, public health,
education, recreation, environmental protection, and other governmental
services.
(14) "Special district" means fire protection districts and water-sewer districts.
(15) "Recreational land" means land so designated under RCW
36.70A.1701 and that, immediately prior to this designation, was
designated as agricultural land of long-term commercial significance
under RCW 36.70A.170. Recreational land must have playing fields and
supporting facilities existing before July 1, 2004, for sports played
on grass playing fields.
(((15))) (16) "Rural character" refers to the patterns of land use
and development established by a county in the rural element of its
comprehensive plan:
(a) In which open space, the natural landscape, and vegetation
predominate over the built environment;
(b) That foster traditional rural lifestyles, rural-based
economies, and opportunities to both live and work in rural areas;
(c) That provide visual landscapes that are traditionally found in
rural areas and communities;
(d) That are compatible with the use of the land by wildlife and
for fish and wildlife habitat;
(e) That reduce the inappropriate conversion of undeveloped land
into sprawling, low-density development;
(f) That generally do not require the extension of urban
governmental services; and
(g) That are consistent with the protection of natural surface
water flows and ground water and surface water recharge and discharge
areas.
(((16))) (17) "Rural development" refers to development outside the
urban growth area and outside agricultural, forest, and mineral
resource lands designated pursuant to RCW 36.70A.170. Rural
development can consist of a variety of uses and residential densities,
including clustered residential development, at levels that are
consistent with the preservation of rural character and the
requirements of the rural element. Rural development does not refer to
agriculture or forestry activities that may be conducted in rural
areas.
(((17))) (18) "Rural governmental services" or "rural services"
include those public services and public facilities historically and
typically delivered at an intensity usually found in rural areas, and
may include domestic water systems, fire and police protection
services, transportation and public transit services, and other public
utilities associated with rural development and normally not associated
with urban areas. Rural services do not include storm or sanitary
sewers, except as otherwise authorized by RCW 36.70A.110(4).
(((18))) (19) "Urban growth" refers to growth that makes intensive
use of land for the location of buildings, structures, and impermeable
surfaces to such a degree as to be incompatible with the primary use of
land for the production of food, other agricultural products, or fiber,
or the extraction of mineral resources, rural uses, rural development,
and natural resource lands designated pursuant to RCW 36.70A.170. A
pattern of more intensive rural development, as provided in RCW
36.70A.070(5)(d), is not urban growth. When allowed to spread over
wide areas, urban growth typically requires urban governmental
services. "Characterized by urban growth" refers to land having urban
growth located on it, or to land located in relationship to an area
with urban growth on it as to be appropriate for urban growth.
(((19))) (20) "Urban growth areas" means those areas designated by
a county pursuant to RCW 36.70A.110.
(((20))) (21) "Urban governmental services" or "urban services"
include those public services and public facilities at an intensity
historically and typically provided in cities or by special districts,
specifically including storm water systems and sanitary sewer systems,
domestic water systems, street cleaning services, fire and police
protection services, public transit services, and other public
utilities associated with urban areas and normally not associated with
rural areas.
(((21))) (22) "Wetland" or "wetlands" means areas that are
inundated or saturated by surface water or ground water at a frequency
and duration sufficient to support, and that under normal circumstances
do support, a prevalence of vegetation typically adapted for life in
saturated soil conditions. Wetlands generally include swamps, marshes,
bogs, and similar areas. Wetlands do not include those artificial
wetlands intentionally created from nonwetland sites, including, but
not limited to, irrigation and drainage ditches, grass-lined swales,
canals, detention facilities, wastewater treatment facilities, farm
ponds, and landscape amenities, or those wetlands created after July 1,
1990, that were unintentionally created as a result of the construction
of a road, street, or highway. Wetlands may include those artificial
wetlands intentionally created from nonwetland areas created to
mitigate conversion of wetlands.
Sec. 2 RCW 36.70A.110 and 2004 c 206 s 1 are each amended to read
as follows:
(1) Each county that is required or chooses to plan under RCW
36.70A.040 shall designate an urban growth area or areas within which
urban growth shall be encouraged and outside of which growth can occur
only if it is not urban in nature. Each city that is located in such
a county shall be included within an urban growth area. An urban
growth area may include more than a single city. An urban growth area
may include territory that is located outside of a city only if such
territory already is characterized by urban growth whether or not the
urban growth area includes a city, or is adjacent to territory already
characterized by urban growth, or is a designated new fully contained
community as defined by RCW 36.70A.350.
(2) Based upon the growth management population projection made for
the county by the office of financial management, the county and each
city within the county shall include areas and densities sufficient to
permit the urban growth that is projected to occur in the county or
city for the succeeding twenty-year period, except for those urban
growth areas contained totally within a national historical reserve.
Each urban growth area shall permit urban densities and shall
include greenbelt and open space areas. In the case of urban growth
areas contained totally within a national historical reserve, the city
may restrict densities, intensities, and forms of urban growth as
determined to be necessary and appropriate to protect the physical,
cultural, or historic integrity of the reserve. An urban growth area
determination may include a reasonable land market supply factor and
shall permit a range of urban densities and uses. In determining this
market factor, cities and counties may consider local circumstances.
Cities and counties have discretion in their comprehensive plans to
make many choices about accommodating growth.
Within one year of July 1, 1990, each county that as of June 1,
1991, was required or chose to plan under RCW 36.70A.040, shall begin
consulting with each city located within its boundaries and each city
shall propose the location of an urban growth area. Within sixty days
of the date the county legislative authority of a county adopts its
resolution of intention or of certification by the office of financial
management, all other counties that are required or choose to plan
under RCW 36.70A.040 shall begin this consultation with each city
located within its boundaries. The county shall attempt to reach
agreement with each city on the location of an urban growth area within
which the city is located. If such an agreement is not reached with
each city located within the urban growth area, the county shall
justify in writing why it so designated the area an urban growth area.
A city may object formally with the department over the designation of
the urban growth area within which it is located. Where appropriate,
the department shall attempt to resolve the conflicts, including the
use of mediation services.
(3) Urban growth should be located first in areas already
characterized by urban growth that have adequate existing public
facility and service capacities to serve such development, second in
areas already characterized by urban growth that will be served
adequately by a combination of both existing public facilities and
services and any additional needed public facilities and services that
are provided by either public or private sources, and third in the
remaining portions of the urban growth areas. Urban growth may also be
located in designated new fully contained communities as defined by RCW
36.70A.350.
(4) In general, cities and special districts are the units of local
government most appropriate to provide urban governmental services. In
general, it is not appropriate that urban governmental services be
extended to or expanded in rural areas except in those limited
circumstances shown to be necessary to protect basic public health and
safety and the environment and when such services are financially
supportable at rural densities and do not permit urban development.
(5) On or before October 1, 1993, each county that was initially
required to plan under RCW 36.70A.040(1) shall adopt development
regulations designating interim urban growth areas under this chapter.
Within three years and three months of the date the county legislative
authority of a county adopts its resolution of intention or of
certification by the office of financial management, all other counties
that are required or choose to plan under RCW 36.70A.040 shall adopt
development regulations designating interim urban growth areas under
this chapter. Adoption of the interim urban growth areas may only
occur after public notice; public hearing; and compliance with the
state environmental policy act, chapter 43.21C RCW, and RCW 36.70A.110.
Such action may be appealed to the appropriate growth management
hearings board under RCW 36.70A.280. Final urban growth areas shall be
adopted at the time of comprehensive plan adoption under this chapter.
(6) Each county shall include designations of urban growth areas in
its comprehensive plan.
(7) An urban growth area designated in accordance with this section
may include within its boundaries urban service areas or potential
annexation areas designated for specific cities or towns within the
county.
Sec. 3 RCW 36.70A.150 and 1991 c 322 s 23 are each amended to
read as follows:
Each county and city that is required or chooses to prepare a
comprehensive land use plan under RCW 36.70A.040 shall identify lands
useful for public purposes such as utility corridors, transportation
corridors, landfills, sewage treatment facilities, storm water
management facilities, recreation, schools, and other public uses. The
county shall work with the state ((and the)), cities, and special
districts within its borders to identify areas of shared need for
public facilities. The jurisdictions within the county shall prepare
a prioritized list of lands necessary for the identified public uses
including an estimated date by which the acquisition will be needed.
The respective capital acquisition budgets for each jurisdiction
shall reflect the jointly agreed upon priorities and time schedule.
Sec. 4 RCW 36.70A.210 and 1998 c 171 s 4 are each amended to read
as follows:
(1) The legislature recognizes that counties are regional
governments within their boundaries, and cities are primary providers
of urban governmental services within urban growth areas. For the
purposes of this section, a "county-wide planning policy" is a written
policy statement or statements used solely for establishing a county-wide framework from which county and city comprehensive plans are
developed and adopted pursuant to this chapter. This framework shall
ensure that city ((and)), county, and special district comprehensive
plans are consistent as required in RCW 36.70A.100. Nothing in this
section shall be construed to alter the land-use powers of cities.
(2) The legislative authority of a county that plans under RCW
36.70A.040 shall adopt a county-wide planning policy in cooperation
with the cities and consultation with special districts located in
whole or in part within the county as follows:
(a) No later than sixty calendar days from July 16, 1991, the
legislative authority of each county that as of June 1, 1991, was
required or chose to plan under RCW 36.70A.040 shall convene a meeting
with representatives of each city and special district located within
the county for the purpose of establishing a collaborative process that
will provide a framework for the adoption of a county-wide planning
policy. In other counties that are required or choose to plan under
RCW 36.70A.040, this meeting shall be convened no later than sixty days
after the date the county adopts its resolution of intention or was
certified by the office of financial management.
(b) The process and framework for adoption of a county-wide
planning policy specified in (a) of this subsection shall determine the
manner in which the county and the cities agree to all procedures and
provisions including but not limited to desired planning policies,
deadlines, ratification of final agreements and demonstration thereof,
and financing, if any, of all activities associated therewith.
(c) If a county fails for any reason to convene a meeting with
representatives of cities and special districts as required in (a) of
this subsection, the governor may immediately impose any appropriate
sanction or sanctions on the county from those specified under RCW
36.70A.340.
(d) If there is no agreement by October 1, 1991, in a county that
was required or chose to plan under RCW 36.70A.040 as of June 1, 1991,
or if there is no agreement within one hundred twenty days of the date
the county adopted its resolution of intention or was certified by the
office of financial management in any other county that is required or
chooses to plan under RCW 36.70A.040, the governor shall first inquire
of the jurisdictions as to the reason or reasons for failure to reach
an agreement. If the governor deems it appropriate, the governor may
immediately request the assistance of the department of community,
trade, and economic development to mediate any disputes that preclude
agreement. If mediation is unsuccessful in resolving all disputes that
will lead to agreement, the governor may impose appropriate sanctions
from those specified under RCW 36.70A.340 on the county, city, ((or))
cities, or special district for failure to reach an agreement as
provided in this section. The governor shall specify the reason or
reasons for the imposition of any sanction.
(e) No later than July 1, 1992, the legislative authority of each
county that was required or chose to plan under RCW 36.70A.040 as of
June 1, 1991, or no later than fourteen months after the date the
county adopted its resolution of intention or was certified by the
office of financial management the county legislative authority of any
other county that is required or chooses to plan under RCW 36.70A.040,
shall adopt a county-wide planning policy according to the process
provided under this section and that is consistent with the agreement
pursuant to (b) of this subsection, and after holding a public hearing
or hearings on the proposed county-wide planning policy.
(f) In a county adopting or having a county-wide planning policy,
the county shall include special districts in the collaborative process
required by this subsection in each scheduled comprehensive revision of
its policy.
(g) All comprehensive revisions of a county-wide planning policy
under this section shall include representatives of each special
district located within the county.
(3) A county-wide planning policy shall at a minimum, address the
following:
(a) Policies to implement RCW 36.70A.110;
(b) Policies for promotion of contiguous and orderly development
and provision of urban services to such development;
(c) Policies for siting public capital facilities of a county-wide
or statewide nature, including transportation facilities of statewide
significance as defined in RCW 47.06.140;
(d) Policies for county-wide transportation facilities and
strategies;
(e) Policies that consider the need for affordable housing, such as
housing for all economic segments of the population and parameters for
its distribution;
(f) Policies for joint county and city planning within urban growth
areas;
(g) Policies for county-wide economic development and employment;
and
(h) An analysis of the fiscal impact.
(4) Federal agencies and Indian tribes may participate in and
cooperate with the county-wide planning policy adoption process.
Adopted county-wide planning policies shall be adhered to by state
agencies.
(5) Failure to adopt a county-wide planning policy that meets the
requirements of this section may result in the imposition of a sanction
or sanctions on a county or city within the county, as specified in RCW
36.70A.340. In imposing a sanction or sanctions, the governor shall
specify the reasons for failure to adopt a county-wide planning policy
in order that any imposed sanction or sanctions are fairly and
equitably related to the failure to adopt a county-wide planning
policy.
(6) Cities, special districts, and the governor may appeal an
adopted county-wide planning policy to the growth management hearings
board within sixty days of the adoption of the county-wide planning
policy.
(7) Multicounty planning policies shall be adopted by two or more
counties, each with a population of four hundred fifty thousand or
more, with contiguous urban areas and may be adopted by other counties,
according to the process established under this section or other
processes agreed to among the counties and cities within the affected
counties throughout the multicounty region.
Sec. 5 RCW 36.70A.350 and 1991 sp.s. c 32 s 16 are each amended
to read as follows:
A county required or choosing to plan under RCW 36.70A.040 may
establish a process as part of its urban growth areas, that are
designated under RCW 36.70A.110, for reviewing proposals to authorize
new fully contained communities located outside of the initially
designated urban growth areas.
(1) A new fully contained community may be approved in a county
planning under this chapter if criteria including but not limited to
the following are met:
(a) New infrastructure, including water systems, storm water
systems, and sanitary sewer systems, is provided for and impact fees
are established consistent with the requirements of RCW 82.02.050;
(b) Transit-oriented site planning and traffic demand management
programs are implemented;
(c) Buffers are provided between the new fully contained
communities and adjacent urban development;
(d) A mix of uses is provided to offer jobs, housing, and services
to the residents of the new community;
(e) Affordable housing is provided within the new community for a
broad range of income levels;
(f) Environmental protection has been addressed and provided for;
(g) Development regulations are established to ensure urban growth
will not occur in adjacent nonurban areas;
(h) Provision is made to mitigate impacts on designated
agricultural lands, forest lands, and mineral resource lands;
(i) The plan for the new fully contained community is consistent
with the development regulations established for the protection of
critical areas by the county pursuant to RCW 36.70A.170.
(2) New fully contained communities may be approved outside
established urban growth areas only if a county reserves a portion of
the twenty-year population projection and offsets the urban growth area
accordingly for allocation to new fully contained communities that meet
the requirements of this chapter. Any county electing to establish a
new community reserve shall do so no more often than once every five
years as a part of the designation or review of urban growth areas
required by this chapter. The new community reserve shall be allocated
on a project-by-project basis, only after specific project approval
procedures have been adopted pursuant to this chapter as a development
regulation. When a new community reserve is established, urban growth
areas designated pursuant to this chapter shall accommodate the
unreserved portion of the twenty-year population projection.
Final approval of an application for a new fully contained
community shall be considered an adopted amendment to the comprehensive
plan prepared pursuant to RCW 36.70A.070 designating the new fully
contained community as an urban growth area.